Chuckwalla Solar, LLC πππ€
Status
cancelled
Country / State / Closest City
πΊπΈ usa / nevada / Clark County
Dates
First heard |
2021-05 |
Construction start |
|
Operation start |
|
Estimated start |
2025-12 |
Month disappeared |
2024-02 |
Construction time |
|
Capacity in MWh
720
Maximum Power in MW
180
Manufacturer
Type / Number of Packs / Cells
/ /
Customer / Owner / Developer
/ Chuckwalla Solar, LLC / EDF Renewables
Use case
200 MW solar farm support
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:36.501562+-114.818882
Coordinates
36.501562, -114.818882
π Coords not known
Notes
Project website
https://www.chuckwallasolarprojectseis.com/about-the-projects.html
Sources
https://www.energy-storage.news/trio-of-solar-project-approvals-brings-nevada-utility-nv-energy-up-to-1000mw-storage-target/
Internal / External id
110 / 64558
U.S. EIA data
The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
Info from the
2024-01
report (Project first appeared in the
2021-05
report):
Plant Name / State
Chuckwalla Solar, LLC / NV
go live / power
2025-12 / 180MW
status / status verbose
planning / (P) Planned for installation, but regulatory approvals not initiated
Plant id / generator id
64558 / CHW1
Entity name / entity id
Chuckwalla Solar, LLC / 64186
Changes:
2023-02
date: 2023-12 -> 2025-12 delayed by
24 months
2024-02
This project disappeared in the
2024-02
report.
That's why the status was set to
cancelled