Longbow BESS, LLC πŸ“πŸ“ŠπŸ“

Status
operation
Country / State / Closest City
πŸ‡ΊπŸ‡Έ usa / texas /
Dates
First heard 2024-01
Construction start
Operation start 2024-10
Estimated start 2024-07
Construction time
Capacity in MWh
348
πŸ“ This is an estimate
Maximum Power in MW
174
Manufacturer
Type / Number of Packs / Cells
/ /
Customer / Owner / Developer
/ Longbow BESS, LLC /
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:33.65154984477027+-95.54526771010998
Coordinates
33.65154984477027, -95.54526771010998
πŸ“ Coords are a guess. Only the state is known
Notes

Project website
Sources
Internal / External id
1188 / 67083

U.S. EIA data

The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
Info from the 2025-01 report (Project first appeared in the 2024-01 report):

Plant Name / State
Longbow BESS, LLC / TX
go live / power
2024-10 / 174MW
status / status verbose
operation / operation
Plant id / generator id
67083 / LBBES
Entity name / entity id
Longbow BESS, LLC / 65984
Changes:
2024-12
status: construction -> operation 🍾 πŸŽ‰ 🍸
status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation
2024-11
date: 2024-09 -> 2024-10 delayed by 1 month
2024-10
date: 2024-08 -> 2024-09 delayed by 1 month
2024-08
date: 2024-07 -> 2024-08 delayed by 1 month