Darien Solar πππ
Status
cancelled
Country / State / Closest City
πΊπΈ usa / wisconsin /
Dates
First heard |
2021-04 |
Construction start |
|
Operation start |
|
Estimated start |
2024-12 |
Month disappeared |
2024-02 |
Construction time |
|
Capacity in MWh
150
π This is an estimate
Maximum Power in MW
75
Manufacturer
Type / Number of Packs / Cells
/ /
Customer / Owner / Developer
/ Wisconsin Electric Power Co /
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:45.007776+-88.206482
Coordinates
45.007776, -88.206482
π Coords are a guess. Only the state is known
Notes
Project website
Sources
Internal / External id
255 / 64534
U.S. EIA data
The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
Info from the
2024-01
report (Project first appeared in the
2021-04
report):
Plant Name / State
Darien Solar / WI
go live / power
2024-12 / 75MW
status / status verbose
planning / (L) Regulatory approvals pending. Not under construction
Plant id / generator id
64534 / 2
Entity name / entity id
Wisconsin Electric Power Co / 20847
Changes:
2024-01
date: 2024-11 -> 2024-12 delayed by
1 month
2023-02
date: 2023-12 -> 2024-11 delayed by
11 months
2024-02
This project disappeared in the
2024-02
report.
That's why the status was set to
cancelled