Bird Dog Energy Storage πŸ“πŸ“ŠπŸ“

Status
construction
Country / State / Closest City
πŸ‡ΊπŸ‡Έ usa / texas /
Dates
First heard 2025-02
Construction start
Operation start
Estimated start 2026-05
Construction time
Capacity in MWh
120
πŸ“ This is an estimate
Maximum Power in MW
60
Manufacturer
Type / Number of Packs / Cells
/ /
Customer / Owner / Developer
/ VESI 37 LLC /
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:33.428714606461256+-95.3514246343362
Coordinates
33.428714606461256, -95.3514246343362
πŸ“ Coords are a guess. Only the state is known
Notes

Project website
Sources
Internal / External id
1731 / 68495

U.S. EIA data

The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
Info from the 2025-04 report (Project first appeared in the 2025-02 report):

Plant Name / State
Bird Dog Energy Storage / TX
go live / power
2026-05 / 60MW
status / status verbose
construction / (U) Under construction, less than or equal to 50 percent complete
Plant id / generator id
68495 / BDOG1
Entity name / entity id
VESI 37 LLC / 66849
Changes:
2025-04
date: 2026-01 -> 2026-05 delayed by 4 months