Edwards Sanborn E1B πŸ“πŸ“ŠπŸ“

Status
operation
Country / State / Closest City
πŸ‡ΊπŸ‡Έ usa / california /
Dates
First heard 2022-06
Construction start
Operation start 2023-11
Estimated start
Construction time
Capacity in MWh
272
πŸ“ This is an estimate
Maximum Power in MW
136
Manufacturer
Type / Number of Packs / Cells
/ /
Customer / Owner / Developer
/ Terra-Gen Operating Co-Hybrid /
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:40.91342545018388+-121.01203895000252
Coordinates
40.91342545018388, -121.01203895000252
πŸ“ Coords are a guess. Only the state is known
Notes

Project website
Sources
Internal / External id
698 / 65674

U.S. EIA data

The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
Info from the 2024-02 report (Project first appeared in the 2022-06 report):

Plant Name / State
Edwards Sanborn E1B / CA
go live / power
2023-11 / 136MW
status / status verbose
operation / operation
Plant id / generator id
65674 / BESS
Entity name / entity id
Terra-Gen Operating Co-Hybrid / 64366
Changes:
2024-01
status: construction -> operation 🍾 πŸŽ‰ 🍸
status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation
2023-12
date: 2023-10 -> 2023-11 delayed by 1 month
2023-04
mw: 140 -> 136
2023-01
date: 2023-09 -> 2023-10 delayed by 1 month
2022-12
date: 2023-08 -> 2023-09 delayed by 1 month