Goleta Grid Resiliency πππ
Status
cancelled
Country / State / Closest City
πΊπΈ usa / california /
Dates
First heard |
2020-09 |
Construction start |
|
Operation start |
|
Estimated start |
2022-09 |
Month disappeared |
2021-11 |
Construction time |
|
Capacity in MWh
20
π This is an estimate
Maximum Power in MW
10
Manufacturer
Type / Number of Packs / Cells
/ /
Customer / Owner / Developer
/ esVolta LP /
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:40.91342545018388+-121.01203895000252
Coordinates
40.91342545018388, -121.01203895000252
π Coords are a guess. Only the state is known
Notes
Project website
Sources
Internal / External id
198 / 63736
U.S. EIA data
The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
Info from the
2021-10
report (Project first appeared in the
2020-09
report):
Plant Name / State
Goleta Grid Resiliency / CA
go live / power
2022-09 / 10MW
status / status verbose
planning / (L) Regulatory approvals pending. Not under construction
Plant id / generator id
63736 / BESS1
Entity name / entity id
esVolta LP / 61198
Changes:
2021-05
date: 2022-12 -> 2022-09 accelerated by
3 months
2021-02
entity id: 62742 -> 61198
entity name: ENEL BELLA ENERGY STORAGE, LLC -> esVolta LP
2021-01
date: 2021-06 -> 2022-12 delayed by
18 months
2020-12
date: 2021-03 -> 2021-06 delayed by
3 months
2021-11
This project disappeared in the
2021-11
report.
That's why the status was set to
cancelled