πŸ‡ΊπŸ‡Έ U.S. EIA data (>10MW)

Latest U.S. EIA report from 2025-05
operation πŸ—οΈ πŸ’»
Projects count 284 152 256
Total πŸ”‹ battery power in GW 24.3 20.2 47.0
πŸ—οΈ = construction; πŸ’» = planning

Monthly big battery changes from U.S. EIA reports


2025-05

New projects (15):
400 MW - planning - georgia - Pepper Hammock Solar and Storage - 68367
300 MW - planning - nevada - Vitex Storage - 68813
180 MW - planning - texas - Brazos River BESS LLC - 68814
150 MW - construction - texas - Chillingham Storage - 68842
150 MW - construction - texas - Bocanova Energy Storage - 68879
150 MW - construction - new mexico - Santa Teresa Solar - 68866
100 MW - construction - texas - Hermes Storage BESS - 68852
52 MW - construction - california - Lithium BESS - 68848
50 MW - construction - new mexico - Shallow Basket - 68868
43 MW - planning - texas - Wildcat Ranch Energy Storage - 68877
32 MW - planning - north carolina - Black Walnut Solar, LLC - 66363
32 MW - planning - north carolina - Timber Mill Solar - 68871
32 MW - planning - north carolina - Panther Branch Solar, LLC - 66385
28 MW - planning - north carolina - Robeson Solar I - 68043
13 MW - construction - texas - Inertia Energy Storage - 68874

Disappeared projects (6):
151 MW - cancelled - texas - Augite Storage - 68164
100 MW - cancelled - nevada - Cooper Canyon Renewable Energy - 68017
51 MW - cancelled - texas - Kobernat Solar and Storage - 68169
50 MW - cancelled - utah - Hornshadow Solar II, LLC - 67511
30 MW - cancelled - texas - Hooper Solar and Storage - 68167
25 MW - cancelled - utah - Hornshadow Solar, LLC - 67497

Updated projects (72):

500 MW - construction - california - Bellefield Solar and Energy Storage Farm - 64210
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (V) Under construction, more than 50 percent complete

300 MW - operation - arizona - Sun Streams 4 - 67291
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

250 MW - construction - arizona - Beehive Energy Storage - 67184
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

220 MW - construction - michigan - Trenton Channel Energy Center - 67759
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

200 MW - operation - indiana - Pike County Energy Storage - 66881
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

200 MW - construction - arizona - Flatland Storage - 68529
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

150 MW - construction - texas - Blue Summit II Storage, LLC - 68456
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

150 MW - construction - texas - Roadrunner Crossing Energy Storage LLC - 68460
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - texas - Burksol Energy Storage - 67968
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2025-05 -> 2025-03 accelerated by 2 months

100 MW - construction - new mexico - Quail Ranch Solar and BESS - 67204
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

100 MW - construction - texas - Seven Flags BESS LLC - 66689
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

97 MW - operation - california - Acid BESS - 66659
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

166 MW - planning - idaho - Hemmingway BESS - 66325
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

67 MW - operation - arizona - Yuma Solar + Storage - 67321
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

40 MW - operation - florida - Lake Mabel Solar and Battery Storage - 66128
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation
  date: 2025-04 -> 2025-03 accelerated by 1 month

166 MW - planning - idaho - Hemmingway BESS - 66325
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

30 MW - operation - hawaii - Hale Kuawehi Solar Hybrid - 62529
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

10 MW - operation - colorado - High Mesa CO - 67323
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

300 MW - planning - nevada - Robinson Solar - 67819
  date: 2029-01 -> 2029-12 delayed by 11 months
  mw: 1000 -> 300

400 MW - construction - california - Kola Energy Center - 67680
  date: 2025-06 -> 2025-07 delayed by 1 month

213 MW - construction - arizona - Serrano - 67503
  date: 2025-06 -> 2025-04 accelerated by 2 months

200 MW - construction - arizona - Roadrunner Reserve Phase 1 - 67905
  date: 2025-10 -> 2025-06 accelerated by 4 months

160 MW - construction - texas - Lumina Solar Project - 65645 Megapack
  date: 2025-03 -> 2025-04 delayed by 1 month

160 MW - construction - texas - Lumina II Solar Project - 65644 Megapack
  date: 2025-03 -> 2025-05 delayed by 2 months

160 MW - construction - texas - IP Radian, LLC - 64859 Megapack
  date: 2025-03 -> 2025-05 delayed by 2 months

150 MW - construction - california - Eland Solar & Storage Center, Phase 2 Hy - 61169 Megapack
  date: 2025-03 -> 2025-05 delayed by 2 months

126 MW - construction - california - AVEP BESS - 65591
  date: 2025-03 -> 2025-04 delayed by 1 month

400 MW - construction - california - Kola Energy Center - 67680
  date: 2025-06 -> 2025-07 delayed by 1 month

200 MW - construction - arizona - Westwing - 67855
  date: 2025-03 -> 2025-04 delayed by 1 month

113 MW - construction - arizona - Sierra Pinta BESS - 67973
  date: 2025-06 -> 2025-07 delayed by 1 month

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2025-04 -> 2025-05 delayed by 1 month

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2025-04 -> 2025-05 delayed by 1 month

103 MW - construction - texas - Bright Arrow Solar, LLC - 66688
  date: 2025-04 -> 2025-05 delayed by 1 month

100 MW - construction - texas - Bexar ESS - 66400
  date: 2025-05 -> 2025-06 delayed by 1 month

100 MW - construction - california - Pome BESS - 67299
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2025-03 -> 2025-06 delayed by 3 months

99 MW - construction - california - Electrolyte BESS - 66661
  date: 2025-04 -> 2025-05 delayed by 1 month

99 MW - construction - california - Lead BESS 1 - 66660
  date: 2025-04 -> 2025-07 delayed by 3 months

92 MW - construction - california - Northern Orchard Solar PV, LLC - 67039
  date: 2025-04 -> 2025-05 delayed by 1 month

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  entity name: RWE Renewables Americas, LLC -> Big Sky Wind, LLC
  date: 2025-03 -> 2025-05 delayed by 2 months

80 MW - construction - california - Shirk Energy Storage - 68494
  date: 2025-06 -> 2026-03 delayed by 9 months

75 MW - construction - new mexico - Milagro Solar I - 67528
  date: 2025-10 -> 2025-09 accelerated by 1 month

65 MW - construction - texas - Liberty Hybrid Solar and Storage Project - 67867
  date: 2025-03 -> 2025-04 delayed by 1 month

88 MW - construction - california - Chaparral Springs - 64864
  date: 2025-03 -> 2025-04 delayed by 1 month

50 MW - construction - tennessee - Ridgely Energy Farm - 65445
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2025-03 -> 2025-05 delayed by 2 months

88 MW - construction - california - Chaparral Springs - 64864
  date: 2025-03 -> 2025-04 delayed by 1 month

32 MW - construction - california - Lead BESS 2 - 66662
  date: 2025-04 -> 2025-07 delayed by 3 months

23 MW - planning - california - Solar Star 3 - 68240
  date: 2025-09 -> 2025-10 delayed by 1 month

23 MW - planning - california - Solar Star 4 - 68241
  date: 2025-09 -> 2025-10 delayed by 1 month

16 MW - construction - california - BCE Seal Beach - 68023
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2025-05 -> 2025-07 delayed by 2 months

15 MW - construction - new york - Elevate Arthur Kill - 66785
  date: 2025-06 -> 2025-09 delayed by 3 months

10 MW - construction - california - Hecate Energy Desert Storage 1 LLC - 65635
  date: 2025-03 -> 2025-04 delayed by 1 month

10 MW - construction - california - Carris Storage I - 65733
  date: 2025-03 -> 2025-04 delayed by 1 month

10 MW - construction - california - Santee BESS - 67118
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2025-04 -> 2025-06 delayed by 2 months

10 MW - planning - texas - Cedar Hill ESS - 67570
  date: 2026-06 -> 2030-06 delayed by 48 months

1200 MW - planning - washington - Hop Hill Solar Generation and BESS - 68342
  mw: 1400 -> 1200

300 MW - construction - arizona - Papago Energy Storage - 66779
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

299 MW - planning - new york - NISA Electric Generation Project - 61331
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (T) Regulatory approvals received. Not under construction

200 MW - construction - california - Big Rock Solar Farm - 64636
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

185 MW - construction - arizona - McFarland C - 67498
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

170 MW - construction - arizona - Scatter Wash 1 - 67454 Megapack
  entity id: 64778 -> 67092
  entity name: Strata Manager, LLC -> Scatter Wash Energy Storage, LLC

150 MW - construction - arizona - Harquahala 2 - 67474
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

150 MW - construction - texas - Cartwheel 1 - Storage, LLC - 68513
  entity name: RWE Renewables Americas, LLC -> Big Sky Wind, LLC

150 MW - construction - texas - Crowned Heron 1 - Storage, LLC - 68499
  entity name: RWE Renewables Americas, LLC -> Big Sky Wind, LLC

150 MW - construction - texas - Crowned Heron 2 - Storage, LLC - 68500
  entity name: RWE Renewables Americas, LLC -> Big Sky Wind, LLC

130 MW - construction - new mexico - Carne Energy Storage, LLC - 67230
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

102 MW - construction - texas - Fort Duncan BESS - 67752
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

85 MW - construction - arizona - Scatter Wash 2 - 67455 Megapack
  entity id: 64778 -> 67092
  entity name: Strata Manager, LLC -> Scatter Wash Energy Storage, LLC

299 MW - planning - new york - NISA Electric Generation Project - 61331
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (T) Regulatory approvals received. Not under construction

60 MW - construction - texas - Lower Rio Energy Storage - 68496
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

60 MW - planning - new mexico - Sandia Energy Center - 68210
  plant producer type: IPP -> Electric Utility

50 MW - construction - california - Ventasso Energy Storage, LLC - 68509
  entity name: RWE Renewables Americas, LLC -> Big Sky Wind, LLC

35 MW - construction - california - Arrowleaf Solar and Storage - 67850
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2025-04

New projects (21):
1000 MW - planning - oregon - Deschutes Solar and BESS - 68763
650 MW - planning - california - Easley Solar - 68758
321 MW - planning - texas - Quantum BESS - 68759
321 MW - planning - texas - Quantum II BESS - 68761
650 MW - planning - california - Easley Solar - 68758
220 MW - construction - texas - Hidden Lakes Reliability Project - 68809
220 MW - planning - texas - Coke BESS - 68668
156 MW - planning - texas - Chimney Rock BESS - 68667
150 MW - planning - idaho - Boise Bench BESS - 68799
143 MW - planning - texas - Summerhill BESS - 68665
135 MW - planning - texas - Stonewall BESS - 68666
125 MW - planning - texas - Houston County BESS - 68671
100 MW - construction - texas - Tierra Seca - 68748
98 MW - planning - texas - Cannibal Draw Solar and Storage - 68738
75 MW - construction - california - Aratina Solar Center 1A - 68661
65 MW - construction - oklahoma - Minco II Energy Storage - 68802
50 MW - construction - arizona - Kingman Energy Storage - 68801
166 MW - planning - idaho - Hemmingway BESS - 66325
31 MW - planning - california - Sand Luis West - 68673
25 MW - planning - california - Chalan - 68672
20 MW - construction - florida - H L Culbreath Bayside Power Station - 7873

Disappeared projects (7):
150 MW - cancelled - ohio - Matador Solar - 68307
150 MW - cancelled - virginia - Twins Solar - 68311
150 MW - cancelled - ohio - Wolf Creek Solar - 68308
100 MW - cancelled - texas - Sandman Solar - 68304
90 MW - cancelled - virginia - Iris Solar - 68310
75 MW - cancelled - ohio - Springwater Solar, LLC - 65900
40 MW - cancelled - idaho - Black Mesa BESS - 66326

Updated projects (52):

240 MW - operation - california - Rexford Solar Farm - 64633
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

235 MW - construction - arizona - Roadrunner Solar and BESS - 67823
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - texas - Angelo Storage - 68146
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation
  date: 2025-03 -> 2025-02 accelerated by 1 month

100 MW - operation - texas - Great Kiskadee Storage - 68189
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

60 MW - operation - idaho - Franklin Battery Storage - 67183
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation
  date: 2025-03 -> 2025-02 accelerated by 1 month

14 MW - operation - michigan - Slocum Energy Storage - 67758
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

756 MW - planning - colorado - Sun Bear - 68261
  date: 2028-07 -> 2029-05 delayed by 10 months

304 MW - construction - texas - SMT Ironman Battery Storage Plant - 67737
  date: 2025-03 -> 2025-04 delayed by 1 month

300 MW - construction - california - Nighthawk Energy Storage, LLC - 65889 Megapack
  date: 2025-10 -> 2026-03 delayed by 5 months

300 MW - planning - arizona - Red Antelope Solar & Energy Storage Farm - 64208
  date: 2027-05 -> 2028-05 delayed by 12 months

250 MW - planning - texas - Rock N' Roll - 68583
  date: 2025-05 -> 2027-05 delayed by 24 months

299 MW - planning - new york - NISA Electric Generation Project - 61331
  status_verbose: (T) Regulatory approvals received. Not under construction -> (P) Planned for installation, but regulatory approvals not initiated
  date: 2026-03 -> 2027-06 delayed by 15 months

300 MW - construction - arizona - Atlas VII - 68322
  date: 2025-06 -> 2025-08 delayed by 2 months

160 MW - construction - texas - Lumina Solar Project - 65645 Megapack
  date: 2025-02 -> 2025-03 delayed by 1 month

150 MW - construction - texas - Myrtle Storage - 66913
  date: 2025-03 -> 2025-04 delayed by 1 month

150 MW - construction - texas - Danish Fields Storage - 66916
  date: 2025-03 -> 2025-05 delayed by 2 months

150 MW - construction - arizona - Atlas IX - 68324
  date: 2025-06 -> 2025-08 delayed by 2 months

150 MW - construction - arizona - Atlas BESS IV LLC - 68321
  date: 2025-06 -> 2026-06 delayed by 12 months

126 MW - construction - california - AVEP BESS - 65591
  date: 2025-02 -> 2025-03 delayed by 1 month

300 MW - construction - arizona - Atlas VII - 68322
  date: 2025-06 -> 2025-08 delayed by 2 months

117 MW - construction - california - Rosamond South 1 - 67764
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2025-07 -> 2025-08 delayed by 1 month

103 MW - construction - texas - Bright Arrow Solar, LLC - 66688
  date: 2025-03 -> 2025-04 delayed by 1 month

100 MW - planning - texas - Yaupon Solar Project (Hybrid) - 66216
  date: 2026-06 -> 2027-12 delayed by 18 months

99 MW - construction - california - Caballero - 68012
  date: 2025-02 -> 2025-04 delayed by 2 months

99 MW - construction - california - Electrolyte BESS - 66661
  date: 2025-02 -> 2025-04 delayed by 2 months

97 MW - operation - california - Acid BESS - 66659
  date: 2025-02 -> 2025-03 delayed by 1 month

92 MW - construction - california - Northern Orchard Solar PV, LLC - 67039
  date: 2025-03 -> 2025-04 delayed by 1 month

299 MW - planning - new york - NISA Electric Generation Project - 61331
  status_verbose: (T) Regulatory approvals received. Not under construction -> (P) Planned for installation, but regulatory approvals not initiated
  date: 2026-03 -> 2027-06 delayed by 15 months

67 MW - operation - arizona - Yuma Solar + Storage - 67321
  date: 2025-02 -> 2025-03 delayed by 1 month

65 MW - construction - california - San Jacinto Grid, LLC - 65657
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> (V) Under construction, more than 50 percent complete
  date: 2025-02 -> 2025-05 delayed by 3 months

60 MW - construction - texas - Bird Dog Energy Storage - 68495
  date: 2026-01 -> 2026-05 delayed by 4 months

88 MW - construction - california - Chaparral Springs - 64864
  date: 2025-02 -> 2025-03 delayed by 1 month

50 MW - construction - california - Ventasso Energy Storage, LLC - 68509
  date: 2025-09 -> 2025-11 delayed by 2 months

50 MW - planning - new mexico - Wildcat Solar Power Plant LLC - 64849
  date: 2026-12 -> 2027-12 delayed by 12 months

88 MW - construction - california - Chaparral Springs - 64864
  date: 2025-02 -> 2025-03 delayed by 1 month

35 MW - construction - california - Arrowleaf Solar and Storage - 67850
  date: 2025-04 -> 2025-09 delayed by 5 months

25 MW - cancelled - utah - Hornshadow Solar, LLC - 67497
  date: 2025-06 -> 2025-12 delayed by 6 months

23 MW - planning - california - Solar Star 3 - 68240
  date: 2025-08 -> 2025-09 delayed by 1 month

23 MW - planning - california - Solar Star 4 - 68241
  date: 2025-08 -> 2025-09 delayed by 1 month

20 MW - planning - indiana - Honey Creek Solar - 65821
  date: 2027-12 -> 2026-12 accelerated by 12 months

12 MW - planning - hawaii - KRS I Anahola Solar Hybrid - 58639
  date: 2025-12 -> 2026-03 delayed by 3 months

12 MW - planning - hawaii - KRS II Koloa Solar - 58640
  date: 2025-12 -> 2026-03 delayed by 3 months

10 MW - operation - colorado - High Mesa CO - 67323
  date: 2025-02 -> 2025-03 delayed by 1 month

10 MW - construction - texas - Grizzly Ridge Solar - 66410
  date: 2025-03 -> 2025-05 delayed by 2 months

400 MW - planning - oregon - Tualatin Battery Energy Storage System - 68299
  mw: 1200 -> 400

200 MW - construction - california - Big Rock Solar Farm - 64636
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

200 MW - construction - arizona - Flatland Storage - 68529
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (T) Regulatory approvals received. Not under construction

125 MW - construction - california - Aratina Solar Center 1B - 61167
  plant name: Aratina Solar Center 1 Hybrid -> Aratina Solar Center 1B

100 MW - construction - california - Pome BESS - 67299
  status_verbose: (V) Under construction, more than 50 percent complete -> (U) Under construction, less than or equal to 50 percent complete

100 MW - construction - new mexico - Quail Ranch Solar and BESS - 67204
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (T) Regulatory approvals received. Not under construction

50 MW - operation - mississippi - Golden Triangle - 64529
  plant name: OE_MS5 -> Golden Triangle

50 MW - planning - mississippi - Optimist - 68536
  plant name: OE_MS7 -> Optimist


2025-03

New projects (16):
300 MW - planning - kansas - Kingbird Solar Energy LLC - 68633
250 MW - planning - texas - Rock N' Roll - 68583
200 MW - construction - texas - Guajillo Energy Storage - 68613
200 MW - construction - texas - Pintail BESS - 68582
200 MW - planning - utah - Dominguez Energy Storage - 68596
200 MW - construction - texas - Mendoza Trail BESS - 68581
300 MW - planning - california - Key Energy Storage - 68461
150 MW - construction - texas - Headcamp BESS - 68580
125 MW - planning - kentucky - E W Brown - 1355
100 MW - construction - new mexico - Sky Ranch BESS II - 68617
100 MW - planning - texas - Dahlia Energy - 68604
65 MW - construction - oklahoma - Breckinridge Energy Storage - 68576
49 MW - construction - new mexico - Route 66 Energy Storage - 68616
40 MW - construction - oklahoma - Woodward Energy Storage - 68577
300 MW - planning - california - Key Energy Storage - 68461
31 MW - planning - missouri - James River Power Station - 2161

Disappeared projects (14):
300 MW - cancelled - new york - Hecate Grid Intrepid - 66911
200 MW - cancelled - new york - KCE NY 35, LLC - 67840
150 MW - cancelled - texas - Upton BESS 2 - 66303
150 MW - cancelled - illinois - Grey Fox Wind - 65939
150 MW - cancelled - texas - Crane 2 BESS 2 - 66300
150 MW - cancelled - texas - Uvalde 2 BESS 2 - 66305
100 MW - cancelled - new york - Clermont - 64236
100 MW - cancelled - texas - Alamo 3 BESS 2 - 66293
75 MW - cancelled - texas - Uvalde 2 BESS 1 - 66304
50 MW - cancelled - texas - Peeler Solar, LLC - 65932
300 MW - cancelled - new york - Hecate Grid Intrepid - 66911
40 MW - cancelled - indiana - Vermillion Rise Solar - 65935
20 MW - cancelled - pennsylvania - Northumberland Solar I - 67675
15 MW - cancelled - south carolina - Wolf Pit Branch Solar, LLC - 65437

Updated projects (89):

150 MW - construction - texas - Peregrine BESS 1 - 66301
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

150 MW - construction - texas - Peregrine BESS 2 - 66302
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - texas - Estonian Solar Project, LLC - 66872
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

100 MW - construction - texas - St Gall Energy Storage II - 68423
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

100 MW - construction - michigan - Tibbits Energy Storage - 68424
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

100 MW - construction - wisconsin - Grant County - 65007
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete
  date: 2025-04 -> 2025-08 delayed by 4 months

75 MW - construction - new mexico - Milagro Solar I - 67528
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (V) Under construction, more than 50 percent complete

75 MW - construction - wisconsin - Wood County - 65011
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete
  date: 2025-03 -> 2025-10 delayed by 7 months

56 MW - operation - indiana - Dunns Bridge II Solar - 67893
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

50 MW - operation - mississippi - Golden Triangle - 64529
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

400 MW - planning - texas - Brittlebush Solar and Battery Storage - 67895
  date: 2030-04 -> 2029-04 accelerated by 12 months

304 MW - construction - texas - SMT Ironman Battery Storage Plant - 67737
  date: 2025-01 -> 2025-03 delayed by 2 months

300 MW - operation - arizona - Sun Streams 4 - 67291
  date: 2025-06 -> 2025-03 accelerated by 3 months

300 MW - construction - california - Nighthawk Energy Storage, LLC - 65889 Megapack
  date: 2025-08 -> 2025-10 delayed by 2 months

300 MW - planning - nevada - Southern Bighorn Solar Hybrid - 63113
  date: 2027-05 -> 2028-05 delayed by 12 months

250 MW - planning - new mexico - Pasilla Solar and Battery Storage - 67897
  date: 2027-10 -> 2028-10 delayed by 12 months

240 MW - operation - california - Rexford Solar Farm - 64633
  date: 2025-01 -> 2025-02 delayed by 1 month

225 MW - planning - texas - Bramble Energy Center - 67767
  date: 2027-06 -> 2026-10 accelerated by 8 months

200 MW - construction - california - Peregrine Energy Storage LLC - 66286 Megapack
  date: 2025-03 -> 2025-04 delayed by 1 month

200 MW - planning - texas - Cumbia Energy Center - 67768
  date: 2027-05 -> 2027-09 delayed by 4 months

160 MW - construction - texas - Lumina Solar Project - 65645 Megapack
  date: 2025-01 -> 2025-02 delayed by 1 month

151 MW - planning - new york - NY2 Battery - 63584
  date: 2026-12 -> 2028-03 delayed by 15 months
  mw: 169 -> 151

150 MW - construction - texas - Danish Fields Storage - 66916
  date: 2025-02 -> 2025-03 delayed by 1 month

150 MW - construction - texas - Myrtle Storage - 66913
  date: 2025-02 -> 2025-03 delayed by 1 month

150 MW - construction - texas - Crowned Heron 1 - Storage, LLC - 68499
  date: 2025-07 -> 2025-08 delayed by 1 month

150 MW - planning - virginia - Prospect Power BESS - 68055
  date: 2026-03 -> 2026-02 accelerated by 1 month

150 MW - planning - virginia - May Solar - 68313
  date: 5028-05 -> 2028-05 accelerated by 36000 months

150 MW - construction - california - Trestles Grid LLC - 67229
  date: 2026-11 -> 2028-12 delayed by 25 months

150 MW - planning - georgia - Aragon Energy Storage - 66431
  date: 2027-04 -> 2029-04 delayed by 24 months

130 MW - construction - new mexico - Carne Energy Storage, LLC - 67230
  date: 2025-11 -> 2026-03 delayed by 4 months

400 MW - construction - california - Kola Energy Center - 67680
  date: 2025-05 -> 2025-06 delayed by 1 month

121 MW - planning - new york - Swiftsure - 64235
  date: 2027-11 -> 2030-11 delayed by 36 months

200 MW - construction - arizona - Westwing - 67855
  date: 2025-01 -> 2025-03 delayed by 2 months

113 MW - construction - california - Daggett 1 - 67931
  date: 2025-07 -> 2025-08 delayed by 1 month

100 MW - operation - texas - Great Kiskadee Storage - 68189
  date: 2025-01 -> 2025-02 delayed by 1 month

100 MW - operation - texas - Angelo Storage - 68146
  date: 2025-01 -> 2025-03 delayed by 2 months

100 MW - planning - texas - TX 14 Venus Mill Storage - 65788
  date: 2026-01 -> 2028-12 delayed by 35 months

99 MW - construction - california - Caballero - 68012
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2025-01 -> 2025-02 delayed by 1 month

92 MW - construction - california - Northern Orchard Solar PV, LLC - 67039
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2025-02 -> 2025-03 delayed by 1 month

166 MW - planning - idaho - Hemmingway BESS - 66325
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2025-02 -> 2025-03 delayed by 1 month

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2025-02 -> 2025-03 delayed by 1 month

79 MW - planning - new york - KCE NY 29, LLC - 66862
  date: 2026-03 -> 2028-03 delayed by 24 months
  mw: 150 -> 79

75 MW - construction - california - Hummingbird Energy Storage LLC - 65395
  date: 2025-03 -> 2025-05 delayed by 2 months

69 MW - construction - california - Lockhart Solar PV, LLC - 10444
  date: 2025-09 -> 2025-10 delayed by 1 month

67 MW - operation - arizona - Yuma Solar + Storage - 67321
  date: 2025-01 -> 2025-02 delayed by 1 month

60 MW - operation - idaho - Franklin Battery Storage - 67183
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2025-02 -> 2025-03 delayed by 1 month

59 MW - construction - california - Lockhart Solar PV II - 66699
  date: 2025-09 -> 2025-10 delayed by 1 month

55 MW - planning - texas - Eagle Springs Hybrid - 66341
  date: 2025-12 -> 2026-12 delayed by 12 months
  mw: 61 -> 55

88 MW - construction - california - Chaparral Springs - 64864
  date: 2025-01 -> 2025-02 delayed by 1 month

50 MW - construction - new mexico - TAG - 67710
  date: 2025-03 -> 2025-07 delayed by 4 months

50 MW - planning - new york - KCE NY 31, LLC - 67839
  date: 2027-05 -> 2027-12 delayed by 7 months

50 MW - planning - new york - KCE NY 30, LLC - 67838
  date: 2027-05 -> 2028-12 delayed by 19 months

45 MW - planning - connecticut - KCE CT 1, LLC - 66879
  date: 2028-10 -> 2030-04 delayed by 18 months
  mw: 105 -> 45

40 MW - cancelled - idaho - Black Mesa BESS - 66326
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2025-02 -> 2025-03 delayed by 1 month

40 MW - planning - illinois - Mulligan Solar, LLC - 65349
  date: 2025-07 -> 2026-02 delayed by 7 months

38 MW - planning - texas - Vernon Solar and Storage - 67934
  date: 2026-10 -> 2028-02 delayed by 16 months
  mw: 35 -> 38

88 MW - construction - california - Chaparral Springs - 64864
  date: 2025-01 -> 2025-02 delayed by 1 month

166 MW - planning - idaho - Hemmingway BESS - 66325
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2025-02 -> 2025-03 delayed by 1 month

25 MW - planning - washington - Arlington Battery Energy Storage System - 67669
  date: 2026-02 -> 2026-04 delayed by 2 months

23 MW - planning - california - Solar Star 3 - 68240
  date: 2025-07 -> 2025-08 delayed by 1 month

20 MW - planning - new york - KCE NY 10, LLC - 66682
  date: 2026-03 -> 2027-12 delayed by 21 months

20 MW - planning - indiana - Honey Creek Solar - 65821
  date: 2026-12 -> 2027-12 delayed by 12 months

20 MW - planning - new york - KCE NY 36, LLC - 67841
  date: 2027-12 -> 2029-05 delayed by 17 months
  mw: 150 -> 20

16 MW - construction - california - BCE Seal Beach - 68023
  date: 2025-04 -> 2025-05 delayed by 1 month

14 MW - operation - michigan - Slocum Energy Storage - 67758
  date: 2025-01 -> 2025-02 delayed by 1 month

10 MW - operation - colorado - High Mesa CO - 67323
  date: 2025-01 -> 2025-02 delayed by 1 month

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2025-05 -> 2025-06 delayed by 1 month

300 MW - planning - nevada - Robinson Solar - 67819
  entity id: 66397 -> 65265
  entity name: CG Northwestern Solar I LLC -> Repsol Renewables NA

756 MW - planning - colorado - Sun Bear - 68261
  mw: 150 -> 756

300 MW - construction - texas - GulfStar Power, LLC - 66871
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

275 MW - planning - connecticut - Elevate Middletown - 66786
  entity name: Elevate Middletown, LLC -> Lighthouse Middletown, LLC

200 MW - construction - nevada - Silver State South Storage - 67734
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

200 MW - planning - texas - OCI Hillsboro - 66401
  entity id: 58489 -> 66905
  entity name: OCI Energy LLC -> HEC Renewable Energy America LLC

185 MW - planning - texas - Zephyr Storage - 67555
  plant name: Wetzel BESS -> Zephyr Storage

224 MW - construction - california - Anode (Springville) BESS - 65458
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

224 MW - construction - california - Anode (Springville) BESS - 65458
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

279 MW - construction - nevada - Silver Peak - 67736
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

279 MW - construction - nevada - Silver Peak - 67736
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

100 MW - construction - california - Pome BESS - 67299
  entity id: 66165 -> 61944
  entity name: IOWN Renewable -> MN8 Energy LLC

100 MW - planning - michigan - Voyager Energy Storage - 68426
  mw: 400 -> 100

100 MW - planning - texas - Holly Branch Solar, LLC - 66692
  entity id: 65698 -> 61060
  entity name: Holly Branch Solar, LLC -> Cypress Creek Renewables

82 MW - construction - idaho - Happy Valley Battery Storage - 67573
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

80 MW - construction - california - Chiquito Grid, LLC - 65655
  entity id: 64934 -> 66217
  entity name: Chiquito Grid, LLC -> Copia Power

300 MW - planning - california - Key Energy Storage - 68461
  mw: 300 -> 75

70 MW - planning - california - Elevate Pier S - 66787
  entity name: Pier S Energy Storage LLC -> Lighthouse Pier S, LLC

279 MW - construction - nevada - Silver Peak - 67736
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

680 MW - construction - california - Menifee Power Bank - 66494
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

20 MW - planning - new york - South Ripley Solar - 64911
  entity id: 64389 -> 65265
  entity name: ConnectGen Chautauqua County LLC -> Repsol Renewables NA

15 MW - construction - new york - Elevate Arthur Kill - 66785
  entity name: GB Arthur Kill Storage LLC -> Lighthouse Arthur Kill, LLC


2025-02

New projects (34):
530 MW - construction - georgia - McGrau Ford Battery Storage Facility - 68512 Megapack
530 MW - construction - georgia - McGrau Ford Battery Storage Facility - 68512 Megapack
250 MW - construction - arizona - Pediment BESS I - 68477
200 MW - construction - arizona - Flatland Storage - 68529
200 MW - planning - california - Rexford 2 Solar Farm - 68485
150 MW - construction - texas - Cartwheel 1 - Storage, LLC - 68513
150 MW - construction - texas - Crowned Heron 1 - Storage, LLC - 68499
150 MW - construction - texas - Crowned Heron 2 - Storage, LLC - 68500
150 MW - planning - virginia - Issa Solar - 68314
150 MW - cancelled - ohio - Matador Solar - 68307
150 MW - cancelled - virginia - Twins Solar - 68311
150 MW - cancelled - ohio - Wolf Creek Solar - 68308
150 MW - planning - virginia - May Solar - 68313
140 MW - planning - virginia - Sunday Solar - 68309
128 MW - construction - georgia - Robins Air Force Base Solar - 61648 Megapack
150 MW - planning - california - Cherry - 63850
100 MW - construction - wisconsin - Grant County - 65007
99 MW - planning - wisconsin - Edgewater - 4050
90 MW - cancelled - virginia - Iris Solar - 68310
85 MW - construction - arizona - Sun Pond - 68492
80 MW - construction - california - Shirk Energy Storage - 68494
80 MW - planning - ohio - Echelon Solar - 68312
75 MW - construction - wisconsin - Wood County - 65011
69 MW - construction - california - Lockhart Solar PV, LLC - 10444
60 MW - construction - texas - Lower Rio Energy Storage - 68496
60 MW - construction - texas - Bird Dog Energy Storage - 68495
60 MW - planning - new mexico - Sandia Energy Center - 68210
59 MW - construction - california - Lockhart Solar PV II - 66699
57 MW - construction - georgia - Hammond - 708 Megapack
55 MW - planning - california - Sienna 2 Solar and Storage Project - 68486
50 MW - construction - california - Ventasso Energy Storage, LLC - 68509
50 MW - planning - mississippi - Optimist - 68536
49 MW - construction - georgia - Moody Air Force Base Solar - 62377 Megapack
150 MW - planning - california - Cherry - 63850

Disappeared projects (2):
20 MW - cancelled - texas - Barilla Solar - 58710
20 MW - cancelled - hawaii - Kahana Solar, LLC - 64095

Updated projects (103):

300 MW - construction - california - Nighthawk Energy Storage, LLC - 65889 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2025-05 -> 2025-08 delayed by 3 months

204 MW - operation - texas - Citadel Battery Storage Plant - 67738
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation
  mw: 206 -> 204

200 MW - operation - texas - Dickens - 65489
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

200 MW - operation - texas - Hydra - 65490
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

200 MW - operation - texas - Paleo - 65491
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

200 MW - operation - oregon - Sundial (Troutdale) BESS - 67869
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

200 MW - construction - texas - Tidwell Prairie Storage 1 - 66337
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

175 MW - operation - texas - Pavo - 65492
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

150 MW - operation - arizona - McFarland B Solar and Storage - 66637
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

150 MW - operation - california - Desert Quartzite - 59871
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

150 MW - operation - california - Scarlet II Hybrid - 66951
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

120 MW - operation - texas - Wigeon Whistle Battery Storage Plant - 67739
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

100 MW - construction - wisconsin - Paris Solar - 65967
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

82 MW - construction - idaho - Happy Valley Battery Storage - 67573
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

80 MW - construction - california - Chiquito Grid, LLC - 65655
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (V) Under construction, more than 50 percent complete
  date: 2025-12 -> 2025-05 accelerated by 7 months

75 MW - operation - oregon - Constable BESS - 67712
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

66 MW - operation - south carolina - Lone Star Solar - 62235
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

60 MW - construction - california - SF Azalea, LLC - 66890
  plant name: Azalea (CA) -> SF Azalea, LLC
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

50 MW - operation - texas - Tortolas - 65493
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

33 MW - operation - colorado - Prairie Center Energy LLC - 68058
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

25 MW - operation - california - Baldy Mesa 2_Silver Peak Hybrid - 66885
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

20 MW - operation - new jersey - Montague Energy Storage - 67851
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2025-04 -> 2024-12 accelerated by 4 months

17 MW - operation - oregon - Coffee Creek BESS - 67698
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

15 MW - operation - north carolina - McLauchin - 67041
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

10 MW - operation - north carolina - Archie Horne - 67040
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

10 MW - operation - north carolina - Butler - 67042
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

400 MW - planning - texas - Iron Belt - 67059
  date: 2025-12 -> 2027-06 delayed by 18 months

306 MW - planning - texas - Cuchillas PV and BESS - 67776
  date: 2026-12 -> 2026-05 accelerated by 7 months

300 MW - construction - texas - GulfStar Power, LLC - 66871
  date: 2025-02 -> 2025-06 delayed by 4 months

400 MW - construction - california - Kola Energy Center - 67680
  date: 2025-05 -> 2025-06 delayed by 1 month
  mw: 400 -> 275

275 MW - planning - connecticut - Elevate Middletown - 66786
  date: 2025-06 -> 2027-12 delayed by 30 months

250 MW - construction - texas - Zeya - 65880
  date: 2024-12 -> 2026-01 delayed by 13 months

240 MW - operation - california - Rexford Solar Farm - 64633
  date: 2024-12 -> 2025-01 delayed by 1 month

226 MW - planning - texas - Ventures BESS - 67783
  date: 2026-09 -> 2028-09 delayed by 24 months

200 MW - operation - indiana - Pike County Energy Storage - 66881
  date: 2024-12 -> 2025-03 delayed by 3 months

200 MW - construction - texas - Cachi - 65861
  date: 2024-12 -> 2025-07 delayed by 7 months

200 MW - construction - texas - Castor - 65870
  date: 2024-12 -> 2025-09 delayed by 9 months

200 MW - construction - texas - Desna - 65876
  date: 2024-12 -> 2025-12 delayed by 12 months

200 MW - planning - texas - Bell Creek BESS LLC - 67535
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (T) Regulatory approvals received. Not under construction
  date: 2025-12 -> 2026-06 delayed by 6 months

160 MW - construction - texas - Lumina Solar Project - 65645 Megapack
  date: 2024-12 -> 2025-01 delayed by 1 month

160 MW - construction - texas - Lumina II Solar Project - 65644 Megapack
  date: 2025-02 -> 2025-03 delayed by 1 month

160 MW - construction - texas - Avila - 65860
  date: 2024-12 -> 2025-08 delayed by 8 months

150 MW - construction - texas - Danish Fields Storage - 66916
  date: 2025-01 -> 2025-02 delayed by 1 month

150 MW - construction - texas - Myrtle Storage - 66913
  date: 2025-01 -> 2025-02 delayed by 1 month

150 MW - construction - texas - Carina - 65589
  date: 2024-12 -> 2025-05 delayed by 5 months

150 MW - planning - virginia - Prospect Power BESS - 68055
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (L) Regulatory approvals pending. Not under construction
  date: 2026-05 -> 2026-03 accelerated by 2 months

150 MW - planning - utah - Gale 1 Solar - 61170
  date: 2027-12 -> 2028-12 delayed by 12 months

141 MW - planning - texas - Vial BESS - 67784
  date: 2026-07 -> 2027-09 delayed by 14 months

126 MW - construction - california - AVEP BESS - 65591
  date: 2025-01 -> 2025-02 delayed by 1 month

400 MW - construction - california - Kola Energy Center - 67680
  date: 2025-04 -> 2025-05 delayed by 1 month

113 MW - construction - arizona - Sierra Pinta BESS - 67973
  date: 2025-12 -> 2025-06 accelerated by 6 months

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2025-02 -> 2025-04 delayed by 2 months

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2025-02 -> 2025-04 delayed by 2 months

279 MW - construction - nevada - Silver Peak - 67736
  date: 2025-02 -> 2025-04 delayed by 2 months

279 MW - construction - nevada - Silver Peak - 67736
  date: 2025-02 -> 2025-04 delayed by 2 months

103 MW - construction - texas - Bright Arrow Solar, LLC - 66688
  date: 2024-12 -> 2025-03 delayed by 3 months

100 MW - operation - texas - Estonian Solar Project, LLC - 66872
  date: 2024-12 -> 2025-01 delayed by 1 month

100 MW - construction - texas - Bexar ESS - 66400
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2025-04 -> 2025-05 delayed by 1 month

100 MW - construction - texas - Ables Springs Solar & Storage - 66905
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2025-02 -> 2025-06 delayed by 4 months

100 MW - planning - texas - Alamo 4 BESS - 66294
  date: 2025-06 -> 2025-12 delayed by 6 months

100 MW - planning - texas - Alamo 5 BESS 1 - 66295
  date: 2025-06 -> 2025-12 delayed by 6 months

100 MW - planning - texas - Alamo 5 BESS 2 - 66296
  date: 2025-06 -> 2025-12 delayed by 6 months

100 MW - planning - texas - Holstein 2 Battery Storage - 67896
  date: 2026-05 -> 2027-05 delayed by 12 months

99 MW - construction - california - Electrolyte BESS - 66661
  date: 2024-12 -> 2025-02 delayed by 2 months

99 MW - construction - california - Lead BESS 1 - 66660
  date: 2024-12 -> 2025-04 delayed by 4 months

99 MW - construction - california - Noosa Energy Storage LLC - 64531
  date: 2025-02 -> 2026-03 delayed by 13 months

97 MW - operation - california - Acid BESS - 66659
  date: 2024-12 -> 2025-02 delayed by 2 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2025-01 -> 2025-02 delayed by 1 month

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2024-12 -> 2025-02 delayed by 2 months

70 MW - construction - texas - Antlia - 65588
  date: 2024-12 -> 2025-05 delayed by 5 months

67 MW - operation - arizona - Yuma Solar + Storage - 67321
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2025-04 -> 2025-01 accelerated by 3 months

61 MW - planning - texas - Oriana Solar LLC - 65849
  date: 2025-05 -> 2026-01 delayed by 8 months

60 MW - operation - idaho - Franklin Battery Storage - 67183
  date: 2025-01 -> 2025-02 delayed by 1 month

279 MW - construction - nevada - Silver Peak - 67736
  date: 2025-02 -> 2025-04 delayed by 2 months

56 MW - operation - indiana - Dunns Bridge II Solar - 67893
  date: 2024-12 -> 2025-01 delayed by 1 month

88 MW - construction - california - Chaparral Springs - 64864
  date: 2024-12 -> 2025-01 delayed by 1 month

52 MW - construction - hawaii - Ho'Ohana Solar 1 - 63723
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2024-12 -> 2025-12 delayed by 12 months

50 MW - cancelled - utah - Hornshadow Solar II, LLC - 67511
  date: 2025-06 -> 2026-04 delayed by 10 months

40 MW - cancelled - idaho - Black Mesa BESS - 66326
  date: 2025-01 -> 2025-02 delayed by 1 month

88 MW - construction - california - Chaparral Springs - 64864
  date: 2024-12 -> 2025-01 delayed by 1 month

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2025-01 -> 2025-02 delayed by 1 month

38 MW - planning - texas - Vernon Solar and Storage - 67934
  date: 2025-10 -> 2026-10 delayed by 12 months

32 MW - construction - california - Lead BESS 2 - 66662
  date: 2024-12 -> 2025-04 delayed by 4 months

30 MW - construction - hawaii - AES Waiawa Phase 2 Solar - 66066
  date: 2025-08 -> 2025-11 delayed by 3 months

20 MW - construction - california - Ortega Grid, LLC - 65656
  date: 2025-03 -> 2025-05 delayed by 2 months

20 MW - construction - tennessee - Vonore Battery Energy Storage System - 64255
  date: 2025-03 -> 2025-06 delayed by 3 months

10 MW - operation - colorado - High Mesa CO - 67323
  date: 2024-12 -> 2025-01 delayed by 1 month

10 MW - construction - texas - Grizzly Ridge Solar - 66410
  date: 2024-12 -> 2025-03 delayed by 3 months

10 MW - construction - california - Hecate Energy Desert Storage 1 LLC - 65635
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2025-01 -> 2025-03 delayed by 2 months

10 MW - construction - california - Carris Storage I - 65733
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2025-01 -> 2025-03 delayed by 2 months

10 MW - construction - california - Sierra Energy Storage, LLC - 61803
  date: 2024-12 -> 2025-05 delayed by 5 months

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2025-04 -> 2025-05 delayed by 1 month

10 MW - construction - colorado - Mamm Creek - 67322
  date: 2025-03 -> 2025-08 delayed by 5 months

300 MW - planning - arizona - THREE SISTERS Solar Generation and BESS - 68298
  entity name: THIS BN, LLC -> THSI bn, LLC

190 MW - planning - texas - Steelhead Energy Storage - 67798
  mw: 193 -> 190

102 MW - construction - texas - Fort Duncan BESS - 67752
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

100 MW - construction - california - Pome BESS - 67299
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

100 MW - planning - nevada - Escape Solar Plant - 67898
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (T) Regulatory approvals received. Not under construction

76 MW - planning - texas - Gaia Hybrid - 66342
  entity id: 65144 -> 65815
  entity name: Samsung C&T Renewables, LLC -> Sunraycer Assets I LLC

65 MW - construction - california - San Jacinto Grid, LLC - 65657
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

55 MW - planning - texas - Eagle Springs Hybrid - 66341
  entity id: 65144 -> 65815
  entity name: Samsung C&T Renewables, LLC -> Sunraycer Assets I LLC

40 MW - planning - illinois - Mulligan Solar, LLC - 65349
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (L) Regulatory approvals pending. Not under construction

20 MW - cancelled - pennsylvania - Northumberland Solar I - 67675
  entity name: Northumberland Solar I, LLC -> Energix US, LLC


2025-01

New projects (42):
1200 MW - planning - washington - Hop Hill Solar Generation and BESS - 68342
1200 MW - planning - oregon - Sunstone Solar - 68396
500 MW - planning - arizona - ORCHARD Solar Generation and BESS - 68328
500 MW - planning - texas - La Salle ESS - 68353
400 MW - planning - texas - Callisto II Energy Center - 68422
100 MW - planning - michigan - Voyager Energy Storage - 68426
300 MW - planning - california - Key Energy Storage - 68461
300 MW - planning - utah - Red Butte Solar and Storage - 68371
300 MW - planning - washington - Lower Snake Solar Generation BESS - 68344
250 MW - construction - texas - Old 300 Storage Center - 68365
250 MW - planning - texas - Lazy U ESS 2 - 68356
250 MW - planning - arizona - Catclaw Solar - 68414
250 MW - planning - texas - Lazy U ESS 1 - 68355
247 MW - planning - oregon - Salmonfly Solar and Storage - 68370
200 MW - planning - texas - Tidwell Prairie II - 68425
200 MW - planning - washington - Greenwater BESS - 68341
200 MW - planning - montana - Oportunity Solar Generation and BESS - 68345
200 MW - planning - texas - Alamo City ESS - 68348
200 MW - planning - texas - Avant Prairie ESS - 68349
200 MW - planning - texas - Bravo ESS - 68350
200 MW - planning - texas - Prost ESS - 68360
200 MW - planning - texas - Rush ESS - 68361
200 MW - planning - texas - SunShiner ESS - 68363
200 MW - planning - texas - Tex-Bar ESS - 68364
200 MW - planning - texas - Sun Angel ESS - 68362
200 MW - planning - alabama - Dega Solar and Storage - 68332
170 MW - planning - washington - AGATE BESS - 68366
150 MW - construction - texas - Blue Summit II Storage, LLC - 68456
150 MW - construction - texas - Roadrunner Crossing Energy Storage LLC - 68460
150 MW - construction - arizona - Agave - 67964
103 MW - construction - texas - Evans Creek Energy Storage Project - 68334
103 MW - construction - texas - Gatsby Energy Storage Project - 68428
100 MW - construction - texas - St Gall Energy Storage II - 68423
100 MW - construction - michigan - Tibbits Energy Storage - 68424
100 MW - planning - arizona - Kitt Solar - 68452
100 MW - planning - colorado - Grand Valley Solar Generation and BESS - 68343
267 MW - construction - arizona - Centennial Flats - 68466
267 MW - construction - arizona - Centennial Flats - 68466
267 MW - construction - arizona - Centennial Flats - 68466
40 MW - operation - florida - Lake Mabel Solar and Battery Storage - 66128
40 MW - construction - florida - Wimauma Solar and Battery Storage - 61667
15 MW - operation - arizona - Mohave Electric Cooperative at Joy Lane - 63554

Disappeared projects (3):
40 MW - cancelled - florida - Lake Mabel Energy Storage - 66641
40 MW - cancelled - florida - Wimauma Energy Storage - 66640
20 MW - cancelled - texas - Barilla BESS - 68081

Updated projects (45):

200 MW - construction - nevada - Silver State South Storage - 67734
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

150 MW - operation - california - Eland Solar & Storage Center, Phase 1 Hy - 61168 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

125 MW - operation - texas - Connolly BESS - 67861
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

125 MW - construction - california - Aratina Solar Center 1B - 61167
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - texas - Al Pastor Battery Storage Plant - 67721
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

82 MW - operation - california - AES ES Alamitos 2 LLC - 67579
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

80 MW - operation - california - Placerita ESS - 66462
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

70 MW - operation - california - Inland Empire Energy Storage - 66726
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2024-12 -> 2024-10 accelerated by 2 months

67 MW - operation - arizona - Yuma Solar + Storage - 67321
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

50 MW - construction - texas - Midpoint Solar, LLC - 66897
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2025-05 -> 2025-12 delayed by 7 months
  mw: 52 -> 50

35 MW - construction - california - Arrowleaf Solar and Storage - 67850
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

33 MW - operation - colorado - Prairie Center Energy LLC - 68058
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (TS) Construction complete, but not yet in commercial operation
  date: 2024-11 -> 2024-12 delayed by 1 month

370 MW - planning - nevada - Arida Solar (Hybrid) - 63841
  date: 2027-12 -> 2028-06 delayed by 6 months

240 MW - construction - texas - Anole Energy Storage - 67740
  date: 2025-05 -> 2025-07 delayed by 2 months

204 MW - operation - texas - Citadel Battery Storage Plant - 67738
  date: 2024-11 -> 2024-12 delayed by 1 month

176 MW - planning - texas - Brotherton Storage - 68165
  date: 2025-05 -> 2026-12 delayed by 19 months

151 MW - planning - texas - Mcgee Storage - 68170
  date: 2025-09 -> 2026-12 delayed by 15 months
  mw: 76 -> 151

150 MW - construction - texas - Danish Fields Storage - 66916
  date: 2024-12 -> 2025-01 delayed by 1 month

150 MW - construction - texas - Myrtle Storage - 66913
  date: 2024-12 -> 2025-01 delayed by 1 month

150 MW - construction - texas - Peregrine BESS 1 - 66301
  date: 2025-05 -> 2025-07 delayed by 2 months

150 MW - construction - texas - Peregrine BESS 2 - 66302
  date: 2025-05 -> 2025-07 delayed by 2 months

126 MW - construction - california - AVEP BESS - 65591
  date: 2024-12 -> 2025-01 delayed by 1 month

120 MW - operation - texas - Wigeon Whistle Battery Storage Plant - 67739
  date: 2024-11 -> 2024-12 delayed by 1 month

200 MW - construction - arizona - Westwing - 67855
  date: 2024-12 -> 2025-01 delayed by 1 month

100 MW - operation - texas - Estonian Solar Project, LLC - 66872
  date: 2024-11 -> 2024-12 delayed by 1 month

99 MW - construction - california - Noosa Energy Storage LLC - 64531
  date: 2024-11 -> 2025-02 delayed by 3 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2024-12 -> 2025-01 delayed by 1 month

75 MW - construction - california - Hummingbird Energy Storage LLC - 65395
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2024-11 -> 2025-03 delayed by 4 months

60 MW - operation - idaho - Franklin Battery Storage - 67183
  date: 2024-12 -> 2025-01 delayed by 1 month

56 MW - operation - indiana - Dunns Bridge II Solar - 67893
  date: 2024-11 -> 2024-12 delayed by 1 month

50 MW - operation - mississippi - Golden Triangle - 64529
  date: 2024-12 -> 2025-01 delayed by 1 month

40 MW - cancelled - idaho - Black Mesa BESS - 66326
  date: 2024-12 -> 2025-01 delayed by 1 month

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2024-12 -> 2025-01 delayed by 1 month

30 MW - cancelled - texas - Hooper Solar and Storage - 68167
  date: 2025-05 -> 2026-12 delayed by 19 months

25 MW - planning - washington - Arlington Battery Energy Storage System - 67669
  date: 2025-11 -> 2026-02 delayed by 3 months

14 MW - operation - michigan - Slocum Energy Storage - 67758
  date: 2024-12 -> 2025-01 delayed by 1 month

10 MW - operation - colorado - High Mesa CO - 67323
  date: 2024-11 -> 2024-12 delayed by 1 month

200 MW - planning - california - Aratina Solar Center 2 - 64215
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (T) Regulatory approvals received. Not under construction

147 MW - operation - california - Golden Field Solar III, LLC - 63859
  entity name: Golden Field Solar III, LLC -> Golden Fields Solar III, LLC

113 MW - construction - california - Daggett 1 - 67931
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

100 MW - operation - texas - Angelo Storage - 68146
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

100 MW - operation - texas - Great Kiskadee Storage - 68189
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

100 MW - construction - new mexico - Quail Ranch Solar and BESS - 67204
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (L) Regulatory approvals pending. Not under construction

50 MW - construction - tennessee - Ridgely Energy Farm - 65445
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

50 MW - planning - texas - MRG Goody Solar Project Hybrid - 66390
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (L) Regulatory approvals pending. Not under construction


2024-12

New projects (43):
400 MW - planning - oregon - Tualatin Battery Energy Storage System - 68299
499 MW - planning - wyoming - Dutchman Solar generation and BESS - 68317
400 MW - planning - nevada - Purple Sage Energy Center - 68209
400 MW - planning - arizona - Eagle Eye Solar and Storage - 68287
300 MW - planning - arizona - Box Canyon (AZ) - 68281
300 MW - planning - arizona - THREE SISTERS Solar Generation and BESS - 68298
300 MW - planning - arizona - Desert Sand BESS - 68283
250 MW - planning - oregon - Biglow Solar Generation and BESS - 68316
382 MW - construction - arizona - Atlas VIII - 68323
200 MW - construction - arizona - Roadrunner Reserve Phase 1 - 67905
200 MW - planning - texas - Kahla Storage - 68168
200 MW - planning - montana - Anthelope Hills Solar Generation BESS - 68315
200 MW - planning - washington - Sinclair BESS - 68300
200 MW - planning - idaho - Juniper Gulch Solar and Storage - 68291
200 MW - planning - washington - Centralia Battery Energy Storage System - 68282
198 MW - planning - utah - Fremont Solar - 68153
300 MW - construction - arizona - Atlas VII - 68322
176 MW - planning - texas - Brotherton Storage - 68165
176 MW - planning - texas - Mcmurtre Storage - 68171
176 MW - planning - texas - Willis Storage - 68176
175 MW - planning - texas - Yooperlite Storage - 68178
382 MW - construction - arizona - Atlas VIII - 68323
151 MW - planning - texas - Windmill Ridge Storage - 68177
151 MW - cancelled - texas - Augite Storage - 68164
150 MW - construction - arizona - Atlas BESS IV LLC - 68321
150 MW - construction - arizona - Atlas IX - 68324
756 MW - planning - colorado - Sun Bear - 68261
125 MW - planning - texas - Dolomite Storage - 68166
300 MW - construction - arizona - Atlas VII - 68322
100 MW - operation - texas - Angelo Storage - 68146
100 MW - operation - texas - Great Kiskadee Storage - 68189
100 MW - construction - texas - Big Elm Storage - 68181
100 MW - planning - texas - Sandford Solar and Storage - 68173
100 MW - planning - texas - Raven Storage - 68149
100 MW - cancelled - texas - Sandman Solar - 68304
151 MW - planning - texas - Mcgee Storage - 68170
75 MW - planning - texas - Myers Solar and Storage - 68172
51 MW - cancelled - texas - Kobernat Solar and Storage - 68169
50 MW - planning - texas - Stegall Solar and Storage - 68174
30 MW - cancelled - texas - Hooper Solar and Storage - 68167
23 MW - planning - california - Solar Star 3 - 68240
23 MW - planning - california - Solar Star 4 - 68241
19 MW - operation - arizona - Chino Valley Solar - 57560

Disappeared projects (1):
15 MW - cancelled - hawaii - Barbers Point Solar, LLC - 64094

Updated projects (56):

174 MW - operation - texas - Longbow BESS, LLC - 67083
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

150 MW - construction - california - Eland Solar & Storage Center, Phase 2 Hy - 61169 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

113 MW - construction - california - Daggett 1 - 67931
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2025-06 -> 2025-07 delayed by 1 month

100 MW - operation - idaho - Franklin Solar Hybrid - 67190
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

100 MW - operation - texas - TX10 Hummingbird Storage - 65693
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

100 MW - operation - new mexico - San Juan Solar I - 66574
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

200 MW - construction - arizona - Westwing - 67855
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2024-11 -> 2024-09 accelerated by 2 months

80 MW - operation - california - Bottleneck Energy Storage - 66757
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

75 MW - operation - california - Baldy Mesa Solar & Storage - 66598
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2025-10 -> 2024-05 accelerated by 17 months

72 MW - operation - texas - Stampede Solar Hybrid - 67762
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

65 MW - operation - georgia - Mossy Branch Battery Facility - 65018
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

30 MW - operation - california - Santa Paula Energy Storage LLC - 65397
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2024-11 -> 2024-10 accelerated by 1 month

20 MW - operation - new jersey - Montague Energy Storage - 67851
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (V) Under construction, more than 50 percent complete

15 MW - construction - new york - Elevate Arthur Kill - 66785
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

200 MW - construction - california - Peregrine Energy Storage LLC - 66286 Megapack
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2025-01 -> 2025-03 delayed by 2 months

160 MW - construction - texas - Lumina Solar Project - 65645 Megapack
  date: 2024-10 -> 2024-12 delayed by 2 months

160 MW - construction - texas - Lumina II Solar Project - 65644 Megapack
  date: 2024-12 -> 2025-02 delayed by 2 months

160 MW - construction - texas - IP Radian, LLC - 64859 Megapack
  date: 2025-02 -> 2025-03 delayed by 1 month

150 MW - operation - california - Eland Solar & Storage Center, Phase 1 Hy - 61168 Megapack
  date: 2024-10 -> 2024-11 delayed by 1 month

150 MW - construction - texas - Danish Fields Storage - 66916
  date: 2024-11 -> 2024-12 delayed by 1 month

150 MW - construction - texas - Myrtle Storage - 66913
  date: 2024-11 -> 2024-12 delayed by 1 month

126 MW - construction - california - AVEP BESS - 65591
  date: 2024-11 -> 2024-12 delayed by 1 month

125 MW - operation - texas - Connolly BESS - 67861
  date: 2024-10 -> 2024-11 delayed by 1 month

200 MW - construction - arizona - Westwing - 67855
  date: 2024-11 -> 2024-12 delayed by 1 month

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2024-12 -> 2025-02 delayed by 2 months

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2024-12 -> 2025-02 delayed by 2 months

279 MW - construction - nevada - Silver Peak - 67736
  date: 2024-11 -> 2025-02 delayed by 3 months

279 MW - construction - nevada - Silver Peak - 67736
  date: 2024-11 -> 2025-02 delayed by 3 months

100 MW - operation - texas - Al Pastor Battery Storage Plant - 67721
  date: 2024-10 -> 2024-11 delayed by 1 month

100 MW - operation - texas - Estonian Solar Project, LLC - 66872
  date: 2024-10 -> 2024-11 delayed by 1 month

99 MW - construction - california - Noosa Energy Storage LLC - 64531
  date: 2024-10 -> 2024-11 delayed by 1 month

99 MW - construction - california - Caballero - 68012
  date: 2024-11 -> 2025-01 delayed by 2 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2024-11 -> 2024-12 delayed by 1 month

75 MW - planning - texas - Noria Hondo Solar (Hybrid) - 65344
  date: 2025-09 -> 2026-10 delayed by 13 months

60 MW - operation - idaho - Franklin Battery Storage - 67183
  date: 2024-11 -> 2024-12 delayed by 1 month

279 MW - construction - nevada - Silver Peak - 67736
  date: 2024-11 -> 2025-02 delayed by 3 months

56 MW - operation - indiana - Dunns Bridge II Solar - 67893
  date: 2024-10 -> 2024-11 delayed by 1 month

50 MW - construction - california - Chula Vista Energy Center 2 - 67878
  date: 2025-06 -> 2026-01 delayed by 7 months

40 MW - cancelled - idaho - Black Mesa BESS - 66326
  date: 2024-11 -> 2024-12 delayed by 1 month

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2024-11 -> 2024-12 delayed by 1 month

30 MW - operation - hawaii - Hale Kuawehi Solar Hybrid - 62529
  date: 2024-11 -> 2025-03 delayed by 4 months

30 MW - construction - hawaii - AES Waiawa Phase 2 Solar - 66066
  date: 2025-06 -> 2025-08 delayed by 2 months

20 MW - construction - tennessee - Vonore Battery Energy Storage System - 64255
  date: 2024-12 -> 2025-03 delayed by 3 months

10 MW - operation - colorado - High Mesa CO - 67323
  date: 2024-10 -> 2024-11 delayed by 1 month

10 MW - construction - california - Sierra Energy Storage, LLC - 61803
  date: 2024-10 -> 2024-12 delayed by 2 months

10 MW - construction - texas - Grizzly Ridge Solar - 66410
  date: 2024-10 -> 2024-12 delayed by 2 months

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2025-02 -> 2025-04 delayed by 2 months

10 MW - construction - california - Santee BESS - 67118
  date: 2024-12 -> 2025-04 delayed by 4 months

200 MW - operation - indiana - Pike County Energy Storage - 66881
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

200 MW - planning - texas - OCI Hillsboro - 66401
  entity name: OCI Solar Power -> OCI Energy LLC

150 MW - operation - california - Scarlet II Hybrid - 66951
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

100 MW - construction - texas - Ables Springs Solar & Storage - 66905
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

97 MW - operation - california - Acid BESS - 66659
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

66 MW - operation - south carolina - Lone Star Solar - 62235
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

680 MW - construction - california - Menifee Power Bank - 66494
  mw: 55 -> 60

14 MW - operation - michigan - Slocum Energy Storage - 67758
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation


2024-11

New projects (28):
500 MW - planning - texas - Sunscape Renewable Energy - 68034
400 MW - planning - wyoming - Cowboy Solar I - 68022
300 MW - planning - texas - Red Hollow Renewable Energy - 68030
300 MW - planning - texas - Sunrose Renewable Energy - 68033
250 MW - planning - texas - Emerald Hill Energy Storage - 68015
250 MW - planning - texas - Mystic Springs Renewable Energy (Hybrid) - 67987
250 MW - planning - california - Athens Solar I (Hybrid) - 67982
200 MW - planning - texas - Hornet Solar II (TX) (Hybrid) - 67985
200 MW - planning - missouri - Scopus Solar - 68031
200 MW - planning - missouri - Vichy Solar - 68036
200 MW - construction - texas - Morrow Lake BESS - 68084
150 MW - planning - virginia - Prospect Power BESS - 68055
150 MW - planning - illinois - Meadow Springs Renewable Energy (Hybrid) - 67986
146 MW - planning - texas - Chisme Solar and Storage - 68078
400 MW - construction - california - Kola Energy Center - 67680
115 MW - planning - texas - Marcos PV and BESS - 68080
100 MW - operation - texas - Burksol Energy Storage - 67968
100 MW - cancelled - nevada - Cooper Canyon Renewable Energy - 68017
100 MW - planning - california - Skylight Renewable Energy - 68032
100 MW - planning - south carolina - May Renewables - 67981
99 MW - construction - california - Caballero - 68012
50 MW - planning - california - Aurora Renewable Energy (Hybrid) - 67983
50 MW - planning - ohio - Richwood Solar and Storage - 68019
40 MW - planning - wisconsin - Sunnyside Solar Energy Center - 68054
40 MW - planning - california - Syracuse and Tours Renewable Energy - 68035
33 MW - operation - colorado - Prairie Center Energy LLC - 68058
20 MW - cancelled - texas - Barilla BESS - 68081
16 MW - construction - california - BCE Seal Beach - 68023

Updated projects (49):

150 MW - construction - idaho - Kuna BESS - 67549
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

680 MW - construction - california - Menifee Power Bank - 66494
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

100 MW - operation - texas - Brazos Bend BESS, LLC - 66690
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

100 MW - operation - texas - Copperhead Solar, LLC - 67019
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

72 MW - operation - texas - Fence Post Solar Hybrid Project, LLC - 66801
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

59 MW - operation - california - Sagebrush Solar 2 ESS 59 - 66950
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

40 MW - operation - california - Sagebrush Solar 2 ESS 40 - 66949
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2024-10 -> 2024-09 accelerated by 1 month

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

15 MW - operation - florida - Dover Energy Storage - 67120
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

400 MW - construction - california - Kola Energy Center - 67680
  date: 2025-04 -> 2025-05 delayed by 1 month

304 MW - construction - texas - SMT Ironman Battery Storage Plant - 67737
  date: 2024-12 -> 2025-01 delayed by 1 month

226 MW - planning - texas - Ventures BESS - 67783
  date: 2025-09 -> 2026-09 delayed by 12 months

200 MW - construction - texas - Tidwell Prairie Storage 1 - 66337
  date: 2025-05 -> 2025-06 delayed by 1 month

174 MW - operation - texas - Longbow BESS, LLC - 67083
  date: 2024-09 -> 2024-10 delayed by 1 month

150 MW - operation - california - Eland Solar & Storage Center, Phase 1 Hy - 61168 Megapack
  date: 2024-09 -> 2024-10 delayed by 1 month

150 MW - construction - texas - Myrtle Storage - 66913
  date: 2024-10 -> 2024-11 delayed by 1 month

150 MW - operation - arizona - McFarland B Solar and Storage - 66637
  date: 2024-09 -> 2024-12 delayed by 3 months

120 MW - operation - texas - Wigeon Whistle Battery Storage Plant - 67739
  date: 2024-10 -> 2024-11 delayed by 1 month

100 MW - operation - idaho - Franklin Solar Hybrid - 67190
  date: 2024-09 -> 2024-10 delayed by 1 month

100 MW - operation - new mexico - San Juan Solar I - 66574
  date: 2024-09 -> 2024-10 delayed by 1 month

100 MW - construction - california - Pome BESS - 67299
  date: 2024-12 -> 2025-03 delayed by 3 months

100 MW - planning - texas - Alamo 4 BESS - 66294
  date: 2025-02 -> 2025-06 delayed by 4 months

100 MW - planning - texas - Alamo 5 BESS 1 - 66295
  date: 2025-02 -> 2025-06 delayed by 4 months

100 MW - planning - texas - Alamo 5 BESS 2 - 66296
  date: 2025-02 -> 2025-06 delayed by 4 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2024-10 -> 2024-11 delayed by 1 month

80 MW - operation - california - Placerita ESS - 66462
  date: 2024-09 -> 2024-11 delayed by 2 months

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2024-10 -> 2024-12 delayed by 2 months

67 MW - operation - arizona - Yuma Solar + Storage - 67321
  date: 2025-01 -> 2025-04 delayed by 3 months

65 MW - operation - georgia - Mossy Branch Battery Facility - 65018
  date: 2024-09 -> 2024-10 delayed by 1 month

60 MW - operation - idaho - Franklin Battery Storage - 67183
  date: 2024-09 -> 2024-11 delayed by 2 months

56 MW - operation - indiana - Dunns Bridge II Solar - 67893
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2024-09 -> 2024-10 delayed by 1 month

52 MW - construction - hawaii - Ho'Ohana Solar 1 - 63723
  date: 2024-10 -> 2024-12 delayed by 2 months

40 MW - cancelled - idaho - Black Mesa BESS - 66326
  date: 2024-10 -> 2024-11 delayed by 1 month

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2024-10 -> 2024-11 delayed by 1 month

30 MW - operation - california - Santa Paula Energy Storage LLC - 65397
  date: 2024-09 -> 2024-11 delayed by 2 months

15 MW - operation - north carolina - McLauchin - 67041
  date: 2024-10 -> 2024-12 delayed by 2 months

14 MW - operation - michigan - Slocum Energy Storage - 67758
  date: 2024-11 -> 2024-12 delayed by 1 month

10 MW - operation - north carolina - Archie Horne - 67040
  date: 2024-10 -> 2024-12 delayed by 2 months

10 MW - operation - north carolina - Butler - 67042
  date: 2024-10 -> 2024-12 delayed by 2 months

10 MW - construction - colorado - Mamm Creek - 67322
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2025-02 -> 2025-03 delayed by 1 month

300 MW - construction - arizona - Papago Energy Storage - 66779
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

160 MW - construction - texas - IP Radian, LLC - 64859 Megapack
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

99 MW - construction - california - Lead BESS 1 - 66660
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

99 MW - construction - california - Electrolyte BESS - 66661
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

32 MW - construction - california - Lead BESS 2 - 66662
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

30 MW - operation - hawaii - Hale Kuawehi Solar Hybrid - 62529
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2024-10

New projects (10):
400 MW - planning - nevada - Sierra Solar Hybrid - 67978
202 MW - planning - texas - Champaign BESS, LLC - 67917
201 MW - planning - texas - Dios BESS, LLC - 67918
200 MW - planning - california - Juniper Creek Storage - 67945
162 MW - planning - texas - Concho Pearl Solar and Storage - 67956
113 MW - construction - california - Daggett 1 - 67931
113 MW - construction - arizona - Sierra Pinta BESS - 67973
101 MW - planning - texas - Dolce BESS, LLC - 67919
200 MW - construction - arizona - Westwing - 67855
38 MW - planning - texas - Vernon Solar and Storage - 67934

Disappeared projects (1):
15 MW - operation - arizona - Mohave Electric Cooperative at Joy Lane - 63554

Updated projects (59):

200 MW - operation - texas - Callisto I Energy Center - 66338
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

150 MW - operation - texas - Borden County BESS - 66804
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

130 MW - construction - new mexico - Carne Energy Storage, LLC - 67230
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2025-08 -> 2025-11 delayed by 3 months

125 MW - operation - texas - GFTX BESS - 67860 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

100 MW - operation - california - Cald BESS - 66617
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

100 MW - operation - texas - TX15 Limousin Oak Storage - 65698
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

100 MW - operation - california - Beaumont BESS - 66461
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

125 MW - operation - california - Tumbleweed Energy Storage - 66666
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

680 MW - construction - california - Menifee Power Bank - 66494
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

15 MW - construction - california - Black Walnut Energy Storage LLC - 65396
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

11 MW - operation - colorado - Davis Battery Storage - 67304
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - construction - texas - Grizzly Ridge Solar - 66410
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (TS) Construction complete, but not yet in commercial operation

204 MW - operation - texas - Citadel Battery Storage Plant - 67738
  date: 2024-10 -> 2024-11 delayed by 1 month

174 MW - operation - texas - Longbow BESS, LLC - 67083
  date: 2024-08 -> 2024-09 delayed by 1 month

150 MW - construction - texas - Myrtle Storage - 66913
  date: 2024-09 -> 2024-10 delayed by 1 month

150 MW - construction - texas - Danish Fields Storage - 66916
  date: 2024-09 -> 2024-11 delayed by 2 months

150 MW - operation - california - Desert Quartzite - 59871
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2024-08 -> 2024-12 delayed by 4 months

126 MW - construction - california - AVEP BESS - 65591
  date: 2024-10 -> 2024-11 delayed by 1 month

125 MW - operation - texas - Connolly BESS - 67861
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2024-08 -> 2024-10 delayed by 2 months

120 MW - operation - texas - Wigeon Whistle Battery Storage Plant - 67739
  date: 2024-09 -> 2024-10 delayed by 1 month

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2024-10 -> 2024-12 delayed by 2 months

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2024-10 -> 2024-12 delayed by 2 months

103 MW - construction - texas - Bright Arrow Solar, LLC - 66688
  date: 2024-10 -> 2024-12 delayed by 2 months

100 MW - operation - texas - Copperhead Solar, LLC - 67019
  date: 2024-08 -> 2024-09 delayed by 1 month

100 MW - operation - texas - Al Pastor Battery Storage Plant - 67721
  date: 2024-09 -> 2024-10 delayed by 1 month

100 MW - operation - texas - TX10 Hummingbird Storage - 65693
  date: 2024-09 -> 2024-10 delayed by 1 month

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2024-09 -> 2024-10 delayed by 1 month

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2024-09 -> 2024-10 delayed by 1 month

80 MW - operation - california - Bottleneck Energy Storage - 66757
  date: 2024-08 -> 2024-10 delayed by 2 months

72 MW - operation - texas - Fence Post Solar Hybrid Project, LLC - 66801
  date: 2024-08 -> 2024-09 delayed by 1 month

65 MW - operation - georgia - Mossy Branch Battery Facility - 65018
  date: 2024-08 -> 2024-09 delayed by 1 month

56 MW - operation - indiana - Dunns Bridge II Solar - 67893
  date: 2025-01 -> 2024-09 accelerated by 4 months

50 MW - construction - texas - Midpoint Solar, LLC - 66897
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (T) Regulatory approvals received. Not under construction
  date: 2025-08 -> 2025-05 accelerated by 3 months

40 MW - cancelled - idaho - Black Mesa BESS - 66326
  date: 2024-09 -> 2024-10 delayed by 1 month

30 MW - operation - california - Santa Paula Energy Storage LLC - 65397
  date: 2024-08 -> 2024-09 delayed by 1 month

25 MW - operation - california - Baldy Mesa 2_Silver Peak Hybrid - 66885
  date: 2024-08 -> 2024-12 delayed by 4 months

15 MW - operation - north carolina - McLauchin - 67041
  date: 2024-09 -> 2024-10 delayed by 1 month

13 MW - planning - california - Gibson Solar Project - Hybrid - 67836
  date: 2024-08 -> 2027-12 delayed by 40 months

10 MW - operation - colorado - High Mesa CO - 67323
  date: 2024-09 -> 2024-10 delayed by 1 month

10 MW - operation - north carolina - Archie Horne - 67040
  date: 2024-09 -> 2024-10 delayed by 1 month

10 MW - operation - north carolina - Butler - 67042
  date: 2024-09 -> 2024-10 delayed by 1 month

10 MW - construction - colorado - Mamm Creek - 67322
  date: 2024-12 -> 2025-02 delayed by 2 months

380 MW - operation - nevada - Gemini Solar Hybrid - 63352
  plant name: Gemini Solar -> Gemini Solar Hybrid

240 MW - operation - california - Rexford Solar Farm - 64633
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

200 MW - construction - california - Big Rock Solar Farm - 64636
  entity name: 92JT 8me, LLC -> Big Rock ESS Assets, LLC

160 MW - construction - texas - Lumina Solar Project - 65645 Megapack
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

150 MW - operation - california - Eland Solar & Storage Center, Phase 1 Hy - 61168 Megapack
  plant name: Eland Solar & Storage Center, Phase 1 Hybrid -> Eland Solar & Storage Center, Phase 1 Hy

150 MW - construction - california - Eland Solar & Storage Center, Phase 2 Hy - 61169 Megapack
  plant name: Eland Solar & Storage Center, Phase 2 Hybrid -> Eland Solar & Storage Center, Phase 2 Hy

200 MW - construction - arizona - Westwing - 67855
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

279 MW - construction - nevada - Silver Peak - 67736
  mw: 60 -> 110

279 MW - construction - nevada - Silver Peak - 67736
  mw: 60 -> 109

82 MW - operation - california - AES ES Alamitos 2 LLC - 67579
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

50 MW - construction - california - Chula Vista Energy Center 2 - 67878
  plant name: Chula Vista Energy Cneter 2 -> Chula Vista Energy Center 2

40 MW - cancelled - florida - Lake Mabel Energy Storage - 66641
  plant name: Lake Mabel Storage -> Lake Mabel Energy Storage

40 MW - cancelled - florida - Wimauma Energy Storage - 66640
  plant name: Wimauma Storage -> Wimauma Energy Storage

35 MW - construction - california - Arrowleaf Solar and Storage - 67850
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (T) Regulatory approvals received. Not under construction

25 MW - construction - california - Mordor ES1 - 67828
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

20 MW - construction - california - Mordor ES2 - 67829
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

10 MW - operation - arizona - Mesquite Solar - 60964
  plant name: Apache Solar 1 -> Mesquite Solar


2024-09

New projects (15):
400 MW - planning - texas - Brittlebush Solar and Battery Storage - 67895
250 MW - planning - new mexico - Pasilla Solar and Battery Storage - 67897
200 MW - operation - oregon - Sundial (Troutdale) BESS - 67869
150 MW - planning - california - Bellefield 3 Solar and Battery Storage - 67894
150 MW - planning - west virginia - Parks Valley Energy LLC - 67874
125 MW - operation - texas - Connolly BESS - 67861
125 MW - operation - texas - GFTX BESS - 67860 Megapack
200 MW - construction - arizona - Westwing - 67855
100 MW - construction - wisconsin - Paris Solar - 65967
100 MW - planning - nevada - Escape Solar Plant - 67898
100 MW - planning - texas - Holstein 2 Battery Storage - 67896
65 MW - construction - texas - Liberty Hybrid Solar and Storage Project - 67867
56 MW - operation - indiana - Dunns Bridge II Solar - 67893
50 MW - construction - california - Chula Vista Energy Center 2 - 67878
50 MW - planning - virginia - Two Oaks Solar and Storage LLC - 67884

Disappeared projects (1):
20 MW - cancelled - new york - Cold Creek Solar - 66674

Updated projects (82):

259 MW - operation - texas - Five Wells Solar Center - Hybrid - 66420
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

680 MW - construction - california - Menifee Power Bank - 66494
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

170 MW - construction - arizona - Scatter Wash 1 - 67454 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

102 MW - construction - texas - Fort Duncan BESS - 67752
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

90 MW - operation - arizona - Superstition Energy Storage - 66333 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

85 MW - construction - arizona - Scatter Wash 2 - 67455 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

72 MW - operation - texas - Stampede Solar Hybrid - 67762
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (TS) Construction complete, but not yet in commercial operation

70 MW - operation - california - Inland Empire Energy Storage - 66726
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (V) Under construction, more than 50 percent complete

125 MW - operation - california - Tumbleweed Energy Storage - 66666
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

45 MW - operation - california - Lockhart ESS, LLC - 66946
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

30 MW - operation - california - Holtville - 67695
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

25 MW - operation - california - West Ford Flat - 66669
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

14 MW - operation - michigan - Slocum Energy Storage - 67758
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

13 MW - operation - california - Bear Canyon - 66650
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

621 MW - planning - texas - Lunis Creek Solar and BESS SLF - 65852
  date: 2025-07 -> 2026-10 delayed by 15 months

600 MW - planning - texas - Clear Fork Creek Solar and BESS SLF - 65842
  date: 2025-12 -> 2026-12 delayed by 12 months

460 MW - planning - texas - Hollow Branch Creek 2 Solar and BESS SLF - 65851
  date: 2025-12 -> 2027-08 delayed by 20 months
  mw: 400 -> 460

418 MW - planning - texas - Tehuacana Creek 1 Solar and BESS - 65855
  date: 2025-07 -> 2026-12 delayed by 17 months

302 MW - planning - texas - Middlebrook Creek Solar and BESS - 65853
  date: 2026-02 -> 2027-04 delayed by 14 months

300 MW - construction - california - Nighthawk Energy Storage, LLC - 65889 Megapack
  date: 2025-04 -> 2025-05 delayed by 1 month

300 MW - planning - arizona - Atlas - 63798
  date: 2024-12 -> 2025-12 delayed by 12 months

300 MW - planning - california - Humidor Storage I - 65703
  date: 2025-06 -> 2029-09 delayed by 51 months

204 MW - operation - texas - Citadel Battery Storage Plant - 67738
  date: 2024-09 -> 2024-10 delayed by 1 month

200 MW - operation - texas - Dickens - 65489
  date: 2024-07 -> 2024-12 delayed by 5 months

200 MW - operation - texas - Hydra - 65490
  date: 2024-07 -> 2024-12 delayed by 5 months

200 MW - operation - texas - Paleo - 65491
  date: 2024-07 -> 2024-12 delayed by 5 months

200 MW - construction - texas - Tidwell Prairie Storage 1 - 66337
  date: 2025-03 -> 2025-05 delayed by 2 months

185 MW - construction - arizona - McFarland C - 67498
  date: 2025-04 -> 2025-05 delayed by 1 month

175 MW - operation - texas - Pavo - 65492
  date: 2024-07 -> 2024-12 delayed by 5 months

150 MW - operation - texas - Borden County BESS - 66804
  date: 2024-07 -> 2024-08 delayed by 1 month

150 MW - construction - texas - Danish Fields Storage - 66916
  date: 2024-08 -> 2024-09 delayed by 1 month

150 MW - construction - texas - Myrtle Storage - 66913
  date: 2024-08 -> 2024-09 delayed by 1 month

126 MW - construction - california - AVEP BESS - 65591
  date: 2024-09 -> 2024-10 delayed by 1 month

125 MW - construction - texas - Octans - 65590
  date: 2024-07 -> 2028-12 delayed by 53 months

121 MW - planning - new york - Swiftsure - 64235
  date: 2026-06 -> 2027-11 delayed by 17 months
  mw: 650 -> 121

117 MW - construction - california - Rosamond South 1 - 67764
  date: 2025-04 -> 2025-07 delayed by 3 months

100 MW - operation - california - Cald BESS - 66617
  date: 2024-07 -> 2024-08 delayed by 1 month

100 MW - operation - texas - Copperhead Solar, LLC - 67019
  date: 2024-07 -> 2024-08 delayed by 1 month

100 MW - operation - texas - Al Pastor Battery Storage Plant - 67721
  date: 2024-08 -> 2024-09 delayed by 1 month

100 MW - operation - texas - Brazos Bend BESS, LLC - 66690
  date: 2024-07 -> 2024-09 delayed by 2 months

100 MW - operation - new mexico - San Juan Solar I - 66574
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2024-08 -> 2024-09 delayed by 1 month

100 MW - planning - texas - Alamo 4 BESS - 66294
  date: 2024-12 -> 2025-02 delayed by 2 months

100 MW - planning - texas - Alamo 5 BESS 1 - 66295
  date: 2024-12 -> 2025-02 delayed by 2 months

100 MW - planning - texas - Alamo 5 BESS 2 - 66296
  date: 2024-12 -> 2025-02 delayed by 2 months

100 MW - construction - texas - Bexar ESS - 66400
  date: 2025-03 -> 2025-04 delayed by 1 month

100 MW - planning - texas - Yaupon Solar Project (Hybrid) - 66216
  date: 2025-06 -> 2026-06 delayed by 12 months

99 MW - construction - california - Noosa Energy Storage LLC - 64531
  date: 2024-09 -> 2024-10 delayed by 1 month

82 MW - operation - california - AES ES Alamitos 2 LLC - 67579
  date: 2024-09 -> 2024-11 delayed by 2 months

80 MW - operation - california - Bottleneck Energy Storage - 66757
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2024-07 -> 2024-08 delayed by 1 month

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2024-07 -> 2024-09 delayed by 2 months

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2024-08 -> 2024-09 delayed by 1 month

67 MW - operation - arizona - Yuma Solar + Storage - 67321
  date: 2024-12 -> 2025-01 delayed by 1 month

60 MW - operation - idaho - Franklin Battery Storage - 67183
  date: 2024-07 -> 2024-09 delayed by 2 months

50 MW - operation - texas - Tortolas - 65493
  date: 2024-07 -> 2024-12 delayed by 5 months

50 MW - planning - texas - MRG Goody Solar Project Hybrid - 66390
  date: 2025-05 -> 2025-12 delayed by 7 months

50 MW - planning - texas - TREX US Red Holly - 63202
  date: 2025-07 -> 2027-07 delayed by 24 months

40 MW - cancelled - idaho - Black Mesa BESS - 66326
  date: 2024-07 -> 2024-09 delayed by 2 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2024-08 -> 2024-10 delayed by 2 months

30 MW - operation - california - Santa Paula Energy Storage LLC - 65397
  date: 2024-07 -> 2024-08 delayed by 1 month

30 MW - construction - hawaii - AES Waiawa Phase 2 Solar - 66066
  date: 2025-04 -> 2025-06 delayed by 2 months

25 MW - operation - california - Baldy Mesa 2_Silver Peak Hybrid - 66885
  date: 2024-07 -> 2024-08 delayed by 1 month

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  date: 2024-07 -> 2024-09 delayed by 2 months

17 MW - planning - virginia - Powells Creek Solar - Hybrid - 65305
  date: 2024-12 -> 2025-12 delayed by 12 months

15 MW - operation - north carolina - McLauchin - 67041
  date: 2024-08 -> 2024-09 delayed by 1 month

12 MW - planning - delaware - ENGIE Solidago Solar Project - Hybrid - 65304
  date: 2024-12 -> 2025-12 delayed by 12 months

12 MW - planning - ohio - Salt City Solar Project - Hybrid - 65302
  date: 2024-12 -> 2025-12 delayed by 12 months

12 MW - planning - virginia - Sunnybrook Solar Project - Hybrid - 65307
  date: 2024-12 -> 2025-12 delayed by 12 months

11 MW - operation - colorado - Davis Battery Storage - 67304
  date: 2024-07 -> 2024-08 delayed by 1 month

10 MW - operation - colorado - High Mesa CO - 67323
  date: 2024-08 -> 2024-09 delayed by 1 month

10 MW - operation - north carolina - Butler - 67042
  date: 2024-08 -> 2024-09 delayed by 1 month

10 MW - construction - california - Sierra Energy Storage, LLC - 61803
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2024-07 -> 2024-10 delayed by 3 months

10 MW - construction - texas - Grizzly Ridge Solar - 66410
  date: 2024-08 -> 2024-10 delayed by 2 months

10 MW - construction - california - Santee BESS - 67118
  date: 2024-10 -> 2024-12 delayed by 2 months

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2024-11 -> 2025-02 delayed by 3 months

10 MW - planning - maine - South Portland ESS, LLC - 64616
  date: 2024-12 -> 2025-12 delayed by 12 months

200 MW - operation - texas - Callisto I Energy Center - 66338
  mw: 100 -> 200

200 MW - operation - indiana - Pike County Energy Storage - 66881
  entity name: Indianapolis Power & Light Co -> AES Indiana

190 MW - planning - texas - Steelhead Energy Storage - 67798
  plant name: Longhorn BESS -> Steelhead Energy Storage

180 MW - planning - texas - Indigo Solar & Storage - 66891
  entity name: GGS Energy LLC -> Innovative Solar 245 LLC

97 MW - operation - california - Acid BESS - 66659
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

40 MW - cancelled - florida - Lake Mabel Energy Storage - 66641
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

40 MW - cancelled - florida - Wimauma Energy Storage - 66640
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2024-08

New projects (33):
300 MW - planning - nevada - Robinson Solar - 67819
400 MW - planning - california - Lycan Solar Project - 66805
306 MW - planning - texas - Cuchillas PV and BESS - 67776
240 MW - construction - texas - Anole Energy Storage - 67740
235 MW - construction - arizona - Roadrunner Solar and BESS - 67823
226 MW - planning - texas - Ventures BESS - 67783
225 MW - planning - texas - Bramble Energy Center - 67767
220 MW - construction - michigan - Trenton Channel Energy Center - 67759
200 MW - planning - texas - Bypass BESS - 67761
200 MW - planning - texas - Cumbia Energy Center - 67768
200 MW - cancelled - new york - KCE NY 35, LLC - 67840
190 MW - planning - texas - Steelhead Energy Storage - 67798
190 MW - planning - texas - Harryoung PV and BESS - 67777
157 MW - planning - texas - Pecan BESS - 67774
20 MW - planning - new york - KCE NY 36, LLC - 67841
141 MW - planning - texas - Vial BESS - 67784
117 MW - construction - california - Rosamond South 1 - 67764
113 MW - planning - texas - Hayrick BESS - 67779
102 MW - construction - texas - Fort Duncan BESS - 67752
84 MW - planning - texas - RedSun PV and BESS - 67782
72 MW - operation - texas - Stampede Solar Hybrid - 67762
50 MW - operation - mississippi - Golden Triangle - 64529
50 MW - construction - new mexico - TAG - 67710
50 MW - planning - new york - KCE NY 30, LLC - 67838
50 MW - planning - new york - KCE NY 31, LLC - 67839
50 MW - planning - texas - Findley PV and BESS - 67778
35 MW - construction - california - Arrowleaf Solar and Storage - 67850
25 MW - construction - california - Mordor ES1 - 67828
20 MW - construction - california - Mordor ES2 - 67829
20 MW - operation - new jersey - Montague Energy Storage - 67851
15 MW - operation - arizona - Mohave Electric Cooperative at Joy Lane - 63554
14 MW - operation - michigan - Slocum Energy Storage - 67758
13 MW - planning - california - Gibson Solar Project - Hybrid - 67836

Disappeared projects (6):
260 MW - cancelled - texas - OCI SunRoper - 65893
100 MW - construction - wisconsin - Paris Solar - 65967
30 MW - cancelled - montana - Beaver Creek Wind Facility - 65019
30 MW - cancelled - montana - Beaver Creek IV - 65023
20 MW - cancelled - montana - Beaver Creek II - 65020
20 MW - cancelled - montana - Beaver Creek III - 65021

Updated projects (66):

300 MW - operation - arizona - Eleven Mile Solar Center - 66263
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

680 MW - construction - california - Menifee Power Bank - 66494
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

215 MW - operation - arizona - Sun Streams 3 - 67285
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

200 MW - operation - texas - Anemoi Energy Storage - 67236
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

200 MW - operation - texas - Ebony Energy Storage - 67237
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

200 MW - construction - california - Peregrine Energy Storage LLC - 66286 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

200 MW - construction - california - Big Rock Solar Farm - 64636
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

100 MW - construction - texas - Bexar ESS - 66400
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

40 MW - operation - california - Scarlet Solar (CA) - 64908
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2024-12 -> 2024-06 accelerated by 6 months

15 MW - operation - california - Paulsell - 67092
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

11 MW - operation - colorado - Bromley Battery Storage - 67305
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - arizona - Mesquite Solar - 60964
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

300 MW - construction - texas - GulfStar Power, LLC - 66871
  date: 2024-10 -> 2025-02 delayed by 4 months

204 MW - operation - texas - Citadel Battery Storage Plant - 67738
  date: 2024-06 -> 2024-09 delayed by 3 months

200 MW - operation - texas - Dickens - 65489
  date: 2024-06 -> 2024-07 delayed by 1 month

200 MW - operation - texas - Hydra - 65490
  date: 2024-06 -> 2024-07 delayed by 1 month

200 MW - operation - texas - Paleo - 65491
  date: 2024-06 -> 2024-07 delayed by 1 month

200 MW - planning - california - Aratina Solar Center 2 - 64215
  date: 2025-01 -> 2025-10 delayed by 9 months

185 MW - construction - arizona - McFarland C - 67498
  date: 2025-02 -> 2025-04 delayed by 2 months

175 MW - operation - texas - Pavo - 65492
  date: 2024-06 -> 2024-07 delayed by 1 month

174 MW - operation - texas - Longbow BESS, LLC - 67083
  date: 2024-07 -> 2024-08 delayed by 1 month

160 MW - construction - texas - IP Radian, LLC - 64859 Megapack
  status_verbose: (V) Under construction, more than 50 percent complete -> (U) Under construction, less than or equal to 50 percent complete
  date: 2024-12 -> 2025-02 delayed by 2 months

150 MW - operation - texas - Borden County BESS - 66804
  date: 2024-06 -> 2024-07 delayed by 1 month

150 MW - construction - texas - Danish Fields Storage - 66916
  date: 2024-07 -> 2024-08 delayed by 1 month

150 MW - construction - texas - Myrtle Storage - 66913
  date: 2024-07 -> 2024-08 delayed by 1 month

125 MW - construction - texas - Octans - 65590
  date: 2024-06 -> 2024-07 delayed by 1 month

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  date: 2024-08 -> 2024-09 delayed by 1 month

100 MW - operation - texas - Brazos Bend BESS, LLC - 66690
  date: 2024-06 -> 2024-07 delayed by 1 month

100 MW - operation - california - Cald BESS - 66617
  date: 2024-06 -> 2024-07 delayed by 1 month

200 MW - operation - texas - Callisto I Energy Center - 66338
  date: 2024-07 -> 2024-08 delayed by 1 month

100 MW - operation - new mexico - San Juan Solar I - 66574
  date: 2024-06 -> 2024-08 delayed by 2 months

100 MW - operation - idaho - Franklin Solar Hybrid - 67190
  date: 2024-06 -> 2024-09 delayed by 3 months

100 MW - operation - texas - TX10 Hummingbird Storage - 65693
  date: 2024-08 -> 2024-09 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2024-08 -> 2024-09 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2024-08 -> 2024-09 delayed by 1 month

100 MW - operation - texas - Estonian Solar Project, LLC - 66872
  date: 2024-08 -> 2024-10 delayed by 2 months

100 MW - construction - california - Pome BESS - 67299
  date: 2024-09 -> 2024-12 delayed by 3 months

100 MW - construction - texas - Ables Springs Solar & Storage - 66905
  date: 2024-10 -> 2025-02 delayed by 4 months

90 MW - operation - arizona - Superstition Energy Storage - 66333 Megapack
  date: 2024-06 -> 2024-07 delayed by 1 month

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2024-07 -> 2024-08 delayed by 1 month

125 MW - operation - california - Tumbleweed Energy Storage - 66666
  date: 2024-07 -> 2024-08 delayed by 1 month

72 MW - operation - texas - Fence Post Solar Hybrid Project, LLC - 66801
  date: 2024-06 -> 2024-08 delayed by 2 months

65 MW - operation - georgia - Mossy Branch Battery Facility - 65018
  date: 2024-07 -> 2024-08 delayed by 1 month

279 MW - construction - nevada - Silver Peak - 67736
  date: 2024-10 -> 2024-11 delayed by 1 month

279 MW - construction - nevada - Silver Peak - 67736
  date: 2024-10 -> 2024-11 delayed by 1 month

279 MW - construction - nevada - Silver Peak - 67736
  date: 2024-10 -> 2024-11 delayed by 1 month

88 MW - construction - california - Chaparral Springs - 64864
  date: 2024-06 -> 2024-12 delayed by 6 months

50 MW - operation - texas - Tortolas - 65493
  date: 2024-06 -> 2024-07 delayed by 1 month

125 MW - operation - california - Tumbleweed Energy Storage - 66666
  date: 2024-06 -> 2024-07 delayed by 1 month

50 MW - planning - texas - Albatross Solar, LLC - 66894
  date: 2025-06 -> 2027-12 delayed by 30 months

40 MW - cancelled - idaho - Black Mesa BESS - 66326
  date: 2024-06 -> 2024-07 delayed by 1 month

88 MW - construction - california - Chaparral Springs - 64864
  date: 2024-06 -> 2024-12 delayed by 6 months

30 MW - operation - california - Santa Paula Energy Storage LLC - 65397
  date: 2024-06 -> 2024-07 delayed by 1 month

30 MW - construction - hawaii - AES Waiawa Phase 2 Solar - 66066
  date: 2025-02 -> 2025-04 delayed by 2 months

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  date: 2024-06 -> 2024-07 delayed by 1 month

25 MW - operation - california - West Ford Flat - 66669
  date: 2024-06 -> 2024-07 delayed by 1 month

13 MW - operation - california - Bear Canyon - 66650
  date: 2024-06 -> 2024-07 delayed by 1 month

10 MW - construction - california - Sierra Energy Storage, LLC - 61803
  date: 2024-06 -> 2024-07 delayed by 1 month

10 MW - operation - colorado - High Mesa CO - 67323
  date: 2024-07 -> 2024-08 delayed by 1 month

10 MW - operation - north carolina - Archie Horne - 67040
  date: 2024-08 -> 2024-09 delayed by 1 month

10 MW - construction - california - Santee BESS - 67118
  date: 2024-07 -> 2024-10 delayed by 3 months

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2024-10 -> 2024-11 delayed by 1 month

65 MW - construction - california - San Jacinto Grid, LLC - 65657
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

30 MW - operation - california - Holtville - 67695
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

15 MW - construction - new york - Elevate Arthur Kill - 66785
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (L) Regulatory approvals pending. Not under construction

10 MW - construction - texas - Grizzly Ridge Solar - 66410
  plant producer type: Commercial -> IPP


2024-07

New projects (32):
400 MW - construction - california - Kola Energy Center - 67680
304 MW - construction - texas - SMT Ironman Battery Storage Plant - 67737
204 MW - operation - texas - Citadel Battery Storage Plant - 67738
200 MW - construction - nevada - Silver State South Storage - 67734
200 MW - construction - oregon - Seaside BESS - 67711
200 MW - planning - texas - Destiny Storage - 67654
200 MW - planning - texas - Wallie Storage - 67668
200 MW - planning - texas - Fort Watt Storage - 67656
200 MW - planning - texas - Jerboa Storage - 67658
200 MW - planning - texas - Bhalu - 67652
200 MW - planning - texas - Malala - 67660
160 MW - construction - texas - Lumina Solar Project - 65645 Megapack
160 MW - construction - texas - Lumina II Solar Project - 65644 Megapack
160 MW - construction - texas - IP Radian, LLC - 64859 Megapack
150 MW - planning - utah - Gale 1 Solar - 61170
120 MW - operation - texas - Wigeon Whistle Battery Storage Plant - 67739
100 MW - operation - texas - Al Pastor Battery Storage Plant - 67721
100 MW - construction - wisconsin - Paris Solar - 65967
100 MW - planning - texas - Berkman Storage - 67651
100 MW - planning - texas - Third Coast BESS, LLC - 67667
100 MW - planning - california - Aramis I Solar Project - 66678
75 MW - operation - oregon - Constable BESS - 67712
75 MW - planning - california - Zeta Solar & Storage - 67676
279 MW - construction - nevada - Silver Peak - 67736
279 MW - construction - nevada - Silver Peak - 67736
279 MW - construction - nevada - Silver Peak - 67736
50 MW - operation - mississippi - OE_MS6 - 65291
50 MW - planning - texas - Lupinus Storage 3 - 67674
30 MW - operation - california - Holtville - 67695
25 MW - planning - washington - Arlington Battery Energy Storage System - 67669
20 MW - cancelled - pennsylvania - Northumberland Solar I - 67675
17 MW - operation - oregon - Coffee Creek BESS - 67698

Disappeared projects (1):
20 MW - cancelled - florida - South Tampa Energy Storage - 66869

Updated projects (60):

300 MW - construction - arizona - Papago Energy Storage - 66779
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

250 MW - operation - arizona - Sierra Estrella Energy Storage - 66334 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2024-06 -> 2024-05 accelerated by 1 month

200 MW - operation - california - Condor Energy Storage LLC - 66285 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

150 MW - operation - california - Vikings Energy Farm - 65711 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

150 MW - operation - california - Scarlet II Hybrid - 66951
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - nevada - Dry Lake Solar Energy Center - 63933
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

80 MW - operation - california - Raceway Solar & Storage - 66773
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

60 MW - operation - hawaii - AES Maui Kuihelani Solar Hybrid - 64256
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

85 MW - operation - nevada - Yellow Pine II - 67091
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

50 MW - construction - tennessee - Ridgely Energy Farm - 65445
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

45 MW - operation - indiana - Cavalry Solar Hybrid - 67489
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

85 MW - operation - nevada - Yellow Pine II - 67091
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

11 MW - operation - colorado - Keenesburg Battery Storage - 67306
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

11 MW - operation - colorado - Rattlesnake Ridge Battery Storage - 67300
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

350 MW - planning - texas - Rowdy Creek Solar and BESS - 65854
  date: 2025-05 -> 2027-05 delayed by 24 months

306 MW - planning - texas - Ash Creek BESS - 66391
  date: 2025-05 -> 2028-03 delayed by 34 months

259 MW - operation - texas - Five Wells Solar Center - Hybrid - 66420
  date: 2024-05 -> 2024-07 delayed by 2 months

180 MW - planning - texas - Indigo Solar & Storage - 66891
  date: 2025-05 -> 2026-05 delayed by 12 months
  mw: 50 -> 180

150 MW - operation - arizona - McFarland B Solar and Storage - 66637
  date: 2024-08 -> 2024-09 delayed by 1 month

130 MW - construction - new mexico - Carne Energy Storage, LLC - 67230
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (T) Regulatory approvals received. Not under construction
  date: 2025-05 -> 2025-08 delayed by 3 months

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  date: 2024-06 -> 2024-08 delayed by 2 months

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2024-07 -> 2024-10 delayed by 3 months

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2024-07 -> 2024-10 delayed by 3 months

100 MW - operation - california - Cald BESS - 66617
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2024-05 -> 2024-06 delayed by 1 month

200 MW - operation - texas - Callisto I Energy Center - 66338
  date: 2024-06 -> 2024-07 delayed by 1 month

100 MW - operation - texas - Copperhead Solar, LLC - 67019
  date: 2024-05 -> 2024-07 delayed by 2 months

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2024-07 -> 2024-08 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2024-07 -> 2024-08 delayed by 1 month

100 MW - planning - texas - Holly Branch Solar, LLC - 66692
  date: 2026-10 -> 2027-08 delayed by 10 months

100 MW - cancelled - texas - Alamo 3 BESS 2 - 66293
  date: 2024-12 -> 2027-10 delayed by 34 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2024-06 -> 2024-07 delayed by 1 month

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2024-05 -> 2024-07 delayed by 2 months

75 MW - construction - california - Hummingbird Energy Storage LLC - 65395
  date: 2024-06 -> 2024-11 delayed by 5 months

70 MW - planning - texas - Briggs Solar, LLC - 66691
  date: 2025-12 -> 2027-12 delayed by 24 months

65 MW - operation - georgia - Mossy Branch Battery Facility - 65018
  date: 2024-05 -> 2024-07 delayed by 2 months

65 MW - construction - california - San Jacinto Grid, LLC - 65657
  date: 2024-06 -> 2025-02 delayed by 8 months

58 MW - planning - utah - Parowan Solar - 65823
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (P) Planned for installation, but regulatory approvals not initiated
  date: 2025-11 -> 2027-01 delayed by 14 months

45 MW - operation - california - Lockhart ESS, LLC - 66946
  date: 2024-05 -> 2024-07 delayed by 2 months

40 MW - operation - california - Sagebrush Solar 2 ESS 40 - 66949
  date: 2024-09 -> 2024-10 delayed by 1 month

40 MW - cancelled - indiana - Vermillion Rise Solar - 65935
  date: 2025-03 -> 2027-12 delayed by 33 months

30 MW - operation - california - Santa Paula Energy Storage LLC - 65397
  date: 2024-05 -> 2024-06 delayed by 1 month

30 MW - construction - hawaii - AES Waiawa Phase 2 Solar - 66066
  date: 2025-01 -> 2025-02 delayed by 1 month

25 MW - operation - california - West Ford Flat - 66669
  date: 2024-05 -> 2024-06 delayed by 1 month

25 MW - operation - california - Baldy Mesa 2_Silver Peak Hybrid - 66885
  date: 2024-06 -> 2024-07 delayed by 1 month

20 MW - construction - california - Ortega Grid, LLC - 65656
  date: 2024-05 -> 2025-03 delayed by 10 months

20 MW - construction - connecticut - Pure Hedge LLC - 50736
  date: 2024-12 -> 2025-10 delayed by 10 months

15 MW - operation - california - Paulsell - 67092
  date: 2024-05 -> 2024-06 delayed by 1 month

15 MW - operation - north carolina - McLauchin - 67041
  date: 2024-05 -> 2024-08 delayed by 3 months

13 MW - operation - california - Bear Canyon - 66650
  date: 2024-05 -> 2024-06 delayed by 1 month

10 MW - operation - north carolina - Butler - 67042
  date: 2024-06 -> 2024-08 delayed by 2 months

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2024-09 -> 2024-10 delayed by 1 month

10 MW - construction - california - Hecate Energy Desert Storage 1 LLC - 65635
  date: 2024-05 -> 2025-01 delayed by 8 months

10 MW - construction - california - Carris Storage I - 65733
  date: 2024-05 -> 2025-01 delayed by 8 months

150 MW - operation - texas - Borden County BESS - 66804
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

680 MW - construction - california - Menifee Power Bank - 66494
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

80 MW - operation - california - Placerita ESS - 66462
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

125 MW - operation - california - Tumbleweed Energy Storage - 66666
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

66 MW - operation - south carolina - Lone Star Solar - 62235
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

30 MW - cancelled - montana - Beaver Creek Wind Facility - 65019
  plant name: Beaver Creek I -> Beaver Creek Wind Facility

20 MW - planning - indiana - Honey Creek Solar - 65821
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (P) Planned for installation, but regulatory approvals not initiated


2024-06

New projects (16):
300 MW - construction - arizona - Papago Energy Storage - 66779
200 MW - planning - texas - Blackcat BESS - 67558
185 MW - planning - texas - Zephyr Storage - 67555
185 MW - planning - texas - Serrano BESS - 67556
150 MW - construction - texas - Desert Willow Energy Storage - 67598
150 MW - construction - idaho - Kuna BESS - 67549
100 MW - planning - texas - Jim Wells BESS - 67553
82 MW - operation - california - AES ES Alamitos 2 LLC - 67579
82 MW - construction - idaho - Happy Valley Battery Storage - 67573
77 MW - planning - texas - Cairos Solar and Storage - 67581
60 MW - construction - california - SF Azalea, LLC - 66890
50 MW - planning - texas - Elm Flats Solar - 67552
50 MW - planning - new mexico - Wildcat Solar Power Plant LLC - 64849
45 MW - operation - indiana - Cavalry Solar Hybrid - 67489
10 MW - operation - arizona - Mesquite Solar - 60964
10 MW - planning - texas - Cedar Hill ESS - 67570

Updated projects (54):

230 MW - operation - california - Sunlight Storage II - 66575
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

162 MW - operation - california - Proxima - 66270
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation
  date: 2024-05 -> 2024-04 accelerated by 1 month

73 MW - operation - texas - Ranchland Wind Storage - 64545
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation
  date: 2024-05 -> 2024-04 accelerated by 1 month

50 MW - operation - new mexico - Sky Ranch Solar - 66814
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

40 MW - operation - texas - Zier Solar - 66137
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

259 MW - operation - texas - Five Wells Solar Center - Hybrid - 66420
  date: 2024-04 -> 2024-05 delayed by 1 month

680 MW - construction - california - Menifee Power Bank - 66494
  date: 2024-06 -> 2024-07 delayed by 1 month

200 MW - operation - california - Condor Energy Storage LLC - 66285 Megapack
  date: 2024-04 -> 2024-05 delayed by 1 month

200 MW - operation - texas - Dickens - 65489
  date: 2024-04 -> 2024-06 delayed by 2 months

200 MW - operation - texas - Hydra - 65490
  date: 2024-04 -> 2024-06 delayed by 2 months

200 MW - operation - texas - Paleo - 65491
  date: 2024-04 -> 2024-06 delayed by 2 months

200 MW - construction - california - Peregrine Energy Storage LLC - 66286 Megapack
  date: 2024-10 -> 2025-01 delayed by 3 months

175 MW - operation - texas - Pavo - 65492
  date: 2024-04 -> 2024-06 delayed by 2 months

150 MW - operation - california - Vikings Energy Farm - 65711 Megapack
  date: 2024-04 -> 2024-05 delayed by 1 month

150 MW - construction - texas - Danish Fields Storage - 66916
  date: 2024-05 -> 2024-07 delayed by 2 months

150 MW - construction - texas - Myrtle Storage - 66913
  date: 2024-05 -> 2024-07 delayed by 2 months

150 MW - operation - arizona - McFarland B Solar and Storage - 66637
  date: 2024-07 -> 2024-08 delayed by 1 month

150 MW - planning - texas - Alamo 7 BESS 1 - 66297
  date: 2024-12 -> 2025-12 delayed by 12 months

150 MW - planning - texas - Alamo 7 BESS 2 - 66298
  date: 2024-12 -> 2025-12 delayed by 12 months

150 MW - cancelled - texas - Upton BESS 2 - 66303
  date: 2024-12 -> 2026-12 delayed by 24 months

150 MW - cancelled - texas - Crane 2 BESS 2 - 66300
  date: 2024-12 -> 2027-12 delayed by 36 months

150 MW - cancelled - texas - Uvalde 2 BESS 2 - 66305
  date: 2024-12 -> 2027-12 delayed by 36 months

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  date: 2024-05 -> 2024-06 delayed by 1 month

100 MW - operation - texas - Copperhead Solar, LLC - 67019
  date: 2024-04 -> 2024-05 delayed by 1 month

100 MW - operation - nevada - Dry Lake Solar Energy Center - 63933
  date: 2024-04 -> 2024-05 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2024-06 -> 2024-07 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2024-06 -> 2024-07 delayed by 1 month

100 MW - operation - texas - TX10 Hummingbird Storage - 65693
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2024-07 -> 2024-08 delayed by 1 month

100 MW - operation - california - Beaumont BESS - 66461
  date: 2024-06 -> 2024-08 delayed by 2 months

100 MW - construction - california - Pome BESS - 67299
  date: 2024-11 -> 2024-09 accelerated by 2 months

92 MW - construction - california - Northern Orchard Solar PV, LLC - 67039
  date: 2024-12 -> 2025-02 delayed by 2 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2024-05 -> 2024-06 delayed by 1 month

75 MW - cancelled - texas - Uvalde 2 BESS 1 - 66304
  date: 2024-12 -> 2027-12 delayed by 36 months

67 MW - operation - arizona - Yuma Solar + Storage - 67321
  date: 2024-05 -> 2024-12 delayed by 7 months

50 MW - operation - texas - Tortolas - 65493
  date: 2024-04 -> 2024-06 delayed by 2 months

125 MW - operation - california - Tumbleweed Energy Storage - 66666
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2024-07 -> 2024-06 accelerated by 1 month

40 MW - cancelled - idaho - Black Mesa BESS - 66326
  date: 2024-05 -> 2024-06 delayed by 1 month

88 MW - construction - california - Chaparral Springs - 64864
  date: 2024-04 -> 2024-06 delayed by 2 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2024-07 -> 2024-08 delayed by 1 month

30 MW - operation - california - Santa Paula Energy Storage LLC - 65397
  date: 2024-04 -> 2024-05 delayed by 1 month

30 MW - construction - hawaii - AES Waiawa Phase 2 Solar - 66066
  date: 2024-11 -> 2025-01 delayed by 2 months

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  date: 2024-04 -> 2024-06 delayed by 2 months

20 MW - construction - tennessee - Vonore Battery Energy Storage System - 64255
  date: 2024-07 -> 2024-12 delayed by 5 months

15 MW - operation - north carolina - McLauchin - 67041
  date: 2024-08 -> 2024-05 accelerated by 3 months

10 MW - construction - california - Sierra Energy Storage, LLC - 61803
  date: 2024-04 -> 2024-06 delayed by 2 months

10 MW - operation - north carolina - Butler - 67042
  date: 2024-08 -> 2024-06 accelerated by 2 months

10 MW - operation - colorado - High Mesa CO - 67323
  date: 2024-04 -> 2024-07 delayed by 3 months

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2024-07 -> 2024-09 delayed by 2 months

300 MW - operation - arizona - Eleven Mile Solar Center - 66263
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

100 MW - operation - texas - Brazos Bend BESS, LLC - 66690
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

100 MW - operation - texas - TX15 Limousin Oak Storage - 65698
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

100 MW - construction - texas - Bexar ESS - 66400
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (T) Regulatory approvals received. Not under construction

15 MW - operation - florida - Dover Energy Storage - 67120
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2024-05

New projects (10):
400 MW - planning - utah - Green River Energy Center - Hybrid - 67501
213 MW - construction - arizona - Serrano - 67503
200 MW - planning - texas - Bell Creek BESS LLC - 67535
185 MW - construction - arizona - McFarland C - 67498
170 MW - construction - arizona - Scatter Wash 1 - 67454 Megapack
150 MW - construction - arizona - Harquahala 2 - 67474
85 MW - construction - arizona - Scatter Wash 2 - 67455 Megapack
75 MW - construction - new mexico - Milagro Solar I - 67528
50 MW - cancelled - utah - Hornshadow Solar II, LLC - 67511
25 MW - cancelled - utah - Hornshadow Solar, LLC - 67497

Disappeared projects (4):
443 MW - cancelled - texas - Dogwood Creek Solar and BESS - 65843
75 MW - cancelled - utah - Hornshadow Solar II - 67191
75 MW - cancelled - utah - Hornshadow Solar - 67189
75 MW - cancelled - texas - Trinity River Solar 1 - 66132

Updated projects (66):

380 MW - operation - nevada - Gemini Solar Hybrid - 63352
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

200 MW - operation - indiana - Pike County Energy Storage - 66881
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

147 MW - operation - california - Golden Field Solar III, LLC - 63859
  status: planning -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (T) Regulatory approvals received. Not under construction -> operation
  date: 2024-04 -> 2024-03 accelerated by 1 month

136 MW - operation - california - Arica Solar - 65744
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

100 MW - operation - texas - St. Gall Energy Storage I - 66336
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation
  date: 2024-04 -> 2024-03 accelerated by 1 month

70 MW - operation - texas - Ganado Solar - 67284
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

50 MW - operation - california - Victory Pass - 65743
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

40 MW - cancelled - florida - Wimauma Energy Storage - 66640
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

16 MW - operation - texas - Cameron Wind 1 LLC - 59118
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

12 MW - operation - hawaii - AES West Oahu Solar Hybrid - 64656
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

10 MW - operation - california - Boulevard Energy Storage - 66279
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - california - Clairemont Energy Storage - 66266
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - california - Elliott Energy Storage - 66278
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

20 MW - operation - california - Melrose BESS - 66281
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

20 MW - operation - california - Melrose BESS - 66281
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - california - Pala Gomez Creek BESS - 66280
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - california - Paradise Energy Storage - 66265
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

300 MW - construction - texas - GulfStar Power, LLC - 66871
  date: 2024-06 -> 2024-10 delayed by 4 months

259 MW - operation - texas - Five Wells Solar Center - Hybrid - 66420
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2024-03 -> 2024-04 delayed by 1 month

200 MW - operation - texas - Dickens - 65489
  date: 2024-03 -> 2024-04 delayed by 1 month

200 MW - operation - texas - Hydra - 65490
  date: 2024-03 -> 2024-04 delayed by 1 month

200 MW - operation - texas - Paleo - 65491
  date: 2024-03 -> 2024-04 delayed by 1 month

200 MW - planning - california - Aratina Solar Center 2 - 64215
  date: 2025-03 -> 2025-01 accelerated by 2 months

200 MW - construction - texas - Tidwell Prairie Storage 1 - 66337
  date: 2024-12 -> 2025-03 delayed by 3 months

180 MW - planning - texas - Starr Solar Ranch - 65975
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (L) Regulatory approvals pending. Not under construction
  date: 2025-03 -> 2026-09 delayed by 18 months

175 MW - operation - texas - Pavo - 65492
  date: 2024-03 -> 2024-04 delayed by 1 month

126 MW - construction - california - AVEP BESS - 65591
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2024-06 -> 2024-09 delayed by 3 months

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  date: 2024-03 -> 2024-05 delayed by 2 months

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2024-06 -> 2024-07 delayed by 1 month

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2024-06 -> 2024-07 delayed by 1 month

100 MW - operation - texas - Copperhead Solar, LLC - 67019
  date: 2024-03 -> 2024-04 delayed by 1 month

100 MW - operation - nevada - Dry Lake Solar Energy Center - 63933
  date: 2024-03 -> 2024-04 delayed by 1 month

100 MW - operation - new mexico - San Juan Solar I - 66574
  date: 2024-05 -> 2024-06 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2024-05 -> 2024-06 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2024-05 -> 2024-06 delayed by 1 month

100 MW - operation - texas - Estonian Solar Project, LLC - 66872
  date: 2024-03 -> 2024-08 delayed by 5 months

100 MW - planning - california - Sacramento Valley Energy Center, LLC - 65808
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (L) Regulatory approvals pending. Not under construction
  date: 2024-12 -> 2026-12 delayed by 24 months

92 MW - construction - california - Northern Orchard Solar PV, LLC - 67039
  date: 2024-03 -> 2024-12 delayed by 9 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2024-04 -> 2024-05 delayed by 1 month

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2024-04 -> 2024-05 delayed by 1 month

73 MW - operation - texas - Ranchland Wind Storage - 64545
  date: 2024-03 -> 2024-05 delayed by 2 months

72 MW - operation - texas - Fence Post Solar Hybrid Project, LLC - 66801
  date: 2024-04 -> 2024-06 delayed by 2 months

88 MW - construction - california - Chaparral Springs - 64864
  date: 2024-04 -> 2024-06 delayed by 2 months

50 MW - operation - new mexico - Sky Ranch Solar - 66814
  plant name: Sky Ranch Solar and Storage -> Sky Ranch Solar
  date: 2024-03 -> 2024-04 delayed by 1 month

50 MW - construction - tennessee - Ridgely Energy Farm - 65445
  date: 2024-12 -> 2025-03 delayed by 3 months

45 MW - operation - california - Lockhart ESS, LLC - 66946
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2024-06 -> 2024-05 accelerated by 1 month

40 MW - cancelled - idaho - Black Mesa BESS - 66326
  date: 2024-04 -> 2024-05 delayed by 1 month

40 MW - planning - california - EDPR CA Solar Park VI LLC (CA) Hybrid - 62892
  date: 2024-12 -> 2026-10 delayed by 22 months

30 MW - operation - california - Santa Paula Energy Storage LLC - 65397
  date: 2024-03 -> 2024-04 delayed by 1 month

30 MW - planning - texas - Second Division Solar - 65981
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (L) Regulatory approvals pending. Not under construction
  date: 2025-03 -> 2026-09 delayed by 18 months

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  date: 2024-03 -> 2024-04 delayed by 1 month

25 MW - operation - california - West Ford Flat - 66669
  date: 2024-03 -> 2024-05 delayed by 2 months

20 MW - construction - tennessee - Vonore Battery Energy Storage System - 64255
  date: 2024-03 -> 2024-07 delayed by 4 months

13 MW - operation - california - Bear Canyon - 66650
  date: 2024-03 -> 2024-05 delayed by 2 months

11 MW - operation - colorado - Bromley Battery Storage - 67305
  date: 2024-05 -> 2024-06 delayed by 1 month

11 MW - operation - colorado - Davis Battery Storage - 67304
  date: 2024-05 -> 2024-07 delayed by 2 months

10 MW - construction - california - Sierra Energy Storage, LLC - 61803
  date: 2024-03 -> 2024-04 delayed by 1 month

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2024-06 -> 2024-07 delayed by 1 month

252 MW - planning - oklahoma - Skeleton Creek Energy Center Hybrid - 62494
  mw: 200 -> 252

103 MW - construction - texas - Bright Arrow Solar, LLC - 66688
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

100 MW - operation - texas - Brazos Bend BESS, LLC - 66690
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

100 MW - operation - idaho - Franklin Solar Hybrid - 67190
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

100 MW - construction - texas - Ables Springs Solar & Storage - 66905
  status_verbose: (V) Under construction, more than 50 percent complete -> (U) Under construction, less than or equal to 50 percent complete

70 MW - planning - california - JVR Energy Park LLC - 64428
  status_verbose: (T) Regulatory approvals received. Not under construction -> (P) Planned for installation, but regulatory approvals not initiated

680 MW - construction - california - Menifee Power Bank - 66494
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

15 MW - operation - california - Paulsell - 67092
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation


2024-04

New projects (16):
300 MW - operation - arizona - Sun Streams 4 - 67291
215 MW - operation - arizona - Sun Streams 3 - 67285
102 MW - planning - texas - SGT Hoskins Solar Project Hybrid - 67341
100 MW - construction - california - Pome BESS - 67299
75 MW - planning - arizona - Pluto Energy Storage - 67328
74 MW - planning - south carolina - Big Fork Solar - 62184
74 MW - planning - south carolina - Colleton Solar - 62188
67 MW - operation - arizona - Yuma Solar + Storage - 67321
50 MW - planning - south carolina - Crossroads Solar - 62190
50 MW - planning - south carolina - Quest Solar - 62299
11 MW - operation - colorado - Bromley Battery Storage - 67305
11 MW - operation - colorado - Davis Battery Storage - 67304
11 MW - operation - colorado - Keenesburg Battery Storage - 67306
11 MW - operation - colorado - Rattlesnake Ridge Battery Storage - 67300
10 MW - operation - colorado - High Mesa CO - 67323
10 MW - construction - colorado - Mamm Creek - 67322

Disappeared projects (2):
100 MW - cancelled - texas - Forest Grove - Dodd - 64131
61 MW - cancelled - texas - Talitha Energy Project, LLC - 65891

Updated projects (47):

175 MW - construction - maine - Cross Town Energy Storage - 66606 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete
  date: 2025-03 -> 2025-08 delayed by 5 months

150 MW - construction - massachusetts - Cranberry Point Energy Storage - 62844 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

200 MW - operation - texas - Callisto I Energy Center - 66338
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

90 MW - operation - arizona - Superstition Energy Storage - 66333 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

20 MW - operation - new jersey - Justin Court Energy Storage - 66758
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

380 MW - operation - nevada - Gemini Solar Hybrid - 63352
  date: 2024-02 -> 2024-03 delayed by 1 month

300 MW - construction - california - Nighthawk Energy Storage, LLC - 65889 Megapack
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (L) Regulatory approvals pending. Not under construction
  date: 2025-02 -> 2025-04 delayed by 2 months

259 MW - operation - texas - Five Wells Solar Center - Hybrid - 66420
  date: 2024-02 -> 2024-03 delayed by 1 month

200 MW - operation - texas - Hydra - 65490
  date: 2024-02 -> 2024-03 delayed by 1 month

200 MW - operation - texas - Anemoi Energy Storage - 67236
  date: 2024-05 -> 2024-06 delayed by 1 month

200 MW - construction - california - Peregrine Energy Storage LLC - 66286 Megapack
  date: 2024-09 -> 2024-10 delayed by 1 month

175 MW - operation - texas - Pavo - 65492
  date: 2024-02 -> 2024-03 delayed by 1 month

162 MW - operation - california - Proxima - 66270
  date: 2024-02 -> 2024-04 delayed by 2 months

150 MW - operation - california - Vikings Energy Farm - 65711 Megapack
  date: 2024-03 -> 2024-04 delayed by 1 month

150 MW - construction - texas - Danish Fields Storage - 66916
  date: 2024-03 -> 2024-05 delayed by 2 months

150 MW - construction - texas - Myrtle Storage - 66913
  date: 2024-03 -> 2024-05 delayed by 2 months

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  date: 2024-02 -> 2024-03 delayed by 1 month

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  date: 2024-04 -> 2024-05 delayed by 1 month

103 MW - construction - texas - Bright Arrow Solar, LLC - 66688
  date: 2024-05 -> 2024-10 delayed by 5 months

100 MW - operation - texas - St. Gall Energy Storage I - 66336
  date: 2024-03 -> 2024-04 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2024-04 -> 2024-05 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2024-04 -> 2024-05 delayed by 1 month

100 MW - operation - texas - TX10 Hummingbird Storage - 65693
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2024-08 -> 2024-07 accelerated by 1 month

100 MW - planning - california - Sacramento Valley Energy Center, LLC - 65808
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (P) Planned for installation, but regulatory approvals not initiated
  date: 2026-12 -> 2024-12 accelerated by 24 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2024-03 -> 2024-04 delayed by 1 month

75 MW - cancelled - ohio - Springwater Solar, LLC - 65900
  date: 2026-02 -> 2026-12 delayed by 10 months

74 MW - planning - california - Kingsley Solar Farm - 64634
  date: 2025-06 -> 2027-12 delayed by 30 months
  mw: 360 -> 74

61 MW - planning - texas - Oriana Solar LLC - 65849
  date: 2024-12 -> 2025-05 delayed by 5 months

50 MW - planning - texas - TREX US Red Holly - 63202
  date: 2024-07 -> 2025-07 delayed by 12 months

50 MW - cancelled - texas - Peeler Solar, LLC - 65932
  date: 2025-10 -> 2026-12 delayed by 14 months
  mw: 100 -> 50

40 MW - operation - texas - Zier Solar - 66137
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2024-02 -> 2024-04 delayed by 2 months

40 MW - cancelled - florida - Lake Mabel Energy Storage - 66641
  date: 2024-12 -> 2025-01 delayed by 1 month

40 MW - planning - illinois - Mulligan Solar, LLC - 65349
  date: 2025-06 -> 2025-07 delayed by 1 month

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  date: 2024-02 -> 2024-03 delayed by 1 month

16 MW - operation - texas - Cameron Wind 1 LLC - 59118
  date: 2024-02 -> 2024-03 delayed by 1 month
  mw: 24 -> 16

15 MW - operation - california - Paulsell - 67092
  date: 2024-02 -> 2024-05 delayed by 3 months

12 MW - operation - hawaii - AES West Oahu Solar Hybrid - 64656
  date: 2024-02 -> 2024-03 delayed by 1 month

20 MW - operation - california - Melrose BESS - 66281
  date: 2024-02 -> 2024-03 delayed by 1 month

20 MW - operation - california - Melrose BESS - 66281
  date: 2024-02 -> 2024-03 delayed by 1 month

10 MW - operation - california - Pala Gomez Creek BESS - 66280
  date: 2024-02 -> 2024-03 delayed by 1 month

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2024-05 -> 2024-06 delayed by 1 month

100 MW - operation - california - Beaumont BESS - 66461
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

100 MW - operation - texas - TX15 Limousin Oak Storage - 65698
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

100 MW - construction - texas - Bexar ESS - 66400
  entity id: 58489 -> 66064
  entity name: OCI Solar Power -> Bexar ESS, LLC

125 MW - operation - california - Tumbleweed Energy Storage - 66666
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

50 MW - construction - tennessee - Ridgely Energy Farm - 65445
  status_verbose: (T) Regulatory approvals received. Not under construction -> (L) Regulatory approvals pending. Not under construction

20 MW - cancelled - hawaii - Kahana Solar, LLC - 64095
  entity id: 63703 -> 64904
  entity name: Kahana Solar, LLC -> AES Clean Energy


2024-03

New projects (10):
300 MW - operation - arizona - Eleven Mile Solar Center - 66263
200 MW - operation - texas - Anemoi Energy Storage - 67236
200 MW - operation - texas - Ebony Energy Storage - 67237
200 MW - planning - texas - Alina Energy LLC - 67250
200 MW - planning - texas - Rock Rose Energy Storage LLC - 67249
150 MW - construction - california - Trestles Grid LLC - 67229
130 MW - construction - new mexico - Carne Energy Storage, LLC - 67230
100 MW - construction - new mexico - Quail Ranch Solar and BESS - 67204
70 MW - operation - texas - Ganado Solar - 67284
85 MW - operation - nevada - Yellow Pine II - 67091

Disappeared projects (2):
300 MW - cancelled - texas - Rodeo Ranch Energy Storage - 67175
100 MW - construction - wisconsin - Paris Solar - 65967

Updated projects (72):

300 MW - construction - texas - GulfStar Power, LLC - 66871
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

250 MW - construction - texas - Zeya - 65880
  entity id: 63883 -> 56201
  entity name: Broad Reach Power -> Engie North America
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

200 MW - construction - texas - Cachi - 65861
  entity id: 63883 -> 56201
  entity name: Broad Reach Power -> Engie North America
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

200 MW - construction - texas - Castor - 65870
  entity id: 63883 -> 56201
  entity name: Broad Reach Power -> Engie North America
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

200 MW - construction - texas - Desna - 65876
  entity id: 63883 -> 56201
  entity name: Broad Reach Power -> Engie North America
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

160 MW - construction - texas - Avila - 65860
  entity id: 63883 -> 56201
  entity name: Broad Reach Power -> Engie North America
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

150 MW - construction - texas - Carina - 65589
  entity id: 63883 -> 56201
  entity name: Broad Reach Power -> Engie North America
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

125 MW - construction - texas - Octans - 65590
  entity id: 63883 -> 56201
  entity name: Broad Reach Power -> Engie North America
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

100 MW - construction - texas - Ables Springs Solar & Storage - 66905
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

99 MW - construction - california - Noosa Energy Storage LLC - 64531
  entity id: 63883 -> 56201
  entity name: Broad Reach Power -> Engie North America
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

70 MW - construction - texas - Antlia - 65588
  entity id: 63883 -> 56201
  entity name: Broad Reach Power -> Engie North America
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

63 MW - operation - texas - House Mountain - 66006
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

60 MW - operation - california - Goleta Energy Storage, LLC - 66394 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

40 MW - cancelled - florida - Lake Mabel Energy Storage - 66641
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

10 MW - operation - arizona - Mesquite Solar 4, LLC - 65962
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2024-02 -> 2024-01 accelerated by 1 month

300 MW - planning - texas - Elio Energy LLC - 65850
  date: 2025-06 -> 2026-12 delayed by 18 months

259 MW - operation - texas - Five Wells Solar Center - Hybrid - 66420
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2024-01 -> 2024-02 delayed by 1 month

200 MW - planning - texas - Eldora Energy LLC - 65847
  date: 2025-06 -> 2026-06 delayed by 12 months

162 MW - operation - california - Proxima - 66270
  date: 2024-01 -> 2024-02 delayed by 1 month

150 MW - construction - texas - Myrtle Storage - 66913
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2024-02 -> 2024-03 delayed by 1 month

150 MW - operation - arizona - McFarland B Solar and Storage - 66637
  date: 2024-05 -> 2024-07 delayed by 2 months

150 MW - operation - california - Eland Solar & Storage Center, Phase 1 Hy - 61168 Megapack
  date: 2024-11 -> 2024-09 accelerated by 2 months

150 MW - planning - georgia - Aragon Energy Storage - 66431
  date: 2026-10 -> 2027-04 delayed by 6 months

125 MW - construction - california - Aratina Solar Center 1B - 61167
  date: 2025-06 -> 2025-11 delayed by 5 months
  mw: 50 -> 125

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  date: 2024-01 -> 2024-02 delayed by 1 month

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  date: 2024-02 -> 2024-04 delayed by 2 months

100 MW - operation - texas - St. Gall Energy Storage I - 66336
  date: 2024-02 -> 2024-03 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2024-03 -> 2024-04 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2024-03 -> 2024-04 delayed by 1 month

100 MW - operation - texas - TX10 Hummingbird Storage - 65693
  date: 2024-07 -> 2024-08 delayed by 1 month

100 MW - operation - texas - TX15 Limousin Oak Storage - 65698
  date: 2024-06 -> 2024-08 delayed by 2 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2024-01 -> 2024-03 delayed by 2 months

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2024-01 -> 2024-04 delayed by 3 months

80 MW - operation - california - Raceway Solar & Storage - 66773
  date: 2024-02 -> 2024-05 delayed by 3 months

80 MW - operation - california - Bottleneck Energy Storage - 66757
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2024-04 -> 2024-07 delayed by 3 months

75 MW - construction - california - Hummingbird Energy Storage LLC - 65395
  date: 2024-12 -> 2024-06 accelerated by 6 months

73 MW - operation - texas - Ranchland Wind Storage - 64545
  date: 2024-01 -> 2024-03 delayed by 2 months

70 MW - operation - california - Inland Empire Energy Storage - 66726
  date: 2024-06 -> 2024-12 delayed by 6 months

65 MW - construction - california - San Jacinto Grid, LLC - 65657
  date: 2024-03 -> 2024-06 delayed by 3 months

88 MW - construction - california - Chaparral Springs - 64864
  date: 2024-02 -> 2024-04 delayed by 2 months

125 MW - operation - california - Tumbleweed Energy Storage - 66666
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2024-06 -> 2024-07 delayed by 1 month

40 MW - cancelled - idaho - Black Mesa BESS - 66326
  date: 2024-02 -> 2024-04 delayed by 2 months

40 MW - operation - california - Scarlet Solar (CA) - 64908
  date: 2024-06 -> 2024-12 delayed by 6 months

88 MW - construction - california - Chaparral Springs - 64864
  date: 2024-02 -> 2024-04 delayed by 2 months

30 MW - operation - california - Santa Paula Energy Storage LLC - 65397
  date: 2024-02 -> 2024-03 delayed by 1 month

30 MW - planning - virginia - Deer Wood Storage, LLC - 65145
  date: 2025-04 -> 2026-11 delayed by 19 months

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  entity id: 63883 -> 56201
  entity name: Broad Reach Power -> Engie North America
  date: 2024-01 -> 2024-02 delayed by 1 month

16 MW - operation - texas - Cameron Wind 1 LLC - 59118
  date: 2024-01 -> 2024-02 delayed by 1 month

20 MW - construction - california - Ortega Grid, LLC - 65656
  date: 2024-04 -> 2024-05 delayed by 1 month

20 MW - cancelled - hawaii - Kahana Solar, LLC - 64095
  date: 2024-12 -> 2027-11 delayed by 35 months

20 MW - planning - new york - South Ripley Solar - 64911
  date: 2026-12 -> 2027-12 delayed by 12 months

17 MW - planning - virginia - Powells Creek Solar - Hybrid - 65305
  date: 2024-06 -> 2024-12 delayed by 6 months

12 MW - operation - hawaii - AES West Oahu Solar Hybrid - 64656
  date: 2024-01 -> 2024-02 delayed by 1 month

12 MW - planning - delaware - ENGIE Solidago Solar Project - Hybrid - 65304
  date: 2024-06 -> 2024-12 delayed by 6 months

12 MW - planning - ohio - Salt City Solar Project - Hybrid - 65302
  date: 2024-06 -> 2024-12 delayed by 6 months

12 MW - planning - virginia - Sunnybrook Solar Project - Hybrid - 65307
  date: 2024-06 -> 2024-12 delayed by 6 months

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2024-04 -> 2024-05 delayed by 1 month

240 MW - operation - california - Rexford Solar Farm - 64633
  entity id: 64247 -> 64904
  entity name: 20SD 8me LLC -> AES Clean Energy
  mw: 300 -> 240

680 MW - construction - california - Menifee Power Bank - 66494
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

200 MW - operation - texas - Hydra - 65490
  entity id: 63883 -> 56201
  entity name: Broad Reach Power -> Engie North America

200 MW - operation - texas - Dickens - 65489
  entity id: 63883 -> 56201
  entity name: Broad Reach Power -> Engie North America

200 MW - operation - texas - Paleo - 65491
  entity id: 63883 -> 56201
  entity name: Broad Reach Power -> Engie North America

200 MW - operation - indiana - Pike County Energy Storage - 66881
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (T) Regulatory approvals received. Not under construction

180 MW - planning - texas - Starr Solar Ranch - 65975
  mw: 30 -> 180

175 MW - operation - texas - Pavo - 65492
  entity id: 63883 -> 56201
  entity name: Broad Reach Power -> Engie North America

150 MW - construction - texas - Danish Fields Storage - 66916
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

100 MW - operation - new mexico - San Juan Solar I - 66574
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

75 MW - cancelled - utah - Hornshadow Solar - 67189
  status_verbose: (T) Regulatory approvals received. Not under construction -> (P) Planned for installation, but regulatory approvals not initiated

50 MW - operation - texas - Tortolas - 65493
  entity id: 63883 -> 56201
  entity name: Broad Reach Power -> Engie North America

50 MW - construction - tennessee - Ridgely Energy Farm - 65445
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (T) Regulatory approvals received. Not under construction

20 MW - cancelled - florida - South Tampa Energy Storage - 66869
  plant name: MacDill Storage -> South Tampa Energy Storage

10 MW - construction - california - Sierra Energy Storage, LLC - 61803
  entity id: 63883 -> 56201
  entity name: Broad Reach Power -> Engie North America


2024-02

New projects (15):
300 MW - cancelled - texas - Rodeo Ranch Energy Storage - 67175 Megapack
250 MW - construction - arizona - Beehive Energy Storage - 67184
100 MW - operation - idaho - Franklin Solar Hybrid - 67190
100 MW - construction - wisconsin - Paris Solar - 65967
75 MW - cancelled - utah - Hornshadow Solar II - 67191
75 MW - cancelled - utah - Hornshadow Solar - 67189
60 MW - operation - idaho - Franklin Battery Storage - 67183
166 MW - planning - idaho - Hemmingway BESS - 66325
20 MW - planning - oregon - Powell Solar - 67157
15 MW - operation - arizona - Mohave Energy - Hybrid - 67178
15 MW - operation - california - Paulsell - 67092
15 MW - operation - florida - Dover Energy Storage - 67120
12 MW - planning - hawaii - KRS I Anahola Solar Hybrid - 58639
12 MW - planning - hawaii - KRS II Koloa Solar - 58640
10 MW - construction - california - Santee BESS - 67118

Disappeared projects (6):
180 MW - cancelled - nevada - Chuckwalla Solar, LLC - 64558
140 MW - cancelled - texas - Coati Solar, LLC - 66693
75 MW - cancelled - wisconsin - Darien Solar - 64534
50 MW - operation - mississippi - Golden Triangle - 64529
50 MW - operation - mississippi - OE_MS6 - 65291
15 MW - cancelled - florida - Dover Solar - 66129

Updated projects (79):

225 MW - operation - california - Solar Blue - 63848
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

220 MW - operation - nevada - Reid Gardner - 2324
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

185 MW - operation - hawaii - Kapolei Energy Storage - 66067 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

150 MW - operation - texas - Revolution - 66170
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

135 MW - operation - california - Chestnut - 63849
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

131 MW - operation - california - Daggett 2 - 64851
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

100 MW - operation - arizona - McFarland A Solar and Storage - 66636
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

100 MW - operation - texas - Estonian Solar Project, LLC - 66872
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (TS) Construction complete, but not yet in commercial operation
  date: 2024-10 -> 2024-03 accelerated by 7 months

99 MW - construction - california - Lead BESS 1 - 66660
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

99 MW - construction - california - Electrolyte BESS - 66661
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

97 MW - operation - california - Acid BESS - 66659
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

75 MW - operation - nevada - Arrow Canyon Solar Hybrid - 62248
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

32 MW - construction - california - Lead BESS 2 - 66662
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

28 MW - operation - california - Estrella Solar & Storage - 66772
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

20 MW - operation - arizona - SR McNeal - 66925
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - texas - SMT Alamo LLC - 66929
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - texas - SMT Elsa LLC - 66931
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - texas - SMT Harlingen II LLC - 66933
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - texas - SMT Los Fresnos LLC - 66932
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - texas - SMT Mercedes LLC - 66926
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - texas - SMT Mission LLC - 66927
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - texas - SMT Rio Grande I LLC - 66934
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - texas - SMT Rio Grande II LLC - 66935
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - texas - SMT Santa Rosa LLC - 66928
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

621 MW - planning - texas - Lunis Creek Solar and BESS SLF - 65852
  date: 2024-12 -> 2025-07 delayed by 7 months

370 MW - planning - nevada - Arida Solar (Hybrid) - 63841
  date: 2027-06 -> 2027-12 delayed by 6 months

300 MW - planning - nevada - Southern Bighorn Solar Hybrid - 63113
  date: 2026-05 -> 2027-05 delayed by 12 months
  mw: 135 -> 300

259 MW - operation - texas - Five Wells Solar Center - Hybrid - 66420
  date: 2023-12 -> 2024-01 delayed by 1 month

200 MW - operation - california - Condor Energy Storage LLC - 66285 Megapack
  date: 2024-03 -> 2024-04 delayed by 1 month

200 MW - construction - california - Peregrine Energy Storage LLC - 66286 Megapack
  date: 2024-12 -> 2024-09 accelerated by 3 months

200 MW - construction - california - Big Rock Solar Farm - 64636
  date: 2024-12 -> 2025-05 delayed by 5 months

200 MW - planning - california - Sienna Solar Farm - 64632
  date: 2024-12 -> 2028-12 delayed by 48 months

151 MW - planning - new york - NY2 Battery - 63584
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (L) Regulatory approvals pending. Not under construction
  date: 2024-12 -> 2026-12 delayed by 24 months

150 MW - construction - texas - Myrtle Storage - 66913
  date: 2024-01 -> 2024-02 delayed by 1 month

150 MW - construction - texas - Danish Fields Storage - 66916
  date: 2024-02 -> 2024-03 delayed by 1 month

150 MW - operation - california - Vikings Energy Farm - 65711 Megapack
  date: 2024-02 -> 2024-03 delayed by 1 month

150 MW - planning - texas - Alamo 7 BESS 1 - 66297
  date: 2024-05 -> 2024-12 delayed by 7 months

150 MW - planning - texas - Alamo 7 BESS 2 - 66298
  date: 2024-05 -> 2024-12 delayed by 7 months

150 MW - cancelled - texas - Crane 2 BESS 2 - 66300
  date: 2024-05 -> 2024-12 delayed by 7 months

150 MW - cancelled - texas - Upton BESS 2 - 66303
  date: 2024-05 -> 2024-12 delayed by 7 months

150 MW - cancelled - texas - Uvalde 2 BESS 2 - 66305
  date: 2024-05 -> 2024-12 delayed by 7 months

79 MW - planning - new york - KCE NY 29, LLC - 66862
  date: 2025-12 -> 2026-03 delayed by 3 months

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  date: 2023-12 -> 2024-01 delayed by 1 month

45 MW - planning - connecticut - KCE CT 1, LLC - 66879
  date: 2027-05 -> 2028-10 delayed by 17 months

100 MW - operation - texas - St. Gall Energy Storage I - 66336
  date: 2024-01 -> 2024-02 delayed by 1 month

100 MW - operation - nevada - Dry Lake Solar Energy Center - 63933
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2023-12 -> 2024-03 delayed by 3 months

100 MW - cancelled - texas - Alamo 3 BESS 2 - 66293
  date: 2024-05 -> 2024-12 delayed by 7 months

100 MW - planning - texas - Alamo 4 BESS - 66294
  date: 2024-05 -> 2024-12 delayed by 7 months

100 MW - planning - texas - Alamo 5 BESS 1 - 66295
  date: 2024-05 -> 2024-12 delayed by 7 months

100 MW - planning - texas - Alamo 5 BESS 2 - 66296
  date: 2024-05 -> 2024-12 delayed by 7 months

100 MW - construction - texas - Seven Flags BESS LLC - 66689
  status_verbose: (T) Regulatory approvals received. Not under construction -> (P) Planned for installation, but regulatory approvals not initiated
  date: 2025-09 -> 2025-12 delayed by 3 months

100 MW - planning - texas - TX 14 Venus Mill Storage - 65788
  date: 2025-12 -> 2026-01 delayed by 1 month

100 MW - planning - california - Sacramento Valley Energy Center, LLC - 65808
  date: 2024-12 -> 2026-12 delayed by 24 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2023-12 -> 2024-01 delayed by 1 month

75 MW - cancelled - texas - Uvalde 2 BESS 1 - 66304
  date: 2024-05 -> 2024-12 delayed by 7 months

75 MW - construction - california - Hummingbird Energy Storage LLC - 65395
  date: 2023-12 -> 2024-12 delayed by 12 months

73 MW - operation - texas - Ranchland Wind Storage - 64545
  date: 2023-12 -> 2024-01 delayed by 1 month

72 MW - operation - texas - Fence Post Solar Hybrid Project, LLC - 66801
  date: 2024-03 -> 2024-04 delayed by 1 month

66 MW - operation - south carolina - Lone Star Solar - 62235
  date: 2023-12 -> 2024-12 delayed by 12 months

61 MW - cancelled - texas - Talitha Energy Project, LLC - 65891
  date: 2025-03 -> 2025-04 delayed by 1 month
  mw: 131 -> 61

60 MW - operation - california - Goleta Energy Storage, LLC - 66394 Megapack
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2023-12 -> 2024-01 delayed by 1 month

58 MW - planning - utah - Parowan Solar - 65823
  date: 2024-12 -> 2025-11 delayed by 11 months

50 MW - planning - virginia - Dulles Solar and Storage - 65043
  date: 2024-12 -> 2026-12 delayed by 24 months

30 MW - operation - california - Santa Paula Energy Storage LLC - 65397
  date: 2024-01 -> 2024-02 delayed by 1 month

16 MW - operation - texas - Cameron Wind 1 LLC - 59118
  date: 2023-12 -> 2024-01 delayed by 1 month

20 MW - planning - new york - KCE NY 10, LLC - 66682
  date: 2025-12 -> 2026-03 delayed by 3 months

20 MW - planning - new york - South Ripley Solar - 64911
  date: 2024-12 -> 2026-12 delayed by 24 months

20 MW - planning - indiana - Honey Creek Solar - 65821
  date: 2024-12 -> 2026-12 delayed by 24 months

17 MW - planning - virginia - Powells Creek Solar - Hybrid - 65305
  date: 2024-05 -> 2024-06 delayed by 1 month

12 MW - planning - delaware - ENGIE Solidago Solar Project - Hybrid - 65304
  date: 2024-05 -> 2024-06 delayed by 1 month

12 MW - planning - ohio - Salt City Solar Project - Hybrid - 65302
  date: 2024-05 -> 2024-06 delayed by 1 month

12 MW - planning - virginia - Sunnybrook Solar Project - Hybrid - 65307
  date: 2024-05 -> 2024-06 delayed by 1 month

10 MW - operation - arizona - Mesquite Solar 4, LLC - 65962
  date: 2023-12 -> 2024-02 delayed by 2 months

250 MW - operation - arizona - Sierra Estrella Energy Storage - 66334 Megapack
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

230 MW - operation - california - Sunlight Storage II - 66575
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

147 MW - operation - california - Golden Field Solar III, LLC - 63859
  energy source code: -> MWH

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

25 MW - operation - california - West Ford Flat - 66669
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

13 MW - operation - california - Bear Canyon - 66650
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2024-01

New projects (4):
400 MW - planning - texas - Iron Belt - 67059
174 MW - operation - texas - Longbow BESS, LLC - 67083
147 MW - operation - california - Golden Field Solar III, LLC - 63859
85 MW - operation - nevada - Yellow Pine II - 67091

Disappeared projects (1):
15 MW - cancelled - hawaii - Paeahu Solar Hybrid - 62534

Updated projects (66):

150 MW - operation - texas - Borden County BESS - 66804
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete
  date: 2024-05 -> 2024-06 delayed by 1 month

136 MW - operation - california - Edwards Sanborn E1B - 65674
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

100 MW - operation - california - Edwards Sanborn E4 - 65675
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

68 MW - operation - california - Stanton Battery Energy Storage - 66423
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

680 MW - construction - california - Menifee Power Bank - 66494
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

47 MW - operation - california - Sanborn BESS 4 - 65673
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation
  date: 2023-12 -> 2023-11 accelerated by 1 month

47 MW - operation - california - Edwards Sanborn E5 - 65676
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

20 MW - operation - virginia - Dry Bridge Storage - 65044
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation
  date: 2023-12 -> 2023-11 accelerated by 1 month

10 MW - operation - texas - SMT Bay City LLC - 66930
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

380 MW - operation - nevada - Gemini Solar Hybrid - 63352
  date: 2023-11 -> 2024-02 delayed by 3 months

240 MW - operation - california - Rexford Solar Farm - 64633
  date: 2024-04 -> 2024-12 delayed by 8 months

225 MW - operation - california - Solar Blue - 63848
  date: 2023-11 -> 2023-12 delayed by 1 month

200 MW - construction - california - Peregrine Energy Storage LLC - 66286 Megapack
  date: 2024-08 -> 2024-12 delayed by 4 months

150 MW - operation - texas - Revolution - 66170
  date: 2023-11 -> 2023-12 delayed by 1 month

150 MW - construction - texas - Myrtle Storage - 66913
  date: 2023-12 -> 2024-01 delayed by 1 month

150 MW - operation - california - Scarlet II Hybrid - 66951
  date: 2024-10 -> 2024-12 delayed by 2 months

150 MW - construction - california - Eland Solar & Storage Center, Phase 2 Hy - 61169 Megapack
  date: 2024-11 -> 2025-03 delayed by 4 months

135 MW - operation - california - Chestnut - 63849
  date: 2023-11 -> 2023-12 delayed by 1 month

61 MW - cancelled - texas - Talitha Energy Project, LLC - 65891
  date: 2024-10 -> 2025-03 delayed by 5 months
  mw: 61 -> 131

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  date: 2023-12 -> 2024-02 delayed by 2 months

100 MW - operation - arizona - McFarland A Solar and Storage - 66636
  date: 2023-11 -> 2023-12 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2024-01 -> 2024-03 delayed by 2 months

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2024-01 -> 2024-03 delayed by 2 months

100 MW - operation - new mexico - San Juan Solar I - 66574
  date: 2024-07 -> 2024-05 accelerated by 2 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2023-11 -> 2023-12 delayed by 1 month

75 MW - cancelled - wisconsin - Darien Solar - 64534
  date: 2024-11 -> 2024-12 delayed by 1 month

65 MW - construction - california - San Jacinto Grid, LLC - 65657
  date: 2024-01 -> 2024-03 delayed by 2 months

63 MW - operation - texas - House Mountain - 66006
  date: 2023-12 -> 2024-01 delayed by 1 month

88 MW - construction - california - Chaparral Springs - 64864
  date: 2023-12 -> 2024-02 delayed by 2 months

50 MW - operation - texas - Tortolas - 65493
  date: 2024-03 -> 2024-04 delayed by 1 month

43 MW - planning - california - Dynegy Oakland Power Plant - 6211
  date: 2024-11 -> 2027-05 delayed by 30 months

40 MW - cancelled - idaho - Black Mesa BESS - 66326
  date: 2023-12 -> 2024-02 delayed by 2 months

88 MW - construction - california - Chaparral Springs - 64864
  date: 2023-12 -> 2024-02 delayed by 2 months

30 MW - operation - california - Santa Paula Energy Storage LLC - 65397
  date: 2023-11 -> 2024-01 delayed by 2 months

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  date: 2023-12 -> 2024-01 delayed by 1 month

20 MW - construction - california - Ortega Grid, LLC - 65656
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2024-01 -> 2024-04 delayed by 3 months

10 MW - operation - texas - SMT Alamo LLC - 66929
  date: 2023-11 -> 2023-12 delayed by 1 month

10 MW - operation - texas - SMT Harlingen II LLC - 66933
  date: 2023-11 -> 2023-12 delayed by 1 month

10 MW - operation - texas - SMT Mercedes LLC - 66926
  date: 2023-11 -> 2023-12 delayed by 1 month

10 MW - operation - texas - SMT Mission LLC - 66927
  date: 2023-11 -> 2023-12 delayed by 1 month

10 MW - operation - texas - SMT Santa Rosa LLC - 66928
  date: 2023-11 -> 2023-12 delayed by 1 month

20 MW - operation - california - Melrose BESS - 66281
  date: 2023-12 -> 2024-02 delayed by 2 months

20 MW - operation - california - Melrose BESS - 66281
  date: 2023-12 -> 2024-02 delayed by 2 months

10 MW - operation - california - Pala Gomez Creek BESS - 66280
  date: 2023-12 -> 2024-02 delayed by 2 months

10 MW - construction - california - Sierra Energy Storage, LLC - 61803
  date: 2023-12 -> 2024-03 delayed by 3 months

10 MW - operation - california - Boulevard Energy Storage - 66279
  date: 2023-12 -> 2024-03 delayed by 3 months

10 MW - operation - california - Clairemont Energy Storage - 66266
  date: 2023-12 -> 2024-03 delayed by 3 months

10 MW - operation - california - Elliott Energy Storage - 66278
  date: 2023-12 -> 2024-03 delayed by 3 months

10 MW - operation - california - Paradise Energy Storage - 66265
  date: 2023-12 -> 2024-03 delayed by 3 months

10 MW - construction - california - Hecate Energy Desert Storage 1 LLC - 65635
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2024-01 -> 2024-05 delayed by 4 months

10 MW - construction - california - Carris Storage I - 65733
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2024-02 -> 2024-05 delayed by 3 months

10 MW - construction - texas - Grizzly Ridge Solar - 66410
  date: 2024-04 -> 2024-08 delayed by 4 months

680 MW - construction - california - Menifee Power Bank - 66494
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

200 MW - operation - texas - Hydra - 65490
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

200 MW - operation - texas - Dickens - 65489
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

175 MW - operation - texas - Pavo - 65492
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

162 MW - operation - california - Proxima - 66270
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

150 MW - construction - texas - Danish Fields Storage - 66916
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

100 MW - operation - california - Cald BESS - 66617
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

72 MW - operation - texas - Fence Post Solar Hybrid Project, LLC - 66801
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

65 MW - operation - georgia - Mossy Branch Battery Facility - 65018
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

50 MW - operation - mississippi - Golden Triangle - 64529
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

50 MW - operation - mississippi - OE_MS6 - 65291
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

45 MW - operation - california - Lockhart ESS, LLC - 66946
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

20 MW - operation - arizona - SR McNeal - 66925
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

15 MW - cancelled - florida - Dover Solar - 66129
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (T) Regulatory approvals received. Not under construction


2023-12

New projects (8):
100 MW - operation - texas - Copperhead Solar, LLC - 67019
92 MW - construction - california - Northern Orchard Solar PV, LLC - 67039
680 MW - construction - california - Menifee Power Bank - 66494
30 MW - planning - texas - Second Division Solar - 65981
180 MW - planning - texas - Starr Solar Ranch - 65975
15 MW - operation - north carolina - McLauchin - 67041
10 MW - operation - north carolina - Archie Horne - 67040
10 MW - operation - north carolina - Butler - 67042

Disappeared projects (1):
660 MW - cancelled - texas - Goldenrod Creek Solar and BESS SLF - 65845

Updated projects (38):

169 MW - operation - california - Sanborn BESS 3 - 65672
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

25 MW - operation - california - West Ford Flat - 66669
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

13 MW - operation - california - Bear Canyon - 66650
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

460 MW - planning - texas - Hollow Branch Creek 2 Solar and BESS SLF - 65851
  date: 2024-10 -> 2025-12 delayed by 14 months

370 MW - planning - nevada - Arida Solar (Hybrid) - 63841
  date: 2024-10 -> 2027-06 delayed by 32 months
  mw: 185 -> 370

302 MW - planning - texas - Middlebrook Creek Solar and BESS - 65853
  date: 2024-10 -> 2026-02 delayed by 16 months

150 MW - operation - texas - Revolution - 66170
  date: 2023-10 -> 2023-11 delayed by 1 month

150 MW - operation - california - Scarlet II Hybrid - 66951
  date: 2024-06 -> 2024-10 delayed by 4 months

136 MW - operation - california - Edwards Sanborn E1B - 65674
  date: 2023-10 -> 2023-11 delayed by 1 month

135 MW - operation - california - Chestnut - 63849
  date: 2023-10 -> 2023-11 delayed by 1 month

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  date: 2023-10 -> 2023-12 delayed by 2 months

680 MW - construction - california - Menifee Power Bank - 66494
  date: 2024-08 -> 2024-09 delayed by 1 month

100 MW - operation - california - Edwards Sanborn E4 - 65675
  date: 2023-10 -> 2023-11 delayed by 1 month

100 MW - operation - texas - TX10 Hummingbird Storage - 65693
  date: 2024-04 -> 2024-07 delayed by 3 months

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2024-02 -> 2024-01 accelerated by 1 month

80 MW - operation - california - Raceway Solar & Storage - 66773
  date: 2023-12 -> 2024-02 delayed by 2 months

75 MW - operation - nevada - Arrow Canyon Solar Hybrid - 62248
  date: 2023-11 -> 2023-12 delayed by 1 month

73 MW - operation - texas - Ranchland Wind Storage - 64545
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2023-10 -> 2023-12 delayed by 2 months

68 MW - operation - california - Stanton Battery Energy Storage - 66423
  date: 2023-10 -> 2023-11 delayed by 1 month

65 MW - construction - california - San Jacinto Grid, LLC - 65657
  date: 2023-12 -> 2024-01 delayed by 1 month

63 MW - operation - texas - House Mountain - 66006
  date: 2023-11 -> 2023-12 delayed by 1 month

60 MW - operation - california - Goleta Energy Storage, LLC - 66394 Megapack
  date: 2023-11 -> 2023-12 delayed by 1 month

40 MW - cancelled - idaho - Black Mesa BESS - 66326
  date: 2023-11 -> 2023-12 delayed by 1 month

30 MW - construction - hawaii - AES Waiawa Phase 2 Solar - 66066
  date: 2024-10 -> 2024-11 delayed by 1 month

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  date: 2023-11 -> 2023-12 delayed by 1 month

16 MW - operation - texas - Cameron Wind 1 LLC - 59118
  date: 2023-11 -> 2023-12 delayed by 1 month

20 MW - operation - virginia - Dry Bridge Storage - 65044
  status_verbose: (V) Under construction, more than 50 percent complete -> (U) Under construction, less than or equal to 50 percent complete
  date: 2023-10 -> 2023-12 delayed by 2 months

20 MW - construction - california - Ortega Grid, LLC - 65656
  date: 2023-11 -> 2024-01 delayed by 2 months

20 MW - construction - tennessee - Vonore Battery Energy Storage System - 64255
  date: 2023-12 -> 2024-03 delayed by 3 months

10 MW - operation - texas - SMT Bay City LLC - 66930
  date: 2023-10 -> 2023-11 delayed by 1 month

10 MW - construction - california - Hecate Energy Desert Storage 1 LLC - 65635
  date: 2023-12 -> 2024-01 delayed by 1 month

10 MW - construction - texas - Grizzly Ridge Solar - 66410
  date: 2024-02 -> 2024-04 delayed by 2 months

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2023-12 -> 2024-04 delayed by 4 months

220 MW - operation - nevada - Reid Gardner - 2324
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

200 MW - operation - california - Condor Energy Storage LLC - 66285 Megapack
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

100 MW - operation - nevada - Dry Lake Solar Energy Center - 63933
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

76 MW - planning - texas - Gaia Hybrid - 66342
  entity name: Samsung Solar Energy 2, LLC -> Samsung C&T Renewables, LLC

55 MW - planning - texas - Eagle Springs Hybrid - 66341
  entity name: Samsung Solar Energy 2, LLC -> Samsung C&T Renewables, LLC


2023-11

New projects (0):

Updated projects (67):

220 MW - operation - nevada - Reid Gardner - 2324
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

125 MW - operation - california - Oberon II Solar Project - 65735 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

125 MW - operation - california - Oberon Solar Project - 65734 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) - 64197
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

103 MW - construction - texas - Bright Arrow Solar, LLC - 66688
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - arizona - Saint Energy Storage II LLC - 66716
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

100 MW - operation - california - Beaumont BESS - 66461
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2024-03 -> 2024-06 delayed by 3 months

88 MW - operation - arizona - Storey Solar and Storage - 65956
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

80 MW - operation - california - Placerita ESS - 66462
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2024-02 -> 2024-09 delayed by 7 months

125 MW - operation - california - Tumbleweed Energy Storage - 66666
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

125 MW - operation - california - Tumbleweed Energy Storage - 66666
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

20 MW - operation - arizona - SR McNeal - 66925
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

10 MW - operation - texas - SMT Bay City LLC - 66930
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (TS) Construction complete, but not yet in commercial operation

10 MW - operation - texas - SMT Alamo LLC - 66929
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (TS) Construction complete, but not yet in commercial operation

10 MW - operation - texas - SMT Harlingen II LLC - 66933
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (TS) Construction complete, but not yet in commercial operation

10 MW - operation - texas - SMT Mercedes LLC - 66926
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (TS) Construction complete, but not yet in commercial operation

10 MW - operation - texas - SMT Mission LLC - 66927
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (TS) Construction complete, but not yet in commercial operation

10 MW - operation - texas - SMT Santa Rosa LLC - 66928
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (TS) Construction complete, but not yet in commercial operation

10 MW - operation - texas - SMT Elsa LLC - 66931
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (TS) Construction complete, but not yet in commercial operation

10 MW - operation - texas - SMT Los Fresnos LLC - 66932
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (TS) Construction complete, but not yet in commercial operation

10 MW - operation - texas - SMT Rio Grande I LLC - 66934
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (TS) Construction complete, but not yet in commercial operation

10 MW - operation - texas - SMT Rio Grande II LLC - 66935
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (TS) Construction complete, but not yet in commercial operation

225 MW - operation - california - Solar Blue - 63848
  date: 2023-09 -> 2023-11 delayed by 2 months

169 MW - operation - california - Sanborn BESS 3 - 65672
  date: 2023-09 -> 2023-10 delayed by 1 month

150 MW - operation - arizona - McFarland B Solar and Storage - 66637
  date: 2023-12 -> 2024-05 delayed by 5 months

135 MW - operation - california - Chestnut - 63849
  date: 2023-09 -> 2023-10 delayed by 1 month

131 MW - operation - california - Daggett 2 - 64851
  date: 2023-11 -> 2023-12 delayed by 1 month

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  date: 2023-09 -> 2023-10 delayed by 1 month

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  date: 2023-10 -> 2023-12 delayed by 2 months

100 MW - operation - california - Edwards Sanborn E4 - 65675
  date: 2023-09 -> 2023-10 delayed by 1 month

100 MW - operation - arizona - McFarland A Solar and Storage - 66636
  date: 2023-12 -> 2023-11 accelerated by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2023-11 -> 2024-01 delayed by 2 months

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2023-11 -> 2024-01 delayed by 2 months

100 MW - operation - new mexico - San Juan Solar I - 66574
  date: 2024-08 -> 2024-07 accelerated by 1 month

100 MW - operation - texas - Estonian Solar Project, LLC - 66872
  date: 2024-04 -> 2024-10 delayed by 6 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2023-10 -> 2023-11 delayed by 1 month

75 MW - operation - nevada - Arrow Canyon Solar Hybrid - 62248
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2023-10 -> 2023-11 delayed by 1 month

75 MW - planning - texas - Noria Hondo Solar (Hybrid) - 65344
  date: 2024-09 -> 2025-09 delayed by 12 months

75 MW - operation - california - Baldy Mesa Solar & Storage - 66598
  date: 2023-12 -> 2025-10 delayed by 22 months

73 MW - operation - texas - Ranchland Wind Storage - 64545
  date: 2023-09 -> 2023-10 delayed by 1 month

68 MW - operation - california - Stanton Battery Energy Storage - 66423
  date: 2023-09 -> 2023-10 delayed by 1 month

65 MW - construction - california - San Jacinto Grid, LLC - 65657
  date: 2023-11 -> 2023-12 delayed by 1 month

63 MW - operation - texas - House Mountain - 66006
  date: 2023-10 -> 2023-11 delayed by 1 month

680 MW - construction - california - Menifee Power Bank - 66494
  date: 2024-09 -> 2024-08 accelerated by 1 month

47 MW - operation - california - Edwards Sanborn E5 - 65676
  date: 2023-09 -> 2023-11 delayed by 2 months

40 MW - cancelled - idaho - Black Mesa BESS - 66326
  date: 2023-10 -> 2023-11 delayed by 1 month

30 MW - operation - california - Santa Paula Energy Storage LLC - 65397
  date: 2023-09 -> 2023-11 delayed by 2 months

30 MW - construction - hawaii - AES Waiawa Phase 2 Solar - 66066
  date: 2023-12 -> 2024-10 delayed by 10 months

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  date: 2023-09 -> 2023-11 delayed by 2 months

25 MW - operation - california - Baldy Mesa 2_Silver Peak Hybrid - 66885
  date: 2023-12 -> 2024-06 delayed by 6 months

16 MW - operation - texas - Cameron Wind 1 LLC - 59118
  date: 2023-10 -> 2023-11 delayed by 1 month

20 MW - operation - virginia - Dry Bridge Storage - 65044
  date: 2023-09 -> 2023-10 delayed by 1 month

20 MW - operation - new jersey - Justin Court Energy Storage - 66758
  date: 2023-11 -> 2024-02 delayed by 3 months

12 MW - operation - hawaii - AES West Oahu Solar Hybrid - 64656
  date: 2023-09 -> 2024-01 delayed by 4 months

10 MW - construction - california - Hecate Energy Desert Storage 1 LLC - 65635
  date: 2023-11 -> 2023-12 delayed by 1 month

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2023-11 -> 2023-12 delayed by 1 month

10 MW - operation - california - Boulevard Energy Storage - 66279
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2023-09 -> 2023-12 delayed by 3 months

10 MW - operation - california - Clairemont Energy Storage - 66266
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2023-09 -> 2023-12 delayed by 3 months

10 MW - operation - california - Elliott Energy Storage - 66278
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2023-09 -> 2023-12 delayed by 3 months

20 MW - operation - california - Melrose BESS - 66281
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2023-09 -> 2023-12 delayed by 3 months

20 MW - operation - california - Melrose BESS - 66281
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2023-09 -> 2023-12 delayed by 3 months

10 MW - operation - california - Pala Gomez Creek BESS - 66280
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2023-09 -> 2023-12 delayed by 3 months

10 MW - operation - california - Paradise Energy Storage - 66265
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2023-09 -> 2023-12 delayed by 3 months

10 MW - construction - california - Carris Storage I - 65733
  date: 2023-11 -> 2024-02 delayed by 3 months

10 MW - planning - maine - South Portland ESS, LLC - 64616
  date: 2024-02 -> 2024-12 delayed by 10 months

150 MW - construction - texas - Myrtle Storage - 66913
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2023-10

New projects (5):
150 MW - operation - california - Scarlet II Hybrid - 66951
680 MW - construction - california - Menifee Power Bank - 66494
59 MW - operation - california - Sagebrush Solar 2 ESS 59 - 66950
45 MW - operation - california - Lockhart ESS, LLC - 66946
40 MW - operation - california - Sagebrush Solar 2 ESS 40 - 66949

Updated projects (60):

680 MW - construction - california - Menifee Power Bank - 66494
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

680 MW - construction - california - Menifee Power Bank - 66494
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

200 MW - operation - california - Condor Energy Storage LLC - 66285 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2024-08 -> 2024-03 accelerated by 5 months

190 MW - operation - texas - Cunningham Storage - 65410
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

150 MW - operation - california - Vikings Energy Farm - 65711 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete
  date: 2024-08 -> 2024-02 accelerated by 6 months

132 MW - operation - california - North Central Valley - 66208
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

100 MW - operation - texas - St. Gall Energy Storage I - 66336
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - texas - Brazos Bend BESS, LLC - 66690
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - new mexico - San Juan Solar I - 66574
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

80 MW - operation - california - Raceway Solar & Storage - 66773
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

75 MW - operation - california - Resurgence Solar - 64489
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

40 MW - operation - california - Resurgence Solar II - 66620
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

28 MW - operation - california - Estrella Solar & Storage - 66772
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

20 MW - operation - california - VESI Pomona - 50300
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation
  date: 2023-10 -> 2023-08 accelerated by 2 months

10 MW - operation - california - BCE Los Alamitos 1 - 66533
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - california - BCE Los Alamitos 2 - 66532
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

200 MW - operation - texas - Hydra - 65490
  date: 2023-12 -> 2024-02 delayed by 2 months

200 MW - operation - texas - Dickens - 65489
  date: 2024-02 -> 2024-03 delayed by 1 month

200 MW - operation - texas - Paleo - 65491
  date: 2024-02 -> 2024-03 delayed by 1 month

185 MW - operation - hawaii - Kapolei Energy Storage - 66067 Megapack
  date: 2023-08 -> 2023-12 delayed by 4 months

175 MW - operation - texas - Pavo - 65492
  date: 2023-12 -> 2024-02 delayed by 2 months

150 MW - construction - texas - Carina - 65589
  date: 2024-06 -> 2024-12 delayed by 6 months

136 MW - operation - california - Arica Solar - 65744
  date: 2023-12 -> 2024-03 delayed by 3 months

131 MW - operation - california - Daggett 2 - 64851
  date: 2023-10 -> 2023-11 delayed by 1 month

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  date: 2023-08 -> 2023-09 delayed by 1 month

117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) - 64197
  date: 2023-08 -> 2023-09 delayed by 1 month

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  date: 2023-09 -> 2023-10 delayed by 1 month

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2023-11 -> 2024-06 delayed by 7 months

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2023-11 -> 2024-06 delayed by 7 months

100 MW - operation - arizona - Saint Energy Storage II LLC - 66716
  date: 2023-08 -> 2023-09 delayed by 1 month

100 MW - operation - california - Edwards Sanborn E4 - 65675
  date: 2023-08 -> 2023-09 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2023-10 -> 2023-11 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2023-10 -> 2023-11 delayed by 1 month

88 MW - operation - arizona - Storey Solar and Storage - 65956
  date: 2023-08 -> 2023-09 delayed by 1 month

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2023-08 -> 2023-10 delayed by 2 months

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2024-04 -> 2024-02 accelerated by 2 months

75 MW - operation - nevada - Arrow Canyon Solar Hybrid - 62248
  date: 2023-08 -> 2023-10 delayed by 2 months

73 MW - operation - texas - Ranchland Wind Storage - 64545
  date: 2023-08 -> 2023-09 delayed by 1 month

70 MW - construction - texas - Antlia - 65588
  date: 2024-06 -> 2024-12 delayed by 6 months

68 MW - operation - california - Stanton Battery Energy Storage - 66423
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2023-08 -> 2023-09 delayed by 1 month

60 MW - operation - hawaii - AES Maui Kuihelani Solar Hybrid - 64256
  date: 2023-12 -> 2024-05 delayed by 5 months

52 MW - construction - hawaii - Ho'Ohana Solar 1 - 63723
  date: 2023-08 -> 2024-10 delayed by 14 months

50 MW - operation - texas - Tortolas - 65493
  date: 2023-12 -> 2024-03 delayed by 3 months

50 MW - operation - california - Victory Pass - 65743
  date: 2023-12 -> 2024-03 delayed by 3 months

40 MW - cancelled - idaho - Black Mesa BESS - 66326
  date: 2023-09 -> 2023-10 delayed by 1 month

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  date: 2023-08 -> 2023-09 delayed by 1 month

16 MW - operation - texas - Cameron Wind 1 LLC - 59118
  date: 2023-09 -> 2023-10 delayed by 1 month

10 MW - operation - california - Boulevard Energy Storage - 66279
  date: 2023-08 -> 2023-09 delayed by 1 month

10 MW - operation - california - Clairemont Energy Storage - 66266
  date: 2023-08 -> 2023-09 delayed by 1 month

10 MW - operation - california - Elliott Energy Storage - 66278
  date: 2023-08 -> 2023-09 delayed by 1 month

20 MW - operation - california - Melrose BESS - 66281
  date: 2023-08 -> 2023-09 delayed by 1 month

20 MW - operation - california - Melrose BESS - 66281
  date: 2023-08 -> 2023-09 delayed by 1 month

10 MW - operation - california - Pala Gomez Creek BESS - 66280
  date: 2023-08 -> 2023-09 delayed by 1 month

10 MW - operation - california - Paradise Energy Storage - 66265
  date: 2023-08 -> 2023-09 delayed by 1 month

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2023-10 -> 2023-11 delayed by 1 month

10 MW - construction - california - Sierra Energy Storage, LLC - 61803
  date: 2023-09 -> 2023-12 delayed by 3 months

200 MW - construction - california - Peregrine Energy Storage LLC - 66286 Megapack
  status_verbose: (T) Regulatory approvals received. Not under construction -> (L) Regulatory approvals pending. Not under construction

162 MW - operation - california - Proxima - 66270
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

125 MW - operation - california - Oberon II Solar Project - 65735 Megapack
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

125 MW - operation - california - Oberon Solar Project - 65734 Megapack
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation


2023-09

New projects (30):
300 MW - construction - texas - GulfStar Power, LLC - 66871
300 MW - cancelled - new york - Hecate Grid Intrepid - 66911
220 MW - operation - nevada - Reid Gardner - 2324
200 MW - operation - indiana - Pike County Energy Storage - 66881
195 MW - planning - nevada - Bonanza Solar and Storage Project - 66908
150 MW - construction - texas - Myrtle Storage - 66913
150 MW - construction - texas - Danish Fields Storage - 66916
79 MW - planning - new york - KCE NY 29, LLC - 66862
122 MW - planning - texas - Lupinus Solar 2, LLC - 66896
45 MW - planning - connecticut - KCE CT 1, LLC - 66879
100 MW - operation - texas - Estonian Solar Project, LLC - 66872
100 MW - construction - texas - Ables Springs Solar & Storage - 66905
83 MW - planning - texas - Lupinus Solar 1, LLC - 66895
50 MW - construction - texas - Midpoint Solar, LLC - 66897
180 MW - planning - texas - Indigo Solar & Storage - 66891
50 MW - planning - texas - Albatross Solar, LLC - 66894
300 MW - cancelled - new york - Hecate Grid Intrepid - 66911
25 MW - operation - california - Baldy Mesa 2_Silver Peak Hybrid - 66885
20 MW - operation - arizona - SR McNeal - 66925
20 MW - cancelled - florida - South Tampa Energy Storage - 66869
10 MW - operation - texas - SMT Bay City LLC - 66930
10 MW - operation - texas - SMT Alamo LLC - 66929
10 MW - operation - texas - SMT Harlingen II LLC - 66933
10 MW - operation - texas - SMT Mercedes LLC - 66926
10 MW - operation - texas - SMT Mission LLC - 66927
10 MW - operation - texas - SMT Santa Rosa LLC - 66928
10 MW - operation - texas - SMT Elsa LLC - 66931
10 MW - operation - texas - SMT Los Fresnos LLC - 66932
10 MW - operation - texas - SMT Rio Grande I LLC - 66934
10 MW - operation - texas - SMT Rio Grande II LLC - 66935

Updated projects (56):

325 MW - operation - california - Desert Peak Energy Storage I - 65987
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

260 MW - operation - arizona - Sonoran Solar Energy - 66627
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

250 MW - operation - arizona - Sierra Estrella Energy Storage - 66334 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

230 MW - operation - california - Sunlight Storage II - 66575
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid - 63172 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

150 MW - operation - texas - Wolf Tank Storage - 66616
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

150 MW - operation - arizona - McFarland B Solar and Storage - 66637
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

149 MW - operation - california - Daggett 3 - 64852
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

100 MW - operation - arizona - McFarland A Solar and Storage - 66636
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

100 MW - operation - texas - TX10 Hummingbird Storage - 65693
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - texas - TX15 Limousin Oak Storage - 65698
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete
  date: 2024-04 -> 2024-06 delayed by 2 months

75 MW - operation - california - Desert Peak Energy Storage II - 65988
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

75 MW - operation - california - Baldy Mesa Solar & Storage - 66598
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

65 MW - construction - california - San Jacinto Grid, LLC - 65657
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

65 MW - operation - georgia - Mossy Branch Battery Facility - 65018
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

60 MW - operation - arizona - Mesquite Solar 5, LLC - 65963
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2023-12 -> 2023-07 accelerated by 5 months

60 MW - operation - hawaii - AES Maui Kuihelani Solar Hybrid - 64256
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

59 MW - operation - texas - Roseland Solar Project, LLC - 65028
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

50 MW - operation - texas - TX19 River Valley Storage 1 - 65699
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

50 MW - operation - texas - TX21 River Valley Storage 2 - 65700
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

50 MW - operation - texas - Roadrunner, LLC Hybrid - 62561
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

48 MW - operation - nevada - Yellow Pine Solar - 66357
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

30 MW - construction - hawaii - AES Waiawa Phase 2 Solar - 66066
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

20 MW - operation - new york - Willis Battery Storage - 63238
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation
  date: 2023-09 -> 2023-07 accelerated by 2 months

20 MW - operation - new mexico - Jicarilla Solar 1 LLC - 66163
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

18 MW - operation - california - Edwards Sanborn S4 - 65677
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

680 MW - construction - california - Menifee Power Bank - 66494
  date: 2024-08 -> 2024-06 accelerated by 2 months

680 MW - construction - california - Menifee Power Bank - 66494
  date: 2024-08 -> 2024-06 accelerated by 2 months

190 MW - operation - texas - Cunningham Storage - 65410
  date: 2023-07 -> 2023-08 delayed by 1 month

169 MW - operation - california - Sanborn BESS 3 - 65672
  date: 2023-08 -> 2023-09 delayed by 1 month

150 MW - operation - california - Desert Quartzite - 59871
  date: 2023-08 -> 2024-08 delayed by 12 months

136 MW - operation - california - Arica Solar - 65744
  date: 2023-11 -> 2023-12 delayed by 1 month

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  date: 2023-08 -> 2023-09 delayed by 1 month

100 MW - operation - arizona - Saint Energy Storage II LLC - 66716
  date: 2023-07 -> 2023-08 delayed by 1 month

100 MW - operation - california - Edwards Sanborn E4 - 65675
  date: 2023-07 -> 2023-08 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2023-09 -> 2023-10 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2023-09 -> 2023-10 delayed by 1 month

100 MW - operation - texas - St. Gall Energy Storage I - 66336
  date: 2023-12 -> 2024-01 delayed by 1 month

100 MW - construction - texas - Bexar ESS - 66400
  date: 2024-08 -> 2025-03 delayed by 7 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2023-07 -> 2023-08 delayed by 1 month

75 MW - operation - california - Resurgence Solar - 64489
  date: 2023-07 -> 2023-08 delayed by 1 month

60 MW - operation - california - Goleta Energy Storage, LLC - 66394 Megapack
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2023-10 -> 2023-11 delayed by 1 month

58 MW - planning - nevada - Boulder Solar III LLC - 65141
  date: 2023-12 -> 2025-12 delayed by 24 months

50 MW - operation - california - Victory Pass - 65743
  date: 2023-11 -> 2023-12 delayed by 1 month

680 MW - construction - california - Menifee Power Bank - 66494
  date: 2024-08 -> 2024-09 delayed by 1 month

40 MW - operation - california - Resurgence Solar II - 66620
  date: 2023-07 -> 2023-08 delayed by 1 month

40 MW - operation - california - Scarlet Solar (CA) - 64908
  date: 2024-03 -> 2024-06 delayed by 3 months

16 MW - operation - texas - Cameron Wind 1 LLC - 59118
  date: 2023-08 -> 2023-09 delayed by 1 month

20 MW - operation - new jersey - Justin Court Energy Storage - 66758
  date: 2023-07 -> 2023-11 delayed by 4 months

15 MW - cancelled - south carolina - Wolf Pit Branch Solar, LLC - 65437
  date: 2023-11 -> 2026-04 delayed by 29 months

20 MW - operation - california - Melrose BESS - 66281
  date: 2023-07 -> 2023-08 delayed by 1 month

20 MW - operation - california - Melrose BESS - 66281
  date: 2023-07 -> 2023-08 delayed by 1 month

10 MW - operation - california - Pala Gomez Creek BESS - 66280
  date: 2023-07 -> 2023-08 delayed by 1 month

10 MW - planning - maine - South Portland ESS, LLC - 64616
  date: 2023-12 -> 2024-02 delayed by 2 months

150 MW - operation - texas - Revolution - 66170
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

47 MW - operation - california - Sanborn BESS 4 - 65673
  plant name: Sanborn EBESS1 -> Sanborn BESS 4


2023-08

New projects (12):
275 MW - planning - connecticut - Elevate Middletown - 66786
150 MW - operation - texas - Borden County BESS - 66804
80 MW - operation - california - Raceway Solar & Storage - 66773
80 MW - operation - california - Bottleneck Energy Storage - 66757
72 MW - operation - texas - Fence Post Solar Hybrid Project, LLC - 66801
70 MW - planning - california - Elevate Pier S - 66787
50 MW - operation - new mexico - Sky Ranch Solar - 66814
28 MW - operation - california - Estrella Solar & Storage - 66772
24 MW - operation - texas - Upton County BESS - 64811
20 MW - operation - new jersey - Justin Court Energy Storage - 66758
15 MW - cancelled - florida - Dover Solar - 66129
15 MW - construction - new york - Elevate Arthur Kill - 66785

Updated projects (50):

750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid - 260
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

210 MW - operation - texas - Blue Jay Solar I, LLC - 64672
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

131 MW - operation - california - CED West Side Canal Battery Storage - 65980
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

125 MW - operation - colorado - Neptune Energy Center Hybrid - 63731
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

100 MW - operation - colorado - Thunder Wolf Energy Center Hybrid - 63776
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

66 MW - operation - south carolina - Lone Star Solar - 62235
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

50 MW - operation - new mexico - Buena Vista Energy Center - 66408
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation
  date: 2023-07 -> 2023-06 accelerated by 1 month

50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid - 62562
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

20 MW - operation - new jersey - Andover Energy Storage Project - 65952
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

500 MW - planning - texas - Hecate Energy Ramsey Storage - 66414
  date: 2024-06 -> 2025-12 delayed by 18 months

74 MW - planning - california - Kingsley Solar Farm - 64634
  date: 2024-06 -> 2025-06 delayed by 12 months

300 MW - construction - california - Nighthawk Energy Storage, LLC - 65889 Megapack
  date: 2024-06 -> 2025-02 delayed by 8 months

260 MW - operation - arizona - Sonoran Solar Energy - 66627
  date: 2023-06 -> 2023-07 delayed by 1 month

259 MW - operation - texas - Five Wells Solar Center - Hybrid - 66420
  entity id: 65507 -> 65502
  entity name: Chesapeake Solar Project, LLC -> Five Wells Solar Center, LLC
  date: 2024-03 -> 2023-12 accelerated by 3 months

255 MW - planning - texas - Hecate Grid East Valley Storage - 66411
  date: 2024-06 -> 2025-12 delayed by 18 months

200 MW - planning - california - Aratina Solar Center 2 - 64215
  date: 2024-06 -> 2025-03 delayed by 9 months

151 MW - planning - new york - NY2 Battery - 63584
  date: 2024-06 -> 2024-12 delayed by 6 months

162 MW - operation - california - Proxima - 66270
  date: 2023-10 -> 2024-01 delayed by 3 months

150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid - 63172 Megapack
  date: 2023-06 -> 2023-07 delayed by 1 month

150 MW - operation - texas - Wolf Tank Storage - 66616
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2023-06 -> 2023-07 delayed by 1 month

149 MW - operation - california - Daggett 3 - 64852
  date: 2023-06 -> 2023-07 delayed by 1 month

131 MW - operation - california - Daggett 2 - 64851
  date: 2023-09 -> 2023-10 delayed by 1 month

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  date: 2023-06 -> 2023-08 delayed by 2 months

88 MW - operation - arizona - Storey Solar and Storage - 65956
  date: 2023-07 -> 2023-08 delayed by 1 month

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2023-12 -> 2024-04 delayed by 4 months

73 MW - operation - texas - Ranchland Wind Storage - 64545
  date: 2023-06 -> 2023-08 delayed by 2 months

65 MW - construction - california - San Jacinto Grid, LLC - 65657
  date: 2023-09 -> 2023-11 delayed by 2 months

65 MW - operation - georgia - Mossy Branch Battery Facility - 65018
  date: 2023-10 -> 2024-05 delayed by 7 months

60 MW - operation - arizona - Mesquite Solar 5, LLC - 65963
  date: 2023-06 -> 2023-12 delayed by 6 months

59 MW - operation - texas - Roseland Solar Project, LLC - 65028
  date: 2023-06 -> 2023-07 delayed by 1 month

50 MW - operation - texas - Roadrunner, LLC Hybrid - 62561
  date: 2023-06 -> 2023-07 delayed by 1 month

47 MW - operation - california - Sanborn BESS 4 - 65673
  date: 2023-08 -> 2023-12 delayed by 4 months

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  date: 2023-07 -> 2023-08 delayed by 1 month

20 MW - operation - new mexico - Jicarilla Solar 1 LLC - 66163
  date: 2023-06 -> 2023-07 delayed by 1 month

20 MW - operation - new york - Willis Battery Storage - 63238
  date: 2023-06 -> 2023-09 delayed by 3 months

20 MW - construction - california - Ortega Grid, LLC - 65656
  date: 2023-08 -> 2023-11 delayed by 3 months

18 MW - operation - california - Edwards Sanborn S4 - 65677
  date: 2023-06 -> 2023-07 delayed by 1 month

10 MW - construction - california - Hecate Energy Desert Storage 1 LLC - 65635
  date: 2023-09 -> 2023-11 delayed by 2 months

10 MW - construction - california - Carris Storage I - 65733
  date: 2023-09 -> 2023-11 delayed by 2 months

10 MW - operation - arizona - Mesquite Solar 4, LLC - 65962
  date: 2023-06 -> 2023-12 delayed by 6 months

250 MW - operation - arizona - Sierra Estrella Energy Storage - 66334 Megapack
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (T) Regulatory approvals received. Not under construction

230 MW - operation - california - Sunlight Storage II - 66575
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (T) Regulatory approvals received. Not under construction

185 MW - operation - hawaii - Kapolei Energy Storage - 66067 Megapack
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

99 MW - construction - california - Lead BESS 1 - 66660
  plant name: Hanford BESS -> Lead BESS 1

99 MW - construction - california - Electrolyte BESS - 66661
  plant name: Henrietta BESS -> Electrolyte BESS

97 MW - operation - california - Acid BESS - 66659
  plant name: Malaga BESS -> Acid BESS

90 MW - operation - arizona - Superstition Energy Storage - 66333 Megapack
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (T) Regulatory approvals received. Not under construction

40 MW - operation - california - Scarlet Solar (CA) - 64908
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

32 MW - construction - california - Lead BESS 2 - 66662
  plant name: BIA BESS -> Lead BESS 2

15 MW - cancelled - south carolina - Wolf Pit Branch Solar, LLC - 65437
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (L) Regulatory approvals pending. Not under construction


2023-07

New projects (21):
140 MW - cancelled - texas - Coati Solar, LLC - 66693
103 MW - construction - texas - Bright Arrow Solar, LLC - 66688
100 MW - operation - arizona - Saint Energy Storage II LLC - 66716
100 MW - operation - texas - Brazos Bend BESS, LLC - 66690
100 MW - construction - texas - Seven Flags BESS LLC - 66689
100 MW - planning - texas - Holly Branch Solar, LLC - 66692
99 MW - construction - california - Lead BESS 1 - 66660
99 MW - construction - california - Electrolyte BESS - 66661
97 MW - operation - california - Acid BESS - 66659
88 MW - operation - arizona - Storey Solar and Storage - 65956
125 MW - operation - california - Tumbleweed Energy Storage - 66666
70 MW - operation - california - Inland Empire Energy Storage - 66726
70 MW - planning - texas - Briggs Solar, LLC - 66691
125 MW - operation - california - Tumbleweed Energy Storage - 66666
40 MW - cancelled - florida - Lake Mabel Energy Storage - 66641
40 MW - cancelled - florida - Wimauma Energy Storage - 66640
32 MW - construction - california - Lead BESS 2 - 66662
25 MW - operation - california - West Ford Flat - 66669
20 MW - planning - new york - KCE NY 10, LLC - 66682
20 MW - planning - new york - Alfred Oaks Solar, LLC - 66675
20 MW - cancelled - new york - Cold Creek Solar - 66674

Disappeared projects (4):
350 MW - cancelled - texas - Tehuacana Creek 2 Solar and BESS - 65856
100 MW - cancelled - texas - TX18 Cottage Meadow Storage - 63879
100 MW - cancelled - texas - TX17 Nickel Prairie Storage - 63880
62 MW - cancelled - indiana - Peony Solar 1 - 66131

Updated projects (42):

240 MW - operation - california - Rexford Solar Farm - 64633
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

80 MW - operation - california - Sagebrush ESS - 65933
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

60 MW - operation - california - Goleta Energy Storage, LLC - 66394 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

50 MW - operation - new mexico - Buena Vista Energy Center - 66408
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (TS) Construction complete, but not yet in commercial operation
  date: 2023-06 -> 2023-07 delayed by 1 month

40 MW - operation - california - Resurgence Solar II - 66620
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

20 MW - operation - new york - NY6 Battery - 65692
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation
  date: 2023-06 -> 2023-05 accelerated by 1 month

12 MW - operation - ohio - Bowling Green Energy Storage Project - 65951
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2023-06 -> 2023-05 accelerated by 1 month

418 MW - planning - texas - Tehuacana Creek 1 Solar and BESS - 65855
  date: 2024-05 -> 2025-07 delayed by 14 months
  mw: 350 -> 418

350 MW - planning - texas - Rowdy Creek Solar and BESS - 65854
  date: 2024-05 -> 2025-05 delayed by 12 months

190 MW - operation - texas - Cunningham Storage - 65410
  date: 2023-06 -> 2023-07 delayed by 1 month

185 MW - operation - hawaii - Kapolei Energy Storage - 66067 Megapack
  date: 2023-07 -> 2023-08 delayed by 1 month

150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid - 63172 Megapack
  date: 2023-05 -> 2023-06 delayed by 1 month

150 MW - operation - texas - Wolf Tank Storage - 66616
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2023-05 -> 2023-06 delayed by 1 month

149 MW - operation - california - Daggett 3 - 64852
  date: 2023-09 -> 2023-06 accelerated by 3 months

131 MW - operation - california - CED West Side Canal Battery Storage - 65980
  date: 2023-05 -> 2023-06 delayed by 1 month

131 MW - operation - california - Daggett 2 - 64851
  date: 2023-11 -> 2023-09 accelerated by 2 months

117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) - 64197
  date: 2023-10 -> 2023-08 accelerated by 2 months

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  date: 2023-06 -> 2023-08 delayed by 2 months

100 MW - operation - colorado - Thunder Wolf Energy Center Hybrid - 63776
  date: 2023-05 -> 2023-06 delayed by 1 month

100 MW - operation - california - Edwards Sanborn E4 - 65675
  date: 2023-06 -> 2023-07 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2023-07 -> 2023-09 delayed by 2 months

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2023-07 -> 2023-09 delayed by 2 months

100 MW - operation - texas - TX10 Hummingbird Storage - 65693
  date: 2024-03 -> 2024-04 delayed by 1 month

100 MW - operation - texas - TX15 Limousin Oak Storage - 65698
  date: 2024-03 -> 2024-04 delayed by 1 month

100 MW - planning - texas - TX 14 Venus Mill Storage - 65788
  plant name: KCE TX 14: Venus Mill Storage -> TX 14 Venus Mill Storage
  date: 2024-07 -> 2025-12 delayed by 17 months

99 MW - construction - california - Noosa Energy Storage LLC - 64531
  date: 2023-10 -> 2024-09 delayed by 11 months

63 MW - operation - texas - House Mountain - 66006
  date: 2023-09 -> 2023-10 delayed by 1 month

50 MW - operation - texas - TX19 River Valley Storage 1 - 65699
  date: 2023-05 -> 2023-07 delayed by 2 months

50 MW - operation - texas - TX21 River Valley Storage 2 - 65700
  date: 2023-05 -> 2023-07 delayed by 2 months

20 MW - operation - new york - Willis Battery Storage - 63238
  date: 2023-05 -> 2023-06 delayed by 1 month

20 MW - operation - new mexico - Jicarilla Solar 1 LLC - 66163
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2023-05 -> 2023-06 delayed by 1 month

151 MW - planning - new york - NY2 Battery - 63584
  mw: 200 -> 169

75 MW - operation - california - Resurgence Solar - 64489
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  mw: 115 -> 75

20 MW - operation - new jersey - Andover Energy Storage Project - 65952
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

20 MW - operation - california - VESI Pomona - 50300
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

20 MW - operation - california - Melrose BESS - 66281
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

20 MW - operation - california - Melrose BESS - 66281
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

10 MW - operation - california - Pala Gomez Creek BESS - 66280
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

10 MW - operation - california - Boulevard Energy Storage - 66279
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

10 MW - operation - california - Clairemont Energy Storage - 66266
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

10 MW - operation - california - Elliott Energy Storage - 66278
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

10 MW - operation - california - Paradise Energy Storage - 66265
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2023-06

New projects (9):
260 MW - operation - arizona - Sonoran Solar Energy - 66627
150 MW - operation - texas - Wolf Tank Storage - 66616
150 MW - operation - arizona - McFarland B Solar and Storage - 66637
100 MW - operation - arizona - McFarland A Solar and Storage - 66636
100 MW - operation - california - Cald BESS - 66617
40 MW - operation - california - Resurgence Solar II - 66620
40 MW - cancelled - indiana - Vermillion Rise Solar - 65935
88 MW - construction - california - Chaparral Springs - 64864
13 MW - operation - california - Bear Canyon - 66650

Disappeared projects (1):
36 MW - cancelled - california - Willow Spring Solar 3, LLC - 60325

Updated projects (48):

162 MW - operation - california - Proxima - 66270
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

68 MW - operation - california - Stanton Battery Energy Storage - 66423
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

50 MW - operation - mississippi - Golden Triangle - 64529
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

50 MW - operation - mississippi - OE_MS6 - 65291
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

38 MW - operation - arizona - Foothills Solar Plant Hybrid - 57997
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

36 MW - operation - arizona - Gila Bend Hybrid - 59020
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

30 MW - operation - hawaii - AES Waikoloa Solar Hybrid - 63900
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

17 MW - operation - arizona - Cotton Center Solar Hybrid - 57561
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

17 MW - operation - arizona - Paloma Solar Hybrid - 57562
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

16 MW - operation - arizona - Hyder Solar Hybrid - 57563
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

14 MW - operation - arizona - Hyder II Hybrid - 58383
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

210 MW - operation - texas - Blue Jay Solar I, LLC - 64672
  date: 2023-04 -> 2023-06 delayed by 2 months

190 MW - operation - texas - Cunningham Storage - 65410
  date: 2023-05 -> 2023-06 delayed by 1 month

185 MW - operation - hawaii - Kapolei Energy Storage - 66067 Megapack
  date: 2023-06 -> 2023-07 delayed by 1 month

300 MW - planning - nevada - Southern Bighorn Solar Hybrid - 63113
  date: 2024-04 -> 2026-05 delayed by 25 months

125 MW - operation - california - Oberon Solar Project - 65734 Megapack
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2023-06 -> 2023-09 delayed by 3 months

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  date: 2023-04 -> 2023-06 delayed by 2 months

100 MW - operation - california - Edwards Sanborn E4 - 65675
  date: 2023-04 -> 2023-06 delayed by 2 months

100 MW - cancelled - texas - Forest Grove - Dodd - 64131
  date: 2024-03 -> 2025-10 delayed by 19 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2023-08 -> 2023-07 accelerated by 1 month

73 MW - operation - texas - Ranchland Wind Storage - 64545
  date: 2023-05 -> 2023-06 delayed by 1 month

70 MW - planning - california - JVR Energy Park LLC - 64428
  date: 2023-09 -> 2026-08 delayed by 35 months

65 MW - construction - california - San Jacinto Grid, LLC - 65657
  date: 2023-06 -> 2023-09 delayed by 3 months

59 MW - operation - texas - Roseland Solar Project, LLC - 65028
  date: 2023-05 -> 2023-06 delayed by 1 month

50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid - 62562
  date: 2023-04 -> 2023-06 delayed by 2 months

50 MW - operation - texas - Roadrunner, LLC Hybrid - 62561
  date: 2023-05 -> 2023-06 delayed by 1 month

50 MW - planning - montana - Beartooth Energy Storage LLC - 65407
  date: 2024-04 -> 2027-12 delayed by 44 months

48 MW - operation - nevada - Yellow Pine Solar - 66357
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2023-06 -> 2023-07 delayed by 1 month

40 MW - operation - california - Scarlet Solar (CA) - 64908
  date: 2023-12 -> 2024-03 delayed by 3 months

20 MW - operation - new jersey - Andover Energy Storage Project - 65952
  date: 2023-04 -> 2023-06 delayed by 2 months

20 MW - construction - california - Ortega Grid, LLC - 65656
  date: 2023-06 -> 2023-08 delayed by 2 months

20 MW - operation - california - VESI Pomona - 50300
  date: 2023-06 -> 2023-10 delayed by 4 months

18 MW - operation - california - Edwards Sanborn S4 - 65677
  date: 2023-04 -> 2023-06 delayed by 2 months

12 MW - operation - ohio - Bowling Green Energy Storage Project - 65951
  date: 2023-04 -> 2023-06 delayed by 2 months

10 MW - operation - california - BCE Los Alamitos 1 - 66533
  date: 2023-07 -> 2023-08 delayed by 1 month

10 MW - operation - california - BCE Los Alamitos 2 - 66532
  date: 2023-07 -> 2023-08 delayed by 1 month

10 MW - construction - california - Sierra Energy Storage, LLC - 61803
  date: 2023-06 -> 2023-09 delayed by 3 months

10 MW - construction - texas - Grizzly Ridge Solar - 66410
  date: 2023-04 -> 2024-02 delayed by 10 months

750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid - 260
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

240 MW - operation - california - Rexford Solar Farm - 64633
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (T) Regulatory approvals received. Not under construction

259 MW - operation - texas - Five Wells Solar Center - Hybrid - 66420
  entity id: 65502 -> 65507
  entity name: Five Wells Solar Center, LLC -> Chesapeake Solar Project, LLC

150 MW - operation - texas - Revolution - 66170
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

136 MW - operation - california - Arica Solar - 65744
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

131 MW - operation - california - CED West Side Canal Battery Storage - 65980
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

125 MW - operation - california - Oberon II Solar Project - 65735 Megapack
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

99 MW - construction - california - Noosa Energy Storage LLC - 64531
  entity id: 64164 -> 63883
  entity name: Noosa Energy Storage LLC -> Broad Reach Power

75 MW - operation - nevada - Arrow Canyon Solar Hybrid - 62248
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

50 MW - operation - california - Victory Pass - 65743
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2023-05

New projects (11):
230 MW - operation - california - Sunlight Storage II - 66575
175 MW - construction - maine - Cross Town Energy Storage - 66606 Megapack
150 MW - cancelled - illinois - Grey Fox Wind - 65939
100 MW - operation - new mexico - San Juan Solar I - 66574
50 MW - cancelled - texas - Peeler Solar, LLC - 65932
75 MW - operation - california - Baldy Mesa Solar & Storage - 66598
75 MW - cancelled - ohio - Springwater Solar, LLC - 65900
50 MW - construction - tennessee - Ridgely Energy Farm - 65445
40 MW - planning - illinois - Mulligan Solar, LLC - 65349
10 MW - operation - california - BCE Los Alamitos 1 - 66533
10 MW - operation - california - BCE Los Alamitos 2 - 66532

Updated projects (60):

132 MW - operation - california - North Central Valley - 66208
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

100 MW - operation - texas - Ignacio Grid Energy Storage System - 64089
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

100 MW - operation - texas - Madero Grid - 63757
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

40 MW - operation - california - Fallbrook Energy Storage - 61365
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

16 MW - operation - texas - Cameron Wind 1 LLC - 59118
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

20 MW - construction - california - Ortega Grid, LLC - 65656
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

20 MW - construction - tennessee - Vonore Battery Energy Storage System - 64255
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete
  date: 2023-08 -> 2023-12 delayed by 4 months

11 MW - operation - north carolina - Camp Lejeune Solar and Energy Storage - 59966
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2023-04 -> 2023-03 accelerated by 1 month

10 MW - construction - california - Hecate Energy Desert Storage 1 LLC - 65635
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

10 MW - construction - california - Carris Storage I - 65733
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

621 MW - planning - texas - Lunis Creek Solar and BESS SLF - 65852
  date: 2024-03 -> 2024-12 delayed by 9 months

600 MW - planning - texas - Clear Fork Creek Solar and BESS SLF - 65842
  date: 2024-03 -> 2025-12 delayed by 21 months

325 MW - operation - california - Desert Peak Energy Storage I - 65987
  date: 2023-06 -> 2023-07 delayed by 1 month

299 MW - planning - new york - NISA Electric Generation Project - 61331
  entity name: NYC ENERGY LLC -> NYC Energy LLC
  date: 2025-07 -> 2026-03 delayed by 8 months

210 MW - operation - texas - Blue Jay Solar I, LLC - 64672
  date: 2023-03 -> 2023-04 delayed by 1 month

162 MW - operation - california - Proxima - 66270
  date: 2023-09 -> 2023-10 delayed by 1 month

150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid - 63172 Megapack
  date: 2023-04 -> 2023-05 delayed by 1 month

150 MW - operation - california - Eland Solar & Storage Center, Phase 1 Hy - 61168 Megapack
  date: 2024-03 -> 2024-11 delayed by 8 months

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  date: 2023-03 -> 2023-04 delayed by 1 month

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  date: 2023-04 -> 2023-06 delayed by 2 months

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2023-05 -> 2023-11 delayed by 6 months

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2023-05 -> 2023-11 delayed by 6 months

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2023-06 -> 2023-07 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2023-06 -> 2023-07 delayed by 1 month

299 MW - planning - new york - NISA Electric Generation Project - 61331
  entity name: NYC ENERGY LLC -> NYC Energy LLC
  date: 2024-03 -> 2026-03 delayed by 24 months

75 MW - operation - california - Desert Peak Energy Storage II - 65988
  date: 2023-06 -> 2023-07 delayed by 1 month

63 MW - operation - texas - House Mountain - 66006
  date: 2023-07 -> 2023-09 delayed by 2 months

60 MW - operation - california - Goleta Energy Storage, LLC - 66394 Megapack
  status_verbose: (T) Regulatory approvals received. Not under construction -> (L) Regulatory approvals pending. Not under construction
  date: 2023-04 -> 2023-10 delayed by 6 months

60 MW - operation - hawaii - AES Maui Kuihelani Solar Hybrid - 64256
  date: 2023-10 -> 2023-12 delayed by 2 months

59 MW - operation - texas - Roseland Solar Project, LLC - 65028
  date: 2023-03 -> 2023-05 delayed by 2 months

88 MW - construction - california - Chaparral Springs - 64864
  date: 2023-09 -> 2023-12 delayed by 3 months

50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid - 62562
  date: 2023-03 -> 2023-04 delayed by 1 month

50 MW - operation - texas - TX19 River Valley Storage 1 - 65699
  date: 2023-03 -> 2023-05 delayed by 2 months

50 MW - operation - texas - TX21 River Valley Storage 2 - 65700
  date: 2023-03 -> 2023-05 delayed by 2 months

50 MW - operation - texas - Roadrunner, LLC Hybrid - 62561
  date: 2023-03 -> 2023-05 delayed by 2 months

125 MW - construction - california - Aratina Solar Center 1B - 61167
  date: 2023-12 -> 2025-06 delayed by 18 months

38 MW - operation - arizona - Foothills Solar Plant Hybrid - 57997
  date: 2023-03 -> 2023-04 delayed by 1 month

36 MW - operation - arizona - Gila Bend Hybrid - 59020
  date: 2023-03 -> 2023-04 delayed by 1 month

30 MW - operation - california - Santa Paula Energy Storage LLC - 65397
  date: 2023-03 -> 2023-09 delayed by 6 months

20 MW - operation - new jersey - Andover Energy Storage Project - 65952
  date: 2023-03 -> 2023-04 delayed by 1 month

20 MW - operation - new york - Willis Battery Storage - 63238
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2023-03 -> 2023-05 delayed by 2 months

20 MW - operation - new mexico - Jicarilla Solar 1 LLC - 66163
  date: 2023-03 -> 2023-05 delayed by 2 months

20 MW - operation - california - VESI Pomona - 50300
  date: 2023-05 -> 2023-06 delayed by 1 month

20 MW - operation - virginia - Dry Bridge Storage - 65044
  date: 2023-04 -> 2023-09 delayed by 5 months

17 MW - operation - arizona - Cotton Center Solar Hybrid - 57561
  date: 2023-03 -> 2023-04 delayed by 1 month

17 MW - operation - arizona - Paloma Solar Hybrid - 57562
  date: 2023-03 -> 2023-04 delayed by 1 month

16 MW - operation - arizona - Hyder Solar Hybrid - 57563
  date: 2023-03 -> 2023-04 delayed by 1 month

14 MW - operation - arizona - Hyder II Hybrid - 58383
  date: 2023-03 -> 2023-04 delayed by 1 month

12 MW - operation - ohio - Bowling Green Energy Storage Project - 65951
  date: 2023-03 -> 2023-04 delayed by 1 month

12 MW - operation - hawaii - AES West Oahu Solar Hybrid - 64656
  date: 2023-06 -> 2023-09 delayed by 3 months

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2023-08 -> 2023-10 delayed by 2 months

680 MW - construction - california - Menifee Power Bank - 66494
  entity name: Menifee Power Bank -> Nova Power, LLC
  plant name: Nova Power -> Menifee Power Bank

680 MW - construction - california - Menifee Power Bank - 66494
  entity name: Menifee Power Bank -> Nova Power, LLC
  plant name: Nova Power -> Menifee Power Bank

117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) - 64197
  entity name: RWE Renewables Americas LLC -> RWE Renewables Americas, LLC

100 MW - operation - california - Beaumont BESS - 66461
  entity id: 64287 -> 65552
  entity name: Terra-Gen Operating Co-BESS -> Terra-Gen Operating Co-BESS 2

80 MW - operation - california - Sagebrush ESS - 65933
  entity id: 64287 -> 65552
  entity name: Terra-Gen Operating Co-BESS -> Terra-Gen Operating Co-BESS 2

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  entity name: RWE Renewables Americas LLC -> RWE Renewables Americas, LLC

80 MW - operation - california - Placerita ESS - 66462
  entity id: 64287 -> 65552
  entity name: Terra-Gen Operating Co-BESS -> Terra-Gen Operating Co-BESS 2

680 MW - construction - california - Menifee Power Bank - 66494
  entity name: Menifee Power Bank -> Nova Power, LLC
  plant name: Nova Power -> Menifee Power Bank

48 MW - operation - nevada - Yellow Pine Solar - 66357
  mw: 26 -> 48


2023-04

New projects (18):
500 MW - planning - texas - Hecate Energy Ramsey Storage - 66414
306 MW - planning - texas - Ash Creek BESS - 66391
259 MW - operation - texas - Five Wells Solar Center - Hybrid - 66420
255 MW - planning - texas - Hecate Grid East Valley Storage - 66411
680 MW - construction - california - Menifee Power Bank - 66494
680 MW - construction - california - Menifee Power Bank - 66494
200 MW - planning - texas - OCI Hillsboro - 66401
150 MW - planning - georgia - Aragon Energy Storage - 66431
135 MW - planning - california - Hecate Grid Gwent Storage 1 - 66409
100 MW - operation - california - Beaumont BESS - 66461
100 MW - construction - texas - Bexar ESS - 66400
80 MW - operation - california - Placerita ESS - 66462
68 MW - operation - california - Stanton Battery Energy Storage - 66423
60 MW - operation - california - Goleta Energy Storage, LLC - 66394 Megapack
50 MW - operation - new mexico - Buena Vista Energy Center - 66408
680 MW - construction - california - Menifee Power Bank - 66494
50 MW - planning - texas - MRG Goody Solar Project Hybrid - 66390
10 MW - construction - texas - Grizzly Ridge Solar - 66410

Disappeared projects (3):
95 MW - cancelled - california - Sandrini Solar 100 - 65664
50 MW - construction - tennessee - Ridgely Energy Farm - 65445
22 MW - cancelled - california - Camino Solar - 63508

Updated projects (59):

150 MW - operation - california - Desert Quartzite - 59871
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

50 MW - operation - arizona - El Sol BESS - 62964
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

40 MW - operation - california - Scarlet Solar (CA) - 64908
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

36 MW - cancelled - california - Willow Spring Solar 3, LLC - 60325
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

17 MW - operation - florida - Lake Placid Solar Power Plant - 62541
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

10 MW - operation - arizona - Desert Star Hybrid - 59444
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

20 MW - operation - california - Melrose BESS - 66281
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

20 MW - operation - california - Melrose BESS - 66281
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

10 MW - operation - california - Pala Gomez Creek BESS - 66280
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

10 MW - operation - california - Boulevard Energy Storage - 66279
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

10 MW - operation - california - Clairemont Energy Storage - 66266
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

10 MW - operation - california - Elliott Energy Storage - 66278
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

10 MW - operation - california - Paradise Energy Storage - 66265
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

250 MW - construction - texas - Zeya - 65880
  date: 2024-04 -> 2024-12 delayed by 8 months

210 MW - operation - texas - Blue Jay Solar I, LLC - 64672
  date: 2023-02 -> 2023-03 delayed by 1 month

200 MW - operation - texas - Hydra - 65490
  date: 2023-11 -> 2023-12 delayed by 1 month

200 MW - operation - texas - Dickens - 65489
  date: 2023-12 -> 2024-02 delayed by 2 months

200 MW - operation - texas - Paleo - 65491
  date: 2023-12 -> 2024-02 delayed by 2 months

200 MW - construction - texas - Cachi - 65861
  date: 2024-03 -> 2024-12 delayed by 9 months

200 MW - construction - texas - Castor - 65870
  date: 2024-05 -> 2024-12 delayed by 7 months

200 MW - construction - texas - Desna - 65876
  date: 2024-06 -> 2024-12 delayed by 6 months

190 MW - operation - texas - Cunningham Storage - 65410
  entity id: 64757 -> 57416
  entity name: BT Cunningham Storage, LLC -> Acciona Energy USA Global, LLC
  date: 2023-03 -> 2023-05 delayed by 2 months

175 MW - operation - texas - Pavo - 65492
  date: 2023-11 -> 2023-12 delayed by 1 month

160 MW - construction - texas - Avila - 65860
  date: 2024-02 -> 2024-12 delayed by 10 months

150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid - 63172 Megapack
  date: 2023-02 -> 2023-04 delayed by 2 months

131 MW - operation - california - CED West Side Canal Battery Storage - 65980
  date: 2023-02 -> 2023-05 delayed by 3 months

117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) - 64197
  date: 2023-09 -> 2023-10 delayed by 1 month

75 MW - operation - california - Resurgence Solar - 64489
  date: 2023-05 -> 2023-07 delayed by 2 months

100 MW - operation - texas - Ignacio Grid Energy Storage System - 64089
  date: 2023-02 -> 2023-03 delayed by 1 month

100 MW - operation - texas - Madero Grid - 63757
  date: 2023-02 -> 2023-03 delayed by 1 month

100 MW - operation - california - Edwards Sanborn E4 - 65675
  date: 2023-07 -> 2023-04 accelerated by 3 months
  mw: 109 -> 100

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2023-05 -> 2023-06 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2023-05 -> 2023-06 delayed by 1 month

80 MW - operation - california - Sagebrush ESS - 65933
  entity id: 65106 -> 64287
  entity name: Sagebrush ESS, LLC -> Terra-Gen Operating Co-BESS
  date: 2023-03 -> 2023-05 delayed by 2 months

166 MW - planning - idaho - Hemmingway BESS - 66325
  date: 2023-06 -> 2023-08 delayed by 2 months

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2023-10 -> 2023-12 delayed by 2 months

75 MW - operation - nevada - Arrow Canyon Solar Hybrid - 62248
  date: 2023-06 -> 2023-08 delayed by 2 months

59 MW - operation - texas - Roseland Solar Project, LLC - 65028
  date: 2023-02 -> 2023-03 delayed by 1 month

50 MW - operation - texas - Tortolas - 65493
  date: 2023-09 -> 2023-12 delayed by 3 months

40 MW - cancelled - idaho - Black Mesa BESS - 66326
  date: 2023-06 -> 2023-09 delayed by 3 months

36 MW - operation - arizona - Gila Bend Hybrid - 59020
  date: 2023-02 -> 2023-03 delayed by 1 month

30 MW - operation - hawaii - AES Waikoloa Solar Hybrid - 63900
  date: 2023-02 -> 2023-04 delayed by 2 months

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  date: 2023-04 -> 2023-07 delayed by 3 months

17 MW - operation - arizona - Cotton Center Solar Hybrid - 57561
  date: 2023-02 -> 2023-03 delayed by 1 month

17 MW - operation - arizona - Paloma Solar Hybrid - 57562
  date: 2023-02 -> 2023-03 delayed by 1 month

16 MW - operation - arizona - Hyder Solar Hybrid - 57563
  date: 2023-02 -> 2023-03 delayed by 1 month

15 MW - construction - california - Black Walnut Energy Storage LLC - 65396
  date: 2023-12 -> 2025-06 delayed by 18 months

14 MW - operation - arizona - Hyder II Hybrid - 58383
  date: 2023-02 -> 2023-03 delayed by 1 month

14 MW - planning - california - Homestead Energy Storage LLC - 65398
  date: 2024-02 -> 2026-06 delayed by 28 months

12 MW - operation - ohio - Bowling Green Energy Storage Project - 65951
  date: 2023-02 -> 2023-03 delayed by 1 month

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2023-06 -> 2023-08 delayed by 2 months

750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid - 260
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

169 MW - operation - california - Sanborn BESS 3 - 65672
  mw: 175 -> 169

136 MW - operation - california - Edwards Sanborn E1B - 65674
  mw: 140 -> 136

131 MW - operation - california - Daggett 2 - 64851
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

47 MW - operation - california - Sanborn BESS 4 - 65673
  mw: 57 -> 47

47 MW - operation - california - Edwards Sanborn E5 - 65676
  mw: 75 -> 47

18 MW - operation - california - Edwards Sanborn S4 - 65677
  mw: 20 -> 18

11 MW - operation - north carolina - Camp Lejeune Solar and Energy Storage - 59966
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2023-03

New projects (40):
260 MW - cancelled - texas - OCI SunRoper - 65893
250 MW - operation - arizona - Sierra Estrella Energy Storage - 66334 Megapack
225 MW - operation - california - Solar Blue - 63848
200 MW - operation - california - Condor Energy Storage LLC - 66285 Megapack
200 MW - construction - california - Peregrine Energy Storage LLC - 66286 Megapack
200 MW - construction - texas - Tidwell Prairie Storage 1 - 66337
162 MW - operation - california - Proxima - 66270
150 MW - planning - texas - Alamo 7 BESS 1 - 66297
150 MW - planning - texas - Alamo 7 BESS 2 - 66298
150 MW - cancelled - texas - Crane 2 BESS 2 - 66300
150 MW - cancelled - texas - Upton BESS 2 - 66303
150 MW - cancelled - texas - Uvalde 2 BESS 2 - 66305
150 MW - construction - texas - Peregrine BESS 1 - 66301
150 MW - construction - texas - Peregrine BESS 2 - 66302
135 MW - operation - california - Chestnut - 63849
100 MW - operation - texas - St. Gall Energy Storage I - 66336
100 MW - cancelled - texas - Alamo 3 BESS 2 - 66293
100 MW - planning - texas - Alamo 4 BESS - 66294
100 MW - planning - texas - Alamo 5 BESS 1 - 66295
100 MW - planning - texas - Alamo 5 BESS 2 - 66296
200 MW - operation - texas - Callisto I Energy Center - 66338
100 MW - cancelled - texas - TX18 Cottage Meadow Storage - 63879
100 MW - cancelled - texas - TX17 Nickel Prairie Storage - 63880
90 MW - operation - arizona - Superstition Energy Storage - 66333 Megapack
166 MW - planning - idaho - Hemmingway BESS - 66325
76 MW - planning - texas - Gaia Hybrid - 66342
75 MW - cancelled - texas - Uvalde 2 BESS 1 - 66304
55 MW - planning - texas - Eagle Springs Hybrid - 66341
50 MW - construction - tennessee - Ridgely Energy Farm - 65445
40 MW - cancelled - idaho - Black Mesa BESS - 66326
48 MW - operation - nevada - Yellow Pine Solar - 66357
20 MW - operation - california - VESI Pomona - 50300
17 MW - planning - virginia - Powells Creek Solar - Hybrid - 65305
12 MW - planning - ohio - Salt City Solar Project - Hybrid - 65302
12 MW - planning - virginia - Sunnybrook Solar Project - Hybrid - 65307
20 MW - operation - california - Melrose BESS - 66281
20 MW - operation - california - Melrose BESS - 66281
10 MW - operation - california - Pala Gomez Creek BESS - 66280
10 MW - operation - california - Boulevard Energy Storage - 66279
10 MW - operation - california - Elliott Energy Storage - 66278

Disappeared projects (3):
280 MW - cancelled - nevada - Hot Pot Solar - 65419
100 MW - cancelled - montana - Haymaker Hybrid - 63878
25 MW - cancelled - colorado - Pike Solar Hybrid - 64212

Updated projects (54):

325 MW - operation - california - Desert Peak Energy Storage I - 65987
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

200 MW - operation - texas - Hydra - 65490
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2023-06 -> 2023-11 delayed by 5 months

200 MW - operation - texas - Dickens - 65489
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2023-06 -> 2023-12 delayed by 6 months

200 MW - operation - texas - Paleo - 65491
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2023-06 -> 2023-12 delayed by 6 months

175 MW - operation - texas - Pavo - 65492
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2023-06 -> 2023-11 delayed by 5 months

75 MW - operation - california - Resurgence Solar - 64489
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

75 MW - operation - california - Desert Peak Energy Storage II - 65988
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

75 MW - construction - california - Hummingbird Energy Storage LLC - 65395
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

50 MW - operation - texas - Tortolas - 65493
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2023-06 -> 2023-09 delayed by 3 months

36 MW - operation - hawaii - Waiawa Solar Power Hybrid - 65058
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

121 MW - planning - new york - Swiftsure - 64235
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (P) Planned for installation, but regulatory approvals not initiated
  date: 2025-12 -> 2026-06 delayed by 6 months

300 MW - planning - arizona - Atlas - 63798
  date: 2023-12 -> 2024-12 delayed by 12 months

300 MW - planning - california - Humidor Storage I - 65703
  date: 2024-01 -> 2025-06 delayed by 17 months

300 MW - planning - arizona - Red Antelope Solar & Energy Storage Farm - 64208
  date: 2024-11 -> 2027-05 delayed by 30 months

210 MW - operation - texas - Blue Jay Solar I, LLC - 64672
  date: 2023-01 -> 2023-02 delayed by 1 month

200 MW - construction - california - Big Rock Solar Farm - 64636
  date: 2023-12 -> 2024-12 delayed by 12 months

190 MW - operation - texas - Cunningham Storage - 65410
  date: 2023-02 -> 2023-03 delayed by 1 month

150 MW - construction - texas - Carina - 65589
  date: 2023-10 -> 2024-06 delayed by 8 months

150 MW - operation - california - Vikings Energy Farm - 65711 Megapack
  date: 2023-12 -> 2024-08 delayed by 8 months

150 MW - construction - massachusetts - Cranberry Point Energy Storage - 62844 Megapack
  date: 2024-06 -> 2025-05 delayed by 11 months

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  date: 2023-01 -> 2023-03 delayed by 2 months

100 MW - operation - texas - TX10 Hummingbird Storage - 65693
  date: 2024-01 -> 2024-03 delayed by 2 months

100 MW - operation - texas - TX15 Limousin Oak Storage - 65698
  date: 2024-01 -> 2024-03 delayed by 2 months

100 MW - cancelled - new york - Clermont - 64236
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (P) Planned for installation, but regulatory approvals not initiated
  date: 2024-12 -> 2026-12 delayed by 24 months

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2023-09 -> 2023-10 delayed by 1 month

80 MW - construction - california - Chiquito Grid, LLC - 65655
  date: 2024-12 -> 2025-12 delayed by 12 months

73 MW - operation - texas - Ranchland Wind Storage - 64545
  date: 2023-01 -> 2023-05 delayed by 4 months

70 MW - construction - texas - Antlia - 65588
  date: 2023-10 -> 2024-06 delayed by 8 months

63 MW - operation - texas - House Mountain - 66006
  date: 2023-05 -> 2023-07 delayed by 2 months

61 MW - cancelled - texas - Talitha Energy Project, LLC - 65891
  date: 2024-06 -> 2024-10 delayed by 4 months

61 MW - planning - texas - Oriana Solar LLC - 65849
  date: 2024-06 -> 2024-12 delayed by 6 months

59 MW - operation - texas - Roseland Solar Project, LLC - 65028
  date: 2023-01 -> 2023-02 delayed by 1 month

50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid - 62562
  date: 2023-01 -> 2023-03 delayed by 2 months

50 MW - operation - texas - Roadrunner, LLC Hybrid - 62561
  date: 2023-01 -> 2023-03 delayed by 2 months

40 MW - operation - california - Fallbrook Energy Storage - 61365
  date: 2023-01 -> 2023-03 delayed by 2 months

40 MW - operation - california - Scarlet Solar (CA) - 64908
  date: 2024-12 -> 2023-12 accelerated by 12 months

30 MW - cancelled - montana - Beaver Creek Wind Facility - 65019
  date: 2024-12 -> 2025-09 delayed by 9 months

30 MW - cancelled - montana - Beaver Creek IV - 65023
  date: 2024-12 -> 2025-09 delayed by 9 months

30 MW - planning - new mexico - Rockmont Solar and Storage Project - 64216
  date: 2024-04 -> 2026-06 delayed by 26 months

16 MW - operation - texas - Cameron Wind 1 LLC - 59118
  date: 2023-06 -> 2023-08 delayed by 2 months

20 MW - operation - new jersey - Andover Energy Storage Project - 65952
  date: 2023-02 -> 2023-03 delayed by 1 month

20 MW - operation - new york - NY6 Battery - 65692
  date: 2023-05 -> 2023-06 delayed by 1 month

20 MW - cancelled - montana - Beaver Creek II - 65020
  date: 2024-12 -> 2025-05 delayed by 5 months

20 MW - cancelled - montana - Beaver Creek III - 65021
  date: 2024-12 -> 2025-05 delayed by 5 months

17 MW - operation - florida - Lake Placid Solar Power Plant - 62541
  date: 2023-01 -> 2023-02 delayed by 1 month

12 MW - operation - ohio - Bowling Green Energy Storage Project - 65951
  date: 2023-01 -> 2023-02 delayed by 1 month

10 MW - construction - california - Sierra Energy Storage, LLC - 61803
  date: 2023-03 -> 2023-06 delayed by 3 months

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2023-04 -> 2023-06 delayed by 2 months

300 MW - planning - texas - Elio Energy LLC - 65850
  mw: 80 -> 300

125 MW - operation - colorado - Neptune Energy Center Hybrid - 63731
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

100 MW - operation - colorado - Thunder Wolf Energy Center Hybrid - 63776
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

60 MW - operation - arizona - Mesquite Solar 5, LLC - 65963
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

12 MW - operation - hawaii - AES West Oahu Solar Hybrid - 64656
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

10 MW - operation - arizona - Mesquite Solar 4, LLC - 65962
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2023-02

New projects (13):
230 MW - operation - california - Sunlight Storage - 65857
203 MW - operation - texas - Crossett Power Management LLC - 66009
150 MW - operation - texas - Revolution - 66170
132 MW - operation - california - North Central Valley - 66208
101 MW - operation - texas - Flower Valley II - 66007
101 MW - operation - texas - Swoose II - 66008
100 MW - planning - texas - Yaupon Solar Project (Hybrid) - 66216
100 MW - planning - california - Buena Vista Energy LLC - 56446
58 MW - planning - utah - Parowan Solar - 65823
20 MW - operation - new mexico - Jicarilla Solar 1 LLC - 66163
20 MW - cancelled - texas - Barilla Solar - 58710
10 MW - operation - california - Clairemont Energy Storage - 66266
10 MW - operation - california - Paradise Energy Storage - 66265

Disappeared projects (1):
200 MW - cancelled - nevada - Iron Point Solar (Hybrid) - 65377

Updated projects (51):

112 MW - operation - california - Blythe Mesa Solar II - 65053 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

100 MW - operation - nevada - Dry Lake Solar Energy Center - 63933
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

63 MW - operation - texas - House Mountain - 66006
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

50 MW - operation - texas - TX13 Endurance Park Storage - 65696
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

50 MW - operation - texas - TX23 Roughneck Storage - 65701
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

40 MW - operation - california - BigBeau Solar, LLC - 64993
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

15 MW - cancelled - south carolina - Wolf Pit Branch Solar, LLC - 65437
  status: construction -> planning
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (P) Planned for installation, but regulatory approvals not initiated

151 MW - planning - new york - NY2 Battery - 63584
  date: 2023-06 -> 2024-06 delayed by 12 months

252 MW - planning - oklahoma - Skeleton Creek Energy Center Hybrid - 62494
  date: 2023-12 -> 2025-12 delayed by 24 months

185 MW - operation - hawaii - Kapolei Energy Storage - 66067 Megapack
  date: 2023-05 -> 2023-06 delayed by 1 month

180 MW - cancelled - nevada - Chuckwalla Solar, LLC - 64558
  date: 2023-12 -> 2025-12 delayed by 24 months

136 MW - operation - california - Arica Solar - 65744
  date: 2023-12 -> 2023-11 accelerated by 1 month

126 MW - construction - california - AVEP BESS - 65591
  date: 2023-05 -> 2024-06 delayed by 13 months

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  date: 2023-03 -> 2023-04 delayed by 1 month

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2023-04 -> 2023-05 delayed by 1 month

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2023-04 -> 2023-05 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2023-04 -> 2023-05 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2023-04 -> 2023-05 delayed by 1 month

80 MW - operation - california - Sagebrush ESS - 65933
  date: 2023-01 -> 2023-03 delayed by 2 months

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2023-08 -> 2023-09 delayed by 1 month

80 MW - construction - california - Chiquito Grid, LLC - 65655
  date: 2023-12 -> 2024-12 delayed by 12 months

75 MW - cancelled - wisconsin - Darien Solar - 64534
  date: 2023-12 -> 2024-11 delayed by 11 months

65 MW - construction - california - San Jacinto Grid, LLC - 65657
  date: 2023-05 -> 2023-06 delayed by 1 month

43 MW - planning - california - Dynegy Oakland Power Plant - 6211
  date: 2023-12 -> 2024-11 delayed by 11 months

40 MW - operation - california - Scarlet Solar (CA) - 64908
  date: 2023-08 -> 2024-12 delayed by 16 months

40 MW - planning - california - EDPR CA Solar Park VI LLC (CA) Hybrid - 62892
  date: 2023-12 -> 2024-12 delayed by 12 months

38 MW - operation - arizona - Foothills Solar Plant Hybrid - 57997
  date: 2022-12 -> 2023-03 delayed by 3 months

36 MW - operation - hawaii - Waiawa Solar Power Hybrid - 65058
  date: 2022-12 -> 2023-01 delayed by 1 month

36 MW - operation - arizona - Gila Bend Hybrid - 59020
  date: 2022-12 -> 2023-02 delayed by 2 months

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  date: 2023-03 -> 2023-04 delayed by 1 month

20 MW - operation - new york - Willis Battery Storage - 63238
  date: 2023-02 -> 2023-03 delayed by 1 month

20 MW - operation - virginia - Dry Bridge Storage - 65044
  entity name: Dominion Energy Inc -> Dominion Energy Inc.
  date: 2022-12 -> 2023-04 delayed by 4 months

20 MW - operation - new york - NY6 Battery - 65692
  date: 2023-02 -> 2023-05 delayed by 3 months

20 MW - construction - california - Ortega Grid, LLC - 65656
  date: 2023-03 -> 2023-06 delayed by 3 months

17 MW - operation - florida - Lake Placid Solar Power Plant - 62541
  date: 2022-12 -> 2023-01 delayed by 1 month

17 MW - operation - arizona - Cotton Center Solar Hybrid - 57561
  date: 2022-12 -> 2023-02 delayed by 2 months

17 MW - operation - arizona - Paloma Solar Hybrid - 57562
  date: 2022-12 -> 2023-02 delayed by 2 months

16 MW - operation - arizona - Hyder Solar Hybrid - 57563
  date: 2022-12 -> 2023-02 delayed by 2 months

14 MW - operation - arizona - Hyder II Hybrid - 58383
  date: 2022-12 -> 2023-02 delayed by 2 months

12 MW - operation - ohio - Bowling Green Energy Storage Project - 65951
  date: 2023-02 -> 2023-01 accelerated by 1 month

22 MW - cancelled - california - Camino Solar - 63508
  date: 2023-12 -> 2024-12 delayed by 12 months

10 MW - operation - arizona - Desert Star Hybrid - 59444
  date: 2022-12 -> 2023-02 delayed by 2 months

10 MW - construction - california - Sierra Energy Storage, LLC - 61803
  date: 2023-02 -> 2023-03 delayed by 1 month

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2023-03 -> 2023-04 delayed by 1 month

10 MW - construction - california - Hecate Energy Desert Storage 1 LLC - 65635
  date: 2023-05 -> 2023-09 delayed by 4 months

10 MW - construction - california - Carris Storage I - 65733
  date: 2023-05 -> 2023-09 delayed by 4 months

150 MW - operation - california - Vikings Energy Farm - 65711 Megapack
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (T) Regulatory approvals received. Not under construction

131 MW - operation - california - CED West Side Canal Battery Storage - 65980
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

75 MW - construction - california - Hummingbird Energy Storage LLC - 65395
  status_verbose: (T) Regulatory approvals received. Not under construction -> (L) Regulatory approvals pending. Not under construction

50 MW - planning - virginia - Dulles Solar and Storage - 65043
  entity name: Dominion Energy Inc -> Dominion Energy Inc.

15 MW - construction - california - Black Walnut Energy Storage LLC - 65396
  status_verbose: (T) Regulatory approvals received. Not under construction -> (L) Regulatory approvals pending. Not under construction


2023-01

New projects (4):
185 MW - operation - hawaii - Kapolei Energy Storage - 66067 Megapack
75 MW - cancelled - texas - Trinity River Solar 1 - 66132
62 MW - cancelled - indiana - Peony Solar 1 - 66131
40 MW - operation - texas - Zier Solar - 66137

Updated projects (33):

131 MW - operation - california - Daggett 2 - 64851
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

50 MW - operation - texas - Byrd Ranch Storage - 65259
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid - 63728
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - virginia - Danville BESS 1 - 65499
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

500 MW - construction - california - Bellefield Solar and Energy Storage Farm - 64210
  date: 2024-11 -> 2025-12 delayed by 13 months

500 MW - planning - california - Bellefield 2 Solar & Energy Storage Farm - 64209
  date: 2024-12 -> 2026-11 delayed by 23 months

300 MW - planning - california - Humidor Storage I - 65703
  date: 2023-11 -> 2024-01 delayed by 2 months

210 MW - operation - texas - Blue Jay Solar I, LLC - 64672
  date: 2022-12 -> 2023-01 delayed by 1 month

150 MW - operation - california - Eland Solar & Storage Center, Phase 1 Hy - 61168 Megapack
  date: 2023-11 -> 2024-03 delayed by 4 months

150 MW - construction - california - Eland Solar & Storage Center, Phase 2 Hy - 61169 Megapack
  date: 2023-11 -> 2024-11 delayed by 12 months

136 MW - operation - california - Edwards Sanborn E1B - 65674
  date: 2023-09 -> 2023-10 delayed by 1 month

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  date: 2022-12 -> 2023-01 delayed by 1 month

112 MW - operation - california - Blythe Mesa Solar II - 65053 Megapack
  date: 2022-11 -> 2022-12 delayed by 1 month

100 MW - operation - california - Edwards Sanborn E4 - 65675
  date: 2023-04 -> 2023-07 delayed by 3 months

100 MW - operation - texas - Ignacio Grid Energy Storage System - 64089
  date: 2022-12 -> 2023-02 delayed by 2 months

100 MW - operation - texas - Madero Grid - 63757
  date: 2022-12 -> 2023-02 delayed by 2 months

100 MW - operation - texas - TX10 Hummingbird Storage - 65693
  date: 2023-08 -> 2024-01 delayed by 5 months

100 MW - operation - texas - TX15 Limousin Oak Storage - 65698
  date: 2023-10 -> 2024-01 delayed by 3 months

63 MW - operation - texas - House Mountain - 66006
  date: 2023-04 -> 2023-05 delayed by 1 month

59 MW - operation - texas - Roseland Solar Project, LLC - 65028
  date: 2022-12 -> 2023-01 delayed by 1 month

47 MW - operation - california - Sanborn BESS 4 - 65673
  date: 2023-06 -> 2023-08 delayed by 2 months

50 MW - operation - texas - TX23 Roughneck Storage - 65701
  date: 2022-11 -> 2022-12 delayed by 1 month

50 MW - operation - arizona - El Sol BESS - 62964
  date: 2022-12 -> 2023-02 delayed by 2 months

40 MW - operation - california - Fallbrook Energy Storage - 61365
  date: 2022-12 -> 2023-01 delayed by 1 month

30 MW - operation - california - Santa Paula Energy Storage LLC - 65397
  date: 2022-11 -> 2023-03 delayed by 4 months

20 MW - operation - new york - Willis Battery Storage - 63238
  date: 2023-01 -> 2023-02 delayed by 1 month

20 MW - planning - new york - South Ripley Solar - 64911
  date: 2023-12 -> 2024-12 delayed by 12 months

17 MW - operation - florida - Lake Placid Solar Power Plant - 62541
  date: 2022-11 -> 2022-12 delayed by 1 month

380 MW - operation - nevada - Gemini Solar Hybrid - 63352
  mw: 280 -> 380

100 MW - cancelled - texas - Forest Grove - Dodd - 64131
  entity name: Renewable Energy Ventures LLC -> Vistra Zero LLC

88 MW - construction - california - Chaparral Springs - 64864
  mw: 50 -> 52

30 MW - operation - hawaii - AES Waikoloa Solar Hybrid - 63900
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2022-12

New projects (1):
30 MW - construction - hawaii - AES Waiawa Phase 2 Solar - 66066

Updated projects (40):

350 MW - operation - california - Crimson - 65140
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

350 MW - operation - california - Crimson - 65140
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

125 MW - operation - texas - Noble Solar - 65271
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

125 MW - operation - california - Oberon II Solar Project - 65735 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - texas - TX12 Silicon Hill Storage - 65695
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

75 MW - operation - nevada - Arrow Canyon Solar Hybrid - 62248
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

50 MW - operation - texas - TX11 Republic Road Storage - 65694
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

24 MW - operation - new york - Orangeville Storage - 64686
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

20 MW - operation - california - Rabbitbrush Solar, LLC - 64630
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

169 MW - operation - california - Sanborn BESS 3 - 65672
  date: 2023-05 -> 2023-08 delayed by 3 months

136 MW - operation - california - Edwards Sanborn E1B - 65674
  date: 2023-08 -> 2023-09 delayed by 1 month

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  date: 2022-11 -> 2022-12 delayed by 1 month

100 MW - operation - california - Edwards Sanborn E4 - 65675
  date: 2023-02 -> 2023-04 delayed by 2 months

47 MW - operation - california - Edwards Sanborn E5 - 65676
  date: 2023-06 -> 2023-09 delayed by 3 months

73 MW - operation - texas - Ranchland Wind Storage - 64545
  date: 2022-11 -> 2023-01 delayed by 2 months

59 MW - operation - texas - Roseland Solar Project, LLC - 65028
  date: 2022-11 -> 2022-12 delayed by 1 month

47 MW - operation - california - Sanborn BESS 4 - 65673
  date: 2023-01 -> 2023-06 delayed by 5 months

50 MW - operation - texas - Byrd Ranch Storage - 65259
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2022-10 -> 2022-11 delayed by 1 month

50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid - 62562
  date: 2022-11 -> 2023-01 delayed by 2 months

50 MW - operation - texas - Roadrunner, LLC Hybrid - 62561
  date: 2022-11 -> 2023-01 delayed by 2 months

50 MW - operation - texas - TX19 River Valley Storage 1 - 65699
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2023-01 -> 2023-03 delayed by 2 months

50 MW - operation - texas - TX21 River Valley Storage 2 - 65700
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2023-01 -> 2023-03 delayed by 2 months

88 MW - construction - california - Chaparral Springs - 64864
  date: 2022-12 -> 2023-09 delayed by 9 months

50 MW - operation - mississippi - Golden Triangle - 64529
  date: 2022-12 -> 2023-12 delayed by 12 months

50 MW - planning - virginia - Dulles Solar and Storage - 65043
  date: 2023-10 -> 2024-12 delayed by 14 months

40 MW - operation - california - Fallbrook Energy Storage - 61365
  date: 2022-10 -> 2022-12 delayed by 2 months

30 MW - operation - hawaii - Hale Kuawehi Solar Hybrid - 62529
  date: 2023-10 -> 2024-11 delayed by 13 months

20 MW - operation - virginia - Dry Bridge Storage - 65044
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2022-10 -> 2022-12 delayed by 2 months

20 MW - operation - new york - Willis Battery Storage - 63238
  date: 2022-12 -> 2023-01 delayed by 1 month

18 MW - operation - california - Edwards Sanborn S4 - 65677
  date: 2023-02 -> 2023-04 delayed by 2 months

12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid - 63728
  date: 2022-10 -> 2022-11 delayed by 1 month

11 MW - operation - north carolina - Camp Lejeune Solar and Energy Storage - 59966
  energy source code: -> MWH
  date: 2023-03 -> 2023-04 delayed by 1 month

10 MW - operation - virginia - Danville BESS 1 - 65499
  date: 2022-10 -> 2022-11 delayed by 1 month

149 MW - operation - california - Daggett 3 - 64852
  mw: 144 -> 149

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

50 MW - operation - texas - TX23 Roughneck Storage - 65701
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

50 MW - operation - texas - TX13 Endurance Park Storage - 65696
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

10 MW - construction - california - Sierra Energy Storage, LLC - 61803
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2022-11

New projects (6):
325 MW - operation - california - Desert Peak Energy Storage I - 65987
131 MW - operation - california - CED West Side Canal Battery Storage - 65980
127 MW - operation - california - Lancaster Area Battery - 66050
75 MW - operation - california - Desert Peak Energy Storage II - 65988
63 MW - operation - texas - House Mountain - 66006
11 MW - operation - north carolina - Camp Lejeune Solar and Energy Storage - 59966

Disappeared projects (1):
100 MW - cancelled - texas - TX17 Nickel Prairie Storage - 63880

Updated projects (41):

125 MW - operation - california - LeConte Energy Storage - 64701
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) - 64197
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

80 MW - operation - california - Sagebrush ESS - 65933
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (V) Under construction, more than 50 percent complete

60 MW - operation - arizona - Mesquite Solar 5, LLC - 65963
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

10 MW - operation - arizona - Mesquite Solar 4, LLC - 65962
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

350 MW - operation - california - Crimson - 65140
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2022-09 -> 2022-10 delayed by 1 month

190 MW - operation - texas - Cunningham Storage - 65410
  date: 2022-12 -> 2023-02 delayed by 2 months

125 MW - operation - texas - Noble Solar - 65271
  date: 2022-09 -> 2022-10 delayed by 1 month

125 MW - operation - colorado - Neptune Energy Center Hybrid - 63731
  date: 2022-12 -> 2023-06 delayed by 6 months

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  date: 2022-11 -> 2023-03 delayed by 4 months

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2022-11 -> 2023-04 delayed by 5 months

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2022-11 -> 2023-04 delayed by 5 months

100 MW - operation - texas - TX12 Silicon Hill Storage - 65695
  date: 2022-09 -> 2022-10 delayed by 1 month

100 MW - operation - texas - Ignacio Grid Energy Storage System - 64089
  date: 2022-10 -> 2022-12 delayed by 2 months

100 MW - operation - texas - Madero Grid - 63757
  date: 2022-10 -> 2022-12 delayed by 2 months

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2022-11 -> 2023-04 delayed by 5 months

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2022-11 -> 2023-04 delayed by 5 months

100 MW - operation - colorado - Thunder Wolf Energy Center Hybrid - 63776
  date: 2022-12 -> 2023-05 delayed by 5 months

65 MW - construction - california - San Jacinto Grid, LLC - 65657
  date: 2023-04 -> 2023-05 delayed by 1 month

50 MW - operation - texas - Byrd Ranch Storage - 65259
  date: 2022-09 -> 2022-10 delayed by 1 month

50 MW - operation - texas - TX11 Republic Road Storage - 65694
  date: 2022-09 -> 2022-10 delayed by 1 month

50 MW - operation - texas - TX23 Roughneck Storage - 65701
  date: 2022-09 -> 2022-11 delayed by 2 months

50 MW - operation - texas - TX13 Endurance Park Storage - 65696
  date: 2022-11 -> 2022-12 delayed by 1 month

50 MW - operation - texas - TX19 River Valley Storage 1 - 65699
  date: 2022-12 -> 2023-01 delayed by 1 month

50 MW - operation - texas - TX21 River Valley Storage 2 - 65700
  date: 2022-12 -> 2023-01 delayed by 1 month

125 MW - construction - california - Aratina Solar Center 1B - 61167
  date: 2023-09 -> 2023-12 delayed by 3 months

43 MW - planning - california - Dynegy Oakland Power Plant - 6211
  date: 2023-07 -> 2023-12 delayed by 5 months

40 MW - operation - california - Fallbrook Energy Storage - 61365
  date: 2022-09 -> 2022-10 delayed by 1 month

20 MW - operation - new york - Willis Battery Storage - 63238
  date: 2022-11 -> 2022-12 delayed by 1 month

20 MW - operation - new york - NY6 Battery - 65692
  date: 2022-11 -> 2023-02 delayed by 3 months

20 MW - operation - new jersey - Andover Energy Storage Project - 65952
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2022-10 -> 2023-02 delayed by 4 months

17 MW - operation - florida - Lake Placid Solar Power Plant - 62541
  date: 2022-09 -> 2022-11 delayed by 2 months

15 MW - cancelled - hawaii - Paeahu Solar Hybrid - 62534
  date: 2023-09 -> 2024-10 delayed by 13 months

12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid - 63728
  date: 2022-09 -> 2022-10 delayed by 1 month

12 MW - operation - ohio - Bowling Green Energy Storage Project - 65951
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2022-10 -> 2023-02 delayed by 4 months

10 MW - operation - virginia - Danville BESS 1 - 65499
  date: 2022-09 -> 2022-10 delayed by 1 month

10 MW - construction - california - Hecate Energy Desert Storage 1 LLC - 65635
  date: 2023-04 -> 2023-05 delayed by 1 month

10 MW - construction - california - Carris Storage I - 65733
  date: 2023-04 -> 2023-05 delayed by 1 month

350 MW - operation - california - Crimson - 65140
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

149 MW - operation - california - Daggett 3 - 64852
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

10 MW - construction - california - Sierra Energy Storage, LLC - 61803
  entity id: 59380 -> 63883
  entity name: Enel Green Power NA, Inc. -> Broad Reach Power


2022-10

New projects (2):
60 MW - operation - arizona - Mesquite Solar 5, LLC - 65963
10 MW - operation - arizona - Mesquite Solar 4, LLC - 65962

Disappeared projects (4):
2250 MW - cancelled - nevada - Chill Sun Solar Project - 65895
40 MW - cancelled - california - Santa Ana Storage 3 - 65789
10 MW - cancelled - california - Sierra - 64320
10 MW - cancelled - california - Chevron - Lost Hills Hybrid - 63545

Updated projects (52):

136 MW - operation - california - Arica Solar - 65744
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2022-12 -> 2023-12 delayed by 12 months

133 MW - operation - california - Edwards Sanborn E1A - 64878
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

132 MW - operation - california - Arlington Energy Center II - 64481
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

110 MW - operation - california - Arlington Energy Center III - 64564
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

52 MW - construction - hawaii - Ho'Ohana Solar 1 - 63723
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

50 MW - operation - arizona - El Sol BESS - 62964
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (V) Under construction, more than 50 percent complete

50 MW - operation - california - Victory Pass - 65743
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2022-11 -> 2023-11 delayed by 12 months

38 MW - operation - arizona - Foothills Solar Plant Hybrid - 57997
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (V) Under construction, more than 50 percent complete

36 MW - operation - arizona - Gila Bend Hybrid - 59020
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (V) Under construction, more than 50 percent complete

16 MW - operation - texas - Cameron Wind 1 LLC - 59118
  status: construction -> planning
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (T) Regulatory approvals received. Not under construction
  date: 2022-10 -> 2023-06 delayed by 8 months

20 MW - operation - virginia - Dry Bridge Storage - 65044
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

17 MW - operation - arizona - Cotton Center Solar Hybrid - 57561
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (V) Under construction, more than 50 percent complete

17 MW - operation - arizona - Paloma Solar Hybrid - 57562
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (V) Under construction, more than 50 percent complete

16 MW - operation - arizona - Hyder Solar Hybrid - 57563
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (V) Under construction, more than 50 percent complete

14 MW - operation - arizona - Hyder II Hybrid - 58383
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (V) Under construction, more than 50 percent complete

210 MW - operation - texas - Blue Jay Solar I, LLC - 64672
  date: 2022-09 -> 2022-12 delayed by 3 months

350 MW - operation - california - Crimson - 65140
  date: 2022-08 -> 2022-09 delayed by 1 month

350 MW - operation - california - Crimson - 65140
  date: 2022-09 -> 2022-10 delayed by 1 month

125 MW - operation - california - LeConte Energy Storage - 64701
  date: 2022-08 -> 2022-09 delayed by 1 month

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  date: 2022-09 -> 2022-11 delayed by 2 months

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2022-09 -> 2022-11 delayed by 2 months

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2022-09 -> 2022-11 delayed by 2 months

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  date: 2022-10 -> 2022-11 delayed by 1 month

100 MW - operation - texas - Ignacio Grid Energy Storage System - 64089
  date: 2022-08 -> 2022-10 delayed by 2 months

100 MW - operation - texas - Madero Grid - 63757
  date: 2022-08 -> 2022-10 delayed by 2 months

75 MW - construction - california - Hummingbird Energy Storage LLC - 65395
  date: 2023-06 -> 2023-12 delayed by 6 months

73 MW - operation - texas - Ranchland Wind Storage - 64545
  date: 2022-09 -> 2022-11 delayed by 2 months

70 MW - planning - california - JVR Energy Park LLC - 64428
  date: 2022-12 -> 2023-09 delayed by 9 months

50 MW - operation - texas - Byrd Ranch Storage - 65259
  date: 2022-08 -> 2022-09 delayed by 1 month

50 MW - operation - texas - TX11 Republic Road Storage - 65694
  date: 2022-08 -> 2022-09 delayed by 1 month

50 MW - operation - texas - TX23 Roughneck Storage - 65701
  date: 2022-08 -> 2022-09 delayed by 1 month

50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid - 62562
  date: 2022-09 -> 2022-11 delayed by 2 months

50 MW - operation - texas - Roadrunner, LLC Hybrid - 62561
  date: 2022-09 -> 2022-11 delayed by 2 months

40 MW - operation - california - Fallbrook Energy Storage - 61365
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2022-08 -> 2022-09 delayed by 1 month

40 MW - operation - california - BigBeau Solar, LLC - 64993
  date: 2022-09 -> 2022-12 delayed by 3 months

30 MW - operation - hawaii - AES Waikoloa Solar Hybrid - 63900
  date: 2022-11 -> 2023-02 delayed by 3 months

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  date: 2022-12 -> 2023-03 delayed by 3 months

20 MW - operation - california - Rabbitbrush Solar, LLC - 64630
  date: 2022-08 -> 2022-10 delayed by 2 months

18 MW - operation - california - Edwards Sanborn S4 - 65677
  date: 2022-12 -> 2023-02 delayed by 2 months

17 MW - operation - florida - Lake Placid Solar Power Plant - 62541
  date: 2022-08 -> 2022-09 delayed by 1 month

15 MW - construction - california - Black Walnut Energy Storage LLC - 65396
  date: 2023-06 -> 2023-12 delayed by 6 months

12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid - 63728
  date: 2022-08 -> 2022-09 delayed by 1 month

12 MW - operation - hawaii - AES West Oahu Solar Hybrid - 64656
  date: 2023-01 -> 2023-06 delayed by 5 months

10 MW - construction - california - Sierra Energy Storage, LLC - 61803
  date: 2022-12 -> 2023-02 delayed by 2 months

59 MW - operation - texas - Roseland Solar Project, LLC - 65028
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

139 MW - operation - california - Slate Hybrid - 63727
  entity name: Goldman Sachs Renewable Power LLC -> MN8 Energy LLC

88 MW - construction - california - Chaparral Springs - 64864
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

139 MW - operation - california - Slate Hybrid - 63727
  entity name: Goldman Sachs Renewable Power LLC -> MN8 Energy LLC

40 MW - operation - california - Scarlet Solar (CA) - 64908
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (T) Regulatory approvals received. Not under construction

36 MW - operation - hawaii - Waiawa Solar Power Hybrid - 65058
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

139 MW - operation - california - Slate Hybrid - 63727
  entity name: Goldman Sachs Renewable Power LLC -> MN8 Energy LLC

139 MW - operation - california - Slate Hybrid - 63727
  entity name: Goldman Sachs Renewable Power LLC -> MN8 Energy LLC


2022-09

New projects (27):
2250 MW - cancelled - nevada - Chill Sun Solar Project - 65895
660 MW - cancelled - texas - Goldenrod Creek Solar and BESS SLF - 65845
621 MW - planning - texas - Lunis Creek Solar and BESS SLF - 65852
600 MW - planning - texas - Clear Fork Creek Solar and BESS SLF - 65842
443 MW - cancelled - texas - Dogwood Creek Solar and BESS - 65843
460 MW - planning - texas - Hollow Branch Creek 2 Solar and BESS SLF - 65851
350 MW - planning - texas - Rowdy Creek Solar and BESS - 65854
418 MW - planning - texas - Tehuacana Creek 1 Solar and BESS - 65855
350 MW - cancelled - texas - Tehuacana Creek 2 Solar and BESS - 65856
302 MW - planning - texas - Middlebrook Creek Solar and BESS - 65853
300 MW - construction - california - Nighthawk Energy Storage, LLC - 65889 Megapack
250 MW - construction - texas - Zeya - 65880
200 MW - construction - texas - Cachi - 65861
200 MW - construction - texas - Castor - 65870
200 MW - construction - texas - Desna - 65876
200 MW - planning - texas - Eldora Energy LLC - 65847
160 MW - construction - texas - Avila - 65860
100 MW - planning - texas - TX 14 Venus Mill Storage - 65788
100 MW - planning - california - Sacramento Valley Energy Center, LLC - 65808
80 MW - operation - california - Sagebrush ESS - 65933
300 MW - planning - texas - Elio Energy LLC - 65850
61 MW - planning - texas - Oriana Solar LLC - 65849
61 MW - cancelled - texas - Talitha Energy Project, LLC - 65891
40 MW - cancelled - california - Santa Ana Storage 3 - 65789
20 MW - operation - new jersey - Andover Energy Storage Project - 65952
20 MW - planning - indiana - Honey Creek Solar - 65821
12 MW - operation - ohio - Bowling Green Energy Storage Project - 65951

Disappeared projects (1):
50 MW - construction - tennessee - Ridgely Energy Farm - 65445

Updated projects (38):

750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid - 260
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

260 MW - operation - texas - DeCordova Steam Electric Station - 8063
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

190 MW - operation - texas - Cunningham Storage - 65410
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (V) Under construction, more than 50 percent complete

125 MW - operation - california - Oberon Solar Project - 65734 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

42 MW - operation - california - Edwards Sanborn S1 - 64929
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

39 MW - operation - hawaii - Mililani South Solar Farm - 57242
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

35 MW - operation - california - Edwards Sanborn S3 - 64928
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

12 MW - operation - hawaii - AES West Oahu Solar Hybrid - 64656
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

10 MW - construction - california - Sierra Energy Storage, LLC - 61803
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

210 MW - operation - texas - Blue Jay Solar I, LLC - 64672
  date: 2022-08 -> 2022-09 delayed by 1 month

200 MW - planning - california - Aratina Solar Center 2 - 64215
  date: 2023-06 -> 2024-06 delayed by 12 months

150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid - 63172 Megapack
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2022-12 -> 2023-02 delayed by 2 months

150 MW - operation - california - Eland Solar & Storage Center, Phase 1 Hy - 61168 Megapack
  date: 2023-07 -> 2023-11 delayed by 4 months

125 MW - operation - california - LeConte Energy Storage - 64701
  date: 2022-07 -> 2022-08 delayed by 1 month

75 MW - operation - california - Resurgence Solar - 64489
  date: 2022-12 -> 2023-05 delayed by 5 months

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  date: 2022-09 -> 2022-10 delayed by 1 month

100 MW - operation - texas - Ignacio Grid Energy Storage System - 64089
  date: 2022-07 -> 2022-08 delayed by 1 month

100 MW - operation - texas - Madero Grid - 63757
  date: 2022-07 -> 2022-08 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2022-10 -> 2022-11 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2022-10 -> 2022-11 delayed by 1 month

73 MW - operation - texas - Ranchland Wind Storage - 64545
  date: 2022-07 -> 2022-09 delayed by 2 months

65 MW - construction - california - San Jacinto Grid, LLC - 65657
  date: 2023-03 -> 2023-04 delayed by 1 month

60 MW - operation - hawaii - AES Maui Kuihelani Solar Hybrid - 64256
  date: 2022-12 -> 2023-10 delayed by 10 months

50 MW - operation - texas - TX11 Republic Road Storage - 65694
  date: 2022-07 -> 2022-08 delayed by 1 month

50 MW - operation - texas - TX23 Roughneck Storage - 65701
  date: 2022-07 -> 2022-08 delayed by 1 month

50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid - 62562
  date: 2022-07 -> 2022-09 delayed by 2 months

50 MW - operation - texas - Roadrunner, LLC Hybrid - 62561
  date: 2022-08 -> 2022-09 delayed by 1 month

40 MW - operation - california - Scarlet Solar (CA) - 64908
  date: 2023-03 -> 2023-08 delayed by 5 months

20 MW - operation - new york - Willis Battery Storage - 63238
  date: 2022-09 -> 2022-11 delayed by 2 months

12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid - 63728
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2022-07 -> 2022-08 delayed by 1 month

10 MW - cancelled - california - Chevron - Lost Hills Hybrid - 63545
  date: 2022-08 -> 2022-09 delayed by 1 month

10 MW - construction - california - Hecate Energy Desert Storage 1 LLC - 65635
  date: 2022-12 -> 2023-04 delayed by 4 months

10 MW - construction - california - Carris Storage I - 65733
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (T) Regulatory approvals received. Not under construction
  date: 2022-12 -> 2023-04 delayed by 4 months

224 MW - construction - california - Anode (Springville) BESS - 65458
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

224 MW - construction - california - Anode (Springville) BESS - 65458
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

40 MW - operation - california - Fallbrook Energy Storage - 61365
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

20 MW - operation - california - Rabbitbrush Solar, LLC - 64630
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

20 MW - construction - california - Ortega Grid, LLC - 65656
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (T) Regulatory approvals received. Not under construction


2022-08

New projects (7):
136 MW - operation - california - Arica Solar - 65744
125 MW - operation - california - Oberon Solar Project - 65734 Megapack
125 MW - operation - california - Oberon II Solar Project - 65735 Megapack
95 MW - cancelled - california - Sandrini Solar 100 - 65664
50 MW - operation - california - Victory Pass - 65743
20 MW - operation - new york - NY6 Battery - 65692
10 MW - construction - california - Carris Storage I - 65733

Disappeared projects (1):
20 MW - cancelled - california - Renz Energy Storage - 63529

Updated projects (41):

100 MW - operation - california - Luna Storage - 63685
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

77 MW - operation - texas - Azure Sky Solar - 63905
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

59 MW - operation - texas - Roseland Solar Project, LLC - 65028
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

50 MW - operation - california - Maverick Solar 6, LLC - 64105
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

40 MW - operation - georgia - Hickory Park Solar Hybrid - 63522
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

30 MW - operation - hawaii - AES Waikoloa Solar Hybrid - 63900
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

16 MW - operation - texas - Cameron Wind 1 LLC - 59118
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

20 MW - operation - california - Santa Ana Storage 2 - 64921
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

260 MW - operation - texas - DeCordova Steam Electric Station - 8063
  date: 2022-06 -> 2022-07 delayed by 1 month

210 MW - operation - texas - Blue Jay Solar I, LLC - 64672
  date: 2022-06 -> 2022-08 delayed by 2 months

350 MW - operation - california - Crimson - 65140
  date: 2022-06 -> 2022-08 delayed by 2 months

350 MW - operation - california - Crimson - 65140
  date: 2022-08 -> 2022-09 delayed by 1 month

131 MW - operation - california - Daggett 2 - 64851
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (T) Regulatory approvals received. Not under construction
  date: 2023-06 -> 2023-11 delayed by 5 months

125 MW - operation - california - LeConte Energy Storage - 64701
  date: 2022-06 -> 2022-07 delayed by 1 month

117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) - 64197
  date: 2022-12 -> 2023-09 delayed by 9 months

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2022-08 -> 2022-09 delayed by 1 month

224 MW - construction - california - Anode (Springville) BESS - 65458
  date: 2022-08 -> 2022-09 delayed by 1 month

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  date: 2022-08 -> 2022-09 delayed by 1 month

100 MW - operation - texas - Ignacio Grid Energy Storage System - 64089
  date: 2022-06 -> 2022-07 delayed by 1 month

100 MW - operation - texas - Madero Grid - 63757
  date: 2022-06 -> 2022-07 delayed by 1 month

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2022-12 -> 2023-08 delayed by 8 months

47 MW - operation - california - Edwards Sanborn E5 - 65676
  date: 2022-12 -> 2023-06 delayed by 6 months

50 MW - operation - texas - Roadrunner, LLC Hybrid - 62561
  date: 2022-06 -> 2022-08 delayed by 2 months

42 MW - operation - california - Edwards Sanborn S1 - 64929
  date: 2022-06 -> 2022-07 delayed by 1 month

35 MW - operation - california - Edwards Sanborn S3 - 64928
  date: 2022-06 -> 2022-07 delayed by 1 month

30 MW - planning - new mexico - Rockmont Solar and Storage Project - 64216
  date: 2023-06 -> 2024-04 delayed by 10 months

24 MW - operation - new york - Orangeville Storage - 64686
  date: 2022-06 -> 2022-10 delayed by 4 months

17 MW - operation - florida - Lake Placid Solar Power Plant - 62541
  date: 2022-06 -> 2022-08 delayed by 2 months

12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid - 63728
  plant producer type: IPP -> Electric Utility
  date: 2022-06 -> 2022-07 delayed by 1 month

10 MW - cancelled - california - Sierra - 64320
  date: 2022-08 -> 2022-09 delayed by 1 month

10 MW - operation - virginia - Danville BESS 1 - 65499
  date: 2022-07 -> 2022-09 delayed by 2 months

10 MW - operation - arizona - Desert Star Hybrid - 59444
  date: 2022-06 -> 2022-12 delayed by 6 months

10 MW - planning - maine - South Portland ESS, LLC - 64616
  date: 2023-06 -> 2023-12 delayed by 6 months

112 MW - operation - california - Blythe Mesa Solar II - 65053 Megapack
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

139 MW - operation - california - Slate Hybrid - 63727
  entity name: Goldman Sachs Renewable Power Group -> Goldman Sachs Renewable Power LLC

139 MW - operation - california - Slate Hybrid - 63727
  entity name: Goldman Sachs Renewable Power Group -> Goldman Sachs Renewable Power LLC

139 MW - operation - california - Slate Hybrid - 63727
  entity name: Goldman Sachs Renewable Power Group -> Goldman Sachs Renewable Power LLC

139 MW - operation - california - Slate Hybrid - 63727
  entity name: Goldman Sachs Renewable Power Group -> Goldman Sachs Renewable Power LLC

10 MW - cancelled - california - Chevron - Lost Hills Hybrid - 63545
  entity name: Goldman Sachs Renewable Power Group -> Goldman Sachs Renewable Power LLC


2022-07

New projects (10):
300 MW - planning - california - Humidor Storage I - 65703
150 MW - operation - california - Vikings Energy Farm - 65711 Megapack
100 MW - operation - texas - TX12 Silicon Hill Storage - 65695
100 MW - operation - texas - TX10 Hummingbird Storage - 65693
100 MW - operation - texas - TX15 Limousin Oak Storage - 65698
50 MW - operation - texas - TX11 Republic Road Storage - 65694
50 MW - operation - texas - TX23 Roughneck Storage - 65701
50 MW - operation - texas - TX13 Endurance Park Storage - 65696
50 MW - operation - texas - TX19 River Valley Storage 1 - 65699
50 MW - operation - texas - TX21 River Valley Storage 2 - 65700

Updated projects (25):

25 MW - operation - massachusetts - Outer Cape Community Battery - 62604
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2022-06 -> 2022-05 accelerated by 1 month

240 MW - operation - california - Rexford Solar Farm - 64633
  date: 2023-04 -> 2024-04 delayed by 12 months

260 MW - operation - texas - DeCordova Steam Electric Station - 8063
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2022-05 -> 2022-06 delayed by 1 month

150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid - 63172 Megapack
  date: 2022-10 -> 2022-12 delayed by 2 months

133 MW - operation - california - Edwards Sanborn E1A - 64878
  date: 2022-07 -> 2022-08 delayed by 1 month

125 MW - operation - texas - Noble Solar - 65271
  date: 2022-06 -> 2022-09 delayed by 3 months

100 MW - operation - california - Luna Storage - 63685
  date: 2022-05 -> 2022-06 delayed by 1 month

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2022-08 -> 2022-10 delayed by 2 months

200 MW - operation - california - Cathode (Hinson) BESS - 65457
  date: 2022-08 -> 2022-10 delayed by 2 months

80 MW - construction - california - Chiquito Grid, LLC - 65655
  date: 2023-03 -> 2023-12 delayed by 9 months

75 MW - operation - nevada - Arrow Canyon Solar Hybrid - 62248
  date: 2022-12 -> 2023-06 delayed by 6 months

50 MW - operation - california - Maverick Solar 6, LLC - 64105
  date: 2022-05 -> 2022-06 delayed by 1 month

42 MW - operation - california - Edwards Sanborn S1 - 64929
  date: 2022-05 -> 2022-06 delayed by 1 month

40 MW - operation - georgia - Hickory Park Solar Hybrid - 63522
  date: 2022-05 -> 2022-06 delayed by 1 month

40 MW - operation - california - BigBeau Solar, LLC - 64993
  date: 2022-08 -> 2022-09 delayed by 1 month

40 MW - operation - california - Scarlet Solar (CA) - 64908
  date: 2022-12 -> 2023-03 delayed by 3 months

36 MW - operation - hawaii - Waiawa Solar Power Hybrid - 65058
  date: 2022-10 -> 2022-12 delayed by 2 months

35 MW - operation - california - Edwards Sanborn S3 - 64928
  date: 2022-05 -> 2022-06 delayed by 1 month

24 MW - operation - new york - Orangeville Storage - 64686
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2022-05 -> 2022-06 delayed by 1 month

20 MW - construction - connecticut - Pure Hedge LLC - 50736
  date: 2023-01 -> 2024-12 delayed by 23 months

10 MW - cancelled - california - Chevron - Lost Hills Hybrid - 63545
  date: 2022-07 -> 2022-08 delayed by 1 month

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2022-08 -> 2023-03 delayed by 7 months

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

77 MW - operation - texas - Azure Sky Solar - 63905
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

20 MW - operation - california - Rabbitbrush Solar, LLC - 64630
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2022-06

New projects (10):
169 MW - operation - california - Sanborn BESS 3 - 65672
136 MW - operation - california - Edwards Sanborn E1B - 65674
100 MW - operation - california - Edwards Sanborn E4 - 65675
80 MW - construction - california - Chiquito Grid, LLC - 65655
47 MW - operation - california - Edwards Sanborn E5 - 65676
65 MW - construction - california - San Jacinto Grid, LLC - 65657
47 MW - operation - california - Sanborn BESS 4 - 65673
18 MW - operation - california - Edwards Sanborn S4 - 65677
20 MW - construction - california - Ortega Grid, LLC - 65656
10 MW - construction - california - Hecate Energy Desert Storage 1 LLC - 65635

Updated projects (26):

200 MW - operation - california - Diablo Energy Storage - 62175
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

182 MW - operation - california - Elkhorn Battery Energy Storage System - 62564 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

122 MW - operation - california - Edwards Sanborn E2 - 64879
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

60 MW - operation - california - Coso Battery Storage - 63943
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

139 MW - operation - california - Slate Hybrid - 63727
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - construction - california - Painter Energy Storage - 62729
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2022-07 -> 2022-08 delayed by 1 month

150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid - 63172 Megapack
  date: 2022-08 -> 2022-10 delayed by 2 months

100 MW - cancelled - montana - Haymaker Hybrid - 63878
  date: 2024-12 -> 2025-10 delayed by 10 months
  mw: 200 -> 100

77 MW - operation - texas - Azure Sky Solar - 63905
  date: 2022-05 -> 2022-06 delayed by 1 month

73 MW - operation - texas - Ranchland Wind Storage - 64545
  date: 2022-05 -> 2022-07 delayed by 2 months

50 MW - operation - texas - Roadrunner, LLC Hybrid - 62561
  date: 2022-05 -> 2022-06 delayed by 1 month

42 MW - operation - california - Edwards Sanborn S1 - 64929
  date: 2022-04 -> 2022-05 delayed by 1 month

40 MW - operation - georgia - Hickory Park Solar Hybrid - 63522
  date: 2022-04 -> 2022-05 delayed by 1 month

40 MW - operation - california - Fallbrook Energy Storage - 61365
  date: 2022-06 -> 2022-08 delayed by 2 months

35 MW - operation - california - Edwards Sanborn S3 - 64928
  date: 2022-04 -> 2022-05 delayed by 1 month

30 MW - operation - hawaii - Hale Kuawehi Solar Hybrid - 62529
  date: 2022-12 -> 2023-10 delayed by 10 months

25 MW - operation - massachusetts - Outer Cape Community Battery - 62604
  date: 2022-04 -> 2022-06 delayed by 2 months

24 MW - operation - new york - Orangeville Storage - 64686
  date: 2022-04 -> 2022-05 delayed by 1 month

20 MW - operation - california - Santa Ana Storage 2 - 64921
  date: 2022-05 -> 2022-06 delayed by 1 month

20 MW - operation - new york - Willis Battery Storage - 63238
  date: 2022-08 -> 2022-09 delayed by 1 month

12 MW - operation - hawaii - AES West Oahu Solar Hybrid - 64656
  date: 2022-09 -> 2023-01 delayed by 4 months

10 MW - operation - virginia - Danville BESS 1 - 65499
  date: 2022-06 -> 2022-07 delayed by 1 month

10 MW - cancelled - california - Sierra - 64320
  date: 2022-05 -> 2022-08 delayed by 3 months

133 MW - operation - california - Edwards Sanborn E1A - 64878
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

125 MW - operation - california - LeConte Energy Storage - 64701
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

10 MW - cancelled - california - Chevron - Lost Hills Hybrid - 63545
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (OT) Other


2022-05

New projects (5):
150 MW - operation - california - Desert Quartzite - 59871
150 MW - construction - texas - Carina - 65589
126 MW - construction - california - AVEP BESS - 65591
125 MW - construction - texas - Octans - 65590
70 MW - construction - texas - Antlia - 65588

Updated projects (36):

224 MW - construction - california - Anode (Springville) BESS - 65458
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

224 MW - construction - california - Anode (Springville) BESS - 65458
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

112 MW - operation - california - Separator (Etiwanda) BESS - 65456
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

50 MW - operation - nevada - Dodge Flat - 63913
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

72 MW - operation - california - RE Tranquillity - 59939
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

139 MW - operation - california - Slate Hybrid - 63727
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

30 MW - operation - oregon - Wheatridge Hybrid - 62745
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

25 MW - operation - nevada - Fish Springs - 64148
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid - 63728
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (V) Under construction, more than 50 percent complete
  date: 2022-05 -> 2022-06 delayed by 1 month

139 MW - operation - california - Slate Hybrid - 63727
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

210 MW - operation - texas - Blue Jay Solar I, LLC - 64672
  date: 2022-03 -> 2022-06 delayed by 3 months

200 MW - operation - california - Diablo Energy Storage - 62175
  date: 2022-03 -> 2022-04 delayed by 1 month

182 MW - operation - california - Elkhorn Battery Energy Storage System - 62564 Megapack
  date: 2022-03 -> 2022-04 delayed by 1 month

149 MW - operation - california - Daggett 3 - 64852
  date: 2022-12 -> 2023-09 delayed by 9 months

122 MW - operation - california - Edwards Sanborn E2 - 64879
  date: 2022-03 -> 2022-04 delayed by 1 month

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  date: 2022-03 -> 2022-09 delayed by 6 months

100 MW - operation - california - Luna Storage - 63685
  date: 2022-04 -> 2022-05 delayed by 1 month

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2022-11 -> 2022-12 delayed by 1 month

73 MW - operation - texas - Ranchland Wind Storage - 64545
  date: 2022-03 -> 2022-05 delayed by 2 months

60 MW - operation - california - Coso Battery Storage - 63943
  date: 2022-03 -> 2022-04 delayed by 1 month

139 MW - operation - california - Slate Hybrid - 63727
  date: 2022-03 -> 2022-04 delayed by 1 month

42 MW - operation - california - Edwards Sanborn S1 - 64929
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2022-03 -> 2022-04 delayed by 1 month

40 MW - operation - california - BigBeau Solar, LLC - 64993
  date: 2022-07 -> 2022-08 delayed by 1 month

36 MW - operation - hawaii - Waiawa Solar Power Hybrid - 65058
  date: 2022-09 -> 2022-10 delayed by 1 month

35 MW - operation - california - Edwards Sanborn S3 - 64928
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2022-03 -> 2022-04 delayed by 1 month

24 MW - operation - new york - Orangeville Storage - 64686
  date: 2022-03 -> 2022-04 delayed by 1 month

20 MW - operation - california - Santa Ana Storage 2 - 64921
  date: 2022-04 -> 2022-05 delayed by 1 month

17 MW - operation - florida - Lake Placid Solar Power Plant - 62541
  date: 2022-04 -> 2022-06 delayed by 2 months

22 MW - cancelled - california - Camino Solar - 63508
  date: 2023-03 -> 2023-12 delayed by 9 months

10 MW - cancelled - california - Chevron - Lost Hills Hybrid - 63545
  date: 2022-06 -> 2022-07 delayed by 1 month

100 MW - operation - texas - Ignacio Grid Energy Storage System - 64089
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

100 MW - operation - texas - Madero Grid - 63757
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

39 MW - operation - hawaii - Mililani South Solar Farm - 57242
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

30 MW - operation - california - Santa Paula Energy Storage LLC - 65397
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

10 MW - cancelled - california - Sierra - 64320
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2022-04

New projects (15):
750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid - 260
200 MW - operation - texas - Dickens - 65489
200 MW - operation - texas - Hydra - 65490
200 MW - operation - texas - Paleo - 65491
175 MW - operation - texas - Pavo - 65492
224 MW - construction - california - Anode (Springville) BESS - 65458
224 MW - construction - california - Anode (Springville) BESS - 65458
112 MW - operation - california - Separator (Etiwanda) BESS - 65456
200 MW - operation - california - Cathode (Hinson) BESS - 65457
200 MW - operation - california - Cathode (Hinson) BESS - 65457
50 MW - construction - tennessee - Ridgely Energy Farm - 65445
66 MW - operation - south carolina - Lone Star Solar - 62235
50 MW - operation - texas - Tortolas - 65493
50 MW - planning - montana - Beartooth Energy Storage LLC - 65407
10 MW - operation - virginia - Danville BESS 1 - 65499

Updated projects (27):

139 MW - operation - california - Slate Hybrid - 63727
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - california - Kearny North Energy Storage - 64612
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - california - Kearny South Energy Storage - 64614
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

210 MW - operation - texas - Blue Jay Solar I, LLC - 64672
  date: 2022-02 -> 2022-03 delayed by 1 month

200 MW - operation - california - Diablo Energy Storage - 62175
  date: 2022-02 -> 2022-03 delayed by 1 month

350 MW - operation - california - Crimson - 65140
  date: 2022-08 -> 2022-06 accelerated by 2 months

350 MW - operation - california - Crimson - 65140
  date: 2022-10 -> 2022-08 accelerated by 2 months

125 MW - operation - california - LeConte Energy Storage - 64701
  date: 2022-04 -> 2022-06 delayed by 2 months

100 MW - operation - texas - Madero Grid - 63757
  date: 2022-05 -> 2022-06 delayed by 1 month

77 MW - operation - texas - Azure Sky Solar - 63905
  date: 2022-02 -> 2022-05 delayed by 3 months

60 MW - operation - california - Coso Battery Storage - 63943
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2022-02 -> 2022-03 delayed by 1 month

40 MW - operation - georgia - Hickory Park Solar Hybrid - 63522
  date: 2022-03 -> 2022-04 delayed by 1 month

40 MW - operation - california - BigBeau Solar, LLC - 64993
  date: 2022-06 -> 2022-07 delayed by 1 month

40 MW - planning - california - EDPR CA Solar Park VI LLC (CA) Hybrid - 62892
  date: 2022-12 -> 2023-12 delayed by 12 months

39 MW - operation - hawaii - Mililani South Solar Farm - 57242
  date: 2022-09 -> 2022-07 accelerated by 2 months

72 MW - operation - california - RE Tranquillity - 59939
  date: 2022-02 -> 2022-03 delayed by 1 month

139 MW - operation - california - Slate Hybrid - 63727
  date: 2022-02 -> 2022-03 delayed by 1 month

20 MW - construction - tennessee - Vonore Battery Energy Storage System - 64255
  date: 2022-07 -> 2023-08 delayed by 13 months

12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid - 63728
  date: 2023-03 -> 2022-05 accelerated by 10 months

139 MW - operation - california - Slate Hybrid - 63727
  date: 2022-02 -> 2022-03 delayed by 1 month

10 MW - cancelled - california - Sierra - 64320
  date: 2022-03 -> 2022-05 delayed by 2 months

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2022-09 -> 2022-07 accelerated by 2 months
  mw: 40 -> 10

125 MW - operation - texas - Noble Solar - 65271
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

100 MW - operation - california - Luna Storage - 63685
  entity id: 63403 -> 61012
  entity name: Luna Storage, LLC -> AES Distributed Energy

139 MW - operation - california - Slate Hybrid - 63727
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

50 MW - operation - texas - Roadrunner, LLC Hybrid - 62561
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid - 62562
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2022-03

New projects (11):
280 MW - cancelled - nevada - Hot Pot Solar - 65419
299 MW - planning - new york - NISA Electric Generation Project - 61331
200 MW - cancelled - nevada - Iron Point Solar (Hybrid) - 65377
190 MW - operation - texas - Cunningham Storage - 65410
75 MW - construction - california - Hummingbird Energy Storage LLC - 65395
75 MW - planning - texas - Noria Hondo Solar (Hybrid) - 65344
59 MW - operation - texas - Roseland Solar Project, LLC - 65028
30 MW - operation - california - Santa Paula Energy Storage LLC - 65397
15 MW - construction - california - Black Walnut Energy Storage LLC - 65396
15 MW - cancelled - south carolina - Wolf Pit Branch Solar, LLC - 65437
14 MW - planning - california - Homestead Energy Storage LLC - 65398

Disappeared projects (4):
316 MW - cancelled - new york - Ravenswood - 2500
316 MW - cancelled - new york - Ravenswood - 2500
316 MW - cancelled - new york - Ravenswood - 2500
60 MW - cancelled - hawaii - Kupehau - 63799

Updated projects (40):

50 MW - operation - texas - Byrd Ranch Storage - 65259
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

46 MW - operation - alaska - Soldotna - 57206 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

10 MW - operation - arkansas - Searcy Solar Hybrid - 62617
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

10 MW - operation - arizona - Desert Star Hybrid - 59444
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (V) Under construction, more than 50 percent complete

121 MW - planning - new york - Swiftsure - 64235
  date: 2023-12 -> 2025-12 delayed by 24 months

300 MW - planning - arizona - Atlas - 63798
  date: 2022-12 -> 2023-12 delayed by 12 months

200 MW - construction - california - Big Rock Solar Farm - 64636
  date: 2022-12 -> 2023-12 delayed by 12 months

182 MW - operation - california - Elkhorn Battery Energy Storage System - 62564 Megapack
  date: 2022-01 -> 2022-03 delayed by 2 months

133 MW - operation - california - Edwards Sanborn E1A - 64878
  date: 2022-05 -> 2022-07 delayed by 2 months

122 MW - operation - california - Edwards Sanborn E2 - 64879
  date: 2022-02 -> 2022-03 delayed by 1 month

110 MW - operation - california - Arlington Energy Center III - 64564
  date: 2022-12 -> 2022-08 accelerated by 4 months
  mw: 47 -> 110

100 MW - cancelled - new york - Clermont - 64236
  date: 2023-12 -> 2024-12 delayed by 12 months

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2022-04 -> 2022-11 delayed by 7 months

299 MW - planning - new york - NISA Electric Generation Project - 61331
  date: 2023-11 -> 2024-03 delayed by 4 months
  mw: 300 -> 79

60 MW - operation - california - Coso Battery Storage - 63943
  date: 2022-01 -> 2022-02 delayed by 1 month

50 MW - operation - nevada - Dodge Flat - 63913
  date: 2022-02 -> 2022-03 delayed by 1 month

50 MW - planning - texas - TREX US Red Holly - 63202
  date: 2022-05 -> 2024-07 delayed by 26 months

139 MW - operation - california - Slate Hybrid - 63727
  date: 2022-01 -> 2022-02 delayed by 1 month

43 MW - planning - california - Dynegy Oakland Power Plant - 6211
  date: 2022-12 -> 2023-07 delayed by 7 months
  mw: 36 -> 43

40 MW - operation - georgia - Hickory Park Solar Hybrid - 63522
  date: 2022-02 -> 2022-03 delayed by 1 month

40 MW - operation - california - BigBeau Solar, LLC - 64993
  date: 2022-04 -> 2022-06 delayed by 2 months

39 MW - operation - hawaii - Mililani South Solar Farm - 57242
  date: 2022-07 -> 2022-09 delayed by 2 months

139 MW - operation - california - Slate Hybrid - 63727
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2022-01 -> 2022-02 delayed by 1 month

30 MW - cancelled - montana - Beaver Creek Wind Facility - 65019
  date: 2023-06 -> 2024-12 delayed by 18 months

30 MW - cancelled - montana - Beaver Creek IV - 65023
  date: 2023-06 -> 2024-12 delayed by 18 months

25 MW - operation - nevada - Fish Springs - 64148
  date: 2022-02 -> 2022-03 delayed by 1 month

24 MW - operation - new york - Orangeville Storage - 64686
  date: 2022-01 -> 2022-03 delayed by 2 months

20 MW - operation - new york - Willis Battery Storage - 63238
  date: 2022-06 -> 2022-08 delayed by 2 months

20 MW - cancelled - montana - Beaver Creek II - 65020
  date: 2023-06 -> 2024-12 delayed by 18 months

20 MW - cancelled - montana - Beaver Creek III - 65021
  date: 2023-06 -> 2024-12 delayed by 18 months

20 MW - cancelled - hawaii - Kahana Solar, LLC - 64095
  date: 2023-12 -> 2024-12 delayed by 12 months

15 MW - cancelled - hawaii - Paeahu Solar Hybrid - 62534
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (L) Regulatory approvals pending. Not under construction
  date: 2023-04 -> 2023-09 delayed by 5 months

15 MW - cancelled - hawaii - Barbers Point Solar, LLC - 64094
  date: 2023-12 -> 2024-12 delayed by 12 months

10 MW - operation - california - Kearny North Energy Storage - 64612
  date: 2022-01 -> 2022-02 delayed by 1 month

10 MW - operation - california - Kearny South Energy Storage - 64614
  date: 2022-01 -> 2022-02 delayed by 1 month

10 MW - cancelled - california - Chevron - Lost Hills Hybrid - 63545
  date: 2022-05 -> 2022-06 delayed by 1 month

10 MW - planning - maine - South Portland ESS, LLC - 64616
  date: 2023-01 -> 2023-06 delayed by 5 months

120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

75 MW - operation - california - Resurgence Solar - 64489
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (T) Regulatory approvals received. Not under construction

139 MW - operation - california - Slate Hybrid - 63727
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation


2022-02

New projects (8):
125 MW - operation - texas - Noble Solar - 65271
50 MW - operation - texas - Byrd Ranch Storage - 65259
50 MW - operation - mississippi - OE_MS6 - 65291
88 MW - operation - california - RE Garland - 60233
39 MW - operation - hawaii - Mililani South Solar Farm - 57242
36 MW - cancelled - california - Willow Spring Solar 3, LLC - 60325
35 MW - operation - california - Edwards Sanborn S3 - 64928
12 MW - planning - delaware - ENGIE Solidago Solar Project - Hybrid - 65304

Updated projects (37):

149 MW - operation - california - Daggett 3 - 64852
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

125 MW - operation - colorado - Neptune Energy Center Hybrid - 63731
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - colorado - Thunder Wolf Energy Center Hybrid - 63776
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

90 MW - operation - nevada - Townsite Solar Project Hybrid - 60654 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

50 MW - operation - california - Hudson - High Desert Hybrid - 64624
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

88 MW - construction - california - Chaparral Springs - 64864
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

40 MW - operation - georgia - Cool Springs Solar (Hybrid) - 63721
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

30 MW - operation - hawaii - Hale Kuawehi Solar Hybrid - 62529
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

13 MW - operation - california - Edwards Sanborn E3 - 64877
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation
  mw: 14 -> 13

11 MW - operation - florida - Trenton - 63995
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2022-01 -> 2021-12 accelerated by 1 month

500 MW - construction - california - Bellefield Solar and Energy Storage Farm - 64210
  date: 2023-06 -> 2024-11 delayed by 17 months

500 MW - planning - california - Bellefield 2 Solar & Energy Storage Farm - 64209
  date: 2023-06 -> 2024-12 delayed by 18 months

300 MW - planning - arizona - Red Antelope Solar & Energy Storage Farm - 64208
  date: 2023-06 -> 2024-11 delayed by 17 months
  mw: 500 -> 300

210 MW - operation - texas - Blue Jay Solar I, LLC - 64672
  date: 2021-12 -> 2022-02 delayed by 2 months

200 MW - operation - california - Diablo Energy Storage - 62175
  date: 2022-01 -> 2022-02 delayed by 1 month

151 MW - planning - new york - NY2 Battery - 63584
  date: 2022-11 -> 2023-06 delayed by 7 months

100 MW - cancelled - montana - Haymaker Hybrid - 63878
  date: 2022-12 -> 2024-12 delayed by 24 months

182 MW - operation - california - Elkhorn Battery Energy Storage System - 62564 Megapack
  date: 2021-12 -> 2022-01 delayed by 1 month

122 MW - operation - california - Edwards Sanborn E2 - 64879
  date: 2021-12 -> 2022-02 delayed by 2 months

100 MW - operation - texas - Madero Grid - 63757
  date: 2022-06 -> 2022-05 accelerated by 1 month

100 MW - cancelled - texas - TX17 Nickel Prairie Storage - 63880
  date: 2022-12 -> 2023-09 delayed by 9 months

77 MW - operation - texas - Azure Sky Solar - 63905
  date: 2021-12 -> 2022-02 delayed by 2 months

60 MW - operation - california - Coso Battery Storage - 63943
  date: 2021-12 -> 2022-01 delayed by 1 month

50 MW - operation - nevada - Dodge Flat - 63913
  date: 2021-12 -> 2022-02 delayed by 2 months

46 MW - operation - alaska - Soldotna - 57206 Megapack
  date: 2021-12 -> 2022-01 delayed by 1 month

25 MW - operation - nevada - Fish Springs - 64148
  date: 2021-12 -> 2022-02 delayed by 2 months

24 MW - operation - new york - Orangeville Storage - 64686
  date: 2021-12 -> 2022-01 delayed by 1 month

20 MW - operation - new york - Willis Battery Storage - 63238
  date: 2022-03 -> 2022-06 delayed by 3 months

20 MW - operation - virginia - Dry Bridge Storage - 65044
  date: 2022-12 -> 2022-10 accelerated by 2 months

17 MW - operation - florida - Lake Placid Solar Power Plant - 62541
  date: 2021-12 -> 2022-04 delayed by 4 months

10 MW - operation - california - Kearny North Energy Storage - 64612
  date: 2021-12 -> 2022-01 delayed by 1 month

10 MW - operation - california - Kearny South Energy Storage - 64614
  date: 2021-12 -> 2022-01 delayed by 1 month

10 MW - operation - arkansas - Searcy Solar Hybrid - 62617
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2021-12 -> 2022-01 delayed by 1 month

133 MW - operation - california - Edwards Sanborn E1A - 64878
  mw: 72 -> 133

139 MW - operation - california - Slate Hybrid - 63727
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

42 MW - operation - california - Edwards Sanborn S1 - 64929
  mw: 11 -> 42

36 MW - operation - hawaii - Waiawa Solar Power Hybrid - 65058
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2022-01

New projects (1):
370 MW - planning - nevada - Arida Solar (Hybrid) - 63841

Disappeared projects (1):
88 MW - operation - california - RE Garland - 60233

Updated projects (42):

409 MW - operation - florida - Manatee Solar Energy Center - 60014
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

150 MW - operation - california - Eland Solar & Storage Center, Phase 1 Hy - 61168 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete
  date: 2022-11 -> 2023-07 delayed by 8 months

125 MW - operation - california - LeConte Energy Storage - 64701
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

112 MW - operation - california - Blythe Mesa Solar II - 65053 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - california - Sanborn BESS 2 - 64713
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

60 MW - operation - california - Cal Flats BESS - 63930
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

50 MW - operation - texas - Roadrunner, LLC Hybrid - 62561
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid - 62562
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

72 MW - operation - california - RE Tranquillity - 59939
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  mw: 72 -> 37

36 MW - operation - hawaii - Waiawa Solar Power Hybrid - 65058
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

10 MW - operation - california - Henrietta D Energy Storage LLC - 60641
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

200 MW - operation - california - Diablo Energy Storage - 62175
  date: 2021-11 -> 2022-01 delayed by 2 months

150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid - 63172 Megapack
  date: 2022-06 -> 2022-08 delayed by 2 months

150 MW - construction - california - Eland Solar & Storage Center, Phase 2 Hy - 61169 Megapack
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (T) Regulatory approvals received. Not under construction
  date: 2023-07 -> 2023-11 delayed by 4 months

300 MW - planning - nevada - Southern Bighorn Solar Hybrid - 63113
  date: 2023-09 -> 2024-04 delayed by 7 months

100 MW - operation - texas - Ignacio Grid Energy Storage System - 64089
  date: 2022-05 -> 2022-06 delayed by 1 month

100 MW - operation - texas - Madero Grid - 63757
  date: 2022-04 -> 2022-06 delayed by 2 months

90 MW - operation - nevada - Townsite Solar Project Hybrid - 60654 Megapack
  date: 2021-11 -> 2021-12 delayed by 1 month

77 MW - operation - texas - Azure Sky Solar - 63905
  date: 2021-11 -> 2021-12 delayed by 1 month

50 MW - operation - california - Hudson - High Desert Hybrid - 64624
  date: 2021-11 -> 2021-12 delayed by 1 month

50 MW - operation - california - Maverick Solar 6, LLC - 64105
  date: 2021-12 -> 2022-05 delayed by 5 months

46 MW - operation - alaska - Soldotna - 57206 Megapack
  date: 2021-11 -> 2021-12 delayed by 1 month

139 MW - operation - california - Slate Hybrid - 63727
  entity id: 62780 -> 61944
  entity name: RE Slate 1 LLC -> Goldman Sachs Renewable Power Group
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2021-11 -> 2022-01 delayed by 2 months

40 MW - operation - georgia - Cool Springs Solar (Hybrid) - 63721
  date: 2021-11 -> 2021-12 delayed by 1 month

40 MW - operation - georgia - Hickory Park Solar Hybrid - 63522
  date: 2021-12 -> 2022-02 delayed by 2 months

139 MW - operation - california - Slate Hybrid - 63727
  entity id: 62780 -> 61944
  entity name: RE Slate 1 LLC -> Goldman Sachs Renewable Power Group
  date: 2021-12 -> 2022-01 delayed by 1 month

30 MW - operation - oregon - Wheatridge Hybrid - 62745
  date: 2021-12 -> 2022-03 delayed by 3 months

30 MW - planning - new mexico - Rockmont Solar and Storage Project - 64216
  date: 2022-06 -> 2023-06 delayed by 12 months

25 MW - operation - massachusetts - Outer Cape Community Battery - 62604
  date: 2021-12 -> 2022-04 delayed by 4 months

24 MW - operation - new york - Orangeville Storage - 64686
  date: 2021-11 -> 2021-12 delayed by 1 month

20 MW - construction - connecticut - Pure Hedge LLC - 50736
  date: 2022-01 -> 2023-01 delayed by 12 months

20 MW - cancelled - california - Renz Energy Storage - 63529
  date: 2022-05 -> 2023-05 delayed by 12 months

11 MW - operation - florida - Trenton - 63995
  date: 2021-11 -> 2022-01 delayed by 2 months

139 MW - operation - california - Slate Hybrid - 63727
  entity id: 62780 -> 61944
  entity name: RE Slate 1 LLC -> Goldman Sachs Renewable Power Group
  date: 2022-01 -> 2022-02 delayed by 1 month

260 MW - operation - texas - DeCordova Steam Electric Station - 8063
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

122 MW - operation - california - Edwards Sanborn E2 - 64879
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  mw: 66 -> 122

139 MW - operation - california - Slate Hybrid - 63727
  entity id: 62780 -> 61944
  entity name: RE Slate 1 LLC -> Goldman Sachs Renewable Power Group

10 MW - construction - california - Painter Energy Storage - 62729
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (T) Regulatory approvals received. Not under construction

17 MW - operation - florida - Lake Placid Solar Power Plant - 62541
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

13 MW - operation - california - Edwards Sanborn E3 - 64877
  plant name: Edwards Sanborn E3 -> Edwards Sanborn E3
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  mw: 12 -> 14

10 MW - operation - california - Kearny North Energy Storage - 64612
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

10 MW - operation - california - Kearny South Energy Storage - 64614
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation


2021-12

New projects (5):
350 MW - operation - california - Crimson - 65140
350 MW - operation - california - Crimson - 65140
58 MW - planning - nevada - Boulder Solar III LLC - 65141
72 MW - operation - california - RE Tranquillity - 59939
30 MW - planning - virginia - Deer Wood Storage, LLC - 65145

Updated projects (34):

260 MW - operation - texas - DeCordova Steam Electric Station - 8063
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - texas - Bat Cave - 64312
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

100 MW - operation - texas - North Fork TX - 64317
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

100 MW - operation - texas - Chisholm Grid Energy Storage System - 63737
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

75 MW - operation - california - RE Mustang LLC - 59150
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

73 MW - operation - texas - Ranchland Wind Storage - 64545
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

40 MW - operation - texas - 2W Permian Solar Project Hybrid - 63255
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

30 MW - operation - oregon - Wheatridge Hybrid - 62745
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (V) Under construction, more than 50 percent complete

25 MW - operation - arizona - Agua Fria - 141 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation
  date: 2021-10 -> 2021-09 accelerated by 1 month

20 MW - operation - california - Hecate Energy Johanna Facility - 62889
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

20 MW - operation - california - Hecate Energy Johanna Facility - 62889
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

200 MW - operation - california - Diablo Energy Storage - 62175
  date: 2021-10 -> 2021-11 delayed by 1 month

182 MW - operation - california - Elkhorn Battery Energy Storage System - 62564 Megapack
  date: 2021-11 -> 2021-12 delayed by 1 month

100 MW - operation - california - Sanborn BESS 2 - 64713
  date: 2021-10 -> 2021-11 delayed by 1 month

100 MW - operation - california - Luna Storage - 63685
  date: 2021-10 -> 2022-04 delayed by 6 months

77 MW - operation - texas - Azure Sky Solar - 63905
  date: 2021-10 -> 2021-11 delayed by 1 month

72 MW - operation - california - RE Tranquillity - 59939
  date: 2021-10 -> 2021-11 delayed by 1 month

60 MW - operation - california - Coso Battery Storage - 63943
  date: 2021-11 -> 2021-12 delayed by 1 month

50 MW - operation - california - Hudson - High Desert Hybrid - 64624
  date: 2021-10 -> 2021-11 delayed by 1 month

46 MW - operation - alaska - Soldotna - 57206 Megapack
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2021-10 -> 2021-11 delayed by 1 month

40 MW - operation - georgia - Hickory Park Solar Hybrid - 63522
  date: 2021-11 -> 2021-12 delayed by 1 month

25 MW - operation - massachusetts - Outer Cape Community Battery - 62604
  date: 2021-11 -> 2021-12 delayed by 1 month

11 MW - operation - florida - Trenton - 63995
  date: 2021-10 -> 2021-11 delayed by 1 month

10 MW - operation - california - Henrietta D Energy Storage LLC - 60641
  date: 2021-10 -> 2021-11 delayed by 1 month

10 MW - operation - california - Kearny North Energy Storage - 64612
  date: 2021-11 -> 2021-12 delayed by 1 month

10 MW - operation - california - Kearny South Energy Storage - 64614
  date: 2021-11 -> 2021-12 delayed by 1 month

10 MW - cancelled - california - Sierra - 64320
  date: 2021-12 -> 2022-03 delayed by 3 months

210 MW - operation - texas - Blue Jay Solar I, LLC - 64672
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

122 MW - operation - california - Edwards Sanborn E2 - 64879
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

139 MW - operation - california - Slate Hybrid - 63727
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

24 MW - operation - new york - Orangeville Storage - 64686
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

17 MW - operation - florida - Lake Placid Solar Power Plant - 62541
  status_verbose: (V) Under construction, more than 50 percent complete -> (U) Under construction, less than or equal to 50 percent complete

13 MW - operation - california - Edwards Sanborn E3 - 64877
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

139 MW - operation - california - Slate Hybrid - 63727
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2021-11

New projects (20):
112 MW - operation - california - Blythe Mesa Solar II - 65053 Megapack
750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid - 260
65 MW - operation - georgia - Mossy Branch Battery Facility - 65018
88 MW - construction - california - Chaparral Springs - 64864
50 MW - planning - virginia - Dulles Solar and Storage - 65043
88 MW - operation - california - RE Garland - 60233
40 MW - operation - california - BigBeau Solar, LLC - 64993
40 MW - operation - california - Scarlet Solar (CA) - 64908
36 MW - operation - hawaii - Waiawa Solar Power Hybrid - 65058
30 MW - cancelled - montana - Beaver Creek Wind Facility - 65019
30 MW - cancelled - montana - Beaver Creek IV - 65023
16 MW - operation - texas - Cameron Wind 1 LLC - 59118
20 MW - operation - california - Santa Ana Storage 2 - 64921
20 MW - operation - california - Rabbitbrush Solar, LLC - 64630
20 MW - operation - virginia - Dry Bridge Storage - 65044
20 MW - cancelled - montana - Beaver Creek II - 65020
20 MW - cancelled - montana - Beaver Creek III - 65021
20 MW - planning - new york - South Ripley Solar - 64911
17 MW - operation - florida - Lake Placid Solar Power Plant - 62541
42 MW - operation - california - Edwards Sanborn S1 - 64929

Disappeared projects (1):
10 MW - cancelled - california - Goleta Grid Resiliency - 63736

Updated projects (28):

100 MW - operation - california - Sanborn BESS 1 - 64712
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

50 MW - operation - texas - Lily Solar Hybrid - 63892
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

200 MW - operation - california - Diablo Energy Storage - 62175
  date: 2021-09 -> 2021-10 delayed by 1 month

182 MW - operation - california - Elkhorn Battery Energy Storage System - 62564 Megapack
  date: 2021-10 -> 2021-11 delayed by 1 month

117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) - 64197
  date: 2022-09 -> 2022-12 delayed by 3 months

100 MW - operation - texas - Bat Cave - 64312
  date: 2021-09 -> 2021-10 delayed by 1 month

100 MW - operation - texas - North Fork TX - 64317
  date: 2021-09 -> 2021-10 delayed by 1 month

100 MW - operation - texas - Chisholm Grid Energy Storage System - 63737
  date: 2021-09 -> 2021-10 delayed by 1 month

77 MW - operation - texas - Azure Sky Solar - 63905
  date: 2021-09 -> 2021-10 delayed by 1 month

60 MW - operation - california - Cal Flats BESS - 63930
  date: 2021-10 -> 2021-11 delayed by 1 month

52 MW - construction - hawaii - Ho'Ohana Solar 1 - 63723
  date: 2022-09 -> 2023-08 delayed by 11 months

50 MW - operation - california - Hudson - High Desert Hybrid - 64624
  date: 2021-09 -> 2021-10 delayed by 1 month

40 MW - operation - california - Fallbrook Energy Storage - 61365
  date: 2021-12 -> 2022-06 delayed by 6 months

25 MW - operation - arizona - Agua Fria - 141 Megapack
  date: 2021-09 -> 2021-10 delayed by 1 month

25 MW - operation - massachusetts - Outer Cape Community Battery - 62604
  date: 2021-09 -> 2021-11 delayed by 2 months

24 MW - operation - new york - Orangeville Storage - 64686
  date: 2021-10 -> 2021-11 delayed by 1 month
  mw: 20 -> 24

12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid - 63728
  date: 2021-09 -> 2023-03 delayed by 18 months

11 MW - operation - florida - Trenton - 63995
  date: 2021-09 -> 2021-10 delayed by 1 month

10 MW - operation - california - Henrietta D Energy Storage LLC - 60641
  date: 2021-09 -> 2021-10 delayed by 1 month

20 MW - operation - california - Hecate Energy Johanna Facility - 62889
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2021-09 -> 2021-10 delayed by 1 month

20 MW - operation - california - Hecate Energy Johanna Facility - 62889
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2021-09 -> 2021-10 delayed by 1 month

10 MW - operation - california - Kearny North Energy Storage - 64612
  date: 2021-10 -> 2021-11 delayed by 1 month

10 MW - operation - california - Kearny South Energy Storage - 64614
  date: 2021-10 -> 2021-11 delayed by 1 month

10 MW - cancelled - california - Sierra - 64320
  date: 2021-10 -> 2021-12 delayed by 2 months

10 MW - cancelled - california - Chevron - Lost Hills Hybrid - 63545
  date: 2022-02 -> 2022-05 delayed by 3 months

75 MW - operation - california - RE Mustang LLC - 59150
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

133 MW - operation - california - Edwards Sanborn E1A - 64878
  mw: 36 -> 72

122 MW - operation - california - Edwards Sanborn E2 - 64879
  mw: 33 -> 66


2021-10

New projects (1):
25 MW - operation - arizona - Agua Fria - 141 Megapack

Updated projects (25):

150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid - 63172 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

88 MW - operation - california - RE Garland - 60233
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  mw: 88 -> 45

182 MW - operation - california - Elkhorn Battery Energy Storage System - 62564 Megapack
  date: 2021-08 -> 2021-10 delayed by 2 months

100 MW - operation - texas - Bat Cave - 64312
  date: 2021-08 -> 2021-09 delayed by 1 month

100 MW - operation - texas - North Fork TX - 64317
  date: 2021-08 -> 2021-09 delayed by 1 month

100 MW - operation - california - Sanborn BESS 2 - 64713
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2021-09 -> 2021-10 delayed by 1 month

100 MW - operation - texas - Madero Grid - 63757
  date: 2022-01 -> 2022-04 delayed by 3 months

100 MW - operation - texas - Ignacio Grid Energy Storage System - 64089
  date: 2022-03 -> 2022-05 delayed by 2 months

77 MW - operation - texas - Azure Sky Solar - 63905
  date: 2021-08 -> 2021-09 delayed by 1 month

60 MW - operation - california - Cal Flats BESS - 63930
  date: 2021-09 -> 2021-10 delayed by 1 month

60 MW - operation - california - Coso Battery Storage - 63943
  date: 2021-10 -> 2021-11 delayed by 1 month

50 MW - operation - texas - Lily Solar Hybrid - 63892
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2021-08 -> 2021-09 delayed by 1 month

125 MW - construction - california - Aratina Solar Center 1B - 61167
  date: 2022-08 -> 2023-09 delayed by 13 months

40 MW - operation - texas - 2W Permian Solar Project Hybrid - 63255
  date: 2021-08 -> 2021-10 delayed by 2 months

24 MW - operation - new york - Orangeville Storage - 64686
  date: 2021-09 -> 2021-10 delayed by 1 month

11 MW - operation - florida - Trenton - 63995
  date: 2021-08 -> 2021-09 delayed by 1 month

10 MW - operation - california - Kearny North Energy Storage - 64612
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2021-09 -> 2021-10 delayed by 1 month

10 MW - operation - california - Kearny South Energy Storage - 64614
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2021-09 -> 2021-10 delayed by 1 month

10 MW - cancelled - california - Chevron - Lost Hills Hybrid - 63545
  date: 2021-11 -> 2022-02 delayed by 3 months

100 MW - operation - california - Sanborn BESS 1 - 64712
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

75 MW - operation - california - RE Mustang LLC - 59150
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

50 MW - operation - california - Hudson - High Desert Hybrid - 64624
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

139 MW - operation - california - Slate Hybrid - 63727
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

40 MW - operation - georgia - Cool Springs Solar (Hybrid) - 63721
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid - 63728
  status_verbose: (T) Regulatory approvals received. Not under construction -> (L) Regulatory approvals pending. Not under construction


2021-09

New projects (6):
149 MW - operation - california - Daggett 3 - 64852
131 MW - operation - california - Daggett 2 - 64851
133 MW - operation - california - Edwards Sanborn E1A - 64878
122 MW - operation - california - Edwards Sanborn E2 - 64879
25 MW - operation - nevada - Battle Mountain Solar Project - 61098
13 MW - operation - california - Edwards Sanborn E3 - 64877

Updated projects (20):

230 MW - operation - california - McCoy Solar Energy Project Hybrid - 58462
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

75 MW - operation - california - RE Mustang LLC - 59150
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

200 MW - operation - california - Diablo Energy Storage - 62175
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2021-08 -> 2021-09 delayed by 1 month

182 MW - operation - california - Elkhorn Battery Energy Storage System - 62564 Megapack
  date: 2021-07 -> 2021-08 delayed by 1 month

100 MW - operation - texas - Bat Cave - 64312
  date: 2021-07 -> 2021-08 delayed by 1 month

100 MW - operation - texas - North Fork TX - 64317
  date: 2021-07 -> 2021-08 delayed by 1 month

100 MW - operation - texas - Chisholm Grid Energy Storage System - 63737
  date: 2021-07 -> 2021-09 delayed by 2 months

100 MW - operation - california - Sanborn BESS 1 - 64712
  date: 2021-08 -> 2021-09 delayed by 1 month

100 MW - operation - california - Sanborn BESS 2 - 64713
  date: 2021-08 -> 2021-09 delayed by 1 month

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  date: 2022-05 -> 2022-04 accelerated by 1 month

60 MW - operation - california - Cal Flats BESS - 63930
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2021-08 -> 2021-09 delayed by 1 month

50 MW - operation - texas - Lily Solar Hybrid - 63892
  date: 2021-07 -> 2021-08 delayed by 1 month

46 MW - operation - alaska - Soldotna - 57206 Megapack
  date: 2021-09 -> 2021-10 delayed by 1 month

24 MW - operation - new york - Orangeville Storage - 64686
  date: 2021-08 -> 2021-09 delayed by 1 month

10 MW - cancelled - california - Chevron - Lost Hills Hybrid - 63545
  date: 2021-10 -> 2021-11 delayed by 1 month

50 MW - operation - california - Hudson - High Desert Hybrid - 64624
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

50 MW - operation - california - Maverick Solar 6, LLC - 64105
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

25 MW - operation - massachusetts - Outer Cape Community Battery - 62604
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

20 MW - operation - california - Johanna Energy Center, LLC - 63843
  entity name: Santa Ana Storage 1 -> Johanna Energy Center, LLC

20 MW - operation - california - Hecate Energy Johanna Facility - 62889
  mw: 20 -> 10


2021-08

New projects (0):

Updated projects (30):

100 MW - operation - texas - Gambit Energy Storage - Angleton Storage - 64528 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

90 MW - operation - nevada - Townsite Solar Project Hybrid - 60654 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

63 MW - operation - california - Blythe Solar 110, LLC - 60093
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

50 MW - operation - california - Hudson - High Desert Hybrid - 64624
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

50 MW - operation - nevada - Dodge Flat - 63913
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (V) Under construction, more than 50 percent complete

40 MW - operation - georgia - Hickory Park Solar Hybrid - 63522
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (V) Under construction, more than 50 percent complete

30 MW - operation - california - Top Gun Energy Storage - 61366
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2021-07 -> 2021-06 accelerated by 1 month

25 MW - operation - arizona - Agua Fria - 141 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation

20 MW - operation - california - Johanna Energy Center, LLC - 63843
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2021-08 -> 2021-06 accelerated by 2 months

10 MW - cancelled - california - Sierra - 64320
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - texas - Bat Cave - 64312
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2021-06 -> 2021-07 delayed by 1 month

100 MW - operation - texas - North Fork TX - 64317
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2021-06 -> 2021-07 delayed by 1 month

60 MW - operation - california - Coso Battery Storage - 63943
  date: 2021-08 -> 2021-10 delayed by 2 months

50 MW - operation - texas - Lily Solar Hybrid - 63892
  date: 2021-06 -> 2021-07 delayed by 1 month

40 MW - operation - texas - 2W Permian Solar Project Hybrid - 63255
  date: 2021-07 -> 2021-08 delayed by 1 month

10 MW - construction - california - Painter Energy Storage - 62729
  date: 2021-12 -> 2022-09 delayed by 9 months

20 MW - operation - california - Hecate Energy Johanna Facility - 62889
  date: 2021-06 -> 2021-09 delayed by 3 months

11 MW - operation - florida - Trenton - 63995
  date: 2021-07 -> 2021-08 delayed by 1 month

20 MW - operation - california - Hecate Energy Johanna Facility - 62889
  date: 2021-06 -> 2021-09 delayed by 3 months

10 MW - operation - california - Kearny North Energy Storage - 64612
  date: 2021-06 -> 2021-09 delayed by 3 months

10 MW - operation - california - Kearny South Energy Storage - 64614
  date: 2021-06 -> 2021-09 delayed by 3 months

409 MW - operation - florida - Manatee Solar Energy Center - 60014
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

210 MW - operation - texas - Blue Jay Solar I, LLC - 64672
  mw: 50 -> 210

125 MW - operation - california - LeConte Energy Storage - 64701
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (L) Regulatory approvals pending. Not under construction

100 MW - operation - texas - Chisholm Grid Energy Storage System - 63737
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

77 MW - operation - texas - Azure Sky Solar - 63905
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

72 MW - operation - california - RE Tranquillity - 59939
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

30 MW - planning - new mexico - Rockmont Solar and Storage Project - 64216
  mw: 200 -> 30

25 MW - operation - nevada - Fish Springs - 64148
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

10 MW - operation - arkansas - Searcy Solar Hybrid - 62617
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2021-07

New projects (6):
125 MW - operation - california - LeConte Energy Storage - 64701
100 MW - operation - california - Sanborn BESS 1 - 64712
100 MW - operation - california - Sanborn BESS 2 - 64713
75 MW - operation - california - RE Mustang LLC - 59150
25 MW - operation - arizona - Agua Fria - 141 Megapack
24 MW - operation - new york - Orangeville Storage - 64686

Disappeared projects (1):
100 MW - cancelled - texas - TX18 Cottage Meadow Storage - 63879

Updated projects (18):

750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid - 260
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation
  date: 2021-06 -> 2021-05 accelerated by 1 month

115 MW - operation - california - Blythe Solar III, LLC Hybrid - 60094
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

10 MW - operation - north carolina - Grissom Solar, LLC - 64450
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

10 MW - operation - california - Kearny North Energy Storage - 64612
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

10 MW - operation - california - Kearny South Energy Storage - 64614
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - california - Luna Storage - 63685
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2021-07 -> 2021-10 delayed by 3 months

50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid - 62562
  date: 2022-05 -> 2022-07 delayed by 2 months

40 MW - operation - texas - 2W Permian Solar Project Hybrid - 63255
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2021-05 -> 2021-07 delayed by 2 months

30 MW - operation - california - Top Gun Energy Storage - 61366
  date: 2021-05 -> 2021-07 delayed by 2 months

20 MW - operation - california - Johanna Energy Center, LLC - 63843
  date: 2021-05 -> 2021-08 delayed by 3 months

20 MW - operation - new york - Willis Battery Storage - 63238
  date: 2021-09 -> 2022-03 delayed by 6 months

11 MW - operation - florida - Trenton - 63995
  date: 2021-06 -> 2021-07 delayed by 1 month

22 MW - cancelled - california - Camino Solar - 63508
  date: 2022-05 -> 2023-03 delayed by 10 months

10 MW - operation - california - Henrietta D Energy Storage LLC - 60641
  date: 2021-06 -> 2021-09 delayed by 3 months

10 MW - cancelled - california - Chevron - Lost Hills Hybrid - 63545
  date: 2021-09 -> 2021-10 delayed by 1 month

88 MW - operation - california - RE Garland - 60233
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

210 MW - operation - texas - Blue Jay Solar I, LLC - 64672
  mw: 210 -> 50

12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid - 63728
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (T) Regulatory approvals received. Not under construction


2021-06

New projects (13):
74 MW - planning - california - Kingsley Solar Farm - 64634
240 MW - operation - california - Rexford Solar Farm - 64633
210 MW - operation - texas - Blue Jay Solar I, LLC - 64672
200 MW - construction - california - Big Rock Solar Farm - 64636
200 MW - planning - california - Sienna Solar Farm - 64632
50 MW - operation - california - Hudson - High Desert Hybrid - 64624
50 MW - operation - nevada - Dodge Flat - 63913
50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid - 62562
50 MW - operation - texas - Roadrunner, LLC Hybrid - 62561
12 MW - operation - hawaii - AES West Oahu Solar Hybrid - 64656
10 MW - operation - california - Kearny North Energy Storage - 64612
10 MW - operation - california - Kearny South Energy Storage - 64614
10 MW - planning - maine - South Portland ESS, LLC - 64616

Updated projects (14):

100 MW - operation - california - Saticoy - 63891 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation
  date: 2021-05 -> 2021-04 accelerated by 1 month

100 MW - operation - texas - Gambit Energy Storage - Angleton Storage - 64528 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

100 MW - operation - texas - Ignacio Grid Energy Storage System - 64089
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2022-04 -> 2022-05 delayed by 1 month

30 MW - operation - arizona - Wilmot Energy Center LLC - 64426
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation
  date: 2021-05 -> 2021-04 accelerated by 1 month

20 MW - operation - new york - Willis Battery Storage - 63238
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

14 MW - operation - hawaii - AES Kekaha Solar, LLC Hybrid - 63280
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation

11 MW - operation - california - Silverstrand Grid Energy Storage System - 63735 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

10 MW - operation - north carolina - Grissom Solar, LLC - 64450
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

60 MW - operation - california - Cal Flats BESS - 63930
  date: 2021-07 -> 2021-08 delayed by 1 month

10 MW - operation - arizona - Desert Star Hybrid - 59444
  date: 2021-12 -> 2022-06 delayed by 6 months

750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid - 260
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation

100 MW - operation - texas - Chisholm Grid Energy Storage System - 63737
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

10 MW - cancelled - california - Chevron - Lost Hills Hybrid - 63545
  entity name: GSRP -> Goldman Sachs Renewable Power Group


2021-05

New projects (4):
180 MW - cancelled - nevada - Chuckwalla Solar, LLC - 64558
73 MW - operation - texas - Ranchland Wind Storage - 64545
50 MW - operation - mississippi - Golden Triangle - 64529
110 MW - operation - california - Arlington Energy Center III - 64564

Updated projects (15):

200 MW - operation - california - Diablo Energy Storage - 62175
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

115 MW - operation - california - Blythe Solar II, LLC - 60092
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

100 MW - operation - texas - Madero Grid - 63757
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

88 MW - operation - california - RE Garland - 60233
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

72 MW - operation - california - RE Tranquillity - 59939
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

60 MW - operation - california - Coso Battery Storage - 63943
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid - 260
  date: 2021-03 -> 2021-06 delayed by 3 months

260 MW - operation - texas - DeCordova Steam Electric Station - 8063
  date: 2022-02 -> 2022-05 delayed by 3 months

50 MW - planning - texas - TREX US Red Holly - 63202
  date: 2021-08 -> 2022-05 delayed by 9 months

25 MW - operation - massachusetts - Outer Cape Community Battery - 62604
  date: 2021-03 -> 2021-09 delayed by 6 months

20 MW - construction - connecticut - Pure Hedge LLC - 50736
  date: 2021-09 -> 2022-01 delayed by 4 months

10 MW - cancelled - california - Goleta Grid Resiliency - 63736
  date: 2022-12 -> 2022-09 accelerated by 3 months

100 MW - operation - texas - Ignacio Grid Energy Storage System - 64089
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (T) Regulatory approvals received. Not under construction

63 MW - operation - california - Blythe Solar 110, LLC - 60093
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

40 MW - operation - georgia - Cool Springs Solar (Hybrid) - 63721
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2021-04

New projects (9):
132 MW - operation - california - Arlington Energy Center II - 64481
75 MW - operation - california - Resurgence Solar - 64489
100 MW - operation - texas - Gambit Energy Storage - Angleton Storage - 64528 Megapack
99 MW - construction - california - Noosa Energy Storage LLC - 64531
75 MW - cancelled - wisconsin - Darien Solar - 64534
30 MW - operation - arizona - Wilmot Energy Center LLC - 64426
25 MW - operation - nevada - Fish Springs - 64148
10 MW - operation - north carolina - Grissom Solar, LLC - 64450
10 MW - operation - arizona - Desert Star Hybrid - 59444

Disappeared projects (1):
10 MW - cancelled - arizona - Desert Star Hybrid - 62965

Updated projects (15):

230 MW - operation - california - McCoy Solar Energy Project Hybrid - 58462
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - california - Luna Storage - 63685
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

60 MW - operation - california - Cal Flats BESS - 63930
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

10 MW - operation - california - Vallecito - 62801 Megapack
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation
  date: 2021-03 -> 2021-02 accelerated by 1 month

151 MW - planning - new york - NY2 Battery - 63584
  date: 2021-11 -> 2022-11 delayed by 12 months

115 MW - operation - california - Blythe Solar II, LLC - 60092
  date: 2021-02 -> 2021-03 delayed by 1 month

100 MW - operation - california - Saticoy - 63891 Megapack
  date: 2021-04 -> 2021-05 delayed by 1 month

139 MW - operation - california - Slate Hybrid - 63727
  date: 2021-10 -> 2022-03 delayed by 5 months
  mw: 300 -> 50

20 MW - operation - california - Hecate Energy Johanna Facility - 62889
  date: 2021-04 -> 2021-06 delayed by 2 months

20 MW - cancelled - california - Renz Energy Storage - 63529
  date: 2021-12 -> 2022-05 delayed by 5 months

11 MW - operation - california - Silverstrand Grid Energy Storage System - 63735 Megapack
  date: 2021-03 -> 2021-04 delayed by 1 month

20 MW - operation - california - Hecate Energy Johanna Facility - 62889
  date: 2021-04 -> 2021-06 delayed by 2 months

60 MW - operation - california - Coso Battery Storage - 63943
  entity id: 63611 -> 64172
  entity name: Coso Battery Storage LLC -> Arevon Asset Management

25 MW - operation - california - Cascade Energy Storage, LLC - 61801
  entity id: 59380 -> 63883
  entity name: Enel Green Power NA, Inc. -> Broad Reach Power

11 MW - operation - florida - Trenton - 63995
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2021-03

New projects (9):
299 MW - planning - new york - NISA Electric Generation Project - 61331
88 MW - operation - california - RE Garland - 60233
72 MW - operation - california - RE Tranquillity - 59939
70 MW - planning - california - JVR Energy Park LLC - 64428
139 MW - operation - california - Slate Hybrid - 63727
10 MW - construction - california - Painter Energy Storage - 62729
139 MW - operation - california - Slate Hybrid - 63727
20 MW - construction - connecticut - Pure Hedge LLC - 50736
139 MW - operation - california - Slate Hybrid - 63727

Updated projects (22):

139 MW - operation - california - Slate Hybrid - 63727
  entity name: RE Slate LLC -> RE Slate 1 LLC
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - california - AES ES ALAMITOS, LLC - 61204
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (V) Under construction, more than 50 percent complete -> operation

35 MW - operation - california - Desert Harvest II LLC - 64103
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation
  date: 2021-02 -> 2021-01 accelerated by 1 month

150 MW - construction - massachusetts - Cranberry Point Energy Storage - 62844 Megapack
  date: 2023-05 -> 2024-06 delayed by 13 months

117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) - 64197
  date: 2022-12 -> 2022-09 accelerated by 3 months

100 MW - operation - texas - Madero Grid - 63757
  date: 2021-12 -> 2022-01 delayed by 1 month

100 MW - operation - texas - Ignacio Grid Energy Storage System - 64089
  date: 2022-01 -> 2022-03 delayed by 2 months

60 MW - operation - california - Cal Flats BESS - 63930
  entity id: 63600 -> 61230
  entity name: Cal Flats BESS, LLC -> CD Arevon USA, Inc.
  date: 2021-06 -> 2021-07 delayed by 1 month

60 MW - operation - california - Coso Battery Storage - 63943
  date: 2021-06 -> 2021-08 delayed by 2 months

50 MW - operation - arizona - El Sol BESS - 62964
  date: 2021-12 -> 2022-12 delayed by 12 months

40 MW - operation - california - Fallbrook Energy Storage - 61365
  date: 2021-05 -> 2021-12 delayed by 7 months

38 MW - operation - arizona - Foothills Solar Plant Hybrid - 57997
  date: 2021-12 -> 2022-12 delayed by 12 months

36 MW - operation - arizona - Gila Bend Hybrid - 59020
  date: 2021-12 -> 2022-12 delayed by 12 months

30 MW - operation - california - Top Gun Energy Storage - 61366
  date: 2021-04 -> 2021-05 delayed by 1 month

17 MW - operation - arizona - Cotton Center Solar Hybrid - 57561
  date: 2021-12 -> 2022-12 delayed by 12 months

17 MW - operation - arizona - Paloma Solar Hybrid - 57562
  date: 2021-12 -> 2022-12 delayed by 12 months

16 MW - operation - arizona - Hyder Solar Hybrid - 57563
  date: 2021-12 -> 2022-12 delayed by 12 months

15 MW - cancelled - hawaii - Paeahu Solar Hybrid - 62534
  date: 2022-12 -> 2023-04 delayed by 4 months

14 MW - operation - arizona - Hyder II Hybrid - 58383
  date: 2021-12 -> 2022-12 delayed by 12 months

10 MW - cancelled - arizona - Desert Star Hybrid - 62965
  date: 2021-12 -> 2022-12 delayed by 12 months

115 MW - operation - california - Blythe Solar III, LLC Hybrid - 60094
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

20 MW - cancelled - california - Renz Energy Storage - 63529
  plant name: Llagas Energy Storage -> Renz Energy Storage


2021-02

New projects (5):
100 MW - operation - texas - Bat Cave - 64312
100 MW - operation - texas - North Fork TX - 64317
63 MW - operation - california - Blythe Solar 110, LLC - 60093
22 MW - cancelled - california - Camino Solar - 63508
10 MW - cancelled - california - Sierra - 64320

Disappeared projects (1):
22 MW - cancelled - california - Camino Solar - 63508

Updated projects (20):

50 MW - operation - california - Maverick Solar 6, LLC - 64105
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

40 MW - operation - california - Fallbrook Energy Storage - 61365
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

20 MW - operation - california - Hecate Energy Johanna Facility - 62889
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2021-01 -> 2021-04 delayed by 3 months

10 MW - operation - arkansas - Searcy Solar Hybrid - 62617
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid - 260
  date: 2020-12 -> 2021-03 delayed by 3 months

260 MW - operation - texas - DeCordova Steam Electric Station - 8063
  date: 2021-07 -> 2022-02 delayed by 7 months

100 MW - cancelled - montana - Haymaker Hybrid - 63878
  date: 2021-12 -> 2022-12 delayed by 12 months

100 MW - cancelled - texas - TX17 Nickel Prairie Storage - 63880
  date: 2021-12 -> 2022-12 delayed by 12 months

35 MW - operation - california - Desert Harvest II LLC - 64103
  status_verbose: (V) Under construction, more than 50 percent complete -> (TS) Construction complete, but not yet in commercial operation
  date: 2020-12 -> 2021-02 delayed by 2 months

30 MW - operation - california - Top Gun Energy Storage - 61366
  date: 2021-03 -> 2021-04 delayed by 1 month

20 MW - operation - california - Hecate Energy Johanna Facility - 62889
  date: 2021-01 -> 2021-04 delayed by 3 months

20 MW - operation - california - Johanna Energy Center, LLC - 63843
  date: 2021-01 -> 2021-05 delayed by 4 months

10 MW - operation - california - Vallecito - 62801 Megapack
  date: 2020-12 -> 2021-03 delayed by 3 months

10 MW - operation - california - Henrietta D Energy Storage LLC - 60641
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2021-04 -> 2021-06 delayed by 2 months

150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid - 63172 Megapack
  mw: 40 -> 150

117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) - 64197
  plant name: Fifth Standard Solar PV, LLC -> Fifth Standard Solar PV, LLC (Hybrid)

100 MW - operation - texas - Chisholm Grid Energy Storage System - 63737
  entity name: Astral Electricity, LLC -> Chisholm Grid, LLC

80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
  plant name: Big Star Solar, LLC -> Big Star Solar, LLC (Hybrid)

11 MW - operation - california - Silverstrand Grid Energy Storage System - 63735 Megapack
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

10 MW - cancelled - california - Goleta Grid Resiliency - 63736
  entity id: 62742 -> 61198
  entity name: ENEL BELLA ENERGY STORAGE, LLC -> esVolta LP


2021-01

New projects (13):
121 MW - planning - new york - Swiftsure - 64235
500 MW - planning - california - Bellefield 2 Solar & Energy Storage Farm - 64209
300 MW - planning - arizona - Red Antelope Solar & Energy Storage Farm - 64208
500 MW - construction - california - Bellefield Solar and Energy Storage Farm - 64210
30 MW - planning - new mexico - Rockmont Solar and Storage Project - 64216
200 MW - planning - california - Aratina Solar Center 2 - 64215
117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) - 64197
100 MW - cancelled - new york - Clermont - 64236
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) - 64202
60 MW - operation - hawaii - AES Maui Kuihelani Solar Hybrid - 64256
25 MW - cancelled - colorado - Pike Solar Hybrid - 64212
20 MW - construction - tennessee - Vonore Battery Energy Storage System - 64255
20 MW - operation - california - Hecate Energy Johanna Facility - 62889

Updated projects (14):

409 MW - operation - florida - Manatee Solar Energy Center - 60014
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

40 MW - operation - georgia - Cool Springs Solar (Hybrid) - 63721
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

35 MW - operation - california - Desert Harvest II LLC - 64103
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (V) Under construction, more than 50 percent complete

11 MW - operation - california - Silverstrand Grid Energy Storage System - 63735 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - texas - Ignacio Grid Energy Storage System - 64089
  date: 2021-06 -> 2022-01 delayed by 7 months

20 MW - operation - new york - Willis Battery Storage - 63238
  date: 2021-06 -> 2021-09 delayed by 3 months

10 MW - operation - california - Henrietta D Energy Storage LLC - 60641
  date: 2021-03 -> 2021-04 delayed by 1 month

10 MW - cancelled - california - Goleta Grid Resiliency - 63736
  date: 2021-06 -> 2022-12 delayed by 18 months

200 MW - operation - california - Diablo Energy Storage - 62175
  mw: 250 -> 200

115 MW - operation - california - Blythe Solar II, LLC - 60092
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete

100 MW - cancelled - texas - TX17 Nickel Prairie Storage - 63880
  entity id: 63552 -> 63289

100 MW - operation - texas - Madero Grid - 63757
  mw: 200 -> 100

100 MW - cancelled - texas - TX18 Cottage Meadow Storage - 63879
  entity id: 63552 -> 63289

30 MW - operation - oregon - Wheatridge Hybrid - 62745
  entity name: Wheatridge Wind Energy, LLC -> Wheatridge Wind Holdings, LLC


2020-12

New projects (4):
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid - 64164
100 MW - cancelled - texas - Forest Grove - Dodd - 64131
50 MW - operation - california - Maverick Solar 6, LLC - 64105
35 MW - operation - california - Desert Harvest II LLC - 64103

Updated projects (6):

182 MW - operation - california - Elkhorn Battery Energy Storage System - 62564 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
  date: 2021-03 -> 2021-07 delayed by 4 months

25 MW - operation - massachusetts - Outer Cape Community Battery - 62604
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

10 MW - operation - california - Henrietta D Energy Storage LLC - 60641
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

20 MW - operation - california - Johanna Energy Center, LLC - 63843
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
  date: 2020-10 -> 2021-01 delayed by 3 months

10 MW - cancelled - california - Goleta Grid Resiliency - 63736
  date: 2021-03 -> 2021-06 delayed by 3 months

100 MW - operation - nevada - Dry Lake Solar Energy Center - 63933
  entity id: 63603 -> 13407
  entity name: Nevada Power Company DBA NV Energy -> Nevada Power Co


2020-11

New projects (4):
260 MW - operation - texas - DeCordova Steam Electric Station - 8063
100 MW - operation - texas - Ignacio Grid Energy Storage System - 64089
20 MW - cancelled - hawaii - Kahana Solar, LLC - 64095
15 MW - cancelled - hawaii - Barbers Point Solar, LLC - 64094

Disappeared projects (1):
10 MW - construction - california - Painter Energy Storage - 62729

Updated projects (8):

115 MW - operation - california - Blythe Solar II, LLC - 60092
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

115 MW - operation - california - Blythe Solar III, LLC Hybrid - 60094
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - california - Saticoy - 63891 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

46 MW - operation - alaska - Soldotna - 57206 Megapack
  status: planning -> construction πŸ—οΈ
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete

100 MW - operation - texas - Madero Grid - 63757
  date: 2021-09 -> 2021-12 delayed by 3 months

14 MW - operation - hawaii - AES Kekaha Solar, LLC Hybrid - 63280
  date: 2020-09 -> 2021-04 delayed by 7 months

10 MW - cancelled - california - Chevron - Lost Hills Hybrid - 63545
  date: 2021-08 -> 2021-09 delayed by 1 month

100 MW - operation - california - Luna Storage - 63685
  status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (L) Regulatory approvals pending. Not under construction


2020-10

New projects (2):
60 MW - operation - california - Coso Battery Storage - 63943
11 MW - operation - florida - Trenton - 63995

Updated projects (9):

100 MW - operation - texas - Chisholm Grid Energy Storage System - 63737
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

20 MW - operation - california - Hecate Energy Johanna Facility - 62889
  status: planning -> construction πŸ—οΈ
  status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete

20 MW - operation - california - Stanton Energy Reliability Center Hybrid - 60698
  status: planning -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (OT) Other -> operation
  date: 2020-09 -> 2020-08 accelerated by 1 month

20 MW - operation - california - Stanton Energy Reliability Center Hybrid - 60698
  status: planning -> operation 🍾 πŸŽ‰ 🍸
  status_verbose: (OT) Other -> operation
  date: 2020-09 -> 2020-08 accelerated by 1 month

139 MW - operation - california - Slate Hybrid - 63727
  date: 2020-12 -> 2021-10 delayed by 10 months

100 MW - operation - texas - Madero Grid - 63757
  date: 2021-07 -> 2021-09 delayed by 2 months

30 MW - operation - california - Top Gun Energy Storage - 61366
  date: 2021-01 -> 2021-03 delayed by 2 months

10 MW - operation - california - Henrietta D Energy Storage LLC - 60641
  date: 2021-01 -> 2021-03 delayed by 2 months

750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid - 260
  status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete


2020-09

New projects (81):
409 MW - operation - florida - Manatee Solar Energy Center - 60014
750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid - 260
139 MW - operation - california - Slate Hybrid - 63727
300 MW - planning - arizona - Atlas - 63798
380 MW - operation - nevada - Gemini Solar Hybrid - 63352
250 MW - operation - california - Gateway Energy Storage System - 63834
200 MW - operation - california - Diablo Energy Storage - 62175
230 MW - operation - california - McCoy Solar Energy Project Hybrid - 58462
100 MW - operation - texas - Madero Grid - 63757
151 MW - planning - new york - NY2 Battery - 63584
100 MW - cancelled - montana - Haymaker Hybrid - 63878
252 MW - planning - oklahoma - Skeleton Creek Energy Center Hybrid - 62494
182 MW - operation - california - Elkhorn Battery Energy Storage System - 62564 Megapack
150 MW - operation - california - Eland Solar & Storage Center, Phase 1 Hy - 61168 Megapack
150 MW - construction - massachusetts - Cranberry Point Energy Storage - 62844 Megapack
150 MW - construction - california - Eland Solar & Storage Center, Phase 2 Hy - 61169 Megapack
300 MW - planning - nevada - Southern Bighorn Solar Hybrid - 63113
316 MW - cancelled - new york - Ravenswood - 2500
125 MW - operation - colorado - Neptune Energy Center Hybrid - 63731
115 MW - operation - california - Blythe Solar II, LLC - 60092
115 MW - operation - california - Blythe Solar III, LLC Hybrid - 60094
100 MW - operation - california - AES ES ALAMITOS, LLC - 61204
100 MW - operation - california - Saticoy - 63891 Megapack
100 MW - operation - texas - Chisholm Grid Energy Storage System - 63737
100 MW - operation - california - Luna Storage - 63685
100 MW - cancelled - texas - TX17 Nickel Prairie Storage - 63880
100 MW - cancelled - texas - TX18 Cottage Meadow Storage - 63879
100 MW - operation - colorado - Thunder Wolf Energy Center Hybrid - 63776
100 MW - operation - nevada - Dry Lake Solar Energy Center - 63933
316 MW - cancelled - new york - Ravenswood - 2500
90 MW - operation - nevada - Townsite Solar Project Hybrid - 60654 Megapack
316 MW - cancelled - new york - Ravenswood - 2500
77 MW - operation - texas - Azure Sky Solar - 63905
75 MW - operation - nevada - Arrow Canyon Solar Hybrid - 62248
60 MW - operation - california - Cal Flats BESS - 63930
60 MW - cancelled - hawaii - Kupehau - 63799
52 MW - construction - hawaii - Ho'Ohana Solar 1 - 63723
50 MW - operation - texas - Lily Solar Hybrid - 63892
50 MW - planning - texas - TREX US Red Holly - 63202
50 MW - operation - arizona - El Sol BESS - 62964
125 MW - construction - california - Aratina Solar Center 1B - 61167
46 MW - operation - alaska - Soldotna - 57206 Megapack
40 MW - operation - texas - 2W Permian Solar Project Hybrid - 63255
40 MW - operation - california - Fallbrook Energy Storage - 61365
40 MW - operation - georgia - Cool Springs Solar (Hybrid) - 63721
40 MW - operation - georgia - Hickory Park Solar Hybrid - 63522
150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid - 63172 Megapack
40 MW - planning - california - EDPR CA Solar Park VI LLC (CA) Hybrid - 62892
38 MW - operation - arizona - Foothills Solar Plant Hybrid - 57997
36 MW - operation - arizona - Gila Bend Hybrid - 59020
43 MW - planning - california - Dynegy Oakland Power Plant - 6211
30 MW - operation - california - Top Gun Energy Storage - 61366
30 MW - operation - oregon - Wheatridge Hybrid - 62745
30 MW - operation - hawaii - AES Waikoloa Solar Hybrid - 63900
30 MW - operation - hawaii - Hale Kuawehi Solar Hybrid - 62529
25 MW - operation - massachusetts - Outer Cape Community Battery - 62604
25 MW - operation - california - Cascade Energy Storage, LLC - 61801
20 MW - operation - california - Johanna Energy Center, LLC - 63843
20 MW - operation - california - Hecate Energy Johanna Facility - 62889
20 MW - operation - new york - Willis Battery Storage - 63238
20 MW - cancelled - california - Renz Energy Storage - 63529
17 MW - operation - arizona - Cotton Center Solar Hybrid - 57561
17 MW - operation - arizona - Paloma Solar Hybrid - 57562
16 MW - operation - arizona - Hyder Solar Hybrid - 57563
15 MW - cancelled - hawaii - Paeahu Solar Hybrid - 62534
14 MW - operation - hawaii - AES Kekaha Solar, LLC Hybrid - 63280
14 MW - operation - arizona - Hyder II Hybrid - 58383
12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid - 63728
11 MW - operation - california - Silverstrand Grid Energy Storage System - 63735 Megapack
22 MW - cancelled - california - Camino Solar - 63508
10 MW - operation - oklahoma - Rush Springs Energy Storage (BA) - 63458
20 MW - operation - california - Stanton Energy Reliability Center Hybrid - 60698
20 MW - operation - california - Stanton Energy Reliability Center Hybrid - 60698
10 MW - operation - california - Vallecito - 62801 Megapack
10 MW - operation - california - Henrietta D Energy Storage LLC - 60641
10 MW - cancelled - california - Goleta Grid Resiliency - 63736
10 MW - construction - california - Painter Energy Storage - 62729
10 MW - cancelled - california - Chevron - Lost Hills Hybrid - 63545
10 MW - cancelled - arizona - Desert Star Hybrid - 62965
10 MW - operation - arkansas - Searcy Solar Hybrid - 62617
10 MW - construction - california - Sierra Energy Storage, LLC - 61803

Updated projects (0):