Iron Point Solar (Hybrid) πππ
Status
cancelled
Country / State / Closest City
πΊπΈ usa / nevada /
Dates
First heard |
2022-03 |
Construction start |
|
Operation start |
|
Estimated start |
2023-12 |
Month disappeared |
2023-02 |
Construction time |
|
Capacity in MWh
400
π This is an estimate
Maximum Power in MW
200
Manufacturer
Type / Number of Packs / Cells
/ /
Customer / Owner / Developer
/ Nevada Power Co /
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:41.693396+-114.906006
Coordinates
41.693396, -114.906006
π Coords are a guess. Only the state is known
Notes
Project website
Sources
Internal / External id
625 / 65377
U.S. EIA data
The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
Info from the
2023-01
report (Project first appeared in the
2022-03
report):
Plant Name / State
Iron Point Solar (Hybrid) / NV
go live / power
2023-12 / 200MW
status / status verbose
planning / (T) Regulatory approvals received. Not under construction
Plant id / generator id
65377 / IPB
Entity name / entity id
Nevada Power Co / 13407
Changes:
2023-02
This project disappeared in the
2023-02
report.
That's why the status was set to
cancelled