πŸ‡¬πŸ‡§ UK REPD data (>10MW)

Latest UK REPD report from 2024-04
operation πŸ—οΈ πŸ’»
Projects count 62 56 590
Total πŸ”‹ battery power in GW 2.2 3.4 53.5
πŸ—οΈ = construction; πŸ’» = planning

Monthly big battery changes from UK REPD reports


2024-04

New projects (79):
1000 MW - planning - wales - Rover Way, Splott - Energy Park & Data Centre - 16190
650 MW - planning - scotland - Braxbess Battery Storage - 15169
560 MW - planning - scotland - Whitehall Battery Storage - 15797
400 MW - planning - scotland - Glenside Farm - Battery Storage - 14988
400 MW - planning - north west - Low Harker Farm, Low Harker - Battery Storage Facility - 15956
400 MW - planning - west midlands - Cellarhead Substation, Rownall Road - Battery Storage Facility - 16111
400 MW - planning - wales - Bronwylfa Road, Rhostyllen - Energy Storage System - 16114
300 MW - planning - scotland - Kintore Energy Storage Project - 10467
290 MW - planning - south west - Saundercroft Farm - Battery Energy Storage System - 13980
250 MW - planning - eastern - Toddington Services, Hipsey Spinney - Battery Storage - 15883
249 MW - planning - south east - Ridham Avenue, Swale Way - Kemsley Battery Energy Storage - 15779
200 MW - planning - eastern - Walsoken, Burrettgate Road - Battery Storage Facility - 15647
200 MW - planning - south east - Sunbury Battery Energy Storage System - Battery Energy Storage System - 15814
150 MW - planning - scotland - Neilston - Battery Storage - 14538
120 MW - planning - scotland - Glen Ullinish II - Wind Farm - 14534
100 MW - planning - scotland - Flemyland Battery Storage - 13770
100 MW - planning - yorkshire and humber - Moat Lane, Wickersley - Battery Storage Facility - 15746
100 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage - 16047
100 MW - planning - yorkshire and humber - Moat Lane, Wickersley - Battery Storage Facility - 16065
99 MW - planning - west midlands - Newfields Farm - Battery Energy Storage - 10233
99 MW - planning - south west - Landulph Substation, Landulph - Battery Storage - 13852
99 MW - planning - west midlands - Newfields Farm, Rownall Road - Battery Energy Storage - 14342
90 MW - planning - south west - Summerway Drove, East Bower - Battery Storage - 15716
85 MW - planning - east midlands - Old Wood Energy Park - Battery Energy Storage - 16013
80 MW - planning - yorkshire and humber - Midland Road - Battery Energy Storage - 15911
70 MW - planning - west midlands - Oaklands Farm, New Road - Battery Energy Storage - 15735
70 MW - planning - north west - Sandyforth Farm, Ashton Road - Battery Energy Storage - 15930
57 MW - planning - south east - Kent Street, Cowfold - Battery Energy Storage System - 14922
50 MW - planning - eastern - Nutsgrove Farm, Thorney - Battery Energy Storage - 9976
50 MW - planning - south west - Pinkworthy Farm, Pyworthy - Battery Storage - 13509
50 MW - planning - scotland - Coylton Substation, Coylton - Battery Energy Storage - 14170
50 MW - planning - south west - Wareham Road, Scouse Farm - Battery Storage - 15962
50 MW - operation - eastern - Burwell - Battery Storage - 15994
50 MW - planning - scotland - Aultmore Forest - Buckie - Windfarm - 15995
49 MW - planning - scotland - Lochluichart - Energy Storage Facility - 9220
49 MW - planning - scotland - Cornhills Farm, Muttonhole Road - Battery Storage - 11647
49 MW - planning - yorkshire and humber - Hewitts Avenue, New Waltham - Battery Storage - 11832
49 MW - planning - scotland - Balwyllo Farm, Dun - Energy Storage Facility - 13058
49 MW - planning - scotland - Templeton Farm, Templeton - Battery Storage - 13605
49 MW - planning - scotland - Existing Kaimes Substation, Old Burdiehouse Road - Battery Storage - 13809
49 MW - planning - scotland - Dunbar Grid Substation - Battery Storage - 13864
49 MW - planning - scotland - Ardencaple Farm - Battery Storage - 14381
49 MW - planning - scotland - Bankhead, Arbirlot - Battery Energy Storage - 14985
49 MW - planning - scotland - Glengolly Farmhouse- Battery Energy Storage - 15088
49 MW - planning - scotland - Dunmill, Substation Dun - 49.9MW Battery Energy Storage - 15233
49 MW - planning - scotland - Kintore Substation, Leylodge - Battery Energy Storage - 15627
49 MW - planning - west midlands - Hobble Lane, Great Wyrley - Battery Energy Storage - 15802
49 MW - planning - wales - The Greenlink Converter Station - Lambeeth Battery Energy Storage - 15803
49 MW - planning - scotland - New Craigie Retail Park - Battery Energy Storage - 16018
49 MW - planning - eastern - Rush Green Motors - Battery storage - 16045
49 MW - operation - scotland - Camilla Battery Storage - 16075
49 MW - planning - west midlands - Hinksford Substation, Hinksford Lane - Battery Energy Storage - 16101
49 MW - planning - scotland - Barnwell, Wright Street - Battery Energy Storage - 16107
49 MW - planning - scotland - Coupar Angus, Pleasance Road - Battery Energy Facility - 16137
45 MW - planning - north west - Huncoat Power Station - Battery Storage Facility - 13080
45 MW - planning - scotland - The Smithy - Battery Storage - 14676
45 MW - planning - north west - Huncoat Power Station - Battery Storage Facility - 15712
41 MW - planning - scotland - Ladyfield Renewable Energy Park - 15785
40 MW - planning - east midlands - Heanor Road - Battery Energy Storage System - 13472
40 MW - planning - west midlands - Draycott Cross Road - Battery Storage System - 14284
39 MW - planning - scotland - Locarno Works, Brown Street - Battery Storage - 14232
37 MW - planning - east midlands - Oaklands Solar Farm Project - Solar Farm & Battery Storage - 9547
30 MW - planning - scotland - Burnbank Street, Greenhill - Battery Storage Facility - 9368
30 MW - planning - yorkshire and humber - Immingham Solar Farm - Battery Storage Facility - 16092
30 MW - planning - scotland - Kellas Wind Farm - 16138
25 MW - planning - scotland - Bankhead Farm - Energy Storage System - 14450
25 MW - planning - scotland - Fernishaw Solar Farm & Battery Energy Storage Facility - 14541
25 MW - planning - east midlands - West Thorpe Church Farm, Willoughby On The Wolds - Battery Energy Storage - 15938
25 MW - planning - south west - Pinkworthy Farm, Pyworthy - Battery Storage - 16068
24 MW - planning - scotland - Parkhouse Road - Battery Energy Storage - 16086
22 MW - planning - scotland - Crutherland Farm, Crutherland Highway - Battery Energy Storage - 15523
20 MW - planning - scotland - Duddingston Solar Farm and Battery Storage - 11383
20 MW - planning - scotland - Craigshaw Drive - Battery Storage Facility & Electric Vehicle Charging Hub - 15435
16 MW - planning - south east - Allington Lane - Solar & Battery Farm - 14585
15 MW - planning - west midlands - Flashbrook Road, Knighton - Solar Farm - 16066
14 MW - planning - scotland - Luggies Knowe, Hill Of Gremista - Wind Turbines & Battery Storage - 15823
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 13480
10 MW - planning - south east - Wharf Road, Discovery Park - Battery Energy Storage - 15093
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 16074

Disappeared projects (10):
600 MW - cancelled - east midlands - West Leake Lane, Ratcliffe - Battery Storage - 12464
99 MW - cancelled - west midlands - Illeybrook Farm - Battery Energy Storage - 14064
60 MW - cancelled - south west - Coldharbour, Chickerell - Battery Storage Facility - 12967
50 MW - cancelled - scotland - Seath Road, Rutherglen - Battery Storage - 14378
50 MW - cancelled - scotland - CoyltonοΏ½GreenerοΏ½GridοΏ½Park - 15312
49 MW - cancelled - south west - Ravensroost Farm, Minety - Battery Energy Storage - 7014
49 MW - cancelled - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility - 15230
49 MW - cancelled - south east - Burcot Solar Farm - 15444
30 MW - cancelled - west midlands - Tanners Lane - Battery Energy Storage System - 15128
10 MW - cancelled - scotland - Lethen Wind Farm Wind Turbines and Energy Storage - 10237

Updated projects (246):

300 MW - construction - scotland - Kilmarnock South Substation - Battery storage - 9696

  Record Last Updated (dd/mm/yyyy): 27/09/2021 ->
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 26/01/2024
  status: planning -> construction πŸ—οΈ
230 MW - construction - wales - Uskmouth Power Station - Battery Storage - 10936

  Record Last Updated (dd/mm/yyyy): 06/04/2022 ->
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Planning Permission Refused: -> 07/12/2022
  Under Construction: -> 01/11/2023
  status: planning -> construction πŸ—οΈ
150 MW - construction - north west - Fiddlers Ferry Power Station - Battery storage - 9404

  Record Last Updated (dd/mm/yyyy): 08/08/2022 -> 21/03/2024
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Planning Permission Expired: 20/06/2026 -> 46193
  Under Construction: -> 28/03/2024
  status: planning -> construction πŸ—οΈ
49 MW - construction - south west - Larks Green Solar Farm - 8052

  Record Last Updated (dd/mm/yyyy): 30/09/2020 -> 15/02/2024
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/01/2024
  status: planning -> construction πŸ—οΈ
49 MW - construction - scotland - Whitehills Energy Storage Facility - 8916

  Record Last Updated (dd/mm/yyyy): 17/10/2022 -> 08/03/2024
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/02/2024
  status: planning -> construction πŸ—οΈ
49 MW - operation - scotland - Pleasance Road - Battery Energy Facility - 9997

  Record Last Updated (dd/mm/yyyy): 12/07/2022 ->
  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  Planning Permission Refused: -> 01/06/2022
  Operational: -> 01/01/2023
  status: planning -> operation 🍾 πŸŽ‰ 🍸
49 MW - operation - scotland - Jamesfield Organic Centre - Battery Storage - 10863 Megapack

  Record Last Updated (dd/mm/yyyy): 24/03/2022 ->
  Development Status: Under Construction -> Operational
  Development Status (short): Under Construction -> Operational
  Are they re-applying (Old REPD Ref) : 7315 & 10456 ->
  Planning Permission Refused: -> 28/09/2022
  Operational: -> 01/02/2024
  status: construction -> operation 🍾 πŸŽ‰ 🍸
40 MW - operation - south east - Newlands Farm Battery Storage Facility Phase 2 - 8264

  Record Last Updated (dd/mm/yyyy): 18/03/2022 -> 15/02/2024
  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  Planning Permission Expired: 26/01/2024 -> 45317
  Under Construction: -> 27/02/2022
  Operational: -> 01/09/2022
  status: planning -> operation 🍾 πŸŽ‰ 🍸
40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage - 9584

  Record Last Updated (dd/mm/yyyy): 05/07/2023 ->
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 27/02/2024
  status: planning -> construction πŸ—οΈ
40 MW - construction - south east - Derehams Farm, Derehams Lane - Battery Storage - 12803

  Record Last Updated (dd/mm/yyyy): 12/07/2023 -> 22/02/2024
  Operator (or Applicant): Capbal Limited -> Eku Energy
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Planning Permission Refused: -> 29/06/2023
  Under Construction: -> 19/02/2024
  status: planning -> construction πŸ—οΈ
40 MW - construction - scotland - Cumberhead West Wind Farm - 15343

  Operator (or Applicant): Unknown -> 3R Energy Solutions Limited
  Site Name: Midland Road - Battery Energy Storage -> Cumberhead West Wind Farm
  Storage Type: Stand-alone Storage -> Co-located with RE
  Storage Co-location REPD Ref ID: -> 3328
  Installed Capacity (MWelec): 80 -> 40
  Development Status: Planning Application Submitted -> Under Construction
  Development Status (short): Application Submitted -> Under Construction
  Address: Midland Road, Bradford -> Cumberhead Forest
  County: West Yorkshire -> Strathclyde
  Region: Yorkshire and Humber -> Scotland
  Country: England -> Scotland
  Post Code: BD8 7DY -> ML11 9AX
  X-coordinate: 416090 -> 281169
  Y-coordinate: 434143 -> 635550
  Planning Authority: Bradford Metropolitan District Council -> Scottish Government (S36)
  Planning Application Submitted: 23/10/2023 -> 02/12/2020
  Planning Permission Expired: -> 18/11/2027
  Under Construction: -> 01/10/2023
  lat: 53.80334 -> 55.599018
  long: -1.757175 -> -3.887474
  status: planning -> construction πŸ—οΈ
  mw: 80 -> 40
28 MW - construction - eastern - Lower Dunton Road Battery Storage Facility - 8213

  Record Last Updated (dd/mm/yyyy): 11/01/2022 -> 22/02/2024
  Operator (or Applicant): Cedar Tech Developments Limited -> Eku Energy
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 19/02/2024
  status: planning -> construction πŸ—οΈ
20 MW - construction - north west - Welkin Road, Bredbury - Battery Storage System - 13740

  Record Last Updated (dd/mm/yyyy): 25/04/2023 -> 29/02/2024
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Are they re-applying (Old REPD Ref) : 8275 ->
  Under Construction: -> 27/02/2024
  status: planning -> construction πŸ—οΈ
10 MW - planning - scotland - Binn Eco Park - Battery - 9098

  Record Last Updated (dd/mm/yyyy): 27/10/2023 -> 23/02/2024
  Development Status: Under Construction -> Planning Permission Granted
  Development Status (short): Under Construction -> Awaiting Construction
  Under Construction: 01/09/2023 ->
  status: construction -> planning

1450 MW - planning - yorkshire and humber - Thorpe Marsh Power Station - Battery Energy Storage - 12453

  Are they re-applying (Old REPD Ref) : -> 8470
1040 MW - planning - north west - Carrington Power Station, Manchester Road - Battery Storage - 13362

  Planning Permission Expired: NA ->
1000 MW - planning - scotland - Coalburn II Energy Storage Facility - Battery Storage Facility - 12206

  Record Last Updated (dd/mm/yyyy): 12/01/2023 -> 08/02/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 24/01/2027
550 MW - planning - east midlands - Spalding Energy Park - Battery Storage - 10173

  Record Last Updated (dd/mm/yyyy): 28/12/2021 ->
500 MW - planning - scotland - Coalburn Energy - Battery Storage - 11034

  Record Last Updated (dd/mm/yyyy): 20/04/2022 ->
  Site Name: Coalburn II Energy - Battery Storage -> Coalburn Energy - Battery Storage
500 MW - planning - east midlands - Normanton Energy Reserve - Battery Storage - 11988

  Record Last Updated (dd/mm/yyyy): 18/01/2023 -> 23/01/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 16/01/2027
450 MW - planning - eastern - Gateway Energy Centre - Battery Energy Storage - 10309

  Record Last Updated (dd/mm/yyyy): 17/12/2021 ->
400 MW - planning - scotland - Hunterston Grid Services Complex - Energy Storage Facility - 10535

  Record Last Updated (dd/mm/yyyy): 03/02/2022 ->
400 MW - planning - scotland - Kincardine Grid Services Complex - Energy Storage Facility - 10536

  Record Last Updated (dd/mm/yyyy): 08/06/2022 ->
350 MW - planning - scotland - Camsiscan Farm, Craigie - Battery Energy Storage System - 12820

  Record Last Updated (dd/mm/yyyy): 09/02/2023 -> 08/02/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Authority: North Ayrshire Council -> Scottish Government (S36)
  Planning Permission Expired: -> 26/01/2027
349 MW - planning - west midlands - Dunton Hall - Battery Energy Storage System - 9427

  Record Last Updated (dd/mm/yyyy): 17/05/2022 ->
349 MW - planning - west midlands - Cellarhead - Battery Site - 10013

  Record Last Updated (dd/mm/yyyy): 29/11/2021 ->
349 MW - planning - wales - Penrhos Works - Battery Energy Storage System - 15472

  Record Last Updated (dd/mm/yyyy): 21/12/2023 -> 27/02/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
320 MW - planning - yorkshire and humber - Monk Fryston Battery Storage - 15164

  Planning Permission Refused: 15/12/2021 ->
300 MW - construction - scotland - Blackhillock Electricity Substation - Battery Energy Storage System - 9723

  Record Last Updated (dd/mm/yyyy): 28/09/2021 ->
264 MW - planning - south east - Bolney Substation - Battery Storage - 10843

  Record Last Updated (dd/mm/yyyy): 22/03/2022 ->
  Are they re-applying (Old REPD Ref) : -> 8986
250 MW - planning - eastern - Toddington Services, Hipsey Spinney - Battery Storage - 15573

  Record Last Updated (dd/mm/yyyy): 12/01/2024 -> 27/02/2024
  Development Status: Planning Application Submitted -> Revised
  Development Status (short): Application Submitted -> Revised
  Are they re-applying (New REPD Ref): -> 15883
  Planning Application Withdrawn: -> 13/02/2024
249 MW - planning - south east - Richborough Energy Park - Phase 3 (Sheaf) - 11201

  Record Last Updated (dd/mm/yyyy): 10/05/2022 ->
200 MW - planning - yorkshire and humber - Drax Re-Power - 7017

  Planning Permission Expired: NA ->
200 MW - planning - north west - Heysham Energy Storage Project - 9545

  Record Last Updated (dd/mm/yyyy): 30/05/2022 ->
200 MW - planning - scotland - Carlisle Road - Battery Energy Storage System - 9684

  Record Last Updated (dd/mm/yyyy): 23/09/2021 ->
200 MW - planning - eastern - Hornsea Project Three - Battery Storage - 9754 Megapack

  Record Last Updated (dd/mm/yyyy): 23/01/2023 ->
200 MW - planning - scotland - Whitehill Energy Storage - 10466

  Record Last Updated (dd/mm/yyyy): 27/01/2022 ->
200 MW - planning - scotland - Windyhill Battery Storage Facility - 10596

  Record Last Updated (dd/mm/yyyy): 09/02/2022 ->
200 MW - planning - north west - Todhills and Westlinton - Harker Battery Energy Storage Facility - 15599

  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
150 MW - construction - south east - Cleve Hill Solar Project - 7856

  Planning Permission Refused: -> 28/05/2020
  Under Construction: -> 01/04/2023
150 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy - 10022

  Record Last Updated (dd/mm/yyyy): 29/11/2021 ->
  Planning Permission Expired: PD ->
150 MW - planning - north west - Printworks Road - Stalybridge Battery Storage - 10808

  Record Last Updated (dd/mm/yyyy): 19/12/2023 ->
150 MW - planning - north east - Wilton International, Greystones Road - Phase 1 - 14729

  Planning Permission Expired: PD ->
130 MW - planning - eastern - Stoke Lane - Battery Energy Storage - 10390

  Record Last Updated (dd/mm/yyyy): 17/10/2022 ->
100 MW - planning - south east - Minchens Lane Battery Storage Facility - 8434

  Planning Authority: Basingstoke & Deane Borough Council -> Basingstoke and Deane Borough Council
  Planning Permission Refused: 08/10/2021 ->
100 MW - planning - yorkshire and humber - Hales Lane - Battery Storage Facility - 9635

  Record Last Updated (dd/mm/yyyy): 19/05/2022 ->
100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage - 9691

  Record Last Updated (dd/mm/yyyy): 06/03/2023 ->
100 MW - planning - eastern - North Walpole, St Peter - Battery Energy Storage - 9762

  Record Last Updated (dd/mm/yyyy): 07/10/2021 ->
100 MW - planning - north west - Cholmondeley Road - Battery Storage - 9763

  Record Last Updated (dd/mm/yyyy): 15/08/2022 ->
100 MW - planning - south west - St Dennis - Battery Energy Storage - 10058

  Record Last Updated (dd/mm/yyyy): 02/12/2021 ->
100 MW - planning - south east - Penn Croft Farm, Crondall - Battery Energy Storage Facility - 10163

  Record Last Updated (dd/mm/yyyy): 24/12/2021 ->
100 MW - construction - eastern - Bullen Lane - Battery Storage - 10311

  Record Last Updated (dd/mm/yyyy): 05/12/2023 ->
100 MW - planning - south west - Shaftesbury Energy Park - Battery Storage System - 10626

  Record Last Updated (dd/mm/yyyy): 16/02/2022 ->
100 MW - planning - eastern - Walpole St Andrew - Battery storage - 10876

  Record Last Updated (dd/mm/yyyy): 29/03/2022 ->
100 MW - planning - north west - Hillside Farm, Lancaster Road - Battery Storage - 11948

  Are they re-applying (New REPD Ref): 12964 ->
100 MW - planning - scotland - Hill of Fare - Hill of Fare Wind Farm & Battery Storage - 12026

  Are they re-applying (Old REPD Ref) : -> 2975
100 MW - operation - north west - National Grid Electricity Substation, Capenhurst Lane - Battery Storage - 12725

  Planning Authority: Cheshire West and Chester Council -> Cheshire West & Chester Council
  Planning Permission Refused: -> 01/02/2021
100 MW - planning - north west - Hillside Farm, Lancaster Road - Battery Storage - 12964

  Are they re-applying (Old REPD Ref) : 11948 ->
100 MW - planning - scotland - Learielaw Farm, Learielaw - Battery Energy Storage - 13368

  Record Last Updated (dd/mm/yyyy): 08/01/2024 -> 19/02/2024
  Are they re-applying (Old REPD Ref) : 7970 ->
99 MW - planning - yorkshire and humber - Scawby Brook, Brigg - Battery Storage - 9848

  Record Last Updated (dd/mm/yyyy): 26/10/2021 ->
  Planning Permission Expired: PD ->
99 MW - planning - north east - South Thinford Lane, Thinford - Energy Storage - 10489

  Record Last Updated (dd/mm/yyyy): 28/01/2022 ->
99 MW - planning - south east - Butts Field, Mill Lane - Battery Storage - 13573

  Are they re-applying (Old REPD Ref) : -> 7399
95 MW - planning - yorkshire and humber - Winterton Road - Battery Energy Storage - 9608

  Record Last Updated (dd/mm/yyyy): 15/09/2021 ->
93 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage - 15610

  Record Last Updated (dd/mm/yyyy): 15/01/2024 -> 12/04/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 08/04/2029
90 MW - planning - east midlands - Caldwell Road - Battery Storage - 9507

  Record Last Updated (dd/mm/yyyy): 04/11/2022 ->
80 MW - planning - yorkshire and humber - Netherlands Way - Battery Energy Facility - 10429

  Record Last Updated (dd/mm/yyyy): 19/01/2022 ->
  Are they re-applying (Old REPD Ref) : 7090 ->
80 MW - planning - scotland - Tealing Battery Energy Storage Farm - 11097

  Record Last Updated (dd/mm/yyyy): 09/01/2024 ->
80 MW - planning - yorkshire and humber - Barlow Road, Barlow Road - Battery Storage - 12734

  Are they re-applying (New REPD Ref): 14715 ->
  Are they re-applying (Old REPD Ref) : 9970 ->
  Planning Permission Refused: 08/03/2023 ->
75 MW - planning - west midlands - Holly Lane Energy Park - Solar Farm & Battery Storage - 13695

  Are they re-applying (New REPD Ref): ->
75 MW - planning - north east - Belasis Avenue - Battery Storage - 13850

  Are they re-applying (New REPD Ref): ->
75 MW - planning - northern ireland - Quarterland Road, Islandmagee - Battery Storage - 14117

  Record Last Updated (dd/mm/yyyy): 20/06/2023 -> 23/01/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 19/01/2029
70 MW - planning - north west - Tontine Road - Battery Energy Storage System - 9819

  Record Last Updated (dd/mm/yyyy): 19/10/2021 ->
70 MW - planning - scotland - Shetland Battery Energy Storage System - 12856

  Record Last Updated (dd/mm/yyyy): 12/09/2023 -> 10/04/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 21/02/2027
69 MW - planning - eastern - Thurleigh Road - Battery Energy Storage - 9651

  Record Last Updated (dd/mm/yyyy): 20/09/2021 ->
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 30/01/2027
60 MW - planning - north east - Greystones Road, Grangetown - Battery Energy Storage System - 10081

  Record Last Updated (dd/mm/yyyy): 11/11/2021 ->
  Planning Permission Expired: PD ->
60 MW - planning - yorkshire and humber - Redcote Lane, Armley - Battery Storage Facility - 12224

  Are they re-applying (Old REPD Ref) : 7111 ->
60 MW - planning - south east - Misslebrook Farm, Botley Road - Battery Storage - 12691

  Planning Authority: Test Valley Council -> Test Valley Borough Council
57 MW - planning - north west - Capenhurst Lane - 8283

  Planning Authority: Cheshire West and Chester Council -> Cheshire West & Chester Council
57 MW - construction - north west - Capenhurst Lane, Capenhurst - Battery storage - 9377

  Planning Authority: Cheshire West and Chester Council -> Cheshire West & Chester Council
57 MW - planning - south east - Ash Lane, Little London - Battery Storage - 11090

  Record Last Updated (dd/mm/yyyy): 27/04/2022 ->
  Planning Authority: Basingstoke & Deane Borough Council -> Basingstoke and Deane Borough Council
  Planning Permission Expired: NA ->
57 MW - planning - north west - Penwortham - Battery storage - 11217

  Record Last Updated (dd/mm/yyyy): 10/05/2022 ->
57 MW - planning - north west - Sutton Manor - Battery Storage Facility - 11559

  Are they re-applying (Old REPD Ref) : 8439 ->
57 MW - planning - eastern - Braintree Road, Cressing - Battery Storage - 11995

  Mounting Type for Solar: Ground ->
  Are they re-applying (Old REPD Ref) : 7161 ->
57 MW - planning - north west - Waterloo Farm, Furbarn Road - Battery Storage - 12187

  Are they re-applying (New REPD Ref): 14597 ->
57 MW - planning - south east - Coxmoor Wood, Crondall Road - Battery Storage - 13728

  Are they re-applying (New REPD Ref): ->
50 MW - operation - south east - Richborough Energy Park - Phase 2 - 9626

  Record Last Updated (dd/mm/yyyy): 11/01/2024 ->
50 MW - planning - south east - Upton Lane, Nursling - Battery Storage Facility - 9673

  Record Last Updated (dd/mm/yyyy): 22/09/2021 ->
50 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage - 9910

  Record Last Updated (dd/mm/yyyy): 15/01/2024 ->
50 MW - planning - yorkshire and humber - Barlow Road, Barlow - Battery Storage - 9970

  Record Last Updated (dd/mm/yyyy): 19/11/2021 ->
50 MW - planning - eastern - Sundon Sub Station Battery Storage Facility - 9998

  Record Last Updated (dd/mm/yyyy): 08/11/2023 ->
50 MW - planning - scotland - Electricity Sub Station, Strichen - Battery Storage Facility - 10039

  Record Last Updated (dd/mm/yyyy): 02/12/2021 ->
50 MW - planning - eastern - Ardleigh Road, Little Bromley - Battery Energy Storage - 10302

  Record Last Updated (dd/mm/yyyy): 01/11/2022 ->
50 MW - planning - eastern - Newmarket Road, Bottisham - Battery Energy Storage - 10486

  Record Last Updated (dd/mm/yyyy): 03/01/2024 ->
50 MW - planning - north west - Huncoat Power Station - Battery Storage - 10516

  Record Last Updated (dd/mm/yyyy): 01/02/2022 ->
  Are they re-applying (New REPD Ref): 13080 ->
  Planning Permission Refused: 18/01/2022 ->
50 MW - planning - west midlands - Penstone Lane, Penn 1 - Battery Storage Facility - 10705

  Record Last Updated (dd/mm/yyyy): 01/03/2022 ->
50 MW - planning - west midlands - Penstone Lane, Lower Penn 2 - Battery Storage - 10733

  Record Last Updated (dd/mm/yyyy): 04/03/2022 ->
50 MW - planning - scotland - Frodo Solar and Battery Energy Development - 10994

  Record Last Updated (dd/mm/yyyy): 12/04/2022 ->
50 MW - planning - eastern - Stocking Pelham - Battery Storage System - 11212

  Record Last Updated (dd/mm/yyyy): 10/05/2022 ->
50 MW - planning - west midlands - Lowlands Farm - Battery Storage - 11399

  Are they re-applying (New REPD Ref): 12959 ->
50 MW - planning - yorkshire and humber - Swangate Project - Energy Storage System - 11437

  Planning Permission Expired: NA ->
  Under Construction: Implemented ->
50 MW - planning - south west - Fairholme, Minety - Battery Storage - 11810

  Are they re-applying (Old REPD Ref) : 10488 ->
50 MW - construction - eastern - Norwich Road Industrial Estate - 12529

  Are they re-applying (Old REPD Ref) : 6958 ->
  Planning Permission Refused: -> 26/03/2021
50 MW - planning - south east - Derehams Farm, Derehams Lane - Battery Storage - 12649

  Are they re-applying (New REPD Ref): 15544 ->
50 MW - planning - scotland - Fairways Business Park - Battery Storage - 13318

  Operator (or Applicant): Intelligent Land Investments Group Plc -> Inverness Caledonian Thistle Football Club
50 MW - planning - scotland - East Rogerton Cottage, Markethill Road - Battery Storage Facility - 13449

  Operator (or Applicant): Private Developer -> Apatura οΏ½ GPC 612 Limited
50 MW - planning - south west - Wareham Road, Scouse Farm - Battery Storage - 15165

  Record Last Updated (dd/mm/yyyy): 03/11/2023 -> 07/03/2024
  Development Status: Planning Application Submitted -> Revised
  Development Status (short): Application Submitted -> Revised
  Are they re-applying (New REPD Ref): -> 15962
  Planning Application Withdrawn: -> 26/01/2024
49 MW - planning - north west - Middleton Clean Energy Plant - 7029

  Under Construction: Implemented ->
49 MW - planning - yorkshire and humber - Elland Storage Project - 7053

  Planning Permission Expired: PD ->
49 MW - planning - south east - Lovedean Energy Storage System - 7064

  Judicial Review: 43350 -> 07/09/2018
49 MW - planning - east midlands - Cottam Power Station - 7066

  Planning Permission Expired: PD ->
49 MW - operation - north west - Lister Drive - 7740

  Under Construction: 01/05/2021 ->
49 MW - planning - eastern - Reach Road - 7906

  Planning Permission Expired: PANR ->
49 MW - planning - london - Mill Hill National Grid Substation - 8009

  Planning Permission Expired: NA ->
49 MW - planning - scotland - Platchaig House, Kilmorack - Battery Storage Facility - 8248

  Planning Permission Refused: 30/08/2022 ->
49 MW - planning - scotland - Old Gallows Road - Battery storage - 8368

  Record Last Updated (dd/mm/yyyy): 08/02/2021 -> 07/02/2024
  Operator (or Applicant): Whirlwind Renewables -> Foresight Group
49 MW - planning - scotland - Shindour - Energy Storage Facility - 8464

  Record Last Updated (dd/mm/yyyy): 28/05/2021 -> 18/01/2024
  Planning Authority: Tayside Council -> Perth & Kinross Council
49 MW - planning - eastern - Rush Green Motors - Battery storage - 8987

  Record Last Updated (dd/mm/yyyy): 11/10/2023 -> 14/03/2024
  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Are they re-applying (New REPD Ref): -> 16045
49 MW - planning - eastern - Greens Farm - Battery energy storage - 9012

  Record Last Updated (dd/mm/yyyy): 13/05/2021 -> 09/04/2024
49 MW - planning - south east - Burcot Solar Farm - 9374

  Planning Permission Refused: 06/12/2022 ->
49 MW - planning - eastern - Admiralty Road - Battery Energy Storage Facility - 9470

  Record Last Updated (dd/mm/yyyy): 23/08/2021 ->
  Planning Permission Expired: NA ->
49 MW - operation - scotland - Wishaw Battery Storage Facility - 9522

  Record Last Updated (dd/mm/yyyy): 10/05/2022 ->
49 MW - construction - north west - Bredbury Substation - Battery Storage Facility - 9653

  Record Last Updated (dd/mm/yyyy): 20/09/2021 ->
  Planning Permission Expired: NA ->
49 MW - planning - west midlands - Chapel Lane - Battery Energy Storage System - 9721

  Record Last Updated (dd/mm/yyyy): 24/11/2023 ->
49 MW - planning - east midlands - Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage - 9796

  Record Last Updated (dd/mm/yyyy): 13/10/2021 ->
49 MW - planning - yorkshire and humber - Common Farm - Solar Farm & Battery Storage - 9877

  Record Last Updated (dd/mm/yyyy): 01/11/2021 ->
49 MW - planning - scotland - Drum Farm - Battery Energy Storage System - 9940

  Record Last Updated (dd/mm/yyyy): 17/11/2021 ->
  Operator (or Applicant): Renewable Energy System Limited -> Field Energy
49 MW - planning - scotland - Stainland Energy Storage Project - 10225

  Record Last Updated (dd/mm/yyyy): 29/12/2021 ->
49 MW - planning - yorkshire and humber - Elland Storage Project - 10236

  Record Last Updated (dd/mm/yyyy): 20/02/2023 ->
  Are they re-applying (New REPD Ref): 15304 ->
  Are they re-applying (Old REPD Ref) : 7053 ->
49 MW - planning - scotland - Fordtown Energy Storage - 10239

  Record Last Updated (dd/mm/yyyy): 19/05/2022 ->
  Are they re-applying (Old REPD Ref) : 7764 ->
49 MW - planning - west midlands - Doverdale - Solar Farm & Battery Storage - 10273

  Record Last Updated (dd/mm/yyyy): 28/06/2021 ->
49 MW - planning - scotland - Newburgh Road, Abernethy - Battery Storage - 10607

  Record Last Updated (dd/mm/yyyy): 11/02/2022 ->
49 MW - planning - scotland - Rothienorman - Battery Storage - 10638

  Record Last Updated (dd/mm/yyyy): 16/02/2022 ->
49 MW - planning - eastern - Model Farm - 10687

  Record Last Updated (dd/mm/yyyy): 24/02/2022 ->
  Are they re-applying (Old REPD Ref) : 7609 ->
49 MW - planning - scotland - Midmill, Kintore - Battery Energy Storage - 10701

  Record Last Updated (dd/mm/yyyy): 01/03/2022 ->
49 MW - planning - scotland - Broomloan Road - Battery Energy Storage - 10886

  Record Last Updated (dd/mm/yyyy): 29/03/2022 ->
49 MW - planning - scotland - Law Of Doune Road, Macduff - Battery Storage - 10894

  Record Last Updated (dd/mm/yyyy): 07/12/2023 ->
  Planning Permission Expired: NA ->
49 MW - planning - north east - Hawthorn Grid Site - Battery Storage - 10896

  Record Last Updated (dd/mm/yyyy): 30/03/2022 ->
49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility - 10955

  Record Last Updated (dd/mm/yyyy): 06/04/2022 ->
  Are they re-applying (New REPD Ref): 14321 ->
  Are they re-applying (Old REPD Ref) : 9341 ->
49 MW - planning - scotland - South Leylodge Farmhouse, Kintore - Battery Energy Storage System - 11092

  Record Last Updated (dd/mm/yyyy): 27/04/2022 ->
49 MW - planning - scotland - Holmston Road - Battery Storage Facility - 11679

  Record Last Updated (dd/mm/yyyy): 18/07/2022 -> 08/02/2024
  Operator (or Applicant): Renewable Energy Systems Limited -> Field Energy
49 MW - construction - london - Clay Tye Farm Phase 1 - Storage Facility - 11720

  Record Last Updated (dd/mm/yyyy): 25/07/2022 -> 27/03/2024
  Planning Permission Refused: -> 18/07/2017
  Operational: -> 22/03/2024
49 MW - construction - london - Clay Tye Farm Phase 2 - Storage Facility - 11721

  Record Last Updated (dd/mm/yyyy): 25/07/2022 -> 27/03/2024
  Planning Permission Refused: -> 10/09/2018
  Operational: -> 22/03/2024
49 MW - planning - scotland - Househill House, Househill - Battery Storage - 12056

  Record Last Updated (dd/mm/yyyy): 10/03/2023 -> 30/01/2024
49 MW - planning - scotland - Meetlaw Farm, Fordoun - Battery Energy Storage System - 12361

  Y-coordinate: 81886 -> 781886
  lat: 50.636363 -> 56.92789
  long: -2.265832 -> -2.308901
49 MW - planning - south west - Landulph, Ellbridge Lane - Battery Storage Facility - 12697

  Are they re-applying (Old REPD Ref) : 7051 ->
49 MW - planning - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility - 12936

  Are they re-applying (New REPD Ref): 15230 ->
49 MW - planning - north west - Welkin Mill, Welkin Road - Battery Storage - 12982

  Are they re-applying (Old REPD Ref) : 8055 ->
49 MW - planning - west midlands - Lichfield Road, Watton Lane - Battery Storage - 13369

  Record Last Updated (dd/mm/yyyy): 09/03/2023 -> 02/04/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
49 MW - planning - scotland - Persley Croft - Battery Storage - 13684

  Are they re-applying (New REPD Ref): ->
  Planning Authority: Aberdeen Council -> Aberdeen City Council
49 MW - planning - south east - Weston Lane - Battery Storage Facility - 14005

  Are they re-applying (New REPD Ref): ->
49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility - 14321

  Are they re-applying (Old REPD Ref) : 10955 ->
49 MW - planning - scotland - Kintore Substation, Leylodge - Battery Energy Storage - 14374

  Record Last Updated (dd/mm/yyyy): 24/07/2023 -> 18/01/2024
  Development Status: Planning Application Submitted -> Revised
  Development Status (short): Application Submitted -> Revised
  Are they re-applying (New REPD Ref): -> 15627
  Planning Application Withdrawn: -> 18/12/2023
49 MW - planning - south west - Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility - 14691

  Record Last Updated (dd/mm/yyyy): 01/09/2023 -> 01/02/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 04/01/2027
47 MW - planning - south west - Dog Trap Lane, Minety - Battery Energy Storage Systems - 10488

  Record Last Updated (dd/mm/yyyy): 28/01/2022 ->
  Are they re-applying (New REPD Ref): 11810 ->
45 MW - planning - north west - Cheshire Power Station - Battery Storage Facility - 10295

  Record Last Updated (dd/mm/yyyy): 22/12/2021 ->
  Planning Authority: Cheshire West and Chester Council -> Cheshire West & Chester Council
45 MW - planning - scotland - Sclenteuch Wind Farm - 11987

  Are they re-applying (Old REPD Ref) : 4612 ->
43 MW - planning - scotland - Ballingall Farm, Leslie - Battery Energy Storage System - 10825

  Record Last Updated (dd/mm/yyyy): 18/03/2022 ->
42 MW - planning - scotland - South Pargillis - Battery Storage - 9564

  Record Last Updated (dd/mm/yyyy): 09/09/2021 ->
42 MW - planning - scotland - Armadale Wind Farm - 11219

  Record Last Updated (dd/mm/yyyy): 10/05/2022 ->
42 MW - planning - scotland - Melvich Bay - Melvich Wind Energy Hub - 13826

  Are they re-applying (Old REPD Ref) : -> 3303
40 MW - planning - east midlands - Breach Farm - Energy Barn - 6914

  Under Construction: Implemented ->
40 MW - planning - eastern - Maldon Hall - 7095

  Under Construction: Implemented ->
40 MW - planning - west midlands - Whitehouse Farm Energy Barn - 7987

  Planning Permission Expired: NA ->
40 MW - planning - south east - Loudwater Battery Storage Site - 8142

  Are they re-applying (New REPD Ref): 11993 -> 12803
40 MW - planning - south east - Tanners Lane - Battery Energy Storage Facility (Phase One) - 9708

  Record Last Updated (dd/mm/yyyy): 07/04/2022 ->
  Under Construction: Implemented ->
40 MW - planning - yorkshire and humber - Field House Solar Farm - 10970

  Record Last Updated (dd/mm/yyyy): 11/04/2022 ->
40 MW - planning - west midlands - Hollydale, Buildwas Road - Battery Storage - 13410

  Record Last Updated (dd/mm/yyyy): 13/03/2023 -> 13/02/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 12/01/2027
40 MW - planning - scotland - Newton Farm, Westburn Road - Battery Storage Facility - 13450

  Operator (or Applicant): Bluefield Renewable Developments Limited -> Apatura οΏ½ GPC 676 Limited
40 MW - planning - yorkshire and humber - Claire Court, Rawmarsh Road - Battery Energy Storage Facility - 13774

  Planning Permission Expired: NA ->
37 MW - planning - scotland - STOR Field 9 - 7018

  Development Status: Planning Permission Granted -> Planning Application Submitted
  Development Status (short): Awaiting Construction -> Application Submitted
  Planning Permission Expired: NA ->
36 MW - planning - south west - Kingston Road, Slimbridge - Battery Storage - 11516

  Are they re-applying (New REPD Ref): 14882 ->
35 MW - planning - south west - Northington Lane - Battery Storage Facility - 9992

  Record Last Updated (dd/mm/yyyy): 23/11/2021 ->
35 MW - planning - south east - New Barn Road - Battery Energy Storage Facility - 14650

  Record Last Updated (dd/mm/yyyy): 29/08/2023 -> 19/02/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 15/02/2027
33 MW - construction - yorkshire and humber - Wormald Green - Battery Energy Storage System - 10893

  Record Last Updated (dd/mm/yyyy): 26/08/2023 ->
  Planning Permission Refused: -> 26/09/2022
32 MW - planning - yorkshire and humber - Kirkhaw Lane Battery Storage - 8430

  Planning Authority: Wakefield Council -> Wakefield Metropolitan District Council
32 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage - 10145

  Record Last Updated (dd/mm/yyyy): 19/01/2022 ->
  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Are they re-applying (New REPD Ref): -> 16047
32 MW - planning - south west - Post Farm, Lytchett Minster - Battery Energy Storage - 10291

  Record Last Updated (dd/mm/yyyy): 24/01/2022 ->
31 MW - planning - scotland - Benthead Farm - Solar Farm & Battery Storage - 10542

  Record Last Updated (dd/mm/yyyy): 03/02/2022 ->
30 MW - planning - scotland - Blackpark Energy Storage - 8105

  Under Construction: Implemented ->
30 MW - planning - scotland - Drumcross Battery Storage - 8155

  Under Construction: Implemented ->
30 MW - planning - scotland - Jamesfield Organic Centre, Phase 1 - 10456

  Record Last Updated (dd/mm/yyyy): 26/01/2022 ->
  Are they re-applying (New REPD Ref): 10863 ->
30 MW - planning - eastern - Colton - Solar photovoltaic farm, Battery storage - 10945

  Record Last Updated (dd/mm/yyyy): 05/01/2024 ->
  Planning Permission Expired: NA ->
30 MW - planning - north east - West Sleekburn - Battery Storage Compound - 10957

  Record Last Updated (dd/mm/yyyy): 06/04/2022 ->
30 MW - planning - west midlands - Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage - 10978

  Record Last Updated (dd/mm/yyyy): 11/04/2022 ->
30 MW - planning - scotland - West Bendings - Battery Storage - 10985

  Record Last Updated (dd/mm/yyyy): 11/04/2022 ->
  Planning Permission Expired: NA ->
30 MW - planning - scotland - Clachaig Glen - 10996

  Record Last Updated (dd/mm/yyyy): 12/04/2022 ->
  Are they re-applying (Old REPD Ref) : 6119 ->
30 MW - planning - south west - Catsbrain Farm - Battery Storage - 11787

  Are they re-applying (Old REPD Ref) : 7988 ->
30 MW - planning - yorkshire and humber - Back Lane, Skerne - Solar Farm & Battery Storage - 12297

  Under Construction: Implemented ->
30 MW - planning - yorkshire and humber - North Lincolnshire Green Energy Park - 12706

  Are they re-applying (Old REPD Ref) : 7854 ->
30 MW - planning - scotland - Meiklelaught Farm - Battery Storage - 14525

  Planning Permission Expired: NA ->
30 MW - planning - north west - Wallerscote Limebeds - Battery Energy Storage - 14888

  Planning Authority: Cheshire West and Chester Council -> Cheshire West & Chester Council
25 MW - planning - north west - Davies Road - Battery Storage - 9563

  Record Last Updated (dd/mm/yyyy): 18/03/2022 ->
25 MW - planning - north west - Middlewich Road - Solar Photovoltaics & Battery Storage - 9565

  Record Last Updated (dd/mm/yyyy): 17/03/2022 ->
25 MW - planning - north west - Caton Road, Lancaster - Battery Storage Facility - 10047

  Record Last Updated (dd/mm/yyyy): 13/12/2022 ->
25 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage - 10222

  Record Last Updated (dd/mm/yyyy): 28/02/2022 ->
25 MW - planning - scotland - Earraghail Renewable Energy Development - 10712

  Record Last Updated (dd/mm/yyyy): 02/03/2022 ->
22 MW - planning - eastern - Surmer Hall, Church Walk - Solar Farm & Battery Storage - 15401

  Planning Authority: Braintree Council -> Braintree District Council
20 MW - operation - south west - Feeder Road - 7663

  Record Last Updated (dd/mm/yyyy): 01/05/2023 -> 22/01/2024
  Development Status: Finished -> Operational
  Development Status (short): Finished -> Operational
  Operational: -> 09/01/2024
20 MW - planning - south east - Basing Road - 7746

  Planning Authority: Basingstoke & Deane Borough Council -> Basingstoke and Deane Borough Council
20 MW - planning - eastern - The Brickmakers Arms Battery - 9668

  Record Last Updated (dd/mm/yyyy): 05/01/2022 ->
20 MW - planning - scotland - Douglas West Wind Farm (extension) - 9957

  Record Last Updated (dd/mm/yyyy): 18/11/2021 ->
20 MW - planning - east midlands - Mount Road, Castle Gresley - Battery Storage Facility - 10012

  Record Last Updated (dd/mm/yyyy): 29/11/2021 ->
20 MW - planning - south west - Plymouth Stor Generation - Battery storage - 10432

  Record Last Updated (dd/mm/yyyy): 21/01/2022 ->
20 MW - planning - north west - Former EON Power Station, Booth Lane - Battery Energy Storage System - 10436

  Record Last Updated (dd/mm/yyyy): 24/01/2022 ->
20 MW - planning - scotland - Carrick Windfarm - 10540

  Record Last Updated (dd/mm/yyyy): 03/02/2022 ->
20 MW - planning - north west - Broadgate, Chadderton - Battery Storage Containers - 10690

  Record Last Updated (dd/mm/yyyy): 01/03/2022 ->
20 MW - planning - scotland - Strathruddie, Kinglassie - Solar farm - 10828

  Record Last Updated (dd/mm/yyyy): 21/03/2022 ->
20 MW - planning - east midlands - West Burton Solar Project - 10917

  Record Last Updated (dd/mm/yyyy): 01/04/2022 ->
20 MW - planning - eastern - Moggerhanger Road, Sandy - Solar Farm - 10981

  Record Last Updated (dd/mm/yyyy): 11/04/2022 ->
20 MW - planning - north west - Vause Farm - Battery Storage - 10989

  Record Last Updated (dd/mm/yyyy): 11/04/2022 ->
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 09/02/2027
20 MW - planning - scotland - Chleansaid Onshore Wind Farm - 10997

  Record Last Updated (dd/mm/yyyy): 09/01/2024 ->
20 MW - planning - scotland - Grayside Wind Farm - 11113

  Record Last Updated (dd/mm/yyyy): 04/05/2022 ->
20 MW - construction - north west - Chadderton - Battery energy storage facility - 11160

  Record Last Updated (dd/mm/yyyy): 09/05/2022 ->
20 MW - planning - scotland - Ben Aketil Wind Farm - Repowered & Extended - 11876

  Are they re-applying (Old REPD Ref) : -> 8332
20 MW - operation - south west - Hawkers Hill Energy Park - 12293

  Planning Permission Refused: -> 22/09/2017
20 MW - planning - scotland - Chesters - Millmoor Rig Wind Farm & Battery Energy Storage - 12821

  Planning Authority: Scottish Borders Council -> Scottish Government (S36)
20 MW - planning - south west - Fair Park Solar Farm - 13761

  Are they re-applying (New REPD Ref): ->
20 MW - planning - scotland - Denfield Farm - 14341

  Are they re-applying (Old REPD Ref) : 7163 ->
20 MW - planning - east midlands - Heron Solar Farm & Battery Storage - 15084

  Planning Authority: Rushcliffe Council -> Rushcliffe Borough Council
19 MW - planning - scotland - Land North of Thornton Road - 7131

  Under Construction: Implemented ->
19 MW - planning - scotland - North West Of Jameston Farm - 7133

  Planning Permission Expired: NA ->
19 MW - planning - scotland - Ochiltree - Battery Sorage - 10162

  Record Last Updated (dd/mm/yyyy): 06/10/2022 ->
  Are they re-applying (New REPD Ref): 15312 -> 14170
19 MW - planning - scotland - Hillcrest Cottage, Shebster - Battery Energy Storage System - 10226

  Record Last Updated (dd/mm/yyyy): 29/09/2022 ->
19 MW - planning - scotland - Speyslaw Farm - Battery Storage - 10394

  Record Last Updated (dd/mm/yyyy): 02/03/2023 ->
19 MW - planning - scotland - Wardlaw Wood Windfarm - Battery Storage - 14231

  Are they re-applying (New REPD Ref): ->
19 MW - planning - scotland - Tofts - Battery Storage - 14706

  Planning Permission Expired: NA ->
16 MW - planning - east midlands - Waterswallows Road, Green Fairfield - Battery Storage Equipment - 10716

  Record Last Updated (dd/mm/yyyy): 04/03/2022 ->
16 MW - planning - scotland - Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm - 11623

  Are they re-applying (Old REPD Ref) : -> 11439
  Planning Permission Expired: NA ->
15 MW - planning - eastern - Three Bridges Solar Farm - 8220

  Planning Authority: Breckland Council -> Breckland District Council
  Planning Permission Expired: NA ->
15 MW - planning - scotland - Hollandmey Renewable Energy Development - 10246

  Record Last Updated (dd/mm/yyyy): 22/12/2021 ->
15 MW - planning - south west - Smithyard Lane - Battery Storage - 10766

  Record Last Updated (dd/mm/yyyy): 09/03/2022 ->
15 MW - planning - north west - Grassing Rome Street - Battery Storage - 11611

  Record Last Updated (dd/mm/yyyy): 08/07/2022 -> 08/04/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 07/03/2027
14 MW - planning - scotland - Hopsrig Wind Farm - 11066

  Record Last Updated (dd/mm/yyyy): 26/04/2022 ->
  Are they re-applying (Old REPD Ref) : 6099 ->
13 MW - planning - west midlands - Maybrook Road - Battery facility - 11008

  Record Last Updated (dd/mm/yyyy): 19/04/2022 ->
  Planning Permission Expired: NA ->
13 MW - planning - east midlands - Dolly Lane, Buxworth - Battery Storage Facility & Sub Station - 15127

  Record Last Updated (dd/mm/yyyy): 30/10/2023 -> 27/02/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 21/02/2027
10 MW - planning - east midlands - Manor Farm Energy Storage - 6948

  Under Construction: Implemented ->
10 MW - planning - south east - Stockbridge Road - 7097

  Under Construction: Implemented ->
10 MW - construction - south east - Land Adj Harmer Warren Quarry - 7143

  Planning Permission Expired: NA ->
10 MW - planning - scotland - East Ballochy - 7675

  Under Construction: Implemented ->
10 MW - planning - south west - Minety Substation - 7942

  Record Last Updated (dd/mm/yyyy): 30/06/2020 -> 12/07/2022
10 MW - planning - eastern - Wissett Solar Farm, Wissett - Battery Storage - 9913

  Record Last Updated (dd/mm/yyyy): 11/11/2021 ->
10 MW - planning - north west - Park Road Battery Storage - 10076

  Record Last Updated (dd/mm/yyyy): 26/09/2022 ->
10 MW - planning - scotland - Glenniston Farm, Auchtertool - Solar Farm - 10434

  Record Last Updated (dd/mm/yyyy): 24/01/2022 ->
10 MW - planning - scotland - Culachy Wind Farm - 10714

  Record Last Updated (dd/mm/yyyy): 06/12/2023 ->
  Are they re-applying (Old REPD Ref) : 3926 ->
10 MW - operation - south west - Cirencester Solar Farm - 12791

  Planning Permission Refused: -> 17/09/2015
10 MW - planning - yorkshire and humber - J3 Business Park - Battery Energy Storage Facility - 12920

  Are they re-applying (Old REPD Ref) : 6979 ->
  Planning Permission Expired: NA ->

2024-01

New projects (136):
1025 MW - planning - yorkshire and humber - The Balk, Almholme - Energy Storage System - 14061
940 MW - planning - north west - Fanny House Farm, Bay Gateway - Battery Storage - 14386
700 MW - planning - scotland - Auchentiber Road - Battery Energy Storage System - 15425
600 MW - cancelled - east midlands - West Leake Lane, Ratcliffe - Battery Storage - 12464
500 MW - planning - scotland - Kilmarnock Battery Energy Storage System - 15176
500 MW - planning - south east - East Claydon Battery Energy Storage - 15501
400 MW - planning - south west - East Chickerell Court Farm - Battery Energy Storage System - 12651
400 MW - planning - eastern - Elstree Substation, Hilfield Lane - Battery Energy Storage - 14638
400 MW - planning - south west - Junction 27, Westleigh - Battery Storage - 14935
400 MW - planning - north west - Blackdyke Farm, Blackford - Battery Storage - 15005
350 MW - planning - wales - Uskmouth Power Station, West Nash Road - Battery Storage Facility - 15263
349 MW - planning - wales - Penrhos Works - Battery Energy Storage System - 15472
320 MW - planning - yorkshire and humber - Monk Fryston Battery Storage - 15164
300 MW - planning - scotland - Newarthill Energy Park - 14763
250 MW - planning - eastern - Toddington Services, Hipsey Spinney - Battery Storage - 15573
200 MW - planning - scotland - Carlisle Road - Battery Energy Storage System - 9684
200 MW - planning - eastern - Hornsea Project Three - Battery Storage - 9754 Megapack
200 MW - planning - north west - Cargo Road, Cargo - Battery Storage - 14939
200 MW - planning - yorkshire and humber - Stocking Lane - Battery Energy Facility - 15082
200 MW - planning - yorkshire and humber - Corner Of Weeland Road, Lunn Lane - Battery Storage Facility - 15375
200 MW - planning - north west - Todhills and Westlinton - Harker Battery Energy Storage Facility - 15599
180 MW - planning - yorkshire and humber - Fordtead Lane, Thorpe Marsh - Battery Energy Facility - 14932
150 MW - planning - north west - Printworks Road - Stalybridge Battery Storage - 10808
150 MW - planning - north east - Wilton International, Greystones Road - Phase 1 - 14729
140 MW - planning - northern ireland - Coolkeeragh - Battery Storage - 15151
136 MW - planning - scotland - Newlands Hill Wind Energy Hub - 15383
126 MW - planning - south east - Derehams Farm, Derehams Lane - Battery Storage - 15544
106 MW - planning - scotland - Bodinglee Wind Farm - 14532
105 MW - planning - scotland - Kinmuck Battery Energy Storage - 13001
100 MW - planning - scotland - Hill of Fare - Hill of Fare Wind Farm & Battery Storage - 12026
100 MW - planning - north west - The Old Vicarage, Reedley - Battery Storage - 12767
100 MW - planning - scotland - Learielaw Farm, Learielaw - Battery Energy Storage - 13368
100 MW - planning - north west - Walshaw House, Regent Street - Battery Energy Storage - 14625
100 MW - planning - yorkshire and humber - Murton Way - Battery Energy Storage - 14759
100 MW - planning - west midlands - New Road, Featherstone - Battery Storage - 15297
99 MW - planning - south east - Butts Field, Mill Lane - Battery Storage - 13573
99 MW - cancelled - west midlands - Illeybrook Farm - Battery Energy Storage - 14064
93 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage - 15610
90 MW - planning - scotland - Rivox Wind Farm - Wind farm - 14533
80 MW - planning - yorkshire and humber - Barlow Road, Barlow Road - Battery Storage - 12734
80 MW - planning - yorkshire and humber - Barlow Road, Barlow Road - Battery Storage - 14715
80 MW - planning - east midlands - Old Trent Road, Beckingham - Battery Storage Facility - 14956
40 MW - construction - scotland - Cumberhead West Wind Farm - 15343
75 MW - planning - west midlands - Holly Lane Energy Park - Solar Farm & Battery Storage - 13695
75 MW - planning - north east - Belasis Avenue - Battery Storage - 13850
70 MW - planning - scotland - Shetland Battery Energy Storage System - 12856
70 MW - planning - south west - Severn Road, Hallen - Battery Storage Facility - 15027
63 MW - planning - scotland - Dolphingstone Farm - Battery Energy Storage System - 13618
60 MW - planning - scotland - Saturland Farm, Salterland Road - Battery Energy Storage System - 12024
60 MW - planning - scotland - Inchbean Farm, Treeswoodhead Road - Battery Energy Storage System - 13323
60 MW - planning - north east - West Boldon Substation - Battery Energy Storage - 14408
57 MW - planning - north west - Waterloo Farm, Furbarn Road - Battery Storage - 12187
57 MW - planning - north west - The Rake, Lower Jowkin Lane - Battery Energy Storage - 14597
53 MW - planning - east midlands - Barfield Lane, Reepham - Battery Energy Storage System - 12600
50 MW - planning - wales - Pancross & Oaklands Solar Farm - 7702
50 MW - planning - east midlands - Main Street, Kelham - Solar Farm & Battery Energy Storage - 11999
50 MW - planning - south east - Derehams Farm, Derehams Lane - Battery Storage - 12649
50 MW - planning - scotland - Penicuik, Moorfoot Hills - Torfichen Wind Farm - 13310
50 MW - planning - scotland - East Rogerton Cottage, Markethill Road - Battery Storage Facility - 13449
50 MW - planning - scotland - Longcroft Wind Farm - 13539
50 MW - planning - south west - Bluebell Wood Solar Farm & Battery Storage - 13989
50 MW - cancelled - scotland - Seath Road, Rutherglen - Battery Storage - 14378
50 MW - planning - south west - Indian Queens Sub station, Carne Hill - Battery Energy Storage - 14461
50 MW - planning - south west - Indian Queens National Grid Substation, Domelick Hill - Battery Storage - 14687
50 MW - planning - north west - Orrell Street Battery Energy Storage Facility - 14892
50 MW - planning - south west - Wareham Road, Scouse Farm - Battery Storage - 15165
50 MW - cancelled - scotland - CoyltonοΏ½GreenerοΏ½GridοΏ½Park - 15312
50 MW - planning - yorkshire and humber - Westfield Road, Carlton - Battery Storage - 15338
50 MW - planning - west midlands - Upper Latherford Farm, Latherford Lane - Battery Energy Storage System - 15446
49 MW - planning - south east - Rye Common Lane - 7028
49 MW - planning - south east - Burcot Solar Farm - 9374
49 MW - planning - west midlands - Chapel Lane - Battery Energy Storage System - 9721
49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility - 10955
49 MW - planning - scotland - Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage - 12350
49 MW - planning - south east - Blue Bell Lodge, Rye Common Lane - Battery Storage - 12496
49 MW - planning - scotland - Rigifa Cove Road - Battery Storage - 12970
49 MW - planning - wales - Carrog Ganol, Rhosgoch - Battery Energy Storage System - 13217
49 MW - planning - scotland - Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage - 13595
49 MW - planning - scotland - Persley Croft - Battery Storage - 13684
49 MW - planning - scotland - Loch Toftingall, Halsary Wind Farm - Battery Energy Storage - 13949
49 MW - planning - south east - Weston Lane - Battery Storage Facility - 14005
49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility - 14321
49 MW - planning - scotland - Caulternich Croft Energy Storage Project - Battery Storage Facility - 14373
49 MW - planning - scotland - Kintore Substation, Leylodge - Battery Energy Storage - 14374
49 MW - planning - west midlands - Ebstree Road, Trysull - Battery Energy Storage - 14497
49 MW - planning - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility - 14510
49 MW - planning - north west - Coopers Lane, Kirkby - Battery Storage Facility - 14670
49 MW - planning - south west - Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility - 14691
49 MW - planning - east midlands - Little Hale Fen - Solar Farm - 14955
49 MW - planning - scotland - Flatterton Farm, Flatterton Road - Battery Storage - 15154
49 MW - cancelled - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility - 15230
49 MW - planning - yorkshire and humber - Lowfields Energy Storage Project - 15304
49 MW - planning - west midlands - Chapel Lane - Battery Energy Storage System - 15308
49 MW - cancelled - south east - Burcot Solar Farm - 15444
47 MW - planning - south west - Holt Road - Battery Energy Storage - 15470
45 MW - planning - scotland - Loch Fergus Farm - Energy Storage System - 12274
40 MW - planning - scotland - Newton Farm, Westburn Road - Battery Storage Facility - 13450
40 MW - planning - north west - Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage - 13985
40 MW - planning - west midlands - Chillington Estate, Chillington Park - Battery Storage - 14088
40 MW - planning - yorkshire and humber - Bywater, Kippax - Battery Energy Storage - 14362
40 MW - planning - south west - Red Barn - Solar Farm & Battery Storage - 15146
40 MW - construction - scotland - Cumberhead West Wind Farm - 15343
36 MW - planning - south west - Kingston Road, Slimbridge - Battery Storage - 14882
35 MW - planning - south east - New Barn Road - Battery Energy Storage Facility - 14650
35 MW - planning - yorkshire and humber - Warren Lane, Bramham - Battery Energy Storage - 14954
34 MW - planning - scotland - Cloud Hill Wind Farm - 15174
34 MW - planning - northern ireland - Battery Energy Storage Facility in Londonderry - 15303
30 MW - planning - scotland - Meiklelaught Farm - Battery Storage - 14525
30 MW - planning - north west - Wallerscote Limebeds - Battery Energy Storage - 14888
30 MW - planning - north east - Fox Cover Road - Battery Energy Storage - 14968
30 MW - planning - scotland - Ditcher Law Wind Farm - 14996
30 MW - cancelled - west midlands - Tanners Lane - Battery Energy Storage System - 15128
29 MW - planning - scotland - Electricity Substation, Bardarroch - Battery Energy Storage - 15569
25 MW - planning - scotland - Houston Solar PV Farm & Energy Storage Facility - 14294
25 MW - planning - east midlands - Ash Tree Solar Farm & Battery Storage - 15397
22 MW - planning - eastern - Surmer Hall, Church Walk - Solar Farm & Battery Storage - 15401
22 MW - planning - eastern - Surmer Hall, Church Walk - Solar Farm & Battery Storage - 15417
20 MW - planning - scotland - Watten Wind Farm - 11480
20 MW - planning - scotland - Ben Aketil Wind Farm - Repowered & Extended - 11876
20 MW - planning - scotland - Knockodhar Wind Farm - 14296
20 MW - planning - scotland - Denfield Farm - 14341
20 MW - planning - scotland - Dunside Wind Farm - 14531
20 MW - planning - east midlands - Heron Solar Farm & Battery Storage - 15084
20 MW - planning - scotland - Vale of Leven Wind Farm - 15175
20 MW - planning - south west - Brockworth Road - Battery Storage System - 15518
19 MW - planning - scotland - Wardlaw Wood Windfarm - Battery Storage - 14231
19 MW - planning - scotland - Tofts - Battery Storage - 14706
19 MW - planning - scotland - Aikengall, Innerwick - Battery Energy Storage - 15141
13 MW - planning - scotland - Hare Craig Windfarm - 15101
13 MW - planning - east midlands - Dolly Lane, Buxworth - Battery Storage Facility & Sub Station - 15127
12 MW - planning - west midlands - Rock Farm - Solar Farm - 15248
12 MW - planning - south east - Caterham Bypass - Battery Energy Storage - 15574
11 MW - planning - scotland - Enoch Hill, Dalmellington - Battery Storage - 14090
10 MW - planning - scotland - Glenniston Farm, Auchtertool - Solar Farm - 10434
10 MW - planning - scotland - Culachy Wind Farm - 10714
10 MW - planning - yorkshire and humber - Bradley Road - Battery Energy Storage System - 13863

Disappeared projects (15):
120 MW - cancelled - south west - Pound Road, Hawkchurch - Battery Energy Storage System - 14016
100 MW - cancelled - south west - Hook Street - Energy Storage Compound - 10142
90 MW - cancelled - north west - Golf Road - Battery Energy Storage - 13459
57 MW - cancelled - west midlands - Beechwood Farm, Hodgetts Lane - Battery Storage - 13297
50 MW - cancelled - west midlands - Armshead Farm, Armshead Road - Battery Energy Storage Facility - 12804
50 MW - cancelled - west midlands - Lowlands Farm - Battery Storage - 12959
50 MW - cancelled - west midlands - Levedale Road, Levedale - Battery Energy Storage - 13615
49 MW - cancelled - eastern - Whites Farm - Battery Storage - 11880
45 MW - planning - north west - Huncoat Power Station - Battery Storage Facility - 13080
25 MW - cancelled - scotland - Clauchrie Windfarm Battery - 7804
24 MW - cancelled - yorkshire and humber - Mauxhall Farm - 7827
20 MW - cancelled - south west - The Transmitting Station, Williton - Battery Storage - 10186
12 MW - cancelled - yorkshire and humber - Windmill Farm Solar Farm - 8348
12 MW - cancelled - eastern - St Ippolyts - Solar Farm & Battery Storage - 9695
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 13480

Updated projects (346):

100 MW - construction - eastern - Bullen Lane - Battery Storage - 10311

  Record Last Updated (dd/mm/yyyy): 17/10/2022 -> 05/12/2023
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/07/2023
  status: planning -> construction πŸ—οΈ
99 MW - operation - eastern - Dollymans Storage - 7088

  Record Last Updated (dd/mm/yyyy): -> 28/05/2021
  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  Operational: -> 01/07/2023
  status: planning -> operation 🍾 πŸŽ‰ 🍸
50 MW - operation - south east - Richborough Energy Park - Phase 2 - 9626

  Record Last Updated (dd/mm/yyyy): 10/01/2023 -> 11/01/2024
  Installed Capacity (MWelec): 71.6 -> 50.1
  Development Status: Under Construction -> Operational
  Development Status (short): Under Construction -> Operational
  status: construction -> operation 🍾 πŸŽ‰ 🍸
  mw: 71 -> 50
49 MW - operation - north west - West Didsbury Battery Storage - 7185

  Record Last Updated (dd/mm/yyyy): -> 24/11/2023
  Operator (or Applicant): Statera Energy -> Statera Energy / Gresham House
  Development Status: Under Construction -> Operational
  Development Status (short): Under Construction -> Operational
  Operational: -> 21/11/2023
  status: construction -> operation 🍾 πŸŽ‰ 🍸
49 MW - operation - north west - Lister Drive - 7740

  Record Last Updated (dd/mm/yyyy): -> 04/01/2023
  Operator (or Applicant): Arenko Cleantech -> Arenko Cleantech / Stratcraft
  Development Status: Under Construction -> Operational
  Development Status (short): Under Construction -> Operational
  Operational: -> 01/08/2022
  status: construction -> operation 🍾 πŸŽ‰ 🍸
49 MW - construction - south east - Titchfield Lane - 7828

  Record Last Updated (dd/mm/yyyy): 30/09/2020 -> 20/08/2023
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 20/08/2023
  status: planning -> construction πŸ—οΈ
49 MW - operation - west midlands - Bustleholme Substation - 7907

  Record Last Updated (dd/mm/yyyy): 07/02/2021 -> 20/10/2023
  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  status: planning -> operation 🍾 πŸŽ‰ 🍸
49 MW - operation - south east - Richborough Energy Park - 8195

  Record Last Updated (dd/mm/yyyy): 19/04/2023 -> 11/01/2024
  Development Status: Under Construction -> Operational
  Development Status (short): Under Construction -> Operational
  status: construction -> operation 🍾 πŸŽ‰ 🍸
49 MW - operation - scotland - Wishaw Battery Storage Facility - 9522

  Operator (or Applicant): Spectrum Reserve Limited -> Zenobe Energy
  Site Name: Wishaw 49.9 Battery Storage Facility -> Wishaw Battery Storage Facility
  Development Status: Under Construction -> Operational
  Development Status (short): Under Construction -> Operational
  status: construction -> operation 🍾 πŸŽ‰ 🍸
33 MW - construction - yorkshire and humber - Wormald Green - Battery Energy Storage System - 10893

  Record Last Updated (dd/mm/yyyy): 27/09/2022 -> 26/08/2023
  Site Name: Station Lane, Burton Leonard - Battery Energy Storage System -> Wormald Green - Battery Energy Storage System
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 26/08/2023
  status: planning -> construction πŸ—οΈ
20 MW - operation - wales - Energy Centre Royal Mint - 7684

  Record Last Updated (dd/mm/yyyy): 16/02/2022 -> 01/08/2023
  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  Under Construction: -> 01/05/2022
  Operational: -> 01/08/2023
  status: planning -> operation 🍾 πŸŽ‰ 🍸
10 MW - planning - scotland - Binn Eco Park - Battery - 9098

  Record Last Updated (dd/mm/yyyy): 02/03/2023 -> 27/10/2023
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Planning Authority: Perth and Kinross Council -> Perth & Kinross Council
  Under Construction: -> 01/09/2023
  status: planning -> construction πŸ—οΈ

1450 MW - planning - yorkshire and humber - Thorpe Marsh Power Station - Battery Energy Storage - 12453

  Record Last Updated (dd/mm/yyyy): 06/02/2023 -> 12/10/2023
  Operator (or Applicant): Banks Renewables Limited -> West Burton Energy
1400 MW - planning - yorkshire and humber - Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage - 13644

  Record Last Updated (dd/mm/yyyy): 13/04/2023 -> 12/10/2023
  Operator (or Applicant): Banks Renewables Limited -> West Burton Energy / Banks Group
1040 MW - planning - north west - Carrington Power Station, Manchester Road - Battery Storage - 13362

  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> NA
550 MW - planning - east midlands - Spalding Energy Park - Battery Storage - 10173

  Record Last Updated (dd/mm/yyyy): 12/07/2023 -> 28/12/2021
500 MW - planning - scotland - Devilla Energy Storage Facility - 9248

  Record Last Updated (dd/mm/yyyy): 24/05/2022 -> 09/01/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 13/12/2028
500 MW - planning - scotland - Coalburn Energy - Battery Storage - 11034

  Record Last Updated (dd/mm/yyyy): 10/07/2023 -> 20/04/2022
450 MW - planning - eastern - Gateway Energy Centre - Battery Energy Storage - 10309

  Record Last Updated (dd/mm/yyyy): 30/01/2023 -> 17/12/2021
400 MW - planning - scotland - Kincardine Grid Services Complex - Energy Storage Facility - 10536

  Record Last Updated (dd/mm/yyyy): 03/02/2022 -> 08/06/2022
400 MW - planning - scotland - Eccles Battery Energy Storage System - 11867

  Record Last Updated (dd/mm/yyyy): 29/09/2022 -> 12/09/2023
  Operator (or Applicant): Weaver Power Limited -> Zenobe Energy Limited
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 11/08/2028
349 MW - planning - west midlands - Cellarhead - Battery Site - 10013

  Record Last Updated (dd/mm/yyyy): 24/06/2022 -> 29/11/2021
340 MW - planning - north west - Blackdyke Farm, Blackford - Battery Storage - 12710

  Record Last Updated (dd/mm/yyyy): 12/07/2023 -> 10/10/2023
  Operator (or Applicant): Novus Renewable Services Limited -> Novus Renewable Services Limited / Story Construction
  Installed Capacity (MWelec): 400 -> 340
  Planning Authority: Carlisle Council -> Carlisle City Council
  Planning Application Reference: 23/0444 -> 23/0659
  Planning Application Submitted: 21/06/2023 -> 22/09/2023
  mw: 400 -> 340
300 MW - construction - scotland - Kilmarnock South Substation - Battery storage - 9696

  Record Last Updated (dd/mm/yyyy): 14/02/2022 -> 27/09/2021
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Application Submitted: 01/04/2022 -> 22/02/2022
  Planning Permission Expired: -> 10/03/2028
300 MW - construction - scotland - Blackhillock Electricity Substation - Battery Energy Storage System - 9723

  Record Last Updated (dd/mm/yyyy): 20/02/2023 -> 28/09/2021
264 MW - planning - south east - Bolney Substation - Battery Storage - 10843

  Record Last Updated (dd/mm/yyyy): 18/05/2023 -> 22/03/2022
249 MW - planning - south east - Richborough Energy Park - Phase 3 (Sheaf) - 11201

  Record Last Updated (dd/mm/yyyy): 22/05/2023 -> 10/05/2022
  Site Name: Richborough Energy Park - Phase 3 -> Richborough Energy Park - Phase 3 (Sheaf)
240 MW - planning - yorkshire and humber - Springfield Farm, Hensall - Battery Energy Storage Facility - 11680

  Record Last Updated (dd/mm/yyyy): 05/04/2023 -> 18/07/2022
  Planning Application Reference: 2023/0285/FULM -> 2022/0813/SCN
230 MW - construction - wales - Uskmouth Power Station - Battery Storage - 10936

  Record Last Updated (dd/mm/yyyy): 20/12/2022 -> 06/04/2022
200 MW - planning - yorkshire and humber - Drax Re-Power - 7017

  Record Last Updated (dd/mm/yyyy): -> 02/01/2020
200 MW - planning - scotland - Whitehill Energy Storage - 10466

  Record Last Updated (dd/mm/yyyy): 11/11/2022 -> 27/01/2022
200 MW - planning - scotland - Windyhill Battery Storage Facility - 10596

  Record Last Updated (dd/mm/yyyy): 15/07/2022 -> 09/02/2022
200 MW - planning - north east - Worset Lane - Battery Energy Storage System - 11406

  Record Last Updated (dd/mm/yyyy): 01/02/2023 -> 07/06/2022
200 MW - planning - west midlands - Little Beanit Farm, Balsall Common - Battery Storage - 11656

  Record Last Updated (dd/mm/yyyy): 10/11/2022 -> 15/07/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 31/08/2026
150 MW - planning - eastern - Thurrock Flexible Generation Plant - 7696

  Record Last Updated (dd/mm/yyyy): 26/05/2022 -> 04/10/2023
150 MW - construction - south east - Cleve Hill Solar Project - 7856

  Record Last Updated (dd/mm/yyyy): 02/05/2023 -> 09/06/2022
  Under Construction: 01/11/2022 ->
150 MW - construction - north west - Fiddlers Ferry Power Station - Battery storage - 9404

  Record Last Updated (dd/mm/yyyy): 06/07/2023 -> 08/08/2022
150 MW - planning - south west - Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility - 11612

  Record Last Updated (dd/mm/yyyy): 23/01/2023 -> 08/07/2022
130 MW - planning - yorkshire and humber - Clough Road - Battery Energy System - 14225

  Record Last Updated (dd/mm/yyyy): 06/07/2023 -> 20/09/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 12/09/2026
114 MW - planning - eastern - Hickling Lane, Swainsthorpe -Battery Storage - 13560

  Record Last Updated (dd/mm/yyyy): 03/04/2023 -> 18/09/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 13/09/2026
100 MW - planning - scotland - Harestanes Windfarm - 7395

  Record Last Updated (dd/mm/yyyy): -> 25/06/2020
100 MW - planning - south east - Minchens Lane Battery Storage Facility - 8434

  Record Last Updated (dd/mm/yyyy): 03/02/2023 -> 21/09/2023
  Appeal Lodged: -> 22/12/2021
100 MW - planning - scotland - Kilgallioch - Battery energy storage - 9007

  Record Last Updated (dd/mm/yyyy): 12/05/2021 -> 18/09/2023
  Operator (or Applicant): Scottish Renewables Limited -> Scottish Power Renewables
  Storage Type: Stand-alone Storage -> Co-located with RE
  Storage Co-location REPD Ref ID: -> 4386
  County: Strathclyde -> Dumfries and Galloway
  Planning Authority: South Ayrshire Council -> Scottish Government (S36)
  Planning Application Reference: 21/00387/DEEM -> ECU00002197
  Planning Application Submitted: 29/03/2021 -> 13/01/2021
100 MW - planning - eastern - North Walpole, St Peter - Battery Energy Storage - 9762

  Record Last Updated (dd/mm/yyyy): 18/08/2022 -> 07/10/2021
100 MW - planning - south west - St Dennis - Battery Energy Storage - 10058

  Record Last Updated (dd/mm/yyyy): 08/02/2022 -> 02/12/2021
  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Are they re-applying (New REPD Ref): -> 14461 & 14687
100 MW - planning - south east - Penn Croft Farm, Crondall - Battery Energy Storage Facility - 10163

  Record Last Updated (dd/mm/yyyy): 06/02/2023 -> 24/12/2021
100 MW - planning - south west - Shaftesbury Energy Park - Battery Storage System - 10626

  Record Last Updated (dd/mm/yyyy): 31/03/2023 -> 16/02/2022
100 MW - planning - eastern - Walpole St Andrew - Battery storage - 10876

  Record Last Updated (dd/mm/yyyy): 11/10/2022 -> 29/03/2022
100 MW - planning - north west - Capenhurst Lane, Capenhurst - Battery Storage - 12503

  Record Last Updated (dd/mm/yyyy): 03/11/2022 -> 13/12/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 08/12/2026
100 MW - operation - north west - National Grid Electricity Substation, Capenhurst Lane - Battery Storage - 12725

  Planning Authority: Cheshire West & Chester Council -> Cheshire West and Chester Council
  Operational: 11/02/2023 ->
100 MW - planning - north west - Hillside Farm, Lancaster Road - Battery Storage - 12964

  Record Last Updated (dd/mm/yyyy): 05/01/2023 -> 28/09/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 19/09/2026
99 MW - planning - yorkshire and humber - Lakeside Energy Storage Facility - 8268

  Record Last Updated (dd/mm/yyyy): 21/06/2022 -> 09/12/2021
99 MW - planning - north east - South Thinford Lane, Thinford - Energy Storage - 10489

  Record Last Updated (dd/mm/yyyy): 01/11/2022 -> 28/01/2022
99 MW - planning - yorkshire and humber - Neil Fox Way - Battery Storage - 11519

  Record Last Updated (dd/mm/yyyy): 26/09/2022 -> 22/09/2022
99 MW - planning - south west - Linton Court Farm, Highnam - Battery storage - 13145

  Record Last Updated (dd/mm/yyyy): 02/02/2023 -> 08/09/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 21/08/2026
95 MW - planning - yorkshire and humber - Winterton Road - Battery Energy Storage - 9608

  Record Last Updated (dd/mm/yyyy): 25/01/2023 -> 15/09/2021
90 MW - planning - yorkshire and humber - Little Crow Solar Park - 7175

  Record Last Updated (dd/mm/yyyy): -> 07/04/2022
80 MW - operation - scotland - Aikengall II Community Wind Farm Battery - 7015

  Record Last Updated (dd/mm/yyyy): -> 27/03/2023
80 MW - construction - yorkshire and humber - Trondheim Way Battery energy storage - 8455

  Record Last Updated (dd/mm/yyyy): 12/01/2022 -> 13/05/2021
80 MW - planning - scotland - Tealing Battery Energy Storage Farm - 11097

  Record Last Updated (dd/mm/yyyy): 29/11/2022 -> 09/01/2024
  Storage Type: Stand-alone Storage -> Co-located with RE
  Storage Co-location REPD Ref ID: -> 14543
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 13/12/2028
79 MW - construction - south east - Stony Energy Storage Facility - 7001

  Record Last Updated (dd/mm/yyyy): -> 30/11/2022
70 MW - planning - north west - Tontine Road - Battery Energy Storage System - 9819

  Record Last Updated (dd/mm/yyyy): 31/01/2023 -> 19/10/2021
70 MW - planning - north west - Sale Golf Club, Golf Road - Battery Storage - 13731

  Record Last Updated (dd/mm/yyyy): 25/04/2023 -> 30/11/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 17/11/2026
69 MW - planning - eastern - Thurleigh Road - Battery Energy Storage - 9651

  Record Last Updated (dd/mm/yyyy): 30/06/2023 -> 20/09/2021
62 MW - planning - wales - Wentlooge Renewable Energy Hub - 7192

  Record Last Updated (dd/mm/yyyy): -> 22/03/2019
60 MW - planning - north east - Greystones Road, Grangetown - Battery Energy Storage System - 10081

  Record Last Updated (dd/mm/yyyy): 11/02/2022 -> 11/11/2021
  Installed Capacity (MWelec): 360 -> 60
  Planning Authority: Redcar and Cleveland Borough Council -> Redcar & Cleveland Borough Council
  mw: 360 -> 60
60 MW - planning - yorkshire and humber - Redcote Lane, Armley - Battery Storage Facility - 12224

  Operator (or Applicant): Leeds Power Limited -> Cambridge Power Limited
60 MW - planning - south west - Blackhill Quarry, Woodbury - Battery Energy Storage Facility - 12815

  Record Last Updated (dd/mm/yyyy): 12/12/2022 -> 04/08/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 13/07/2026
57 MW - planning - north west - Capenhurst Lane - 8283

  Record Last Updated (dd/mm/yyyy): 15/07/2022 -> 25/04/2023
57 MW - planning - north west - National Grids Rainhill Substation Battery storage facility - 8439

  Record Last Updated (dd/mm/yyyy): 21/10/2022 -> 02/08/2021
57 MW - planning - north east - The Carrs - Meadow Farm Energy storage facility - 9207

  Record Last Updated (dd/mm/yyyy): 05/05/2023 -> 26/09/2023
  Operator (or Applicant): Meadow Farm Battery Limited -> BayWa r.e.
  Site Name: The Carrs - Energy storage facility -> The Carrs - Meadow Farm Energy storage facility
  Installed Capacity (MWelec): 60 -> 57
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 21/09/2026
  mw: 60 -> 57
57 MW - planning - south east - Ash Lane, Little London - Battery Storage - 11090

  Record Last Updated (dd/mm/yyyy): 16/02/2023 -> 27/04/2022
57 MW - planning - north west - Penwortham - Battery storage - 11217

  Record Last Updated (dd/mm/yyyy): 17/10/2022 -> 10/05/2022
57 MW - planning - north west - Sutton Manor - Battery Storage Facility - 11559

  Record Last Updated (dd/mm/yyyy): 21/10/2022 -> 28/06/2022
57 MW - planning - eastern - Braintree Road, Cressing - Battery Storage - 11995

  Record Last Updated (dd/mm/yyyy): 06/09/2022 -> 11/09/2023
  Operator (or Applicant): Pivot Power -> Pivot Power (EDF Renewables)
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 01/09/2026
57 MW - planning - south east - Sellindge Substation, Church Lane - Battery Storage - 12351

  Record Last Updated (dd/mm/yyyy): 19/10/2022 -> 11/09/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 04/08/2026
57 MW - planning - south east - Coxmoor Wood, Crondall Road - Battery Storage - 13728

  Planning Application Withdrawn: ->
  Planning Permission Refused: ->
  Appeal Lodged: ->
  Appeal Withdrawn: ->
  Appeal Refused: ->
  Appeal Granted: ->
  Secretary of State - Intervened: ->
  Secretary of State - Refusal: ->
  Secretary of State - Granted: ->
  Planning Permission Expired: ->
  Under Construction: ->
  Operational: ->
50 MW - operation - south west - Melksham Substation East Storage - 6953

  Record Last Updated (dd/mm/yyyy): -> 22/11/2022
50 MW - construction - northern ireland - Portadown Road - 7047

  Record Last Updated (dd/mm/yyyy): -> 23/06/2020
50 MW - construction - northern ireland - Dungannon Energy Storage System - 7050

  Record Last Updated (dd/mm/yyyy): -> 03/03/2020
50 MW - operation - scotland - Whitelee Wind Farm Battery Storage Extension - 7174

  Record Last Updated (dd/mm/yyyy): -> 21/02/2022
50 MW - planning - scotland - Clash Gour - 7178

  Record Last Updated (dd/mm/yyyy): -> 27/10/2022
50 MW - planning - wales - Garn Fach Wind Farm - 7705

  Record Last Updated (dd/mm/yyyy): 11/05/2023 -> 26/05/2022
50 MW - operation - south west - Stonehill Energy Storage - 7773

  Record Last Updated (dd/mm/yyyy): 01/11/2021 -> 09/10/2021
50 MW - planning - scotland - Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage - 8342

  Record Last Updated (dd/mm/yyyy): 21/02/2022 -> 05/02/2021
50 MW - planning - south east - Upton Lane, Nursling - Battery Storage Facility - 9673

  Record Last Updated (dd/mm/yyyy): 10/02/2022 -> 22/09/2021
  Operator (or Applicant): Balance Power Projects Limited -> Unknown
50 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage - 9910

  Record Last Updated (dd/mm/yyyy): 11/11/2021 -> 15/01/2024
  Development Status: Planning Application Submitted -> Revised
  Development Status (short): Application Submitted -> Revised
  Are they re-applying (New REPD Ref): -> 15610
50 MW - planning - yorkshire and humber - Barlow Road, Barlow - Battery Storage - 9970

  Record Last Updated (dd/mm/yyyy): 28/11/2022 -> 19/11/2021
50 MW - planning - eastern - Sundon Sub Station Battery Storage Facility - 9998

  Record Last Updated (dd/mm/yyyy): 24/11/2021 -> 08/11/2023
  Under Construction: -> 01/07/2023
50 MW - planning - scotland - Electricity Sub Station, Strichen - Battery Storage Facility - 10039

  Record Last Updated (dd/mm/yyyy): 04/03/2022 -> 02/12/2021
50 MW - planning - eastern - Ardleigh Road, Little Bromley - Battery Energy Storage - 10302

  Record Last Updated (dd/mm/yyyy): -> 01/11/2022
50 MW - planning - eastern - Newmarket Road, Bottisham - Battery Energy Storage - 10486

  Record Last Updated (dd/mm/yyyy): 01/12/2022 -> 03/01/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 21/12/2026
50 MW - planning - north west - Huncoat Power Station - Battery Storage - 10516

  Record Last Updated (dd/mm/yyyy): 23/01/2023 -> 01/02/2022
50 MW - planning - west midlands - Penstone Lane, Penn 1 - Battery Storage Facility - 10705

  Record Last Updated (dd/mm/yyyy): 17/10/2022 -> 01/03/2022
  County: West Midlands -> Staffordshire
50 MW - planning - west midlands - Penstone Lane, Lower Penn 2 - Battery Storage - 10733

  Record Last Updated (dd/mm/yyyy): 17/10/2022 -> 04/03/2022
50 MW - planning - scotland - Frodo Solar and Battery Energy Development - 10994

  Record Last Updated (dd/mm/yyyy): 07/06/2023 -> 12/04/2022
50 MW - planning - west midlands - Lowlands Farm - Battery Storage - 11399

  Record Last Updated (dd/mm/yyyy): 04/01/2023 -> 06/06/2022
50 MW - planning - yorkshire and humber - Swangate Project - Energy Storage System - 11437

  Record Last Updated (dd/mm/yyyy): 22/12/2022 -> 09/06/2022
50 MW - planning - eastern - Third Drove, Fengate - Battery Storage - 11558

  Record Last Updated (dd/mm/yyyy): 28/06/2022 -> 16/01/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 05/01/2026
50 MW - planning - south west - Says Court Farm, Coalpit Heath - Battery Energy Storage - 11793

  Record Last Updated (dd/mm/yyyy): 14/11/2022 -> 04/08/2022
50 MW - planning - scotland - Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility - 12780

  Record Last Updated (dd/mm/yyyy): 05/12/2022 -> 19/12/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 11/12/2026
50 MW - planning - north east - Whelley Hill Farm, Worset Lane - Battery Energy Storage - 13246

  Record Last Updated (dd/mm/yyyy): 20/02/2023 -> 02/01/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Authority: Hartlepool Council -> Hartlepool Borough Council
  Planning Permission Expired: -> 07/12/2026
50 MW - planning - scotland - Fairways Business Park - Battery Storage - 13318

  Planning Authority: Highlands Council -> Highland Council
49 MW - operation - eastern - Pelham - 6898

  Record Last Updated (dd/mm/yyyy): -> 03/01/2019
49 MW - operation - north west - Roosecote - 6912

  Record Last Updated (dd/mm/yyyy): -> 30/11/2018
49 MW - operation - east midlands - West Burton - 6920

  Record Last Updated (dd/mm/yyyy): -> 27/11/2018
49 MW - planning - eastern - Tollgate Battery Storage Facility - 6949

  Record Last Updated (dd/mm/yyyy): -> 23/11/2018
49 MW - operation - yorkshire and humber - Pillswood Phase 1 - 7005 Megapack

  Record Last Updated (dd/mm/yyyy): -> 09/11/2022
49 MW - cancelled - south west - Ravensroost Farm, Minety - Battery Energy Storage - 7014

  Record Last Updated (dd/mm/yyyy): -> 29/06/2022
49 MW - operation - yorkshire and humber - Nether Moor Field - 7019

  Record Last Updated (dd/mm/yyyy): -> 27/05/2020
49 MW - planning - eastern - Norwich Substation Storage Facility - 7021

  Record Last Updated (dd/mm/yyyy): -> 17/09/2020
49 MW - operation - south west - Mannington Battery Storage Plant - 7024

  Record Last Updated (dd/mm/yyyy): -> 14/09/2022
49 MW - planning - north west - Middleton Clean Energy Plant - 7029

  Record Last Updated (dd/mm/yyyy): -> 26/09/2022
  Operator (or Applicant): Lancaster Power -> Infra Balance New Energy
49 MW - planning - eastern - Hilfield Farm Tech - 7030

  Record Last Updated (dd/mm/yyyy): -> 26/03/2020
49 MW - planning - north east - Lackenby - 7040

  Record Last Updated (dd/mm/yyyy): -> 23/07/2019
49 MW - construction - east midlands - Enderby Storage, Redcomb Farm - 7044

  Record Last Updated (dd/mm/yyyy): -> 01/04/2021
49 MW - planning - south west - Ellbridge Lane - 7051

  Record Last Updated (dd/mm/yyyy): -> 23/11/2022
49 MW - planning - yorkshire and humber - Elland Storage Project - 7053

  Record Last Updated (dd/mm/yyyy): -> 14/11/2019
49 MW - planning - eastern - Chapel Farm - 7058 Megapack

  Record Last Updated (dd/mm/yyyy): -> 13/06/2019
49 MW - planning - south east - Lovedean Energy Storage System - 7064

  Record Last Updated (dd/mm/yyyy): -> 16/05/2019
  Judicial Review: 07/09/2018 -> 43350
49 MW - planning - east midlands - Cottam Power Station - 7066

  Record Last Updated (dd/mm/yyyy): -> 12/08/2020
49 MW - construction - south east - Sundridge Hill - 7081

  Record Last Updated (dd/mm/yyyy): -> 17/03/2022
49 MW - planning - yorkshire and humber - Land Adjacent to 4 Redcote Lane (Armley) - 7111

  Record Last Updated (dd/mm/yyyy): -> 19/01/2022
49 MW - operation - yorkshire and humber - Creyke Beck - 7122

  Record Last Updated (dd/mm/yyyy): -> 28/01/2019
49 MW - planning - eastern - Braintree Road Substation - 7161

  Record Last Updated (dd/mm/yyyy): -> 06/09/2022
49 MW - construction - south east - Halewick Lane, Sompting - Battery-based Energy Storage Facility - 7168

  Record Last Updated (dd/mm/yyyy): -> 17/10/2022
49 MW - construction - yorkshire and humber - Osbaldwick Substation - 7172

  Record Last Updated (dd/mm/yyyy): -> 27/07/2022
49 MW - operation - south west - Minety South - Battery Storage - 7184

  Record Last Updated (dd/mm/yyyy): -> 21/08/2020
49 MW - planning - eastern - Burwell Main Sub-Station - 7272

  Record Last Updated (dd/mm/yyyy): -> 29/04/2019
49 MW - planning - eastern - Sundon Substation - 7283

  Record Last Updated (dd/mm/yyyy): -> 30/04/2019
49 MW - construction - eastern - Tollgate Farm Battery Storage - 7335

  Record Last Updated (dd/mm/yyyy): -> 01/02/2022
49 MW - operation - yorkshire and humber - Pillswood Phase 2 - 7360 Megapack

  Record Last Updated (dd/mm/yyyy): -> 01/11/2022
49 MW - construction - south east - Kemsley Substation - 7368

  Record Last Updated (dd/mm/yyyy): -> 15/11/2019
49 MW - construction - scotland - Ferrymuir - 7371

  Record Last Updated (dd/mm/yyyy): -> 29/07/2022
49 MW - planning - north west - Harker Grid Sub Station - 7462

  Record Last Updated (dd/mm/yyyy): -> 17/09/2020
49 MW - construction - south west - Salisbury Substation - 7510

  Record Last Updated (dd/mm/yyyy): -> 16/03/2023
49 MW - construction - south east - Cowley electricity sub-station - 7571

  Record Last Updated (dd/mm/yyyy): -> 17/09/2020
49 MW - construction - yorkshire and humber - Bradford West Substation (Harrop Edge Farm) - 7577

  Record Last Updated (dd/mm/yyyy): -> 08/07/2022
49 MW - planning - south east - Rye Common - 7737 Megapack

  Record Last Updated (dd/mm/yyyy): -> 12/03/2020
  Operator (or Applicant): Harmony Energy Storage -> Pulse Clean Energy
  Are they re-applying (Old REPD Ref) : -> 7028
49 MW - operation - north west - Liverpool Energy Management Facility - 7772

  Record Last Updated (dd/mm/yyyy): 22/06/2023 -> 01/03/2022
49 MW - planning - east midlands - Newton Wood Farm - 7780

  Record Last Updated (dd/mm/yyyy): 07/02/2021 -> 22/03/2022
49 MW - planning - north west - Welkin Mill - 7832

  Record Last Updated (dd/mm/yyyy): 05/01/2023 -> 12/08/2020
49 MW - construction - west midlands - Coventry National Grid Substation - 7885

  Record Last Updated (dd/mm/yyyy): 11/11/2022 -> 25/06/2020
49 MW - planning - eastern - Reach Road - 7906

  Record Last Updated (dd/mm/yyyy): 30/09/2020 -> 30/06/2020
49 MW - operation - scotland - Dundee Technology Park - 7946

  Record Last Updated (dd/mm/yyyy): 07/02/2021 -> 30/09/2020
  Operational: 21/06/2021 ->
49 MW - construction - north west - Unit 5 XL Business Park - 7985

  Record Last Updated (dd/mm/yyyy): 30/07/2021 -> 30/06/2020
49 MW - planning - london - Mill Hill National Grid Substation - 8009

  Record Last Updated (dd/mm/yyyy): 21/03/2023 -> 27/03/2023
49 MW - planning - south west - National Grid Minety Substation - 8021

  Record Last Updated (dd/mm/yyyy): 07/02/2021 -> 22/12/2022
49 MW - planning - northern ireland - Colinglen Road Battery - 8033

  Record Last Updated (dd/mm/yyyy): 30/09/2020 -> 15/08/2022
49 MW - construction - east midlands - National Grid Enderby Substation - 8037

  Record Last Updated (dd/mm/yyyy): 25/01/2023 -> 30/09/2020
49 MW - planning - south west - Claydon Farm - Solar Farm & Battery Storage - 8039

  Record Last Updated (dd/mm/yyyy): 10/05/2022 -> 07/02/2021
49 MW - construction - south west - Larks Green Solar Farm - 8052

  Record Last Updated (dd/mm/yyyy): 06/06/2023 -> 30/09/2020
49 MW - planning - north west - Welkin Mill - 8055

  Record Last Updated (dd/mm/yyyy): 05/01/2023 -> 10/12/2021
49 MW - planning - scotland - Torrdhuin, Auchteraw Battery Storage Facility - 8096

  Record Last Updated (dd/mm/yyyy): 12/01/2021 -> 04/08/2023
49 MW - planning - scotland - Platchaig House, Kilmorack - Battery Storage Facility - 8248

  Record Last Updated (dd/mm/yyyy): 02/08/2021 -> 31/07/2023
  Development Status: Planning Application Submitted -> Revised
  Development Status (short): Application Submitted -> Revised
  Are they re-applying (New REPD Ref): -> 14373
  Planning Permission Refused: -> 30/08/2022
49 MW - planning - eastern - Brentwood nergy Storage System - 8249

  Record Last Updated (dd/mm/yyyy): 12/01/2021 -> 08/07/2022
49 MW - planning - eastern - Crouch Solar Farm - 8358

  Record Last Updated (dd/mm/yyyy): 14/03/2022 -> 11/07/2023
  Site Name: Park Farm, Herongate Solar Photovoltaic PV Farm -> Crouch Solar Farm
49 MW - planning - scotland - Old Gallows Road - Battery storage - 8368

  Record Last Updated (dd/mm/yyyy): 28/04/2021 -> 08/02/2021
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Authority: Perth and Kinross Council -> Perth & Kinross Council
  Planning Permission Expired: -> 03/08/2024
49 MW - planning - scotland - Shindour - Energy Storage Facility - 8464

  Record Last Updated (dd/mm/yyyy): 11/11/2022 -> 28/05/2021
49 MW - construction - south west - Mannington Battery Energy Storage System - 8833

  Record Last Updated (dd/mm/yyyy): 01/02/2023 -> 26/03/2021
49 MW - planning - south west - Moreton Lane - Solar Farm & Battery Storage - 8844

  Site Name: Whitminster - Solar Farm & Battery Storage -> Moreton Lane - Solar Farm & Battery Storage
49 MW - planning - eastern - Rush Green Motors - Battery storage - 8987

  Record Last Updated (dd/mm/yyyy): 15/09/2022 -> 11/10/2023
49 MW - planning - scotland - East Kilbride - Battery storage - 9013

  Record Last Updated (dd/mm/yyyy): 04/11/2022 -> 15/12/2023
  Operator (or Applicant): Cathkin Energy Storage Limited -> Engie Regeneration Limited
49 MW - planning - scotland - Newhouse Farm - Energy Storage Facility - 9047

  Record Last Updated (dd/mm/yyyy): 08/02/2023 -> 29/07/2022
  Planning Authority: Perth and Kinross Council -> Perth & Kinross Council
49 MW - construction - north west - Bredbury Substation - Battery Storage Facility - 9653

  Record Last Updated (dd/mm/yyyy): 11/04/2023 -> 20/09/2021
49 MW - planning - east midlands - Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage - 9796

  Record Last Updated (dd/mm/yyyy): 24/02/2023 -> 13/10/2021
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 02/10/2026
49 MW - planning - yorkshire and humber - Common Farm - Solar Farm & Battery Storage - 9877

  Record Last Updated (dd/mm/yyyy): 13/07/2023 -> 01/11/2021
49 MW - planning - scotland - Drum Farm - Battery Energy Storage System - 9940

  Record Last Updated (dd/mm/yyyy): 22/11/2022 -> 17/11/2021
49 MW - planning - scotland - Stainland Energy Storage Project - 10225

  Record Last Updated (dd/mm/yyyy): 14/12/2022 -> 29/12/2021
  Planning Authority: Highlands Council -> Highland Council
49 MW - planning - yorkshire and humber - Elland Storage Project - 10236

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Are they re-applying (New REPD Ref): -> 15304
49 MW - planning - scotland - Newburgh Road, Abernethy - Battery Storage - 10607

  Record Last Updated (dd/mm/yyyy): 25/10/2022 -> 11/02/2022
  Planning Authority: Perth and Kinross Council -> Perth & Kinross Council
49 MW - planning - scotland - Rothienorman - Battery Storage - 10638

  Record Last Updated (dd/mm/yyyy): 22/11/2022 -> 16/02/2022
49 MW - planning - scotland - Midmill, Kintore - Battery Energy Storage - 10701

  Record Last Updated (dd/mm/yyyy): 20/07/2022 -> 01/03/2022
49 MW - operation - scotland - Jamesfield Organic Centre - Battery Storage - 10863 Megapack

  Record Last Updated (dd/mm/yyyy): 12/01/2023 -> 24/03/2022
  Planning Authority: Perth and Kinross Council -> Perth & Kinross Council
49 MW - planning - scotland - Broomloan Road - Battery Energy Storage - 10886

  Record Last Updated (dd/mm/yyyy): 08/07/2022 -> 29/03/2022
49 MW - planning - scotland - Law Of Doune Road, Macduff - Battery Storage - 10894

  Record Last Updated (dd/mm/yyyy): 16/02/2023 -> 07/12/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> NA
49 MW - planning - north east - Hawthorn Grid Site - Battery Storage - 10896

  Record Last Updated (dd/mm/yyyy): 05/12/2022 -> 30/03/2022
49 MW - planning - scotland - South Leylodge Farmhouse, Kintore - Battery Energy Storage System - 11092

  Record Last Updated (dd/mm/yyyy): 02/05/2023 -> 27/04/2022
49 MW - planning - west midlands - Brown Edge - Battery Storage - 11418

  Record Last Updated (dd/mm/yyyy): 18/03/2021 -> 03/11/2021
49 MW - planning - south east - Harrington Franklin, Richborough Energy Park - Battery Storage - 11449

  Record Last Updated (dd/mm/yyyy): 12/12/2022 -> 14/06/2022
49 MW - planning - scotland - Well Street - Battery Storage - 11473

  Record Last Updated (dd/mm/yyyy): 22/06/2023 -> 31/03/2023
49 MW - planning - scotland - Kellwood Road - Battery Storage - 11545

  Record Last Updated (dd/mm/yyyy): 17/04/2023 -> 24/06/2022
49 MW - planning - scotland - Overhill Farm, Rothienorman - Battery Energy Storage - 11590

  Record Last Updated (dd/mm/yyyy): 02/03/2023 -> 05/07/2022
49 MW - planning - scotland - Holmston Road - Battery Storage Facility - 11679

  Record Last Updated (dd/mm/yyyy): 06/07/2023 -> 18/07/2022
  Planning Application Reference: 23/00176/APPM -> 22/00505/PAN
  Planning Permission Expired: 30/06/2023 -> 30/06/2026
49 MW - construction - london - Clay Tye Farm Phase 1 - Storage Facility - 11720

  Planning Authority: London Borough of Havering Council -> London Borough of Havering
49 MW - construction - london - Clay Tye Farm Phase 2 - Storage Facility - 11721

  Planning Authority: London Borough of Havering Council -> London Borough of Havering
49 MW - planning - scotland - Househill House, Househill - Battery Storage - 12056

  Planning Authority: Highlands Council -> Highland Council
49 MW - planning - scotland - Meetlaw Farm, Fordoun - Battery Energy Storage System - 12361

  Record Last Updated (dd/mm/yyyy): 01/02/2023 -> 04/10/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 19/09/2029
49 MW - planning - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility - 12936

  Record Last Updated (dd/mm/yyyy): 22/12/2022 -> 13/11/2023
  Development Status: Planning Application Submitted -> Revised
  Development Status (short): Application Submitted -> Revised
  Are they re-applying (New REPD Ref): -> 15230
49 MW - planning - north west - Welkin Mill, Welkin Road - Battery Storage - 12982

  Record Last Updated (dd/mm/yyyy): 05/01/2023 -> 23/08/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 01/08/2026
49 MW - planning - scotland - Drumore Cottage, Swordale - Battery Storage - 12983

  Planning Authority: Highlands Council -> Highland Council
49 MW - planning - scotland - Middleton Of Blackhills, Rothienorman - Battery Energy Storage System - 13087

  Record Last Updated (dd/mm/yyyy): 25/05/2023 -> 18/09/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 07/09/2026
49 MW - planning - south west - Landulph Substation, Ellbridge Lane - Battery Energy Storage - 13461

  Record Last Updated (dd/mm/yyyy): 20/03/2023 -> 11/09/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 05/09/2026
49 MW - planning - scotland - Forest Avenue Cottage, Drumlithie - Battery Energy Storage - 13986

  Record Last Updated (dd/mm/yyyy): 31/05/2023 -> 30/11/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 14/11/2028
48 MW - planning - northern ireland - Classic Marble Showers Site - 7208

  Record Last Updated (dd/mm/yyyy): -> 16/04/2020
47 MW - planning - south west - Indian Queens Sub-Station - Battery Storage - 11725

  Record Last Updated (dd/mm/yyyy): 01/11/2022 -> 25/07/2022
45 MW - planning - scotland - Pleasance Road - 7217

  Record Last Updated (dd/mm/yyyy): -> 08/03/2022
  Planning Authority: Perth and Kinross Council -> Perth & Kinross Council
45 MW - planning - north west - Cheshire Power Station - Battery Storage Facility - 10295

  Record Last Updated (dd/mm/yyyy): 06/06/2023 -> 22/12/2021
45 MW - planning - north east - Edge Lane, Maiden Law - Solar Farm & Battery Storage - 11619

  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 13/07/2026
45 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage - 12711

  Record Last Updated (dd/mm/yyyy): 18/04/2023 -> 03/07/2023
45 MW - planning - north west - Mount Pleasant Farm, Green Lane - Battery Storage - 13011

  Record Last Updated (dd/mm/yyyy): 12/01/2023 -> 30/10/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 03/10/2026
43 MW - planning - scotland - Ballingall Farm, Leslie - Battery Energy Storage System - 10825

  Record Last Updated (dd/mm/yyyy): 25/05/2023 -> 18/03/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 14/09/2026
43 MW - planning - scotland - Merchiston Industrial Estate, Smith Street - Battery Storage - 13225

  County: Central -> Falkirk
42 MW - planning - scotland - South Pargillis - Battery Storage - 9564

  Record Last Updated (dd/mm/yyyy): 14/06/2023 -> 09/09/2021
42 MW - planning - scotland - Armadale Wind Farm - 11219

  Record Last Updated (dd/mm/yyyy): 18/05/2022 -> 10/05/2022
41 MW - operation - west midlands - Bloxwich Battery - 8160

  Record Last Updated (dd/mm/yyyy): 02/10/2020 -> 30/09/2020
  Operational: 01/07/2019 ->
40 MW - planning - east midlands - Breach Farm - Energy Barn - 6914

  Record Last Updated (dd/mm/yyyy): -> 27/05/2022
40 MW - planning - eastern - Norwich Road Industrial Estate - 6958

  Record Last Updated (dd/mm/yyyy): -> 04/11/2022
40 MW - planning - east midlands - Breach Farm - 6962

  Record Last Updated (dd/mm/yyyy): -> 27/05/2022
40 MW - construction - south east - Land off Queenborough Road - 7003

  Record Last Updated (dd/mm/yyyy): -> 12/01/2021
40 MW - construction - scotland - Bilbo Solar Farm Energy Storage - 7020

  Record Last Updated (dd/mm/yyyy): -> 30/07/2020
40 MW - planning - eastern - Maldon Hall - 7095

  Record Last Updated (dd/mm/yyyy): -> 23/12/2021
40 MW - planning - west midlands - Rubber and Allied Products - 7096

  Record Last Updated (dd/mm/yyyy): -> 20/04/2020
40 MW - operation - south east - Huggin's Hall - 7129

  Record Last Updated (dd/mm/yyyy): -> 23/10/2018
40 MW - planning - west midlands - Whitehouse Farm Energy Barn - 7987

  Record Last Updated (dd/mm/yyyy): 27/05/2022 -> 30/06/2020
40 MW - planning - south east - Loudwater Battery Storage Site - 8142

  Record Last Updated (dd/mm/yyyy): 12/12/2022 -> 30/09/2020
40 MW - operation - south east - Newlands Farm Battery Storage Facility Phase 2 - 8264

  Record Last Updated (dd/mm/yyyy): 12/01/2021 -> 18/03/2022
40 MW - planning - scotland - Dalmarnock Road - Battery Storage - 8507

  Record Last Updated (dd/mm/yyyy): 11/05/2022 -> 09/03/2021
40 MW - planning - south west - Forest Gate - Solar Farm & Battery Storage - 9230

  Record Last Updated (dd/mm/yyyy): 14/03/2023 -> 28/06/2021
40 MW - planning - yorkshire and humber - Field House Solar Farm - 10970

  Record Last Updated (dd/mm/yyyy): 28/07/2022 -> 11/04/2022
40 MW - planning - north east - Long Pasture Farm, Little Stainton - Solar Farm - 12952

  Record Last Updated (dd/mm/yyyy): 23/12/2022 -> 14/08/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 10/08/2030
40 MW - planning - yorkshire and humber - Tofts Lane, Hunshelf - Battery Storage - 13733

  Record Last Updated (dd/mm/yyyy): 25/04/2023 -> 17/11/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 13/11/2028
40 MW - planning - northern ireland - Doogary Road, Omagh - Battery Storage - 14125

  County: Fermanagh & Omagh -> Co. Fermanagh & Omagh
37 MW - planning - scotland - STOR Field 9 - 7018

  Record Last Updated (dd/mm/yyyy): -> 25/04/2023
36 MW - planning - northern ireland - Lisnabreeny Road - 7556

  Record Last Updated (dd/mm/yyyy): -> 25/06/2020
36 MW - planning - south west - Kingston Road, Slimbridge - Battery Storage - 11516

  Development Status: Planning Application Submitted -> Revised
  Development Status (short): Application Submitted -> Revised
  Are they re-applying (New REPD Ref): -> 14882
  Planning Permission Expired: -> 26/04/2026
35 MW - operation - north east - Port of Tyne - 6976

  Record Last Updated (dd/mm/yyyy): -> 09/05/2019
35 MW - planning - yorkshire and humber - Rusholme Grange - 7093

  Record Last Updated (dd/mm/yyyy): -> 16/09/2019
35 MW - planning - south west - Northington Lane - Battery Storage Facility - 9992

  Record Last Updated (dd/mm/yyyy): 18/05/2023 -> 23/11/2021
32 MW - operation - south west - Severn Road - 7085

  Record Last Updated (dd/mm/yyyy): -> 13/10/2022
32 MW - planning - south west - Gloucestershire Science and Technology Park (small) - 7181

  Record Last Updated (dd/mm/yyyy): -> 14/03/2022
32 MW - planning - yorkshire and humber - Kirkhaw Lane Battery Storage - 8430

  Record Last Updated (dd/mm/yyyy): 24/02/2022 -> 02/03/2021
32 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage - 10145

  Record Last Updated (dd/mm/yyyy): 04/03/2022 -> 19/01/2022
32 MW - planning - south west - Post Farm, Lytchett Minster - Battery Energy Storage - 10291

  Record Last Updated (dd/mm/yyyy): 31/05/2023 -> 24/01/2022
31 MW - planning - scotland - Benthead Farm - Solar Farm & Battery Storage - 10542

  Record Last Updated (dd/mm/yyyy): 09/02/2023 -> 03/02/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 11/08/2028
30 MW - planning - south west - Gloucestershire Science and Technology Park - 7067

  Record Last Updated (dd/mm/yyyy): -> 14/03/2022
30 MW - operation - south west - Fideoak Mills - 7152

  Record Last Updated (dd/mm/yyyy): -> 21/09/2022
30 MW - planning - south west - Catsbrain Farm - 7988

  Record Last Updated (dd/mm/yyyy): 04/08/2022 -> 30/06/2020
30 MW - planning - scotland - Roaring Hill (Resubmission) - 7989

  Record Last Updated (dd/mm/yyyy): 30/06/2020 -> 24/01/2023
  Post Code: -> KY6 3ET
30 MW - planning - scotland - Blackpark Energy Storage - 8105

  Record Last Updated (dd/mm/yyyy): 22/01/2021 -> 12/01/2021
  Under Construction: -> Implemented
30 MW - planning - scotland - Drumcross Battery Storage - 8155

  Record Last Updated (dd/mm/yyyy): 15/09/2022 -> 06/12/2023
  Post Code: -> EH54 6WF
30 MW - planning - scotland - Farburn Place - Energy Storage Facility - 8385

  Record Last Updated (dd/mm/yyyy): 21/12/2022 -> 08/02/2021
30 MW - planning - scotland - Jamesfield Organic Centre, Phase 1 - 10456

  Planning Authority: Perth and Kinross Council -> Perth & Kinross Council
30 MW - planning - eastern - Colton - Solar photovoltaic farm, Battery storage - 10945

  Record Last Updated (dd/mm/yyyy): 08/07/2022 -> 05/01/2024
30 MW - planning - north east - West Sleekburn - Battery Storage Compound - 10957

  Record Last Updated (dd/mm/yyyy): 21/10/2022 -> 06/04/2022
30 MW - planning - west midlands - Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage - 10978

  Record Last Updated (dd/mm/yyyy): 02/03/2023 -> 11/04/2022
30 MW - planning - scotland - West Bendings - Battery Storage - 10985

  Record Last Updated (dd/mm/yyyy): 04/07/2023 -> 11/04/2022
30 MW - planning - south west - Catsbrain Farm - Battery Storage - 11787

  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 03/10/2026
30 MW - planning - west midlands - Rectory Farm, Rectory Lane - Battery Storage - 11905

  Operator (or Applicant): Private Developer -> Balance Power Projects Limited
  Installed Capacity (MWelec): 50 -> 30
  mw: 50 -> 30
30 MW - planning - yorkshire and humber - Back Lane, Skerne - Solar Farm & Battery Storage - 12297

  Under Construction: -> Implemented
30 MW - planning - yorkshire and humber - North Lincolnshire Green Energy Park - 12706

  Record Last Updated (dd/mm/yyyy): 24/11/2022 -> 11/01/2024
30 MW - planning - scotland - Bishopmill - Battery Energy Storage - 14191

  Record Last Updated (dd/mm/yyyy): 03/07/2023 -> 02/01/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 21/12/2026
29 MW - planning - scotland - Fordtown Energy Storage - 7764

  Record Last Updated (dd/mm/yyyy): 30/06/2020 -> 17/09/2020
29 MW - planning - scotland - Learielaw Farm - 7970

  Record Last Updated (dd/mm/yyyy): 06/03/2023 -> 16/11/2022
  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Are they re-applying (New REPD Ref): -> 13368
28 MW - construction - eastern - Lower Dunton Road Battery Storage Facility - 8213

  Record Last Updated (dd/mm/yyyy): 24/02/2021 -> 11/01/2022
27 MW - operation - yorkshire and humber - Boscar Grange Farm - 7332

  Record Last Updated (dd/mm/yyyy): -> 18/12/2019
26 MW - planning - yorkshire and humber - West Melton Electricity Substation - Energy Storage System - 11436

  Record Last Updated (dd/mm/yyyy): 23/09/2022 -> 23/11/2023
25 MW - operation - north east - Tynemouth Energy Storage System (TESS) - 6925

  Record Last Updated (dd/mm/yyyy): -> 03/08/2018
23 MW - operation - east midlands - Asfordby Business Park (1) - 6932

  Record Last Updated (dd/mm/yyyy): -> 28/04/2020
22 MW - operation - wales - Pen y Cymoedd Energy Storage - 6927

  Record Last Updated (dd/mm/yyyy): -> 03/01/2019
21 MW - operation - eastern - Clayhill Farm - Battery Energy Storage - 7570

  Record Last Updated (dd/mm/yyyy): -> 14/09/2022
  Operational: -> 01/10/2019
20 MW - operation - scotland - Broxburn - 6910

  Record Last Updated (dd/mm/yyyy): -> 18/04/2019
20 MW - operation - west midlands - Land to the west of Clay Hill Pit / Larport Farm - 6911

  Record Last Updated (dd/mm/yyyy): -> 20/01/2020
20 MW - operation - west midlands - Noriker Power Staunch - 6918

  Record Last Updated (dd/mm/yyyy): -> 09/05/2019
20 MW - planning - wales - Traston Road - 6929

  Record Last Updated (dd/mm/yyyy): -> 08/09/2023
  Operator (or Applicant): UK Power Reserve -> Field Energy
  Planning Permission Expired: 03/11/2021 -> 27/07/2028
20 MW - construction - east midlands - Chelveston Renewable Energy Park - 6941

  Record Last Updated (dd/mm/yyyy): -> 27/05/2020
20 MW - operation - north east - Ray Battery Storage Facility - 6943

  Record Last Updated (dd/mm/yyyy): -> 27/03/2023
20 MW - operation - eastern - Claredown Farm - 6945

  Record Last Updated (dd/mm/yyyy): -> 26/11/2019
20 MW - planning - london - Riverside Energy Park - 7036

  Record Last Updated (dd/mm/yyyy): -> 06/04/2022
20 MW - planning - west midlands - Perseverance Road - 7061

  Record Last Updated (dd/mm/yyyy): -> 24/02/2022
20 MW - operation - east midlands - Calow Green Farm - 7140

  Record Last Updated (dd/mm/yyyy): -> 31/03/2023
20 MW - operation - yorkshire and humber - Kirkhaw Lane - 7148

  Record Last Updated (dd/mm/yyyy): -> 19/01/2022
20 MW - planning - yorkshire and humber - Kirkhaw Lane - 7149

  Record Last Updated (dd/mm/yyyy): -> 24/02/2022
20 MW - operation - north west - Land at Carnegie Road - 7155

  Record Last Updated (dd/mm/yyyy): -> 02/01/2019
20 MW - planning - scotland - Blackpark Farm - 7226

  Record Last Updated (dd/mm/yyyy): -> 22/08/2019
20 MW - planning - scotland - Fordtown Energy Storage - 7234

  Record Last Updated (dd/mm/yyyy): -> 20/08/2019
20 MW - planning - scotland - Stranoch 2 - 7306

  Record Last Updated (dd/mm/yyyy): -> 24/11/2021
20 MW - planning - scotland - Troston Loch Wind Farm - 7333

  Record Last Updated (dd/mm/yyyy): -> 18/12/2020
  Operator (or Applicant): EDF Renewables -> EDF Energy Renewables
  Planning Permission Expired: 18/12/2023 -> 18/12/2026
20 MW - construction - south east - Plot 2B EurolinkV - 7383

  Record Last Updated (dd/mm/yyyy): -> 13/12/2021
20 MW - planning - scotland - Douglas West Wind Farm (extension) - 7460

  Record Last Updated (dd/mm/yyyy): -> 02/07/2019
20 MW - operation - north west - Lascar Works - 7464

  Record Last Updated (dd/mm/yyyy): -> 03/07/2019
20 MW - planning - scotland - Hagshaw Hill - 7572

  Record Last Updated (dd/mm/yyyy): -> 25/03/2020
20 MW - construction - north west - Gipsy Lane - 7632

  Record Last Updated (dd/mm/yyyy): 12/01/2022 -> 01/07/2021
20 MW - operation - south west - Feeder Road - 7663

  Record Last Updated (dd/mm/yyyy): 13/06/2023 -> 01/05/2023
20 MW - planning - south east - Basing Road - 7746

  Record Last Updated (dd/mm/yyyy): 15/09/2021 -> 24/02/2023
20 MW - construction - north west - Hawthorne Road - 7800

  Record Last Updated (dd/mm/yyyy): 19/04/2023 -> 30/09/2020
20 MW - planning - scotland - Arecleoch Wind Farm (extension) - 7882

  Record Last Updated (dd/mm/yyyy): 18/11/2021 -> 20/02/2023
20 MW - construction - south east - Mill Lane, Nursling - Battery Storage Facility - 8099

  Record Last Updated (dd/mm/yyyy): 22/05/2023 -> 02/03/2022
20 MW - planning - east midlands - Vicarage Drove - Solar farm & Battery storage - 8518

  Record Last Updated (dd/mm/yyyy): 04/11/2022 -> 11/05/2022
20 MW - planning - east midlands - Mount Road, Castle Gresley - Battery Storage Facility - 10012

  Record Last Updated (dd/mm/yyyy): 18/08/2022 -> 29/11/2021
20 MW - planning - north west - Broadgate, Chadderton - Battery Storage Containers - 10690

  Record Last Updated (dd/mm/yyyy): 14/06/2022 -> 01/03/2022
20 MW - planning - scotland - Strathruddie, Kinglassie - Solar farm - 10828

  Record Last Updated (dd/mm/yyyy): 18/07/2022 -> 21/03/2022
20 MW - planning - east midlands - West Burton Solar Project - 10917

  Record Last Updated (dd/mm/yyyy): 11/04/2023 -> 01/04/2022
20 MW - planning - scotland - Chleansaid Onshore Wind Farm - 10997

  Record Last Updated (dd/mm/yyyy): 12/04/2022 -> 09/01/2024
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 15/12/2026
20 MW - planning - scotland - Grayside Wind Farm - 11113

  CfD Capacity (MW): -> 7
  Turbine Capacity (MW): 7 ->
20 MW - construction - north west - Chadderton - Battery energy storage facility - 11160

  Record Last Updated (dd/mm/yyyy): 07/06/2022 -> 09/05/2022
20 MW - operation - south west - Hawkers Hill Energy Park - 12293

  Operational: 03/10/2022 ->
20 MW - planning - west midlands - Fordhouse Lane - Battery Energy Storage System - 13108

  Record Last Updated (dd/mm/yyyy): 31/01/2023 -> 11/09/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 18/08/2026
20 MW - planning - north west - Peel Road, Westby With Plumptons - Battery Storage - 13300

  Record Last Updated (dd/mm/yyyy): 24/02/2023 -> 25/09/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 22/09/2026
20 MW - planning - south west - Fair Park Solar Farm - 13761

  Planning Application Withdrawn: ->
  Planning Permission Refused: ->
  Appeal Lodged: ->
  Appeal Withdrawn: ->
  Appeal Refused: ->
  Appeal Granted: ->
  Secretary of State - Intervened: ->
  Secretary of State - Refusal: ->
  Secretary of State - Granted: ->
  Planning Permission Expired: ->
  Under Construction: ->
  Operational: ->
19 MW - planning - scotland - Land North of Thornton Road - 7131

  Record Last Updated (dd/mm/yyyy): -> 29/04/2020
19 MW - planning - scotland - North West Of Jameston Farm - 7133

  Record Last Updated (dd/mm/yyyy): -> 27/09/2021
19 MW - planning - scotland - Jamesfield Organic Centre, Phase 2 - 7315

  Record Last Updated (dd/mm/yyyy): -> 07/03/2019
  Planning Authority: Perth and Kinross Council -> Perth & Kinross Council
19 MW - planning - scotland - Ochiltree - Battery Sorage - 10162

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Are they re-applying (New REPD Ref): -> 15312
19 MW - planning - scotland - Hillcrest Cottage, Shebster - Battery Energy Storage System - 10226

  Planning Authority: Highlands Council -> Highland Council
18 MW - construction - south east - Aurora Solar Farm - 7385

  Record Last Updated (dd/mm/yyyy): -> 23/03/2023
18 MW - planning - south west - Whaddon Lane, Hilperton - 9057

  Record Last Updated (dd/mm/yyyy): 27/04/2022 -> 29/09/2023
  Operator (or Applicant): INRG -> British Solar Renewables
16 MW - planning - east midlands - Waterswallows Road, Green Fairfield - Battery Storage Equipment - 10716

  Record Last Updated (dd/mm/yyyy): 19/04/2022 -> 04/03/2022
16 MW - planning - wales - Little Llwyn Onn - Solar Farm & Battery Storage - 11544

  Record Last Updated (dd/mm/yyyy): 14/03/2023 -> 24/06/2022
16 MW - planning - scotland - Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm - 11623

  Record Last Updated (dd/mm/yyyy): 06/04/2023 -> 13/07/2022
  Installed Capacity (MWelec): 66 -> 16
  mw: 66 -> 16
16 MW - planning - yorkshire and humber - J3 Business Park - Battery Storage Facility - 14054

  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 11/07/2026
15 MW - operation - south west - Lockleaze Energy Storage - 6961

  Record Last Updated (dd/mm/yyyy): -> 31/01/2019
15 MW - construction - south west - Holes Bay - 7688 Megapack

  Record Last Updated (dd/mm/yyyy): 29/04/2020 -> 14/01/2020
15 MW - planning - eastern - Three Bridges Solar Farm - 8220

  Record Last Updated (dd/mm/yyyy): 07/04/2021 -> 07/05/2021
15 MW - planning - south west - Smithyard Lane - Battery Storage - 10766

  Record Last Updated (dd/mm/yyyy): 16/02/2023 -> 09/03/2022
14 MW - planning - south east - Guildford Road Battery Storage Facility - 8269

  Record Last Updated (dd/mm/yyyy): 12/01/2021 -> 24/03/2023
14 MW - planning - scotland - Hopsrig Wind Farm - 11066

  Record Last Updated (dd/mm/yyyy): 27/10/2022 -> 26/04/2022
14 MW - planning - north west - St Michaels Road, Ditton Road - Battery Storage - 12904

  Record Last Updated (dd/mm/yyyy): 19/12/2022 -> 28/11/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 27/10/2026
14 MW - planning - west midlands - Pershore Lane, Tibberton - Battery Energy Storage System - 13096

  Record Last Updated (dd/mm/yyyy): 25/01/2023 -> 31/10/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 27/10/2026
13 MW - operation - south east - Bumpers Lane Solar Farm - 6913

  Record Last Updated (dd/mm/yyyy): -> 01/12/2021
13 MW - planning - west midlands - Maybrook Road - Battery facility - 11008

  Record Last Updated (dd/mm/yyyy): 18/08/2022 -> 19/04/2022
12 MW - planning - yorkshire and humber - Stor Generation Plant - Battery Storage - 8998

  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Expired: -> 11/06/2024
12 MW - planning - north west - Dragons Lane - Battery Storage Facility - 11701

  Record Last Updated (dd/mm/yyyy): 12/12/2022 -> 20/07/2022
10 MW - operation - northern ireland - AES Kilroot Station Battery Storage Array - 6845

  Record Last Updated (dd/mm/yyyy): -> 12/12/2018
10 MW - operation - yorkshire and humber - Blackburn Meadows - 6906

  Record Last Updated (dd/mm/yyyy): -> 21/03/2019
10 MW - operation - east midlands - Hill Farm - Energy Barn - 6915

  Record Last Updated (dd/mm/yyyy): -> 15/03/2019
10 MW - operation - south east - Kings Barn Farm - Energy Barn - 6916

  Record Last Updated (dd/mm/yyyy): -> 15/03/2019
10 MW - operation - east midlands - Leverton Farm - Energy Barn - 6917

  Record Last Updated (dd/mm/yyyy): -> 11/12/2018
10 MW - operation - eastern - Nevendon - 6926

  Record Last Updated (dd/mm/yyyy): -> 28/03/2017
10 MW - planning - east midlands - Manor Farm Energy Storage - 6948

  Record Last Updated (dd/mm/yyyy): -> 15/12/2022
10 MW - construction - eastern - Slamseys Energy Storage - 7000

  Record Last Updated (dd/mm/yyyy): -> 20/01/2020
10 MW - planning - south east - Stockbridge Road - 7097

  Record Last Updated (dd/mm/yyyy): -> 25/02/2020
10 MW - construction - south east - Land Adj Harmer Warren Quarry - 7143

  Record Last Updated (dd/mm/yyyy): -> 09/12/2022
10 MW - operation - north west - Cleator - 7177

  Record Last Updated (dd/mm/yyyy): -> 03/01/2019
10 MW - planning - south west - Old Green Farm, Alveston Battery Storage - 7182

  Record Last Updated (dd/mm/yyyy): -> 03/08/2020
10 MW - planning - south west - Trevol Business Park - 7404

  Record Last Updated (dd/mm/yyyy): -> 23/01/2020
10 MW - planning - south west - Tiddlywink Barn - 7527

  Record Last Updated (dd/mm/yyyy): -> 20/12/2019
10 MW - planning - scotland - East Ballochy - 7675

  Record Last Updated (dd/mm/yyyy): 30/09/2020 -> 15/09/2020
  Under Construction: -> Implemented
10 MW - planning - south west - Minety Substation - 7942

  Record Last Updated (dd/mm/yyyy): 27/04/2022 -> 30/06/2020
10 MW - construction - north west - Moston Vale - 8085

  Record Last Updated (dd/mm/yyyy): 27/09/2021 -> 07/05/2021
10 MW - construction - scotland - Dragonhall Farm, Padanaram - Battery Storage - 9066

  Record Last Updated (dd/mm/yyyy): 02/03/2022 -> 30/10/2023
10 MW - operation - south west - South Farm Solar Park - 9361

  Operational: 16/12/2022 ->
10 MW - planning - eastern - Wissett Solar Farm, Wissett - Battery Storage - 9913

  Record Last Updated (dd/mm/yyyy): 01/11/2022 -> 11/11/2021
10 MW - cancelled - scotland - Lethen Wind Farm Wind Turbines and Energy Storage - 10237

  Record Last Updated (dd/mm/yyyy): 24/01/2022 -> 10/01/2022
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 11369

  Record Last Updated (dd/mm/yyyy): 21/03/2023 -> 27/05/2022
10 MW - operation - south west - Cirencester Solar Farm - 12791

  Operational: 13/10/2022 ->

2023-07

New projects (102):
1450 MW - planning - yorkshire and humber - Thorpe Marsh Power Station - Battery Energy Storage - 12453
1400 MW - planning - yorkshire and humber - Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage - 13644
1040 MW - planning - north west - Carrington Power Station, Manchester Road - Battery Storage - 13362
500 MW - planning - scotland - Coalburn Energy - Battery Storage - 11034
500 MW - planning - east midlands - West Burton Power Station, North Road - Battery Storage - 11928
500 MW - planning - east midlands - Normanton Energy Reserve - Battery Storage - 11988
500 MW - planning - scotland - Eccles II Substation - Battery Energy Storage System - 14058
450 MW - planning - scotland - Haughend Farm - Alyth Battery Energy Storage System - 11858
400 MW - planning - scotland - Eccles Battery Energy Storage System - 11867
340 MW - planning - north west - Blackdyke Farm, Blackford - Battery Storage - 12710
350 MW - planning - scotland - Camsiscan Farm, Craigie - Battery Energy Storage System - 12820
300 MW - planning - east midlands - Staythorpe Road, Averham - Battery Storage - 12893
264 MW - planning - south east - Bolney Substation - Battery Storage - 10843
240 MW - planning - yorkshire and humber - Springfield Farm, Hensall - Battery Energy Storage Facility - 11680
200 MW - planning - scotland - Windyhill Battery Storage Facility - 10596
200 MW - planning - north east - Spennymoor Greener Grid Park - 13576
200 MW - planning - south west - Westerleigh Hill, Westerleigh - Battery Energy Storage Facility - 13607
200 MW - planning - south west - Earthcott Green Farm, Earthcott Green - Battery Energy Storage - 13643
200 MW - planning - west midlands - Astwood Lane, Feckenham - Battery Storage - 13707
200 MW - planning - south east - Bolney - Battery Storage - 13880
150 MW - construction - south east - Cleve Hill Solar Project - 7856
130 MW - planning - yorkshire and humber - Clough Road - Battery Energy System - 14225
120 MW - planning - south east - Kemsley Energy Park Battery Storage - 13489
120 MW - cancelled - south west - Pound Road, Hawkchurch - Battery Energy Storage System - 14016
114 MW - planning - eastern - Hickling Lane, Swainsthorpe -Battery Storage - 13560
100 MW - planning - south east - Libra Energy Stability Project - Battery Energy Storage - 12443
100 MW - planning - eastern - Walpole Sub Station, Walpole Bank - Battery Storage - 13045
100 MW - planning - eastern - Walpole Bank - Battery Energy Storage Facility - 13639
99 MW - planning - south west - Linton Court Farm, Highnam - Battery storage - 13145
99 MW - planning - south west - Lower Larks Farm - Battery storage - 14076
90 MW - cancelled - north west - Golf Road - Battery Energy Storage - 13459
75 MW - planning - northern ireland - Quarterland Road, Islandmagee - Battery Storage - 14117
70 MW - planning - north west - Tontine Road - Battery Energy Storage System - 9819
70 MW - planning - north west - Sale Golf Club, Golf Road - Battery Storage - 13731
69 MW - planning - eastern - Thurleigh Road - Battery Energy Storage - 9651
69 MW - planning - scotland - Middleton Road - Linwood Battery Energy Storage System - 11868
57 MW - planning - north east - The Carrs - Meadow Farm Energy storage facility - 9207
60 MW - cancelled - south west - Coldharbour, Chickerell - Battery Storage Facility - 12967
57 MW - cancelled - west midlands - Beechwood Farm, Hodgetts Lane - Battery Storage - 13297
57 MW - planning - south east - Coxmoor Wood, Crondall Road - Battery Storage - 13728
50 MW - planning - wales - Garn Fach Wind Farm - 7705
50 MW - planning - north west - Huncoat Power Station - Battery Storage - 10516
50 MW - planning - scotland - Clashindarroch Wind Farm Extension - 13117
50 MW - planning - scotland - Quantans Hill Wind Farm - 13238
50 MW - planning - north east - Whelley Hill Farm, Worset Lane - Battery Energy Storage - 13246
50 MW - planning - scotland - Fairways Business Park - Battery Storage - 13318
50 MW - cancelled - west midlands - Levedale Road, Levedale - Battery Energy Storage - 13615
49 MW - planning - london - Mill Hill National Grid Substation - 8009
49 MW - construction - south west - Larks Green Solar Farm - 8052
49 MW - planning - east midlands - Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage - 9796
49 MW - planning - yorkshire and humber - Common Farm - Solar Farm & Battery Storage - 9877
49 MW - planning - scotland - Law Of Doune Road, Macduff - Battery Storage - 10894
49 MW - planning - north east - Hawthorn Grid Site - Battery Storage - 10896
49 MW - planning - scotland - Well Street - Battery Storage - 11473
49 MW - planning - scotland - Kellwood Road - Battery Storage - 11545
49 MW - planning - scotland - Holmston Road - Battery Storage Facility - 11679
49 MW - planning - scotland - Meetlaw Farm, Fordoun - Battery Energy Storage System - 12361
49 MW - planning - scotland - Drumore Cottage, Swordale - Battery Storage - 12983
49 MW - planning - scotland - Middleton Of Blackhills, Rothienorman - Battery Energy Storage System - 13087
49 MW - planning - scotland - Shindour, Feddal Hill Wood - Battery Energy Storage Facility - 13236
49 MW - planning - west midlands - Lichfield Road, Watton Lane - Battery Storage - 13369
49 MW - planning - south west - Landulph Substation, Ellbridge Lane - Battery Energy Storage - 13461
49 MW - planning - west midlands - Peterstow Gas Compressor Station, Hentland - Energy Storage System - 13976
49 MW - planning - scotland - Forest Avenue Cottage, Drumlithie - Battery Energy Storage - 13986
45 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage - 12711
45 MW - planning - scotland - Bloch Wind Farm & Battery Storage (Solway Bank Extension) - 12760
45 MW - planning - north west - Huncoat Power Station - Battery Storage Facility - 13080
43 MW - planning - scotland - Ballingall Farm, Leslie - Battery Energy Storage System - 10825
43 MW - planning - scotland - Merchiston Industrial Estate, Smith Street - Battery Storage - 13225
42 MW - planning - scotland - South Pargillis - Battery Storage - 9564
42 MW - planning - scotland - Melvich Bay - Melvich Wind Energy Hub - 13826
40 MW - planning - west midlands - Hollydale, Buildwas Road - Battery Storage - 13410
40 MW - planning - yorkshire and humber - Tofts Lane, Hunshelf - Battery Storage - 13733
40 MW - planning - yorkshire and humber - Claire Court, Rawmarsh Road - Battery Energy Storage Facility - 13774
40 MW - planning - northern ireland - Doogary Road, Omagh - Battery Storage - 14125
35 MW - planning - south west - Northington Lane - Battery Storage Facility - 9992
33 MW - construction - yorkshire and humber - Wormald Green - Battery Energy Storage System - 10893
32 MW - planning - south west - Post Farm, Lytchett Minster - Battery Energy Storage - 10291
31 MW - planning - scotland - Benthead Farm - Solar Farm & Battery Storage - 10542
30 MW - planning - west midlands - Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage - 13550
30 MW - planning - east midlands - Marsh Lane, Gowhole - Energy Storage System - 13982
30 MW - planning - scotland - Abhainn Dubh Wind Farm - 14039
30 MW - planning - scotland - Bishopmill - Battery Energy Storage - 14191
30 MW - planning - south west - Frome Power, Styles Close - Energy Storage Facility - 14227
25 MW - planning - scotland - Earraghail Renewable Energy Development - 10712
20 MW - planning - east midlands - West Burton Solar Project - 10917
20 MW - planning - west midlands - Fordhouse Lane - Battery Energy Storage System - 13108
20 MW - planning - north west - Peel Road, Westby With Plumptons - Battery Storage - 13300
20 MW - planning - yorkshire and humber - Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage - 13655
20 MW - construction - north west - Welkin Road, Bredbury - Battery Storage System - 13740
20 MW - planning - south west - Fair Park Solar Farm - 13761
20 MW - planning - south west - Larks Lane, Iron Acton - Battery Storage Facility - 14091
16 MW - planning - yorkshire and humber - J3 Business Park - Battery Storage Facility - 14054
15 MW - planning - south west - Smithyard Lane - Battery Storage - 10766
15 MW - planning - scotland - Newburgh Road, Abernethy - Energy Storage - 13111
15 MW - planning - south east - Ash Farm, Titchfield Lane - Battery Storage - 14145
14 MW - planning - west midlands - Pershore Lane, Tibberton - Battery Energy Storage System - 13096
13 MW - planning - west midlands - Hollins Lane - Battery Energy Storage - 13144
12 MW - cancelled - yorkshire and humber - Windmill Farm Solar Farm - 8348
12 MW - planning - north east - Highfield Energy Park - 12312
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 11369
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 13480

Disappeared projects (22):
200 MW - cancelled - south east - Bolney Substation - Battery Storage - 8986
200 MW - cancelled - east midlands - Staythorpe Road - Battery energy storage - 11321
130 MW - cancelled - east midlands - Southfields Farm, Common Lane - Battery Storage - 12698
120 MW - cancelled - south west - Pound Road, Hawkchurch - Battery Energy Storage - 12360
100 MW - cancelled - east midlands - Gotham - Battery Energy storage - 10986
80 MW - planning - yorkshire and humber - Barlow Road, Barlow Road - Battery Storage - 12734
57 MW - cancelled - south east - Slough Road - Battery Storage - 9774
50 MW - cancelled - eastern - High Road, Saddlebow - Battery Storage - 11648
50 MW - planning - south east - Derehams Farm, Derehams Lane - Battery Storage - 12649
49 MW - cancelled - south west - Land North of Actrees Solar Farm - 7230
49 MW - cancelled - south west - Snarlton Farm - 7380
49 MW - cancelled - north east - Lackenby - 7518
49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility - 10955
40 MW - cancelled - north west - Carnegie Road (Phase 2) - 7403
38 MW - cancelled - scotland - Sheirdrim Renewable Energy Development - Battery - 7585
26 MW - cancelled - east midlands - Manor Farm - 7820
20 MW - cancelled - south east - Brook Farm - 7498
20 MW - cancelled - scotland - Ardoch Farm - 7575
18 MW - cancelled - south west - Churchtown Solar Farm Battery Storage - 7726
13 MW - cancelled - south west - Leechpool Farm, Norrington Battery Storage - 7183
10 MW - cancelled - yorkshire and humber - South Kirkby Business Park - 7109
10 MW - cancelled - south west - Park Farm - 7983

Updated projects (209):

300 MW - construction - scotland - Blackhillock Electricity Substation - Battery Energy Storage System - 9723

  Record Last Updated (dd/mm/yyyy): 07/11/2022 -> 20/02/2023
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/02/2023
  status: planning -> construction πŸ—οΈ
100 MW - operation - north west - National Grid Electricity Substation, Capenhurst Lane - Battery Storage - 12725

  Record Last Updated (dd/mm/yyyy): 28/11/2022 -> 14/02/2023
  Development Status: Under Construction -> Operational
  Development Status (short): Under Construction -> Operational
  Planning Permission Expired: 01/02/2024 -> 01/06/2021
  Under Construction: 01/06/2021 ->
  Operational: -> 11/02/2023
  status: construction -> operation 🍾 πŸŽ‰ 🍸
80 MW - operation - scotland - Aikengall II Community Wind Farm Battery - 7015

  Record Last Updated (dd/mm/yyyy): 21/08/2020 ->
  Turbine Capacity (MW): 4.2 ->
  No. of Turbines: 19 ->
  Height of Turbines (m): 145 ->
  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  Under Construction: -> 01/12/2020
  Operational: -> 01/06/2021
  status: planning -> operation 🍾 πŸŽ‰ 🍸
57 MW - construction - eastern - Bramford Substation - 7479

  Record Last Updated (dd/mm/yyyy): 17/09/2020 -> 23/05/2023
  Installed Capacity (MWelec): 49.9 -> 57
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/06/2023
  status: planning -> construction πŸ—οΈ
  mw: 49 -> 57
49 MW - construction - south east - Halewick Lane, Sompting - Battery-based Energy Storage Facility - 7168

  Record Last Updated (dd/mm/yyyy): 17/10/2022 ->
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  status: planning -> construction πŸ—οΈ
49 MW - construction - south west - Salisbury Substation - 7510

  Record Last Updated (dd/mm/yyyy): 04/07/2022 ->
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/09/2022
  status: planning -> construction πŸ—οΈ
49 MW - operation - scotland - Dunsinane Industrial Estate - 7591

  Record Last Updated (dd/mm/yyyy): 30/06/2020 -> 16/05/2023
  Operator (or Applicant): Gigabox Developments -> JLEN Environmental Assets Group
  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  Planning Permission Expired: 27/03/2023 -> 08/12/2023
  Operational: -> 03/05/2023
  status: planning -> operation 🍾 πŸŽ‰ 🍸
49 MW - operation - north west - Liverpool Energy Management Facility - 7772

  Record Last Updated (dd/mm/yyyy): 23/09/2020 -> 22/06/2023
  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  Under Construction: -> 01/10/2021
  Operational: -> 01/03/2022
  status: planning -> operation 🍾 πŸŽ‰ 🍸
49 MW - construction - east midlands - National Grid Enderby Substation - 8037

  Record Last Updated (dd/mm/yyyy): 26/09/2022 -> 25/01/2023
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/01/2023
  status: planning -> construction πŸ—οΈ
49 MW - operation - south east - Richborough Energy Park - 8195

  Record Last Updated (dd/mm/yyyy): 07/12/2021 -> 19/04/2023
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/03/2023
  status: planning -> construction πŸ—οΈ
49 MW - construction - south west - Mannington Battery Energy Storage System - 8833

  Record Last Updated (dd/mm/yyyy): 26/03/2021 -> 01/02/2023
  Operator (or Applicant): Mannington Energy Centre Limited -> EDF Energy Renewables
  Site Name: Holt Road - Battery Energy Storage System -> Mannington Battery Energy Storage System
  Development Status: Planning Application Submitted -> Under Construction
  Development Status (short): Application Submitted -> Under Construction
  Planning Permission Granted: -> 18/06/2021
  Planning Permission Expired: -> 18/06/2024
  Under Construction: -> 01/10/2022
  status: planning -> construction πŸ—οΈ
49 MW - construction - north west - Bredbury Substation - Battery Storage Facility - 9653

  Record Last Updated (dd/mm/yyyy): 20/09/2021 -> 11/04/2023
  Development Status: Planning Application Submitted -> Under Construction
  Development Status (short): Application Submitted -> Under Construction
  Planning Permission Granted: -> 28/02/2023
  Planning Permission Expired: -> NA
  Under Construction: -> 01/03/2023
  status: planning -> construction πŸ—οΈ
49 MW - planning - yorkshire and humber - Elland Storage Project - 10236

  Record Last Updated (dd/mm/yyyy): 15/08/2022 -> 20/02/2023
  Development Status: Under Construction -> Planning Permission Granted
  Development Status (short): Under Construction -> Awaiting Construction
  Under Construction: 01/08/2022 ->
  status: construction -> planning
20 MW - operation - north east - Ray Battery Storage Facility - 6943

  Record Last Updated (dd/mm/yyyy): 21/09/2020 ->
  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  Under Construction: -> 01/07/2022
  Operational: -> 01/10/2022
  status: planning -> operation 🍾 πŸŽ‰ 🍸
20 MW - operation - east midlands - Calow Green Farm - 7140

  Record Last Updated (dd/mm/yyyy): 12/02/2020 ->
  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  Under Construction: -> 01/04/2019
  Operational: -> 01/10/2019
  status: planning -> operation 🍾 πŸŽ‰ 🍸
20 MW - operation - south west - Feeder Road - 7663

  Record Last Updated (dd/mm/yyyy): 20/05/2022 -> 13/06/2023
  Development Status: Planning Permission Granted -> Finished
  Development Status (short): Awaiting Construction -> Finished
  Under Construction: -> 01/01/2023
  status: planning -> operation 🍾 πŸŽ‰ 🍸
20 MW - construction - north west - Hawthorne Road - 7800

  Record Last Updated (dd/mm/yyyy): 30/06/2020 -> 19/04/2023
  Operator (or Applicant): Shaw Energy -> Bluefield Renewable Developments
  Installed Capacity (MWelec): 40 -> 20
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 17/02/2023
  status: planning -> construction πŸ—οΈ
  mw: 40 -> 20
20 MW - construction - south east - Mill Lane, Nursling - Battery Storage Facility - 8099

  Record Last Updated (dd/mm/yyyy): 30/09/2020 -> 22/05/2023
  Site Name: SHB Hire Ltd -> Mill Lane, Nursling - Battery Storage Facility
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/01/2023
  status: planning -> construction πŸ—οΈ
18 MW - construction - south east - Aurora Solar Farm - 7385

  Record Last Updated (dd/mm/yyyy): 04/06/2020 ->
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 26/04/2021
  status: planning -> construction πŸ—οΈ
10 MW - construction - scotland - Dragonhall Farm, Padanaram - Battery Storage - 9066

  Record Last Updated (dd/mm/yyyy): 25/05/2021 -> 02/03/2022
  Development Status: Planning Application Submitted -> Under Construction
  Development Status (short): Application Submitted -> Under Construction
  Planning Permission Granted: -> 02/12/2021
  Under Construction: -> 01/06/2022
  status: planning -> construction πŸ—οΈ

550 MW - planning - east midlands - Spalding Energy Park - Battery Storage - 10173

  Record Last Updated (dd/mm/yyyy): 28/12/2021 -> 12/07/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 14/06/2023
  Planning Permission Expired: -> 14/06/2028
500 MW - planning - yorkshire and humber - Eggborough Power Station, Selby Road - Battery Storage - 12483

  Record Last Updated (dd/mm/yyyy): 31/10/2022 -> 24/01/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 17/01/2023
  Planning Permission Expired: -> 17/01/2026
450 MW - planning - eastern - Gateway Energy Centre - Battery Energy Storage - 10309

  Record Last Updated (dd/mm/yyyy): 17/12/2021 -> 30/01/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 13/01/2023
  Planning Permission Expired: -> 13/01/2028
60 MW - planning - north east - Greystones Road, Grangetown - Battery Energy Storage System - 10081

  Planning Permission Expired: -> PD
249 MW - planning - south east - Richborough Energy Park - Phase 3 (Sheaf) - 11201

  Record Last Updated (dd/mm/yyyy): 10/05/2022 -> 22/05/2023
  Operator (or Applicant): Sheaf Energy Limited -> Pacific Green
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 22/09/2022
  Planning Permission Expired: -> 22/09/2025
200 MW - planning - yorkshire and humber - Drax Re-Power - 7017

  Record Last Updated (dd/mm/yyyy): 02/01/2020 ->
  Planning Permission Expired: -> NA
200 MW - planning - north east - Worset Lane - Battery Energy Storage System - 11406

  Record Last Updated (dd/mm/yyyy): 05/08/2022 -> 01/02/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 18/01/2023
  Planning Permission Expired: -> 18/01/2026
150 MW - construction - north west - Fiddlers Ferry Power Station - Battery storage - 9404

  Record Last Updated (dd/mm/yyyy): 08/08/2022 -> 06/07/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 20/06/2023
  Planning Permission Expired: -> 20/06/2026
150 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy - 10022

  Planning Permission Expired: -> PD
150 MW - planning - south west - Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility - 11612

  Record Last Updated (dd/mm/yyyy): 17/10/2022 -> 23/01/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 06/01/2023
  Planning Permission Expired: -> 06/01/2026
100 MW - planning - scotland - Harestanes Windfarm - 7395

  Record Last Updated (dd/mm/yyyy): 25/06/2020 ->
100 MW - planning - south east - Minchens Lane Battery Storage Facility - 8434

  Record Last Updated (dd/mm/yyyy): 02/03/2021 -> 03/02/2023
  Development Status: Planning Application Submitted -> Appeal Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Authority: Basingstoke and Deane Borough Council -> Basingstoke & Deane Borough Council
  Planning Permission Refused: -> 08/10/2021
  Appeal Granted: -> 26/01/2023
  Planning Permission Granted: -> 26/01/2023
  Planning Permission Expired: -> 26/01/2026
100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage - 9691

  Record Last Updated (dd/mm/yyyy): 27/10/2022 -> 06/03/2023
100 MW - planning - eastern - North Walpole, St Peter - Battery Energy Storage - 9762

  Planning Authority: King's Lynn and West Norfolk Borough Council -> Borough Council of King's Lynn & West Norfolk
100 MW - planning - south east - Penn Croft Farm, Crondall - Battery Energy Storage Facility - 10163

  Record Last Updated (dd/mm/yyyy): 24/12/2021 -> 06/02/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 30/01/2023
  Planning Permission Expired: -> 30/01/2026
100 MW - construction - eastern - Bullen Lane - Battery Storage - 10311

  Planning Authority: Babergh and Mid Suffolk District Council -> Babergh & Mid Suffolk District Councils
100 MW - planning - south west - Shaftesbury Energy Park - Battery Storage System - 10626

  Record Last Updated (dd/mm/yyyy): 01/11/2022 -> 31/03/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 29/03/2023
  Planning Permission Expired: -> 29/03/2035
100 MW - planning - eastern - Walpole St Andrew - Battery storage - 10876

  Planning Authority: King's Lynn and West Norfolk Borough Council -> Borough Council of King's Lynn & West Norfolk
100 MW - planning - eastern - Walpole Sub Station, Walpole Bank - Battery Storage - 12683

  Record Last Updated (dd/mm/yyyy): 23/11/2022 -> 12/07/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Authority: Kings Lynn and West Norfolk Council -> Borough Council of King's Lynn & West Norfolk
  Planning Permission Granted: -> 04/07/2023
  Planning Permission Expired: -> 04/07/2026
100 MW - planning - north east - Newburn Bridge Road - Battery Storage Facility - 12729

  Record Last Updated (dd/mm/yyyy): 28/11/2022 -> 13/02/2023
  Operator (or Applicant): Aura Power Storage Solutions -> The Renewables Infrastructure Group Limited
100 MW - planning - yorkshire and humber - Bradford West, Harrop Lane, Wilsden - Battery Storage - 12909

  Record Last Updated (dd/mm/yyyy): 20/12/2022 -> 25/05/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Authority: Bradford City of -> Bradford Metropolitan District Council
  Planning Permission Granted: -> 15/05/2023
  Planning Permission Expired: -> 15/05/2026
99 MW - operation - eastern - Dollymans Storage - 7088

  Record Last Updated (dd/mm/yyyy): 28/05/2021 ->
99 MW - planning - yorkshire and humber - Scawby Brook, Brigg - Battery Storage - 9848

  Planning Permission Expired: -> PD
99 MW - planning - north west - Freshfields, Fairy Lane - Battery Storage - 12694

  Record Last Updated (dd/mm/yyyy): 23/11/2022 -> 12/04/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 20/03/2023
  Planning Permission Expired: -> 20/03/2026
95 MW - planning - yorkshire and humber - Winterton Road - Battery Energy Storage - 9608

  Record Last Updated (dd/mm/yyyy): 15/09/2021 -> 25/01/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 16/12/2022
  Planning Permission Expired: -> 16/12/2025
90 MW - planning - yorkshire and humber - Little Crow Solar Park - 7175

  Record Last Updated (dd/mm/yyyy): 07/04/2022 ->
85 MW - planning - yorkshire and humber - Green Lane, Thurcroft - Battery Energy Storage Facility - 12789

  Record Last Updated (dd/mm/yyyy): 05/12/2022 -> 30/05/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 12/05/2023
  Planning Permission Expired: -> 12/05/2026
79 MW - construction - south east - Stony Energy Storage Facility - 7001

  Record Last Updated (dd/mm/yyyy): 30/11/2022 ->
16 MW - planning - scotland - Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm - 11623

  Record Last Updated (dd/mm/yyyy): 12/10/2022 -> 06/04/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 21/03/2023
  Planning Permission Expired: -> NA
62 MW - planning - wales - Wentlooge Renewable Energy Hub - 7192

  Record Last Updated (dd/mm/yyyy): 22/03/2019 ->
60 MW - planning - yorkshire and humber - Redcote Lane, Armley - Battery Storage Facility - 12224

  Record Last Updated (dd/mm/yyyy): 05/10/2022 -> 26/05/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 18/05/2023
  Planning Permission Expired: -> 18/05/2026
57 MW - planning - south east - Ash Lane, Little London - Battery Storage - 11090

  Record Last Updated (dd/mm/yyyy): 15/07/2022 -> 16/02/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Authority: Basingstoke and Deane Council -> Basingstoke & Deane Borough Council
  Planning Permission Granted: -> 09/02/2023
  Planning Permission Expired: -> NA
57 MW - planning - south east - Sellindge Substation, Church Lane - Battery Storage - 12351

  Planning Authority: Ashford Council -> Ashford Borough Council
50 MW - operation - south west - Melksham Substation East Storage - 6953

  Record Last Updated (dd/mm/yyyy): 22/11/2022 ->
50 MW - construction - northern ireland - Portadown Road - 7047

  Record Last Updated (dd/mm/yyyy): 23/06/2020 ->
50 MW - construction - northern ireland - Dungannon Energy Storage System - 7050

  Record Last Updated (dd/mm/yyyy): 03/03/2020 ->
50 MW - operation - scotland - Whitelee Wind Farm Battery Storage Extension - 7174

  Record Last Updated (dd/mm/yyyy): 21/02/2022 ->
50 MW - planning - scotland - Clash Gour - 7178

  Record Last Updated (dd/mm/yyyy): 27/10/2022 ->
50 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage - 9910

  Planning Authority: City of Cardiff Council -> Cardiff Council
50 MW - planning - eastern - Ardleigh Road, Little Bromley - Battery Energy Storage - 10302

  Record Last Updated (dd/mm/yyyy): 01/11/2022 ->
50 MW - planning - scotland - Frodo Solar and Battery Energy Development - 10994

  Record Last Updated (dd/mm/yyyy): 12/04/2022 -> 07/06/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 16/05/2023
  Planning Permission Expired: -> 16/05/2028
50 MW - planning - yorkshire and humber - Swangate Project - Energy Storage System - 11437

  Planning Permission Expired: 22/09/2020 -> NA
  Under Construction: -> Implemented
30 MW - planning - west midlands - Rectory Farm, Rectory Lane - Battery Storage - 11905

  Record Last Updated (dd/mm/yyyy): 28/11/2022 -> 02/03/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 20/02/2023
  Planning Permission Expired: -> 20/02/2026
50 MW - planning - north west - Lancaster Power Extension, Middleton Road - Energy Storage Facility - 12125

  Record Last Updated (dd/mm/yyyy): 20/09/2022 -> 23/06/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 17/05/2023
  Planning Permission Expired: -> 17/05/2026
50 MW - planning - scotland - Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage - 12303

  Record Last Updated (dd/mm/yyyy): 17/10/2022 -> 09/02/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 30/01/2023
  Planning Permission Expired: -> 30/01/2026
50 MW - construction - eastern - Norwich Road Industrial Estate - 12529

  Planning Permission Expired: 26/03/2024 -> 01/04/2022
  Under Construction: 01/04/2022 ->
50 MW - planning - scotland - Eccles Substation, Eccles - Battery Energy Storage System - 13003

  Record Last Updated (dd/mm/yyyy): 12/01/2023 -> 30/06/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 15/06/2023
  Planning Permission Expired: -> 15/06/2028
49 MW - operation - eastern - Pelham - 6898

  Record Last Updated (dd/mm/yyyy): 03/01/2019 ->
49 MW - operation - north west - Roosecote - 6912

  Record Last Updated (dd/mm/yyyy): 30/11/2018 ->
49 MW - operation - east midlands - West Burton - 6920

  Record Last Updated (dd/mm/yyyy): 27/11/2018 ->
49 MW - planning - eastern - Tollgate Battery Storage Facility - 6949

  Record Last Updated (dd/mm/yyyy): 23/11/2018 ->
49 MW - operation - yorkshire and humber - Pillswood Phase 1 - 7005 Megapack

  Record Last Updated (dd/mm/yyyy): 09/11/2022 ->
49 MW - cancelled - south west - Ravensroost Farm, Minety - Battery Energy Storage - 7014

  Record Last Updated (dd/mm/yyyy): 29/06/2022 ->
49 MW - operation - yorkshire and humber - Nether Moor Field - 7019

  Record Last Updated (dd/mm/yyyy): 27/05/2020 ->
49 MW - planning - eastern - Norwich Substation Storage Facility - 7021

  Record Last Updated (dd/mm/yyyy): 17/09/2020 ->
49 MW - operation - south west - Mannington Battery Storage Plant - 7024

  Record Last Updated (dd/mm/yyyy): 14/09/2022 ->
49 MW - planning - north west - Middleton Clean Energy Plant - 7029

  Record Last Updated (dd/mm/yyyy): 26/09/2022 ->
  Under Construction: -> Implemented
49 MW - planning - eastern - Hilfield Farm Tech - 7030

  Record Last Updated (dd/mm/yyyy): 26/03/2020 ->
49 MW - planning - north east - Lackenby - 7040

  Record Last Updated (dd/mm/yyyy): 23/07/2019 ->
49 MW - construction - east midlands - Enderby Storage, Redcomb Farm - 7044

  Record Last Updated (dd/mm/yyyy): 21/08/2020 ->
49 MW - planning - south west - Ellbridge Lane - 7051

  Record Last Updated (dd/mm/yyyy): 23/11/2022 ->
49 MW - planning - yorkshire and humber - Elland Storage Project - 7053

  Record Last Updated (dd/mm/yyyy): 14/11/2019 ->
  Planning Permission Expired: -> PD
49 MW - planning - eastern - Chapel Farm - 7058 Megapack

  Record Last Updated (dd/mm/yyyy): 13/06/2019 ->
49 MW - planning - south east - Lovedean Energy Storage System - 7064

  Record Last Updated (dd/mm/yyyy): 16/05/2019 ->
49 MW - planning - east midlands - Cottam Power Station - 7066

  Record Last Updated (dd/mm/yyyy): 12/08/2020 ->
  Planning Permission Expired: -> PD
49 MW - construction - south east - Sundridge Hill - 7081

  Record Last Updated (dd/mm/yyyy): 17/03/2022 ->
49 MW - planning - yorkshire and humber - Land Adjacent to 4 Redcote Lane (Armley) - 7111

  Record Last Updated (dd/mm/yyyy): 19/01/2022 ->
49 MW - operation - yorkshire and humber - Creyke Beck - 7122

  Record Last Updated (dd/mm/yyyy): 28/01/2019 ->
49 MW - planning - eastern - Braintree Road Substation - 7161

  Record Last Updated (dd/mm/yyyy): 06/09/2022 ->
49 MW - construction - yorkshire and humber - Osbaldwick Substation - 7172

  Record Last Updated (dd/mm/yyyy): 27/07/2022 ->
49 MW - operation - south west - Minety South - Battery Storage - 7184

  Record Last Updated (dd/mm/yyyy): 21/08/2020 ->
49 MW - operation - north west - West Didsbury Battery Storage - 7185

  Record Last Updated (dd/mm/yyyy): 23/08/2022 ->
49 MW - planning - eastern - Burwell Main Sub-Station - 7272

  Record Last Updated (dd/mm/yyyy): 17/09/2020 ->
49 MW - planning - eastern - Sundon Substation - 7283

  Record Last Updated (dd/mm/yyyy): 17/09/2020 ->
49 MW - construction - eastern - Tollgate Farm Battery Storage - 7335

  Record Last Updated (dd/mm/yyyy): 01/02/2022 ->
49 MW - operation - yorkshire and humber - Pillswood Phase 2 - 7360 Megapack

  Record Last Updated (dd/mm/yyyy): 09/11/2022 ->
49 MW - construction - south east - Kemsley Substation - 7368

  Record Last Updated (dd/mm/yyyy): 17/09/2020 ->
49 MW - construction - scotland - Ferrymuir - 7371

  Record Last Updated (dd/mm/yyyy): 21/09/2022 ->
49 MW - planning - north west - Harker Grid Sub Station - 7462

  Record Last Updated (dd/mm/yyyy): 17/09/2020 ->
49 MW - construction - south east - Cowley electricity sub-station - 7571

  Record Last Updated (dd/mm/yyyy): 17/09/2020 ->
49 MW - construction - yorkshire and humber - Bradford West Substation (Harrop Edge Farm) - 7577

  Record Last Updated (dd/mm/yyyy): 08/07/2022 ->
49 MW - planning - eastern - Lapwing Fen II, Crown Farm - 7606

  Operator (or Applicant): Tribus Clean Energy -> Private Developer
49 MW - planning - south east - Rye Common - 7737 Megapack

  Record Last Updated (dd/mm/yyyy): 06/10/2021 ->
49 MW - operation - north west - Lister Drive - 7740

  Record Last Updated (dd/mm/yyyy): 17/05/2022 ->
49 MW - planning - eastern - Reach Road - 7906

  Storage Co-location REPD Ref ID: -> NA
  Planning Permission Expired: -> PANR
49 MW - construction - scotland - Whitehills Energy Storage Facility - 8916

  Operator (or Applicant): Gigabox Developments Limited -> Gigabox Developments Limited / Whirlwind Renewables
49 MW - planning - scotland - Newhouse Farm - Energy Storage Facility - 9047

  Record Last Updated (dd/mm/yyyy): 29/07/2022 -> 08/02/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 27/01/2023
  Planning Permission Expired: -> 27/01/2026
49 MW - planning - wales - Bronwylfa Road, Talwrn - Battery Storage Facility - 9052

  Record Last Updated (dd/mm/yyyy): 27/07/2022 -> 28/04/2023
  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Are they re-applying (New REPD Ref): -> 13768
49 MW - planning - eastern - Admiralty Road - Battery Energy Storage Facility - 9470

  Planning Permission Expired: -> NA
49 MW - planning - eastern - Model Farm - 10687

  Planning Authority: King's Lynn and West Norfolk Borough Council -> Borough Council of King's Lynn & West Norfolk
49 MW - operation - scotland - Jamesfield Organic Centre - Battery Storage - 10863 Megapack

  Planning Permission Expired: 28/09/2025 ->
49 MW - planning - scotland - South Leylodge Farmhouse, Kintore - Battery Energy Storage System - 11092

  Record Last Updated (dd/mm/yyyy): 11/10/2022 -> 02/05/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 20/04/2023
  Planning Permission Expired: -> 20/04/2028
49 MW - planning - scotland - Overhill Farm, Rothienorman - Battery Energy Storage - 11590

  Record Last Updated (dd/mm/yyyy): 10/11/2022 -> 02/03/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 01/03/2023
  Planning Permission Expired: -> 01/03/2026
49 MW - cancelled - eastern - Whites Farm - Battery Storage - 11880

  Planning Authority: Basildon Council -> Basildon Borough Council
49 MW - planning - scotland - Househill House, Househill - Battery Storage - 12056

  Record Last Updated (dd/mm/yyyy): 09/09/2022 -> 10/03/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 15/02/2023
  Planning Permission Expired: -> 15/02/2026
49 MW - planning - scotland - Killoch Depot, Killoch Colliery - Battery Storage - 12349

  Record Last Updated (dd/mm/yyyy): 19/10/2022 -> 17/04/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 30/03/2023
  Planning Permission Expired: -> 30/03/2026
49 MW - planning - scotland - Electricity Substation, Westerton Road - Battery Storage - 12467

  Record Last Updated (dd/mm/yyyy): 28/10/2022 -> 20/03/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 15/03/2023
  Planning Permission Expired: -> 15/03/2028
49 MW - planning - south west - Landulph, Ellbridge Lane - Battery Storage Facility - 12697

  Record Last Updated (dd/mm/yyyy): 23/11/2022 -> 22/02/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 06/02/2023
  Planning Permission Expired: -> 06/02/2026
48 MW - planning - northern ireland - Classic Marble Showers Site - 7208

  Record Last Updated (dd/mm/yyyy): 16/04/2020 ->
45 MW - planning - scotland - Pleasance Road - 7217

  Record Last Updated (dd/mm/yyyy): 08/03/2022 ->
45 MW - planning - north west - Cheshire Power Station - Battery Storage Facility - 10295

  Record Last Updated (dd/mm/yyyy): 22/12/2021 -> 06/06/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 24/05/2023
  Planning Permission Expired: -> 24/05/2026
40 MW - planning - east midlands - Breach Farm - Energy Barn - 6914

  Record Last Updated (dd/mm/yyyy): 27/05/2022 ->
  Under Construction: -> Implemented
40 MW - planning - eastern - Norwich Road Industrial Estate - 6958

  Record Last Updated (dd/mm/yyyy): 04/11/2022 ->
40 MW - planning - east midlands - Breach Farm - 6962

  Record Last Updated (dd/mm/yyyy): 27/05/2022 ->
40 MW - construction - south east - Land off Queenborough Road - 7003

  Record Last Updated (dd/mm/yyyy): 12/01/2021 ->
40 MW - construction - scotland - Bilbo Solar Farm Energy Storage - 7020

  Record Last Updated (dd/mm/yyyy): 30/07/2020 ->
  County: Aberdeen -> Aberdeenshire
40 MW - planning - eastern - Maldon Hall - 7095

  Record Last Updated (dd/mm/yyyy): 23/12/2021 ->
  Under Construction: -> Implemented
40 MW - planning - west midlands - Rubber and Allied Products - 7096

  Record Last Updated (dd/mm/yyyy): 20/04/2020 ->
  Planning Permission Expired: -> 15/12/2020
40 MW - operation - south east - Huggin's Hall - 7129

  Record Last Updated (dd/mm/yyyy): 23/10/2018 ->
40 MW - planning - west midlands - Whitehouse Farm Energy Barn - 7987

  Planning Permission Expired: -> NA
40 MW - planning - south west - Forest Gate - Solar Farm & Battery Storage - 9230

  Record Last Updated (dd/mm/yyyy): 28/06/2021 -> 14/03/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 10/03/2023
  Planning Permission Expired: -> 10/03/2026
40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage - 9584

  Record Last Updated (dd/mm/yyyy): 24/02/2022 -> 05/07/2023
40 MW - planning - south east - Tanners Lane - Battery Energy Storage Facility (Phase One) - 9708

  Under Construction: -> Implemented
40 MW - construction - south east - Derehams Farm, Derehams Lane - Battery Storage - 12803

  Record Last Updated (dd/mm/yyyy): 12/12/2022 -> 12/07/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Authority: Buckinghamshire Council -> Buckinghamshire Council - Wycombe Area
  Planning Permission Granted: -> 29/06/2023
  Planning Permission Expired: -> 29/06/2026
37 MW - planning - scotland - STOR Field 9 - 7018

  Record Last Updated (dd/mm/yyyy): 24/07/2020 ->
  Planning Permission Expired: 06/12/2021 -> NA
36 MW - planning - northern ireland - Lisnabreeny Road - 7556

  Record Last Updated (dd/mm/yyyy): 25/06/2020 ->
35 MW - operation - north east - Port of Tyne - 6976

  Record Last Updated (dd/mm/yyyy): 09/05/2019 ->
35 MW - planning - yorkshire and humber - Rusholme Grange - 7093

  Record Last Updated (dd/mm/yyyy): 16/09/2019 ->
32 MW - operation - south west - Severn Road - 7085

  Record Last Updated (dd/mm/yyyy): 13/10/2022 ->
32 MW - planning - south west - Gloucestershire Science and Technology Park (small) - 7181

  Record Last Updated (dd/mm/yyyy): 14/03/2022 ->
30 MW - planning - south west - Gloucestershire Science and Technology Park - 7067

  Record Last Updated (dd/mm/yyyy): 14/03/2022 ->
30 MW - operation - south west - Fideoak Mills - 7152

  Record Last Updated (dd/mm/yyyy): 21/09/2022 ->
30 MW - planning - scotland - Drumcross Battery Storage - 8155

  Installed Capacity (MWelec): 49.9 -> 30
  Under Construction: -> Implemented
  mw: 49 -> 30
30 MW - planning - eastern - Colton - Solar photovoltaic farm, Battery storage - 10945

  Planning Permission Expired: -> NA
30 MW - planning - west midlands - Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage - 10978

  Record Last Updated (dd/mm/yyyy): 11/04/2022 -> 02/03/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 28/02/2023
  Planning Permission Expired: -> 28/02/2028
30 MW - planning - scotland - West Bendings - Battery Storage - 10985

  Record Last Updated (dd/mm/yyyy): 29/09/2022 -> 04/07/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 29/06/2023
  Planning Permission Expired: -> NA
29 MW - planning - scotland - Learielaw Farm - 7970

  Record Last Updated (dd/mm/yyyy): 21/06/2022 -> 06/03/2023
27 MW - operation - yorkshire and humber - Boscar Grange Farm - 7332

  Record Last Updated (dd/mm/yyyy): 02/01/2020 ->
25 MW - operation - north east - Tynemouth Energy Storage System (TESS) - 6925

  Record Last Updated (dd/mm/yyyy): 03/08/2018 ->
25 MW - cancelled - scotland - Clauchrie Windfarm Battery - 7804

  Record Last Updated (dd/mm/yyyy): 31/03/2020 ->
25 MW - planning - north west - Bristol Avenue - Battery Energy Storage Facility - 8809

  Planning Authority: Blackpool City Council -> Blackpool Council
23 MW - operation - east midlands - Asfordby Business Park (1) - 6932

  Record Last Updated (dd/mm/yyyy): 28/04/2020 ->
22 MW - operation - wales - Pen y Cymoedd Energy Storage - 6927

  Record Last Updated (dd/mm/yyyy): 03/01/2019 ->
21 MW - operation - eastern - Clayhill Farm - Battery Energy Storage - 7570

  Record Last Updated (dd/mm/yyyy): 14/09/2022 ->
20 MW - operation - scotland - Broxburn - 6910

  Record Last Updated (dd/mm/yyyy): 18/04/2019 ->
20 MW - operation - west midlands - Land to the west of Clay Hill Pit / Larport Farm - 6911

  Record Last Updated (dd/mm/yyyy): 20/01/2020 ->
20 MW - operation - west midlands - Noriker Power Staunch - 6918

  Record Last Updated (dd/mm/yyyy): 09/05/2019 ->
20 MW - planning - wales - Traston Road - 6929

  Record Last Updated (dd/mm/yyyy): 28/04/2020 ->
20 MW - construction - east midlands - Chelveston Renewable Energy Park - 6941

  Record Last Updated (dd/mm/yyyy): 27/05/2020 ->
20 MW - operation - eastern - Claredown Farm - 6945

  Record Last Updated (dd/mm/yyyy): 26/11/2019 ->
20 MW - planning - london - Riverside Energy Park - 7036

  Record Last Updated (dd/mm/yyyy): 06/04/2022 ->
20 MW - planning - west midlands - Perseverance Road - 7061

  Record Last Updated (dd/mm/yyyy): 24/02/2022 ->
20 MW - operation - yorkshire and humber - Kirkhaw Lane - 7148

  Record Last Updated (dd/mm/yyyy): 19/01/2022 ->
20 MW - planning - yorkshire and humber - Kirkhaw Lane - 7149

  Record Last Updated (dd/mm/yyyy): 24/02/2022 ->
20 MW - operation - north west - Land at Carnegie Road - 7155

  Record Last Updated (dd/mm/yyyy): 02/01/2019 ->
20 MW - planning - scotland - Blackpark Farm - 7226

  Record Last Updated (dd/mm/yyyy): 22/08/2019 ->
20 MW - planning - scotland - Fordtown Energy Storage - 7234

  Record Last Updated (dd/mm/yyyy): 30/06/2020 ->
20 MW - planning - scotland - Stranoch 2 - 7306

  Record Last Updated (dd/mm/yyyy): 22/12/2021 ->
20 MW - planning - scotland - Troston Loch Wind Farm - 7333

  Record Last Updated (dd/mm/yyyy): 16/01/2021 ->
20 MW - construction - south east - Plot 2B EurolinkV - 7383

  Record Last Updated (dd/mm/yyyy): 13/12/2021 ->
20 MW - planning - scotland - Douglas West Wind Farm (extension) - 7460

  Record Last Updated (dd/mm/yyyy): 02/07/2019 ->
20 MW - operation - north west - Lascar Works - 7464

  Record Last Updated (dd/mm/yyyy): 03/07/2019 ->
20 MW - planning - scotland - Hagshaw Hill - 7572

  Record Last Updated (dd/mm/yyyy): 25/03/2020 ->
20 MW - planning - south east - Basing Road - 7746

  Planning Authority: Basingstoke and Deane Borough Council -> Basingstoke & Deane Borough Council
20 MW - planning - west midlands - Perserverance Road - 7966

  Record Last Updated (dd/mm/yyyy): 12/10/2022 -> 22/03/2023
20 MW - planning - south west - Hele Manor Farm, Bradford On Tone - Battery Storage System - 12174

  Record Last Updated (dd/mm/yyyy): 27/09/2022 -> 19/06/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 13/04/2023
  Planning Permission Expired: -> 13/04/2026
20 MW - operation - south west - Hawkers Hill Energy Park - 12293

  Planning Permission Expired: 22/09/2020 ->
20 MW - planning - wales - John Green Frog Power Compound, John North Road - Battery System - 12455

  Record Last Updated (dd/mm/yyyy): 28/10/2022 -> 24/01/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 20/01/2023
  Planning Permission Expired: -> 20/01/2028
20 MW - planning - scotland - Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility - 12823

  Record Last Updated (dd/mm/yyyy): 12/12/2022 -> 08/03/2023
19 MW - planning - scotland - Land North of Thornton Road - 7131

  Record Last Updated (dd/mm/yyyy): 29/04/2020 ->
  Under Construction: -> Implemented
19 MW - planning - scotland - North West Of Jameston Farm - 7133

  Record Last Updated (dd/mm/yyyy): 27/09/2021 ->
  Planning Permission Expired: -> NA
19 MW - planning - scotland - Jamesfield Organic Centre, Phase 2 - 7315

  Record Last Updated (dd/mm/yyyy): 26/01/2022 ->
19 MW - planning - scotland - Ochiltree - Battery Sorage - 10162

  Planning Permission Expired: 05/10/2022 -> 05/10/2025
19 MW - planning - scotland - Speyslaw Farm - Battery Storage - 10394

  Record Last Updated (dd/mm/yyyy): 16/12/2021 -> 02/03/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 09/02/2023
  Planning Permission Expired: -> 09/02/2026
16 MW - planning - wales - Little Llwyn Onn - Solar Farm & Battery Storage - 11544

  Record Last Updated (dd/mm/yyyy): 24/06/2022 -> 14/03/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 08/03/2023
  Planning Permission Expired: -> 08/03/2028
15 MW - operation - south west - Lockleaze Energy Storage - 6961

  Record Last Updated (dd/mm/yyyy): 31/01/2019 ->
15 MW - planning - eastern - Three Bridges Solar Farm - 8220

  Planning Permission Expired: -> NA
15 MW - planning - eastern - Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage - 9346

  Planning Authority: Borough Council of KingοΏ½s Lynn & West Norfolk -> Borough Council of King's Lynn & West Norfolk
13 MW - operation - south east - Bumpers Lane Solar Farm - 6913

  Record Last Updated (dd/mm/yyyy): 01/12/2021 ->
13 MW - planning - west midlands - Maybrook Road - Battery facility - 11008

  Planning Permission Expired: -> NA
10 MW - operation - northern ireland - AES Kilroot Station Battery Storage Array - 6845

  Record Last Updated (dd/mm/yyyy): 12/12/2018 ->
10 MW - operation - yorkshire and humber - Blackburn Meadows - 6906

  Record Last Updated (dd/mm/yyyy): 21/03/2019 ->
10 MW - operation - east midlands - Hill Farm - Energy Barn - 6915

  Record Last Updated (dd/mm/yyyy): 15/03/2019 ->
10 MW - operation - south east - Kings Barn Farm - Energy Barn - 6916

  Record Last Updated (dd/mm/yyyy): 15/03/2019 ->
10 MW - operation - east midlands - Leverton Farm - Energy Barn - 6917

  Record Last Updated (dd/mm/yyyy): 11/12/2018 ->
10 MW - operation - eastern - Nevendon - 6926

  Record Last Updated (dd/mm/yyyy): 28/03/2017 ->
10 MW - planning - east midlands - Manor Farm Energy Storage - 6948

  Record Last Updated (dd/mm/yyyy): 15/12/2022 ->
  Planning Permission Expired: -> 30/11/2020
  Under Construction: -> Implemented
10 MW - construction - eastern - Slamseys Energy Storage - 7000

  Record Last Updated (dd/mm/yyyy): 20/01/2020 ->
10 MW - planning - south east - Stockbridge Road - 7097

  Record Last Updated (dd/mm/yyyy): 25/02/2020 ->
  Under Construction: -> Implemented
10 MW - construction - south east - Land Adj Harmer Warren Quarry - 7143

  Record Last Updated (dd/mm/yyyy): 09/12/2022 ->
  Planning Permission Expired: -> NA
10 MW - planning - scotland - Greenburn Wind Park - 7159

  Record Last Updated (dd/mm/yyyy): 24/06/2020 -> 10/05/2023
  Operator (or Applicant): Energy Consents And Deployment Unit -> REG Windpower Limited
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 21/04/2023
  Planning Permission Expired: -> 21/04/2029
10 MW - operation - north west - Cleator - 7177

  Record Last Updated (dd/mm/yyyy): 03/01/2019 ->
10 MW - planning - south west - Old Green Farm, Alveston Battery Storage - 7182

  Record Last Updated (dd/mm/yyyy): 03/08/2020 ->
10 MW - planning - south west - Trevol Business Park - 7404

  Record Last Updated (dd/mm/yyyy): 23/01/2020 ->
10 MW - planning - south west - Tiddlywink Barn - 7527

  Record Last Updated (dd/mm/yyyy): 20/12/2019 ->
10 MW - planning - scotland - Binn Eco Park - Battery - 9098

  Record Last Updated (dd/mm/yyyy): 17/10/2022 -> 02/03/2023
  Site Name: Binn Eco Park Wind Farm Energy Storage Facility -> Binn Eco Park - Battery
  Storage Type: Stand-alone Storage -> Co-located with RE
  Storage Co-location REPD Ref ID: -> 4817, 7807, 9071 & 13672
10 MW - planning - west midlands - Aspley House Farm, Aspley Lane - Battery Storage Facility - 12571

  Record Last Updated (dd/mm/yyyy): 07/11/2022 -> 08/02/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 27/01/2023
  Planning Permission Expired: -> 27/01/2026
10 MW - operation - south west - Cirencester Solar Farm - 12791

  Planning Permission Expired: 17/09/2018 -> 06/09/2018
  Under Construction: 06/09/2018 ->
10 MW - planning - yorkshire and humber - J3 Business Park - Battery Energy Storage Facility - 12920

  Record Last Updated (dd/mm/yyyy): 22/12/2022 -> 27/01/2023
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 24/01/2023
  Planning Permission Expired: -> NA

2023-01

New projects (66):
1000 MW - planning - scotland - Coalburn II Energy Storage Facility - Battery Storage Facility - 12206
500 MW - planning - yorkshire and humber - Eggborough Power Station, Selby Road - Battery Storage - 12483
200 MW - planning - scotland - Whitehill Energy Storage - 10466
200 MW - cancelled - east midlands - Staythorpe Road - Battery energy storage - 11321
200 MW - planning - west midlands - Little Beanit Farm, Balsall Common - Battery Storage - 11656
130 MW - cancelled - east midlands - Southfields Farm, Common Lane - Battery Storage - 12698
120 MW - cancelled - south west - Pound Road, Hawkchurch - Battery Energy Storage - 12360
100 MW - planning - south west - Shaftesbury Energy Park - Battery Storage System - 10626
100 MW - planning - north west - Hillside Farm, Lancaster Road - Battery Storage - 11948
100 MW - planning - north west - Capenhurst Lane, Capenhurst - Battery Storage - 12503
100 MW - planning - eastern - Walpole Sub Station, Walpole Bank - Battery Storage - 12683
100 MW - operation - north west - National Grid Electricity Substation, Capenhurst Lane - Battery Storage - 12725
100 MW - planning - north east - Newburn Bridge Road - Battery Storage Facility - 12729
100 MW - planning - yorkshire and humber - Bradford West, Harrop Lane, Wilsden - Battery Storage - 12909
100 MW - planning - north west - Hillside Farm, Lancaster Road - Battery Storage - 12964
99 MW - planning - north west - Freshfields, Fairy Lane - Battery Storage - 12694
85 MW - planning - yorkshire and humber - Green Lane, Thurcroft - Battery Energy Storage Facility - 12789
80 MW - planning - yorkshire and humber - Barlow Road, Barlow Road - Battery Storage - 12734
60 MW - planning - south east - Misslebrook Farm, Botley Road - Battery Storage - 12691
60 MW - planning - south west - Blackhill Quarry, Woodbury - Battery Energy Storage Facility - 12815
57 MW - planning - south east - Sellindge Substation, Church Lane - Battery Storage - 12351
50 MW - planning - scotland - Clash Gour - 7178
50 MW - planning - eastern - Newmarket Road, Bottisham - Battery Energy Storage - 10486
50 MW - planning - west midlands - Lowlands Farm - Battery Storage - 11399
50 MW - planning - yorkshire and humber - Swangate Project - Energy Storage System - 11437
30 MW - planning - west midlands - Rectory Farm, Rectory Lane - Battery Storage - 11905
50 MW - planning - scotland - Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage - 12303
50 MW - planning - west midlands - Ryton End, Barston - Battery Storage - 12348
50 MW - construction - eastern - Norwich Road Industrial Estate - 12529
50 MW - planning - south east - Derehams Farm, Derehams Lane - Battery Storage - 12649
50 MW - planning - scotland - Ourack - 12727
50 MW - planning - scotland - Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility - 12780
50 MW - cancelled - west midlands - Armshead Farm, Armshead Road - Battery Energy Storage Facility - 12804
50 MW - planning - scotland - Tomchrasky Estate Wind farm - 12877
50 MW - cancelled - west midlands - Lowlands Farm - Battery Storage - 12959
50 MW - planning - scotland - Eccles Substation, Eccles - Battery Energy Storage System - 13003
49 MW - planning - north west - Welkin Mill - 7832
49 MW - planning - scotland - Rothienorman - Battery Storage - 10638
49 MW - planning - scotland - Overhill Farm, Rothienorman - Battery Energy Storage - 11590
49 MW - planning - scotland - Killoch Depot, Killoch Colliery - Battery Storage - 12349
49 MW - planning - scotland - Electricity Substation, Westerton Road - Battery Storage - 12467
49 MW - planning - south west - Landulph, Ellbridge Lane - Battery Storage Facility - 12697
49 MW - planning - south west - Bengrove Farm, Base Lane - Battery Storage - 12830
49 MW - planning - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility - 12936
49 MW - planning - north west - Welkin Mill, Welkin Road - Battery Storage - 12982
45 MW - planning - north west - Mount Pleasant Farm, Green Lane - Battery Storage - 13011
40 MW - construction - south east - Derehams Farm, Derehams Lane - Battery Storage - 12803
40 MW - planning - north east - Long Pasture Farm, Little Stainton - Solar Farm - 12952
38 MW - cancelled - scotland - Sheirdrim Renewable Energy Development - Battery - 7585
30 MW - planning - yorkshire and humber - North Lincolnshire Green Energy Park - 12706
28 MW - planning - south east - Sunny Oaks Renewable Energy Park - 12415
20 MW - planning - wales - John Green Frog Power Compound, John North Road - Battery System - 12455
20 MW - planning - yorkshire and humber - Yarra Industrial Estate, Loicher Lane - Battery Storage - 12524
20 MW - planning - scotland - Chesters - Millmoor Rig Wind Farm & Battery Energy Storage - 12821
20 MW - planning - scotland - Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility - 12823
20 MW - planning - scotland - Kirkton Energy Farm - 12876
20 MW - planning - south east - Reeds Solar Farm, Alders Road - Solar Farm & Battery Storage - 12941
14 MW - planning - scotland - Hopsrig Wind Farm - 11066
14 MW - planning - north west - St Michaels Road, Ditton Road - Battery Storage - 12904
12 MW - planning - scotland - Scawd Law Wind Farm - 13000
10 MW - planning - east midlands - Manor Farm Energy Storage - 6948
10 MW - construction - south east - Land Adj Harmer Warren Quarry - 7143
10 MW - planning - eastern - Wissett Solar Farm, Wissett - Battery Storage - 9913
10 MW - planning - west midlands - Aspley House Farm, Aspley Lane - Battery Storage Facility - 12571
10 MW - operation - south west - Cirencester Solar Farm - 12791
10 MW - planning - yorkshire and humber - J3 Business Park - Battery Energy Storage Facility - 12920

Disappeared projects (14):
99 MW - planning - west midlands - Newfields Farm - Battery Energy Storage - 10233
57 MW - planning - north west - Waterloo Farm, Furbarn Road - Battery Storage - 12187
50 MW - cancelled - north west - Penwortham Sub Station - 7119
49 MW - planning - south east - Burcot Solar Farm - 9374
49 MW - cancelled - west midlands - Lanegreat Barr, Great Barr - Battery Storage Facility - 10438
49 MW - cancelled - scotland - Rothienorman - Battery Energy Storage Facility - 11497
49 MW - cancelled - south west - Arlingham Solar Farm - Solar PV Panels & Battery Storage Facility - 11636
16 MW - cancelled - wales - Maelor Gasworks - Solar Farm & Battery Storage - 9343
12 MW - cancelled - west midlands - Mucklow Hill - 7984
10 MW - cancelled - eastern - Rayleigh Transforming Station - 6984
10 MW - cancelled - scotland - Shindour Feddal Hill Wood Braco - 7573
10 MW - cancelled - scotland - Orchardbank Industrial Estate - 7574
10 MW - cancelled - north west - Britannia House - 7986
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 11369

Updated projects (59):

79 MW - construction - south east - Stony Energy Storage Facility - 7001

  Record Last Updated (dd/mm/yyyy): 18/03/2022 -> 30/11/2022
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/07/2022
  status: planning -> construction πŸ—οΈ
50 MW - operation - south east - Richborough Energy Park - Phase 2 - 9626

  Record Last Updated (dd/mm/yyyy): 16/09/2021 -> 10/01/2023
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/01/2023
  status: planning -> construction πŸ—οΈ
50 MW - operation - south west - Melksham Substation East Storage - 6953

  Record Last Updated (dd/mm/yyyy): 21/08/2020 -> 22/11/2022
  Development Status: Under Construction -> Operational
  Development Status (short): Under Construction -> Operational
  Operational: -> 07/11/2022
  status: construction -> operation 🍾 πŸŽ‰ 🍸
49 MW - operation - yorkshire and humber - Pillswood Phase 1 - 7005 Megapack

  Record Last Updated (dd/mm/yyyy): 13/06/2019 -> 09/11/2022
  Site Name: Creyke Substation -> Pillswood Phase 1
  Development Status: Revised -> Operational
  Development Status (short): Revised -> Operational
  Are they re-applying (New REPD Ref): 7360 ->
  Under Construction: -> 01/04/2022
  Operational: -> 01/11/2022
  status: planning -> operation 🍾 πŸŽ‰ 🍸
49 MW - construction - south east - Halewick Lane, Sompting - Battery-based Energy Storage Facility - 7168

  Record Last Updated (dd/mm/yyyy): 04/08/2022 -> 17/10/2022
  Development Status: Under Construction -> Planning Permission Granted
  Development Status (short): Under Construction -> Awaiting Construction
  Planning Permission Expired: 03/04/2022 ->
  Under Construction: 01/07/2022 -> 01/02/2023
  status: construction -> planning
49 MW - operation - south west - Minety South - Battery Storage - 7184

  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  Operational: -> 01/10/2022
  status: planning -> operation 🍾 πŸŽ‰ 🍸
49 MW - operation - yorkshire and humber - Pillswood Phase 2 - 7360 Megapack

  Record Last Updated (dd/mm/yyyy): 31/01/2020 -> 09/11/2022
  Operator (or Applicant): Northern Powergrid -> Harmony Energy Storage
  Site Name: Creyke Beck Substation -> Pillswood Phase 2
  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  Are they re-applying (Old REPD Ref) : 7005 ->
  Under Construction: -> 01/04/2022
  Operational: -> 01/11/2022
  status: planning -> operation 🍾 πŸŽ‰ 🍸
49 MW - construction - west midlands - Coventry National Grid Substation - 7885

  Record Last Updated (dd/mm/yyyy): 07/02/2021 -> 11/11/2022
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/07/2022
  status: planning -> construction πŸ—οΈ
49 MW - operation - scotland - Jamesfield Organic Centre - Battery Storage - 10863 Megapack

  Record Last Updated (dd/mm/yyyy): 07/06/2022 -> 12/01/2023
  Development Status: Planning Application Submitted -> Under Construction
  Development Status (short): Application Submitted -> Under Construction
  Planning Permission Granted: -> 28/09/2022
  Planning Permission Expired: -> 28/09/2025
  Under Construction: -> 01/01/2023
  status: planning -> construction πŸ—οΈ
23 MW - operation - east midlands - Asfordby Business Park (1) - 6932

  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  Under Construction: -> 08/06/2018
  Operational: -> 01/04/2019
  status: planning -> operation 🍾 πŸŽ‰ 🍸
20 MW - construction - north east - Standby Embedded Stor Power Plant - Battery storage - 9010

  Record Last Updated (dd/mm/yyyy): 21/06/2021 -> 16/01/2023
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/10/2022
  status: planning -> construction πŸ—οΈ
10 MW - operation - south west - South Farm Solar Park - 9361

  Record Last Updated (dd/mm/yyyy): 28/07/2021 -> 21/12/2022
  Development Status: Under Construction -> Operational
  Development Status (short): Under Construction -> Operational
  Operational: -> 16/12/2022
  status: construction -> operation 🍾 πŸŽ‰ 🍸

300 MW - construction - scotland - Blackhillock Electricity Substation - Battery Energy Storage System - 9723

  Record Last Updated (dd/mm/yyyy): 27/01/2022 -> 07/11/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 30/09/2022
  Planning Permission Expired: -> 30/09/2027
230 MW - construction - wales - Uskmouth Power Station - Battery Storage - 10936

  Record Last Updated (dd/mm/yyyy): 09/09/2022 -> 20/12/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 07/12/2022
  Planning Permission Expired: -> 07/12/2027
150 MW - planning - south west - Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility - 11612

  Record Last Updated (dd/mm/yyyy): 08/07/2022 -> 17/10/2022
130 MW - planning - eastern - Stoke Lane - Battery Energy Storage - 10390

  Record Last Updated (dd/mm/yyyy): 16/12/2021 -> 17/10/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 09/09/2022
  Planning Permission Expired: -> 09/09/2025
100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage - 9691

  Record Last Updated (dd/mm/yyyy): 10/05/2022 -> 27/10/2022
100 MW - construction - eastern - Bullen Lane - Battery Storage - 10311

  Record Last Updated (dd/mm/yyyy): 18/07/2022 -> 17/10/2022
99 MW - planning - north east - South Thinford Lane, Thinford - Energy Storage - 10489

  Record Last Updated (dd/mm/yyyy): 28/01/2022 -> 01/11/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 21/10/2022
  Planning Permission Expired: -> 21/10/2025
90 MW - planning - east midlands - Caldwell Road - Battery Storage - 9507

  Record Last Updated (dd/mm/yyyy): 19/04/2022 -> 04/11/2022
  Operator (or Applicant): Aura Power BESS Ltd -> Infrared Capital Partners Limited
80 MW - planning - scotland - Tealing Battery Energy Storage Farm - 11097

  Record Last Updated (dd/mm/yyyy): 27/04/2022 -> 29/11/2022
57 MW - planning - north west - National Grids Rainhill Substation Battery storage facility - 8439

  Record Last Updated (dd/mm/yyyy): 02/03/2021 -> 21/10/2022
  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Are they re-applying (New REPD Ref): -> 11559
57 MW - planning - north west - Penwortham - Battery storage - 11217

  Record Last Updated (dd/mm/yyyy): 24/05/2022 -> 17/10/2022
57 MW - planning - north west - Sutton Manor - Battery Storage Facility - 11559

  Record Last Updated (dd/mm/yyyy): 28/06/2022 -> 21/10/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Are they re-applying (Old REPD Ref) : -> 8439
  Planning Permission Granted: -> 16/09/2022
  Planning Permission Expired: -> 16/09/2025
50 MW - planning - scotland - Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage - 8342

  Storage Co-location REPD Ref ID: 8341 -> 8341 & 9076
50 MW - planning - yorkshire and humber - Barlow Road, Barlow - Battery Storage - 9970

  Record Last Updated (dd/mm/yyyy): 19/11/2021 -> 28/11/2022
  Development Status: Planning Application Submitted -> Revised
  Development Status (short): Application Submitted -> Revised
  Are they re-applying (New REPD Ref): -> 12734
  Planning Application Withdrawn: -> 18/10/2022
50 MW - planning - eastern - Ardleigh Road, Little Bromley - Battery Energy Storage - 10302

  Record Last Updated (dd/mm/yyyy): 23/12/2021 -> 01/11/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 28/09/2022
  Planning Permission Expired: -> 28/09/2025
50 MW - planning - west midlands - Penstone Lane, Penn 1 - Battery Storage Facility - 10705

  Record Last Updated (dd/mm/yyyy): 01/03/2022 -> 17/10/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 11/10/2022
  Planning Permission Expired: -> 11/10/2025
50 MW - planning - west midlands - Penstone Lane, Lower Penn 2 - Battery Storage - 10733

  Record Last Updated (dd/mm/yyyy): 04/03/2022 -> 17/10/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 29/09/2022
  Planning Permission Expired: -> 29/09/2025
50 MW - cancelled - eastern - High Road, Saddlebow - Battery Storage - 11648

  Record Last Updated (dd/mm/yyyy): 15/07/2022 -> 04/11/2022
50 MW - planning - south west - Says Court Farm, Coalpit Heath - Battery Energy Storage - 11793

  Record Last Updated (dd/mm/yyyy): 04/08/2022 -> 14/11/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 02/11/2022
  Planning Permission Expired: -> 02/11/2025
49 MW - planning - south west - Ellbridge Lane - 7051

  Record Last Updated (dd/mm/yyyy): 17/09/2020 -> 23/11/2022
  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Are they re-applying (New REPD Ref): -> 12697
49 MW - planning - eastern - Lapwing Fen II, Crown Farm - 7606

  Record Last Updated (dd/mm/yyyy): 15/09/2022 -> 22/11/2022
49 MW - planning - north west - Welkin Mill - 8055

  Record Last Updated (dd/mm/yyyy): 30/09/2020 -> 05/01/2023
  Development Status: Planning Application Submitted -> Revised
  Development Status (short): Application Submitted -> Revised
  Are they re-applying (New REPD Ref): -> 12982
  Are they re-applying (Old REPD Ref) : -> 7832
49 MW - planning - scotland - Shindour - Energy Storage Facility - 8464

  Record Last Updated (dd/mm/yyyy): 28/07/2022 -> 11/11/2022
49 MW - construction - scotland - Whitehills Energy Storage Facility - 8916

  Record Last Updated (dd/mm/yyyy): 11/03/2022 -> 17/10/2022
49 MW - planning - scotland - East Kilbride - Battery storage - 9013

  Record Last Updated (dd/mm/yyyy): 27/04/2022 -> 04/11/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 22/08/2022
  Planning Permission Expired: -> 22/08/2025
49 MW - planning - south west - Minety South 2 - Battery Storage Facility - 9063

  Operator (or Applicant): Minety South 2 -> Statera Energy
49 MW - planning - scotland - Drum Farm - Battery Energy Storage System - 9940

  Record Last Updated (dd/mm/yyyy): 18/05/2022 -> 22/11/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 27/10/2022
  Planning Permission Expired: -> 27/10/2027
49 MW - planning - scotland - Stainland Energy Storage Project - 10225

  Record Last Updated (dd/mm/yyyy): 21/06/2022 -> 14/12/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 04/11/2022
  Planning Permission Expired: -> 04/11/2027
49 MW - planning - scotland - Newburgh Road, Abernethy - Battery Storage - 10607

  Record Last Updated (dd/mm/yyyy): 07/06/2022 -> 25/10/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 26/09/2022
  Planning Permission Expired: -> 26/09/2025
49 MW - planning - south east - Harrington Franklin, Richborough Energy Park - Battery Storage - 11449

  Record Last Updated (dd/mm/yyyy): 14/06/2022 -> 12/12/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 06/12/2022
  Planning Permission Expired: -> 06/12/2025
49 MW - planning - scotland - Gleniston, Auchtertool - Battery Storage Facility - 11808 Megapack

  Record Last Updated (dd/mm/yyyy): 08/08/2022 -> 11/11/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 09/11/2022
  Planning Permission Expired: -> 09/11/2025
49 MW - planning - scotland - Househill House, Househill - Battery Storage - 12056

  County: Highlands -> Highland
47 MW - planning - south west - Indian Queens Sub-Station - Battery Storage - 11725

  Record Last Updated (dd/mm/yyyy): 25/07/2022 -> 01/11/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 17/10/2022
  Planning Permission Expired: -> 17/10/2025
40 MW - planning - east midlands - Breach Farm - Energy Barn - 6914

  Planning Permission Expired: 15/08/2020 -> 01/05/2021
40 MW - planning - eastern - Norwich Road Industrial Estate - 6958

  Record Last Updated (dd/mm/yyyy): 07/04/2021 -> 04/11/2022
  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Are they re-applying (New REPD Ref): -> 12529
40 MW - planning - south east - Loudwater Battery Storage Site - 8142

  Record Last Updated (dd/mm/yyyy): 30/06/2021 -> 12/12/2022
  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Are they re-applying (New REPD Ref): -> 11993
30 MW - planning - scotland - Farburn Place - Energy Storage Facility - 8385

  Record Last Updated (dd/mm/yyyy): 11/10/2021 -> 21/12/2022
  Operator (or Applicant): Peak Reserve Power Limited -> Peak Reserve Power Limited / Centrica / Cragside
30 MW - planning - north east - West Sleekburn - Battery Storage Compound - 10957

  Record Last Updated (dd/mm/yyyy): 29/06/2022 -> 21/10/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 19/10/2022
  Planning Permission Expired: -> 19/10/2025
30 MW - planning - yorkshire and humber - Back Lane, Skerne - Solar Farm & Battery Storage - 12297

  Record Last Updated (dd/mm/yyyy): 13/10/2022 -> 18/11/2022
25 MW - planning - north west - Caton Road, Lancaster - Battery Storage Facility - 10047

  Record Last Updated (dd/mm/yyyy): 02/12/2021 -> 13/12/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 07/12/2022
  Planning Permission Expired: -> 07/12/2027
22 MW - operation - wales - Pen y Cymoedd Energy Storage - 6927

  Planning Authority: Neath Port Talbot County Borough Council -> Neath Port Talbot Council
  Planning Application Reference: -> P2009/1053
  Planning Application Submitted: -> 19/11/2009
  Planning Permission Granted: -> 18/11/2011
20 MW - planning - east midlands - Vicarage Drove - Solar farm & Battery storage - 8518

  Record Last Updated (dd/mm/yyyy): 28/02/2022 -> 04/11/2022
20 MW - planning - eastern - South Fambridge Hall - Solar farm & Battery storage - 9274

  Record Last Updated (dd/mm/yyyy): 05/08/2022 -> 17/11/2022
19 MW - planning - scotland - Ochiltree - Battery Sorage - 10162

  Y-coordinate: 62020 -> 620201
  lat: 50.440496 -> 55.454634
  long: -4.018763 -> -4.266842
18 MW - cancelled - south west - Churchtown Solar Farm Battery Storage - 7726

  Storage Type: Co-located with RE -> Stand-alone Storage
12 MW - planning - north west - Dragons Lane - Battery Storage Facility - 11701

  Record Last Updated (dd/mm/yyyy): 20/07/2022 -> 12/12/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 01/12/2022
  Planning Permission Expired: -> 01/12/2025
10 MW - planning - scotland - Binn Eco Park - Battery - 9098

  Record Last Updated (dd/mm/yyyy): 11/02/2022 -> 17/10/2022

2022-10

New projects (40):
349 MW - planning - west midlands - Cellarhead - Battery Site - 10013
300 MW - construction - scotland - Kilmarnock South Substation - Battery storage - 9696
230 MW - construction - wales - Uskmouth Power Station - Battery Storage - 10936
200 MW - planning - north east - Worset Lane - Battery Energy Storage System - 11406
150 MW - construction - north west - Fiddlers Ferry Power Station - Battery storage - 9404
100 MW - planning - eastern - North Walpole, St Peter - Battery Energy Storage - 9762
100 MW - construction - eastern - Bullen Lane - Battery Storage - 10311
100 MW - cancelled - east midlands - Gotham - Battery Energy storage - 10986
99 MW - planning - yorkshire and humber - Neil Fox Way - Battery Storage - 11519
16 MW - planning - scotland - Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm - 11623
62 MW - planning - wales - Wentlooge Renewable Energy Hub - 7192
60 MW - planning - yorkshire and humber - Redcote Lane, Armley - Battery Storage Facility - 12224
57 MW - planning - south east - Ash Lane, Little London - Battery Storage - 11090
57 MW - planning - eastern - Braintree Road, Cressing - Battery Storage - 11995
57 MW - planning - north west - Waterloo Farm, Furbarn Road - Battery Storage - 12187
50 MW - planning - west midlands - South Staffordshire Railway Walk, Castlecroft - Battery Storage - 11414
50 MW - cancelled - eastern - High Road, Saddlebow - Battery Storage - 11648
50 MW - planning - south west - Says Court Farm, Coalpit Heath - Battery Energy Storage - 11793
50 MW - planning - south west - Fairholme, Minety - Battery Storage - 11810
50 MW - planning - south west - Stonehill, Minety - 11812
50 MW - planning - north west - Lancaster Power Extension, Middleton Road - Energy Storage Facility - 12125
49 MW - planning - scotland - Newhouse Farm - Energy Storage Facility - 9047
49 MW - cancelled - south west - Arlingham Solar Farm - Solar PV Panels & Battery Storage Facility - 11636
49 MW - construction - london - Clay Tye Farm Phase 1 - Storage Facility - 11720
49 MW - construction - london - Clay Tye Farm Phase 2 - Storage Facility - 11721
49 MW - planning - scotland - Gleniston, Auchtertool - Battery Storage Facility - 11808 Megapack
49 MW - cancelled - eastern - Whites Farm - Battery Storage - 11880
49 MW - planning - scotland - Househill House, Househill - Battery Storage - 12056
47 MW - planning - south west - Dog Trap Lane, Minety - Battery Energy Storage Systems - 10488
47 MW - planning - south west - Indian Queens Sub-Station - Battery Storage - 11725
45 MW - planning - scotland - Sclenteuch Wind Farm - 11987
30 MW - planning - scotland - West Bendings - Battery Storage - 10985
30 MW - planning - south west - Catsbrain Farm - Battery Storage - 11787
30 MW - planning - yorkshire and humber - Back Lane, Skerne - Solar Farm & Battery Storage - 12297
28 MW - planning - scotland - Sandy Knowe Wind Farm Extension - 12080
20 MW - planning - south west - Hele Manor Farm, Bradford On Tone - Battery Storage System - 12174
20 MW - operation - south west - Hawkers Hill Energy Park - 12293
19 MW - planning - scotland - Ochiltree - Battery Sorage - 10162
16 MW - planning - scotland - Knockkippen Wind, Solar & Battery Farm - 11676
12 MW - planning - north west - Dragons Lane - Battery Storage Facility - 11701

Disappeared projects (33):
240 MW - cancelled - east midlands - Temple Oaks Renewable Energy Park - 11562
100 MW - cancelled - eastern - Tilbury Energy Centre - 7048
50 MW - cancelled - south west - Minety North - 6952
50 MW - cancelled - west midlands - Wolverhampton West Sub Station - 6977
50 MW - cancelled - scotland - Braidfield Road, Hardgate - Battery Storage Facility - 9869
50 MW - planning - west midlands - Lowlands Farm - Battery Storage - 11399
49 MW - cancelled - north east - Norton - 6923
49 MW - cancelled - west midlands - Former Rugeley Power Station - 6981
49 MW - cancelled - north west - Charleywood Road, Knowsley Industrial Park - 7026
49 MW - cancelled - yorkshire and humber - Salt End Lane - 7039
49 MW - cancelled - south west - Riverford Farm - 7078
49 MW - cancelled - east midlands - Grendon Storage - 7089
49 MW - cancelled - south west - Taunton Substation - 7153
40 MW - cancelled - yorkshire and humber - Tofts Lane - 6942
29 MW - cancelled - north east - Land at Derwenthaugh Eco Park - 7054
29 MW - cancelled - scotland - Land SW of Shilton Cottage - 7134
29 MW - cancelled - scotland - Drumfad Wood - 7165
25 MW - cancelled - scotland - Fraserburgh Development - 7041
24 MW - cancelled - east midlands - The Hollies - 6946
20 MW - cancelled - south west - Bristol Road - 6930
20 MW - cancelled - yorkshire and humber - Aven Industrial Estate - 7007
20 MW - cancelled - north west - Leighton Hall Farm - 7032
20 MW - cancelled - scotland - Land To The East Of Wholeflats Road (Grangemouth) - 7043
20 MW - cancelled - north west - Kilshaw Street - 7072
20 MW - cancelled - north west - Beaufort Road - 7128
18 MW - cancelled - east midlands - Callywhite Lane Commercial Estate - 7087
10 MW - cancelled - north west - Pikelaw Place - 6944
10 MW - cancelled - south east - Litchlake Farm - 7011
10 MW - cancelled - east midlands - Manton Wood - 7035
10 MW - cancelled - scotland - Strichen South - 7056
10 MW - cancelled - eastern - Hadham Road - 7068
10 MW - construction - south east - Land Adj Harmer Warren Quarry - 7143
10 MW - cancelled - south west - Earthcott Green - Battery Storage - 11510

Updated projects (119):

57 MW - planning - north west - Capenhurst Lane - 8283

  Record Last Updated (dd/mm/yyyy): 24/01/2022 -> 15/07/2022
  Development Status: Under Construction -> Planning Permission Granted
  Development Status (short): Under Construction -> Awaiting Construction
  Planning Permission Expired: -> 16/04/2024
  Under Construction: 01/02/2022 ->
  status: construction -> planning
57 MW - construction - north west - Capenhurst Lane, Capenhurst - Battery storage - 9377

  Record Last Updated (dd/mm/yyyy): 03/08/2021 -> 15/09/2022
  Development Status: Planning Application Submitted -> Under Construction
  Development Status (short): Application Submitted -> Under Construction
  Planning Permission Granted: -> 21/10/2021
  Planning Permission Expired: -> 21/10/2024
  Under Construction: -> 01/09/2022
  status: planning -> construction πŸ—οΈ
50 MW - operation - south west - Melksham Substation East Storage - 6953

  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Planning Permission Expired: -> 28/09/2020
  Under Construction: -> 01/01/2022
  status: planning -> construction πŸ—οΈ
49 MW - operation - yorkshire and humber - Nether Moor Field - 7019

  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  Planning Permission Expired: -> 22/11/2022
  Operational: -> 01/09/2020
  status: planning -> operation 🍾 πŸŽ‰ 🍸
49 MW - operation - south west - Mannington Battery Storage Plant - 7024

  Record Last Updated (dd/mm/yyyy): 27/05/2020 -> 14/09/2022
  Operator (or Applicant): Public Power Solutions -> Still Waters Green Technology
  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  Planning Permission Expired: -> 28/02/2021
  Under Construction: -> 01/11/2020
  Operational: -> 01/10/2021
  status: planning -> operation 🍾 πŸŽ‰ 🍸
49 MW - planning - yorkshire and humber - Land Adjacent to 4 Redcote Lane (Armley) - 7111

  Development Status: Under Construction -> Revised
  Development Status (short): Under Construction -> Revised
  Are they re-applying (New REPD Ref): -> 12224
  Under Construction: 01/02/2022 ->
  status: construction -> planning
49 MW - construction - south east - Halewick Lane, Sompting - Battery-based Energy Storage Facility - 7168

  Record Last Updated (dd/mm/yyyy): 11/03/2022 -> 04/08/2022
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Planning Permission Expired: -> 03/04/2022
  Under Construction: -> 01/07/2022
  status: planning -> construction πŸ—οΈ
49 MW - construction - yorkshire and humber - Osbaldwick Substation - 7172

  Record Last Updated (dd/mm/yyyy): 14/11/2019 -> 27/07/2022
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Address: Os Field 5070, Hull Road, Dunnington, York, North Yorkshire -> Os Field 5070, Hull Road, Dunnington, York,
  Planning Application Reference: 18/02659/OUT -> 20/01515/REM
  Planning Application Submitted: 21/11/2018 -> 21/08/2020
  Planning Permission Granted: 22/02/2019 -> 08/10/2020
  Planning Permission Expired: 22/02/2022 ->
  Under Construction: -> 01/05/2022
  status: planning -> construction πŸ—οΈ
49 MW - operation - north west - West Didsbury Battery Storage - 7185

  Record Last Updated (dd/mm/yyyy): 21/08/2020 -> 23/08/2022
  Installed Capacity (MWelec): 50 -> 49.99
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/06/2022
  status: planning -> construction πŸ—οΈ
  mw: 50 -> 49
49 MW - construction - scotland - Ferrymuir - 7371

  Record Last Updated (dd/mm/yyyy): 17/03/2022 -> 21/09/2022
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Planning Permission Expired: -> 21/11/2022
  Under Construction: 14/07/1905 -> 29/07/2022
  status: planning -> construction πŸ—οΈ
49 MW - planning - yorkshire and humber - Elland Storage Project - 10236

  Record Last Updated (dd/mm/yyyy): 10/01/2022 -> 15/08/2022
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Planning Permission Expired: -> 23/12/2023
  Under Construction: -> 01/08/2022
  status: planning -> construction πŸ—οΈ
32 MW - operation - south west - Severn Road - 7085

  Record Last Updated (dd/mm/yyyy): 10/01/2022 -> 13/10/2022
  Development Status: Under Construction -> Operational
  Development Status (short): Under Construction -> Operational
  Operational: -> 23/12/2021
  status: construction -> operation 🍾 πŸŽ‰ 🍸
30 MW - operation - south west - Fideoak Mills - 7152

  Record Last Updated (dd/mm/yyyy): 21/02/2020 -> 21/09/2022
  Development Status: Under Construction -> Operational
  Development Status (short): Under Construction -> Operational
  Operational: -> 01/08/2020
  status: construction -> operation 🍾 πŸŽ‰ 🍸
21 MW - operation - eastern - Clayhill Farm - Battery Energy Storage - 7570

  Record Last Updated (dd/mm/yyyy): 26/01/2022 -> 14/09/2022
  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  Planning Permission Expired: -> 23/03/2021
  Under Construction: -> 01/05/2019
  status: planning -> operation 🍾 πŸŽ‰ 🍸
20 MW - planning - west midlands - Perserverance Road - 7966

  Record Last Updated (dd/mm/yyyy): 16/06/2022 -> 12/10/2022
  Development Status: Under Construction -> Planning Permission Granted
  Development Status (short): Under Construction -> Awaiting Construction
  Under Construction: 01/06/2022 ->
  status: construction -> planning
19 MW - construction - scotland - Balsillie Avenue - Roaring Hill Energy Storage Facility - 9224

  Record Last Updated (dd/mm/yyyy): 18/11/2021 -> 15/09/2022
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Planning Permission Expired: -> 03/09/2024
  Under Construction: -> 12/09/2022
  status: planning -> construction πŸ—οΈ

400 MW - planning - scotland - Hunterston Grid Services Complex - Energy Storage Facility - 10535

  Planning Permission Expired: -> 05/01/2027
400 MW - planning - scotland - Kincardine Grid Services Complex - Energy Storage Facility - 10536

  Planning Permission Expired: -> 05/01/2023
349 MW - planning - west midlands - Dunton Hall - Battery Energy Storage System - 9427

  Planning Permission Expired: -> 04/03/2025
200 MW - planning - north west - Heysham Energy Storage Project - 9545

  Planning Permission Expired: -> 26/05/2025
150 MW - planning - eastern - Thurrock Flexible Generation Plant - 7696

  Planning Permission Expired: -> 16/02/2027
100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage - 9691

  Planning Permission Expired: -> 14/10/2024
100 MW - planning - north west - Cholmondeley Road - Battery Storage - 9763

  Record Last Updated (dd/mm/yyyy): 07/10/2021 -> 15/08/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 10/08/2022
  Planning Permission Expired: -> 10/08/2025
100 MW - planning - south west - St Dennis - Battery Energy Storage - 10058

  Planning Permission Expired: -> 02/02/2025
100 MW - planning - eastern - Walpole St Andrew - Battery storage - 10876

  Record Last Updated (dd/mm/yyyy): 29/03/2022 -> 11/10/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 20/09/2022
  Planning Permission Expired: -> 20/09/2025
100 MW - planning - scotland - Teviot Wind Farm - 11442

  Storage Co-location REPD Ref ID: 8921, 11441 -> 8921 & 11441
99 MW - planning - yorkshire and humber - Lakeside Energy Storage Facility - 8268

  Planning Permission Expired: -> 06/05/2024
99 MW - planning - yorkshire and humber - Skelton Grange Battery Storage Facility - 8914

  Planning Permission Expired: -> 04/08/2024
99 MW - planning - north west - Bay Gateway - Battery Storage Facility - 9199

  Planning Permission Expired: -> 26/04/2025
90 MW - planning - yorkshire and humber - Little Crow Solar Park - 7175

  Planning Permission Expired: -> 05/04/2027
90 MW - planning - east midlands - Caldwell Road - Battery Storage - 9507

  Planning Permission Expired: -> 03/03/2025
80 MW - planning - yorkshire and humber - Netherlands Way - Battery Energy Facility - 10429

  Are they re-applying (Old REPD Ref) : -> 7090
  Planning Permission Expired: -> 06/01/2025
80 MW - planning - scotland - Tealing Battery Energy Storage Farm - 11097

  Storage Type: -> Stand-alone Storage
79 MW - construction - south east - Stony Energy Storage Facility - 7001

  Planning Permission Expired: -> 12/10/2020
50 MW - operation - south east - Richborough Energy Park - Phase 2 - 9626

  Planning Permission Expired: -> 30/04/2024
57 MW - planning - north west - National Grids Rainhill Substation Battery storage facility - 8439

  Planning Permission Expired: -> 07/06/2024
57 MW - planning - north west - Penwortham - Battery storage - 11217

  Planning Permission Expired: -> 03/05/2025
50 MW - planning - scotland - Dersalloch Battery Storage Facility - 8927

  Planning Permission Expired: -> 29/11/2026
50 MW - planning - south east - Upton Lane, Nursling - Battery Storage Facility - 9673

  Planning Permission Expired: -> 28/01/2025
50 MW - planning - eastern - Sundon Sub Station Battery Storage Facility - 9998

  Planning Permission Expired: -> 10/11/2024
50 MW - planning - scotland - Electricity Sub Station, Strichen - Battery Storage Facility - 10039

  Planning Permission Expired: -> 01/03/2025
49 MW - operation - yorkshire and humber - Pillswood Phase 1 - 7005 Megapack

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Are they re-applying (New REPD Ref): -> 7360
  Planning Permission Expired: -> 17/11/2020
49 MW - planning - north west - Middleton Clean Energy Plant - 7029

  Record Last Updated (dd/mm/yyyy): 01/02/2022 -> 26/09/2022
49 MW - planning - yorkshire and humber - Elland Storage Project - 7053

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Are they re-applying (New REPD Ref): -> 10236
49 MW - planning - eastern - Braintree Road Substation - 7161

  Record Last Updated (dd/mm/yyyy): 17/09/2020 -> 06/09/2022
  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Are they re-applying (New REPD Ref): -> 11995
49 MW - operation - south west - Minety South - Battery Storage - 7184

  Site Name: Minety South Battery Storage -> Minety South - Battery Storage
  Installed Capacity (MWelec): 50 -> 49.99
  mw: 50 -> 49
49 MW - operation - yorkshire and humber - Pillswood Phase 2 - 7360 Megapack

  Are they re-applying (Old REPD Ref) : -> 7005
49 MW - planning - eastern - Lapwing Fen II, Crown Farm - 7606

  Record Last Updated (dd/mm/yyyy): 07/09/2020 -> 15/09/2022
  Site Name: Crown Farm -> Lapwing Fen II, Crown Farm
49 MW - planning - south east - Rye Common - 7737 Megapack

  Planning Permission Granted: -> 28/09/2021
  Planning Permission Expired: -> 28/09/2024
49 MW - planning - east midlands - Newton Wood Farm - 7780

  Planning Permission Expired: -> 28/10/2023
49 MW - construction - east midlands - National Grid Enderby Substation - 8037

  Record Last Updated (dd/mm/yyyy): 07/02/2021 -> 26/09/2022
49 MW - planning - south west - Claydon Farm - Solar Farm & Battery Storage - 8039

  Planning Permission Expired: -> 17/12/2026
30 MW - planning - scotland - Drumcross Battery Storage - 8155

  Record Last Updated (dd/mm/yyyy): 30/09/2020 -> 15/09/2022
49 MW - operation - south east - Richborough Energy Park - 8195

  Planning Permission Expired: -> 09/02/2024
49 MW - planning - eastern - Brentwood nergy Storage System - 8249

  Planning Permission Expired: -> 21/05/2024
49 MW - planning - eastern - Crouch Solar Farm - 8358

  Planning Permission Expired: -> 23/12/2024
49 MW - planning - scotland - Shindour - Energy Storage Facility - 8464

  Record Last Updated (dd/mm/yyyy): 18/01/2022 -> 28/07/2022
  Planning Permission Expired: -> 16/12/2025
49 MW - planning - south west - Moreton Lane - Solar Farm & Battery Storage - 8844

  Planning Permission Expired: -> 05/04/2025
49 MW - construction - scotland - Whitehills Energy Storage Facility - 8916

  Planning Permission Expired: -> 15/12/2024
49 MW - planning - scotland - Drumshoreland Road Battery Storage Facility - 8920

  Record Last Updated (dd/mm/yyyy): 11/04/2022 -> 15/08/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 07/07/2022
  Planning Permission Expired: -> 07/07/2025
49 MW - planning - eastern - Rush Green Motors - Battery storage - 8987

  Record Last Updated (dd/mm/yyyy): 24/01/2022 -> 15/09/2022
  Planning Permission Expired: -> 06/10/2024
49 MW - planning - wales - Bronwylfa Road, Talwrn - Battery Storage Facility - 9052

  Record Last Updated (dd/mm/yyyy): 24/05/2021 -> 27/07/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 05/07/2022
  Planning Permission Expired: -> 05/07/2027
49 MW - planning - south west - Minety South 2 - Battery Storage Facility - 9063

  Site Name: Purlieus Farm, Minety - Battery Storage Facility -> Minety South 2 - Battery Storage Facility
  Planning Permission Expired: -> 08/11/2024
49 MW - planning - eastern - Sundon Substation - 9315

  Planning Permission Expired: -> 26/01/2025
49 MW - operation - scotland - Pleasance Road - Battery Energy Facility - 9997

  Planning Permission Expired: -> 01/06/2025
49 MW - planning - scotland - Fordtown Energy Storage - 10239

  Planning Permission Expired: -> 24/02/2024
49 MW - planning - eastern - Model Farm - 10687

  Planning Permission Expired: -> 27/01/2025
49 MW - planning - scotland - Midmill, Kintore - Battery Energy Storage - 10701

  Record Last Updated (dd/mm/yyyy): 01/03/2022 -> 20/07/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 01/07/2022
  Planning Permission Expired: -> 01/07/2025
49 MW - planning - scotland - Broomloan Road - Battery Energy Storage - 10886

  Planning Permission Expired: -> 28/06/2025
49 MW - planning - scotland - South Leylodge Farmhouse, Kintore - Battery Energy Storage System - 11092

  Record Last Updated (dd/mm/yyyy): 27/04/2022 -> 11/10/2022
  Planning Application Reference: ENQ/2022/0562 -> APP/2022/2022
  Planning Application Submitted: 14/04/2022 -> 30/09/2022
49 MW - planning - west midlands - Brown Edge - Battery Storage - 11418

  Storage Type: -> Stand-alone Storage
40 MW - planning - eastern - Maldon Hall - 7095

  Planning Permission Expired: -> 13/05/2022
40 MW - operation - south east - Newlands Farm Battery Storage Facility Phase 2 - 8264

  Planning Permission Expired: -> 26/01/2024
40 MW - planning - scotland - Dalmarnock Road - Battery Storage - 8507

  Planning Permission Expired: -> 16/02/2025
40 MW - planning - yorkshire and humber - Rusholme Grange - 9121 Megapack

  Planning Permission Expired: -> 03/09/2024
40 MW - planning - south west - Leigh Delamere - Solar farm & Battery storage - 9238

  Record Last Updated (dd/mm/yyyy): 29/06/2021 -> 01/09/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 11/08/2022
  Planning Permission Expired: -> 11/08/2025
40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage - 9584

  Planning Permission Expired: -> 10/02/2025
40 MW - planning - south east - Tanners Lane - Battery Energy Storage Facility (Phase One) - 9708

  Site Name: Tanners Lane - 40 MW Battery Energy Storage Facility (Phase One) -> Tanners Lane - Battery Energy Storage Facility (Phase One)
  Planning Permission Expired: -> 26/11/2022
40 MW - planning - yorkshire and humber - Field House Solar Farm - 10970

  Record Last Updated (dd/mm/yyyy): 11/04/2022 -> 28/07/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 08/07/2022
  Planning Permission Expired: -> 08/07/2025
38 MW - planning - north east - Maiden, Annfield Plain - Energy Storage - 9036

  Record Last Updated (dd/mm/yyyy): 13/12/2021 -> 28/07/2022
  Planning Permission Expired: -> 18/08/2026
35 MW - planning - south west - Patch Elm Lane - Battery Storage - 11415

  Planning Permission Expired: -> 18/03/2025
32 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage - 10145

  Planning Permission Expired: -> 28/02/2025
30 MW - planning - south west - Catsbrain Farm - 7988

  Record Last Updated (dd/mm/yyyy): 25/08/2020 -> 04/08/2022
  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Are they re-applying (New REPD Ref): -> 11787
  Address: N/o Kingsdown Road and W/o, Catsbrain Farm, Swindon, Wiltshire -> N/o Kingsdown Road and W/o, Catsbrain Farm, Swindon,
30 MW - planning - scotland - Farburn Place - Energy Storage Facility - 8385

  Planning Permission Expired: -> 30/09/2024
30 MW - planning - south west - North Tawton Primary Substation - Battery Storage - 9275

  Planning Permission Expired: -> 03/11/2024
28 MW - construction - eastern - Lower Dunton Road Battery Storage Facility - 8213

  Planning Permission Expired: -> 05/02/2024
26 MW - planning - yorkshire and humber - West Melton Electricity Substation - Energy Storage System - 11436

  Record Last Updated (dd/mm/yyyy): 09/06/2022 -> 23/09/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 13/09/2022
  Planning Permission Expired: -> 13/09/2025
25 MW - planning - north west - Bristol Avenue - Battery Energy Storage Facility - 8809

  Planning Permission Expired: -> 11/05/2024
25 MW - planning - yorkshire and humber - Stainland Road, Salterhebble - Battery Storage Facility - 9397

  Planning Permission Expired: -> 28/09/2024
25 MW - planning - north west - Davies Road - Battery Storage - 9563

  Planning Permission Expired: -> 17/03/2025
25 MW - planning - north west - Middlewich Road - Solar Photovoltaics & Battery Storage - 9565

  Planning Permission Expired: -> 11/03/2025
25 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage - 10222

  Planning Permission Expired: -> 21/02/2025
25 MW - planning - scotland - Wemyss Estate - Randolph Solar Farm & Battery Energy Storage - 11482

  Storage Type: -> Co-located with RE
  Planning Permission Granted: -> 24/05/2022
  Secretary of State - Intervened: 24/05/2022 ->
  Planning Permission Expired: -> 24/05/2027
20 MW - planning - london - Riverside Energy Park - 7036

  Planning Permission Expired: -> 09/04/2025
20 MW - planning - scotland - Stranoch 2 - 7306

  Planning Permission Expired: -> 24/11/2027
20 MW - planning - scotland - Hagshaw Hill - 7572

  Planning Permission Expired: 26/02/2023 -> 26/02/2025
20 MW - planning - scotland - Arecleoch Wind Farm (extension) - 7882

  Planning Permission Expired: -> 16/11/2027
20 MW - planning - east midlands - Vicarage Drove - Solar farm & Battery storage - 8518

  Planning Permission Expired: -> 17/02/2026
20 MW - planning - yorkshire and humber - Hull East Stor Generation Compound - Battery energy storage - 9006

  Planning Permission Expired: -> 29/07/2024
20 MW - construction - north east - Standby Embedded Stor Power Plant - Battery storage - 9010

  Planning Permission Expired: -> 16/06/2024
20 MW - planning - eastern - South Fambridge Hall - Solar farm & Battery storage - 9274

  Record Last Updated (dd/mm/yyyy): 22/12/2021 -> 05/08/2022
  Operator (or Applicant): British Solar Renewables -> British Solar Renewables / BayWa r.e. UK Limited
  Planning Permission Expired: -> 15/12/2024
20 MW - planning - eastern - The Brickmakers Arms Battery - 9668

  Planning Permission Expired: -> 22/12/2024
20 MW - planning - scotland - Douglas West Wind Farm (extension) - 9957

  Planning Permission Expired: -> 18/11/2024
20 MW - planning - east midlands - Mount Road, Castle Gresley - Battery Storage Facility - 10012

  Record Last Updated (dd/mm/yyyy): 29/11/2021 -> 18/08/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 17/07/2022
  Planning Permission Expired: -> 17/07/2025
20 MW - planning - north west - Broadgate, Chadderton - Battery Storage Containers - 10690

  Planning Permission Expired: -> 19/05/2025
20 MW - planning - scotland - Strathruddie, Kinglassie - Solar farm - 10828

  Record Last Updated (dd/mm/yyyy): 21/03/2022 -> 18/07/2022
  Planning Permission Expired: -> 16/03/2025
20 MW - construction - north west - Chadderton - Battery energy storage facility - 11160

  Storage Type: -> Stand-alone Storage
19 MW - planning - scotland - Land North of Thornton Road - 7131

  Planning Permission Expired: -> 10/02/2019
19 MW - planning - scotland - Hillcrest Cottage, Shebster - Battery Energy Storage System - 10226

  Record Last Updated (dd/mm/yyyy): 24/12/2021 -> 29/09/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 22/08/2022
  Planning Permission Expired: -> 22/08/2025
18 MW - cancelled - south west - Churchtown Solar Farm Battery Storage - 7726

  Record Last Updated (dd/mm/yyyy): 25/06/2020 -> 15/09/2022
18 MW - planning - south west - Whaddon Lane, Hilperton - 9057

  Planning Permission Expired: -> 06/04/2025
16 MW - planning - east midlands - Waterswallows Road, Green Fairfield - Battery Storage Equipment - 10716

  Planning Permission Expired: -> 08/04/2025
15 MW - planning - eastern - Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage - 9346

  Planning Permission Expired: -> 08/12/2024
13 MW - planning - west midlands - Maybrook Road - Battery facility - 11008

  Record Last Updated (dd/mm/yyyy): 19/04/2022 -> 18/08/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 08/08/2022
10 MW - planning - south east - Stockbridge Road - 7097

  Planning Permission Expired: -> 14/12/2020
10 MW - planning - south west - Minety Substation - 7942

  Planning Permission Expired: -> 07/04/2025
10 MW - planning - scotland - Binn Eco Park - Battery - 9098

  Planning Permission Expired: -> 12/07/2024
10 MW - planning - north west - Park Road Battery Storage - 10076

  Record Last Updated (dd/mm/yyyy): 07/12/2021 -> 26/09/2022
  Planning Permission Expired: -> 19/11/2024
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 11369

  Site Name: Bath Mews, Minsterley - 10MW Battery Storage Facility -> Bath Mews, Minsterley - Battery Storage Facility

2022-07

New projects (49):
500 MW - planning - scotland - Devilla Energy Storage Facility - 9248
249 MW - planning - south east - Richborough Energy Park - Phase 3 (Sheaf) - 11201
240 MW - cancelled - east midlands - Temple Oaks Renewable Energy Park - 11562
150 MW - planning - south west - Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility - 11612
100 MW - planning - yorkshire and humber - Hales Lane - Battery Storage Facility - 9635
100 MW - planning - scotland - Teviot Wind Farm - 11442
99 MW - planning - west midlands - Newfields Farm - Battery Energy Storage - 10233
80 MW - planning - scotland - Tealing Battery Energy Storage Farm - 11097
57 MW - planning - north west - Penwortham - Battery storage - 11217
57 MW - planning - north west - Sutton Manor - Battery Storage Facility - 11559
50 MW - planning - eastern - Stocking Pelham - Battery Storage System - 11212
50 MW - planning - west midlands - Lowlands Farm - Battery Storage - 11399
50 MW - planning - eastern - Third Drove, Fengate - Battery Storage - 11558
49 MW - planning - eastern - Tollgate Battery Storage Facility - 6949
49 MW - planning - eastern - Hilfield Farm Tech - 7030
49 MW - planning - north east - Lackenby - 7040
49 MW - planning - south east - Lovedean Energy Storage System - 7064
49 MW - planning - south west - Moreton Lane - Solar Farm & Battery Storage - 8844
49 MW - planning - scotland - East Kilbride - Battery storage - 9013
49 MW - planning - east midlands - Grendon Lakes - Battery Storage - 9341
49 MW - planning - scotland - Drum Farm - Battery Energy Storage System - 9940
49 MW - planning - scotland - Newburgh Road, Abernethy - Battery Storage - 10607
49 MW - operation - scotland - Jamesfield Organic Centre - Battery Storage - 10863 Megapack
49 MW - planning - scotland - South Leylodge Farmhouse, Kintore - Battery Energy Storage System - 11092
49 MW - planning - west midlands - Brown Edge - Battery Storage - 11418
49 MW - planning - south east - Harrington Franklin, Richborough Energy Park - Battery Storage - 11449
49 MW - cancelled - scotland - Rothienorman - Battery Energy Storage Facility - 11497
45 MW - planning - north east - Edge Lane, Maiden Law - Solar Farm & Battery Storage - 11619
42 MW - planning - scotland - Armadale Wind Farm - 11219
40 MW - planning - east midlands - Breach Farm - 6962
36 MW - planning - south west - Kingston Road, Slimbridge - Battery Storage - 11516
35 MW - planning - south west - Patch Elm Lane - Battery Storage - 11415
32 MW - planning - south west - Gloucestershire Science and Technology Park (small) - 7181
32 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage - 10145
30 MW - planning - south west - Gloucestershire Science and Technology Park - 7067
30 MW - planning - scotland - Roaring Hill (Resubmission) - 7989
30 MW - planning - north east - West Sleekburn - Battery Storage Compound - 10957
27 MW - planning - scotland - Craig Watch - Wind Farm & Battery Storage - 11609
26 MW - planning - yorkshire and humber - West Melton Electricity Substation - Energy Storage System - 11436
25 MW - planning - scotland - Wemyss Estate - Randolph Solar Farm & Battery Energy Storage - 11482
20 MW - planning - scotland - Fordtown Energy Storage - 7234
20 MW - planning - scotland - Grayside Wind Farm - 11113
20 MW - construction - north west - Chadderton - Battery energy storage facility - 11160
16 MW - planning - wales - Little Llwyn Onn - Solar Farm & Battery Storage - 11544
15 MW - planning - north west - Grassing Rome Street - Battery Storage - 11611
13 MW - planning - west midlands - Maybrook Road - Battery facility - 11008
10 MW - planning - south west - Tiddlywink Barn - 7527
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 11369
10 MW - cancelled - south west - Earthcott Green - Battery Storage - 11510

Disappeared projects (11):
349 MW - planning - west midlands - Cellarhead - Battery Site - 10013
100 MW - cancelled - eastern - Battlesbridge Bypass, Rettendon - Battery Storage - 9801
49 MW - planning - london - Mill Hill National Grid Substation - 8009
49 MW - cancelled - west midlands - Brown Edge - Battery Storage - 10431
49 MW - cancelled - scotland - East Croftmore - Battery Energy Storage - 10700
47 MW - planning - south west - Dog Trap Lane, Minety - Battery Energy Storage Systems - 10488
35 MW - planning - south west - Northington Lane - Battery Storage Facility - 9992
35 MW - cancelled - south west - Patch Elm Lane - Battery Storage - 10282
30 MW - cancelled - wales - Pound Farm Lane - Battery Storage - 9969
20 MW - cancelled - south west - Tiddlywink Barn Battery Storage Power Plant - 9552
13 MW - cancelled - north east - Newcastle International Airport Phase 2 - Battery Storage - 9756

Updated projects (55):

250 MW - construction - eastern - Lapwing Fen 2 - Battery Storage Plant - 7614

  Record Last Updated (dd/mm/yyyy): 21/02/2022 -> 08/06/2022
  Site Name: Flower Farm -> Lapwing Fen 2 - Battery Storage Plant
  Installed Capacity (MWelec): 49.90 -> 250
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/06/2022
  status: planning -> construction πŸ—οΈ
  mw: 49 -> 250
49 MW - construction - yorkshire and humber - Bradford West Substation (Harrop Edge Farm) - 7577

  Record Last Updated (dd/mm/yyyy): 08/03/2022 -> 08/07/2022
  Site Name: Bradford West Substation (Harrop Edge Farm Resubmission) -> Bradford West Substation (Harrop Edge Farm)
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: 01/03/2022 -> 07/07/2022
  status: planning -> construction πŸ—οΈ
49 MW - operation - scotland - Wishaw Battery Storage Facility - 9522

  Record Last Updated (dd/mm/yyyy): 01/09/2021 -> 10/05/2022
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/04/2022
  status: planning -> construction πŸ—οΈ
20 MW - planning - west midlands - Perserverance Road - 7966

  Record Last Updated (dd/mm/yyyy): 07/02/2021 -> 16/06/2022
  Site Name: Perserverance Road (Resubmission) -> Perserverance Road
  Storage Type: Co-located with fossil fuel plant -> Stand-alone Storage
  CHP Enabled: Yes -> No
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Address: Old School Lane, Hereford, Hereford and Worcester -> Old School Lane, Hereford,
  Under Construction: -> 01/06/2022
  status: planning -> construction πŸ—οΈ

349 MW - planning - west midlands - Dunton Hall - Battery Energy Storage System - 9427

  Record Last Updated (dd/mm/yyyy): 08/03/2022 -> 17/05/2022
200 MW - planning - north west - Heysham Energy Storage Project - 9545

  Record Last Updated (dd/mm/yyyy): 07/09/2021 -> 30/05/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 27/05/2022
150 MW - planning - eastern - Thurrock Flexible Generation Plant - 7696

  Record Last Updated (dd/mm/yyyy): 06/07/2020 -> 26/05/2022
  Operator (or Applicant): RPS Group / Thurrock Power -> Thurrock Power
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Address: Thurrock Flexible Generation Plant Fort Road Tilbury Essex -> Thurrock Flexible Generation Plant Fort Road Tilbury
  Planning Permission Granted: -> 16/02/2022
100 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy - 9115

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage - 9691

  Record Last Updated (dd/mm/yyyy): 25/10/2021 -> 10/05/2022
99 MW - operation - eastern - Dollymans Storage - 7088

  Address: Land North Of National Grid, Doublegate Lane, Rawreth, Wickford, Essex -> Land North Of National Grid, Doublegate Lane, Rawreth, Wickford,
  Planning Permission Expired: -> 05/11/2023
99 MW - planning - yorkshire and humber - Lakeside Energy Storage Facility - 8268

  Record Last Updated (dd/mm/yyyy): 21/05/2021 -> 21/06/2022
  Operator (or Applicant): Renewable Energy System Limited -> Tag Energy UK
  Installed Capacity (MWelec): 100.00 -> 99.9
  mw: 100 -> 99
99 MW - planning - north west - Bay Gateway - Battery Storage Facility - 9199

  Record Last Updated (dd/mm/yyyy): 16/07/2021 -> 27/06/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 26/04/2022
90 MW - planning - east midlands - Caldwell Road - Battery Storage - 9507

  Record Last Updated (dd/mm/yyyy): 31/08/2021 -> 19/04/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 03/03/2022
49 MW - cancelled - south west - Ravensroost Farm, Minety - Battery Energy Storage - 7014

  Record Last Updated (dd/mm/yyyy): 12/02/2020 -> 29/06/2022
  Operator (or Applicant): Arlington Energy (formerly Enso Energy) -> Conrad Energy Developments II Limited
  Site Name: Ravensroost Farm -> Ravensroost Farm, Minety - Battery Energy Storage
  CHP Enabled: -> No
  Development Status: Planning Permission Granted -> Planning Application Submitted
  Development Status (short): Awaiting Construction -> Application Submitted
  Address: Land Adjacent Ravensroost Farm, Minety, Malmesbury, Wiltshire -> Ravensroost Farm, Minety, Malmesbury,
  Planning Application Reference: 18/04914/FUL -> PL/2022/04524
  Planning Application Submitted: 15/06/2018 -> 13/06/2022
  Planning Permission Granted: 10/10/2018 ->
49 MW - planning - eastern - Burwell Main Sub-Station - 7272

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
49 MW - planning - eastern - Sundon Substation - 7283

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
49 MW - construction - south west - Salisbury Substation - 7510

  Record Last Updated (dd/mm/yyyy): 29/04/2020 -> 04/07/2022
  Operator (or Applicant): Harmony Energy Storage -> SSE Renewables
  Address: Land Adjacent To, Salisbury Substation, Wilton, Salisbury, Wiltshire -> Land Adjacent To, Salisbury Substation, Wilton, Salisbury,
49 MW - cancelled - north east - Lackenby - 7518

  Site Name: Lackenby (Resubmission) -> Lackenby
  Address: Land at, Crow Lane, Old Lackenby, Middlesbrough, Cleveland -> Land at, Crow Lane, Old Lackenby, Middlesbrough
49 MW - planning - eastern - Lapwing Fen II, Crown Farm - 7606

  Address: Crown Farm, Mill Road, West Walton, Wisbech, Cambridgeshire -> Crown Farm, Mill Road, West Walton, Wisbech,
  County: Norfolk -> Cambridgeshire
49 MW - planning - eastern - Model Farm - 7609

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
49 MW - operation - north west - Lister Drive - 7740

  Record Last Updated (dd/mm/yyyy): 07/05/2021 -> 17/05/2022
49 MW - planning - south west - Claydon Farm - Solar Farm & Battery Storage - 8039

  Record Last Updated (dd/mm/yyyy): 18/01/2022 -> 10/05/2022
49 MW - operation - scotland - Pleasance Road - Battery Energy Facility - 9997

  Record Last Updated (dd/mm/yyyy): 08/03/2022 -> 12/07/2022
  Operator (or Applicant): Coronation Power Limited -> Gresham House
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Authority: Perth and Kinross Council -> Perth & Kinross Council
  Planning Permission Granted: -> 01/06/2022
49 MW - planning - scotland - Stainland Energy Storage Project - 10225

  Record Last Updated (dd/mm/yyyy): 29/12/2021 -> 21/06/2022
  Site Name: Upper Geiselittle - Energy Storage Facility -> Stainland Energy Storage Project
  Planning Application Reference: 21/05957/PAN -> 22/02054/FUL
  Planning Application Submitted: 21/12/2021 -> 23/05/2022
49 MW - planning - scotland - Fordtown Energy Storage - 10239

  Record Last Updated (dd/mm/yyyy): 10/12/2021 -> 19/05/2022
  Operator (or Applicant): Intelligent Land Investments (ILI) -> Private Developer
  Site Name: Fordtown Energy Storage (Resubmission) -> Fordtown Energy Storage
  Installed Capacity (MWelec): 19.90 -> 49.9
  mw: 19 -> 49
49 MW - cancelled - west midlands - Lanegreat Barr, Great Barr - Battery Storage Facility - 10438

  Address: Adj The Duckery, Chapel Lane, Great Barr -> Adj The Duckery, Chapel Lane, Great Barr, Walsall
  County: Walsall -> West Midlands
49 MW - planning - scotland - Broomloan Road - Battery Energy Storage - 10886

  Record Last Updated (dd/mm/yyyy): 29/03/2022 -> 08/07/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 28/06/2022
48 MW - planning - northern ireland - Classic Marble Showers Site - 7208

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Address: South of Classic Marble (Showe, 31 Garvaghy Bridge Road, Garvaghy, Dungannon, Co Tyrone -> South of Classic Marble (Showe, 31 Garvaghy Bridge Road, Garvaghy, Dungannon,
45 MW - planning - scotland - Pleasance Road - 7217

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
40 MW - planning - east midlands - Breach Farm - Energy Barn - 6914

  Record Last Updated (dd/mm/yyyy): 25/08/2020 -> 27/05/2022
  Operator (or Applicant): Anesco/ Green Hedge Energy UK -> Bluefield Solar Income Fund
  Address: Breach Farm, Caldwell, Swadlincote, Derbyshire -> Breach Farm, Caldwell, Swadlincote,
  Planning Permission Expired: -> 15/08/2020
40 MW - planning - eastern - Norwich Road Industrial Estate - 6958

  Address: Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth Suffolk -> Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth
40 MW - planning - west midlands - Whitehouse Farm Energy Barn - 7987

  Record Last Updated (dd/mm/yyyy): 25/08/2020 -> 27/05/2022
  Operator (or Applicant): Green Hedge -> Bluefield Solar Income Fund
  Address: Whitehouse Farm, Blakes Lane, Guarlford, Malvern, Hereford and Worcester -> Whitehouse Farm, Blakes Lane, Guarlford, Malvern,
  Planning Permission Expired: 29/11/2020 ->
40 MW - planning - scotland - Dalmarnock Road - Battery Storage - 8507

  Record Last Updated (dd/mm/yyyy): 25/03/2022 -> 11/05/2022
35 MW - planning - yorkshire and humber - Rusholme Grange - 7093

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
32 MW - planning - yorkshire and humber - Kirkhaw Lane Battery Storage - 8430

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
30 MW - planning - scotland - Blackpark Energy Storage - 8105

  Site Name: Blackpark Energy Storage (Resubmission) -> Blackpark Energy Storage
  Address: Black Park Farm, Nairn, Highlands -> Black Park Farm, Nairn,
30 MW - planning - scotland - Jamesfield Organic Centre, Phase 1 - 10456

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
30 MW - planning - eastern - Colton - Solar photovoltaic farm, Battery storage - 10945

  Record Last Updated (dd/mm/yyyy): 06/04/2022 -> 08/07/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 30/06/2022
29 MW - planning - scotland - Fordtown Energy Storage - 7764

  Site Name: Fordtown Energy Storage (Resubmission) -> Fordtown Energy Storage
  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
29 MW - planning - scotland - Learielaw Farm - 7970

  Record Last Updated (dd/mm/yyyy): 07/02/2021 -> 21/06/2022
23 MW - operation - east midlands - Asfordby Business Park (1) - 6932

  Address: Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, -> Zone P, Asfordby Business Park, Welby Road, Melton Mowbray,
20 MW - operation - west midlands - Land to the west of Clay Hill Pit / Larport Farm - 6911

  Address: Land West of Clay Hill Pit Larport Farm Larport Lane Dormington Herefordshire -> Land West of Clay Hill Pit Larport Farm Larport Lane Dormington
20 MW - construction - east midlands - Chelveston Renewable Energy Park - 6941

  Address: Chelveston Renewable Energy Pa, The Airfield, Chelveston, Wellingborough,οΏ½Northamptonshire -> Chelveston Renewable Energy Pa, The Airfield, Chelveston, Wellingborough,οΏ½
20 MW - operation - north east - Ray Battery Storage Facility - 6943

  Address: Ray Wind Farm, Kirkwhelpington, Newcastle Upon Tyne, Northumberland -> Ray Wind Farm, Kirkwhelpington, Newcastle Upon Tyne,
20 MW - planning - west midlands - Perseverance Road - 7061

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Address: Land At Perseverance Road, Perseverance Road, Hereford, Hereford & Worcester -> Land At Perseverance Road, Perseverance Road, Hereford,
20 MW - planning - yorkshire and humber - Kirkhaw Lane - 7149

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
20 MW - planning - scotland - Blackpark Farm - 7226

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
  Address: Black Park Farm, Nairn, Highlands -> Black Park Farm, Nairn,
20 MW - operation - south west - Feeder Road - 7663

  Record Last Updated (dd/mm/yyyy): 21/05/2021 -> 20/05/2022
20 MW - planning - north west - Broadgate, Chadderton - Battery Storage Containers - 10690

  Record Last Updated (dd/mm/yyyy): 01/03/2022 -> 14/06/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 19/05/2022
19 MW - planning - scotland - Jamesfield Organic Centre, Phase 2 - 7315

  Development Status: Planning Permission Granted -> Revised
  Development Status (short): Awaiting Construction -> Revised
18 MW - construction - south east - Aurora Solar Farm - 7385

  Address: Twelve Acre Farm, Chilbridge Road, Eynsham, Witney, Oxfordshire -> Twelve Acre Farm, Chilbridge Road, Eynsham, Witney,
18 MW - planning - south west - Whaddon Lane, Hilperton - 9057

  Record Last Updated (dd/mm/yyyy): 24/05/2021 -> 27/04/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 06/04/2022
16 MW - planning - east midlands - Waterswallows Road, Green Fairfield - Battery Storage Equipment - 10716

  Record Last Updated (dd/mm/yyyy): 04/03/2022 -> 19/04/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 08/04/2022
10 MW - operation - eastern - Nevendon - 6926

  Address: Nevendon, Essex -> Nevendon,
10 MW - planning - south west - Minety Substation - 7942

  Record Last Updated (dd/mm/yyyy): 30/06/2020 -> 27/04/2022
  Installed Capacity (MWelec): 49.90 -> 10
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Address: Land Near Minety Substation, Stonehill, Charlton, Malmesbury, Wiltshire -> Land Near Minety Substation, Stonehill, Charlton, Malmesbury,
  Planning Permission Granted: -> 07/04/2022
  mw: 49 -> 10

2022-04

New projects (48):
400 MW - planning - scotland - Hunterston Grid Services Complex - Energy Storage Facility - 10535
400 MW - planning - scotland - Kincardine Grid Services Complex - Energy Storage Facility - 10536
300 MW - construction - scotland - Blackhillock Electricity Substation - Battery Energy Storage System - 9723
100 MW - cancelled - eastern - Battlesbridge Bypass, Rettendon - Battery Storage - 9801
100 MW - planning - eastern - Walpole St Andrew - Battery storage - 10876
100 MW - cancelled - south west - Hook Street - Energy Storage Compound - 10142
99 MW - planning - north east - South Thinford Lane, Thinford - Energy Storage - 10489
90 MW - planning - yorkshire and humber - Little Crow Solar Park - 7175
80 MW - planning - yorkshire and humber - Netherlands Way - Battery Energy Facility - 10429
50 MW - planning - scotland - Frodo Solar and Battery Energy Development - 10994
50 MW - planning - west midlands - Penstone Lane, Penn 1 - Battery Storage Facility - 10705
50 MW - planning - west midlands - Penstone Lane, Lower Penn 2 - Battery Storage - 10733
50 MW - planning - south east - Upton Lane, Nursling - Battery Storage Facility - 9673
49 MW - planning - scotland - Midmill, Kintore - Battery Energy Storage - 10701
49 MW - construction - scotland - Ferrymuir - 7371
49 MW - planning - scotland - Broomloan Road - Battery Energy Storage - 10886
49 MW - planning - eastern - Model Farm - 10687
49 MW - cancelled - west midlands - Brown Edge - Battery Storage - 10431
49 MW - operation - scotland - Pleasance Road - Battery Energy Facility - 9997
49 MW - construction - south east - Halewick Lane, Sompting - Battery-based Energy Storage Facility - 7168
49 MW - planning - south east - Burcot Solar Farm - 9374
49 MW - planning - scotland - Shindour - Energy Storage Facility - 8464
49 MW - planning - south west - Claydon Farm - Solar Farm & Battery Storage - 8039
49 MW - cancelled - scotland - East Croftmore - Battery Energy Storage - 10700
49 MW - cancelled - west midlands - Lanegreat Barr, Great Barr - Battery Storage Facility - 10438
49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility - 10955
49 MW - planning - scotland - Drumshoreland Road Battery Storage Facility - 8920
47 MW - planning - south west - Dog Trap Lane, Minety - Battery Energy Storage Systems - 10488
40 MW - planning - yorkshire and humber - Field House Solar Farm - 10970
40 MW - planning - scotland - Dalmarnock Road - Battery Storage - 8507
35 MW - planning - yorkshire and humber - Rusholme Grange - 7093
30 MW - planning - scotland - Jamesfield Organic Centre, Phase 1 - 10456
30 MW - planning - scotland - Clachaig Glen - 10996
30 MW - planning - eastern - Colton - Solar photovoltaic farm, Battery storage - 10945
30 MW - planning - west midlands - Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage - 10978
20 MW - planning - east midlands - Vicarage Drove - Solar farm & Battery storage - 8518
20 MW - planning - eastern - Moggerhanger Road, Sandy - Solar Farm - 10981
20 MW - planning - north west - Former EON Power Station, Booth Lane - Battery Energy Storage System - 10436
20 MW - planning - north west - Vause Farm - Battery Storage - 10989
20 MW - planning - scotland - Strathruddie, Kinglassie - Solar farm - 10828
20 MW - planning - north west - Broadgate, Chadderton - Battery Storage Containers - 10690
20 MW - planning - south west - Plymouth Stor Generation - Battery storage - 10432
20 MW - planning - scotland - Carrick Windfarm - 10540
20 MW - planning - scotland - Chleansaid Onshore Wind Farm - 10997
20 MW - operation - yorkshire and humber - Kirkhaw Lane - 7148
16 MW - planning - east midlands - Waterswallows Road, Green Fairfield - Battery Storage Equipment - 10716
12 MW - cancelled - eastern - St Ippolyts - Solar Farm & Battery Storage - 9695
10 MW - planning - scotland - Binn Eco Park - Battery - 9098

Disappeared projects (3):
150 MW - construction - south east - Cleve Hill Solar Project - 7856
30 MW - planning - south west - Gloucestershire Science and Technology Park - 7067
30 MW - planning - scotland - Roaring Hill (Resubmission) - 7989

Updated projects (56):

57 MW - planning - north west - Capenhurst Lane - 8283

  Record Last Updated (dd/mm/yyyy): 12/01/2021 -> 24/01/2022
  Development Status: Planning Application Submitted -> Under Construction
  Development Status (short): Application Submitted -> Under Construction
  Planning Authority: -> Cheshire West and Chester Council
  Planning Permission Granted: -> 16/04/2021
  Under Construction: -> 01/02/2022
  status: planning -> construction πŸ—οΈ
50 MW - operation - scotland - Whitelee Wind Farm Battery Storage Extension - 7174

  Record Last Updated (dd/mm/yyyy): 29/04/2020 -> 21/02/2022
  Development Status: Planning Permission Granted -> Operational
  Development Status (short): Awaiting Construction -> Operational
  Under Construction: -> 01/10/2020
  Operational: -> 01/10/2021
  status: planning -> operation 🍾 πŸŽ‰ 🍸
49 MW - construction - south east - Sundridge Hill - 7081

  Record Last Updated (dd/mm/yyyy): 27/01/2020 -> 17/03/2022
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Address: Land To South Of A228, Sundridge Hill, Cuxton, Rochester, Kent -> Land To South Of A228, Sundridge Hill, Cuxton, Rochester,
  Under Construction: -> 01/02/2022
  status: planning -> construction πŸ—οΈ
49 MW - construction - eastern - Tollgate Farm Battery Storage - 7335

  Record Last Updated (dd/mm/yyyy): 23/12/2021 -> 01/02/2022
  Site Name: Tollgate Farm Battery Storage (Resubmission) -> Tollgate Farm Battery Storage
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Under Construction: -> 01/02/2022
  status: planning -> construction πŸ—οΈ
21 MW - operation - eastern - Clayhill Farm - Battery Energy Storage - 7570

  Record Last Updated (dd/mm/yyyy): 20/01/2020 -> 26/01/2022
  Operator (or Applicant): Arlington Energy -> Enso Energy Limited
  Site Name: Greenfield Road -> Clayhill Farm - Battery Energy Storage
  Storage Type: Co-located with RE -> Stand-alone Storage
  Storage Co-location REPD Ref ID: 2265 ->
  Installed Capacity (MWelec): 40.00 -> 21.00
  CHP Enabled: -> No
  Development Status: Under Construction -> Planning Permission Granted
  Development Status (short): Under Construction -> Awaiting Construction
  Under Construction: 19/06/2019 ->
  status: construction -> planning
  mw: 40 -> 21
20 MW - operation - wales - Energy Centre Royal Mint - 7684

  Record Last Updated (dd/mm/yyyy): 17/08/2020 -> 16/02/2022
  Development Status: Under Construction -> Planning Permission Granted
  Development Status (short): Under Construction -> Awaiting Construction
  Under Construction: 01/04/2021 ->
  status: construction -> planning

550 MW - planning - east midlands - Spalding Energy Park - Battery Storage - 10173

  Operator (or Applicant): Spalding Energy Park Limited -> Intergen Limited
  Site Name: West Marsh Road - Battery Energy Storage System -> Spalding Energy Park - Battery Storage
450 MW - planning - eastern - Gateway Energy Centre - Battery Energy Storage - 10309

  Operator (or Applicant): Gateway Energy Centre Limited -> Intergen Limited
  Site Name: Baltic Avenue - Battery Energy Storage -> Gateway Energy Centre - Battery Energy Storage
60 MW - planning - north east - Greystones Road, Grangetown - Battery Energy Storage System - 10081

  Record Last Updated (dd/mm/yyyy): 11/11/2021 -> 11/02/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Authority: Redcar and Cleveland Council -> Redcar and Cleveland Borough Council
  Planning Permission Granted: -> 17/12/2021
349 MW - planning - west midlands - Dunton Hall - Battery Energy Storage System - 9427

  Record Last Updated (dd/mm/yyyy): 13/08/2021 -> 08/03/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 04/03/2022
100 MW - planning - south west - St Dennis - Battery Energy Storage - 10058

  Record Last Updated (dd/mm/yyyy): 02/12/2021 -> 08/02/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 02/02/2022
99 MW - planning - yorkshire and humber - Skelton Grange Battery Storage Facility - 8914

  Record Last Updated (dd/mm/yyyy): 27/04/2021 -> 24/01/2022
  Operator (or Applicant): Skelton Peak Power Limited -> Catalyst Capital LLP
  Site Name: Skelton Battery Storage Facility -> Skelton Grange Battery Storage Facility
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 04/08/2021
80 MW - operation - scotland - Aikengall II Community Wind Farm Battery - 7015

  Turbine Capacity (MW): 4.20 -> 4.2
  Height of Turbines (m): 145.00 -> 145
79 MW - construction - south east - Stony Energy Storage Facility - 7001

  Record Last Updated (dd/mm/yyyy): 25/06/2020 -> 18/03/2022
  Operator (or Applicant): Renewable Energy Systems (RES) -> Gore Street Energy Storage Fund
  Installed Capacity (MWelec): 49.90 -> 79.90
  mw: 49 -> 79
57 MW - planning - north west - National Grids Rainhill Substation Battery storage facility - 8439

  Address: οΏ½Land To The South Of National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens WA9 4QH -> οΏ½Land To The South Of National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens
50 MW - planning - scotland - Electricity Sub Station, Strichen - Battery Storage Facility - 10039

  Record Last Updated (dd/mm/yyyy): 02/12/2021 -> 04/03/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 01/03/2022
50 MW - operation - south west - Stonehill Energy Storage - 7773

  Address: Land Adjacent To Electricity S, Stonehill, Charlton, Malmesbury, Wiltshire -> Land Adjacent To Electricity S, Stonehill, Charlton, Malmesbury,
50 MW - planning - scotland - Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage - 8342

  Record Last Updated (dd/mm/yyyy): 23/11/2021 -> 21/02/2022
  Post Code: G76 -> G76 0QQ
  Planning Authority: East Ayrshire Council -> Scottish Government (S36)
  Planning Application Reference: 21/0261/PP -> ECU00002198
  Planning Application Submitted: 13/05/2021 -> 17/04/2021
49 MW - construction - scotland - Whitehills Energy Storage Facility - 8916

  Record Last Updated (dd/mm/yyyy): 20/09/2021 -> 11/03/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 15/12/2021
49 MW - construction - yorkshire and humber - Bradford West Substation (Harrop Edge Farm) - 7577

  Record Last Updated (dd/mm/yyyy): 15/11/2019 -> 08/03/2022
  Address: Land At Grid Ref 409233 434810 Old Allen Road Wilsden Bradford West Yorkshire -> Land At Grid Ref 409233 434810 Old Allen Road Wilsden Bradford
  Post Code: -> BD15 9AG
  Under Construction: -> 01/03/2022
49 MW - planning - eastern - Burwell Main Sub-Station - 7272

  Address: Land adj to Burwell 400kV Subs, Weirs Drove, Burwell, Cambridge, Cambridgeshire -> Land adj to Burwell 400kV Subs, Weirs Drove, Burwell, Cambridge,
49 MW - planning - eastern - Sundon Substation - 7283

  Address: Sundon 400KV Substation, Waterend Lane, Chalton, Luton, Bedfordshire -> Sundon 400KV Substation, Waterend Lane, Chalton,
49 MW - planning - eastern - Crouch Solar Farm - 8358

  Record Last Updated (dd/mm/yyyy): 20/05/2021 -> 14/03/2022
  Operator (or Applicant): Private Developer -> Low Carbon Storage
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Address: Dunton Road -> Park Farm, Dunton Road, Brentwood
  Planning Permission Granted: -> 23/12/2021
49 MW - planning - south east - Rye Common - 7737 Megapack

  Address: Street Record, Rye Common Lane, Crondall, Farnham, Surrey -> Street Record, Rye Common Lane, Crondall, Farnham,
49 MW - operation - north west - Lister Drive - 7740

  Address: Land Adjacent to Lister Drive, Carnegie Road, Liverpool, Merseyside -> Land Adjacent to Lister Drive, Carnegie Road, Liverpool,
49 MW - operation - north west - Liverpool Energy Management Facility - 7772

  Address: Land To The South Of, Carnegie Road, Liverpool, Merseyside -> Land To The South Of, Carnegie Road, Liverpool,
49 MW - planning - eastern - Sundon Substation - 9315

  Record Last Updated (dd/mm/yyyy): 16/07/2021 -> 30/03/2022
  Site Name: Sundon Substation - 49.9MW Battery Storage -> Sundon Substation
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 26/01/2022
49 MW - planning - eastern - Admiralty Road - Battery Energy Storage Facility - 9470

  County: Norfolk -> Norfolk
49 MW - planning - eastern - Model Farm - 7609

  Record Last Updated (dd/mm/yyyy): 13/09/2021 -> 24/02/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Address: Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech, Cambridgeshire -> Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech,
  County: Norfolk -> Cambridgeshire
  Planning Application Reference: 21/01715/FM -> 19/02003/F
  Planning Application Submitted: 31/08/2021 -> 20/11/2019
  Planning Permission Granted: -> 06/03/2020
250 MW - construction - eastern - Lapwing Fen 2 - Battery Storage Plant - 7614

  Record Last Updated (dd/mm/yyyy): 07/09/2020 -> 21/02/2022
  Address: Flower Farm, The Marsh, Walpole St. Andrew, Wisbech, Cambridgeshire -> Flower Farm, The Marsh, Walpole St. Andrew, Wisbech,
  County: Norfolk -> Cambridgeshire
49 MW - planning - north west - Middleton Clean Energy Plant - 7029

  Record Last Updated (dd/mm/yyyy): 04/06/2020 -> 01/02/2022
  CHP Enabled: -> No
  Address: Middleton Clean Energy Plant, Middleton Road, Heysham, Morecambe, Lancashire, LA3 2 -> Middleton Clean Energy Plant, Middleton Road, Heysham, Morecambe
49 MW - planning - yorkshire and humber - Land Adjacent to 4 Redcote Lane (Armley) - 7111

  Record Last Updated (dd/mm/yyyy): 12/08/2020 -> 19/01/2022
  CHP Enabled: -> No
  Address: Land Adjacent, 4 Redcote Lane, Armley, Leeds, West Yorkshire -> Land Adjacent, 4 Redcote Lane, Armley, Leeds,
  Under Construction: 01/06/2021 -> 01/02/2022
49 MW - planning - eastern - Rush Green Motors - Battery storage - 8987

  Record Last Updated (dd/mm/yyyy): 25/10/2021 -> 24/01/2022
45 MW - planning - scotland - Pleasance Road - 7217

  Record Last Updated (dd/mm/yyyy): 23/01/2020 -> 08/03/2022
40 MW - planning - south east - Tanners Lane - Battery Energy Storage Facility (Phase One) - 9708

  Record Last Updated (dd/mm/yyyy): 27/09/2021 -> 07/04/2022
40 MW - planning - yorkshire and humber - Rusholme Grange - 9121 Megapack

  Site Name: Rusholme Grange Resubmission -> Rusholme Grange
40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage - 9584

  Record Last Updated (dd/mm/yyyy): 13/09/2021 -> 24/02/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 10/02/2022
35 MW - cancelled - south west - Patch Elm Lane - Battery Storage - 10282

  Record Last Updated (dd/mm/yyyy): 20/12/2021 -> 30/03/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 18/03/2022
32 MW - planning - yorkshire and humber - Kirkhaw Lane Battery Storage - 8430

  Record Last Updated (dd/mm/yyyy): 11/05/2021 -> 24/02/2022
  Address: Kirkhaw Lane Knottingley West Yorkshire -> Kirkhaw Lane Knottingley
29 MW - planning - scotland - Fordtown Energy Storage - 7764

  Address: Fordtown, Kintore, Inverurie, Grampian -> Fordtown, Kintore, Inverurie
25 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage - 10222

  Record Last Updated (dd/mm/yyyy): 29/12/2021 -> 28/02/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 21/02/2022
25 MW - planning - north west - Middlewich Road - Solar Photovoltaics & Battery Storage - 9565

  Record Last Updated (dd/mm/yyyy): 09/09/2021 -> 17/03/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 11/03/2022
25 MW - planning - north west - Davies Road - Battery Storage - 9563

  Record Last Updated (dd/mm/yyyy): 09/09/2021 -> 18/03/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 17/03/2022
20 MW - operation - north west - Lascar Works - 7464

  Planning Application Reference: 62,215 -> 62215
20 MW - planning - south east - Basing Road - 7746

  Address: Land At, Basing Road, Old Basing, Basingstoke, Hampshire -> Land At, Basing Road, Old Basing, Basingstoke,
20 MW - planning - west midlands - Perseverance Road - 7061

  Record Last Updated (dd/mm/yyyy): 29/11/2021 -> 24/02/2022
20 MW - planning - scotland - Douglas West Wind Farm (extension) - 9957

  Operator (or Applicant): Greencoat UK Wind PLC -> ScottishPower Renewables (UK) Limited
  Address: Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark, Strathclyde -> Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark,
20 MW - construction - north west - Gipsy Lane - 7632

  Planning Authority: Rochdale Borough Council -> Rochdale Metropolitan Borough Council
20 MW - planning - london - Riverside Energy Park - 7036

  Record Last Updated (dd/mm/yyyy): 24/06/2020 -> 06/04/2022
20 MW - planning - yorkshire and humber - Kirkhaw Lane - 7149

  Record Last Updated (dd/mm/yyyy): 10/01/2022 -> 24/02/2022
  Operator (or Applicant): Volta Energy Storage -> Walker & Son (Hauliers) Limited
  Site Name: Kirkhaw Lane - Resubmission -> Kirkhaw Lane
  Storage Type: Co-located with fossil fuel plant -> Stand-alone Storage
  Planning Authority: Wakefield Council -> Wakefield Metropolitan District Council
20 MW - cancelled - south west - Tiddlywink Barn Battery Storage Power Plant - 9552

  Record Last Updated (dd/mm/yyyy): 08/09/2021 -> 21/02/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 14/01/2022
49 MW - planning - scotland - Fordtown Energy Storage - 10239

  Installed Capacity (MWelec): 49.90 -> 19.90
  mw: 49 -> 19
19 MW - planning - scotland - Jamesfield Organic Centre, Phase 2 - 7315

  Record Last Updated (dd/mm/yyyy): 29/04/2020 -> 26/01/2022
  Site Name: Jamesfield Organic Centre -> Jamesfield Organic Centre, Phase 2
  CHP Enabled: -> No
  Address: Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar, Fife -> Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar,
  Planning Permission Expired: 06/03/2022 -> 30/09/2022
18 MW - cancelled - south west - Churchtown Solar Farm Battery Storage - 7726

  Address: Churchtown Solar Farm, Nanterrow Lane, Connor Downs, Hayle, Cornwall -> Churchtown Solar Farm, Nanterrow Lane, Connor Downs, Hayle,
10 MW - construction - south east - Land Adj Harmer Warren Quarry - 7143

  Record Last Updated (dd/mm/yyyy): 29/04/2020 -> 21/02/2022
  Address: Land Adj Harmer Warren Quarry, Plumley, Harbridge Drove, Ellingham, Ringwood, Hampshire -> Land Adj Harmer Warren Quarry, Plumley, Harbridge Drove, Ellingham, Ringwood
10 MW - cancelled - scotland - Lethen Wind Farm Wind Turbines and Energy Storage - 10237

  Record Last Updated (dd/mm/yyyy): 10/01/2022 -> 24/01/2022
  Planning Authority: Highland Council -> Scottish Government (S36)
  Planning Application Reference: 21/05946/S36 -> ECU00002216
  Planning Application Submitted: 20/12/2021 -> 21/01/2022

2021-12

New projects (39):
550 MW - planning - east midlands - Spalding Energy Park - Battery Storage - 10173
450 MW - planning - eastern - Gateway Energy Centre - Battery Energy Storage - 10309
60 MW - planning - north east - Greystones Road, Grangetown - Battery Energy Storage System - 10081
349 MW - planning - west midlands - Cellarhead - Battery Site - 10013
150 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy - 10022
130 MW - planning - eastern - Stoke Lane - Battery Energy Storage - 10390
100 MW - planning - south west - St Dennis - Battery Energy Storage - 10058
100 MW - planning - south east - Penn Croft Farm, Crondall - Battery Energy Storage Facility - 10163
99 MW - planning - yorkshire and humber - Scawby Brook, Brigg - Battery Storage - 9848
50 MW - planning - scotland - Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage - 8342
50 MW - cancelled - scotland - Braidfield Road, Hardgate - Battery Storage Facility - 9869
50 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage - 9910
50 MW - planning - yorkshire and humber - Barlow Road, Barlow - Battery Storage - 9970
50 MW - planning - eastern - Sundon Sub Station Battery Storage Facility - 9998
50 MW - planning - scotland - Electricity Sub Station, Strichen - Battery Storage Facility - 10039
50 MW - planning - eastern - Ardleigh Road, Little Bromley - Battery Energy Storage - 10302
49 MW - planning - eastern - Rush Green Motors - Battery storage - 8987
49 MW - planning - scotland - Stainland Energy Storage Project - 10225
49 MW - planning - yorkshire and humber - Elland Storage Project - 10236
49 MW - planning - scotland - Fordtown Energy Storage - 10239
49 MW - planning - west midlands - Doverdale - Solar Farm & Battery Storage - 10273
45 MW - planning - north west - Cheshire Power Station - Battery Storage Facility - 10295
35 MW - planning - south west - Northington Lane - Battery Storage Facility - 9992
35 MW - cancelled - south west - Patch Elm Lane - Battery Storage - 10282
30 MW - planning - south west - North Tawton Primary Substation - Battery Storage - 9275
30 MW - cancelled - wales - Pound Farm Lane - Battery Storage - 9969
25 MW - planning - north west - Caton Road, Lancaster - Battery Storage Facility - 10047
25 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage - 10222
20 MW - planning - scotland - Stranoch 2 - 7306
20 MW - planning - scotland - Douglas West Wind Farm (extension) - 9957
20 MW - planning - east midlands - Mount Road, Castle Gresley - Battery Storage Facility - 10012
20 MW - cancelled - south west - The Transmitting Station, Williton - Battery Storage - 10186
19 MW - planning - scotland - Hillcrest Cottage, Shebster - Battery Energy Storage System - 10226
19 MW - planning - scotland - Speyslaw Farm - Battery Storage - 10394
15 MW - planning - scotland - Hollandmey Renewable Energy Development - 10246
13 MW - operation - south east - Bumpers Lane Solar Farm - 6913
13 MW - cancelled - north east - Newcastle International Airport Phase 2 - Battery Storage - 9756
10 MW - planning - north west - Park Road Battery Storage - 10076
10 MW - cancelled - scotland - Lethen Wind Farm Wind Turbines and Energy Storage - 10237

Disappeared projects (7):
100 MW - cancelled - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy - 9475
62 MW - planning - wales - Wentlooge Renewable Energy Hub - 7192
50 MW - cancelled - south west - Melksham Substation West Storage - 6955
50 MW - cancelled - south east - Upton Lane, Nursling - Battery Storage Facility - 9760
49 MW - cancelled - west midlands - Doverdale - Solar Farm & Battery Storage - 8529
49 MW - planning - east midlands - Grendon Lakes - Battery Storage - 9341
19 MW - cancelled - scotland - Roaring Hill Energy Storage Facility - 7002

Updated projects (29):

80 MW - construction - yorkshire and humber - Trondheim Way Battery energy storage - 8455

  Record Last Updated (dd/mm/yyyy): 24/05/2021 -> 12/01/2022
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Address: Land At Trondheim Way Stallingborough North East Lincolnshire -> Land At Trondheim Way Stallingborough
  Under Construction: -> 01/09/2021
  status: planning -> construction πŸ—οΈ
50 MW - operation - south west - Stonehill Energy Storage - 7773

  Record Last Updated (dd/mm/yyyy): 29/06/2020 -> 01/11/2021
  CHP Enabled: -> No
  Development Status: Under Construction -> Operational
  Development Status (short): Under Construction -> Operational
  Operational: -> 09/10/2021
  status: construction -> operation 🍾 πŸŽ‰ 🍸
40 MW - planning - south east - Loudwater Battery Storage Site - 8142

  Record Last Updated (dd/mm/yyyy): 30/09/2020 -> 30/06/2021
  CHP Enabled: -> No
  Development Status: Under Construction -> Planning Permission Granted
  Development Status (short): Under Construction -> Awaiting Construction
  Under Construction: 10/06/2021 ->
  status: construction -> planning
32 MW - operation - south west - Severn Road - 7085

  Record Last Updated (dd/mm/yyyy): 30/07/2020 -> 10/01/2022
  Installed Capacity (MWelec): 18.00 -> 32.00
  CHP Enabled: -> No
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Address: Land At, Severn Road, Hallen, Bristol, Avon -> Land At, Severn Road, Hallen, Bristol
  Under Construction: -> 01/08/2021
  status: planning -> construction πŸ—οΈ
  mw: 18 -> 32
20 MW - construction - south east - Plot 2B EurolinkV - 7383

  Record Last Updated (dd/mm/yyyy): 31/01/2020 -> 13/12/2021
  CHP Enabled: -> No
  Development Status: Planning Permission Granted -> Under Construction
  Development Status (short): Awaiting Construction -> Under Construction
  Address: Plot 2B Eurolink V, Sittingbourne, Land orth of Swale Way, Sittingbourne, Kent -> Plot 2B Eurolink V, Sittingbourne, Land orth of Swale Way, Sittingbourne
  Under Construction: -> 01/10/2021
  status: planning -> construction πŸ—οΈ

100 MW - planning - scotland - Daer Wind Farm - 9127

  Planning Application Reference: P/21/1014 -> ECU00000740
100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage - 9691

  Record Last Updated (dd/mm/yyyy): 23/09/2021 -> 25/10/2021
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 14/10/2021
99 MW - operation - eastern - Dollymans Storage - 7088

  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 05/11/2021
50 MW - planning - scotland - Dersalloch Battery Storage Facility - 8927

  Record Last Updated (dd/mm/yyyy): 28/04/2021 -> 22/12/2021
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 29/11/2021
49 MW - construction - eastern - Tollgate Farm Battery Storage - 7335

  Record Last Updated (dd/mm/yyyy): 27/01/2020 -> 23/12/2021
  Operator (or Applicant): RNA Energy -> RNA Energy / Harmony Energy Storage/ Tag Energy UK
  CHP Enabled: -> No
49 MW - operation - south east - Richborough Energy Park - 8195

  Record Last Updated (dd/mm/yyyy): 24/02/2021 -> 07/12/2021
49 MW - planning - south west - Minety South 2 - Battery Storage Facility - 9063

  Record Last Updated (dd/mm/yyyy): 25/05/2021 -> 08/12/2021
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 08/11/2021
40 MW - planning - eastern - Maldon Hall - 7095

  Record Last Updated (dd/mm/yyyy): 24/07/2020 -> 23/12/2021
  Operator (or Applicant): Capbal -> Green Investment Group
  CHP Enabled: -> No
  Address: Land North West Of Maldon Hall, Spital Road, Maldon, Essex -> Land North West Of Maldon Hall, Spital Road, Maldon
40 MW - operation - south east - Newlands Farm Battery Storage Facility Phase 2 - 8264

  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 26/01/2021
40 MW - planning - yorkshire and humber - Rusholme Grange - 9121 Megapack

  Record Last Updated (dd/mm/yyyy): 07/06/2021 -> 13/12/2021
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Address: Rusholme Grange, Rusholme Lane, Drax, Selby, North Yorkshire -> Rusholme Grange, Rusholme Lane, Drax, Selby
  Planning Permission Granted: 19/12/2017 -> 03/09/2021
40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage - 9584

  Planning Authority: Rochdale borough Council -> Rochdale Borough Council
38 MW - planning - north east - Maiden, Annfield Plain - Energy Storage - 9036

  Record Last Updated (dd/mm/yyyy): 18/05/2021 -> 13/12/2021
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 18/08/2021
25 MW - planning - north west - Bristol Avenue - Battery Energy Storage Facility - 8809

  Address: 281 BRISTOL AVENUE, BLACKPOOL, FY2 0JF -> 281 BRISTOL AVENUE, BLACKPOOL,
25 MW - planning - yorkshire and humber - Stainland Road, Salterhebble - Battery Storage Facility - 9397

  Record Last Updated (dd/mm/yyyy): 06/08/2021 -> 13/12/2021
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 28/09/2021
20 MW - planning - west midlands - Perseverance Road - 7061

  Record Last Updated (dd/mm/yyyy): 31/01/2020 -> 29/11/2021
  CHP Enabled: -> No
20 MW - planning - yorkshire and humber - Kirkhaw Lane - 7149

  Record Last Updated (dd/mm/yyyy): 20/04/2020 -> 10/01/2022
  CHP Enabled: -> No
  Address: Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley, West Yorkshire -> Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley
20 MW - operation - north west - Lascar Works - 7464

  Planning Application Reference: 62215 -> 62,215
20 MW - cancelled - south east - Brook Farm - 7498

  Record Last Updated (dd/mm/yyyy): 30/06/2020 -> 05/01/2022
  CHP Enabled: -> No
  Address: Os Parcel 6086 Adjacent, Ploughley Road, Railway Line, Arncott, Bicester, Oxfordshire -> Os Parcel 6086 Adjacent, Ploughley Road, Railway Line, Arncott, Bicester
20 MW - construction - north west - Gipsy Lane - 7632

  Record Last Updated (dd/mm/yyyy): 05/08/2021 -> 12/01/2022
  Address: Land Rear Of The Royal Toby Ho, Manchester Road, Rochdale, -> Land Rear Of The Royal Toby Ho, Manchester Road, Rochdale
20 MW - planning - scotland - Arecleoch Wind Farm (extension) - 7882

  Record Last Updated (dd/mm/yyyy): 25/06/2020 -> 18/11/2021
  CHP Enabled: -> No
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 16/11/2021
20 MW - planning - eastern - South Fambridge Hall - Solar farm & Battery storage - 9274

  Record Last Updated (dd/mm/yyyy): 05/07/2021 -> 22/12/2021
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 15/12/2021
20 MW - planning - eastern - The Brickmakers Arms Battery - 9668

  Record Last Updated (dd/mm/yyyy): 21/09/2021 -> 05/01/2022
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 22/12/2021
19 MW - construction - scotland - Balsillie Avenue - Roaring Hill Energy Storage Facility - 9224

  Record Last Updated (dd/mm/yyyy): 25/06/2021 -> 18/11/2021
  Operator (or Applicant): RES Limited -> Tag Energy UK
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 03/09/2021
15 MW - planning - eastern - Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage - 9346

  Record Last Updated (dd/mm/yyyy): 22/07/2021 -> 15/12/2021
  Development Status: Planning Application Submitted -> Planning Permission Granted
  Development Status (short): Application Submitted -> Awaiting Construction
  Planning Permission Granted: -> 08/12/2021

2021-09

New projects (265):
150 MW - construction - south east - Cleve Hill Solar Project - 7856
349 MW - planning - west midlands - Dunton Hall - Battery Energy Storage System - 9427
200 MW - planning - yorkshire and humber - Drax Re-Power - 7017
200 MW - cancelled - south east - Bolney Substation - Battery Storage - 8986
200 MW - planning - north west - Heysham Energy Storage Project - 9545
150 MW - planning - eastern - Thurrock Flexible Generation Plant - 7696
100 MW - cancelled - eastern - Tilbury Energy Centre - 7048
100 MW - planning - scotland - Harestanes Windfarm - 7395
99 MW - planning - yorkshire and humber - Lakeside Energy Storage Facility - 8268
100 MW - planning - south east - Minchens Lane Battery Storage Facility - 8434
100 MW - planning - scotland - Kilgallioch - Battery energy storage - 9007
100 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy - 9115
100 MW - planning - scotland - Daer Wind Farm - 9127
100 MW - cancelled - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy - 9475
100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage - 9691
100 MW - planning - north west - Cholmondeley Road - Battery Storage - 9763
99 MW - operation - eastern - Dollymans Storage - 7088
99 MW - planning - yorkshire and humber - Skelton Grange Battery Storage Facility - 8914
99 MW - planning - north west - Bay Gateway - Battery Storage Facility - 9199
95 MW - planning - yorkshire and humber - Winterton Road - Battery Energy Storage - 9608
90 MW - planning - east midlands - Caldwell Road - Battery Storage - 9507
80 MW - operation - scotland - Aikengall II Community Wind Farm Battery - 7015
80 MW - construction - yorkshire and humber - Trondheim Way Battery energy storage - 8455
50 MW - operation - south east - Richborough Energy Park - Phase 2 - 9626
70 MW - planning - north west - Widow Hill, Balderstone Lane - Battery Energy Storage System - 9340
62 MW - planning - wales - Wentlooge Renewable Energy Hub - 7192
57 MW - planning - north west - Capenhurst Lane - 8283
57 MW - planning - north west - National Grids Rainhill Substation Battery storage facility - 8439
57 MW - construction - north west - Capenhurst Lane, Capenhurst - Battery storage - 9377
57 MW - cancelled - south east - Slough Road - Battery Storage - 9774
50 MW - cancelled - south west - Minety North - 6952
50 MW - operation - south west - Melksham Substation East Storage - 6953
50 MW - cancelled - south west - Melksham Substation West Storage - 6955
50 MW - cancelled - west midlands - Wolverhampton West Sub Station - 6977
50 MW - construction - northern ireland - Portadown Road - 7047
50 MW - construction - northern ireland - Dungannon Energy Storage System - 7050
50 MW - cancelled - north west - Penwortham Sub Station - 7119
50 MW - operation - scotland - Whitelee Wind Farm Battery Storage Extension - 7174
49 MW - operation - south west - Minety South - Battery Storage - 7184
49 MW - operation - north west - West Didsbury Battery Storage - 7185
50 MW - operation - south west - Stonehill Energy Storage - 7773
50 MW - planning - east midlands - Cottom Power Station - 8278
50 MW - planning - scotland - Dersalloch Battery Storage Facility - 8927
50 MW - cancelled - south east - Upton Lane, Nursling - Battery Storage Facility - 9760
49 MW - operation - eastern - Pelham - 6898
49 MW - operation - north west - Roosecote - 6912
49 MW - operation - east midlands - West Burton - 6920
49 MW - cancelled - north east - Norton - 6923
49 MW - cancelled - west midlands - Former Rugeley Power Station - 6981
79 MW - construction - south east - Stony Energy Storage Facility - 7001
49 MW - operation - yorkshire and humber - Pillswood Phase 1 - 7005 Megapack
49 MW - cancelled - south west - Ravensroost Farm, Minety - Battery Energy Storage - 7014
49 MW - operation - yorkshire and humber - Nether Moor Field - 7019
49 MW - planning - eastern - Norwich Substation Storage Facility - 7021
49 MW - operation - south west - Mannington Battery Storage Plant - 7024
49 MW - cancelled - north west - Charleywood Road, Knowsley Industrial Park - 7026
49 MW - construction - east midlands - Enderby Storage, Redcomb Farm - 7044
49 MW - planning - north west - Middleton Clean Energy Plant - 7029
49 MW - cancelled - yorkshire and humber - Salt End Lane - 7039
49 MW - planning - south west - Ellbridge Lane - 7051
49 MW - planning - yorkshire and humber - Elland Storage Project - 7053
49 MW - planning - eastern - Chapel Farm - 7058 Megapack
49 MW - planning - east midlands - Cottam Power Station - 7066
49 MW - cancelled - south west - Riverford Farm - 7078
49 MW - construction - south east - Sundridge Hill - 7081
49 MW - planning - yorkshire and humber - Land Adjacent to 4 Redcote Lane (Armley) - 7111
49 MW - cancelled - east midlands - Grendon Storage - 7089
49 MW - operation - yorkshire and humber - Creyke Beck - 7122
49 MW - cancelled - south west - Taunton Substation - 7153
49 MW - planning - eastern - Braintree Road Substation - 7161
49 MW - construction - yorkshire and humber - Osbaldwick Substation - 7172
49 MW - cancelled - south west - Land North of Actrees Solar Farm - 7230
49 MW - planning - eastern - Burwell Main Sub-Station - 7272
49 MW - planning - eastern - Sundon Substation - 7283
49 MW - construction - south east - Kemsley Substation - 7368
49 MW - construction - eastern - Tollgate Farm Battery Storage - 7335
49 MW - operation - yorkshire and humber - Pillswood Phase 2 - 7360 Megapack
49 MW - cancelled - south west - Snarlton Farm - 7380
49 MW - planning - north west - Harker Grid Sub Station - 7462
57 MW - construction - eastern - Bramford Substation - 7479
49 MW - construction - south west - Salisbury Substation - 7510
49 MW - cancelled - north east - Lackenby - 7518
49 MW - construction - south east - Cowley electricity sub-station - 7571
49 MW - construction - yorkshire and humber - Bradford West Substation (Harrop Edge Farm) - 7577
49 MW - operation - scotland - Dunsinane Industrial Estate - 7591
49 MW - planning - eastern - Lapwing Fen II, Crown Farm - 7606
49 MW - planning - eastern - Model Farm - 7609
250 MW - construction - eastern - Lapwing Fen 2 - Battery Storage Plant - 7614
49 MW - operation - north west - Lister Drive - 7740
49 MW - planning - south east - Rye Common - 7737 Megapack
49 MW - operation - north west - Liverpool Energy Management Facility - 7772
49 MW - planning - east midlands - Newton Wood Farm - 7780
49 MW - construction - south east - Titchfield Lane - 7828
49 MW - construction - west midlands - Coventry National Grid Substation - 7885
49 MW - operation - scotland - Dundee Technology Park - 7946
49 MW - planning - eastern - Reach Road - 7906
49 MW - operation - west midlands - Bustleholme Substation - 7907
10 MW - planning - south west - Minety Substation - 7942
49 MW - construction - north west - Unit 5 XL Business Park - 7985
49 MW - planning - london - Mill Hill National Grid Substation - 8009
49 MW - planning - south west - National Grid Minety Substation - 8021
49 MW - planning - northern ireland - Colinglen Road Battery - 8033
49 MW - planning - south west - National Grid Axminster Substation - 8036
49 MW - construction - east midlands - National Grid Enderby Substation - 8037
49 MW - planning - north west - Welkin Mill - 8055
49 MW - planning - scotland - Torrdhuin, Auchteraw Battery Storage Facility - 8096
30 MW - planning - scotland - Drumcross Battery Storage - 8155
49 MW - operation - south east - Richborough Energy Park - 8195
49 MW - planning - scotland - Platchaig House, Kilmorack - Battery Storage Facility - 8248
49 MW - planning - eastern - Brentwood nergy Storage System - 8249
49 MW - planning - eastern - Crouch Solar Farm - 8358
49 MW - planning - scotland - Old Gallows Road - Battery storage - 8368
49 MW - cancelled - west midlands - Doverdale - Solar Farm & Battery Storage - 8529
49 MW - planning - north west - Howick Hall Farm - Battery Storage Facility - 8829
49 MW - construction - south west - Mannington Battery Energy Storage System - 8833
49 MW - planning - scotland - Bolfornought Farm Battery Storage Facility - 8912
49 MW - construction - scotland - Whitehills Energy Storage Facility - 8916
49 MW - planning - eastern - Greens Farm - Battery energy storage - 9012
49 MW - planning - wales - Bronwylfa Road, Talwrn - Battery Storage Facility - 9052
49 MW - planning - south west - Minety South 2 - Battery Storage Facility - 9063
49 MW - planning - eastern - Sundon Substation - 9315
49 MW - planning - east midlands - Grendon Lakes - Battery Storage - 9341
49 MW - planning - eastern - Admiralty Road - Battery Energy Storage Facility - 9470
49 MW - operation - scotland - Wishaw Battery Storage Facility - 9522
49 MW - construction - north west - Bredbury Substation - Battery Storage Facility - 9653
48 MW - planning - northern ireland - Classic Marble Showers Site - 7208
45 MW - planning - scotland - Pleasance Road - 7217
41 MW - operation - west midlands - Bloxwich Battery - 8160
40 MW - planning - east midlands - Breach Farm - Energy Barn - 6914
40 MW - cancelled - yorkshire and humber - Tofts Lane - 6942
40 MW - planning - eastern - Norwich Road Industrial Estate - 6958
40 MW - construction - south east - Land off Queenborough Road - 7003
40 MW - construction - scotland - Bilbo Solar Farm Energy Storage - 7020
40 MW - planning - eastern - Maldon Hall - 7095
40 MW - planning - west midlands - Rubber and Allied Products - 7096
40 MW - operation - south east - Huggin's Hall - 7129
40 MW - cancelled - north west - Carnegie Road (Phase 2) - 7403
21 MW - operation - eastern - Clayhill Farm - Battery Energy Storage - 7570
20 MW - construction - north west - Hawthorne Road - 7800
40 MW - planning - west midlands - Whitehouse Farm Energy Barn - 7987
40 MW - planning - south east - Loudwater Battery Storage Site - 8142
40 MW - operation - south east - Newlands Farm Battery Storage Facility Phase 2 - 8264
40 MW - planning - yorkshire and humber - Rusholme Grange - 9121 Megapack
40 MW - planning - south west - Forest Gate - Solar Farm & Battery Storage - 9230
40 MW - planning - south west - Leigh Delamere - Solar farm & Battery storage - 9238
40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage - 9584
40 MW - planning - south east - Tanners Lane - Battery Energy Storage Facility (Phase One) - 9708
38 MW - planning - north east - Maiden, Annfield Plain - Energy Storage - 9036
37 MW - planning - scotland - STOR Field 9 - 7018
36 MW - planning - northern ireland - Lisnabreeny Road - 7556
35 MW - operation - north east - Port of Tyne - 6976
32 MW - planning - yorkshire and humber - Kirkhaw Lane Battery Storage - 8430
30 MW - planning - south west - Gloucestershire Science and Technology Park - 7067
30 MW - operation - south west - Fideoak Mills - 7152
30 MW - planning - south west - Catsbrain Farm - 7988
30 MW - planning - scotland - Roaring Hill (Resubmission) - 7989
30 MW - planning - scotland - Blackpark Energy Storage - 8105
30 MW - planning - scotland - Farburn Place - Energy Storage Facility - 8385
30 MW - planning - eastern - Weirs Drove, Burwell - Battery Storage Facility - 9292
29 MW - cancelled - north east - Land at Derwenthaugh Eco Park - 7054
29 MW - cancelled - scotland - Land SW of Shilton Cottage - 7134
29 MW - cancelled - scotland - Drumfad Wood - 7165
29 MW - planning - scotland - Fordtown Energy Storage - 7764
29 MW - planning - scotland - Learielaw Farm - 7970
28 MW - construction - eastern - Lower Dunton Road Battery Storage Facility - 8213
27 MW - operation - yorkshire and humber - Boscar Grange Farm - 7332
26 MW - cancelled - east midlands - Manor Farm - 7820
25 MW - operation - north east - Tynemouth Energy Storage System (TESS) - 6925
25 MW - cancelled - scotland - Fraserburgh Development - 7041
25 MW - cancelled - scotland - Clauchrie Windfarm Battery - 7804
25 MW - planning - north west - Bristol Avenue - Battery Energy Storage Facility - 8809
25 MW - planning - yorkshire and humber - Stainland Road, Salterhebble - Battery Storage Facility - 9397
25 MW - planning - north west - Davies Road - Battery Storage - 9563
25 MW - planning - north west - Middlewich Road - Solar Photovoltaics & Battery Storage - 9565
24 MW - cancelled - east midlands - The Hollies - 6946
24 MW - cancelled - yorkshire and humber - Mauxhall Farm - 7827
23 MW - operation - east midlands - Asfordby Business Park (1) - 6932
22 MW - operation - wales - Pen y Cymoedd Energy Storage - 6927
22 MW - planning - south west - Barton Hill Industrial Park - Battery Energy Storage Facility - 9046
20 MW - operation - scotland - Broxburn - 6910
20 MW - operation - west midlands - Land to the west of Clay Hill Pit / Larport Farm - 6911
20 MW - operation - west midlands - Noriker Power Staunch - 6918
20 MW - construction - east midlands - Chelveston Renewable Energy Park - 6941
20 MW - operation - eastern - Claredown Farm - 6945
20 MW - planning - wales - Traston Road - 6929
20 MW - cancelled - south west - Bristol Road - 6930
20 MW - operation - north east - Ray Battery Storage Facility - 6943
20 MW - cancelled - yorkshire and humber - Aven Industrial Estate - 7007
20 MW - cancelled - north west - Leighton Hall Farm - 7032
20 MW - planning - london - Riverside Energy Park - 7036
20 MW - cancelled - scotland - Land To The East Of Wholeflats Road (Grangemouth) - 7043
20 MW - planning - west midlands - Perseverance Road - 7061
20 MW - cancelled - north west - Kilshaw Street - 7072
20 MW - operation - north west - Land at Carnegie Road - 7155
20 MW - cancelled - north west - Beaufort Road - 7128
20 MW - operation - east midlands - Calow Green Farm - 7140
20 MW - planning - yorkshire and humber - Kirkhaw Lane - 7149
20 MW - planning - scotland - Blackpark Farm - 7226
20 MW - planning - scotland - Troston Loch Wind Farm - 7333
20 MW - construction - south east - Plot 2B EurolinkV - 7383
20 MW - operation - north west - Lascar Works - 7464
20 MW - planning - scotland - Douglas West Wind Farm (extension) - 7460
20 MW - cancelled - south east - Brook Farm - 7498
20 MW - planning - scotland - Hagshaw Hill - 7572
20 MW - cancelled - scotland - Ardoch Farm - 7575
20 MW - construction - north west - Gipsy Lane - 7632
20 MW - operation - wales - Energy Centre Royal Mint - 7684
20 MW - operation - south west - Feeder Road - 7663
20 MW - planning - south east - Basing Road - 7746
20 MW - planning - scotland - Arecleoch Wind Farm (extension) - 7882
20 MW - planning - west midlands - Perserverance Road - 7966
20 MW - construction - south east - Mill Lane, Nursling - Battery Storage Facility - 8099
20 MW - planning - south east - Gerrards Cross Sewage Treatment Works - 8271
20 MW - planning - yorkshire and humber - Hull East Stor Generation Compound - Battery energy storage - 9006
20 MW - construction - north east - Standby Embedded Stor Power Plant - Battery storage - 9010
20 MW - planning - eastern - South Fambridge Hall - Solar farm & Battery storage - 9274
20 MW - cancelled - south west - Tiddlywink Barn Battery Storage Power Plant - 9552
20 MW - planning - eastern - The Brickmakers Arms Battery - 9668
19 MW - cancelled - scotland - Roaring Hill Energy Storage Facility - 7002
19 MW - planning - scotland - Land North of Thornton Road - 7131
19 MW - planning - scotland - North West Of Jameston Farm - 7133
19 MW - planning - scotland - Jamesfield Organic Centre, Phase 2 - 7315
19 MW - construction - scotland - Balsillie Avenue - Roaring Hill Energy Storage Facility - 9224
32 MW - operation - south west - Severn Road - 7085
18 MW - cancelled - east midlands - Callywhite Lane Commercial Estate - 7087
18 MW - construction - south east - Aurora Solar Farm - 7385
18 MW - cancelled - south west - Churchtown Solar Farm Battery Storage - 7726
18 MW - planning - south west - Whaddon Lane, Hilperton - 9057
16 MW - cancelled - wales - Maelor Gasworks - Solar Farm & Battery Storage - 9343
15 MW - operation - south west - Lockleaze Energy Storage - 6961
15 MW - construction - south west - Holes Bay - 7688 Megapack
15 MW - planning - eastern - Three Bridges Solar Farm - 8220
15 MW - planning - eastern - Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage - 9346
14 MW - planning - south east - Guildford Road Battery Storage Facility - 8269
13 MW - cancelled - south west - Leechpool Farm, Norrington Battery Storage - 7183
12 MW - cancelled - west midlands - Mucklow Hill - 7984
12 MW - planning - yorkshire and humber - Stor Generation Plant - Battery Storage - 8998
10 MW - operation - northern ireland - AES Kilroot Station Battery Storage Array - 6845
10 MW - operation - yorkshire and humber - Blackburn Meadows - 6906
10 MW - operation - east midlands - Hill Farm - Energy Barn - 6915
10 MW - operation - south east - Kings Barn Farm - Energy Barn - 6916
10 MW - operation - east midlands - Leverton Farm - Energy Barn - 6917
10 MW - operation - eastern - Nevendon - 6926
10 MW - cancelled - north west - Pikelaw Place - 6944
10 MW - construction - eastern - Slamseys Energy Storage - 7000
10 MW - cancelled - eastern - Rayleigh Transforming Station - 6984
10 MW - cancelled - south east - Litchlake Farm - 7011
10 MW - cancelled - east midlands - Manton Wood - 7035
10 MW - cancelled - scotland - Strichen South - 7056
10 MW - cancelled - eastern - Hadham Road - 7068
10 MW - planning - south east - Stockbridge Road - 7097
10 MW - cancelled - yorkshire and humber - South Kirkby Business Park - 7109
10 MW - construction - south east - Land Adj Harmer Warren Quarry - 7143
10 MW - operation - north west - Cleator - 7177
10 MW - planning - scotland - Greenburn Wind Park - 7159
10 MW - planning - south west - Old Green Farm, Alveston Battery Storage - 7182
10 MW - planning - south west - Trevol Business Park - 7404
10 MW - cancelled - scotland - Shindour Feddal Hill Wood Braco - 7573
10 MW - cancelled - scotland - Orchardbank Industrial Estate - 7574
10 MW - planning - scotland - East Ballochy - 7675
10 MW - cancelled - south west - Park Farm - 7983
10 MW - cancelled - north west - Britannia House - 7986
10 MW - construction - north west - Moston Vale - 8085
10 MW - construction - scotland - Dragonhall Farm, Padanaram - Battery Storage - 9066
10 MW - operation - south west - South Farm Solar Park - 9361

Updated projects (0):