Crimson πŸ“πŸ“ŠπŸ“

Status
operation
Country / State / Closest City
πŸ‡ΊπŸ‡Έ usa / california /
Dates
First heard 2021-12
Construction start
Operation start 2022-10
Estimated start 2022-08
Construction time
Capacity in MWh
700
πŸ“ This is an estimate
Maximum Power in MW
350
Manufacturer
Type / Number of Packs / Cells
/ /
Customer / Owner / Developer
/ RE Crimson LLC /
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:41.122677+-121.440049
Coordinates
41.122677, -121.440049
πŸ“ Coords are a guess. Only the state is known
Notes

Project website
Sources
Internal / External id
570 / 65140

U.S. EIA data

The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
This project has 2 generator ids under the same plant id
Info from the 2023-02 report (Project first appeared in the 2021-12 report):

Plant Name / State
Crimson / CA
go live / power
2022-10 / 200MW
status / status verbose
operation / operation
Plant id / generator id
65140 / SWSH1
Entity name / entity id
RE Crimson LLC / 64513
Changes:
2022-12
status: construction -> operation 🍾 πŸŽ‰ 🍸
status_verbose: (V) Under construction, more than 50 percent complete -> operation
2022-11
status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
date: 2022-09 -> 2022-10 delayed by 1 month
2022-10
date: 2022-08 -> 2022-09 delayed by 1 month
2022-08
date: 2022-06 -> 2022-08 delayed by 2 months
2022-04
date: 2022-08 -> 2022-06 accelerated by 2 months


Info from the 2023-02 report (Project first appeared in the 2021-12 report):

Plant Name / State
Crimson / CA
go live / power
2022-10 / 150MW
status / status verbose
operation / operation
Plant id / generator id
65140 / SWSH2
Entity name / entity id
RE Crimson LLC / 64513
Changes:
2022-12
status: construction -> operation 🍾 πŸŽ‰ 🍸
status_verbose: (V) Under construction, more than 50 percent complete -> operation
2022-11
status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
2022-10
date: 2022-09 -> 2022-10 delayed by 1 month
2022-08
date: 2022-08 -> 2022-09 delayed by 1 month
2022-04
date: 2022-10 -> 2022-08 accelerated by 2 months