BCE Los Alamitos 1 πŸ“πŸ“ŠπŸ“

Status
operation
Country / State / Closest City
πŸ‡ΊπŸ‡Έ usa / california /
Dates
First heard 2023-05
Construction start
Operation start 2023-08
Estimated start
Construction time
Capacity in MWh
20
πŸ“ This is an estimate
Maximum Power in MW
10
Manufacturer
Type / Number of Packs / Cells
/ /
Customer / Owner / Developer
/ Bright Canyon Energy /
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:41.352677+-121.300049
Coordinates
41.352677, -121.300049
πŸ“ Coords are a guess. Only the state is known
Notes

Project website
Sources
Internal / External id
965 / 66533

U.S. EIA data

The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
Info from the 2024-02 report (Project first appeared in the 2023-05 report):

Plant Name / State
BCE Los Alamitos 1 / CA
go live / power
2023-08 / 10MW
status / status verbose
operation / operation
Plant id / generator id
66533 / BCE12
Entity name / entity id
Bright Canyon Energy / 65534
Changes:
2023-10
status: construction -> operation 🍾 πŸŽ‰ 🍸
status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation
2023-06
date: 2023-07 -> 2023-08 delayed by 1 month