Chuckwalla Solar, LLC πŸ“πŸ“ŠπŸ‘€

Status
cancelled
Country / State / Closest City
πŸ‡ΊπŸ‡Έ usa / nevada / Clark County
Dates
First heard 2021-05
Construction start
Operation start
Estimated start 2025-12
Month disappeared 2024-02
Construction time
Capacity in MWh
720
Maximum Power in MW
180
Manufacturer
Type / Number of Packs / Cells
/ /
Customer / Owner / Developer
/ Chuckwalla Solar, LLC / EDF Renewables
Use case
200 MW solar farm support
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:36.501562+-114.818882
Coordinates
36.501562, -114.818882
πŸ“ Coords not known
Notes

Project website
https://www.chuckwallasolarprojectseis.com/about-the-projects.html
Sources
https://www.energy-storage.news/trio-of-solar-project-approvals-brings-nevada-utility-nv-energy-up-to-1000mw-storage-target/
Internal / External id
110 / 64558

U.S. EIA data

The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
Info from the 2024-01 report (Project first appeared in the 2021-05 report):

Plant Name / State
Chuckwalla Solar, LLC / NV
go live / power
2025-12 / 180MW
status / status verbose
planning / (P) Planned for installation, but regulatory approvals not initiated
Plant id / generator id
64558 / CHW1
Entity name / entity id
Chuckwalla Solar, LLC / 64186
Changes:
2023-02
date: 2023-12 -> 2025-12 delayed by 24 months



2024-02 This project disappeared in the 2024-02 report.
That's why the status was set to cancelled