BCE Los Alamitos 1 πππ 
Status 
operation 
Country / State / Closest City 
πΊπΈ usa / california / 
Dates
    
        
            
                | First heard | 
                2023-05 | 
            
            
                | Construction start | 
                 | 
            
            
                | Operation start | 
                2023-08 | 
            
            
                | Estimated start | 
                2023-07 | 
            
            
            
                | Construction time | 
                
                    
                 | 
            
        
     
 
Capacity in MWh 
    20
     
π  This is an estimate 
Maximum Power in MW 
10
Manufacturer 
 
Type / Number of Packs / Cells 
 /  / 
Customer / Owner / Developer
 / Bright Canyon Energy /  
Use case 
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:41.352677+-121.300049 
Coordinates 
    41.352677, -121.300049 
    
 π Coords are a guess. Only the state is known
Notes 
    
     
     
Project website 
  
 Sources 
     
 Internal / External id 
    965 / 66533
    
 U.S. EIA data 
The government data source for this battery is the U.S. Energy Information Administration (EIA)
    https://www.eia.gov/electricity/monthly/
Info from the 
2024-02 report (Project first appeared in the 
2023-05 report):
Plant Name / State
BCE Los Alamitos 1 / CA
go live / power 
2023-08 / 10MW
status / status verbose
operation / operation 
Plant id / generator id 
66533 / BCE12
Entity name / entity id 
Bright Canyon Energy / 65534
Changes:
    2023-10
    
        status: construction -> operation πΎ π πΈ
    
        status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation 
     
    
2023-06
    
        date: 2023-07 -> 2023-08 delayed by 
1 month