πΊπΈ U.S. EIA data (>10MW)
Latest U.S. EIA report from
2024-07
|
operation |
ποΈ |
π» |
Projects count |
200 |
128 |
159 |
Total π battery power in GW |
16.1 |
14.5 |
22.5 |
ποΈ = construction; π» = planning
- The U.S. Energy Information Administration (EIA) publishes a monthly report on planned (Chapter 6.5) and existing (Chapter 6.3) energy projects here:
https://www.eia.gov/electricity/monthly/
- The data is usually published on the 25th of every month but it is lagging 2 months
(E.g. in October 21 the data will be published for August 21).
- Those two tables are filtered by battery projects above 10MW (unfortunately the capacity is not in the reports)
Monthly big battery changes from U.S. EIA reports
- Comparing the reports to show the changes throughout the months.
- Projects are sorted by the max power output.
- All projects below are also listed on the All Big Batteries page
- Click on the reference number to get to the detail page of the project
2024-07
New projects (32):
400 MW - construction - california - Kola Energy Center -
67680
304 MW - construction - texas - SMT Ironman Battery Storage Plant -
67737
206 MW - construction - texas - Citadel Battery Storage Plant -
67738
200 MW - planning - nevada - Silver State South Storage -
67734
200 MW - construction - oregon - Seaside BESS -
67711
200 MW - planning - texas - Destiny Storage -
67654
200 MW - planning - texas - Wallie Storage -
67668
200 MW - planning - texas - Fort Watt Storage -
67656
200 MW - planning - texas - Jerboa Storage -
67658
200 MW - planning - texas - Bhalu -
67652
200 MW - planning - texas - Malala -
67660
160 MW - construction - texas - Lumina Solar Project -
65645
160 MW - construction - texas - Lumina II Solar Project -
65644
160 MW - construction - texas - IP Radian, LLC -
64859
150 MW - planning - utah - Gale 1 Solar -
61170
120 MW - construction - texas - Wigeon Whistle Battery Storage Plant -
67739
100 MW - construction - texas - Al Pastor Battery Storage Plant -
67721
100 MW - planning - wisconsin - Paris Solar -
65967
100 MW - planning - texas - Berkman Storage -
67651
100 MW - planning - texas - Third Coast BESS, LLC -
67667
100 MW - planning - california - Aramis I Solar Project -
66678
75 MW - construction - oregon - Constable BESS -
67712
75 MW - planning - california - Zeta Solar & Storage -
67676
180 MW - construction - nevada - Silver Peak -
67736
180 MW - construction - nevada - Silver Peak -
67736
180 MW - construction - nevada - Silver Peak -
67736
50 MW - operation - mississippi - OE_MS6 -
65291
50 MW - planning - texas - Lupinus Storage 3 -
67674
30 MW - construction - california - Holtville -
67695
25 MW - planning - washington - Arlington Battery Energy Storage System -
67669
20 MW - planning - pennsylvania - Northumberland Solar I -
67675
17 MW - construction - oregon - Coffee Creek BESS -
67698
Disappeared projects (1):
20 MW - cancelled - florida - South Tampa Energy Storage -
66869
Updated projects (60):
300 MW - construction - arizona - Papago Energy Storage -
66779
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
250 MW - operation - arizona - Sierra Estrella Energy Storage -
66334
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
date: 2024-06
-> 2024-05 accelerated by
1 month
200 MW - operation - california - Condor Energy Storage LLC -
66285
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
150 MW - operation - california - Vikings Energy Farm -
65711
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
150 MW - construction - california - Scarlet II Hybrid -
66951
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - operation - nevada - Dry Lake Solar Energy Center -
63933
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
80 MW - operation - california - Raceway Solar & Storage -
66773
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
60 MW - operation - hawaii - AES Maui Kuihelani Solar Hybrid -
64256
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
85 MW - operation - nevada - Yellow Pine II -
67091
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
50 MW - construction - tennessee - Ridgely Energy Farm -
65445
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
45 MW - operation - indiana - Cavalry Solar Hybrid -
67489
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
85 MW - operation - nevada - Yellow Pine II -
67091
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
11 MW - operation - colorado - Keenesburg Battery Storage -
67306
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
11 MW - operation - colorado - Rattlesnake Ridge Battery Storage -
67300
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
350 MW - planning - texas - Rowdy Creek Solar and BESS -
65854
date: 2025-05
-> 2027-05 delayed by
24 months
306 MW - planning - texas - Ash Creek BESS -
66391
date: 2025-05
-> 2028-03 delayed by
34 months
259 MW - construction - texas - Five Wells Solar Center - Hybrid -
66420
date: 2024-05
-> 2024-07 delayed by
2 months
180 MW - planning - texas - Indigo Solar & Storage -
66891
date: 2025-05
-> 2026-05 delayed by
12 months
mw: 50
-> 180
150 MW - construction - arizona - McFarland B Solar and Storage -
66637
date: 2024-08
-> 2024-09 delayed by
1 month
130 MW - planning - new mexico - Carne Energy Storage, LLC -
67230
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (T) Regulatory approvals received. Not under construction
date: 2025-05
-> 2025-08 delayed by
3 months
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
date: 2024-06
-> 2024-08 delayed by
2 months
224 MW - construction - california - Anode (Springville) BESS -
65458
date: 2024-07
-> 2024-10 delayed by
3 months
224 MW - construction - california - Anode (Springville) BESS -
65458
date: 2024-07
-> 2024-10 delayed by
3 months
100 MW - construction - california - Cald BESS -
66617
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2024-05
-> 2024-06 delayed by
1 month
100 MW - construction - texas - Callisto I Energy Center -
66338
date: 2024-06
-> 2024-07 delayed by
1 month
100 MW - construction - texas - Copperhead Solar, LLC -
67019
date: 2024-05
-> 2024-07 delayed by
2 months
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2024-07
-> 2024-08 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2024-07
-> 2024-08 delayed by
1 month
100 MW - planning - texas - Holly Branch Solar, LLC -
66692
date: 2026-10
-> 2027-08 delayed by
10 months
100 MW - planning - texas - Alamo 3 BESS 2 -
66293
date: 2024-12
-> 2027-10 delayed by
34 months
116 MW - construction - idaho - Hemmingway BESS -
66325
date: 2024-06
-> 2024-07 delayed by
1 month
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
date: 2024-05
-> 2024-07 delayed by
2 months
75 MW - construction - california - Hummingbird Energy Storage LLC -
65395
date: 2024-06
-> 2024-11 delayed by
5 months
70 MW - planning - texas - Briggs Solar, LLC -
66691
date: 2025-12
-> 2027-12 delayed by
24 months
65 MW - construction - georgia - Mossy Branch Battery Facility -
65018
date: 2024-05
-> 2024-07 delayed by
2 months
65 MW - construction - california - San Jacinto Grid, LLC -
65657
date: 2024-06
-> 2025-02 delayed by
8 months
58 MW - planning - utah - Parowan Solar -
65823
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (P) Planned for installation, but regulatory approvals not initiated
date: 2025-11
-> 2027-01 delayed by
14 months
45 MW - construction - california - Lockhart ESS, LLC -
66946
date: 2024-05
-> 2024-07 delayed by
2 months
40 MW - construction - california - Sagebrush Solar 2 ESS 40 -
66949
date: 2024-09
-> 2024-10 delayed by
1 month
40 MW - planning - indiana - Vermillion Rise Solar -
65935
date: 2025-03
-> 2027-12 delayed by
33 months
30 MW - construction - california - Santa Paula Energy Storage LLC -
65397
date: 2024-05
-> 2024-06 delayed by
1 month
30 MW - construction - hawaii - AES Waiawa Phase 2 Solar -
66066
date: 2025-01
-> 2025-02 delayed by
1 month
25 MW - construction - california - West Ford Flat -
66669
date: 2024-05
-> 2024-06 delayed by
1 month
25 MW - construction - california - Baldy Mesa 2_Silver Peak Hybrid -
66885
date: 2024-06
-> 2024-07 delayed by
1 month
20 MW - construction - california - Ortega Grid, LLC -
65656
date: 2024-05
-> 2025-03 delayed by
10 months
20 MW - construction - connecticut - Pure Hedge LLC -
50736
date: 2024-12
-> 2025-10 delayed by
10 months
15 MW - construction - california - Paulsell -
67092
date: 2024-05
-> 2024-06 delayed by
1 month
15 MW - construction - north carolina - McLauchin -
67041
date: 2024-05
-> 2024-08 delayed by
3 months
13 MW - construction - california - Bear Canyon -
66650
date: 2024-05
-> 2024-06 delayed by
1 month
10 MW - construction - north carolina - Butler -
67042
date: 2024-06
-> 2024-08 delayed by
2 months
10 MW - construction - california - Painter Energy Storage -
62729
date: 2024-09
-> 2024-10 delayed by
1 month
10 MW - construction - california - Hecate Energy Desert Storage 1 LLC -
65635
date: 2024-05
-> 2025-01 delayed by
8 months
10 MW - construction - california - Carris Storage I -
65733
date: 2024-05
-> 2025-01 delayed by
8 months
150 MW - construction - texas - Borden County BESS -
66804
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
675 MW - construction - california - Menifee Power Bank -
66494
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
80 MW - construction - california - Placerita ESS -
66462
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
125 MW - construction - california - Tumbleweed Energy Storage -
66666
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
66 MW - construction - south carolina - Lone Star Solar -
62235
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
30 MW - construction - montana - Beaver Creek Wind Facility -
65019
plant name: Beaver Creek I
-> Beaver Creek Wind Facility
20 MW - planning - indiana - Honey Creek Solar -
65821
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (P) Planned for installation, but regulatory approvals not initiated
2024-06
New projects (16):
300 MW - construction - arizona - Papago Energy Storage -
66779
200 MW - planning - texas - Blackcat BESS -
67558
185 MW - planning - texas - Wetzel BESS -
67555
185 MW - planning - texas - Serrano BESS -
67556
150 MW - construction - texas - Desert Willow Energy Storage -
67598
150 MW - planning - idaho - Kuna BESS -
67549
100 MW - planning - texas - Jim Wells BESS -
67553
82 MW - construction - california - AES ES Alamitos 2 LLC -
67579
82 MW - planning - idaho - Happy Valley Battery Storage -
67573
77 MW - planning - texas - Cairos Solar and Storage -
67581
60 MW - planning - california - Azalea (CA) -
66890
50 MW - planning - texas - Elm Flats Solar -
67552
50 MW - planning - new mexico - Wildcat Solar Power Plant LLC -
64849
45 MW - operation - indiana - Cavalry Solar Hybrid -
67489
10 MW - construction - arizona - Apache Solar 1 -
60964
10 MW - planning - texas - Cedar Hill ESS -
67570
Updated projects (54):
230 MW - operation - california - Sunlight Storage II -
66575
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
162 MW - operation - california - Proxima -
66270
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
date: 2024-05
-> 2024-04 accelerated by
1 month
73 MW - operation - texas - Ranchland Wind Storage -
64545
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
date: 2024-05
-> 2024-04 accelerated by
1 month
50 MW - operation - new mexico - Sky Ranch Solar -
66814
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
40 MW - operation - texas - Zier Solar -
66137
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
259 MW - construction - texas - Five Wells Solar Center - Hybrid -
66420
date: 2024-04
-> 2024-05 delayed by
1 month
675 MW - construction - california - Menifee Power Bank -
66494
date: 2024-06
-> 2024-07 delayed by
1 month
200 MW - operation - california - Condor Energy Storage LLC -
66285
date: 2024-04
-> 2024-05 delayed by
1 month
200 MW - construction - texas - Dickens -
65489
date: 2024-04
-> 2024-06 delayed by
2 months
200 MW - construction - texas - Hydra -
65490
date: 2024-04
-> 2024-06 delayed by
2 months
200 MW - construction - texas - Paleo -
65491
date: 2024-04
-> 2024-06 delayed by
2 months
200 MW - planning - california - Peregrine Energy Storage LLC -
66286
date: 2024-10
-> 2025-01 delayed by
3 months
175 MW - construction - texas - Pavo -
65492
date: 2024-04
-> 2024-06 delayed by
2 months
150 MW - operation - california - Vikings Energy Farm -
65711
date: 2024-04
-> 2024-05 delayed by
1 month
150 MW - construction - texas - Danish Fields Storage -
66916
date: 2024-05
-> 2024-07 delayed by
2 months
150 MW - construction - texas - Myrtle Storage -
66913
date: 2024-05
-> 2024-07 delayed by
2 months
150 MW - construction - arizona - McFarland B Solar and Storage -
66637
date: 2024-07
-> 2024-08 delayed by
1 month
150 MW - planning - texas - Alamo 7 BESS 1 -
66297
date: 2024-12
-> 2025-12 delayed by
12 months
150 MW - planning - texas - Alamo 7 BESS 2 -
66298
date: 2024-12
-> 2025-12 delayed by
12 months
150 MW - planning - texas - Upton BESS 2 -
66303
date: 2024-12
-> 2026-12 delayed by
24 months
150 MW - planning - texas - Crane 2 BESS 2 -
66300
date: 2024-12
-> 2027-12 delayed by
36 months
150 MW - planning - texas - Uvalde 2 BESS 2 -
66305
date: 2024-12
-> 2027-12 delayed by
36 months
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
date: 2024-05
-> 2024-06 delayed by
1 month
100 MW - construction - texas - Copperhead Solar, LLC -
67019
date: 2024-04
-> 2024-05 delayed by
1 month
100 MW - operation - nevada - Dry Lake Solar Energy Center -
63933
date: 2024-04
-> 2024-05 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2024-06
-> 2024-07 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2024-06
-> 2024-07 delayed by
1 month
100 MW - construction - texas - TX10 Hummingbird Storage -
65693
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2024-07
-> 2024-08 delayed by
1 month
100 MW - construction - california - Beaumont BESS -
66461
date: 2024-06
-> 2024-08 delayed by
2 months
100 MW - construction - california - Pome BESS -
67299
date: 2024-11
-> 2024-09 accelerated by
2 months
92 MW - construction - california - Northern Orchard Solar PV, LLC -
67039
date: 2024-12
-> 2025-02 delayed by
2 months
116 MW - construction - idaho - Hemmingway BESS -
66325
date: 2024-05
-> 2024-06 delayed by
1 month
75 MW - planning - texas - Uvalde 2 BESS 1 -
66304
date: 2024-12
-> 2027-12 delayed by
36 months
67 MW - planning - arizona - Yuma Solar + Storage -
67321
date: 2024-05
-> 2024-12 delayed by
7 months
50 MW - construction - texas - Tortolas -
65493
date: 2024-04
-> 2024-06 delayed by
2 months
125 MW - construction - california - Tumbleweed Energy Storage -
66666
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2024-07
-> 2024-06 accelerated by
1 month
40 MW - construction - idaho - Black Mesa BESS -
66326
date: 2024-05
-> 2024-06 delayed by
1 month
88 MW - construction - california - Chaparral Springs -
64864
date: 2024-04
-> 2024-06 delayed by
2 months
116 MW - construction - idaho - Hemmingway BESS -
66325
date: 2024-07
-> 2024-08 delayed by
1 month
30 MW - construction - california - Santa Paula Energy Storage LLC -
65397
date: 2024-04
-> 2024-05 delayed by
1 month
30 MW - construction - hawaii - AES Waiawa Phase 2 Solar -
66066
date: 2024-11
-> 2025-01 delayed by
2 months
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
date: 2024-04
-> 2024-06 delayed by
2 months
20 MW - construction - tennessee - Vonore Battery Energy Storage System -
64255
date: 2024-07
-> 2024-12 delayed by
5 months
15 MW - construction - north carolina - McLauchin -
67041
date: 2024-08
-> 2024-05 accelerated by
3 months
10 MW - construction - california - Sierra Energy Storage, LLC -
61803
date: 2024-04
-> 2024-06 delayed by
2 months
10 MW - construction - north carolina - Butler -
67042
date: 2024-08
-> 2024-06 accelerated by
2 months
10 MW - construction - colorado - High Mesa CO -
67323
date: 2024-04
-> 2024-07 delayed by
3 months
10 MW - construction - california - Painter Energy Storage -
62729
date: 2024-07
-> 2024-09 delayed by
2 months
300 MW - construction - arizona - Eleven Mile Solar Center -
66263
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
100 MW - construction - texas - Brazos Bend BESS, LLC -
66690
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
100 MW - construction - texas - TX15 Limousin Oak Storage -
65698
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
100 MW - planning - texas - Bexar ESS -
66400
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (T) Regulatory approvals received. Not under construction
15 MW - construction - florida - Dover Energy Storage -
67120
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2024-05
New projects (10):
400 MW - planning - utah - Green River Energy Center - Hybrid -
67501
213 MW - construction - arizona - Serrano -
67503
200 MW - planning - texas - Bell Creek BESS LLC -
67535
185 MW - construction - arizona - McFarland C -
67498
170 MW - planning - arizona - Scatter Wash 1 -
67454
150 MW - construction - arizona - Harquahala 2 -
67474
85 MW - planning - arizona - Scatter Wash 2 -
67455
75 MW - planning - new mexico - Milagro Solar I -
67528
50 MW - planning - utah - Hornshadow Solar II, LLC -
67511
25 MW - planning - utah - Hornshadow Solar, LLC -
67497
Disappeared projects (4):
443 MW - cancelled - texas - Dogwood Creek Solar and BESS -
65843
75 MW - cancelled - utah - Hornshadow Solar II -
67191
75 MW - cancelled - utah - Hornshadow Solar -
67189
75 MW - cancelled - texas - Trinity River Solar 1 -
66132
Updated projects (66):
380 MW - operation - nevada - Gemini Solar -
63352
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
200 MW - construction - indiana - Pike County Energy Storage -
66881
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
147 MW - operation - california - Golden Field Solar III, LLC -
63859
status: planning
-> operation πΎ π πΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> operation
date: 2024-04
-> 2024-03 accelerated by
1 month
136 MW - operation - california - Arica Solar -
65744
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
100 MW - operation - texas - St. Gall Energy Storage I -
66336
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
date: 2024-04
-> 2024-03 accelerated by
1 month
70 MW - operation - texas - Ganado Solar -
67284
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
50 MW - operation - california - Victory Pass -
65743
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
40 MW - construction - florida - Wimauma Storage -
66640
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
16 MW - operation - texas - Cameron Wind 1 LLC -
59118
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
12 MW - operation - hawaii - AES West Oahu Solar Hybrid -
64656
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
10 MW - operation - california - Boulevard Energy Storage -
66279
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - california - Clairemont Energy Storage -
66266
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - california - Elliott Energy Storage -
66278
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
20 MW - operation - california - Melrose BESS -
66281
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
20 MW - operation - california - Melrose BESS -
66281
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - california - Pala Gomez Creek BESS -
66280
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - california - Paradise Energy Storage -
66265
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
300 MW - construction - texas - GulfStar Power, LLC -
66871
date: 2024-06
-> 2024-10 delayed by
4 months
259 MW - construction - texas - Five Wells Solar Center - Hybrid -
66420
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2024-03
-> 2024-04 delayed by
1 month
200 MW - construction - texas - Dickens -
65489
date: 2024-03
-> 2024-04 delayed by
1 month
200 MW - construction - texas - Hydra -
65490
date: 2024-03
-> 2024-04 delayed by
1 month
200 MW - construction - texas - Paleo -
65491
date: 2024-03
-> 2024-04 delayed by
1 month
200 MW - planning - california - Aratina Solar Center 2 -
64215
date: 2025-03
-> 2025-01 accelerated by
2 months
200 MW - planning - texas - Tidwell Prairie Storage 1 -
66337
date: 2024-12
-> 2025-03 delayed by
3 months
180 MW - planning - texas - Starr Solar Ranch -
65975
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (L) Regulatory approvals pending. Not under construction
date: 2025-03
-> 2026-09 delayed by
18 months
175 MW - construction - texas - Pavo -
65492
date: 2024-03
-> 2024-04 delayed by
1 month
126 MW - construction - california - AVEP BESS -
65591
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2024-06
-> 2024-09 delayed by
3 months
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
date: 2024-03
-> 2024-05 delayed by
2 months
224 MW - construction - california - Anode (Springville) BESS -
65458
date: 2024-06
-> 2024-07 delayed by
1 month
224 MW - construction - california - Anode (Springville) BESS -
65458
date: 2024-06
-> 2024-07 delayed by
1 month
100 MW - construction - texas - Copperhead Solar, LLC -
67019
date: 2024-03
-> 2024-04 delayed by
1 month
100 MW - operation - nevada - Dry Lake Solar Energy Center -
63933
date: 2024-03
-> 2024-04 delayed by
1 month
100 MW - construction - new mexico - San Juan Solar I -
66574
date: 2024-05
-> 2024-06 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2024-05
-> 2024-06 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2024-05
-> 2024-06 delayed by
1 month
100 MW - construction - texas - Estonian Solar Project, LLC -
66872
date: 2024-03
-> 2024-08 delayed by
5 months
100 MW - planning - california - Sacramento Valley Energy Center, LLC -
65808
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (L) Regulatory approvals pending. Not under construction
date: 2024-12
-> 2026-12 delayed by
24 months
92 MW - construction - california - Northern Orchard Solar PV, LLC -
67039
date: 2024-03
-> 2024-12 delayed by
9 months
116 MW - construction - idaho - Hemmingway BESS -
66325
date: 2024-04
-> 2024-05 delayed by
1 month
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
date: 2024-04
-> 2024-05 delayed by
1 month
73 MW - operation - texas - Ranchland Wind Storage -
64545
date: 2024-03
-> 2024-05 delayed by
2 months
72 MW - construction - texas - Fence Post Solar Hybrid Project, LLC -
66801
date: 2024-04
-> 2024-06 delayed by
2 months
88 MW - construction - california - Chaparral Springs -
64864
date: 2024-04
-> 2024-06 delayed by
2 months
50 MW - operation - new mexico - Sky Ranch Solar -
66814
plant name: Sky Ranch Solar and Storage
-> Sky Ranch Solar
date: 2024-03
-> 2024-04 delayed by
1 month
50 MW - construction - tennessee - Ridgely Energy Farm -
65445
date: 2024-12
-> 2025-03 delayed by
3 months
45 MW - construction - california - Lockhart ESS, LLC -
66946
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2024-06
-> 2024-05 accelerated by
1 month
40 MW - construction - idaho - Black Mesa BESS -
66326
date: 2024-04
-> 2024-05 delayed by
1 month
40 MW - planning - california - EDPR CA Solar Park VI LLC (CA) Hybrid -
62892
date: 2024-12
-> 2026-10 delayed by
22 months
30 MW - construction - california - Santa Paula Energy Storage LLC -
65397
date: 2024-03
-> 2024-04 delayed by
1 month
30 MW - planning - texas - Second Division Solar -
65981
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (L) Regulatory approvals pending. Not under construction
date: 2025-03
-> 2026-09 delayed by
18 months
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
date: 2024-03
-> 2024-04 delayed by
1 month
25 MW - construction - california - West Ford Flat -
66669
date: 2024-03
-> 2024-05 delayed by
2 months
20 MW - construction - tennessee - Vonore Battery Energy Storage System -
64255
date: 2024-03
-> 2024-07 delayed by
4 months
13 MW - construction - california - Bear Canyon -
66650
date: 2024-03
-> 2024-05 delayed by
2 months
11 MW - construction - colorado - Bromley Battery Storage -
67305
date: 2024-05
-> 2024-06 delayed by
1 month
11 MW - construction - colorado - Davis Battery Storage -
67304
date: 2024-05
-> 2024-07 delayed by
2 months
10 MW - construction - california - Sierra Energy Storage, LLC -
61803
date: 2024-03
-> 2024-04 delayed by
1 month
10 MW - construction - california - Painter Energy Storage -
62729
date: 2024-06
-> 2024-07 delayed by
1 month
252 MW - planning - oklahoma - Skeleton Creek Energy Center Hybrid -
62494
mw: 200
-> 252
103 MW - construction - texas - Bright Arrow Solar, LLC -
66688
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
100 MW - construction - texas - Brazos Bend BESS, LLC -
66690
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
100 MW - construction - idaho - Franklin Solar Hybrid -
67190
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
100 MW - construction - texas - Ables Springs Solar & Storage -
66905
status_verbose: (V) Under construction, more than 50 percent complete
-> (U) Under construction, less than or equal to 50 percent complete
70 MW - planning - california - JVR Energy Park LLC -
64428
status_verbose: (T) Regulatory approvals received. Not under construction
-> (P) Planned for installation, but regulatory approvals not initiated
675 MW - construction - california - Menifee Power Bank -
66494
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
15 MW - construction - california - Paulsell -
67092
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
2024-04
New projects (16):
300 MW - construction - arizona - Sun Streams 4 -
67291
215 MW - construction - arizona - Sun Streams 3 -
67285
102 MW - planning - texas - SGT Hoskins Solar Project Hybrid -
67341
100 MW - construction - california - Pome BESS -
67299
75 MW - planning - arizona - Pluto Energy Storage -
67328
74 MW - planning - south carolina - Big Fork Solar -
62184
74 MW - planning - south carolina - Colleton Solar -
62188
67 MW - planning - arizona - Yuma Solar + Storage -
67321
50 MW - planning - south carolina - Crossroads Solar -
62190
50 MW - planning - south carolina - Quest Solar -
62299
11 MW - construction - colorado - Bromley Battery Storage -
67305
11 MW - construction - colorado - Davis Battery Storage -
67304
11 MW - operation - colorado - Keenesburg Battery Storage -
67306
11 MW - operation - colorado - Rattlesnake Ridge Battery Storage -
67300
10 MW - construction - colorado - High Mesa CO -
67323
10 MW - construction - colorado - Mamm Creek -
67322
Disappeared projects (2):
100 MW - cancelled - texas - Forest Grove - Dodd -
64131
61 MW - cancelled - texas - Talitha Energy Project, LLC -
65891
Updated projects (47):
175 MW - construction - maine - Cross Town Energy Storage -
66606
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
date: 2025-03
-> 2025-08 delayed by
5 months
150 MW - construction - massachusetts - Cranberry Point Energy Storage -
62844
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - construction - texas - Callisto I Energy Center -
66338
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
90 MW - construction - arizona - Superstition Energy Storage -
66333
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
20 MW - operation - new jersey - Justin Court Energy Storage -
66758
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
380 MW - operation - nevada - Gemini Solar -
63352
date: 2024-02
-> 2024-03 delayed by
1 month
300 MW - planning - california - Nighthawk Energy Storage, LLC -
65889
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (L) Regulatory approvals pending. Not under construction
date: 2025-02
-> 2025-04 delayed by
2 months
259 MW - construction - texas - Five Wells Solar Center - Hybrid -
66420
date: 2024-02
-> 2024-03 delayed by
1 month
200 MW - construction - texas - Hydra -
65490
date: 2024-02
-> 2024-03 delayed by
1 month
200 MW - construction - texas - Anemoi Energy Storage -
67236
date: 2024-05
-> 2024-06 delayed by
1 month
200 MW - planning - california - Peregrine Energy Storage LLC -
66286
date: 2024-09
-> 2024-10 delayed by
1 month
175 MW - construction - texas - Pavo -
65492
date: 2024-02
-> 2024-03 delayed by
1 month
162 MW - operation - california - Proxima -
66270
date: 2024-02
-> 2024-04 delayed by
2 months
150 MW - operation - california - Vikings Energy Farm -
65711
date: 2024-03
-> 2024-04 delayed by
1 month
150 MW - construction - texas - Danish Fields Storage -
66916
date: 2024-03
-> 2024-05 delayed by
2 months
150 MW - construction - texas - Myrtle Storage -
66913
date: 2024-03
-> 2024-05 delayed by
2 months
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
date: 2024-02
-> 2024-03 delayed by
1 month
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
date: 2024-04
-> 2024-05 delayed by
1 month
103 MW - construction - texas - Bright Arrow Solar, LLC -
66688
date: 2024-05
-> 2024-10 delayed by
5 months
100 MW - operation - texas - St. Gall Energy Storage I -
66336
date: 2024-03
-> 2024-04 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2024-04
-> 2024-05 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2024-04
-> 2024-05 delayed by
1 month
100 MW - construction - texas - TX10 Hummingbird Storage -
65693
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2024-08
-> 2024-07 accelerated by
1 month
100 MW - planning - california - Sacramento Valley Energy Center, LLC -
65808
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (P) Planned for installation, but regulatory approvals not initiated
date: 2026-12
-> 2024-12 accelerated by
24 months
116 MW - construction - idaho - Hemmingway BESS -
66325
date: 2024-03
-> 2024-04 delayed by
1 month
75 MW - planning - ohio - Springwater Solar, LLC -
65900
date: 2026-02
-> 2026-12 delayed by
10 months
74 MW - planning - california - Kingsley Solar Farm -
64634
date: 2025-06
-> 2027-12 delayed by
30 months
mw: 360
-> 74
61 MW - planning - texas - Oriana Solar LLC -
65849
date: 2024-12
-> 2025-05 delayed by
5 months
50 MW - planning - texas - TREX US Red Holly -
63202
date: 2024-07
-> 2025-07 delayed by
12 months
50 MW - planning - texas - Peeler Solar, LLC -
65932
date: 2025-10
-> 2026-12 delayed by
14 months
mw: 100
-> 50
40 MW - operation - texas - Zier Solar -
66137
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2024-02
-> 2024-04 delayed by
2 months
40 MW - construction - florida - Lake Mabel Storage -
66641
date: 2024-12
-> 2025-01 delayed by
1 month
40 MW - planning - illinois - Mulligan Solar, LLC -
65349
date: 2025-06
-> 2025-07 delayed by
1 month
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
date: 2024-02
-> 2024-03 delayed by
1 month
16 MW - operation - texas - Cameron Wind 1 LLC -
59118
date: 2024-02
-> 2024-03 delayed by
1 month
mw: 24
-> 16
15 MW - construction - california - Paulsell -
67092
date: 2024-02
-> 2024-05 delayed by
3 months
12 MW - operation - hawaii - AES West Oahu Solar Hybrid -
64656
date: 2024-02
-> 2024-03 delayed by
1 month
20 MW - operation - california - Melrose BESS -
66281
date: 2024-02
-> 2024-03 delayed by
1 month
20 MW - operation - california - Melrose BESS -
66281
date: 2024-02
-> 2024-03 delayed by
1 month
10 MW - operation - california - Pala Gomez Creek BESS -
66280
date: 2024-02
-> 2024-03 delayed by
1 month
10 MW - construction - california - Painter Energy Storage -
62729
date: 2024-05
-> 2024-06 delayed by
1 month
100 MW - construction - california - Beaumont BESS -
66461
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
100 MW - construction - texas - TX15 Limousin Oak Storage -
65698
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
100 MW - planning - texas - Bexar ESS -
66400
entity id: 58489
-> 66064
entity name: OCI Solar Power
-> Bexar ESS, LLC
125 MW - construction - california - Tumbleweed Energy Storage -
66666
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
50 MW - construction - tennessee - Ridgely Energy Farm -
65445
status_verbose: (T) Regulatory approvals received. Not under construction
-> (L) Regulatory approvals pending. Not under construction
20 MW - planning - hawaii - Kahana Solar, LLC -
64095
entity id: 63703
-> 64904
entity name: Kahana Solar, LLC
-> AES Clean Energy
2024-03
New projects (10):
300 MW - construction - arizona - Eleven Mile Solar Center -
66263
200 MW - construction - texas - Anemoi Energy Storage -
67236
200 MW - construction - texas - Ebony Energy Storage -
67237
200 MW - planning - texas - Alina Energy LLC -
67250
200 MW - planning - texas - Rock Rose Energy Storage LLC -
67249
150 MW - construction - california - Trestles Grid LLC -
67229
130 MW - planning - new mexico - Carne Energy Storage, LLC -
67230
100 MW - planning - new mexico - Quail Ranch Solar and BESS -
67204
70 MW - operation - texas - Ganado Solar -
67284
85 MW - operation - nevada - Yellow Pine II -
67091
Disappeared projects (2):
300 MW - cancelled - texas - Rodeo Ranch Energy Storage -
67175
100 MW - planning - wisconsin - Paris Solar -
65967
Updated projects (72):
300 MW - construction - texas - GulfStar Power, LLC -
66871
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
250 MW - construction - texas - Zeya -
65880
entity id: 63883
-> 56201
entity name: Broad Reach Power
-> Engie North America
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
200 MW - construction - texas - Cachi -
65861
entity id: 63883
-> 56201
entity name: Broad Reach Power
-> Engie North America
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
200 MW - construction - texas - Castor -
65870
entity id: 63883
-> 56201
entity name: Broad Reach Power
-> Engie North America
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
200 MW - construction - texas - Desna -
65876
entity id: 63883
-> 56201
entity name: Broad Reach Power
-> Engie North America
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
160 MW - construction - texas - Avila -
65860
entity id: 63883
-> 56201
entity name: Broad Reach Power
-> Engie North America
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
150 MW - construction - texas - Carina -
65589
entity id: 63883
-> 56201
entity name: Broad Reach Power
-> Engie North America
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
125 MW - construction - texas - Octans -
65590
entity id: 63883
-> 56201
entity name: Broad Reach Power
-> Engie North America
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - construction - texas - Ables Springs Solar & Storage -
66905
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
99 MW - construction - california - Noosa Energy Storage LLC -
64531
entity id: 63883
-> 56201
entity name: Broad Reach Power
-> Engie North America
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
70 MW - construction - texas - Antlia -
65588
entity id: 63883
-> 56201
entity name: Broad Reach Power
-> Engie North America
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
63 MW - operation - texas - House Mountain -
66006
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
60 MW - operation - california - Goleta Energy Storage, LLC -
66394
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
40 MW - construction - florida - Lake Mabel Storage -
66641
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
10 MW - operation - arizona - Mesquite Solar 4, LLC -
65962
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
date: 2024-02
-> 2024-01 accelerated by
1 month
300 MW - planning - texas - Elio Energy LLC -
65850
date: 2025-06
-> 2026-12 delayed by
18 months
259 MW - construction - texas - Five Wells Solar Center - Hybrid -
66420
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2024-01
-> 2024-02 delayed by
1 month
200 MW - planning - texas - Eldora Energy LLC -
65847
date: 2025-06
-> 2026-06 delayed by
12 months
162 MW - operation - california - Proxima -
66270
date: 2024-01
-> 2024-02 delayed by
1 month
150 MW - construction - texas - Myrtle Storage -
66913
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2024-02
-> 2024-03 delayed by
1 month
150 MW - construction - arizona - McFarland B Solar and Storage -
66637
date: 2024-05
-> 2024-07 delayed by
2 months
150 MW - construction - california - Eland Solar & Storage Center, Phase 1 Hybrid -
61168
date: 2024-11
-> 2024-09 accelerated by
2 months
150 MW - planning - georgia - Aragon Energy Storage -
66431
date: 2026-10
-> 2027-04 delayed by
6 months
125 MW - planning - california - Aratina Solar Center 1 Hybrid -
61167
date: 2025-06
-> 2025-11 delayed by
5 months
mw: 50
-> 125
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
date: 2024-01
-> 2024-02 delayed by
1 month
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
date: 2024-02
-> 2024-04 delayed by
2 months
100 MW - operation - texas - St. Gall Energy Storage I -
66336
date: 2024-02
-> 2024-03 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2024-03
-> 2024-04 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2024-03
-> 2024-04 delayed by
1 month
100 MW - construction - texas - TX10 Hummingbird Storage -
65693
date: 2024-07
-> 2024-08 delayed by
1 month
100 MW - construction - texas - TX15 Limousin Oak Storage -
65698
date: 2024-06
-> 2024-08 delayed by
2 months
116 MW - construction - idaho - Hemmingway BESS -
66325
date: 2024-01
-> 2024-03 delayed by
2 months
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
date: 2024-01
-> 2024-04 delayed by
3 months
80 MW - operation - california - Raceway Solar & Storage -
66773
date: 2024-02
-> 2024-05 delayed by
3 months
80 MW - construction - california - Bottleneck Energy Storage -
66757
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2024-04
-> 2024-07 delayed by
3 months
75 MW - construction - california - Hummingbird Energy Storage LLC -
65395
date: 2024-12
-> 2024-06 accelerated by
6 months
73 MW - operation - texas - Ranchland Wind Storage -
64545
date: 2024-01
-> 2024-03 delayed by
2 months
70 MW - planning - california - Inland Empire Energy Storage -
66726
date: 2024-06
-> 2024-12 delayed by
6 months
65 MW - construction - california - San Jacinto Grid, LLC -
65657
date: 2024-03
-> 2024-06 delayed by
3 months
88 MW - construction - california - Chaparral Springs -
64864
date: 2024-02
-> 2024-04 delayed by
2 months
125 MW - construction - california - Tumbleweed Energy Storage -
66666
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2024-06
-> 2024-07 delayed by
1 month
40 MW - construction - idaho - Black Mesa BESS -
66326
date: 2024-02
-> 2024-04 delayed by
2 months
40 MW - construction - california - Scarlet Solar (CA) -
64908
date: 2024-06
-> 2024-12 delayed by
6 months
88 MW - construction - california - Chaparral Springs -
64864
date: 2024-02
-> 2024-04 delayed by
2 months
30 MW - construction - california - Santa Paula Energy Storage LLC -
65397
date: 2024-02
-> 2024-03 delayed by
1 month
30 MW - planning - virginia - Deer Wood Storage, LLC -
65145
date: 2025-04
-> 2026-11 delayed by
19 months
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
entity id: 63883
-> 56201
entity name: Broad Reach Power
-> Engie North America
date: 2024-01
-> 2024-02 delayed by
1 month
16 MW - operation - texas - Cameron Wind 1 LLC -
59118
date: 2024-01
-> 2024-02 delayed by
1 month
20 MW - construction - california - Ortega Grid, LLC -
65656
date: 2024-04
-> 2024-05 delayed by
1 month
20 MW - planning - hawaii - Kahana Solar, LLC -
64095
date: 2024-12
-> 2027-11 delayed by
35 months
20 MW - planning - new york - South Ripley Solar -
64911
date: 2026-12
-> 2027-12 delayed by
12 months
17 MW - planning - virginia - Powells Creek Solar - Hybrid -
65305
date: 2024-06
-> 2024-12 delayed by
6 months
12 MW - operation - hawaii - AES West Oahu Solar Hybrid -
64656
date: 2024-01
-> 2024-02 delayed by
1 month
12 MW - planning - delaware - ENGIE Solidago Solar Project - Hybrid -
65304
date: 2024-06
-> 2024-12 delayed by
6 months
12 MW - planning - ohio - Salt City Solar Project - Hybrid -
65302
date: 2024-06
-> 2024-12 delayed by
6 months
12 MW - planning - virginia - Sunnybrook Solar Project - Hybrid -
65307
date: 2024-06
-> 2024-12 delayed by
6 months
10 MW - construction - california - Painter Energy Storage -
62729
date: 2024-04
-> 2024-05 delayed by
1 month
240 MW - construction - california - Rexford Solar Farm -
64633
entity id: 64247
-> 64904
entity name: 20SD 8me LLC
-> AES Clean Energy
mw: 300
-> 240
675 MW - construction - california - Menifee Power Bank -
66494
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
200 MW - construction - texas - Hydra -
65490
entity id: 63883
-> 56201
entity name: Broad Reach Power
-> Engie North America
200 MW - construction - texas - Dickens -
65489
entity id: 63883
-> 56201
entity name: Broad Reach Power
-> Engie North America
200 MW - construction - texas - Paleo -
65491
entity id: 63883
-> 56201
entity name: Broad Reach Power
-> Engie North America
200 MW - construction - indiana - Pike County Energy Storage -
66881
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (T) Regulatory approvals received. Not under construction
180 MW - planning - texas - Starr Solar Ranch -
65975
mw: 30
-> 180
175 MW - construction - texas - Pavo -
65492
entity id: 63883
-> 56201
entity name: Broad Reach Power
-> Engie North America
150 MW - construction - texas - Danish Fields Storage -
66916
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
100 MW - construction - new mexico - San Juan Solar I -
66574
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
75 MW - cancelled - utah - Hornshadow Solar -
67189
status_verbose: (T) Regulatory approvals received. Not under construction
-> (P) Planned for installation, but regulatory approvals not initiated
50 MW - construction - texas - Tortolas -
65493
entity id: 63883
-> 56201
entity name: Broad Reach Power
-> Engie North America
50 MW - construction - tennessee - Ridgely Energy Farm -
65445
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (T) Regulatory approvals received. Not under construction
20 MW - cancelled - florida - South Tampa Energy Storage -
66869
plant name: MacDill Storage
-> South Tampa Energy Storage
10 MW - construction - california - Sierra Energy Storage, LLC -
61803
entity id: 63883
-> 56201
entity name: Broad Reach Power
-> Engie North America
2024-02
New projects (15):
300 MW - cancelled - texas - Rodeo Ranch Energy Storage -
67175
250 MW - planning - arizona - Beehive Energy Storage -
67184
100 MW - construction - idaho - Franklin Solar Hybrid -
67190
100 MW - planning - wisconsin - Paris Solar -
65967
75 MW - cancelled - utah - Hornshadow Solar II -
67191
75 MW - cancelled - utah - Hornshadow Solar -
67189
60 MW - construction - idaho - Franklin Battery Storage -
67183
116 MW - construction - idaho - Hemmingway BESS -
66325
20 MW - planning - oregon - Powell Solar -
67157
15 MW - operation - arizona - Mohave Energy - Hybrid -
67178
15 MW - construction - california - Paulsell -
67092
15 MW - construction - florida - Dover Energy Storage -
67120
12 MW - planning - hawaii - KRS I Anahola Solar Hybrid -
58639
12 MW - planning - hawaii - KRS II Koloa Solar -
58640
10 MW - construction - california - Santee BESS -
67118
Disappeared projects (6):
180 MW - cancelled - nevada - Chuckwalla Solar, LLC -
64558
140 MW - cancelled - texas - Coati Solar, LLC -
66693
75 MW - cancelled - wisconsin - Darien Solar -
64534
50 MW - cancelled - mississippi - OE_MS5 -
64529
50 MW - operation - mississippi - OE_MS6 -
65291
15 MW - cancelled - florida - Dover Solar -
66129
Updated projects (79):
225 MW - operation - california - Solar Blue -
63848
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
220 MW - operation - nevada - Reid Gardner -
2324
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
185 MW - operation - hawaii - Kapolei Energy Storage -
66067
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
150 MW - operation - texas - Revolution -
66170
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
135 MW - operation - california - Chestnut -
63849
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
131 MW - operation - california - Daggett 2 -
64851
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
100 MW - operation - arizona - McFarland A Solar and Storage -
66636
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
100 MW - construction - texas - Estonian Solar Project, LLC -
66872
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (TS) Construction complete, but not yet in commercial operation
date: 2024-10
-> 2024-03 accelerated by
7 months
99 MW - construction - california - Lead BESS 1 -
66660
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
99 MW - construction - california - Electrolyte BESS -
66661
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
97 MW - construction - california - Acid BESS -
66659
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
75 MW - operation - nevada - Arrow Canyon Solar Hybrid -
62248
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
32 MW - construction - california - Lead BESS 2 -
66662
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
28 MW - operation - california - Estrella Solar & Storage -
66772
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
20 MW - operation - arizona - SR McNeal -
66925
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - texas - SMT Alamo LLC -
66929
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - texas - SMT Elsa LLC -
66931
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - texas - SMT Harlingen II LLC -
66933
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - texas - SMT Los Fresnos LLC -
66932
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - texas - SMT Mercedes LLC -
66926
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - texas - SMT Mission LLC -
66927
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - texas - SMT Rio Grande I LLC -
66934
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - texas - SMT Rio Grande II LLC -
66935
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - texas - SMT Santa Rosa LLC -
66928
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
621 MW - planning - texas - Lunis Creek Solar and BESS SLF -
65852
date: 2024-12
-> 2025-07 delayed by
7 months
370 MW - planning - nevada - Arida Solar (Hybrid) -
63841
date: 2027-06
-> 2027-12 delayed by
6 months
300 MW - planning - nevada - Southern Bighorn Solar Hybrid -
63113
date: 2026-05
-> 2027-05 delayed by
12 months
mw: 135
-> 300
259 MW - construction - texas - Five Wells Solar Center - Hybrid -
66420
date: 2023-12
-> 2024-01 delayed by
1 month
200 MW - operation - california - Condor Energy Storage LLC -
66285
date: 2024-03
-> 2024-04 delayed by
1 month
200 MW - planning - california - Peregrine Energy Storage LLC -
66286
date: 2024-12
-> 2024-09 accelerated by
3 months
200 MW - planning - california - Big Rock Solar Farm -
64636
date: 2024-12
-> 2025-05 delayed by
5 months
200 MW - planning - california - Sienna Solar Farm -
64632
date: 2024-12
-> 2028-12 delayed by
48 months
169 MW - planning - new york - NY2 Battery -
63584
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (L) Regulatory approvals pending. Not under construction
date: 2024-12
-> 2026-12 delayed by
24 months
150 MW - construction - texas - Myrtle Storage -
66913
date: 2024-01
-> 2024-02 delayed by
1 month
150 MW - construction - texas - Danish Fields Storage -
66916
date: 2024-02
-> 2024-03 delayed by
1 month
150 MW - operation - california - Vikings Energy Farm -
65711
date: 2024-02
-> 2024-03 delayed by
1 month
150 MW - planning - texas - Alamo 7 BESS 1 -
66297
date: 2024-05
-> 2024-12 delayed by
7 months
150 MW - planning - texas - Alamo 7 BESS 2 -
66298
date: 2024-05
-> 2024-12 delayed by
7 months
150 MW - planning - texas - Crane 2 BESS 2 -
66300
date: 2024-05
-> 2024-12 delayed by
7 months
150 MW - planning - texas - Upton BESS 2 -
66303
date: 2024-05
-> 2024-12 delayed by
7 months
150 MW - planning - texas - Uvalde 2 BESS 2 -
66305
date: 2024-05
-> 2024-12 delayed by
7 months
150 MW - planning - new york - KCE NY 29, LLC -
66862
date: 2025-12
-> 2026-03 delayed by
3 months
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
date: 2023-12
-> 2024-01 delayed by
1 month
105 MW - planning - connecticut - KCE CT 1, LLC -
66879
date: 2027-05
-> 2028-10 delayed by
17 months
100 MW - operation - texas - St. Gall Energy Storage I -
66336
date: 2024-01
-> 2024-02 delayed by
1 month
100 MW - operation - nevada - Dry Lake Solar Energy Center -
63933
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2023-12
-> 2024-03 delayed by
3 months
100 MW - planning - texas - Alamo 3 BESS 2 -
66293
date: 2024-05
-> 2024-12 delayed by
7 months
100 MW - planning - texas - Alamo 4 BESS -
66294
date: 2024-05
-> 2024-12 delayed by
7 months
100 MW - planning - texas - Alamo 5 BESS 1 -
66295
date: 2024-05
-> 2024-12 delayed by
7 months
100 MW - planning - texas - Alamo 5 BESS 2 -
66296
date: 2024-05
-> 2024-12 delayed by
7 months
100 MW - planning - texas - Seven Flags BESS LLC -
66689
status_verbose: (T) Regulatory approvals received. Not under construction
-> (P) Planned for installation, but regulatory approvals not initiated
date: 2025-09
-> 2025-12 delayed by
3 months
100 MW - planning - texas - TX 14 Venus Mill Storage -
65788
date: 2025-12
-> 2026-01 delayed by
1 month
100 MW - planning - california - Sacramento Valley Energy Center, LLC -
65808
date: 2024-12
-> 2026-12 delayed by
24 months
116 MW - construction - idaho - Hemmingway BESS -
66325
date: 2023-12
-> 2024-01 delayed by
1 month
75 MW - planning - texas - Uvalde 2 BESS 1 -
66304
date: 2024-05
-> 2024-12 delayed by
7 months
75 MW - construction - california - Hummingbird Energy Storage LLC -
65395
date: 2023-12
-> 2024-12 delayed by
12 months
73 MW - operation - texas - Ranchland Wind Storage -
64545
date: 2023-12
-> 2024-01 delayed by
1 month
72 MW - construction - texas - Fence Post Solar Hybrid Project, LLC -
66801
date: 2024-03
-> 2024-04 delayed by
1 month
66 MW - construction - south carolina - Lone Star Solar -
62235
date: 2023-12
-> 2024-12 delayed by
12 months
61 MW - cancelled - texas - Talitha Energy Project, LLC -
65891
date: 2025-03
-> 2025-04 delayed by
1 month
mw: 131
-> 61
60 MW - operation - california - Goleta Energy Storage, LLC -
66394
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2023-12
-> 2024-01 delayed by
1 month
58 MW - planning - utah - Parowan Solar -
65823
date: 2024-12
-> 2025-11 delayed by
11 months
50 MW - planning - virginia - Dulles Solar and Storage -
65043
date: 2024-12
-> 2026-12 delayed by
24 months
30 MW - construction - california - Santa Paula Energy Storage LLC -
65397
date: 2024-01
-> 2024-02 delayed by
1 month
16 MW - operation - texas - Cameron Wind 1 LLC -
59118
date: 2023-12
-> 2024-01 delayed by
1 month
20 MW - planning - new york - KCE NY 10, LLC -
66682
date: 2025-12
-> 2026-03 delayed by
3 months
20 MW - planning - new york - South Ripley Solar -
64911
date: 2024-12
-> 2026-12 delayed by
24 months
20 MW - planning - indiana - Honey Creek Solar -
65821
date: 2024-12
-> 2026-12 delayed by
24 months
17 MW - planning - virginia - Powells Creek Solar - Hybrid -
65305
date: 2024-05
-> 2024-06 delayed by
1 month
12 MW - planning - delaware - ENGIE Solidago Solar Project - Hybrid -
65304
date: 2024-05
-> 2024-06 delayed by
1 month
12 MW - planning - ohio - Salt City Solar Project - Hybrid -
65302
date: 2024-05
-> 2024-06 delayed by
1 month
12 MW - planning - virginia - Sunnybrook Solar Project - Hybrid -
65307
date: 2024-05
-> 2024-06 delayed by
1 month
10 MW - operation - arizona - Mesquite Solar 4, LLC -
65962
date: 2023-12
-> 2024-02 delayed by
2 months
250 MW - operation - arizona - Sierra Estrella Energy Storage -
66334
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
230 MW - operation - california - Sunlight Storage II -
66575
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
147 MW - operation - california - Golden Field Solar III, LLC -
63859
energy source code:
-> MWH
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
25 MW - construction - california - West Ford Flat -
66669
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
13 MW - construction - california - Bear Canyon -
66650
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2024-01
New projects (4):
400 MW - planning - texas - Iron Belt -
67059
174 MW - construction - texas - Longbow BESS, LLC -
67083
147 MW - operation - california - Golden Field Solar III, LLC -
63859
85 MW - operation - nevada - Yellow Pine II -
67091
Disappeared projects (1):
15 MW - cancelled - hawaii - Paeahu Solar Hybrid -
62534
Updated projects (66):
150 MW - construction - texas - Borden County BESS -
66804
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
date: 2024-05
-> 2024-06 delayed by
1 month
136 MW - operation - california - Edwards Sanborn E1B -
65674
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
100 MW - operation - california - Edwards Sanborn E4 -
65675
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
68 MW - operation - california - Stanton Battery Energy Storage -
66423
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
675 MW - construction - california - Menifee Power Bank -
66494
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
47 MW - operation - california - Sanborn BESS 4 -
65673
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
date: 2023-12
-> 2023-11 accelerated by
1 month
47 MW - operation - california - Edwards Sanborn E5 -
65676
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
20 MW - operation - virginia - Dry Bridge Storage -
65044
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
date: 2023-12
-> 2023-11 accelerated by
1 month
10 MW - operation - texas - SMT Bay City LLC -
66930
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
380 MW - operation - nevada - Gemini Solar -
63352
date: 2023-11
-> 2024-02 delayed by
3 months
240 MW - construction - california - Rexford Solar Farm -
64633
date: 2024-04
-> 2024-12 delayed by
8 months
225 MW - operation - california - Solar Blue -
63848
date: 2023-11
-> 2023-12 delayed by
1 month
200 MW - planning - california - Peregrine Energy Storage LLC -
66286
date: 2024-08
-> 2024-12 delayed by
4 months
150 MW - operation - texas - Revolution -
66170
date: 2023-11
-> 2023-12 delayed by
1 month
150 MW - construction - texas - Myrtle Storage -
66913
date: 2023-12
-> 2024-01 delayed by
1 month
150 MW - construction - california - Scarlet II Hybrid -
66951
date: 2024-10
-> 2024-12 delayed by
2 months
150 MW - planning - california - Eland Solar & Storage Center, Phase 2 Hybrid -
61169
date: 2024-11
-> 2025-03 delayed by
4 months
135 MW - operation - california - Chestnut -
63849
date: 2023-11
-> 2023-12 delayed by
1 month
61 MW - cancelled - texas - Talitha Energy Project, LLC -
65891
date: 2024-10
-> 2025-03 delayed by
5 months
mw: 61
-> 131
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
date: 2023-12
-> 2024-02 delayed by
2 months
100 MW - operation - arizona - McFarland A Solar and Storage -
66636
date: 2023-11
-> 2023-12 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2024-01
-> 2024-03 delayed by
2 months
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2024-01
-> 2024-03 delayed by
2 months
100 MW - construction - new mexico - San Juan Solar I -
66574
date: 2024-07
-> 2024-05 accelerated by
2 months
116 MW - construction - idaho - Hemmingway BESS -
66325
date: 2023-11
-> 2023-12 delayed by
1 month
75 MW - cancelled - wisconsin - Darien Solar -
64534
date: 2024-11
-> 2024-12 delayed by
1 month
65 MW - construction - california - San Jacinto Grid, LLC -
65657
date: 2024-01
-> 2024-03 delayed by
2 months
63 MW - operation - texas - House Mountain -
66006
date: 2023-12
-> 2024-01 delayed by
1 month
88 MW - construction - california - Chaparral Springs -
64864
date: 2023-12
-> 2024-02 delayed by
2 months
50 MW - construction - texas - Tortolas -
65493
date: 2024-03
-> 2024-04 delayed by
1 month
43 MW - planning - california - Dynegy Oakland Power Plant -
6211
date: 2024-11
-> 2027-05 delayed by
30 months
40 MW - construction - idaho - Black Mesa BESS -
66326
date: 2023-12
-> 2024-02 delayed by
2 months
88 MW - construction - california - Chaparral Springs -
64864
date: 2023-12
-> 2024-02 delayed by
2 months
30 MW - construction - california - Santa Paula Energy Storage LLC -
65397
date: 2023-11
-> 2024-01 delayed by
2 months
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
date: 2023-12
-> 2024-01 delayed by
1 month
20 MW - construction - california - Ortega Grid, LLC -
65656
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2024-01
-> 2024-04 delayed by
3 months
10 MW - operation - texas - SMT Alamo LLC -
66929
date: 2023-11
-> 2023-12 delayed by
1 month
10 MW - operation - texas - SMT Harlingen II LLC -
66933
date: 2023-11
-> 2023-12 delayed by
1 month
10 MW - operation - texas - SMT Mercedes LLC -
66926
date: 2023-11
-> 2023-12 delayed by
1 month
10 MW - operation - texas - SMT Mission LLC -
66927
date: 2023-11
-> 2023-12 delayed by
1 month
10 MW - operation - texas - SMT Santa Rosa LLC -
66928
date: 2023-11
-> 2023-12 delayed by
1 month
20 MW - operation - california - Melrose BESS -
66281
date: 2023-12
-> 2024-02 delayed by
2 months
20 MW - operation - california - Melrose BESS -
66281
date: 2023-12
-> 2024-02 delayed by
2 months
10 MW - operation - california - Pala Gomez Creek BESS -
66280
date: 2023-12
-> 2024-02 delayed by
2 months
10 MW - construction - california - Sierra Energy Storage, LLC -
61803
date: 2023-12
-> 2024-03 delayed by
3 months
10 MW - operation - california - Boulevard Energy Storage -
66279
date: 2023-12
-> 2024-03 delayed by
3 months
10 MW - operation - california - Clairemont Energy Storage -
66266
date: 2023-12
-> 2024-03 delayed by
3 months
10 MW - operation - california - Elliott Energy Storage -
66278
date: 2023-12
-> 2024-03 delayed by
3 months
10 MW - operation - california - Paradise Energy Storage -
66265
date: 2023-12
-> 2024-03 delayed by
3 months
10 MW - construction - california - Hecate Energy Desert Storage 1 LLC -
65635
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2024-01
-> 2024-05 delayed by
4 months
10 MW - construction - california - Carris Storage I -
65733
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2024-02
-> 2024-05 delayed by
3 months
10 MW - planning - texas - Grizzly Ridge Solar -
66410
date: 2024-04
-> 2024-08 delayed by
4 months
675 MW - construction - california - Menifee Power Bank -
66494
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
200 MW - construction - texas - Hydra -
65490
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
200 MW - construction - texas - Dickens -
65489
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
175 MW - construction - texas - Pavo -
65492
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
162 MW - operation - california - Proxima -
66270
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
150 MW - construction - texas - Danish Fields Storage -
66916
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
100 MW - construction - california - Cald BESS -
66617
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
72 MW - construction - texas - Fence Post Solar Hybrid Project, LLC -
66801
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
65 MW - construction - georgia - Mossy Branch Battery Facility -
65018
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
50 MW - cancelled - mississippi - OE_MS5 -
64529
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
50 MW - operation - mississippi - OE_MS6 -
65291
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
45 MW - construction - california - Lockhart ESS, LLC -
66946
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
20 MW - operation - arizona - SR McNeal -
66925
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
15 MW - cancelled - florida - Dover Solar -
66129
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (T) Regulatory approvals received. Not under construction
2023-12
New projects (8):
100 MW - construction - texas - Copperhead Solar, LLC -
67019
92 MW - construction - california - Northern Orchard Solar PV, LLC -
67039
675 MW - construction - california - Menifee Power Bank -
66494
30 MW - planning - texas - Second Division Solar -
65981
180 MW - planning - texas - Starr Solar Ranch -
65975
15 MW - construction - north carolina - McLauchin -
67041
10 MW - construction - north carolina - Archie Horne -
67040
10 MW - construction - north carolina - Butler -
67042
Disappeared projects (1):
660 MW - cancelled - texas - Goldenrod Creek Solar and BESS SLF -
65845
Updated projects (38):
169 MW - operation - california - Sanborn BESS 3 -
65672
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
25 MW - construction - california - West Ford Flat -
66669
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
13 MW - construction - california - Bear Canyon -
66650
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
400 MW - planning - texas - Hollow Branch Creek 2 Solar and BESS SLF -
65851
date: 2024-10
-> 2025-12 delayed by
14 months
370 MW - planning - nevada - Arida Solar (Hybrid) -
63841
date: 2024-10
-> 2027-06 delayed by
32 months
mw: 185
-> 370
302 MW - planning - texas - Middlebrook Creek Solar and BESS -
65853
date: 2024-10
-> 2026-02 delayed by
16 months
150 MW - operation - texas - Revolution -
66170
date: 2023-10
-> 2023-11 delayed by
1 month
150 MW - construction - california - Scarlet II Hybrid -
66951
date: 2024-06
-> 2024-10 delayed by
4 months
136 MW - operation - california - Edwards Sanborn E1B -
65674
date: 2023-10
-> 2023-11 delayed by
1 month
135 MW - operation - california - Chestnut -
63849
date: 2023-10
-> 2023-11 delayed by
1 month
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
date: 2023-10
-> 2023-12 delayed by
2 months
675 MW - construction - california - Menifee Power Bank -
66494
date: 2024-08
-> 2024-09 delayed by
1 month
100 MW - operation - california - Edwards Sanborn E4 -
65675
date: 2023-10
-> 2023-11 delayed by
1 month
100 MW - construction - texas - TX10 Hummingbird Storage -
65693
date: 2024-04
-> 2024-07 delayed by
3 months
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
date: 2024-02
-> 2024-01 accelerated by
1 month
80 MW - operation - california - Raceway Solar & Storage -
66773
date: 2023-12
-> 2024-02 delayed by
2 months
75 MW - operation - nevada - Arrow Canyon Solar Hybrid -
62248
date: 2023-11
-> 2023-12 delayed by
1 month
73 MW - operation - texas - Ranchland Wind Storage -
64545
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2023-10
-> 2023-12 delayed by
2 months
68 MW - operation - california - Stanton Battery Energy Storage -
66423
date: 2023-10
-> 2023-11 delayed by
1 month
65 MW - construction - california - San Jacinto Grid, LLC -
65657
date: 2023-12
-> 2024-01 delayed by
1 month
63 MW - operation - texas - House Mountain -
66006
date: 2023-11
-> 2023-12 delayed by
1 month
60 MW - operation - california - Goleta Energy Storage, LLC -
66394
date: 2023-11
-> 2023-12 delayed by
1 month
40 MW - construction - idaho - Black Mesa BESS -
66326
date: 2023-11
-> 2023-12 delayed by
1 month
30 MW - construction - hawaii - AES Waiawa Phase 2 Solar -
66066
date: 2024-10
-> 2024-11 delayed by
1 month
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
date: 2023-11
-> 2023-12 delayed by
1 month
16 MW - operation - texas - Cameron Wind 1 LLC -
59118
date: 2023-11
-> 2023-12 delayed by
1 month
20 MW - operation - virginia - Dry Bridge Storage -
65044
status_verbose: (V) Under construction, more than 50 percent complete
-> (U) Under construction, less than or equal to 50 percent complete
date: 2023-10
-> 2023-12 delayed by
2 months
20 MW - construction - california - Ortega Grid, LLC -
65656
date: 2023-11
-> 2024-01 delayed by
2 months
20 MW - construction - tennessee - Vonore Battery Energy Storage System -
64255
date: 2023-12
-> 2024-03 delayed by
3 months
10 MW - operation - texas - SMT Bay City LLC -
66930
date: 2023-10
-> 2023-11 delayed by
1 month
10 MW - construction - california - Hecate Energy Desert Storage 1 LLC -
65635
date: 2023-12
-> 2024-01 delayed by
1 month
10 MW - planning - texas - Grizzly Ridge Solar -
66410
date: 2024-02
-> 2024-04 delayed by
2 months
10 MW - construction - california - Painter Energy Storage -
62729
date: 2023-12
-> 2024-04 delayed by
4 months
220 MW - operation - nevada - Reid Gardner -
2324
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
200 MW - operation - california - Condor Energy Storage LLC -
66285
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
100 MW - operation - nevada - Dry Lake Solar Energy Center -
63933
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
76 MW - planning - texas - Gaia Hybrid -
66342
entity name: Samsung Solar Energy 2, LLC
-> Samsung C&T Renewables, LLC
61 MW - planning - texas - Eagle Springs Hybrid -
66341
entity name: Samsung Solar Energy 2, LLC
-> Samsung C&T Renewables, LLC
2023-11
New projects (0):
Updated projects (67):
220 MW - operation - nevada - Reid Gardner -
2324
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
125 MW - operation - california - Oberon II Solar Project -
65735
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
125 MW - operation - california - Oberon Solar Project -
65734
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) -
64197
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
103 MW - construction - texas - Bright Arrow Solar, LLC -
66688
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - operation - arizona - Saint Energy Storage II LLC -
66716
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
100 MW - construction - california - Beaumont BESS -
66461
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
date: 2024-03
-> 2024-06 delayed by
3 months
88 MW - operation - arizona - Storey Solar and Storage -
65956
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
80 MW - construction - california - Placerita ESS -
66462
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
date: 2024-02
-> 2024-09 delayed by
7 months
125 MW - construction - california - Tumbleweed Energy Storage -
66666
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
125 MW - construction - california - Tumbleweed Energy Storage -
66666
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
20 MW - operation - arizona - SR McNeal -
66925
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
10 MW - operation - texas - SMT Bay City LLC -
66930
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (TS) Construction complete, but not yet in commercial operation
10 MW - operation - texas - SMT Alamo LLC -
66929
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (TS) Construction complete, but not yet in commercial operation
10 MW - operation - texas - SMT Harlingen II LLC -
66933
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (TS) Construction complete, but not yet in commercial operation
10 MW - operation - texas - SMT Mercedes LLC -
66926
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (TS) Construction complete, but not yet in commercial operation
10 MW - operation - texas - SMT Mission LLC -
66927
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (TS) Construction complete, but not yet in commercial operation
10 MW - operation - texas - SMT Santa Rosa LLC -
66928
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (TS) Construction complete, but not yet in commercial operation
10 MW - operation - texas - SMT Elsa LLC -
66931
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (TS) Construction complete, but not yet in commercial operation
10 MW - operation - texas - SMT Los Fresnos LLC -
66932
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (TS) Construction complete, but not yet in commercial operation
10 MW - operation - texas - SMT Rio Grande I LLC -
66934
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (TS) Construction complete, but not yet in commercial operation
10 MW - operation - texas - SMT Rio Grande II LLC -
66935
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (TS) Construction complete, but not yet in commercial operation
225 MW - operation - california - Solar Blue -
63848
date: 2023-09
-> 2023-11 delayed by
2 months
169 MW - operation - california - Sanborn BESS 3 -
65672
date: 2023-09
-> 2023-10 delayed by
1 month
150 MW - construction - arizona - McFarland B Solar and Storage -
66637
date: 2023-12
-> 2024-05 delayed by
5 months
135 MW - operation - california - Chestnut -
63849
date: 2023-09
-> 2023-10 delayed by
1 month
131 MW - operation - california - Daggett 2 -
64851
date: 2023-11
-> 2023-12 delayed by
1 month
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
date: 2023-09
-> 2023-10 delayed by
1 month
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
date: 2023-10
-> 2023-12 delayed by
2 months
100 MW - operation - california - Edwards Sanborn E4 -
65675
date: 2023-09
-> 2023-10 delayed by
1 month
100 MW - operation - arizona - McFarland A Solar and Storage -
66636
date: 2023-12
-> 2023-11 accelerated by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2023-11
-> 2024-01 delayed by
2 months
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2023-11
-> 2024-01 delayed by
2 months
100 MW - construction - new mexico - San Juan Solar I -
66574
date: 2024-08
-> 2024-07 accelerated by
1 month
100 MW - construction - texas - Estonian Solar Project, LLC -
66872
date: 2024-04
-> 2024-10 delayed by
6 months
116 MW - construction - idaho - Hemmingway BESS -
66325
date: 2023-10
-> 2023-11 delayed by
1 month
75 MW - operation - nevada - Arrow Canyon Solar Hybrid -
62248
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2023-10
-> 2023-11 delayed by
1 month
75 MW - planning - texas - Noria Hondo Solar (Hybrid) -
65344
date: 2024-09
-> 2025-09 delayed by
12 months
75 MW - construction - california - Baldy Mesa Solar & Storage -
66598
date: 2023-12
-> 2025-10 delayed by
22 months
73 MW - operation - texas - Ranchland Wind Storage -
64545
date: 2023-09
-> 2023-10 delayed by
1 month
68 MW - operation - california - Stanton Battery Energy Storage -
66423
date: 2023-09
-> 2023-10 delayed by
1 month
65 MW - construction - california - San Jacinto Grid, LLC -
65657
date: 2023-11
-> 2023-12 delayed by
1 month
63 MW - operation - texas - House Mountain -
66006
date: 2023-10
-> 2023-11 delayed by
1 month
675 MW - construction - california - Menifee Power Bank -
66494
date: 2024-09
-> 2024-08 accelerated by
1 month
47 MW - operation - california - Edwards Sanborn E5 -
65676
date: 2023-09
-> 2023-11 delayed by
2 months
40 MW - construction - idaho - Black Mesa BESS -
66326
date: 2023-10
-> 2023-11 delayed by
1 month
30 MW - construction - california - Santa Paula Energy Storage LLC -
65397
date: 2023-09
-> 2023-11 delayed by
2 months
30 MW - construction - hawaii - AES Waiawa Phase 2 Solar -
66066
date: 2023-12
-> 2024-10 delayed by
10 months
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
date: 2023-09
-> 2023-11 delayed by
2 months
25 MW - construction - california - Baldy Mesa 2_Silver Peak Hybrid -
66885
date: 2023-12
-> 2024-06 delayed by
6 months
16 MW - operation - texas - Cameron Wind 1 LLC -
59118
date: 2023-10
-> 2023-11 delayed by
1 month
20 MW - operation - virginia - Dry Bridge Storage -
65044
date: 2023-09
-> 2023-10 delayed by
1 month
20 MW - operation - new jersey - Justin Court Energy Storage -
66758
date: 2023-11
-> 2024-02 delayed by
3 months
12 MW - operation - hawaii - AES West Oahu Solar Hybrid -
64656
date: 2023-09
-> 2024-01 delayed by
4 months
10 MW - construction - california - Hecate Energy Desert Storage 1 LLC -
65635
date: 2023-11
-> 2023-12 delayed by
1 month
10 MW - construction - california - Painter Energy Storage -
62729
date: 2023-11
-> 2023-12 delayed by
1 month
10 MW - operation - california - Boulevard Energy Storage -
66279
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2023-09
-> 2023-12 delayed by
3 months
10 MW - operation - california - Clairemont Energy Storage -
66266
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2023-09
-> 2023-12 delayed by
3 months
10 MW - operation - california - Elliott Energy Storage -
66278
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2023-09
-> 2023-12 delayed by
3 months
20 MW - operation - california - Melrose BESS -
66281
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2023-09
-> 2023-12 delayed by
3 months
20 MW - operation - california - Melrose BESS -
66281
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2023-09
-> 2023-12 delayed by
3 months
10 MW - operation - california - Pala Gomez Creek BESS -
66280
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2023-09
-> 2023-12 delayed by
3 months
10 MW - operation - california - Paradise Energy Storage -
66265
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2023-09
-> 2023-12 delayed by
3 months
10 MW - construction - california - Carris Storage I -
65733
date: 2023-11
-> 2024-02 delayed by
3 months
10 MW - planning - maine - South Portland ESS, LLC -
64616
date: 2024-02
-> 2024-12 delayed by
10 months
150 MW - construction - texas - Myrtle Storage -
66913
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2023-10
New projects (5):
150 MW - construction - california - Scarlet II Hybrid -
66951
675 MW - construction - california - Menifee Power Bank -
66494
59 MW - construction - california - Sagebrush Solar 2 ESS 59 -
66950
45 MW - construction - california - Lockhart ESS, LLC -
66946
40 MW - construction - california - Sagebrush Solar 2 ESS 40 -
66949
Updated projects (60):
675 MW - construction - california - Menifee Power Bank -
66494
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
675 MW - construction - california - Menifee Power Bank -
66494
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
200 MW - operation - california - Condor Energy Storage LLC -
66285
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
date: 2024-08
-> 2024-03 accelerated by
5 months
190 MW - operation - texas - Cunningham Storage -
65410
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
150 MW - operation - california - Vikings Energy Farm -
65711
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
date: 2024-08
-> 2024-02 accelerated by
6 months
132 MW - operation - california - North Central Valley -
66208
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
100 MW - operation - texas - St. Gall Energy Storage I -
66336
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - construction - texas - Brazos Bend BESS, LLC -
66690
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - construction - new mexico - San Juan Solar I -
66574
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
80 MW - operation - california - Raceway Solar & Storage -
66773
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
75 MW - operation - california - Resurgence Solar -
64489
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
40 MW - operation - california - Resurgence Solar II -
66620
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
28 MW - operation - california - Estrella Solar & Storage -
66772
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
20 MW - operation - california - VESI Pomona -
50300
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
date: 2023-10
-> 2023-08 accelerated by
2 months
10 MW - operation - california - BCE Los Alamitos 1 -
66533
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - california - BCE Los Alamitos 2 -
66532
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
200 MW - construction - texas - Hydra -
65490
date: 2023-12
-> 2024-02 delayed by
2 months
200 MW - construction - texas - Dickens -
65489
date: 2024-02
-> 2024-03 delayed by
1 month
200 MW - construction - texas - Paleo -
65491
date: 2024-02
-> 2024-03 delayed by
1 month
185 MW - operation - hawaii - Kapolei Energy Storage -
66067
date: 2023-08
-> 2023-12 delayed by
4 months
175 MW - construction - texas - Pavo -
65492
date: 2023-12
-> 2024-02 delayed by
2 months
150 MW - construction - texas - Carina -
65589
date: 2024-06
-> 2024-12 delayed by
6 months
136 MW - operation - california - Arica Solar -
65744
date: 2023-12
-> 2024-03 delayed by
3 months
131 MW - operation - california - Daggett 2 -
64851
date: 2023-10
-> 2023-11 delayed by
1 month
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
date: 2023-08
-> 2023-09 delayed by
1 month
117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) -
64197
date: 2023-08
-> 2023-09 delayed by
1 month
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
date: 2023-09
-> 2023-10 delayed by
1 month
224 MW - construction - california - Anode (Springville) BESS -
65458
date: 2023-11
-> 2024-06 delayed by
7 months
224 MW - construction - california - Anode (Springville) BESS -
65458
date: 2023-11
-> 2024-06 delayed by
7 months
100 MW - operation - arizona - Saint Energy Storage II LLC -
66716
date: 2023-08
-> 2023-09 delayed by
1 month
100 MW - operation - california - Edwards Sanborn E4 -
65675
date: 2023-08
-> 2023-09 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2023-10
-> 2023-11 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2023-10
-> 2023-11 delayed by
1 month
88 MW - operation - arizona - Storey Solar and Storage -
65956
date: 2023-08
-> 2023-09 delayed by
1 month
116 MW - construction - idaho - Hemmingway BESS -
66325
date: 2023-08
-> 2023-10 delayed by
2 months
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
date: 2024-04
-> 2024-02 accelerated by
2 months
75 MW - operation - nevada - Arrow Canyon Solar Hybrid -
62248
date: 2023-08
-> 2023-10 delayed by
2 months
73 MW - operation - texas - Ranchland Wind Storage -
64545
date: 2023-08
-> 2023-09 delayed by
1 month
70 MW - construction - texas - Antlia -
65588
date: 2024-06
-> 2024-12 delayed by
6 months
68 MW - operation - california - Stanton Battery Energy Storage -
66423
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2023-08
-> 2023-09 delayed by
1 month
60 MW - operation - hawaii - AES Maui Kuihelani Solar Hybrid -
64256
date: 2023-12
-> 2024-05 delayed by
5 months
52 MW - construction - hawaii - Ho'Ohana Solar 1 -
63723
date: 2023-08
-> 2024-10 delayed by
14 months
50 MW - construction - texas - Tortolas -
65493
date: 2023-12
-> 2024-03 delayed by
3 months
50 MW - operation - california - Victory Pass -
65743
date: 2023-12
-> 2024-03 delayed by
3 months
40 MW - construction - idaho - Black Mesa BESS -
66326
date: 2023-09
-> 2023-10 delayed by
1 month
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
date: 2023-08
-> 2023-09 delayed by
1 month
16 MW - operation - texas - Cameron Wind 1 LLC -
59118
date: 2023-09
-> 2023-10 delayed by
1 month
10 MW - operation - california - Boulevard Energy Storage -
66279
date: 2023-08
-> 2023-09 delayed by
1 month
10 MW - operation - california - Clairemont Energy Storage -
66266
date: 2023-08
-> 2023-09 delayed by
1 month
10 MW - operation - california - Elliott Energy Storage -
66278
date: 2023-08
-> 2023-09 delayed by
1 month
20 MW - operation - california - Melrose BESS -
66281
date: 2023-08
-> 2023-09 delayed by
1 month
20 MW - operation - california - Melrose BESS -
66281
date: 2023-08
-> 2023-09 delayed by
1 month
10 MW - operation - california - Pala Gomez Creek BESS -
66280
date: 2023-08
-> 2023-09 delayed by
1 month
10 MW - operation - california - Paradise Energy Storage -
66265
date: 2023-08
-> 2023-09 delayed by
1 month
10 MW - construction - california - Painter Energy Storage -
62729
date: 2023-10
-> 2023-11 delayed by
1 month
10 MW - construction - california - Sierra Energy Storage, LLC -
61803
date: 2023-09
-> 2023-12 delayed by
3 months
200 MW - planning - california - Peregrine Energy Storage LLC -
66286
status_verbose: (T) Regulatory approvals received. Not under construction
-> (L) Regulatory approvals pending. Not under construction
162 MW - operation - california - Proxima -
66270
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
125 MW - operation - california - Oberon II Solar Project -
65735
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
125 MW - operation - california - Oberon Solar Project -
65734
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
2023-09
New projects (30):
300 MW - construction - texas - GulfStar Power, LLC -
66871
300 MW - planning - new york - Hecate Grid Intrepid -
66911
220 MW - operation - nevada - Reid Gardner -
2324
200 MW - construction - indiana - Pike County Energy Storage -
66881
195 MW - planning - nevada - Bonanza Solar and Storage Project -
66908
150 MW - construction - texas - Myrtle Storage -
66913
150 MW - construction - texas - Danish Fields Storage -
66916
150 MW - planning - new york - KCE NY 29, LLC -
66862
122 MW - planning - texas - Lupinus Solar 2, LLC -
66896
105 MW - planning - connecticut - KCE CT 1, LLC -
66879
100 MW - construction - texas - Estonian Solar Project, LLC -
66872
100 MW - construction - texas - Ables Springs Solar & Storage -
66905
83 MW - planning - texas - Lupinus Solar 1, LLC -
66895
52 MW - planning - texas - Midpoint Solar, LLC -
66897
180 MW - planning - texas - Indigo Solar & Storage -
66891
50 MW - planning - texas - Albatross Solar, LLC -
66894
300 MW - planning - new york - Hecate Grid Intrepid -
66911
25 MW - construction - california - Baldy Mesa 2_Silver Peak Hybrid -
66885
20 MW - operation - arizona - SR McNeal -
66925
20 MW - cancelled - florida - South Tampa Energy Storage -
66869
10 MW - operation - texas - SMT Bay City LLC -
66930
10 MW - operation - texas - SMT Alamo LLC -
66929
10 MW - operation - texas - SMT Harlingen II LLC -
66933
10 MW - operation - texas - SMT Mercedes LLC -
66926
10 MW - operation - texas - SMT Mission LLC -
66927
10 MW - operation - texas - SMT Santa Rosa LLC -
66928
10 MW - operation - texas - SMT Elsa LLC -
66931
10 MW - operation - texas - SMT Los Fresnos LLC -
66932
10 MW - operation - texas - SMT Rio Grande I LLC -
66934
10 MW - operation - texas - SMT Rio Grande II LLC -
66935
Updated projects (56):
325 MW - operation - california - Desert Peak Energy Storage I -
65987
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
260 MW - operation - arizona - Sonoran Solar Energy -
66627
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
250 MW - operation - arizona - Sierra Estrella Energy Storage -
66334
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
230 MW - operation - california - Sunlight Storage II -
66575
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid -
63172
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
150 MW - operation - texas - Wolf Tank Storage -
66616
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
150 MW - construction - arizona - McFarland B Solar and Storage -
66637
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
149 MW - operation - california - Daggett 3 -
64852
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
100 MW - operation - arizona - McFarland A Solar and Storage -
66636
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
100 MW - construction - texas - TX10 Hummingbird Storage -
65693
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - construction - texas - TX15 Limousin Oak Storage -
65698
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
date: 2024-04
-> 2024-06 delayed by
2 months
75 MW - operation - california - Desert Peak Energy Storage II -
65988
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
75 MW - construction - california - Baldy Mesa Solar & Storage -
66598
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
65 MW - construction - california - San Jacinto Grid, LLC -
65657
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
65 MW - construction - georgia - Mossy Branch Battery Facility -
65018
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
60 MW - operation - arizona - Mesquite Solar 5, LLC -
65963
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
date: 2023-12
-> 2023-07 accelerated by
5 months
60 MW - operation - hawaii - AES Maui Kuihelani Solar Hybrid -
64256
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
59 MW - operation - texas - Roseland Solar Project, LLC -
65028
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
50 MW - operation - texas - TX19 River Valley Storage 1 -
65699
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
50 MW - operation - texas - TX21 River Valley Storage 2 -
65700
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
50 MW - operation - texas - Roadrunner, LLC Hybrid -
62561
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
48 MW - operation - nevada - Yellow Pine Solar -
66357
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
30 MW - construction - hawaii - AES Waiawa Phase 2 Solar -
66066
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
20 MW - operation - new york - Willis Battery Storage -
63238
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
date: 2023-09
-> 2023-07 accelerated by
2 months
20 MW - operation - new mexico - Jicarilla Solar 1 LLC -
66163
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
18 MW - operation - california - Edwards Sanborn S4 -
65677
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
675 MW - construction - california - Menifee Power Bank -
66494
date: 2024-08
-> 2024-06 accelerated by
2 months
675 MW - construction - california - Menifee Power Bank -
66494
date: 2024-08
-> 2024-06 accelerated by
2 months
190 MW - operation - texas - Cunningham Storage -
65410
date: 2023-07
-> 2023-08 delayed by
1 month
169 MW - operation - california - Sanborn BESS 3 -
65672
date: 2023-08
-> 2023-09 delayed by
1 month
150 MW - construction - california - Desert Quartzite -
59871
date: 2023-08
-> 2024-08 delayed by
12 months
136 MW - operation - california - Arica Solar -
65744
date: 2023-11
-> 2023-12 delayed by
1 month
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
date: 2023-08
-> 2023-09 delayed by
1 month
100 MW - operation - arizona - Saint Energy Storage II LLC -
66716
date: 2023-07
-> 2023-08 delayed by
1 month
100 MW - operation - california - Edwards Sanborn E4 -
65675
date: 2023-07
-> 2023-08 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2023-09
-> 2023-10 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2023-09
-> 2023-10 delayed by
1 month
100 MW - operation - texas - St. Gall Energy Storage I -
66336
date: 2023-12
-> 2024-01 delayed by
1 month
100 MW - planning - texas - Bexar ESS -
66400
date: 2024-08
-> 2025-03 delayed by
7 months
116 MW - construction - idaho - Hemmingway BESS -
66325
date: 2023-07
-> 2023-08 delayed by
1 month
75 MW - operation - california - Resurgence Solar -
64489
date: 2023-07
-> 2023-08 delayed by
1 month
60 MW - operation - california - Goleta Energy Storage, LLC -
66394
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2023-10
-> 2023-11 delayed by
1 month
58 MW - planning - nevada - Boulder Solar III LLC -
65141
date: 2023-12
-> 2025-12 delayed by
24 months
50 MW - operation - california - Victory Pass -
65743
date: 2023-11
-> 2023-12 delayed by
1 month
675 MW - construction - california - Menifee Power Bank -
66494
date: 2024-08
-> 2024-09 delayed by
1 month
40 MW - operation - california - Resurgence Solar II -
66620
date: 2023-07
-> 2023-08 delayed by
1 month
40 MW - construction - california - Scarlet Solar (CA) -
64908
date: 2024-03
-> 2024-06 delayed by
3 months
16 MW - operation - texas - Cameron Wind 1 LLC -
59118
date: 2023-08
-> 2023-09 delayed by
1 month
20 MW - operation - new jersey - Justin Court Energy Storage -
66758
date: 2023-07
-> 2023-11 delayed by
4 months
15 MW - planning - south carolina - Wolf Pit Branch Solar, LLC -
65437
date: 2023-11
-> 2026-04 delayed by
29 months
20 MW - operation - california - Melrose BESS -
66281
date: 2023-07
-> 2023-08 delayed by
1 month
20 MW - operation - california - Melrose BESS -
66281
date: 2023-07
-> 2023-08 delayed by
1 month
10 MW - operation - california - Pala Gomez Creek BESS -
66280
date: 2023-07
-> 2023-08 delayed by
1 month
10 MW - planning - maine - South Portland ESS, LLC -
64616
date: 2023-12
-> 2024-02 delayed by
2 months
150 MW - operation - texas - Revolution -
66170
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
47 MW - operation - california - Sanborn BESS 4 -
65673
plant name: Sanborn EBESS1
-> Sanborn BESS 4
2023-08
New projects (12):
275 MW - planning - connecticut - Elevate Middletown -
66786
150 MW - construction - texas - Borden County BESS -
66804
80 MW - operation - california - Raceway Solar & Storage -
66773
80 MW - construction - california - Bottleneck Energy Storage -
66757
72 MW - construction - texas - Fence Post Solar Hybrid Project, LLC -
66801
70 MW - planning - california - Elevate Pier S -
66787
50 MW - operation - new mexico - Sky Ranch Solar -
66814
28 MW - operation - california - Estrella Solar & Storage -
66772
24 MW - operation - texas - Upton County BESS -
64811
20 MW - operation - new jersey - Justin Court Energy Storage -
66758
15 MW - cancelled - florida - Dover Solar -
66129
15 MW - planning - new york - Elevate Arthur Kill -
66785
Updated projects (50):
750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid -
260
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
210 MW - operation - texas - Blue Jay Solar I, LLC -
64672
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
131 MW - operation - california - CED West Side Canal Battery Storage -
65980
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
125 MW - operation - colorado - Neptune Energy Center Hybrid -
63731
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
100 MW - operation - colorado - Thunder Wolf Energy Center Hybrid -
63776
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
66 MW - construction - south carolina - Lone Star Solar -
62235
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
50 MW - operation - new mexico - Buena Vista Energy Center -
66408
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
date: 2023-07
-> 2023-06 accelerated by
1 month
50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid -
62562
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
20 MW - operation - new jersey - Andover Energy Storage Project -
65952
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
500 MW - planning - texas - Hecate Energy Ramsey Storage -
66414
date: 2024-06
-> 2025-12 delayed by
18 months
74 MW - planning - california - Kingsley Solar Farm -
64634
date: 2024-06
-> 2025-06 delayed by
12 months
300 MW - planning - california - Nighthawk Energy Storage, LLC -
65889
date: 2024-06
-> 2025-02 delayed by
8 months
260 MW - operation - arizona - Sonoran Solar Energy -
66627
date: 2023-06
-> 2023-07 delayed by
1 month
259 MW - construction - texas - Five Wells Solar Center - Hybrid -
66420
entity id: 65507
-> 65502
entity name: Chesapeake Solar Project, LLC
-> Five Wells Solar Center, LLC
date: 2024-03
-> 2023-12 accelerated by
3 months
255 MW - planning - texas - Hecate Grid East Valley Storage -
66411
date: 2024-06
-> 2025-12 delayed by
18 months
200 MW - planning - california - Aratina Solar Center 2 -
64215
date: 2024-06
-> 2025-03 delayed by
9 months
169 MW - planning - new york - NY2 Battery -
63584
date: 2024-06
-> 2024-12 delayed by
6 months
162 MW - operation - california - Proxima -
66270
date: 2023-10
-> 2024-01 delayed by
3 months
150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid -
63172
date: 2023-06
-> 2023-07 delayed by
1 month
150 MW - operation - texas - Wolf Tank Storage -
66616
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2023-06
-> 2023-07 delayed by
1 month
149 MW - operation - california - Daggett 3 -
64852
date: 2023-06
-> 2023-07 delayed by
1 month
131 MW - operation - california - Daggett 2 -
64851
date: 2023-09
-> 2023-10 delayed by
1 month
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
date: 2023-06
-> 2023-08 delayed by
2 months
88 MW - operation - arizona - Storey Solar and Storage -
65956
date: 2023-07
-> 2023-08 delayed by
1 month
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
date: 2023-12
-> 2024-04 delayed by
4 months
73 MW - operation - texas - Ranchland Wind Storage -
64545
date: 2023-06
-> 2023-08 delayed by
2 months
65 MW - construction - california - San Jacinto Grid, LLC -
65657
date: 2023-09
-> 2023-11 delayed by
2 months
65 MW - construction - georgia - Mossy Branch Battery Facility -
65018
date: 2023-10
-> 2024-05 delayed by
7 months
60 MW - operation - arizona - Mesquite Solar 5, LLC -
65963
date: 2023-06
-> 2023-12 delayed by
6 months
59 MW - operation - texas - Roseland Solar Project, LLC -
65028
date: 2023-06
-> 2023-07 delayed by
1 month
50 MW - operation - texas - Roadrunner, LLC Hybrid -
62561
date: 2023-06
-> 2023-07 delayed by
1 month
47 MW - operation - california - Sanborn BESS 4 -
65673
date: 2023-08
-> 2023-12 delayed by
4 months
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
date: 2023-07
-> 2023-08 delayed by
1 month
20 MW - operation - new mexico - Jicarilla Solar 1 LLC -
66163
date: 2023-06
-> 2023-07 delayed by
1 month
20 MW - operation - new york - Willis Battery Storage -
63238
date: 2023-06
-> 2023-09 delayed by
3 months
20 MW - construction - california - Ortega Grid, LLC -
65656
date: 2023-08
-> 2023-11 delayed by
3 months
18 MW - operation - california - Edwards Sanborn S4 -
65677
date: 2023-06
-> 2023-07 delayed by
1 month
10 MW - construction - california - Hecate Energy Desert Storage 1 LLC -
65635
date: 2023-09
-> 2023-11 delayed by
2 months
10 MW - construction - california - Carris Storage I -
65733
date: 2023-09
-> 2023-11 delayed by
2 months
10 MW - operation - arizona - Mesquite Solar 4, LLC -
65962
date: 2023-06
-> 2023-12 delayed by
6 months
250 MW - operation - arizona - Sierra Estrella Energy Storage -
66334
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (T) Regulatory approvals received. Not under construction
230 MW - operation - california - Sunlight Storage II -
66575
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (T) Regulatory approvals received. Not under construction
185 MW - operation - hawaii - Kapolei Energy Storage -
66067
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
99 MW - construction - california - Lead BESS 1 -
66660
plant name: Hanford BESS
-> Lead BESS 1
99 MW - construction - california - Electrolyte BESS -
66661
plant name: Henrietta BESS
-> Electrolyte BESS
97 MW - construction - california - Acid BESS -
66659
plant name: Malaga BESS
-> Acid BESS
90 MW - construction - arizona - Superstition Energy Storage -
66333
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (T) Regulatory approvals received. Not under construction
40 MW - construction - california - Scarlet Solar (CA) -
64908
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
32 MW - construction - california - Lead BESS 2 -
66662
plant name: BIA BESS
-> Lead BESS 2
15 MW - planning - south carolina - Wolf Pit Branch Solar, LLC -
65437
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (L) Regulatory approvals pending. Not under construction
2023-07
New projects (21):
140 MW - cancelled - texas - Coati Solar, LLC -
66693
103 MW - construction - texas - Bright Arrow Solar, LLC -
66688
100 MW - operation - arizona - Saint Energy Storage II LLC -
66716
100 MW - construction - texas - Brazos Bend BESS, LLC -
66690
100 MW - planning - texas - Seven Flags BESS LLC -
66689
100 MW - planning - texas - Holly Branch Solar, LLC -
66692
99 MW - construction - california - Lead BESS 1 -
66660
99 MW - construction - california - Electrolyte BESS -
66661
97 MW - construction - california - Acid BESS -
66659
88 MW - operation - arizona - Storey Solar and Storage -
65956
125 MW - construction - california - Tumbleweed Energy Storage -
66666
70 MW - planning - california - Inland Empire Energy Storage -
66726
70 MW - planning - texas - Briggs Solar, LLC -
66691
125 MW - construction - california - Tumbleweed Energy Storage -
66666
40 MW - construction - florida - Lake Mabel Storage -
66641
40 MW - construction - florida - Wimauma Storage -
66640
32 MW - construction - california - Lead BESS 2 -
66662
25 MW - construction - california - West Ford Flat -
66669
20 MW - planning - new york - KCE NY 10, LLC -
66682
20 MW - planning - new york - Alfred Oaks Solar, LLC -
66675
20 MW - planning - new york - Cold Creek Solar -
66674
Disappeared projects (4):
350 MW - cancelled - texas - Tehuacana Creek 2 Solar and BESS -
65856
100 MW - cancelled - texas - TX18 Cottage Meadow Storage -
63879
100 MW - cancelled - texas - TX17 Nickel Prairie Storage -
63880
62 MW - cancelled - indiana - Peony Solar 1 -
66131
Updated projects (42):
240 MW - construction - california - Rexford Solar Farm -
64633
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
80 MW - operation - california - Sagebrush ESS -
65933
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
60 MW - operation - california - Goleta Energy Storage, LLC -
66394
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
50 MW - operation - new mexico - Buena Vista Energy Center -
66408
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (TS) Construction complete, but not yet in commercial operation
date: 2023-06
-> 2023-07 delayed by
1 month
40 MW - operation - california - Resurgence Solar II -
66620
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
20 MW - operation - new york - NY6 Battery -
65692
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
date: 2023-06
-> 2023-05 accelerated by
1 month
12 MW - operation - ohio - Bowling Green Energy Storage Project -
65951
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
date: 2023-06
-> 2023-05 accelerated by
1 month
418 MW - planning - texas - Tehuacana Creek 1 Solar and BESS -
65855
date: 2024-05
-> 2025-07 delayed by
14 months
mw: 350
-> 418
350 MW - planning - texas - Rowdy Creek Solar and BESS -
65854
date: 2024-05
-> 2025-05 delayed by
12 months
190 MW - operation - texas - Cunningham Storage -
65410
date: 2023-06
-> 2023-07 delayed by
1 month
185 MW - operation - hawaii - Kapolei Energy Storage -
66067
date: 2023-07
-> 2023-08 delayed by
1 month
150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid -
63172
date: 2023-05
-> 2023-06 delayed by
1 month
150 MW - operation - texas - Wolf Tank Storage -
66616
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2023-05
-> 2023-06 delayed by
1 month
149 MW - operation - california - Daggett 3 -
64852
date: 2023-09
-> 2023-06 accelerated by
3 months
131 MW - operation - california - CED West Side Canal Battery Storage -
65980
date: 2023-05
-> 2023-06 delayed by
1 month
131 MW - operation - california - Daggett 2 -
64851
date: 2023-11
-> 2023-09 accelerated by
2 months
117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) -
64197
date: 2023-10
-> 2023-08 accelerated by
2 months
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
date: 2023-06
-> 2023-08 delayed by
2 months
100 MW - operation - colorado - Thunder Wolf Energy Center Hybrid -
63776
date: 2023-05
-> 2023-06 delayed by
1 month
100 MW - operation - california - Edwards Sanborn E4 -
65675
date: 2023-06
-> 2023-07 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2023-07
-> 2023-09 delayed by
2 months
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2023-07
-> 2023-09 delayed by
2 months
100 MW - construction - texas - TX10 Hummingbird Storage -
65693
date: 2024-03
-> 2024-04 delayed by
1 month
100 MW - construction - texas - TX15 Limousin Oak Storage -
65698
date: 2024-03
-> 2024-04 delayed by
1 month
100 MW - planning - texas - TX 14 Venus Mill Storage -
65788
plant name: KCE TX 14: Venus Mill Storage
-> TX 14 Venus Mill Storage
date: 2024-07
-> 2025-12 delayed by
17 months
99 MW - construction - california - Noosa Energy Storage LLC -
64531
date: 2023-10
-> 2024-09 delayed by
11 months
63 MW - operation - texas - House Mountain -
66006
date: 2023-09
-> 2023-10 delayed by
1 month
50 MW - operation - texas - TX19 River Valley Storage 1 -
65699
date: 2023-05
-> 2023-07 delayed by
2 months
50 MW - operation - texas - TX21 River Valley Storage 2 -
65700
date: 2023-05
-> 2023-07 delayed by
2 months
20 MW - operation - new york - Willis Battery Storage -
63238
date: 2023-05
-> 2023-06 delayed by
1 month
20 MW - operation - new mexico - Jicarilla Solar 1 LLC -
66163
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2023-05
-> 2023-06 delayed by
1 month
169 MW - planning - new york - NY2 Battery -
63584
mw: 200
-> 169
75 MW - operation - california - Resurgence Solar -
64489
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
mw: 115
-> 75
20 MW - operation - new jersey - Andover Energy Storage Project -
65952
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
20 MW - operation - california - VESI Pomona -
50300
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
20 MW - operation - california - Melrose BESS -
66281
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
20 MW - operation - california - Melrose BESS -
66281
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
10 MW - operation - california - Pala Gomez Creek BESS -
66280
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
10 MW - operation - california - Boulevard Energy Storage -
66279
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
10 MW - operation - california - Clairemont Energy Storage -
66266
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
10 MW - operation - california - Elliott Energy Storage -
66278
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
10 MW - operation - california - Paradise Energy Storage -
66265
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2023-06
New projects (9):
260 MW - operation - arizona - Sonoran Solar Energy -
66627
150 MW - operation - texas - Wolf Tank Storage -
66616
150 MW - construction - arizona - McFarland B Solar and Storage -
66637
100 MW - operation - arizona - McFarland A Solar and Storage -
66636
100 MW - construction - california - Cald BESS -
66617
40 MW - operation - california - Resurgence Solar II -
66620
40 MW - planning - indiana - Vermillion Rise Solar -
65935
88 MW - construction - california - Chaparral Springs -
64864
13 MW - construction - california - Bear Canyon -
66650
Disappeared projects (1):
36 MW - cancelled - california - Willow Spring Solar 3, LLC -
60325
Updated projects (48):
162 MW - operation - california - Proxima -
66270
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
68 MW - operation - california - Stanton Battery Energy Storage -
66423
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
50 MW - cancelled - mississippi - OE_MS5 -
64529
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
50 MW - operation - mississippi - OE_MS6 -
65291
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
38 MW - operation - arizona - Foothills Solar Plant Hybrid -
57997
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
36 MW - operation - arizona - Gila Bend Hybrid -
59020
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
30 MW - operation - hawaii - AES Waikoloa Solar Hybrid -
63900
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
17 MW - operation - arizona - Cotton Center Solar Hybrid -
57561
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
17 MW - operation - arizona - Paloma Solar Hybrid -
57562
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
16 MW - operation - arizona - Hyder Solar Hybrid -
57563
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
14 MW - operation - arizona - Hyder II Hybrid -
58383
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
210 MW - operation - texas - Blue Jay Solar I, LLC -
64672
date: 2023-04
-> 2023-06 delayed by
2 months
190 MW - operation - texas - Cunningham Storage -
65410
date: 2023-05
-> 2023-06 delayed by
1 month
185 MW - operation - hawaii - Kapolei Energy Storage -
66067
date: 2023-06
-> 2023-07 delayed by
1 month
300 MW - planning - nevada - Southern Bighorn Solar Hybrid -
63113
date: 2024-04
-> 2026-05 delayed by
25 months
125 MW - operation - california - Oberon Solar Project -
65734
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2023-06
-> 2023-09 delayed by
3 months
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
date: 2023-04
-> 2023-06 delayed by
2 months
100 MW - operation - california - Edwards Sanborn E4 -
65675
date: 2023-04
-> 2023-06 delayed by
2 months
100 MW - cancelled - texas - Forest Grove - Dodd -
64131
date: 2024-03
-> 2025-10 delayed by
19 months
116 MW - construction - idaho - Hemmingway BESS -
66325
date: 2023-08
-> 2023-07 accelerated by
1 month
73 MW - operation - texas - Ranchland Wind Storage -
64545
date: 2023-05
-> 2023-06 delayed by
1 month
70 MW - planning - california - JVR Energy Park LLC -
64428
date: 2023-09
-> 2026-08 delayed by
35 months
65 MW - construction - california - San Jacinto Grid, LLC -
65657
date: 2023-06
-> 2023-09 delayed by
3 months
59 MW - operation - texas - Roseland Solar Project, LLC -
65028
date: 2023-05
-> 2023-06 delayed by
1 month
50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid -
62562
date: 2023-04
-> 2023-06 delayed by
2 months
50 MW - operation - texas - Roadrunner, LLC Hybrid -
62561
date: 2023-05
-> 2023-06 delayed by
1 month
50 MW - planning - montana - Beartooth Energy Storage LLC -
65407
date: 2024-04
-> 2027-12 delayed by
44 months
48 MW - operation - nevada - Yellow Pine Solar -
66357
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2023-06
-> 2023-07 delayed by
1 month
40 MW - construction - california - Scarlet Solar (CA) -
64908
date: 2023-12
-> 2024-03 delayed by
3 months
20 MW - operation - new jersey - Andover Energy Storage Project -
65952
date: 2023-04
-> 2023-06 delayed by
2 months
20 MW - construction - california - Ortega Grid, LLC -
65656
date: 2023-06
-> 2023-08 delayed by
2 months
20 MW - operation - california - VESI Pomona -
50300
date: 2023-06
-> 2023-10 delayed by
4 months
18 MW - operation - california - Edwards Sanborn S4 -
65677
date: 2023-04
-> 2023-06 delayed by
2 months
12 MW - operation - ohio - Bowling Green Energy Storage Project -
65951
date: 2023-04
-> 2023-06 delayed by
2 months
10 MW - operation - california - BCE Los Alamitos 1 -
66533
date: 2023-07
-> 2023-08 delayed by
1 month
10 MW - operation - california - BCE Los Alamitos 2 -
66532
date: 2023-07
-> 2023-08 delayed by
1 month
10 MW - construction - california - Sierra Energy Storage, LLC -
61803
date: 2023-06
-> 2023-09 delayed by
3 months
10 MW - planning - texas - Grizzly Ridge Solar -
66410
date: 2023-04
-> 2024-02 delayed by
10 months
750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid -
260
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
240 MW - construction - california - Rexford Solar Farm -
64633
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (T) Regulatory approvals received. Not under construction
259 MW - construction - texas - Five Wells Solar Center - Hybrid -
66420
entity id: 65502
-> 65507
entity name: Five Wells Solar Center, LLC
-> Chesapeake Solar Project, LLC
150 MW - operation - texas - Revolution -
66170
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
136 MW - operation - california - Arica Solar -
65744
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
131 MW - operation - california - CED West Side Canal Battery Storage -
65980
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
125 MW - operation - california - Oberon II Solar Project -
65735
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
99 MW - construction - california - Noosa Energy Storage LLC -
64531
entity id: 64164
-> 63883
entity name: Noosa Energy Storage LLC
-> Broad Reach Power
75 MW - operation - nevada - Arrow Canyon Solar Hybrid -
62248
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
50 MW - operation - california - Victory Pass -
65743
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2023-05
New projects (11):
230 MW - operation - california - Sunlight Storage II -
66575
175 MW - construction - maine - Cross Town Energy Storage -
66606
150 MW - planning - illinois - Grey Fox Wind -
65939
100 MW - construction - new mexico - San Juan Solar I -
66574
50 MW - planning - texas - Peeler Solar, LLC -
65932
75 MW - construction - california - Baldy Mesa Solar & Storage -
66598
75 MW - planning - ohio - Springwater Solar, LLC -
65900
50 MW - construction - tennessee - Ridgely Energy Farm -
65445
40 MW - planning - illinois - Mulligan Solar, LLC -
65349
10 MW - operation - california - BCE Los Alamitos 1 -
66533
10 MW - operation - california - BCE Los Alamitos 2 -
66532
Updated projects (60):
132 MW - operation - california - North Central Valley -
66208
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
100 MW - operation - texas - Ignacio Grid Energy Storage System -
64089
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
100 MW - operation - texas - Madero Grid -
63757
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
40 MW - operation - california - Fallbrook Energy Storage -
61365
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
16 MW - operation - texas - Cameron Wind 1 LLC -
59118
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
20 MW - construction - california - Ortega Grid, LLC -
65656
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
20 MW - construction - tennessee - Vonore Battery Energy Storage System -
64255
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
date: 2023-08
-> 2023-12 delayed by
4 months
11 MW - operation - north carolina - Camp Lejeune Solar and Energy Storage -
59966
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
date: 2023-04
-> 2023-03 accelerated by
1 month
10 MW - construction - california - Hecate Energy Desert Storage 1 LLC -
65635
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
10 MW - construction - california - Carris Storage I -
65733
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
621 MW - planning - texas - Lunis Creek Solar and BESS SLF -
65852
date: 2024-03
-> 2024-12 delayed by
9 months
600 MW - planning - texas - Clear Fork Creek Solar and BESS SLF -
65842
date: 2024-03
-> 2025-12 delayed by
21 months
325 MW - operation - california - Desert Peak Energy Storage I -
65987
date: 2023-06
-> 2023-07 delayed by
1 month
299 MW - planning - new york - NISA Electric Generation Project -
61331
entity name: NYC ENERGY LLC
-> NYC Energy LLC
date: 2025-07
-> 2026-03 delayed by
8 months
210 MW - operation - texas - Blue Jay Solar I, LLC -
64672
date: 2023-03
-> 2023-04 delayed by
1 month
162 MW - operation - california - Proxima -
66270
date: 2023-09
-> 2023-10 delayed by
1 month
150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid -
63172
date: 2023-04
-> 2023-05 delayed by
1 month
150 MW - construction - california - Eland Solar & Storage Center, Phase 1 Hybrid -
61168
date: 2024-03
-> 2024-11 delayed by
8 months
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
date: 2023-03
-> 2023-04 delayed by
1 month
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
date: 2023-04
-> 2023-06 delayed by
2 months
224 MW - construction - california - Anode (Springville) BESS -
65458
date: 2023-05
-> 2023-11 delayed by
6 months
224 MW - construction - california - Anode (Springville) BESS -
65458
date: 2023-05
-> 2023-11 delayed by
6 months
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2023-06
-> 2023-07 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2023-06
-> 2023-07 delayed by
1 month
299 MW - planning - new york - NISA Electric Generation Project -
61331
entity name: NYC ENERGY LLC
-> NYC Energy LLC
date: 2024-03
-> 2026-03 delayed by
24 months
75 MW - operation - california - Desert Peak Energy Storage II -
65988
date: 2023-06
-> 2023-07 delayed by
1 month
63 MW - operation - texas - House Mountain -
66006
date: 2023-07
-> 2023-09 delayed by
2 months
60 MW - operation - california - Goleta Energy Storage, LLC -
66394
status_verbose: (T) Regulatory approvals received. Not under construction
-> (L) Regulatory approvals pending. Not under construction
date: 2023-04
-> 2023-10 delayed by
6 months
60 MW - operation - hawaii - AES Maui Kuihelani Solar Hybrid -
64256
date: 2023-10
-> 2023-12 delayed by
2 months
59 MW - operation - texas - Roseland Solar Project, LLC -
65028
date: 2023-03
-> 2023-05 delayed by
2 months
88 MW - construction - california - Chaparral Springs -
64864
date: 2023-09
-> 2023-12 delayed by
3 months
50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid -
62562
date: 2023-03
-> 2023-04 delayed by
1 month
50 MW - operation - texas - TX19 River Valley Storage 1 -
65699
date: 2023-03
-> 2023-05 delayed by
2 months
50 MW - operation - texas - TX21 River Valley Storage 2 -
65700
date: 2023-03
-> 2023-05 delayed by
2 months
50 MW - operation - texas - Roadrunner, LLC Hybrid -
62561
date: 2023-03
-> 2023-05 delayed by
2 months
125 MW - planning - california - Aratina Solar Center 1 Hybrid -
61167
date: 2023-12
-> 2025-06 delayed by
18 months
38 MW - operation - arizona - Foothills Solar Plant Hybrid -
57997
date: 2023-03
-> 2023-04 delayed by
1 month
36 MW - operation - arizona - Gila Bend Hybrid -
59020
date: 2023-03
-> 2023-04 delayed by
1 month
30 MW - construction - california - Santa Paula Energy Storage LLC -
65397
date: 2023-03
-> 2023-09 delayed by
6 months
20 MW - operation - new jersey - Andover Energy Storage Project -
65952
date: 2023-03
-> 2023-04 delayed by
1 month
20 MW - operation - new york - Willis Battery Storage -
63238
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2023-03
-> 2023-05 delayed by
2 months
20 MW - operation - new mexico - Jicarilla Solar 1 LLC -
66163
date: 2023-03
-> 2023-05 delayed by
2 months
20 MW - operation - california - VESI Pomona -
50300
date: 2023-05
-> 2023-06 delayed by
1 month
20 MW - operation - virginia - Dry Bridge Storage -
65044
date: 2023-04
-> 2023-09 delayed by
5 months
17 MW - operation - arizona - Cotton Center Solar Hybrid -
57561
date: 2023-03
-> 2023-04 delayed by
1 month
17 MW - operation - arizona - Paloma Solar Hybrid -
57562
date: 2023-03
-> 2023-04 delayed by
1 month
16 MW - operation - arizona - Hyder Solar Hybrid -
57563
date: 2023-03
-> 2023-04 delayed by
1 month
14 MW - operation - arizona - Hyder II Hybrid -
58383
date: 2023-03
-> 2023-04 delayed by
1 month
12 MW - operation - ohio - Bowling Green Energy Storage Project -
65951
date: 2023-03
-> 2023-04 delayed by
1 month
12 MW - operation - hawaii - AES West Oahu Solar Hybrid -
64656
date: 2023-06
-> 2023-09 delayed by
3 months
10 MW - construction - california - Painter Energy Storage -
62729
date: 2023-08
-> 2023-10 delayed by
2 months
675 MW - construction - california - Menifee Power Bank -
66494
entity name: Menifee Power Bank
-> Nova Power, LLC
plant name: Nova Power
-> Menifee Power Bank
675 MW - construction - california - Menifee Power Bank -
66494
entity name: Menifee Power Bank
-> Nova Power, LLC
plant name: Nova Power
-> Menifee Power Bank
117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) -
64197
entity name: RWE Renewables Americas LLC
-> RWE Renewables Americas, LLC
100 MW - construction - california - Beaumont BESS -
66461
entity id: 64287
-> 65552
entity name: Terra-Gen Operating Co-BESS
-> Terra-Gen Operating Co-BESS 2
80 MW - operation - california - Sagebrush ESS -
65933
entity id: 64287
-> 65552
entity name: Terra-Gen Operating Co-BESS
-> Terra-Gen Operating Co-BESS 2
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
entity name: RWE Renewables Americas LLC
-> RWE Renewables Americas, LLC
80 MW - construction - california - Placerita ESS -
66462
entity id: 64287
-> 65552
entity name: Terra-Gen Operating Co-BESS
-> Terra-Gen Operating Co-BESS 2
675 MW - construction - california - Menifee Power Bank -
66494
entity name: Menifee Power Bank
-> Nova Power, LLC
plant name: Nova Power
-> Menifee Power Bank
48 MW - operation - nevada - Yellow Pine Solar -
66357
mw: 26
-> 48
2023-04
New projects (18):
500 MW - planning - texas - Hecate Energy Ramsey Storage -
66414
306 MW - planning - texas - Ash Creek BESS -
66391
259 MW - construction - texas - Five Wells Solar Center - Hybrid -
66420
255 MW - planning - texas - Hecate Grid East Valley Storage -
66411
675 MW - construction - california - Menifee Power Bank -
66494
675 MW - construction - california - Menifee Power Bank -
66494
200 MW - planning - texas - OCI Hillsboro -
66401
150 MW - planning - georgia - Aragon Energy Storage -
66431
135 MW - planning - california - Hecate Grid Gwent Storage 1 -
66409
100 MW - construction - california - Beaumont BESS -
66461
100 MW - planning - texas - Bexar ESS -
66400
80 MW - construction - california - Placerita ESS -
66462
68 MW - operation - california - Stanton Battery Energy Storage -
66423
60 MW - operation - california - Goleta Energy Storage, LLC -
66394
50 MW - operation - new mexico - Buena Vista Energy Center -
66408
675 MW - construction - california - Menifee Power Bank -
66494
50 MW - planning - texas - MRG Goody Solar Project Hybrid -
66390
10 MW - planning - texas - Grizzly Ridge Solar -
66410
Disappeared projects (3):
95 MW - cancelled - california - Sandrini Solar 100 -
65664
50 MW - construction - tennessee - Ridgely Energy Farm -
65445
22 MW - cancelled - california - Camino Solar -
63508
Updated projects (59):
150 MW - construction - california - Desert Quartzite -
59871
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
50 MW - operation - arizona - El Sol BESS -
62964
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
40 MW - construction - california - Scarlet Solar (CA) -
64908
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
36 MW - cancelled - california - Willow Spring Solar 3, LLC -
60325
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
17 MW - operation - florida - Lake Placid Solar Power Plant -
62541
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
10 MW - operation - arizona - Desert Star Hybrid -
59444
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
20 MW - operation - california - Melrose BESS -
66281
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
20 MW - operation - california - Melrose BESS -
66281
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
10 MW - operation - california - Pala Gomez Creek BESS -
66280
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
10 MW - operation - california - Boulevard Energy Storage -
66279
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
10 MW - operation - california - Clairemont Energy Storage -
66266
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
10 MW - operation - california - Elliott Energy Storage -
66278
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
10 MW - operation - california - Paradise Energy Storage -
66265
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
250 MW - construction - texas - Zeya -
65880
date: 2024-04
-> 2024-12 delayed by
8 months
210 MW - operation - texas - Blue Jay Solar I, LLC -
64672
date: 2023-02
-> 2023-03 delayed by
1 month
200 MW - construction - texas - Hydra -
65490
date: 2023-11
-> 2023-12 delayed by
1 month
200 MW - construction - texas - Dickens -
65489
date: 2023-12
-> 2024-02 delayed by
2 months
200 MW - construction - texas - Paleo -
65491
date: 2023-12
-> 2024-02 delayed by
2 months
200 MW - construction - texas - Cachi -
65861
date: 2024-03
-> 2024-12 delayed by
9 months
200 MW - construction - texas - Castor -
65870
date: 2024-05
-> 2024-12 delayed by
7 months
200 MW - construction - texas - Desna -
65876
date: 2024-06
-> 2024-12 delayed by
6 months
190 MW - operation - texas - Cunningham Storage -
65410
entity id: 64757
-> 57416
entity name: BT Cunningham Storage, LLC
-> Acciona Energy USA Global, LLC
date: 2023-03
-> 2023-05 delayed by
2 months
175 MW - construction - texas - Pavo -
65492
date: 2023-11
-> 2023-12 delayed by
1 month
160 MW - construction - texas - Avila -
65860
date: 2024-02
-> 2024-12 delayed by
10 months
150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid -
63172
date: 2023-02
-> 2023-04 delayed by
2 months
131 MW - operation - california - CED West Side Canal Battery Storage -
65980
date: 2023-02
-> 2023-05 delayed by
3 months
117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) -
64197
date: 2023-09
-> 2023-10 delayed by
1 month
75 MW - operation - california - Resurgence Solar -
64489
date: 2023-05
-> 2023-07 delayed by
2 months
100 MW - operation - texas - Ignacio Grid Energy Storage System -
64089
date: 2023-02
-> 2023-03 delayed by
1 month
100 MW - operation - texas - Madero Grid -
63757
date: 2023-02
-> 2023-03 delayed by
1 month
100 MW - operation - california - Edwards Sanborn E4 -
65675
date: 2023-07
-> 2023-04 accelerated by
3 months
mw: 109
-> 100
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2023-05
-> 2023-06 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2023-05
-> 2023-06 delayed by
1 month
80 MW - operation - california - Sagebrush ESS -
65933
entity id: 65106
-> 64287
entity name: Sagebrush ESS, LLC
-> Terra-Gen Operating Co-BESS
date: 2023-03
-> 2023-05 delayed by
2 months
116 MW - construction - idaho - Hemmingway BESS -
66325
date: 2023-06
-> 2023-08 delayed by
2 months
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
date: 2023-10
-> 2023-12 delayed by
2 months
75 MW - operation - nevada - Arrow Canyon Solar Hybrid -
62248
date: 2023-06
-> 2023-08 delayed by
2 months
59 MW - operation - texas - Roseland Solar Project, LLC -
65028
date: 2023-02
-> 2023-03 delayed by
1 month
50 MW - construction - texas - Tortolas -
65493
date: 2023-09
-> 2023-12 delayed by
3 months
40 MW - construction - idaho - Black Mesa BESS -
66326
date: 2023-06
-> 2023-09 delayed by
3 months
36 MW - operation - arizona - Gila Bend Hybrid -
59020
date: 2023-02
-> 2023-03 delayed by
1 month
30 MW - operation - hawaii - AES Waikoloa Solar Hybrid -
63900
date: 2023-02
-> 2023-04 delayed by
2 months
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
date: 2023-04
-> 2023-07 delayed by
3 months
17 MW - operation - arizona - Cotton Center Solar Hybrid -
57561
date: 2023-02
-> 2023-03 delayed by
1 month
17 MW - operation - arizona - Paloma Solar Hybrid -
57562
date: 2023-02
-> 2023-03 delayed by
1 month
16 MW - operation - arizona - Hyder Solar Hybrid -
57563
date: 2023-02
-> 2023-03 delayed by
1 month
15 MW - planning - california - Black Walnut Energy Storage LLC -
65396
date: 2023-12
-> 2025-06 delayed by
18 months
14 MW - operation - arizona - Hyder II Hybrid -
58383
date: 2023-02
-> 2023-03 delayed by
1 month
14 MW - planning - california - Homestead Energy Storage LLC -
65398
date: 2024-02
-> 2026-06 delayed by
28 months
12 MW - operation - ohio - Bowling Green Energy Storage Project -
65951
date: 2023-02
-> 2023-03 delayed by
1 month
10 MW - construction - california - Painter Energy Storage -
62729
date: 2023-06
-> 2023-08 delayed by
2 months
750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid -
260
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
169 MW - operation - california - Sanborn BESS 3 -
65672
mw: 175
-> 169
136 MW - operation - california - Edwards Sanborn E1B -
65674
mw: 140
-> 136
131 MW - operation - california - Daggett 2 -
64851
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
47 MW - operation - california - Sanborn BESS 4 -
65673
mw: 57
-> 47
47 MW - operation - california - Edwards Sanborn E5 -
65676
mw: 75
-> 47
18 MW - operation - california - Edwards Sanborn S4 -
65677
mw: 20
-> 18
11 MW - operation - north carolina - Camp Lejeune Solar and Energy Storage -
59966
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2023-03
New projects (40):
260 MW - planning - texas - OCI SunRoper -
65893
250 MW - operation - arizona - Sierra Estrella Energy Storage -
66334
225 MW - operation - california - Solar Blue -
63848
200 MW - operation - california - Condor Energy Storage LLC -
66285
200 MW - planning - california - Peregrine Energy Storage LLC -
66286
200 MW - planning - texas - Tidwell Prairie Storage 1 -
66337
162 MW - operation - california - Proxima -
66270
150 MW - planning - texas - Alamo 7 BESS 1 -
66297
150 MW - planning - texas - Alamo 7 BESS 2 -
66298
150 MW - planning - texas - Crane 2 BESS 2 -
66300
150 MW - planning - texas - Upton BESS 2 -
66303
150 MW - planning - texas - Uvalde 2 BESS 2 -
66305
150 MW - planning - texas - Peregrine BESS 1 -
66301
150 MW - planning - texas - Peregrine BESS 2 -
66302
135 MW - operation - california - Chestnut -
63849
100 MW - operation - texas - St. Gall Energy Storage I -
66336
100 MW - planning - texas - Alamo 3 BESS 2 -
66293
100 MW - planning - texas - Alamo 4 BESS -
66294
100 MW - planning - texas - Alamo 5 BESS 1 -
66295
100 MW - planning - texas - Alamo 5 BESS 2 -
66296
100 MW - construction - texas - Callisto I Energy Center -
66338
100 MW - cancelled - texas - TX18 Cottage Meadow Storage -
63879
100 MW - cancelled - texas - TX17 Nickel Prairie Storage -
63880
90 MW - construction - arizona - Superstition Energy Storage -
66333
116 MW - construction - idaho - Hemmingway BESS -
66325
76 MW - planning - texas - Gaia Hybrid -
66342
75 MW - planning - texas - Uvalde 2 BESS 1 -
66304
61 MW - planning - texas - Eagle Springs Hybrid -
66341
50 MW - construction - tennessee - Ridgely Energy Farm -
65445
40 MW - construction - idaho - Black Mesa BESS -
66326
48 MW - operation - nevada - Yellow Pine Solar -
66357
20 MW - operation - california - VESI Pomona -
50300
17 MW - planning - virginia - Powells Creek Solar - Hybrid -
65305
12 MW - planning - ohio - Salt City Solar Project - Hybrid -
65302
12 MW - planning - virginia - Sunnybrook Solar Project - Hybrid -
65307
20 MW - operation - california - Melrose BESS -
66281
20 MW - operation - california - Melrose BESS -
66281
10 MW - operation - california - Pala Gomez Creek BESS -
66280
10 MW - operation - california - Boulevard Energy Storage -
66279
10 MW - operation - california - Elliott Energy Storage -
66278
Disappeared projects (3):
280 MW - cancelled - nevada - Hot Pot Solar -
65419
100 MW - cancelled - montana - Haymaker Hybrid -
63878
25 MW - cancelled - colorado - Pike Solar Hybrid -
64212
Updated projects (54):
325 MW - operation - california - Desert Peak Energy Storage I -
65987
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
200 MW - construction - texas - Hydra -
65490
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
date: 2023-06
-> 2023-11 delayed by
5 months
200 MW - construction - texas - Dickens -
65489
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
date: 2023-06
-> 2023-12 delayed by
6 months
200 MW - construction - texas - Paleo -
65491
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
date: 2023-06
-> 2023-12 delayed by
6 months
175 MW - construction - texas - Pavo -
65492
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
date: 2023-06
-> 2023-11 delayed by
5 months
75 MW - operation - california - Resurgence Solar -
64489
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
75 MW - operation - california - Desert Peak Energy Storage II -
65988
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
75 MW - construction - california - Hummingbird Energy Storage LLC -
65395
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
50 MW - construction - texas - Tortolas -
65493
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
date: 2023-06
-> 2023-09 delayed by
3 months
36 MW - operation - hawaii - Waiawa Solar Power Hybrid -
65058
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
650 MW - planning - new york - Swiftsure -
64235
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (P) Planned for installation, but regulatory approvals not initiated
date: 2025-12
-> 2026-06 delayed by
6 months
300 MW - planning - arizona - Atlas -
63798
date: 2023-12
-> 2024-12 delayed by
12 months
300 MW - planning - california - Humidor Storage I -
65703
date: 2024-01
-> 2025-06 delayed by
17 months
300 MW - planning - arizona - Red Antelope Solar & Energy Storage Farm -
64208
date: 2024-11
-> 2027-05 delayed by
30 months
210 MW - operation - texas - Blue Jay Solar I, LLC -
64672
date: 2023-01
-> 2023-02 delayed by
1 month
200 MW - planning - california - Big Rock Solar Farm -
64636
date: 2023-12
-> 2024-12 delayed by
12 months
190 MW - operation - texas - Cunningham Storage -
65410
date: 2023-02
-> 2023-03 delayed by
1 month
150 MW - construction - texas - Carina -
65589
date: 2023-10
-> 2024-06 delayed by
8 months
150 MW - operation - california - Vikings Energy Farm -
65711
date: 2023-12
-> 2024-08 delayed by
8 months
150 MW - construction - massachusetts - Cranberry Point Energy Storage -
62844
date: 2024-06
-> 2025-05 delayed by
11 months
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
date: 2023-01
-> 2023-03 delayed by
2 months
100 MW - construction - texas - TX10 Hummingbird Storage -
65693
date: 2024-01
-> 2024-03 delayed by
2 months
100 MW - construction - texas - TX15 Limousin Oak Storage -
65698
date: 2024-01
-> 2024-03 delayed by
2 months
100 MW - planning - new york - Clermont -
64236
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (P) Planned for installation, but regulatory approvals not initiated
date: 2024-12
-> 2026-12 delayed by
24 months
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
date: 2023-09
-> 2023-10 delayed by
1 month
80 MW - planning - california - Chiquito Grid, LLC -
65655
date: 2024-12
-> 2025-12 delayed by
12 months
73 MW - operation - texas - Ranchland Wind Storage -
64545
date: 2023-01
-> 2023-05 delayed by
4 months
70 MW - construction - texas - Antlia -
65588
date: 2023-10
-> 2024-06 delayed by
8 months
63 MW - operation - texas - House Mountain -
66006
date: 2023-05
-> 2023-07 delayed by
2 months
61 MW - cancelled - texas - Talitha Energy Project, LLC -
65891
date: 2024-06
-> 2024-10 delayed by
4 months
61 MW - planning - texas - Oriana Solar LLC -
65849
date: 2024-06
-> 2024-12 delayed by
6 months
59 MW - operation - texas - Roseland Solar Project, LLC -
65028
date: 2023-01
-> 2023-02 delayed by
1 month
50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid -
62562
date: 2023-01
-> 2023-03 delayed by
2 months
50 MW - operation - texas - Roadrunner, LLC Hybrid -
62561
date: 2023-01
-> 2023-03 delayed by
2 months
40 MW - operation - california - Fallbrook Energy Storage -
61365
date: 2023-01
-> 2023-03 delayed by
2 months
40 MW - construction - california - Scarlet Solar (CA) -
64908
date: 2024-12
-> 2023-12 accelerated by
12 months
30 MW - construction - montana - Beaver Creek Wind Facility -
65019
date: 2024-12
-> 2025-09 delayed by
9 months
30 MW - construction - montana - Beaver Creek IV -
65023
date: 2024-12
-> 2025-09 delayed by
9 months
30 MW - planning - new mexico - Rockmont Solar and Storage Project -
64216
date: 2024-04
-> 2026-06 delayed by
26 months
16 MW - operation - texas - Cameron Wind 1 LLC -
59118
date: 2023-06
-> 2023-08 delayed by
2 months
20 MW - operation - new jersey - Andover Energy Storage Project -
65952
date: 2023-02
-> 2023-03 delayed by
1 month
20 MW - operation - new york - NY6 Battery -
65692
date: 2023-05
-> 2023-06 delayed by
1 month
20 MW - construction - montana - Beaver Creek II -
65020
date: 2024-12
-> 2025-05 delayed by
5 months
20 MW - construction - montana - Beaver Creek III -
65021
date: 2024-12
-> 2025-05 delayed by
5 months
17 MW - operation - florida - Lake Placid Solar Power Plant -
62541
date: 2023-01
-> 2023-02 delayed by
1 month
12 MW - operation - ohio - Bowling Green Energy Storage Project -
65951
date: 2023-01
-> 2023-02 delayed by
1 month
10 MW - construction - california - Sierra Energy Storage, LLC -
61803
date: 2023-03
-> 2023-06 delayed by
3 months
10 MW - construction - california - Painter Energy Storage -
62729
date: 2023-04
-> 2023-06 delayed by
2 months
300 MW - planning - texas - Elio Energy LLC -
65850
mw: 80
-> 300
125 MW - operation - colorado - Neptune Energy Center Hybrid -
63731
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
100 MW - operation - colorado - Thunder Wolf Energy Center Hybrid -
63776
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
60 MW - operation - arizona - Mesquite Solar 5, LLC -
65963
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
12 MW - operation - hawaii - AES West Oahu Solar Hybrid -
64656
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
10 MW - operation - arizona - Mesquite Solar 4, LLC -
65962
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2023-02
New projects (13):
230 MW - operation - california - Sunlight Storage -
65857
203 MW - operation - texas - Crossett Power Management LLC -
66009
150 MW - operation - texas - Revolution -
66170
132 MW - operation - california - North Central Valley -
66208
101 MW - operation - texas - Flower Valley II -
66007
101 MW - operation - texas - Swoose II -
66008
100 MW - planning - texas - Yaupon Solar Project (Hybrid) -
66216
100 MW - planning - california - Buena Vista Energy LLC -
56446
58 MW - planning - utah - Parowan Solar -
65823
20 MW - operation - new mexico - Jicarilla Solar 1 LLC -
66163
20 MW - planning - texas - Barilla Solar -
58710
10 MW - operation - california - Clairemont Energy Storage -
66266
10 MW - operation - california - Paradise Energy Storage -
66265
Disappeared projects (1):
200 MW - cancelled - nevada - Iron Point Solar (Hybrid) -
65377
Updated projects (51):
112 MW - operation - california - Blythe Mesa Solar II -
65053
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
100 MW - operation - nevada - Dry Lake Solar Energy Center -
63933
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
63 MW - operation - texas - House Mountain -
66006
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
50 MW - operation - texas - TX13 Endurance Park Storage -
65696
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
50 MW - operation - texas - TX23 Roughneck Storage -
65701
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
40 MW - operation - california - BigBeau Solar, LLC -
64993
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
15 MW - planning - south carolina - Wolf Pit Branch Solar, LLC -
65437
status: construction
-> planning
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (P) Planned for installation, but regulatory approvals not initiated
169 MW - planning - new york - NY2 Battery -
63584
date: 2023-06
-> 2024-06 delayed by
12 months
252 MW - planning - oklahoma - Skeleton Creek Energy Center Hybrid -
62494
date: 2023-12
-> 2025-12 delayed by
24 months
185 MW - operation - hawaii - Kapolei Energy Storage -
66067
date: 2023-05
-> 2023-06 delayed by
1 month
180 MW - cancelled - nevada - Chuckwalla Solar, LLC -
64558
date: 2023-12
-> 2025-12 delayed by
24 months
136 MW - operation - california - Arica Solar -
65744
date: 2023-12
-> 2023-11 accelerated by
1 month
126 MW - construction - california - AVEP BESS -
65591
date: 2023-05
-> 2024-06 delayed by
13 months
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
date: 2023-03
-> 2023-04 delayed by
1 month
224 MW - construction - california - Anode (Springville) BESS -
65458
date: 2023-04
-> 2023-05 delayed by
1 month
224 MW - construction - california - Anode (Springville) BESS -
65458
date: 2023-04
-> 2023-05 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2023-04
-> 2023-05 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2023-04
-> 2023-05 delayed by
1 month
80 MW - operation - california - Sagebrush ESS -
65933
date: 2023-01
-> 2023-03 delayed by
2 months
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
date: 2023-08
-> 2023-09 delayed by
1 month
80 MW - planning - california - Chiquito Grid, LLC -
65655
date: 2023-12
-> 2024-12 delayed by
12 months
75 MW - cancelled - wisconsin - Darien Solar -
64534
date: 2023-12
-> 2024-11 delayed by
11 months
65 MW - construction - california - San Jacinto Grid, LLC -
65657
date: 2023-05
-> 2023-06 delayed by
1 month
43 MW - planning - california - Dynegy Oakland Power Plant -
6211
date: 2023-12
-> 2024-11 delayed by
11 months
40 MW - construction - california - Scarlet Solar (CA) -
64908
date: 2023-08
-> 2024-12 delayed by
16 months
40 MW - planning - california - EDPR CA Solar Park VI LLC (CA) Hybrid -
62892
date: 2023-12
-> 2024-12 delayed by
12 months
38 MW - operation - arizona - Foothills Solar Plant Hybrid -
57997
date: 2022-12
-> 2023-03 delayed by
3 months
36 MW - operation - hawaii - Waiawa Solar Power Hybrid -
65058
date: 2022-12
-> 2023-01 delayed by
1 month
36 MW - operation - arizona - Gila Bend Hybrid -
59020
date: 2022-12
-> 2023-02 delayed by
2 months
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
date: 2023-03
-> 2023-04 delayed by
1 month
20 MW - operation - new york - Willis Battery Storage -
63238
date: 2023-02
-> 2023-03 delayed by
1 month
20 MW - operation - virginia - Dry Bridge Storage -
65044
entity name: Dominion Energy Inc
-> Dominion Energy Inc.
date: 2022-12
-> 2023-04 delayed by
4 months
20 MW - operation - new york - NY6 Battery -
65692
date: 2023-02
-> 2023-05 delayed by
3 months
20 MW - construction - california - Ortega Grid, LLC -
65656
date: 2023-03
-> 2023-06 delayed by
3 months
17 MW - operation - florida - Lake Placid Solar Power Plant -
62541
date: 2022-12
-> 2023-01 delayed by
1 month
17 MW - operation - arizona - Cotton Center Solar Hybrid -
57561
date: 2022-12
-> 2023-02 delayed by
2 months
17 MW - operation - arizona - Paloma Solar Hybrid -
57562
date: 2022-12
-> 2023-02 delayed by
2 months
16 MW - operation - arizona - Hyder Solar Hybrid -
57563
date: 2022-12
-> 2023-02 delayed by
2 months
14 MW - operation - arizona - Hyder II Hybrid -
58383
date: 2022-12
-> 2023-02 delayed by
2 months
12 MW - operation - ohio - Bowling Green Energy Storage Project -
65951
date: 2023-02
-> 2023-01 accelerated by
1 month
22 MW - cancelled - california - Camino Solar -
63508
date: 2023-12
-> 2024-12 delayed by
12 months
10 MW - operation - arizona - Desert Star Hybrid -
59444
date: 2022-12
-> 2023-02 delayed by
2 months
10 MW - construction - california - Sierra Energy Storage, LLC -
61803
date: 2023-02
-> 2023-03 delayed by
1 month
10 MW - construction - california - Painter Energy Storage -
62729
date: 2023-03
-> 2023-04 delayed by
1 month
10 MW - construction - california - Hecate Energy Desert Storage 1 LLC -
65635
date: 2023-05
-> 2023-09 delayed by
4 months
10 MW - construction - california - Carris Storage I -
65733
date: 2023-05
-> 2023-09 delayed by
4 months
150 MW - operation - california - Vikings Energy Farm -
65711
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (T) Regulatory approvals received. Not under construction
131 MW - operation - california - CED West Side Canal Battery Storage -
65980
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
75 MW - construction - california - Hummingbird Energy Storage LLC -
65395
status_verbose: (T) Regulatory approvals received. Not under construction
-> (L) Regulatory approvals pending. Not under construction
50 MW - planning - virginia - Dulles Solar and Storage -
65043
entity name: Dominion Energy Inc
-> Dominion Energy Inc.
15 MW - planning - california - Black Walnut Energy Storage LLC -
65396
status_verbose: (T) Regulatory approvals received. Not under construction
-> (L) Regulatory approvals pending. Not under construction
2023-01
New projects (4):
185 MW - operation - hawaii - Kapolei Energy Storage -
66067
75 MW - cancelled - texas - Trinity River Solar 1 -
66132
62 MW - cancelled - indiana - Peony Solar 1 -
66131
40 MW - operation - texas - Zier Solar -
66137
Updated projects (33):
131 MW - operation - california - Daggett 2 -
64851
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
50 MW - operation - texas - Byrd Ranch Storage -
65259
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid -
63728
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - virginia - Danville BESS 1 -
65499
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
500 MW - planning - california - Bellefield Solar and Energy Storage Farm -
64210
date: 2024-11
-> 2025-12 delayed by
13 months
500 MW - planning - california - Bellefield 2 Solar & Energy Storage Farm -
64209
date: 2024-12
-> 2026-11 delayed by
23 months
300 MW - planning - california - Humidor Storage I -
65703
date: 2023-11
-> 2024-01 delayed by
2 months
210 MW - operation - texas - Blue Jay Solar I, LLC -
64672
date: 2022-12
-> 2023-01 delayed by
1 month
150 MW - construction - california - Eland Solar & Storage Center, Phase 1 Hybrid -
61168
date: 2023-11
-> 2024-03 delayed by
4 months
150 MW - planning - california - Eland Solar & Storage Center, Phase 2 Hybrid -
61169
date: 2023-11
-> 2024-11 delayed by
12 months
136 MW - operation - california - Edwards Sanborn E1B -
65674
date: 2023-09
-> 2023-10 delayed by
1 month
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
date: 2022-12
-> 2023-01 delayed by
1 month
112 MW - operation - california - Blythe Mesa Solar II -
65053
date: 2022-11
-> 2022-12 delayed by
1 month
100 MW - operation - california - Edwards Sanborn E4 -
65675
date: 2023-04
-> 2023-07 delayed by
3 months
100 MW - operation - texas - Ignacio Grid Energy Storage System -
64089
date: 2022-12
-> 2023-02 delayed by
2 months
100 MW - operation - texas - Madero Grid -
63757
date: 2022-12
-> 2023-02 delayed by
2 months
100 MW - construction - texas - TX10 Hummingbird Storage -
65693
date: 2023-08
-> 2024-01 delayed by
5 months
100 MW - construction - texas - TX15 Limousin Oak Storage -
65698
date: 2023-10
-> 2024-01 delayed by
3 months
63 MW - operation - texas - House Mountain -
66006
date: 2023-04
-> 2023-05 delayed by
1 month
59 MW - operation - texas - Roseland Solar Project, LLC -
65028
date: 2022-12
-> 2023-01 delayed by
1 month
47 MW - operation - california - Sanborn BESS 4 -
65673
date: 2023-06
-> 2023-08 delayed by
2 months
50 MW - operation - texas - TX23 Roughneck Storage -
65701
date: 2022-11
-> 2022-12 delayed by
1 month
50 MW - operation - arizona - El Sol BESS -
62964
date: 2022-12
-> 2023-02 delayed by
2 months
40 MW - operation - california - Fallbrook Energy Storage -
61365
date: 2022-12
-> 2023-01 delayed by
1 month
30 MW - construction - california - Santa Paula Energy Storage LLC -
65397
date: 2022-11
-> 2023-03 delayed by
4 months
20 MW - operation - new york - Willis Battery Storage -
63238
date: 2023-01
-> 2023-02 delayed by
1 month
20 MW - planning - new york - South Ripley Solar -
64911
date: 2023-12
-> 2024-12 delayed by
12 months
17 MW - operation - florida - Lake Placid Solar Power Plant -
62541
date: 2022-11
-> 2022-12 delayed by
1 month
380 MW - operation - nevada - Gemini Solar -
63352
mw: 280
-> 380
100 MW - cancelled - texas - Forest Grove - Dodd -
64131
entity name: Renewable Energy Ventures LLC
-> Vistra Zero LLC
88 MW - construction - california - Chaparral Springs -
64864
mw: 50
-> 52
30 MW - operation - hawaii - AES Waikoloa Solar Hybrid -
63900
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2022-12
New projects (1):
30 MW - construction - hawaii - AES Waiawa Phase 2 Solar -
66066
Updated projects (40):
350 MW - operation - california - Crimson -
65140
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
350 MW - operation - california - Crimson -
65140
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
125 MW - operation - texas - Noble Solar -
65271
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
125 MW - operation - california - Oberon II Solar Project -
65735
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - operation - texas - TX12 Silicon Hill Storage -
65695
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
75 MW - operation - nevada - Arrow Canyon Solar Hybrid -
62248
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
50 MW - operation - texas - TX11 Republic Road Storage -
65694
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
24 MW - operation - new york - Orangeville Storage -
64686
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
20 MW - operation - california - Rabbitbrush Solar, LLC -
64630
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
169 MW - operation - california - Sanborn BESS 3 -
65672
date: 2023-05
-> 2023-08 delayed by
3 months
136 MW - operation - california - Edwards Sanborn E1B -
65674
date: 2023-08
-> 2023-09 delayed by
1 month
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
date: 2022-11
-> 2022-12 delayed by
1 month
100 MW - operation - california - Edwards Sanborn E4 -
65675
date: 2023-02
-> 2023-04 delayed by
2 months
47 MW - operation - california - Edwards Sanborn E5 -
65676
date: 2023-06
-> 2023-09 delayed by
3 months
73 MW - operation - texas - Ranchland Wind Storage -
64545
date: 2022-11
-> 2023-01 delayed by
2 months
59 MW - operation - texas - Roseland Solar Project, LLC -
65028
date: 2022-11
-> 2022-12 delayed by
1 month
47 MW - operation - california - Sanborn BESS 4 -
65673
date: 2023-01
-> 2023-06 delayed by
5 months
50 MW - operation - texas - Byrd Ranch Storage -
65259
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2022-10
-> 2022-11 delayed by
1 month
50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid -
62562
date: 2022-11
-> 2023-01 delayed by
2 months
50 MW - operation - texas - Roadrunner, LLC Hybrid -
62561
date: 2022-11
-> 2023-01 delayed by
2 months
50 MW - operation - texas - TX19 River Valley Storage 1 -
65699
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2023-01
-> 2023-03 delayed by
2 months
50 MW - operation - texas - TX21 River Valley Storage 2 -
65700
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2023-01
-> 2023-03 delayed by
2 months
88 MW - construction - california - Chaparral Springs -
64864
date: 2022-12
-> 2023-09 delayed by
9 months
50 MW - cancelled - mississippi - OE_MS5 -
64529
date: 2022-12
-> 2023-12 delayed by
12 months
50 MW - planning - virginia - Dulles Solar and Storage -
65043
date: 2023-10
-> 2024-12 delayed by
14 months
40 MW - operation - california - Fallbrook Energy Storage -
61365
date: 2022-10
-> 2022-12 delayed by
2 months
30 MW - construction - hawaii - Hale Kuawehi Solar Hybrid -
62529
date: 2023-10
-> 2024-11 delayed by
13 months
20 MW - operation - virginia - Dry Bridge Storage -
65044
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2022-10
-> 2022-12 delayed by
2 months
20 MW - operation - new york - Willis Battery Storage -
63238
date: 2022-12
-> 2023-01 delayed by
1 month
18 MW - operation - california - Edwards Sanborn S4 -
65677
date: 2023-02
-> 2023-04 delayed by
2 months
12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid -
63728
date: 2022-10
-> 2022-11 delayed by
1 month
11 MW - operation - north carolina - Camp Lejeune Solar and Energy Storage -
59966
energy source code:
-> MWH
date: 2023-03
-> 2023-04 delayed by
1 month
10 MW - operation - virginia - Danville BESS 1 -
65499
date: 2022-10
-> 2022-11 delayed by
1 month
149 MW - operation - california - Daggett 3 -
64852
mw: 144
-> 149
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
200 MW - construction - california - Cathode (Hinson) BESS -
65457
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
200 MW - construction - california - Cathode (Hinson) BESS -
65457
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
50 MW - operation - texas - TX23 Roughneck Storage -
65701
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
50 MW - operation - texas - TX13 Endurance Park Storage -
65696
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
10 MW - construction - california - Sierra Energy Storage, LLC -
61803
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2022-11
New projects (6):
325 MW - operation - california - Desert Peak Energy Storage I -
65987
131 MW - operation - california - CED West Side Canal Battery Storage -
65980
127 MW - operation - california - Lancaster Area Battery -
66050
75 MW - operation - california - Desert Peak Energy Storage II -
65988
63 MW - operation - texas - House Mountain -
66006
11 MW - operation - north carolina - Camp Lejeune Solar and Energy Storage -
59966
Disappeared projects (1):
100 MW - cancelled - texas - TX17 Nickel Prairie Storage -
63880
Updated projects (41):
125 MW - operation - california - LeConte Energy Storage -
64701
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) -
64197
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
80 MW - operation - california - Sagebrush ESS -
65933
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (V) Under construction, more than 50 percent complete
60 MW - operation - arizona - Mesquite Solar 5, LLC -
65963
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
10 MW - operation - arizona - Mesquite Solar 4, LLC -
65962
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
350 MW - operation - california - Crimson -
65140
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2022-09
-> 2022-10 delayed by
1 month
190 MW - operation - texas - Cunningham Storage -
65410
date: 2022-12
-> 2023-02 delayed by
2 months
125 MW - operation - texas - Noble Solar -
65271
date: 2022-09
-> 2022-10 delayed by
1 month
125 MW - operation - colorado - Neptune Energy Center Hybrid -
63731
date: 2022-12
-> 2023-06 delayed by
6 months
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
date: 2022-11
-> 2023-03 delayed by
4 months
224 MW - construction - california - Anode (Springville) BESS -
65458
date: 2022-11
-> 2023-04 delayed by
5 months
224 MW - construction - california - Anode (Springville) BESS -
65458
date: 2022-11
-> 2023-04 delayed by
5 months
100 MW - operation - texas - TX12 Silicon Hill Storage -
65695
date: 2022-09
-> 2022-10 delayed by
1 month
100 MW - operation - texas - Ignacio Grid Energy Storage System -
64089
date: 2022-10
-> 2022-12 delayed by
2 months
100 MW - operation - texas - Madero Grid -
63757
date: 2022-10
-> 2022-12 delayed by
2 months
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2022-11
-> 2023-04 delayed by
5 months
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2022-11
-> 2023-04 delayed by
5 months
100 MW - operation - colorado - Thunder Wolf Energy Center Hybrid -
63776
date: 2022-12
-> 2023-05 delayed by
5 months
65 MW - construction - california - San Jacinto Grid, LLC -
65657
date: 2023-04
-> 2023-05 delayed by
1 month
50 MW - operation - texas - Byrd Ranch Storage -
65259
date: 2022-09
-> 2022-10 delayed by
1 month
50 MW - operation - texas - TX11 Republic Road Storage -
65694
date: 2022-09
-> 2022-10 delayed by
1 month
50 MW - operation - texas - TX23 Roughneck Storage -
65701
date: 2022-09
-> 2022-11 delayed by
2 months
50 MW - operation - texas - TX13 Endurance Park Storage -
65696
date: 2022-11
-> 2022-12 delayed by
1 month
50 MW - operation - texas - TX19 River Valley Storage 1 -
65699
date: 2022-12
-> 2023-01 delayed by
1 month
50 MW - operation - texas - TX21 River Valley Storage 2 -
65700
date: 2022-12
-> 2023-01 delayed by
1 month
125 MW - planning - california - Aratina Solar Center 1 Hybrid -
61167
date: 2023-09
-> 2023-12 delayed by
3 months
43 MW - planning - california - Dynegy Oakland Power Plant -
6211
date: 2023-07
-> 2023-12 delayed by
5 months
40 MW - operation - california - Fallbrook Energy Storage -
61365
date: 2022-09
-> 2022-10 delayed by
1 month
20 MW - operation - new york - Willis Battery Storage -
63238
date: 2022-11
-> 2022-12 delayed by
1 month
20 MW - operation - new york - NY6 Battery -
65692
date: 2022-11
-> 2023-02 delayed by
3 months
20 MW - operation - new jersey - Andover Energy Storage Project -
65952
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2022-10
-> 2023-02 delayed by
4 months
17 MW - operation - florida - Lake Placid Solar Power Plant -
62541
date: 2022-09
-> 2022-11 delayed by
2 months
15 MW - cancelled - hawaii - Paeahu Solar Hybrid -
62534
date: 2023-09
-> 2024-10 delayed by
13 months
12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid -
63728
date: 2022-09
-> 2022-10 delayed by
1 month
12 MW - operation - ohio - Bowling Green Energy Storage Project -
65951
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2022-10
-> 2023-02 delayed by
4 months
10 MW - operation - virginia - Danville BESS 1 -
65499
date: 2022-09
-> 2022-10 delayed by
1 month
10 MW - construction - california - Hecate Energy Desert Storage 1 LLC -
65635
date: 2023-04
-> 2023-05 delayed by
1 month
10 MW - construction - california - Carris Storage I -
65733
date: 2023-04
-> 2023-05 delayed by
1 month
350 MW - operation - california - Crimson -
65140
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
149 MW - operation - california - Daggett 3 -
64852
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
10 MW - construction - california - Sierra Energy Storage, LLC -
61803
entity id: 59380
-> 63883
entity name: Enel Green Power NA, Inc.
-> Broad Reach Power
2022-10
New projects (2):
60 MW - operation - arizona - Mesquite Solar 5, LLC -
65963
10 MW - operation - arizona - Mesquite Solar 4, LLC -
65962
Disappeared projects (4):
2250 MW - cancelled - nevada - Chill Sun Solar Project -
65895
40 MW - cancelled - california - Santa Ana Storage 3 -
65789
10 MW - cancelled - california - Sierra -
64320
10 MW - cancelled - california - Chevron - Lost Hills Hybrid -
63545
Updated projects (52):
136 MW - operation - california - Arica Solar -
65744
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
date: 2022-12
-> 2023-12 delayed by
12 months
133 MW - operation - california - Edwards Sanborn E1A -
64878
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
132 MW - operation - california - Arlington Energy Center II -
64481
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
110 MW - operation - california - Arlington Energy Center III -
64564
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
52 MW - construction - hawaii - Ho'Ohana Solar 1 -
63723
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
50 MW - operation - arizona - El Sol BESS -
62964
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (V) Under construction, more than 50 percent complete
50 MW - operation - california - Victory Pass -
65743
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
date: 2022-11
-> 2023-11 delayed by
12 months
38 MW - operation - arizona - Foothills Solar Plant Hybrid -
57997
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (V) Under construction, more than 50 percent complete
36 MW - operation - arizona - Gila Bend Hybrid -
59020
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (V) Under construction, more than 50 percent complete
16 MW - operation - texas - Cameron Wind 1 LLC -
59118
status: construction
-> planning
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (T) Regulatory approvals received. Not under construction
date: 2022-10
-> 2023-06 delayed by
8 months
20 MW - operation - virginia - Dry Bridge Storage -
65044
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
17 MW - operation - arizona - Cotton Center Solar Hybrid -
57561
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (V) Under construction, more than 50 percent complete
17 MW - operation - arizona - Paloma Solar Hybrid -
57562
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (V) Under construction, more than 50 percent complete
16 MW - operation - arizona - Hyder Solar Hybrid -
57563
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (V) Under construction, more than 50 percent complete
14 MW - operation - arizona - Hyder II Hybrid -
58383
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (V) Under construction, more than 50 percent complete
210 MW - operation - texas - Blue Jay Solar I, LLC -
64672
date: 2022-09
-> 2022-12 delayed by
3 months
350 MW - operation - california - Crimson -
65140
date: 2022-08
-> 2022-09 delayed by
1 month
350 MW - operation - california - Crimson -
65140
date: 2022-09
-> 2022-10 delayed by
1 month
125 MW - operation - california - LeConte Energy Storage -
64701
date: 2022-08
-> 2022-09 delayed by
1 month
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
date: 2022-09
-> 2022-11 delayed by
2 months
224 MW - construction - california - Anode (Springville) BESS -
65458
date: 2022-09
-> 2022-11 delayed by
2 months
224 MW - construction - california - Anode (Springville) BESS -
65458
date: 2022-09
-> 2022-11 delayed by
2 months
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
date: 2022-10
-> 2022-11 delayed by
1 month
100 MW - operation - texas - Ignacio Grid Energy Storage System -
64089
date: 2022-08
-> 2022-10 delayed by
2 months
100 MW - operation - texas - Madero Grid -
63757
date: 2022-08
-> 2022-10 delayed by
2 months
75 MW - construction - california - Hummingbird Energy Storage LLC -
65395
date: 2023-06
-> 2023-12 delayed by
6 months
73 MW - operation - texas - Ranchland Wind Storage -
64545
date: 2022-09
-> 2022-11 delayed by
2 months
70 MW - planning - california - JVR Energy Park LLC -
64428
date: 2022-12
-> 2023-09 delayed by
9 months
50 MW - operation - texas - Byrd Ranch Storage -
65259
date: 2022-08
-> 2022-09 delayed by
1 month
50 MW - operation - texas - TX11 Republic Road Storage -
65694
date: 2022-08
-> 2022-09 delayed by
1 month
50 MW - operation - texas - TX23 Roughneck Storage -
65701
date: 2022-08
-> 2022-09 delayed by
1 month
50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid -
62562
date: 2022-09
-> 2022-11 delayed by
2 months
50 MW - operation - texas - Roadrunner, LLC Hybrid -
62561
date: 2022-09
-> 2022-11 delayed by
2 months
40 MW - operation - california - Fallbrook Energy Storage -
61365
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2022-08
-> 2022-09 delayed by
1 month
40 MW - operation - california - BigBeau Solar, LLC -
64993
date: 2022-09
-> 2022-12 delayed by
3 months
30 MW - operation - hawaii - AES Waikoloa Solar Hybrid -
63900
date: 2022-11
-> 2023-02 delayed by
3 months
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
date: 2022-12
-> 2023-03 delayed by
3 months
20 MW - operation - california - Rabbitbrush Solar, LLC -
64630
date: 2022-08
-> 2022-10 delayed by
2 months
18 MW - operation - california - Edwards Sanborn S4 -
65677
date: 2022-12
-> 2023-02 delayed by
2 months
17 MW - operation - florida - Lake Placid Solar Power Plant -
62541
date: 2022-08
-> 2022-09 delayed by
1 month
15 MW - planning - california - Black Walnut Energy Storage LLC -
65396
date: 2023-06
-> 2023-12 delayed by
6 months
12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid -
63728
date: 2022-08
-> 2022-09 delayed by
1 month
12 MW - operation - hawaii - AES West Oahu Solar Hybrid -
64656
date: 2023-01
-> 2023-06 delayed by
5 months
10 MW - construction - california - Sierra Energy Storage, LLC -
61803
date: 2022-12
-> 2023-02 delayed by
2 months
59 MW - operation - texas - Roseland Solar Project, LLC -
65028
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
139 MW - operation - california - Slate Hybrid -
63727
entity name: Goldman Sachs Renewable Power LLC
-> MN8 Energy LLC
88 MW - construction - california - Chaparral Springs -
64864
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
139 MW - operation - california - Slate Hybrid -
63727
entity name: Goldman Sachs Renewable Power LLC
-> MN8 Energy LLC
40 MW - construction - california - Scarlet Solar (CA) -
64908
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (T) Regulatory approvals received. Not under construction
36 MW - operation - hawaii - Waiawa Solar Power Hybrid -
65058
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
139 MW - operation - california - Slate Hybrid -
63727
entity name: Goldman Sachs Renewable Power LLC
-> MN8 Energy LLC
139 MW - operation - california - Slate Hybrid -
63727
entity name: Goldman Sachs Renewable Power LLC
-> MN8 Energy LLC
2022-09
New projects (27):
2250 MW - cancelled - nevada - Chill Sun Solar Project -
65895
660 MW - cancelled - texas - Goldenrod Creek Solar and BESS SLF -
65845
621 MW - planning - texas - Lunis Creek Solar and BESS SLF -
65852
600 MW - planning - texas - Clear Fork Creek Solar and BESS SLF -
65842
443 MW - cancelled - texas - Dogwood Creek Solar and BESS -
65843
400 MW - planning - texas - Hollow Branch Creek 2 Solar and BESS SLF -
65851
350 MW - planning - texas - Rowdy Creek Solar and BESS -
65854
418 MW - planning - texas - Tehuacana Creek 1 Solar and BESS -
65855
350 MW - cancelled - texas - Tehuacana Creek 2 Solar and BESS -
65856
302 MW - planning - texas - Middlebrook Creek Solar and BESS -
65853
300 MW - planning - california - Nighthawk Energy Storage, LLC -
65889
250 MW - construction - texas - Zeya -
65880
200 MW - construction - texas - Cachi -
65861
200 MW - construction - texas - Castor -
65870
200 MW - construction - texas - Desna -
65876
200 MW - planning - texas - Eldora Energy LLC -
65847
160 MW - construction - texas - Avila -
65860
100 MW - planning - texas - TX 14 Venus Mill Storage -
65788
100 MW - planning - california - Sacramento Valley Energy Center, LLC -
65808
80 MW - operation - california - Sagebrush ESS -
65933
300 MW - planning - texas - Elio Energy LLC -
65850
61 MW - planning - texas - Oriana Solar LLC -
65849
61 MW - cancelled - texas - Talitha Energy Project, LLC -
65891
40 MW - cancelled - california - Santa Ana Storage 3 -
65789
20 MW - operation - new jersey - Andover Energy Storage Project -
65952
20 MW - planning - indiana - Honey Creek Solar -
65821
12 MW - operation - ohio - Bowling Green Energy Storage Project -
65951
Disappeared projects (1):
50 MW - construction - tennessee - Ridgely Energy Farm -
65445
Updated projects (38):
750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid -
260
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
260 MW - operation - texas - DeCordova Steam Electric Station -
8063
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
190 MW - operation - texas - Cunningham Storage -
65410
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (V) Under construction, more than 50 percent complete
125 MW - operation - california - Oberon Solar Project -
65734
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
42 MW - operation - california - Edwards Sanborn S1 -
64929
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
39 MW - operation - hawaii - Mililani South Solar Farm -
57242
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
35 MW - operation - california - Edwards Sanborn S3 -
64928
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
12 MW - operation - hawaii - AES West Oahu Solar Hybrid -
64656
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
10 MW - construction - california - Sierra Energy Storage, LLC -
61803
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
210 MW - operation - texas - Blue Jay Solar I, LLC -
64672
date: 2022-08
-> 2022-09 delayed by
1 month
200 MW - planning - california - Aratina Solar Center 2 -
64215
date: 2023-06
-> 2024-06 delayed by
12 months
150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid -
63172
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2022-12
-> 2023-02 delayed by
2 months
150 MW - construction - california - Eland Solar & Storage Center, Phase 1 Hybrid -
61168
date: 2023-07
-> 2023-11 delayed by
4 months
125 MW - operation - california - LeConte Energy Storage -
64701
date: 2022-07
-> 2022-08 delayed by
1 month
75 MW - operation - california - Resurgence Solar -
64489
date: 2022-12
-> 2023-05 delayed by
5 months
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
date: 2022-09
-> 2022-10 delayed by
1 month
100 MW - operation - texas - Ignacio Grid Energy Storage System -
64089
date: 2022-07
-> 2022-08 delayed by
1 month
100 MW - operation - texas - Madero Grid -
63757
date: 2022-07
-> 2022-08 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2022-10
-> 2022-11 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2022-10
-> 2022-11 delayed by
1 month
73 MW - operation - texas - Ranchland Wind Storage -
64545
date: 2022-07
-> 2022-09 delayed by
2 months
65 MW - construction - california - San Jacinto Grid, LLC -
65657
date: 2023-03
-> 2023-04 delayed by
1 month
60 MW - operation - hawaii - AES Maui Kuihelani Solar Hybrid -
64256
date: 2022-12
-> 2023-10 delayed by
10 months
50 MW - operation - texas - TX11 Republic Road Storage -
65694
date: 2022-07
-> 2022-08 delayed by
1 month
50 MW - operation - texas - TX23 Roughneck Storage -
65701
date: 2022-07
-> 2022-08 delayed by
1 month
50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid -
62562
date: 2022-07
-> 2022-09 delayed by
2 months
50 MW - operation - texas - Roadrunner, LLC Hybrid -
62561
date: 2022-08
-> 2022-09 delayed by
1 month
40 MW - construction - california - Scarlet Solar (CA) -
64908
date: 2023-03
-> 2023-08 delayed by
5 months
20 MW - operation - new york - Willis Battery Storage -
63238
date: 2022-09
-> 2022-11 delayed by
2 months
12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid -
63728
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2022-07
-> 2022-08 delayed by
1 month
10 MW - cancelled - california - Chevron - Lost Hills Hybrid -
63545
date: 2022-08
-> 2022-09 delayed by
1 month
10 MW - construction - california - Hecate Energy Desert Storage 1 LLC -
65635
date: 2022-12
-> 2023-04 delayed by
4 months
10 MW - construction - california - Carris Storage I -
65733
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (T) Regulatory approvals received. Not under construction
date: 2022-12
-> 2023-04 delayed by
4 months
224 MW - construction - california - Anode (Springville) BESS -
65458
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
224 MW - construction - california - Anode (Springville) BESS -
65458
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
40 MW - operation - california - Fallbrook Energy Storage -
61365
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
20 MW - operation - california - Rabbitbrush Solar, LLC -
64630
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
20 MW - construction - california - Ortega Grid, LLC -
65656
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (T) Regulatory approvals received. Not under construction
2022-08
New projects (7):
136 MW - operation - california - Arica Solar -
65744
125 MW - operation - california - Oberon Solar Project -
65734
125 MW - operation - california - Oberon II Solar Project -
65735
95 MW - cancelled - california - Sandrini Solar 100 -
65664
50 MW - operation - california - Victory Pass -
65743
20 MW - operation - new york - NY6 Battery -
65692
10 MW - construction - california - Carris Storage I -
65733
Disappeared projects (1):
20 MW - cancelled - california - Renz Energy Storage -
63529
Updated projects (41):
100 MW - operation - california - Luna Storage -
63685
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
200 MW - construction - california - Cathode (Hinson) BESS -
65457
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
200 MW - construction - california - Cathode (Hinson) BESS -
65457
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
77 MW - operation - texas - Azure Sky Solar -
63905
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
59 MW - operation - texas - Roseland Solar Project, LLC -
65028
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
50 MW - operation - california - Maverick Solar 6, LLC -
64105
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
40 MW - operation - georgia - Hickory Park Solar Hybrid -
63522
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
30 MW - operation - hawaii - AES Waikoloa Solar Hybrid -
63900
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
16 MW - operation - texas - Cameron Wind 1 LLC -
59118
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
20 MW - operation - california - Santa Ana Storage 2 -
64921
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
260 MW - operation - texas - DeCordova Steam Electric Station -
8063
date: 2022-06
-> 2022-07 delayed by
1 month
210 MW - operation - texas - Blue Jay Solar I, LLC -
64672
date: 2022-06
-> 2022-08 delayed by
2 months
350 MW - operation - california - Crimson -
65140
date: 2022-06
-> 2022-08 delayed by
2 months
350 MW - operation - california - Crimson -
65140
date: 2022-08
-> 2022-09 delayed by
1 month
131 MW - operation - california - Daggett 2 -
64851
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (T) Regulatory approvals received. Not under construction
date: 2023-06
-> 2023-11 delayed by
5 months
125 MW - operation - california - LeConte Energy Storage -
64701
date: 2022-06
-> 2022-07 delayed by
1 month
117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) -
64197
date: 2022-12
-> 2023-09 delayed by
9 months
224 MW - construction - california - Anode (Springville) BESS -
65458
date: 2022-08
-> 2022-09 delayed by
1 month
224 MW - construction - california - Anode (Springville) BESS -
65458
date: 2022-08
-> 2022-09 delayed by
1 month
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
date: 2022-08
-> 2022-09 delayed by
1 month
100 MW - operation - texas - Ignacio Grid Energy Storage System -
64089
date: 2022-06
-> 2022-07 delayed by
1 month
100 MW - operation - texas - Madero Grid -
63757
date: 2022-06
-> 2022-07 delayed by
1 month
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
date: 2022-12
-> 2023-08 delayed by
8 months
47 MW - operation - california - Edwards Sanborn E5 -
65676
date: 2022-12
-> 2023-06 delayed by
6 months
50 MW - operation - texas - Roadrunner, LLC Hybrid -
62561
date: 2022-06
-> 2022-08 delayed by
2 months
42 MW - operation - california - Edwards Sanborn S1 -
64929
date: 2022-06
-> 2022-07 delayed by
1 month
35 MW - operation - california - Edwards Sanborn S3 -
64928
date: 2022-06
-> 2022-07 delayed by
1 month
30 MW - planning - new mexico - Rockmont Solar and Storage Project -
64216
date: 2023-06
-> 2024-04 delayed by
10 months
24 MW - operation - new york - Orangeville Storage -
64686
date: 2022-06
-> 2022-10 delayed by
4 months
17 MW - operation - florida - Lake Placid Solar Power Plant -
62541
date: 2022-06
-> 2022-08 delayed by
2 months
12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid -
63728
plant producer type: IPP
-> Electric Utility
date: 2022-06
-> 2022-07 delayed by
1 month
10 MW - cancelled - california - Sierra -
64320
date: 2022-08
-> 2022-09 delayed by
1 month
10 MW - operation - virginia - Danville BESS 1 -
65499
date: 2022-07
-> 2022-09 delayed by
2 months
10 MW - operation - arizona - Desert Star Hybrid -
59444
date: 2022-06
-> 2022-12 delayed by
6 months
10 MW - planning - maine - South Portland ESS, LLC -
64616
date: 2023-06
-> 2023-12 delayed by
6 months
112 MW - operation - california - Blythe Mesa Solar II -
65053
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
139 MW - operation - california - Slate Hybrid -
63727
entity name: Goldman Sachs Renewable Power Group
-> Goldman Sachs Renewable Power LLC
139 MW - operation - california - Slate Hybrid -
63727
entity name: Goldman Sachs Renewable Power Group
-> Goldman Sachs Renewable Power LLC
139 MW - operation - california - Slate Hybrid -
63727
entity name: Goldman Sachs Renewable Power Group
-> Goldman Sachs Renewable Power LLC
139 MW - operation - california - Slate Hybrid -
63727
entity name: Goldman Sachs Renewable Power Group
-> Goldman Sachs Renewable Power LLC
10 MW - cancelled - california - Chevron - Lost Hills Hybrid -
63545
entity name: Goldman Sachs Renewable Power Group
-> Goldman Sachs Renewable Power LLC
2022-07
New projects (10):
300 MW - planning - california - Humidor Storage I -
65703
150 MW - operation - california - Vikings Energy Farm -
65711
100 MW - operation - texas - TX12 Silicon Hill Storage -
65695
100 MW - construction - texas - TX10 Hummingbird Storage -
65693
100 MW - construction - texas - TX15 Limousin Oak Storage -
65698
50 MW - operation - texas - TX11 Republic Road Storage -
65694
50 MW - operation - texas - TX23 Roughneck Storage -
65701
50 MW - operation - texas - TX13 Endurance Park Storage -
65696
50 MW - operation - texas - TX19 River Valley Storage 1 -
65699
50 MW - operation - texas - TX21 River Valley Storage 2 -
65700
Updated projects (25):
25 MW - operation - massachusetts - Outer Cape Community Battery -
62604
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
date: 2022-06
-> 2022-05 accelerated by
1 month
240 MW - construction - california - Rexford Solar Farm -
64633
date: 2023-04
-> 2024-04 delayed by
12 months
260 MW - operation - texas - DeCordova Steam Electric Station -
8063
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2022-05
-> 2022-06 delayed by
1 month
150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid -
63172
date: 2022-10
-> 2022-12 delayed by
2 months
133 MW - operation - california - Edwards Sanborn E1A -
64878
date: 2022-07
-> 2022-08 delayed by
1 month
125 MW - operation - texas - Noble Solar -
65271
date: 2022-06
-> 2022-09 delayed by
3 months
100 MW - operation - california - Luna Storage -
63685
date: 2022-05
-> 2022-06 delayed by
1 month
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2022-08
-> 2022-10 delayed by
2 months
200 MW - construction - california - Cathode (Hinson) BESS -
65457
date: 2022-08
-> 2022-10 delayed by
2 months
80 MW - planning - california - Chiquito Grid, LLC -
65655
date: 2023-03
-> 2023-12 delayed by
9 months
75 MW - operation - nevada - Arrow Canyon Solar Hybrid -
62248
date: 2022-12
-> 2023-06 delayed by
6 months
50 MW - operation - california - Maverick Solar 6, LLC -
64105
date: 2022-05
-> 2022-06 delayed by
1 month
42 MW - operation - california - Edwards Sanborn S1 -
64929
date: 2022-05
-> 2022-06 delayed by
1 month
40 MW - operation - georgia - Hickory Park Solar Hybrid -
63522
date: 2022-05
-> 2022-06 delayed by
1 month
40 MW - operation - california - BigBeau Solar, LLC -
64993
date: 2022-08
-> 2022-09 delayed by
1 month
40 MW - construction - california - Scarlet Solar (CA) -
64908
date: 2022-12
-> 2023-03 delayed by
3 months
36 MW - operation - hawaii - Waiawa Solar Power Hybrid -
65058
date: 2022-10
-> 2022-12 delayed by
2 months
35 MW - operation - california - Edwards Sanborn S3 -
64928
date: 2022-05
-> 2022-06 delayed by
1 month
24 MW - operation - new york - Orangeville Storage -
64686
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2022-05
-> 2022-06 delayed by
1 month
20 MW - construction - connecticut - Pure Hedge LLC -
50736
date: 2023-01
-> 2024-12 delayed by
23 months
10 MW - cancelled - california - Chevron - Lost Hills Hybrid -
63545
date: 2022-07
-> 2022-08 delayed by
1 month
10 MW - construction - california - Painter Energy Storage -
62729
date: 2022-08
-> 2023-03 delayed by
7 months
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
77 MW - operation - texas - Azure Sky Solar -
63905
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
20 MW - operation - california - Rabbitbrush Solar, LLC -
64630
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2022-06
New projects (10):
169 MW - operation - california - Sanborn BESS 3 -
65672
136 MW - operation - california - Edwards Sanborn E1B -
65674
100 MW - operation - california - Edwards Sanborn E4 -
65675
80 MW - planning - california - Chiquito Grid, LLC -
65655
47 MW - operation - california - Edwards Sanborn E5 -
65676
65 MW - construction - california - San Jacinto Grid, LLC -
65657
47 MW - operation - california - Sanborn BESS 4 -
65673
18 MW - operation - california - Edwards Sanborn S4 -
65677
20 MW - construction - california - Ortega Grid, LLC -
65656
10 MW - construction - california - Hecate Energy Desert Storage 1 LLC -
65635
Updated projects (26):
200 MW - operation - california - Diablo Energy Storage -
62175
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
182 MW - operation - california - Elkhorn Battery Energy Storage System -
62564
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
122 MW - operation - california - Edwards Sanborn E2 -
64879
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
60 MW - operation - california - Coso Battery Storage -
63943
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
139 MW - operation - california - Slate Hybrid -
63727
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - construction - california - Painter Energy Storage -
62729
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
date: 2022-07
-> 2022-08 delayed by
1 month
150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid -
63172
date: 2022-08
-> 2022-10 delayed by
2 months
100 MW - cancelled - montana - Haymaker Hybrid -
63878
date: 2024-12
-> 2025-10 delayed by
10 months
mw: 200
-> 100
77 MW - operation - texas - Azure Sky Solar -
63905
date: 2022-05
-> 2022-06 delayed by
1 month
73 MW - operation - texas - Ranchland Wind Storage -
64545
date: 2022-05
-> 2022-07 delayed by
2 months
50 MW - operation - texas - Roadrunner, LLC Hybrid -
62561
date: 2022-05
-> 2022-06 delayed by
1 month
42 MW - operation - california - Edwards Sanborn S1 -
64929
date: 2022-04
-> 2022-05 delayed by
1 month
40 MW - operation - georgia - Hickory Park Solar Hybrid -
63522
date: 2022-04
-> 2022-05 delayed by
1 month
40 MW - operation - california - Fallbrook Energy Storage -
61365
date: 2022-06
-> 2022-08 delayed by
2 months
35 MW - operation - california - Edwards Sanborn S3 -
64928
date: 2022-04
-> 2022-05 delayed by
1 month
30 MW - construction - hawaii - Hale Kuawehi Solar Hybrid -
62529
date: 2022-12
-> 2023-10 delayed by
10 months
25 MW - operation - massachusetts - Outer Cape Community Battery -
62604
date: 2022-04
-> 2022-06 delayed by
2 months
24 MW - operation - new york - Orangeville Storage -
64686
date: 2022-04
-> 2022-05 delayed by
1 month
20 MW - operation - california - Santa Ana Storage 2 -
64921
date: 2022-05
-> 2022-06 delayed by
1 month
20 MW - operation - new york - Willis Battery Storage -
63238
date: 2022-08
-> 2022-09 delayed by
1 month
12 MW - operation - hawaii - AES West Oahu Solar Hybrid -
64656
date: 2022-09
-> 2023-01 delayed by
4 months
10 MW - operation - virginia - Danville BESS 1 -
65499
date: 2022-06
-> 2022-07 delayed by
1 month
10 MW - cancelled - california - Sierra -
64320
date: 2022-05
-> 2022-08 delayed by
3 months
133 MW - operation - california - Edwards Sanborn E1A -
64878
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
125 MW - operation - california - LeConte Energy Storage -
64701
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
10 MW - cancelled - california - Chevron - Lost Hills Hybrid -
63545
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (OT) Other
2022-05
New projects (5):
150 MW - construction - california - Desert Quartzite -
59871
150 MW - construction - texas - Carina -
65589
126 MW - construction - california - AVEP BESS -
65591
125 MW - construction - texas - Octans -
65590
70 MW - construction - texas - Antlia -
65588
Updated projects (36):
224 MW - construction - california - Anode (Springville) BESS -
65458
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
224 MW - construction - california - Anode (Springville) BESS -
65458
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
50 MW - operation - nevada - Dodge Flat -
63913
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
72 MW - operation - california - RE Tranquillity -
59939
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
139 MW - operation - california - Slate Hybrid -
63727
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
30 MW - operation - oregon - Wheatridge Hybrid -
62745
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
25 MW - operation - nevada - Fish Springs -
64148
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid -
63728
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (V) Under construction, more than 50 percent complete
date: 2022-05
-> 2022-06 delayed by
1 month
139 MW - operation - california - Slate Hybrid -
63727
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
210 MW - operation - texas - Blue Jay Solar I, LLC -
64672
date: 2022-03
-> 2022-06 delayed by
3 months
200 MW - operation - california - Diablo Energy Storage -
62175
date: 2022-03
-> 2022-04 delayed by
1 month
182 MW - operation - california - Elkhorn Battery Energy Storage System -
62564
date: 2022-03
-> 2022-04 delayed by
1 month
149 MW - operation - california - Daggett 3 -
64852
date: 2022-12
-> 2023-09 delayed by
9 months
122 MW - operation - california - Edwards Sanborn E2 -
64879
date: 2022-03
-> 2022-04 delayed by
1 month
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
date: 2022-03
-> 2022-09 delayed by
6 months
100 MW - operation - california - Luna Storage -
63685
date: 2022-04
-> 2022-05 delayed by
1 month
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
date: 2022-11
-> 2022-12 delayed by
1 month
73 MW - operation - texas - Ranchland Wind Storage -
64545
date: 2022-03
-> 2022-05 delayed by
2 months
60 MW - operation - california - Coso Battery Storage -
63943
date: 2022-03
-> 2022-04 delayed by
1 month
139 MW - operation - california - Slate Hybrid -
63727
date: 2022-03
-> 2022-04 delayed by
1 month
42 MW - operation - california - Edwards Sanborn S1 -
64929
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2022-03
-> 2022-04 delayed by
1 month
40 MW - operation - california - BigBeau Solar, LLC -
64993
date: 2022-07
-> 2022-08 delayed by
1 month
36 MW - operation - hawaii - Waiawa Solar Power Hybrid -
65058
date: 2022-09
-> 2022-10 delayed by
1 month
35 MW - operation - california - Edwards Sanborn S3 -
64928
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2022-03
-> 2022-04 delayed by
1 month
24 MW - operation - new york - Orangeville Storage -
64686
date: 2022-03
-> 2022-04 delayed by
1 month
20 MW - operation - california - Santa Ana Storage 2 -
64921
date: 2022-04
-> 2022-05 delayed by
1 month
17 MW - operation - florida - Lake Placid Solar Power Plant -
62541
date: 2022-04
-> 2022-06 delayed by
2 months
22 MW - cancelled - california - Camino Solar -
63508
date: 2023-03
-> 2023-12 delayed by
9 months
10 MW - cancelled - california - Chevron - Lost Hills Hybrid -
63545
date: 2022-06
-> 2022-07 delayed by
1 month
100 MW - operation - texas - Ignacio Grid Energy Storage System -
64089
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
100 MW - operation - texas - Madero Grid -
63757
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
39 MW - operation - hawaii - Mililani South Solar Farm -
57242
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
30 MW - construction - california - Santa Paula Energy Storage LLC -
65397
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
10 MW - cancelled - california - Sierra -
64320
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2022-04
New projects (15):
750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid -
260
200 MW - construction - texas - Dickens -
65489
200 MW - construction - texas - Hydra -
65490
200 MW - construction - texas - Paleo -
65491
175 MW - construction - texas - Pavo -
65492
224 MW - construction - california - Anode (Springville) BESS -
65458
224 MW - construction - california - Anode (Springville) BESS -
65458
112 MW - construction - california - Separator (Etiwanda) BESS -
65456
200 MW - construction - california - Cathode (Hinson) BESS -
65457
200 MW - construction - california - Cathode (Hinson) BESS -
65457
50 MW - construction - tennessee - Ridgely Energy Farm -
65445
66 MW - construction - south carolina - Lone Star Solar -
62235
50 MW - construction - texas - Tortolas -
65493
50 MW - planning - montana - Beartooth Energy Storage LLC -
65407
10 MW - operation - virginia - Danville BESS 1 -
65499
Updated projects (27):
139 MW - operation - california - Slate Hybrid -
63727
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - california - Kearny North Energy Storage -
64612
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - california - Kearny South Energy Storage -
64614
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
210 MW - operation - texas - Blue Jay Solar I, LLC -
64672
date: 2022-02
-> 2022-03 delayed by
1 month
200 MW - operation - california - Diablo Energy Storage -
62175
date: 2022-02
-> 2022-03 delayed by
1 month
350 MW - operation - california - Crimson -
65140
date: 2022-08
-> 2022-06 accelerated by
2 months
350 MW - operation - california - Crimson -
65140
date: 2022-10
-> 2022-08 accelerated by
2 months
125 MW - operation - california - LeConte Energy Storage -
64701
date: 2022-04
-> 2022-06 delayed by
2 months
100 MW - operation - texas - Madero Grid -
63757
date: 2022-05
-> 2022-06 delayed by
1 month
77 MW - operation - texas - Azure Sky Solar -
63905
date: 2022-02
-> 2022-05 delayed by
3 months
60 MW - operation - california - Coso Battery Storage -
63943
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2022-02
-> 2022-03 delayed by
1 month
40 MW - operation - georgia - Hickory Park Solar Hybrid -
63522
date: 2022-03
-> 2022-04 delayed by
1 month
40 MW - operation - california - BigBeau Solar, LLC -
64993
date: 2022-06
-> 2022-07 delayed by
1 month
40 MW - planning - california - EDPR CA Solar Park VI LLC (CA) Hybrid -
62892
date: 2022-12
-> 2023-12 delayed by
12 months
39 MW - operation - hawaii - Mililani South Solar Farm -
57242
date: 2022-09
-> 2022-07 accelerated by
2 months
72 MW - operation - california - RE Tranquillity -
59939
date: 2022-02
-> 2022-03 delayed by
1 month
139 MW - operation - california - Slate Hybrid -
63727
date: 2022-02
-> 2022-03 delayed by
1 month
20 MW - construction - tennessee - Vonore Battery Energy Storage System -
64255
date: 2022-07
-> 2023-08 delayed by
13 months
12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid -
63728
date: 2023-03
-> 2022-05 accelerated by
10 months
139 MW - operation - california - Slate Hybrid -
63727
date: 2022-02
-> 2022-03 delayed by
1 month
10 MW - cancelled - california - Sierra -
64320
date: 2022-03
-> 2022-05 delayed by
2 months
10 MW - construction - california - Painter Energy Storage -
62729
date: 2022-09
-> 2022-07 accelerated by
2 months
mw: 40
-> 10
125 MW - operation - texas - Noble Solar -
65271
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
100 MW - operation - california - Luna Storage -
63685
entity id: 63403
-> 61012
entity name: Luna Storage, LLC
-> AES Distributed Energy
139 MW - operation - california - Slate Hybrid -
63727
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
50 MW - operation - texas - Roadrunner, LLC Hybrid -
62561
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid -
62562
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2022-03
New projects (11):
280 MW - cancelled - nevada - Hot Pot Solar -
65419
299 MW - planning - new york - NISA Electric Generation Project -
61331
200 MW - cancelled - nevada - Iron Point Solar (Hybrid) -
65377
190 MW - operation - texas - Cunningham Storage -
65410
75 MW - construction - california - Hummingbird Energy Storage LLC -
65395
75 MW - planning - texas - Noria Hondo Solar (Hybrid) -
65344
59 MW - operation - texas - Roseland Solar Project, LLC -
65028
30 MW - construction - california - Santa Paula Energy Storage LLC -
65397
15 MW - planning - california - Black Walnut Energy Storage LLC -
65396
15 MW - planning - south carolina - Wolf Pit Branch Solar, LLC -
65437
14 MW - planning - california - Homestead Energy Storage LLC -
65398
Disappeared projects (4):
316 MW - cancelled - new york - Ravenswood -
2500
316 MW - cancelled - new york - Ravenswood -
2500
316 MW - cancelled - new york - Ravenswood -
2500
60 MW - cancelled - hawaii - Kupehau -
63799
Updated projects (40):
50 MW - operation - texas - Byrd Ranch Storage -
65259
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
46 MW - operation - alaska - Soldotna -
57206
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
10 MW - operation - arkansas - Searcy Solar Hybrid -
62617
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
10 MW - operation - arizona - Desert Star Hybrid -
59444
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (V) Under construction, more than 50 percent complete
650 MW - planning - new york - Swiftsure -
64235
date: 2023-12
-> 2025-12 delayed by
24 months
300 MW - planning - arizona - Atlas -
63798
date: 2022-12
-> 2023-12 delayed by
12 months
200 MW - planning - california - Big Rock Solar Farm -
64636
date: 2022-12
-> 2023-12 delayed by
12 months
182 MW - operation - california - Elkhorn Battery Energy Storage System -
62564
date: 2022-01
-> 2022-03 delayed by
2 months
133 MW - operation - california - Edwards Sanborn E1A -
64878
date: 2022-05
-> 2022-07 delayed by
2 months
122 MW - operation - california - Edwards Sanborn E2 -
64879
date: 2022-02
-> 2022-03 delayed by
1 month
110 MW - operation - california - Arlington Energy Center III -
64564
date: 2022-12
-> 2022-08 accelerated by
4 months
mw: 47
-> 110
100 MW - planning - new york - Clermont -
64236
date: 2023-12
-> 2024-12 delayed by
12 months
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
date: 2022-04
-> 2022-11 delayed by
7 months
299 MW - planning - new york - NISA Electric Generation Project -
61331
date: 2023-11
-> 2024-03 delayed by
4 months
mw: 300
-> 79
60 MW - operation - california - Coso Battery Storage -
63943
date: 2022-01
-> 2022-02 delayed by
1 month
50 MW - operation - nevada - Dodge Flat -
63913
date: 2022-02
-> 2022-03 delayed by
1 month
50 MW - planning - texas - TREX US Red Holly -
63202
date: 2022-05
-> 2024-07 delayed by
26 months
139 MW - operation - california - Slate Hybrid -
63727
date: 2022-01
-> 2022-02 delayed by
1 month
43 MW - planning - california - Dynegy Oakland Power Plant -
6211
date: 2022-12
-> 2023-07 delayed by
7 months
mw: 36
-> 43
40 MW - operation - georgia - Hickory Park Solar Hybrid -
63522
date: 2022-02
-> 2022-03 delayed by
1 month
40 MW - operation - california - BigBeau Solar, LLC -
64993
date: 2022-04
-> 2022-06 delayed by
2 months
39 MW - operation - hawaii - Mililani South Solar Farm -
57242
date: 2022-07
-> 2022-09 delayed by
2 months
139 MW - operation - california - Slate Hybrid -
63727
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2022-01
-> 2022-02 delayed by
1 month
30 MW - construction - montana - Beaver Creek Wind Facility -
65019
date: 2023-06
-> 2024-12 delayed by
18 months
30 MW - construction - montana - Beaver Creek IV -
65023
date: 2023-06
-> 2024-12 delayed by
18 months
25 MW - operation - nevada - Fish Springs -
64148
date: 2022-02
-> 2022-03 delayed by
1 month
24 MW - operation - new york - Orangeville Storage -
64686
date: 2022-01
-> 2022-03 delayed by
2 months
20 MW - operation - new york - Willis Battery Storage -
63238
date: 2022-06
-> 2022-08 delayed by
2 months
20 MW - construction - montana - Beaver Creek II -
65020
date: 2023-06
-> 2024-12 delayed by
18 months
20 MW - construction - montana - Beaver Creek III -
65021
date: 2023-06
-> 2024-12 delayed by
18 months
20 MW - planning - hawaii - Kahana Solar, LLC -
64095
date: 2023-12
-> 2024-12 delayed by
12 months
15 MW - cancelled - hawaii - Paeahu Solar Hybrid -
62534
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (L) Regulatory approvals pending. Not under construction
date: 2023-04
-> 2023-09 delayed by
5 months
15 MW - planning - hawaii - Barbers Point Solar, LLC -
64094
date: 2023-12
-> 2024-12 delayed by
12 months
10 MW - operation - california - Kearny North Energy Storage -
64612
date: 2022-01
-> 2022-02 delayed by
1 month
10 MW - operation - california - Kearny South Energy Storage -
64614
date: 2022-01
-> 2022-02 delayed by
1 month
10 MW - cancelled - california - Chevron - Lost Hills Hybrid -
63545
date: 2022-05
-> 2022-06 delayed by
1 month
10 MW - planning - maine - South Portland ESS, LLC -
64616
date: 2023-01
-> 2023-06 delayed by
5 months
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
75 MW - operation - california - Resurgence Solar -
64489
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (T) Regulatory approvals received. Not under construction
139 MW - operation - california - Slate Hybrid -
63727
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
2022-02
New projects (8):
125 MW - operation - texas - Noble Solar -
65271
50 MW - operation - texas - Byrd Ranch Storage -
65259
50 MW - operation - mississippi - OE_MS6 -
65291
88 MW - operation - california - RE Garland -
60233
39 MW - operation - hawaii - Mililani South Solar Farm -
57242
36 MW - cancelled - california - Willow Spring Solar 3, LLC -
60325
35 MW - operation - california - Edwards Sanborn S3 -
64928
12 MW - planning - delaware - ENGIE Solidago Solar Project - Hybrid -
65304
Updated projects (37):
149 MW - operation - california - Daggett 3 -
64852
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
125 MW - operation - colorado - Neptune Energy Center Hybrid -
63731
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - operation - colorado - Thunder Wolf Energy Center Hybrid -
63776
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
90 MW - operation - nevada - Townsite Solar Project Hybrid -
60654
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
50 MW - operation - california - Hudson - High Desert Hybrid -
64624
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
88 MW - construction - california - Chaparral Springs -
64864
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
40 MW - operation - georgia - Cool Springs Solar (Hybrid) -
63721
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
30 MW - construction - hawaii - Hale Kuawehi Solar Hybrid -
62529
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
13 MW - operation - california - Edwards Sanborn E3 -
64877
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
mw: 14
-> 13
11 MW - operation - florida - Trenton -
63995
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
date: 2022-01
-> 2021-12 accelerated by
1 month
500 MW - planning - california - Bellefield Solar and Energy Storage Farm -
64210
date: 2023-06
-> 2024-11 delayed by
17 months
500 MW - planning - california - Bellefield 2 Solar & Energy Storage Farm -
64209
date: 2023-06
-> 2024-12 delayed by
18 months
300 MW - planning - arizona - Red Antelope Solar & Energy Storage Farm -
64208
date: 2023-06
-> 2024-11 delayed by
17 months
mw: 500
-> 300
210 MW - operation - texas - Blue Jay Solar I, LLC -
64672
date: 2021-12
-> 2022-02 delayed by
2 months
200 MW - operation - california - Diablo Energy Storage -
62175
date: 2022-01
-> 2022-02 delayed by
1 month
169 MW - planning - new york - NY2 Battery -
63584
date: 2022-11
-> 2023-06 delayed by
7 months
100 MW - cancelled - montana - Haymaker Hybrid -
63878
date: 2022-12
-> 2024-12 delayed by
24 months
182 MW - operation - california - Elkhorn Battery Energy Storage System -
62564
date: 2021-12
-> 2022-01 delayed by
1 month
122 MW - operation - california - Edwards Sanborn E2 -
64879
date: 2021-12
-> 2022-02 delayed by
2 months
100 MW - operation - texas - Madero Grid -
63757
date: 2022-06
-> 2022-05 accelerated by
1 month
100 MW - cancelled - texas - TX17 Nickel Prairie Storage -
63880
date: 2022-12
-> 2023-09 delayed by
9 months
77 MW - operation - texas - Azure Sky Solar -
63905
date: 2021-12
-> 2022-02 delayed by
2 months
60 MW - operation - california - Coso Battery Storage -
63943
date: 2021-12
-> 2022-01 delayed by
1 month
50 MW - operation - nevada - Dodge Flat -
63913
date: 2021-12
-> 2022-02 delayed by
2 months
46 MW - operation - alaska - Soldotna -
57206
date: 2021-12
-> 2022-01 delayed by
1 month
25 MW - operation - nevada - Fish Springs -
64148
date: 2021-12
-> 2022-02 delayed by
2 months
24 MW - operation - new york - Orangeville Storage -
64686
date: 2021-12
-> 2022-01 delayed by
1 month
20 MW - operation - new york - Willis Battery Storage -
63238
date: 2022-03
-> 2022-06 delayed by
3 months
20 MW - operation - virginia - Dry Bridge Storage -
65044
date: 2022-12
-> 2022-10 accelerated by
2 months
17 MW - operation - florida - Lake Placid Solar Power Plant -
62541
date: 2021-12
-> 2022-04 delayed by
4 months
10 MW - operation - california - Kearny North Energy Storage -
64612
date: 2021-12
-> 2022-01 delayed by
1 month
10 MW - operation - california - Kearny South Energy Storage -
64614
date: 2021-12
-> 2022-01 delayed by
1 month
10 MW - operation - arkansas - Searcy Solar Hybrid -
62617
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2021-12
-> 2022-01 delayed by
1 month
133 MW - operation - california - Edwards Sanborn E1A -
64878
mw: 72
-> 133
139 MW - operation - california - Slate Hybrid -
63727
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
42 MW - operation - california - Edwards Sanborn S1 -
64929
mw: 11
-> 42
36 MW - operation - hawaii - Waiawa Solar Power Hybrid -
65058
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2022-01
New projects (1):
370 MW - planning - nevada - Arida Solar (Hybrid) -
63841
Disappeared projects (1):
88 MW - operation - california - RE Garland -
60233
Updated projects (42):
409 MW - operation - florida - Manatee Solar Energy Center -
60014
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
150 MW - construction - california - Eland Solar & Storage Center, Phase 1 Hybrid -
61168
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
date: 2022-11
-> 2023-07 delayed by
8 months
125 MW - operation - california - LeConte Energy Storage -
64701
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
112 MW - operation - california - Blythe Mesa Solar II -
65053
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - operation - california - Sanborn BESS 2 -
64713
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
60 MW - operation - california - Cal Flats BESS -
63930
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
50 MW - operation - texas - Roadrunner, LLC Hybrid -
62561
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid -
62562
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
72 MW - operation - california - RE Tranquillity -
59939
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
mw: 72
-> 37
36 MW - operation - hawaii - Waiawa Solar Power Hybrid -
65058
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
10 MW - operation - california - Henrietta D Energy Storage LLC -
60641
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
200 MW - operation - california - Diablo Energy Storage -
62175
date: 2021-11
-> 2022-01 delayed by
2 months
150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid -
63172
date: 2022-06
-> 2022-08 delayed by
2 months
150 MW - planning - california - Eland Solar & Storage Center, Phase 2 Hybrid -
61169
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (T) Regulatory approvals received. Not under construction
date: 2023-07
-> 2023-11 delayed by
4 months
300 MW - planning - nevada - Southern Bighorn Solar Hybrid -
63113
date: 2023-09
-> 2024-04 delayed by
7 months
100 MW - operation - texas - Ignacio Grid Energy Storage System -
64089
date: 2022-05
-> 2022-06 delayed by
1 month
100 MW - operation - texas - Madero Grid -
63757
date: 2022-04
-> 2022-06 delayed by
2 months
90 MW - operation - nevada - Townsite Solar Project Hybrid -
60654
date: 2021-11
-> 2021-12 delayed by
1 month
77 MW - operation - texas - Azure Sky Solar -
63905
date: 2021-11
-> 2021-12 delayed by
1 month
50 MW - operation - california - Hudson - High Desert Hybrid -
64624
date: 2021-11
-> 2021-12 delayed by
1 month
50 MW - operation - california - Maverick Solar 6, LLC -
64105
date: 2021-12
-> 2022-05 delayed by
5 months
46 MW - operation - alaska - Soldotna -
57206
date: 2021-11
-> 2021-12 delayed by
1 month
139 MW - operation - california - Slate Hybrid -
63727
entity id: 62780
-> 61944
entity name: RE Slate 1 LLC
-> Goldman Sachs Renewable Power Group
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2021-11
-> 2022-01 delayed by
2 months
40 MW - operation - georgia - Cool Springs Solar (Hybrid) -
63721
date: 2021-11
-> 2021-12 delayed by
1 month
40 MW - operation - georgia - Hickory Park Solar Hybrid -
63522
date: 2021-12
-> 2022-02 delayed by
2 months
139 MW - operation - california - Slate Hybrid -
63727
entity id: 62780
-> 61944
entity name: RE Slate 1 LLC
-> Goldman Sachs Renewable Power Group
date: 2021-12
-> 2022-01 delayed by
1 month
30 MW - operation - oregon - Wheatridge Hybrid -
62745
date: 2021-12
-> 2022-03 delayed by
3 months
30 MW - planning - new mexico - Rockmont Solar and Storage Project -
64216
date: 2022-06
-> 2023-06 delayed by
12 months
25 MW - operation - massachusetts - Outer Cape Community Battery -
62604
date: 2021-12
-> 2022-04 delayed by
4 months
24 MW - operation - new york - Orangeville Storage -
64686
date: 2021-11
-> 2021-12 delayed by
1 month
20 MW - construction - connecticut - Pure Hedge LLC -
50736
date: 2022-01
-> 2023-01 delayed by
12 months
20 MW - cancelled - california - Renz Energy Storage -
63529
date: 2022-05
-> 2023-05 delayed by
12 months
11 MW - operation - florida - Trenton -
63995
date: 2021-11
-> 2022-01 delayed by
2 months
139 MW - operation - california - Slate Hybrid -
63727
entity id: 62780
-> 61944
entity name: RE Slate 1 LLC
-> Goldman Sachs Renewable Power Group
date: 2022-01
-> 2022-02 delayed by
1 month
260 MW - operation - texas - DeCordova Steam Electric Station -
8063
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
122 MW - operation - california - Edwards Sanborn E2 -
64879
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
mw: 66
-> 122
139 MW - operation - california - Slate Hybrid -
63727
entity id: 62780
-> 61944
entity name: RE Slate 1 LLC
-> Goldman Sachs Renewable Power Group
10 MW - construction - california - Painter Energy Storage -
62729
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (T) Regulatory approvals received. Not under construction
17 MW - operation - florida - Lake Placid Solar Power Plant -
62541
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
13 MW - operation - california - Edwards Sanborn E3 -
64877
plant name: Edwards Sanborn E3
-> Edwards Sanborn E3
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
mw: 12
-> 14
10 MW - operation - california - Kearny North Energy Storage -
64612
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
10 MW - operation - california - Kearny South Energy Storage -
64614
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
2021-12
New projects (5):
350 MW - operation - california - Crimson -
65140
350 MW - operation - california - Crimson -
65140
58 MW - planning - nevada - Boulder Solar III LLC -
65141
72 MW - operation - california - RE Tranquillity -
59939
30 MW - planning - virginia - Deer Wood Storage, LLC -
65145
Updated projects (34):
260 MW - operation - texas - DeCordova Steam Electric Station -
8063
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - operation - texas - Bat Cave -
64312
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
100 MW - operation - texas - North Fork TX -
64317
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
100 MW - operation - texas - Chisholm Grid Energy Storage System -
63737
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
75 MW - operation - california - RE Mustang LLC -
59150
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
73 MW - operation - texas - Ranchland Wind Storage -
64545
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
40 MW - operation - texas - 2W Permian Solar Project Hybrid -
63255
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
30 MW - operation - oregon - Wheatridge Hybrid -
62745
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (V) Under construction, more than 50 percent complete
25 MW - operation - arizona - Agua Fria -
141
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
date: 2021-10
-> 2021-09 accelerated by
1 month
20 MW - operation - california - Hecate Energy Johanna Facility -
62889
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
20 MW - operation - california - Hecate Energy Johanna Facility -
62889
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
200 MW - operation - california - Diablo Energy Storage -
62175
date: 2021-10
-> 2021-11 delayed by
1 month
182 MW - operation - california - Elkhorn Battery Energy Storage System -
62564
date: 2021-11
-> 2021-12 delayed by
1 month
100 MW - operation - california - Sanborn BESS 2 -
64713
date: 2021-10
-> 2021-11 delayed by
1 month
100 MW - operation - california - Luna Storage -
63685
date: 2021-10
-> 2022-04 delayed by
6 months
77 MW - operation - texas - Azure Sky Solar -
63905
date: 2021-10
-> 2021-11 delayed by
1 month
72 MW - operation - california - RE Tranquillity -
59939
date: 2021-10
-> 2021-11 delayed by
1 month
60 MW - operation - california - Coso Battery Storage -
63943
date: 2021-11
-> 2021-12 delayed by
1 month
50 MW - operation - california - Hudson - High Desert Hybrid -
64624
date: 2021-10
-> 2021-11 delayed by
1 month
46 MW - operation - alaska - Soldotna -
57206
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2021-10
-> 2021-11 delayed by
1 month
40 MW - operation - georgia - Hickory Park Solar Hybrid -
63522
date: 2021-11
-> 2021-12 delayed by
1 month
25 MW - operation - massachusetts - Outer Cape Community Battery -
62604
date: 2021-11
-> 2021-12 delayed by
1 month
11 MW - operation - florida - Trenton -
63995
date: 2021-10
-> 2021-11 delayed by
1 month
10 MW - operation - california - Henrietta D Energy Storage LLC -
60641
date: 2021-10
-> 2021-11 delayed by
1 month
10 MW - operation - california - Kearny North Energy Storage -
64612
date: 2021-11
-> 2021-12 delayed by
1 month
10 MW - operation - california - Kearny South Energy Storage -
64614
date: 2021-11
-> 2021-12 delayed by
1 month
10 MW - cancelled - california - Sierra -
64320
date: 2021-12
-> 2022-03 delayed by
3 months
210 MW - operation - texas - Blue Jay Solar I, LLC -
64672
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
122 MW - operation - california - Edwards Sanborn E2 -
64879
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
139 MW - operation - california - Slate Hybrid -
63727
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
24 MW - operation - new york - Orangeville Storage -
64686
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
17 MW - operation - florida - Lake Placid Solar Power Plant -
62541
status_verbose: (V) Under construction, more than 50 percent complete
-> (U) Under construction, less than or equal to 50 percent complete
13 MW - operation - california - Edwards Sanborn E3 -
64877
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
139 MW - operation - california - Slate Hybrid -
63727
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2021-11
New projects (20):
112 MW - operation - california - Blythe Mesa Solar II -
65053
750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid -
260
65 MW - construction - georgia - Mossy Branch Battery Facility -
65018
88 MW - construction - california - Chaparral Springs -
64864
50 MW - planning - virginia - Dulles Solar and Storage -
65043
88 MW - operation - california - RE Garland -
60233
40 MW - operation - california - BigBeau Solar, LLC -
64993
40 MW - construction - california - Scarlet Solar (CA) -
64908
36 MW - operation - hawaii - Waiawa Solar Power Hybrid -
65058
30 MW - construction - montana - Beaver Creek Wind Facility -
65019
30 MW - construction - montana - Beaver Creek IV -
65023
16 MW - operation - texas - Cameron Wind 1 LLC -
59118
20 MW - operation - california - Santa Ana Storage 2 -
64921
20 MW - operation - california - Rabbitbrush Solar, LLC -
64630
20 MW - operation - virginia - Dry Bridge Storage -
65044
20 MW - construction - montana - Beaver Creek II -
65020
20 MW - construction - montana - Beaver Creek III -
65021
20 MW - planning - new york - South Ripley Solar -
64911
17 MW - operation - florida - Lake Placid Solar Power Plant -
62541
42 MW - operation - california - Edwards Sanborn S1 -
64929
Disappeared projects (1):
10 MW - cancelled - california - Goleta Grid Resiliency -
63736
Updated projects (28):
100 MW - operation - california - Sanborn BESS 1 -
64712
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
50 MW - operation - texas - Lily Solar Hybrid -
63892
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
200 MW - operation - california - Diablo Energy Storage -
62175
date: 2021-09
-> 2021-10 delayed by
1 month
182 MW - operation - california - Elkhorn Battery Energy Storage System -
62564
date: 2021-10
-> 2021-11 delayed by
1 month
117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) -
64197
date: 2022-09
-> 2022-12 delayed by
3 months
100 MW - operation - texas - Bat Cave -
64312
date: 2021-09
-> 2021-10 delayed by
1 month
100 MW - operation - texas - North Fork TX -
64317
date: 2021-09
-> 2021-10 delayed by
1 month
100 MW - operation - texas - Chisholm Grid Energy Storage System -
63737
date: 2021-09
-> 2021-10 delayed by
1 month
77 MW - operation - texas - Azure Sky Solar -
63905
date: 2021-09
-> 2021-10 delayed by
1 month
60 MW - operation - california - Cal Flats BESS -
63930
date: 2021-10
-> 2021-11 delayed by
1 month
52 MW - construction - hawaii - Ho'Ohana Solar 1 -
63723
date: 2022-09
-> 2023-08 delayed by
11 months
50 MW - operation - california - Hudson - High Desert Hybrid -
64624
date: 2021-09
-> 2021-10 delayed by
1 month
40 MW - operation - california - Fallbrook Energy Storage -
61365
date: 2021-12
-> 2022-06 delayed by
6 months
25 MW - operation - arizona - Agua Fria -
141
date: 2021-09
-> 2021-10 delayed by
1 month
25 MW - operation - massachusetts - Outer Cape Community Battery -
62604
date: 2021-09
-> 2021-11 delayed by
2 months
24 MW - operation - new york - Orangeville Storage -
64686
date: 2021-10
-> 2021-11 delayed by
1 month
mw: 20
-> 24
12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid -
63728
date: 2021-09
-> 2023-03 delayed by
18 months
11 MW - operation - florida - Trenton -
63995
date: 2021-09
-> 2021-10 delayed by
1 month
10 MW - operation - california - Henrietta D Energy Storage LLC -
60641
date: 2021-09
-> 2021-10 delayed by
1 month
20 MW - operation - california - Hecate Energy Johanna Facility -
62889
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2021-09
-> 2021-10 delayed by
1 month
20 MW - operation - california - Hecate Energy Johanna Facility -
62889
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2021-09
-> 2021-10 delayed by
1 month
10 MW - operation - california - Kearny North Energy Storage -
64612
date: 2021-10
-> 2021-11 delayed by
1 month
10 MW - operation - california - Kearny South Energy Storage -
64614
date: 2021-10
-> 2021-11 delayed by
1 month
10 MW - cancelled - california - Sierra -
64320
date: 2021-10
-> 2021-12 delayed by
2 months
10 MW - cancelled - california - Chevron - Lost Hills Hybrid -
63545
date: 2022-02
-> 2022-05 delayed by
3 months
75 MW - operation - california - RE Mustang LLC -
59150
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
133 MW - operation - california - Edwards Sanborn E1A -
64878
mw: 36
-> 72
122 MW - operation - california - Edwards Sanborn E2 -
64879
mw: 33
-> 66
2021-10
New projects (1):
25 MW - operation - arizona - Agua Fria -
141
Updated projects (25):
150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid -
63172
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
88 MW - operation - california - RE Garland -
60233
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
mw: 88
-> 45
182 MW - operation - california - Elkhorn Battery Energy Storage System -
62564
date: 2021-08
-> 2021-10 delayed by
2 months
100 MW - operation - texas - Bat Cave -
64312
date: 2021-08
-> 2021-09 delayed by
1 month
100 MW - operation - texas - North Fork TX -
64317
date: 2021-08
-> 2021-09 delayed by
1 month
100 MW - operation - california - Sanborn BESS 2 -
64713
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2021-09
-> 2021-10 delayed by
1 month
100 MW - operation - texas - Madero Grid -
63757
date: 2022-01
-> 2022-04 delayed by
3 months
100 MW - operation - texas - Ignacio Grid Energy Storage System -
64089
date: 2022-03
-> 2022-05 delayed by
2 months
77 MW - operation - texas - Azure Sky Solar -
63905
date: 2021-08
-> 2021-09 delayed by
1 month
60 MW - operation - california - Cal Flats BESS -
63930
date: 2021-09
-> 2021-10 delayed by
1 month
60 MW - operation - california - Coso Battery Storage -
63943
date: 2021-10
-> 2021-11 delayed by
1 month
50 MW - operation - texas - Lily Solar Hybrid -
63892
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2021-08
-> 2021-09 delayed by
1 month
125 MW - planning - california - Aratina Solar Center 1 Hybrid -
61167
date: 2022-08
-> 2023-09 delayed by
13 months
40 MW - operation - texas - 2W Permian Solar Project Hybrid -
63255
date: 2021-08
-> 2021-10 delayed by
2 months
24 MW - operation - new york - Orangeville Storage -
64686
date: 2021-09
-> 2021-10 delayed by
1 month
11 MW - operation - florida - Trenton -
63995
date: 2021-08
-> 2021-09 delayed by
1 month
10 MW - operation - california - Kearny North Energy Storage -
64612
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2021-09
-> 2021-10 delayed by
1 month
10 MW - operation - california - Kearny South Energy Storage -
64614
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2021-09
-> 2021-10 delayed by
1 month
10 MW - cancelled - california - Chevron - Lost Hills Hybrid -
63545
date: 2021-11
-> 2022-02 delayed by
3 months
100 MW - operation - california - Sanborn BESS 1 -
64712
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
75 MW - operation - california - RE Mustang LLC -
59150
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
50 MW - operation - california - Hudson - High Desert Hybrid -
64624
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
139 MW - operation - california - Slate Hybrid -
63727
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
40 MW - operation - georgia - Cool Springs Solar (Hybrid) -
63721
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid -
63728
status_verbose: (T) Regulatory approvals received. Not under construction
-> (L) Regulatory approvals pending. Not under construction
2021-09
New projects (6):
149 MW - operation - california - Daggett 3 -
64852
131 MW - operation - california - Daggett 2 -
64851
133 MW - operation - california - Edwards Sanborn E1A -
64878
122 MW - operation - california - Edwards Sanborn E2 -
64879
25 MW - operation - nevada - Battle Mountain Solar Project -
61098
13 MW - operation - california - Edwards Sanborn E3 -
64877
Updated projects (20):
230 MW - operation - california - McCoy Solar Energy Project Hybrid -
58462
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
75 MW - operation - california - RE Mustang LLC -
59150
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
200 MW - operation - california - Diablo Energy Storage -
62175
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2021-08
-> 2021-09 delayed by
1 month
182 MW - operation - california - Elkhorn Battery Energy Storage System -
62564
date: 2021-07
-> 2021-08 delayed by
1 month
100 MW - operation - texas - Bat Cave -
64312
date: 2021-07
-> 2021-08 delayed by
1 month
100 MW - operation - texas - North Fork TX -
64317
date: 2021-07
-> 2021-08 delayed by
1 month
100 MW - operation - texas - Chisholm Grid Energy Storage System -
63737
date: 2021-07
-> 2021-09 delayed by
2 months
100 MW - operation - california - Sanborn BESS 1 -
64712
date: 2021-08
-> 2021-09 delayed by
1 month
100 MW - operation - california - Sanborn BESS 2 -
64713
date: 2021-08
-> 2021-09 delayed by
1 month
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
date: 2022-05
-> 2022-04 accelerated by
1 month
60 MW - operation - california - Cal Flats BESS -
63930
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2021-08
-> 2021-09 delayed by
1 month
50 MW - operation - texas - Lily Solar Hybrid -
63892
date: 2021-07
-> 2021-08 delayed by
1 month
46 MW - operation - alaska - Soldotna -
57206
date: 2021-09
-> 2021-10 delayed by
1 month
24 MW - operation - new york - Orangeville Storage -
64686
date: 2021-08
-> 2021-09 delayed by
1 month
10 MW - cancelled - california - Chevron - Lost Hills Hybrid -
63545
date: 2021-10
-> 2021-11 delayed by
1 month
50 MW - operation - california - Hudson - High Desert Hybrid -
64624
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
50 MW - operation - california - Maverick Solar 6, LLC -
64105
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
25 MW - operation - massachusetts - Outer Cape Community Battery -
62604
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
20 MW - operation - california - Johanna Energy Center, LLC -
63843
entity name: Santa Ana Storage 1
-> Johanna Energy Center, LLC
20 MW - operation - california - Hecate Energy Johanna Facility -
62889
mw: 20
-> 10
2021-08
New projects (0):
Updated projects (30):
100 MW - operation - texas - Gambit Energy Storage - Angleton Storage -
64528
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
90 MW - operation - nevada - Townsite Solar Project Hybrid -
60654
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
63 MW - operation - california - Blythe Solar 110, LLC -
60093
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
50 MW - operation - california - Hudson - High Desert Hybrid -
64624
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
50 MW - operation - nevada - Dodge Flat -
63913
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (V) Under construction, more than 50 percent complete
40 MW - operation - georgia - Hickory Park Solar Hybrid -
63522
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (V) Under construction, more than 50 percent complete
30 MW - operation - california - Top Gun Energy Storage -
61366
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
date: 2021-07
-> 2021-06 accelerated by
1 month
25 MW - operation - arizona - Agua Fria -
141
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
20 MW - operation - california - Johanna Energy Center, LLC -
63843
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
date: 2021-08
-> 2021-06 accelerated by
2 months
10 MW - cancelled - california - Sierra -
64320
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - operation - texas - Bat Cave -
64312
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2021-06
-> 2021-07 delayed by
1 month
100 MW - operation - texas - North Fork TX -
64317
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2021-06
-> 2021-07 delayed by
1 month
60 MW - operation - california - Coso Battery Storage -
63943
date: 2021-08
-> 2021-10 delayed by
2 months
50 MW - operation - texas - Lily Solar Hybrid -
63892
date: 2021-06
-> 2021-07 delayed by
1 month
40 MW - operation - texas - 2W Permian Solar Project Hybrid -
63255
date: 2021-07
-> 2021-08 delayed by
1 month
10 MW - construction - california - Painter Energy Storage -
62729
date: 2021-12
-> 2022-09 delayed by
9 months
20 MW - operation - california - Hecate Energy Johanna Facility -
62889
date: 2021-06
-> 2021-09 delayed by
3 months
11 MW - operation - florida - Trenton -
63995
date: 2021-07
-> 2021-08 delayed by
1 month
20 MW - operation - california - Hecate Energy Johanna Facility -
62889
date: 2021-06
-> 2021-09 delayed by
3 months
10 MW - operation - california - Kearny North Energy Storage -
64612
date: 2021-06
-> 2021-09 delayed by
3 months
10 MW - operation - california - Kearny South Energy Storage -
64614
date: 2021-06
-> 2021-09 delayed by
3 months
409 MW - operation - florida - Manatee Solar Energy Center -
60014
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
210 MW - operation - texas - Blue Jay Solar I, LLC -
64672
mw: 50
-> 210
125 MW - operation - california - LeConte Energy Storage -
64701
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (L) Regulatory approvals pending. Not under construction
100 MW - operation - texas - Chisholm Grid Energy Storage System -
63737
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
77 MW - operation - texas - Azure Sky Solar -
63905
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
72 MW - operation - california - RE Tranquillity -
59939
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
30 MW - planning - new mexico - Rockmont Solar and Storage Project -
64216
mw: 200
-> 30
25 MW - operation - nevada - Fish Springs -
64148
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
10 MW - operation - arkansas - Searcy Solar Hybrid -
62617
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2021-07
New projects (6):
125 MW - operation - california - LeConte Energy Storage -
64701
100 MW - operation - california - Sanborn BESS 1 -
64712
100 MW - operation - california - Sanborn BESS 2 -
64713
75 MW - operation - california - RE Mustang LLC -
59150
25 MW - operation - arizona - Agua Fria -
141
24 MW - operation - new york - Orangeville Storage -
64686
Disappeared projects (1):
100 MW - cancelled - texas - TX18 Cottage Meadow Storage -
63879
Updated projects (18):
750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid -
260
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
date: 2021-06
-> 2021-05 accelerated by
1 month
115 MW - operation - california - Blythe Solar III, LLC Hybrid -
60094
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
10 MW - operation - north carolina - Grissom Solar, LLC -
64450
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
10 MW - operation - california - Kearny North Energy Storage -
64612
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
10 MW - operation - california - Kearny South Energy Storage -
64614
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - operation - california - Luna Storage -
63685
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2021-07
-> 2021-10 delayed by
3 months
50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid -
62562
date: 2022-05
-> 2022-07 delayed by
2 months
40 MW - operation - texas - 2W Permian Solar Project Hybrid -
63255
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2021-05
-> 2021-07 delayed by
2 months
30 MW - operation - california - Top Gun Energy Storage -
61366
date: 2021-05
-> 2021-07 delayed by
2 months
20 MW - operation - california - Johanna Energy Center, LLC -
63843
date: 2021-05
-> 2021-08 delayed by
3 months
20 MW - operation - new york - Willis Battery Storage -
63238
date: 2021-09
-> 2022-03 delayed by
6 months
11 MW - operation - florida - Trenton -
63995
date: 2021-06
-> 2021-07 delayed by
1 month
22 MW - cancelled - california - Camino Solar -
63508
date: 2022-05
-> 2023-03 delayed by
10 months
10 MW - operation - california - Henrietta D Energy Storage LLC -
60641
date: 2021-06
-> 2021-09 delayed by
3 months
10 MW - cancelled - california - Chevron - Lost Hills Hybrid -
63545
date: 2021-09
-> 2021-10 delayed by
1 month
88 MW - operation - california - RE Garland -
60233
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
210 MW - operation - texas - Blue Jay Solar I, LLC -
64672
mw: 210
-> 50
12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid -
63728
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (T) Regulatory approvals received. Not under construction
2021-06
New projects (13):
74 MW - planning - california - Kingsley Solar Farm -
64634
240 MW - construction - california - Rexford Solar Farm -
64633
210 MW - operation - texas - Blue Jay Solar I, LLC -
64672
200 MW - planning - california - Big Rock Solar Farm -
64636
200 MW - planning - california - Sienna Solar Farm -
64632
50 MW - operation - california - Hudson - High Desert Hybrid -
64624
50 MW - operation - nevada - Dodge Flat -
63913
50 MW - operation - texas - High Lonesome Wind Power, LLC Hybrid -
62562
50 MW - operation - texas - Roadrunner, LLC Hybrid -
62561
12 MW - operation - hawaii - AES West Oahu Solar Hybrid -
64656
10 MW - operation - california - Kearny North Energy Storage -
64612
10 MW - operation - california - Kearny South Energy Storage -
64614
10 MW - planning - maine - South Portland ESS, LLC -
64616
Updated projects (14):
100 MW - operation - california - Saticoy -
63891
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
date: 2021-05
-> 2021-04 accelerated by
1 month
100 MW - operation - texas - Gambit Energy Storage - Angleton Storage -
64528
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
100 MW - operation - texas - Ignacio Grid Energy Storage System -
64089
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
date: 2022-04
-> 2022-05 delayed by
1 month
30 MW - operation - arizona - Wilmot Energy Center LLC -
64426
status: construction
-> operation πΎ π πΈ
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> operation
date: 2021-05
-> 2021-04 accelerated by
1 month
20 MW - operation - new york - Willis Battery Storage -
63238
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
14 MW - operation - hawaii - AES Kekaha Solar, LLC Hybrid -
63280
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
11 MW - operation - california - Silverstrand Grid Energy Storage System -
63735
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
10 MW - operation - north carolina - Grissom Solar, LLC -
64450
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
60 MW - operation - california - Cal Flats BESS -
63930
date: 2021-07
-> 2021-08 delayed by
1 month
10 MW - operation - arizona - Desert Star Hybrid -
59444
date: 2021-12
-> 2022-06 delayed by
6 months
750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid -
260
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
100 MW - operation - texas - Chisholm Grid Energy Storage System -
63737
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
10 MW - cancelled - california - Chevron - Lost Hills Hybrid -
63545
entity name: GSRP
-> Goldman Sachs Renewable Power Group
2021-05
New projects (4):
180 MW - cancelled - nevada - Chuckwalla Solar, LLC -
64558
73 MW - operation - texas - Ranchland Wind Storage -
64545
50 MW - cancelled - mississippi - OE_MS5 -
64529
110 MW - operation - california - Arlington Energy Center III -
64564
Updated projects (15):
200 MW - operation - california - Diablo Energy Storage -
62175
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
115 MW - operation - california - Blythe Solar II, LLC -
60092
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
100 MW - operation - texas - Madero Grid -
63757
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
88 MW - operation - california - RE Garland -
60233
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
72 MW - operation - california - RE Tranquillity -
59939
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
60 MW - operation - california - Coso Battery Storage -
63943
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid -
260
date: 2021-03
-> 2021-06 delayed by
3 months
260 MW - operation - texas - DeCordova Steam Electric Station -
8063
date: 2022-02
-> 2022-05 delayed by
3 months
50 MW - planning - texas - TREX US Red Holly -
63202
date: 2021-08
-> 2022-05 delayed by
9 months
25 MW - operation - massachusetts - Outer Cape Community Battery -
62604
date: 2021-03
-> 2021-09 delayed by
6 months
20 MW - construction - connecticut - Pure Hedge LLC -
50736
date: 2021-09
-> 2022-01 delayed by
4 months
10 MW - cancelled - california - Goleta Grid Resiliency -
63736
date: 2022-12
-> 2022-09 accelerated by
3 months
100 MW - operation - texas - Ignacio Grid Energy Storage System -
64089
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (T) Regulatory approvals received. Not under construction
63 MW - operation - california - Blythe Solar 110, LLC -
60093
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
40 MW - operation - georgia - Cool Springs Solar (Hybrid) -
63721
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2021-04
New projects (9):
132 MW - operation - california - Arlington Energy Center II -
64481
75 MW - operation - california - Resurgence Solar -
64489
100 MW - operation - texas - Gambit Energy Storage - Angleton Storage -
64528
99 MW - construction - california - Noosa Energy Storage LLC -
64531
75 MW - cancelled - wisconsin - Darien Solar -
64534
30 MW - operation - arizona - Wilmot Energy Center LLC -
64426
25 MW - operation - nevada - Fish Springs -
64148
10 MW - operation - north carolina - Grissom Solar, LLC -
64450
10 MW - operation - arizona - Desert Star Hybrid -
59444
Disappeared projects (1):
10 MW - cancelled - arizona - Desert Star Hybrid -
62965
Updated projects (15):
230 MW - operation - california - McCoy Solar Energy Project Hybrid -
58462
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - operation - california - Luna Storage -
63685
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
60 MW - operation - california - Cal Flats BESS -
63930
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
10 MW - operation - california - Vallecito -
62801
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
date: 2021-03
-> 2021-02 accelerated by
1 month
169 MW - planning - new york - NY2 Battery -
63584
date: 2021-11
-> 2022-11 delayed by
12 months
115 MW - operation - california - Blythe Solar II, LLC -
60092
date: 2021-02
-> 2021-03 delayed by
1 month
100 MW - operation - california - Saticoy -
63891
date: 2021-04
-> 2021-05 delayed by
1 month
139 MW - operation - california - Slate Hybrid -
63727
date: 2021-10
-> 2022-03 delayed by
5 months
mw: 300
-> 50
20 MW - operation - california - Hecate Energy Johanna Facility -
62889
date: 2021-04
-> 2021-06 delayed by
2 months
20 MW - cancelled - california - Renz Energy Storage -
63529
date: 2021-12
-> 2022-05 delayed by
5 months
11 MW - operation - california - Silverstrand Grid Energy Storage System -
63735
date: 2021-03
-> 2021-04 delayed by
1 month
20 MW - operation - california - Hecate Energy Johanna Facility -
62889
date: 2021-04
-> 2021-06 delayed by
2 months
60 MW - operation - california - Coso Battery Storage -
63943
entity id: 63611
-> 64172
entity name: Coso Battery Storage LLC
-> Arevon Asset Management
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
entity id: 59380
-> 63883
entity name: Enel Green Power NA, Inc.
-> Broad Reach Power
11 MW - operation - florida - Trenton -
63995
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2021-03
New projects (9):
299 MW - planning - new york - NISA Electric Generation Project -
61331
88 MW - operation - california - RE Garland -
60233
72 MW - operation - california - RE Tranquillity -
59939
70 MW - planning - california - JVR Energy Park LLC -
64428
139 MW - operation - california - Slate Hybrid -
63727
10 MW - construction - california - Painter Energy Storage -
62729
139 MW - operation - california - Slate Hybrid -
63727
20 MW - construction - connecticut - Pure Hedge LLC -
50736
139 MW - operation - california - Slate Hybrid -
63727
Updated projects (22):
139 MW - operation - california - Slate Hybrid -
63727
entity name: RE Slate LLC
-> RE Slate 1 LLC
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - operation - california - AES ES ALAMITOS, LLC -
61204
status: construction
-> operation πΎ π πΈ
status_verbose: (V) Under construction, more than 50 percent complete
-> operation
35 MW - operation - california - Desert Harvest II LLC -
64103
status: construction
-> operation πΎ π πΈ
status_verbose: (TS) Construction complete, but not yet in commercial operation
-> operation
date: 2021-02
-> 2021-01 accelerated by
1 month
150 MW - construction - massachusetts - Cranberry Point Energy Storage -
62844
date: 2023-05
-> 2024-06 delayed by
13 months
117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) -
64197
date: 2022-12
-> 2022-09 accelerated by
3 months
100 MW - operation - texas - Madero Grid -
63757
date: 2021-12
-> 2022-01 delayed by
1 month
100 MW - operation - texas - Ignacio Grid Energy Storage System -
64089
date: 2022-01
-> 2022-03 delayed by
2 months
60 MW - operation - california - Cal Flats BESS -
63930
entity id: 63600
-> 61230
entity name: Cal Flats BESS, LLC
-> CD Arevon USA, Inc.
date: 2021-06
-> 2021-07 delayed by
1 month
60 MW - operation - california - Coso Battery Storage -
63943
date: 2021-06
-> 2021-08 delayed by
2 months
50 MW - operation - arizona - El Sol BESS -
62964
date: 2021-12
-> 2022-12 delayed by
12 months
40 MW - operation - california - Fallbrook Energy Storage -
61365
date: 2021-05
-> 2021-12 delayed by
7 months
38 MW - operation - arizona - Foothills Solar Plant Hybrid -
57997
date: 2021-12
-> 2022-12 delayed by
12 months
36 MW - operation - arizona - Gila Bend Hybrid -
59020
date: 2021-12
-> 2022-12 delayed by
12 months
30 MW - operation - california - Top Gun Energy Storage -
61366
date: 2021-04
-> 2021-05 delayed by
1 month
17 MW - operation - arizona - Cotton Center Solar Hybrid -
57561
date: 2021-12
-> 2022-12 delayed by
12 months
17 MW - operation - arizona - Paloma Solar Hybrid -
57562
date: 2021-12
-> 2022-12 delayed by
12 months
16 MW - operation - arizona - Hyder Solar Hybrid -
57563
date: 2021-12
-> 2022-12 delayed by
12 months
15 MW - cancelled - hawaii - Paeahu Solar Hybrid -
62534
date: 2022-12
-> 2023-04 delayed by
4 months
14 MW - operation - arizona - Hyder II Hybrid -
58383
date: 2021-12
-> 2022-12 delayed by
12 months
10 MW - cancelled - arizona - Desert Star Hybrid -
62965
date: 2021-12
-> 2022-12 delayed by
12 months
115 MW - operation - california - Blythe Solar III, LLC Hybrid -
60094
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
20 MW - cancelled - california - Renz Energy Storage -
63529
plant name: Llagas Energy Storage
-> Renz Energy Storage
2021-02
New projects (5):
100 MW - operation - texas - Bat Cave -
64312
100 MW - operation - texas - North Fork TX -
64317
63 MW - operation - california - Blythe Solar 110, LLC -
60093
22 MW - cancelled - california - Camino Solar -
63508
10 MW - cancelled - california - Sierra -
64320
Disappeared projects (1):
22 MW - cancelled - california - Camino Solar -
63508
Updated projects (20):
50 MW - operation - california - Maverick Solar 6, LLC -
64105
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
40 MW - operation - california - Fallbrook Energy Storage -
61365
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
20 MW - operation - california - Hecate Energy Johanna Facility -
62889
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
date: 2021-01
-> 2021-04 delayed by
3 months
10 MW - operation - arkansas - Searcy Solar Hybrid -
62617
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid -
260
date: 2020-12
-> 2021-03 delayed by
3 months
260 MW - operation - texas - DeCordova Steam Electric Station -
8063
date: 2021-07
-> 2022-02 delayed by
7 months
100 MW - cancelled - montana - Haymaker Hybrid -
63878
date: 2021-12
-> 2022-12 delayed by
12 months
100 MW - cancelled - texas - TX17 Nickel Prairie Storage -
63880
date: 2021-12
-> 2022-12 delayed by
12 months
35 MW - operation - california - Desert Harvest II LLC -
64103
status_verbose: (V) Under construction, more than 50 percent complete
-> (TS) Construction complete, but not yet in commercial operation
date: 2020-12
-> 2021-02 delayed by
2 months
30 MW - operation - california - Top Gun Energy Storage -
61366
date: 2021-03
-> 2021-04 delayed by
1 month
20 MW - operation - california - Hecate Energy Johanna Facility -
62889
date: 2021-01
-> 2021-04 delayed by
3 months
20 MW - operation - california - Johanna Energy Center, LLC -
63843
date: 2021-01
-> 2021-05 delayed by
4 months
10 MW - operation - california - Vallecito -
62801
date: 2020-12
-> 2021-03 delayed by
3 months
10 MW - operation - california - Henrietta D Energy Storage LLC -
60641
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2021-04
-> 2021-06 delayed by
2 months
150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid -
63172
mw: 40
-> 150
117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) -
64197
plant name: Fifth Standard Solar PV, LLC
-> Fifth Standard Solar PV, LLC (Hybrid)
100 MW - operation - texas - Chisholm Grid Energy Storage System -
63737
entity name: Astral Electricity, LLC
-> Chisholm Grid, LLC
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
plant name: Big Star Solar, LLC
-> Big Star Solar, LLC (Hybrid)
11 MW - operation - california - Silverstrand Grid Energy Storage System -
63735
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
10 MW - cancelled - california - Goleta Grid Resiliency -
63736
entity id: 62742
-> 61198
entity name: ENEL BELLA ENERGY STORAGE, LLC
-> esVolta LP
2021-01
New projects (13):
650 MW - planning - new york - Swiftsure -
64235
500 MW - planning - california - Bellefield 2 Solar & Energy Storage Farm -
64209
300 MW - planning - arizona - Red Antelope Solar & Energy Storage Farm -
64208
500 MW - planning - california - Bellefield Solar and Energy Storage Farm -
64210
30 MW - planning - new mexico - Rockmont Solar and Storage Project -
64216
200 MW - planning - california - Aratina Solar Center 2 -
64215
117 MW - operation - california - Fifth Standard Solar PV, LLC (Hybrid) -
64197
100 MW - planning - new york - Clermont -
64236
80 MW - construction - texas - Big Star Solar, LLC (Hybrid) -
64202
60 MW - operation - hawaii - AES Maui Kuihelani Solar Hybrid -
64256
25 MW - cancelled - colorado - Pike Solar Hybrid -
64212
20 MW - construction - tennessee - Vonore Battery Energy Storage System -
64255
20 MW - operation - california - Hecate Energy Johanna Facility -
62889
Updated projects (14):
409 MW - operation - florida - Manatee Solar Energy Center -
60014
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
40 MW - operation - georgia - Cool Springs Solar (Hybrid) -
63721
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
35 MW - operation - california - Desert Harvest II LLC -
64103
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (V) Under construction, more than 50 percent complete
11 MW - operation - california - Silverstrand Grid Energy Storage System -
63735
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - operation - texas - Ignacio Grid Energy Storage System -
64089
date: 2021-06
-> 2022-01 delayed by
7 months
20 MW - operation - new york - Willis Battery Storage -
63238
date: 2021-06
-> 2021-09 delayed by
3 months
10 MW - operation - california - Henrietta D Energy Storage LLC -
60641
date: 2021-03
-> 2021-04 delayed by
1 month
10 MW - cancelled - california - Goleta Grid Resiliency -
63736
date: 2021-06
-> 2022-12 delayed by
18 months
200 MW - operation - california - Diablo Energy Storage -
62175
mw: 250
-> 200
115 MW - operation - california - Blythe Solar II, LLC -
60092
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
100 MW - cancelled - texas - TX17 Nickel Prairie Storage -
63880
entity id: 63552
-> 63289
100 MW - operation - texas - Madero Grid -
63757
mw: 200
-> 100
100 MW - cancelled - texas - TX18 Cottage Meadow Storage -
63879
entity id: 63552
-> 63289
30 MW - operation - oregon - Wheatridge Hybrid -
62745
entity name: Wheatridge Wind Energy, LLC
-> Wheatridge Wind Holdings, LLC
2020-12
New projects (4):
120 MW - operation - texas - Azure Sky Wind Project, LLC Hybrid -
64164
100 MW - cancelled - texas - Forest Grove - Dodd -
64131
50 MW - operation - california - Maverick Solar 6, LLC -
64105
35 MW - operation - california - Desert Harvest II LLC -
64103
Updated projects (6):
182 MW - operation - california - Elkhorn Battery Energy Storage System -
62564
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
date: 2021-03
-> 2021-07 delayed by
4 months
25 MW - operation - massachusetts - Outer Cape Community Battery -
62604
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
10 MW - operation - california - Henrietta D Energy Storage LLC -
60641
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
20 MW - operation - california - Johanna Energy Center, LLC -
63843
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
date: 2020-10
-> 2021-01 delayed by
3 months
10 MW - cancelled - california - Goleta Grid Resiliency -
63736
date: 2021-03
-> 2021-06 delayed by
3 months
100 MW - operation - nevada - Dry Lake Solar Energy Center -
63933
entity id: 63603
-> 13407
entity name: Nevada Power Company DBA NV Energy
-> Nevada Power Co
2020-11
New projects (4):
260 MW - operation - texas - DeCordova Steam Electric Station -
8063
100 MW - operation - texas - Ignacio Grid Energy Storage System -
64089
20 MW - planning - hawaii - Kahana Solar, LLC -
64095
15 MW - planning - hawaii - Barbers Point Solar, LLC -
64094
Disappeared projects (1):
10 MW - construction - california - Painter Energy Storage -
62729
Updated projects (8):
115 MW - operation - california - Blythe Solar II, LLC -
60092
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
115 MW - operation - california - Blythe Solar III, LLC Hybrid -
60094
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - operation - california - Saticoy -
63891
status: planning
-> construction ποΈ
status_verbose: (T) Regulatory approvals received. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
46 MW - operation - alaska - Soldotna -
57206
status: planning
-> construction ποΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (U) Under construction, less than or equal to 50 percent complete
100 MW - operation - texas - Madero Grid -
63757
date: 2021-09
-> 2021-12 delayed by
3 months
14 MW - operation - hawaii - AES Kekaha Solar, LLC Hybrid -
63280
date: 2020-09
-> 2021-04 delayed by
7 months
10 MW - cancelled - california - Chevron - Lost Hills Hybrid -
63545
date: 2021-08
-> 2021-09 delayed by
1 month
100 MW - operation - california - Luna Storage -
63685
status_verbose: (P) Planned for installation, but regulatory approvals not initiated
-> (L) Regulatory approvals pending. Not under construction
2020-10
New projects (2):
60 MW - operation - california - Coso Battery Storage -
63943
11 MW - operation - florida - Trenton -
63995
Updated projects (9):
100 MW - operation - texas - Chisholm Grid Energy Storage System -
63737
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
20 MW - operation - california - Hecate Energy Johanna Facility -
62889
status: planning
-> construction ποΈ
status_verbose: (L) Regulatory approvals pending. Not under construction
-> (U) Under construction, less than or equal to 50 percent complete
20 MW - operation - california - Stanton Energy Reliability Center Hybrid -
60698
status: planning
-> operation πΎ π πΈ
status_verbose: (OT) Other
-> operation
date: 2020-09
-> 2020-08 accelerated by
1 month
20 MW - operation - california - Stanton Energy Reliability Center Hybrid -
60698
status: planning
-> operation πΎ π πΈ
status_verbose: (OT) Other
-> operation
date: 2020-09
-> 2020-08 accelerated by
1 month
139 MW - operation - california - Slate Hybrid -
63727
date: 2020-12
-> 2021-10 delayed by
10 months
100 MW - operation - texas - Madero Grid -
63757
date: 2021-07
-> 2021-09 delayed by
2 months
30 MW - operation - california - Top Gun Energy Storage -
61366
date: 2021-01
-> 2021-03 delayed by
2 months
10 MW - operation - california - Henrietta D Energy Storage LLC -
60641
date: 2021-01
-> 2021-03 delayed by
2 months
750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid -
260
status_verbose: (U) Under construction, less than or equal to 50 percent complete
-> (V) Under construction, more than 50 percent complete
2020-09
New projects (81):
409 MW - operation - florida - Manatee Solar Energy Center -
60014
750 MW - operation - california - Dynegy Moss Landing Power Plant Hybrid -
260
139 MW - operation - california - Slate Hybrid -
63727
300 MW - planning - arizona - Atlas -
63798
380 MW - operation - nevada - Gemini Solar -
63352
250 MW - operation - california - Gateway Energy Storage System -
63834
200 MW - operation - california - Diablo Energy Storage -
62175
230 MW - operation - california - McCoy Solar Energy Project Hybrid -
58462
100 MW - operation - texas - Madero Grid -
63757
169 MW - planning - new york - NY2 Battery -
63584
100 MW - cancelled - montana - Haymaker Hybrid -
63878
252 MW - planning - oklahoma - Skeleton Creek Energy Center Hybrid -
62494
182 MW - operation - california - Elkhorn Battery Energy Storage System -
62564
150 MW - construction - california - Eland Solar & Storage Center, Phase 1 Hybrid -
61168
150 MW - construction - massachusetts - Cranberry Point Energy Storage -
62844
150 MW - planning - california - Eland Solar & Storage Center, Phase 2 Hybrid -
61169
300 MW - planning - nevada - Southern Bighorn Solar Hybrid -
63113
316 MW - cancelled - new york - Ravenswood -
2500
125 MW - operation - colorado - Neptune Energy Center Hybrid -
63731
115 MW - operation - california - Blythe Solar II, LLC -
60092
115 MW - operation - california - Blythe Solar III, LLC Hybrid -
60094
100 MW - operation - california - AES ES ALAMITOS, LLC -
61204
100 MW - operation - california - Saticoy -
63891
100 MW - operation - texas - Chisholm Grid Energy Storage System -
63737
100 MW - operation - california - Luna Storage -
63685
100 MW - cancelled - texas - TX17 Nickel Prairie Storage -
63880
100 MW - cancelled - texas - TX18 Cottage Meadow Storage -
63879
100 MW - operation - colorado - Thunder Wolf Energy Center Hybrid -
63776
100 MW - operation - nevada - Dry Lake Solar Energy Center -
63933
316 MW - cancelled - new york - Ravenswood -
2500
90 MW - operation - nevada - Townsite Solar Project Hybrid -
60654
316 MW - cancelled - new york - Ravenswood -
2500
77 MW - operation - texas - Azure Sky Solar -
63905
75 MW - operation - nevada - Arrow Canyon Solar Hybrid -
62248
60 MW - operation - california - Cal Flats BESS -
63930
60 MW - cancelled - hawaii - Kupehau -
63799
52 MW - construction - hawaii - Ho'Ohana Solar 1 -
63723
50 MW - operation - texas - Lily Solar Hybrid -
63892
50 MW - planning - texas - TREX US Red Holly -
63202
50 MW - operation - arizona - El Sol BESS -
62964
125 MW - planning - california - Aratina Solar Center 1 Hybrid -
61167
46 MW - operation - alaska - Soldotna -
57206
40 MW - operation - texas - 2W Permian Solar Project Hybrid -
63255
40 MW - operation - california - Fallbrook Energy Storage -
61365
40 MW - operation - georgia - Cool Springs Solar (Hybrid) -
63721
40 MW - operation - georgia - Hickory Park Solar Hybrid -
63522
150 MW - operation - new mexico - Arroyo Solar Energy Storage Hybrid -
63172
40 MW - planning - california - EDPR CA Solar Park VI LLC (CA) Hybrid -
62892
38 MW - operation - arizona - Foothills Solar Plant Hybrid -
57997
36 MW - operation - arizona - Gila Bend Hybrid -
59020
43 MW - planning - california - Dynegy Oakland Power Plant -
6211
30 MW - operation - california - Top Gun Energy Storage -
61366
30 MW - operation - oregon - Wheatridge Hybrid -
62745
30 MW - operation - hawaii - AES Waikoloa Solar Hybrid -
63900
30 MW - construction - hawaii - Hale Kuawehi Solar Hybrid -
62529
25 MW - operation - massachusetts - Outer Cape Community Battery -
62604
25 MW - construction - california - Cascade Energy Storage, LLC -
61801
20 MW - operation - california - Johanna Energy Center, LLC -
63843
20 MW - operation - california - Hecate Energy Johanna Facility -
62889
20 MW - operation - new york - Willis Battery Storage -
63238
20 MW - cancelled - california - Renz Energy Storage -
63529
17 MW - operation - arizona - Cotton Center Solar Hybrid -
57561
17 MW - operation - arizona - Paloma Solar Hybrid -
57562
16 MW - operation - arizona - Hyder Solar Hybrid -
57563
15 MW - cancelled - hawaii - Paeahu Solar Hybrid -
62534
14 MW - operation - hawaii - AES Kekaha Solar, LLC Hybrid -
63280
14 MW - operation - arizona - Hyder II Hybrid -
58383
12 MW - operation - new mexico - Taos Mesa Energy Facility Hybrid -
63728
11 MW - operation - california - Silverstrand Grid Energy Storage System -
63735
22 MW - cancelled - california - Camino Solar -
63508
10 MW - operation - oklahoma - Rush Springs Energy Storage (BA) -
63458
20 MW - operation - california - Stanton Energy Reliability Center Hybrid -
60698
20 MW - operation - california - Stanton Energy Reliability Center Hybrid -
60698
10 MW - operation - california - Vallecito -
62801
10 MW - operation - california - Henrietta D Energy Storage LLC -
60641
10 MW - cancelled - california - Goleta Grid Resiliency -
63736
10 MW - construction - california - Painter Energy Storage -
62729
10 MW - cancelled - california - Chevron - Lost Hills Hybrid -
63545
10 MW - cancelled - arizona - Desert Star Hybrid -
62965
10 MW - operation - arkansas - Searcy Solar Hybrid -
62617
10 MW - construction - california - Sierra Energy Storage, LLC -
61803
Updated projects (0):