Condor Energy Storage LLC πŸ“ŠπŸ‘€

Status
construction
Country / State / Closest City
πŸ‡ΊπŸ‡Έ usa / california /
Dates
First heard 2023-03
Construction start 2023-10
Operation start
Estimated start 2024-04
Construction time
Capacity in MWh
800
Maximum Power in MW
200
Manufacturer
tesla
Type / Number of Packs / Cells
megapack / /
Customer / Owner / Developer
arevon / Condor Energy Storage LLC / tenaska
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:34.020505+-117.332255
Coordinates
34.020505, -117.332255
βœ… The site is known, coords are +/- 1 kilometer
Notes

Project website
https://arevonenergy.com/location/condor/
Sources
https://arevonenergy.com/new-utility-scale-battery-storage-facility-planned-for-city-of-grand-terrace/
Internal / External id
864 / 66285

U.S. EIA data

The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
Info from the 2024-02 report (Project first appeared in the 2023-03 report):

Plant Name / State
Condor Energy Storage LLC / CA
go live / power
2024-04 / 200MW
status / status verbose
construction / (V) Under construction, more than 50 percent complete
Plant id / generator id
66285 / COND1
Entity name / entity id
Condor Energy Storage LLC / 65397
Changes:
2024-02
date: 2024-03 -> 2024-04 delayed by 1 month
2023-12
status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
2023-10
status: planning -> construction πŸ—οΈ
status_verbose: (T) Regulatory approvals received. Not under construction -> (U) Under construction, less than or equal to 50 percent complete
date: 2024-08 -> 2024-03 accelerated by 5 months