Chestnut πππ 
Status 
operation 
Country / State / Closest CityπΊπΈ usa / california / 
Dates
    
        
            
                | First heard | 2023-03 | 
            
                | Construction start |  | 
            
                | Operation start | 2023-12 | 
            
                | Estimated start | 2023-09 | 
            
            
                | Construction time |  | 
        
     
 
Capacity in MWh 
    270
     
π  This is an estimate 
Maximum Power in MW135
Manufacturer 
Type / Number of Packs / Cells /  / 
Customer / Owner / Developer / Chestnut Westside, LLC /  
Use case
Link to google maps satellite viewhttp://maps.google.com/maps?z=19&t=k&q=loc:40.98838017893376+-121.39762135188055 
Coordinates
    40.98838017893376, -121.39762135188055 
    
 π Coords are a guess. Only the state is known
Notes
    
     
     
Project website  
Sources
     
Internal / External id
    953 / 63849
 U.S. EIA data 
The government data source for this battery is the U.S. Energy Information Administration (EIA)
    https://www.eia.gov/electricity/monthly/
Info from the 
2024-02 report (Project first appeared in the 
2023-03 report):
Plant Name / State
Chestnut / CA
go live / power2023-12 / 135MW
status / status verboseoperation / operation 
Plant id / generator id63849 / BESS1
Entity name / entity idChestnut Westside, LLC / 63526
Changes:
    2024-02
    
        status: construction -> operation πΎ π πΈ
    
        status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation 
     
    
2024-01
    
        date: 2023-11 -> 2023-12 delayed by 
1 month
     
    
2023-12
    
        date: 2023-10 -> 2023-11 delayed by 
1 month
     
    
2023-11
    
        date: 2023-09 -> 2023-10 delayed by 
1 month