Darien Solar πŸ“πŸ“ŠπŸ“

Status
cancelled
Country / State / Closest City
πŸ‡ΊπŸ‡Έ usa / wisconsin /
Dates
First heard 2021-04
Construction start
Operation start
Estimated start 2024-12
Month disappeared 2024-02
Construction time
Capacity in MWh
150
πŸ“ This is an estimate
Maximum Power in MW
75
Manufacturer
Type / Number of Packs / Cells
/ /
Customer / Owner / Developer
/ Wisconsin Electric Power Co /
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:45.007776+-88.206482
Coordinates
45.007776, -88.206482
πŸ“ Coords are a guess. Only the state is known
Notes

Project website
Sources
Internal / External id
255 / 64534

U.S. EIA data

The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
Info from the 2024-01 report (Project first appeared in the 2021-04 report):

Plant Name / State
Darien Solar / WI
go live / power
2024-12 / 75MW
status / status verbose
planning / (L) Regulatory approvals pending. Not under construction
Plant id / generator id
64534 / 2
Entity name / entity id
Wisconsin Electric Power Co / 20847
Changes:
2024-01
date: 2024-11 -> 2024-12 delayed by 1 month
2023-02
date: 2023-12 -> 2024-11 delayed by 11 months



2024-02 This project disappeared in the 2024-02 report.
That's why the status was set to cancelled