Dates
First heard |
2023-04 |
Construction start |
|
Operation start |
|
Estimated start |
2024-08 |
Construction time |
|
Capacity in MWh
20
π This is an estimate
Maximum Power in MW
10
Manufacturer
Type / Number of Packs / Cells
/ /
Customer / Owner / Developer
/ Grizzly Ridge Solar LLC /
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:33.537746973433975+-95.24624450449501
Coordinates
33.537746973433975, -95.24624450449501
π Coords are a guess. Only the state is known
Notes
Project website
Sources
Internal / External id
1004 / 66410
U.S. EIA data
The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
Info from the
2024-07
report (Project first appeared in the
2023-04
report):
Plant Name / State
Grizzly Ridge Solar / TX
go live / power
2024-08 / 10MW
status / status verbose
planning / (P) Planned for installation, but regulatory approvals not initiated
Plant id / generator id
66410 / 596
Entity name / entity id
Grizzly Ridge Solar LLC / 65451
Changes:
2024-01
date: 2024-04 -> 2024-08 delayed by
4 months
2023-12
date: 2024-02 -> 2024-04 delayed by
2 months
2023-06
date: 2023-04 -> 2024-02 delayed by
10 months