North Fork TX πŸ“πŸ“ŠπŸ‘€

Status
operation
Country / State / Closest City
πŸ‡ΊπŸ‡Έ usa / texas / Williamson County
Dates
First heard 2021-02
Construction start
Operation start 2021-10
Estimated start
Construction time
Capacity in MWh
100
Maximum Power in MW
100
Manufacturer
Type / Number of Packs / Cells
/ /
Customer / Owner / Developer
/ Broad Reach Power / Plus Power
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:30.655335+-97.883739
Coordinates
30.655335, -97.883739
πŸ“ Coords not known
Notes
location from the broad reach power website, but do not think it is correct
Project website
https://broadreachpower.com/projects/
Sources
https://www.solarpowerworldonline.com/2020/09/texas-ipp-broad-reach-power-to-bring-200-mw-of-energy-storage-online-next-year/
Internal / External id
116 / 64317

U.S. EIA data

The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
Info from the 2022-02 report (Project first appeared in the 2021-02 report):

Plant Name / State
North Fork TX / TX
go live / power
2021-10 / 100MW
status / status verbose
operation / operation
Plant id / generator id
64317 / NF
Entity name / entity id
Broad Reach Power / 63883
Changes:
2021-12
status: construction -> operation 🍾 πŸŽ‰ 🍸
status_verbose: (V) Under construction, more than 50 percent complete -> operation
2021-11
date: 2021-09 -> 2021-10 delayed by 1 month
2021-10
date: 2021-08 -> 2021-09 delayed by 1 month
2021-09
date: 2021-07 -> 2021-08 delayed by 1 month
2021-08
status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
date: 2021-06 -> 2021-07 delayed by 1 month