Peregrine Energy Storage LLC πŸ“ŠπŸ‘€

Status
planning
Country / State / Closest City
πŸ‡ΊπŸ‡Έ usa / california / San Diego
Dates
First heard 2023-03
Construction start
Operation start
Estimated start 2025-01
Construction time
Capacity in MWh
800
Maximum Power in MW
200
Manufacturer
tesla
Type / Number of Packs / Cells
megapack / /
Customer / Owner / Developer
arevon / Peregrine Energy Storage, LLC / tenaska
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:32.692183+-117.13667
Coordinates
32.692183, -117.13667
βœ… The site is known, coords are +/- 1 kilometer
Notes

Project website
https://arevonenergy.com/location/peregrine/
Sources
https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-san-diego/
Internal / External id
865 / 66286

U.S. EIA data

The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
Info from the 2024-07 report (Project first appeared in the 2023-03 report):

Plant Name / State
Peregrine Energy Storage LLC / CA
go live / power
2025-01 / 200MW
status / status verbose
planning / (L) Regulatory approvals pending. Not under construction
Plant id / generator id
66286 / PERE1
Entity name / entity id
Peregrine Energy Storage, LLC / 65398
Changes:
2024-06
date: 2024-10 -> 2025-01 delayed by 3 months
2024-04
date: 2024-09 -> 2024-10 delayed by 1 month
2024-02
date: 2024-12 -> 2024-09 accelerated by 3 months
2024-01
date: 2024-08 -> 2024-12 delayed by 4 months
2023-10
status_verbose: (T) Regulatory approvals received. Not under construction -> (L) Regulatory approvals pending. Not under construction