๐ฌ๐ง UK REPD data (>10MW)
Latest UK REPD report from
2024-04
|
operation |
๐๏ธ |
๐ป |
| Projects count |
62 |
56 |
590 |
| Total ๐ battery power in GW |
2.2 |
3.4 |
53.5 |
๐๏ธ = construction; ๐ป = planning
Monthly big battery changes from UK REPD reports
- Comparing the reports to show the changes throughout the months.
- Projects are sorted by the max power output.
- All projects below are also listed on the All Big Batteries page
- Click on the reference number to get to the detail page of the project
2024-04
New projects (79):
1000 MW - planning - wales - Rover Way, Splott - Energy Park & Data Centre -
16190
650 MW - planning - scotland - Braxbess Battery Storage -
15169
560 MW - planning - scotland - Whitehall Battery Storage -
15797
400 MW - planning - scotland - Glenside Farm - Battery Storage -
14988
400 MW - planning - north west - Low Harker Farm, Low Harker - Battery Storage Facility -
15956
400 MW - planning - west midlands - Cellarhead Substation, Rownall Road - Battery Storage Facility -
16111
400 MW - planning - wales - Bronwylfa Road, Rhostyllen - Energy Storage System -
16114
300 MW - planning - scotland - Kintore Energy Storage Project -
10467
290 MW - planning - south west - Saundercroft Farm - Battery Energy Storage System -
13980
250 MW - planning - eastern - Toddington Services, Hipsey Spinney - Battery Storage -
15883
249 MW - planning - south east - Ridham Avenue, Swale Way - Kemsley Battery Energy Storage -
15779
200 MW - planning - eastern - Walsoken, Burrettgate Road - Battery Storage Facility -
15647
200 MW - planning - south east - Sunbury Battery Energy Storage System - Battery Energy Storage System -
15814
150 MW - planning - scotland - Neilston - Battery Storage -
14538
120 MW - planning - scotland - Glen Ullinish II - Wind Farm -
14534
100 MW - planning - scotland - Flemyland Battery Storage -
13770
100 MW - planning - yorkshire and humber - Moat Lane, Wickersley - Battery Storage Facility -
15746
100 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage -
16047
100 MW - planning - yorkshire and humber - Moat Lane, Wickersley - Battery Storage Facility -
16065
99 MW - planning - west midlands - Newfields Farm - Battery Energy Storage -
10233
99 MW - planning - south west - Landulph Substation, Landulph - Battery Storage -
13852
99 MW - planning - west midlands - Newfields Farm, Rownall Road - Battery Energy Storage -
14342
90 MW - planning - south west - Summerway Drove, East Bower - Battery Storage -
15716
85 MW - planning - east midlands - Old Wood Energy Park - Battery Energy Storage -
16013
80 MW - planning - yorkshire and humber - Midland Road - Battery Energy Storage -
15911
70 MW - planning - west midlands - Oaklands Farm, New Road - Battery Energy Storage -
15735
70 MW - planning - north west - Sandyforth Farm, Ashton Road - Battery Energy Storage -
15930
57 MW - planning - south east - Kent Street, Cowfold - Battery Energy Storage System -
14922
50 MW - planning - eastern - Nutsgrove Farm, Thorney - Battery Energy Storage -
9976
50 MW - planning - south west - Pinkworthy Farm, Pyworthy - Battery Storage -
13509
50 MW - planning - scotland - Coylton Substation, Coylton - Battery Energy Storage -
14170
50 MW - planning - south west - Wareham Road, Scouse Farm - Battery Storage -
15962
50 MW - operation - eastern - Burwell - Battery Storage -
15994
50 MW - planning - scotland - Aultmore Forest - Buckie - Windfarm -
15995
49 MW - planning - scotland - Lochluichart - Energy Storage Facility -
9220
49 MW - planning - scotland - Cornhills Farm, Muttonhole Road - Battery Storage -
11647
49 MW - planning - yorkshire and humber - Hewitts Avenue, New Waltham - Battery Storage -
11832
49 MW - planning - scotland - Balwyllo Farm, Dun - Energy Storage Facility -
13058
49 MW - planning - scotland - Templeton Farm, Templeton - Battery Storage -
13605
49 MW - planning - scotland - Existing Kaimes Substation, Old Burdiehouse Road - Battery Storage -
13809
49 MW - planning - scotland - Dunbar Grid Substation - Battery Storage -
13864
49 MW - planning - scotland - Ardencaple Farm - Battery Storage -
14381
49 MW - planning - scotland - Bankhead, Arbirlot - Battery Energy Storage -
14985
49 MW - planning - scotland - Glengolly Farmhouse- Battery Energy Storage -
15088
49 MW - planning - scotland - Dunmill, Substation Dun - 49.9MW Battery Energy Storage -
15233
49 MW - planning - scotland - Kintore Substation, Leylodge - Battery Energy Storage -
15627
49 MW - planning - west midlands - Hobble Lane, Great Wyrley - Battery Energy Storage -
15802
49 MW - planning - wales - The Greenlink Converter Station - Lambeeth Battery Energy Storage -
15803
49 MW - planning - scotland - New Craigie Retail Park - Battery Energy Storage -
16018
49 MW - planning - eastern - Rush Green Motors - Battery storage -
16045
49 MW - operation - scotland - Camilla Battery Storage -
16075
49 MW - planning - west midlands - Hinksford Substation, Hinksford Lane - Battery Energy Storage -
16101
49 MW - planning - scotland - Barnwell, Wright Street - Battery Energy Storage -
16107
49 MW - planning - scotland - Coupar Angus, Pleasance Road - Battery Energy Facility -
16137
45 MW - planning - north west - Huncoat Power Station - Battery Storage Facility -
13080
45 MW - planning - scotland - The Smithy - Battery Storage -
14676
45 MW - planning - north west - Huncoat Power Station - Battery Storage Facility -
15712
41 MW - planning - scotland - Ladyfield Renewable Energy Park -
15785
40 MW - planning - east midlands - Heanor Road - Battery Energy Storage System -
13472
40 MW - planning - west midlands - Draycott Cross Road - Battery Storage System -
14284
39 MW - planning - scotland - Locarno Works, Brown Street - Battery Storage -
14232
37 MW - planning - east midlands - Oaklands Solar Farm Project - Solar Farm & Battery Storage -
9547
30 MW - planning - scotland - Burnbank Street, Greenhill - Battery Storage Facility -
9368
30 MW - planning - yorkshire and humber - Immingham Solar Farm - Battery Storage Facility -
16092
30 MW - planning - scotland - Kellas Wind Farm -
16138
25 MW - planning - scotland - Bankhead Farm - Energy Storage System -
14450
25 MW - planning - scotland - Fernishaw Solar Farm & Battery Energy Storage Facility -
14541
25 MW - planning - east midlands - West Thorpe Church Farm, Willoughby On The Wolds - Battery Energy Storage -
15938
25 MW - planning - south west - Pinkworthy Farm, Pyworthy - Battery Storage -
16068
24 MW - planning - scotland - Parkhouse Road - Battery Energy Storage -
16086
22 MW - planning - scotland - Crutherland Farm, Crutherland Highway - Battery Energy Storage -
15523
20 MW - planning - scotland - Duddingston Solar Farm and Battery Storage -
11383
20 MW - planning - scotland - Craigshaw Drive - Battery Storage Facility & Electric Vehicle Charging Hub -
15435
16 MW - planning - south east - Allington Lane - Solar & Battery Farm -
14585
15 MW - planning - west midlands - Flashbrook Road, Knighton - Solar Farm -
16066
14 MW - planning - scotland - Luggies Knowe, Hill Of Gremista - Wind Turbines & Battery Storage -
15823
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility -
13480
10 MW - planning - south east - Wharf Road, Discovery Park - Battery Energy Storage -
15093
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility -
16074
Disappeared projects (10):
600 MW - cancelled - east midlands - West Leake Lane, Ratcliffe - Battery Storage -
12464
99 MW - cancelled - west midlands - Illeybrook Farm - Battery Energy Storage -
14064
60 MW - cancelled - south west - Coldharbour, Chickerell - Battery Storage Facility -
12967
50 MW - cancelled - scotland - Seath Road, Rutherglen - Battery Storage -
14378
50 MW - cancelled - scotland - Coylton๏ฟฝGreener๏ฟฝGrid๏ฟฝPark -
15312
49 MW - cancelled - south west - Ravensroost Farm, Minety - Battery Energy Storage -
7014
49 MW - cancelled - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility -
15230
49 MW - cancelled - south east - Burcot Solar Farm -
15444
30 MW - cancelled - west midlands - Tanners Lane - Battery Energy Storage System -
15128
10 MW - cancelled - scotland - Lethen Wind Farm Wind Turbines and Energy Storage -
10237
Updated projects (246):
300 MW - construction - scotland - Kilmarnock South Substation - Battery storage -
9696
Record Last Updated (dd/mm/yyyy): 27/09/2021
->
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 26/01/2024
status: planning
-> construction ๐๏ธ
230 MW - construction - wales - Uskmouth Power Station - Battery Storage -
10936
Record Last Updated (dd/mm/yyyy): 06/04/2022
->
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Planning Permission Refused:
-> 07/12/2022
Under Construction:
-> 01/11/2023
status: planning
-> construction ๐๏ธ
150 MW - construction - north west - Fiddlers Ferry Power Station - Battery storage -
9404
Record Last Updated (dd/mm/yyyy): 08/08/2022
-> 21/03/2024
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Planning Permission Expired: 20/06/2026
-> 46193
Under Construction:
-> 28/03/2024
status: planning
-> construction ๐๏ธ
49 MW - construction - south west - Larks Green Solar Farm -
8052
Record Last Updated (dd/mm/yyyy): 30/09/2020
-> 15/02/2024
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/01/2024
status: planning
-> construction ๐๏ธ
49 MW - construction - scotland - Whitehills Energy Storage Facility -
8916
Record Last Updated (dd/mm/yyyy): 17/10/2022
-> 08/03/2024
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/02/2024
status: planning
-> construction ๐๏ธ
49 MW - operation - scotland - Pleasance Road - Battery Energy Facility -
9997
Record Last Updated (dd/mm/yyyy): 12/07/2022
->
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
Planning Permission Refused:
-> 01/06/2022
Operational:
-> 01/01/2023
status: planning
-> operation ๐พ ๐ ๐ธ
49 MW - operation - scotland - Jamesfield Organic Centre - Battery Storage -
10863
Megapack
Record Last Updated (dd/mm/yyyy): 24/03/2022
->
Development Status: Under Construction
-> Operational
Development Status (short): Under Construction
-> Operational
Are they re-applying (Old REPD Ref) : 7315 & 10456
->
Planning Permission Refused:
-> 28/09/2022
Operational:
-> 01/02/2024
status: construction
-> operation ๐พ ๐ ๐ธ
40 MW - operation - south east - Newlands Farm Battery Storage Facility Phase 2 -
8264
Record Last Updated (dd/mm/yyyy): 18/03/2022
-> 15/02/2024
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
Planning Permission Expired: 26/01/2024
-> 45317
Under Construction:
-> 27/02/2022
Operational:
-> 01/09/2022
status: planning
-> operation ๐พ ๐ ๐ธ
40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage -
9584
Record Last Updated (dd/mm/yyyy): 05/07/2023
->
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 27/02/2024
status: planning
-> construction ๐๏ธ
40 MW - construction - south east - Derehams Farm, Derehams Lane - Battery Storage -
12803
Record Last Updated (dd/mm/yyyy): 12/07/2023
-> 22/02/2024
Operator (or Applicant): Capbal Limited
-> Eku Energy
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Planning Permission Refused:
-> 29/06/2023
Under Construction:
-> 19/02/2024
status: planning
-> construction ๐๏ธ
40 MW - construction - scotland - Cumberhead West Wind Farm -
15343
Operator (or Applicant): Unknown
-> 3R Energy Solutions Limited
Site Name: Midland Road - Battery Energy Storage
-> Cumberhead West Wind Farm
Storage Type: Stand-alone Storage
-> Co-located with RE
Storage Co-location REPD Ref ID:
-> 3328
Installed Capacity (MWelec): 80
-> 40
Development Status: Planning Application Submitted
-> Under Construction
Development Status (short): Application Submitted
-> Under Construction
Address: Midland Road, Bradford
-> Cumberhead Forest
County: West Yorkshire
-> Strathclyde
Region: Yorkshire and Humber
-> Scotland
Country: England
-> Scotland
Post Code: BD8 7DY
-> ML11 9AX
X-coordinate: 416090
-> 281169
Y-coordinate: 434143
-> 635550
Planning Authority: Bradford Metropolitan District Council
-> Scottish Government (S36)
Planning Application Submitted: 23/10/2023
-> 02/12/2020
Planning Permission Expired:
-> 18/11/2027
Under Construction:
-> 01/10/2023
lat: 53.80334
-> 55.599018
long: -1.757175
-> -3.887474
status: planning
-> construction ๐๏ธ
mw: 80
-> 40
28 MW - construction - eastern - Lower Dunton Road Battery Storage Facility -
8213
Record Last Updated (dd/mm/yyyy): 11/01/2022
-> 22/02/2024
Operator (or Applicant): Cedar Tech Developments Limited
-> Eku Energy
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 19/02/2024
status: planning
-> construction ๐๏ธ
20 MW - construction - north west - Welkin Road, Bredbury - Battery Storage System -
13740
Record Last Updated (dd/mm/yyyy): 25/04/2023
-> 29/02/2024
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Are they re-applying (Old REPD Ref) : 8275
->
Under Construction:
-> 27/02/2024
status: planning
-> construction ๐๏ธ
10 MW - planning - scotland - Binn Eco Park - Battery -
9098
Record Last Updated (dd/mm/yyyy): 27/10/2023
-> 23/02/2024
Development Status: Under Construction
-> Planning Permission Granted
Development Status (short): Under Construction
-> Awaiting Construction
Under Construction: 01/09/2023
->
status: construction
-> planning
1450 MW - planning - yorkshire and humber - Thorpe Marsh Power Station - Battery Energy Storage -
12453
Are they re-applying (Old REPD Ref) :
-> 8470
1040 MW - planning - north west - Carrington Power Station, Manchester Road - Battery Storage -
13362
Planning Permission Expired: NA
->
1000 MW - planning - scotland - Coalburn II Energy Storage Facility - Battery Storage Facility -
12206
Record Last Updated (dd/mm/yyyy): 12/01/2023
-> 08/02/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 24/01/2027
550 MW - planning - east midlands - Spalding Energy Park - Battery Storage -
10173
Record Last Updated (dd/mm/yyyy): 28/12/2021
->
500 MW - planning - scotland - Coalburn Energy - Battery Storage -
11034
Record Last Updated (dd/mm/yyyy): 20/04/2022
->
Site Name: Coalburn II Energy - Battery Storage
-> Coalburn Energy - Battery Storage
500 MW - planning - east midlands - Normanton Energy Reserve - Battery Storage -
11988
Record Last Updated (dd/mm/yyyy): 18/01/2023
-> 23/01/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 16/01/2027
450 MW - planning - eastern - Gateway Energy Centre - Battery Energy Storage -
10309
Record Last Updated (dd/mm/yyyy): 17/12/2021
->
400 MW - planning - scotland - Hunterston Grid Services Complex - Energy Storage Facility -
10535
Record Last Updated (dd/mm/yyyy): 03/02/2022
->
400 MW - planning - scotland - Kincardine Grid Services Complex - Energy Storage Facility -
10536
Record Last Updated (dd/mm/yyyy): 08/06/2022
->
350 MW - planning - scotland - Camsiscan Farm, Craigie - Battery Energy Storage System -
12820
Record Last Updated (dd/mm/yyyy): 09/02/2023
-> 08/02/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Authority: North Ayrshire Council
-> Scottish Government (S36)
Planning Permission Expired:
-> 26/01/2027
349 MW - planning - west midlands - Dunton Hall - Battery Energy Storage System -
9427
Record Last Updated (dd/mm/yyyy): 17/05/2022
->
349 MW - planning - west midlands - Cellarhead - Battery Site -
10013
Record Last Updated (dd/mm/yyyy): 29/11/2021
->
349 MW - planning - wales - Penrhos Works - Battery Energy Storage System -
15472
Record Last Updated (dd/mm/yyyy): 21/12/2023
-> 27/02/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
320 MW - planning - yorkshire and humber - Monk Fryston Battery Storage -
15164
Planning Permission Refused: 15/12/2021
->
300 MW - construction - scotland - Blackhillock Electricity Substation - Battery Energy Storage System -
9723
Record Last Updated (dd/mm/yyyy): 28/09/2021
->
264 MW - planning - south east - Bolney Substation - Battery Storage -
10843
Record Last Updated (dd/mm/yyyy): 22/03/2022
->
Are they re-applying (Old REPD Ref) :
-> 8986
250 MW - planning - eastern - Toddington Services, Hipsey Spinney - Battery Storage -
15573
Record Last Updated (dd/mm/yyyy): 12/01/2024
-> 27/02/2024
Development Status: Planning Application Submitted
-> Revised
Development Status (short): Application Submitted
-> Revised
Are they re-applying (New REPD Ref):
-> 15883
Planning Application Withdrawn:
-> 13/02/2024
249 MW - planning - south east - Richborough Energy Park - Phase 3 (Sheaf) -
11201
Record Last Updated (dd/mm/yyyy): 10/05/2022
->
200 MW - planning - yorkshire and humber - Drax Re-Power -
7017
Planning Permission Expired: NA
->
200 MW - planning - north west - Heysham Energy Storage Project -
9545
Record Last Updated (dd/mm/yyyy): 30/05/2022
->
200 MW - planning - scotland - Carlisle Road - Battery Energy Storage System -
9684
Record Last Updated (dd/mm/yyyy): 23/09/2021
->
200 MW - planning - eastern - Hornsea Project Three - Battery Storage -
9754
Megapack
Record Last Updated (dd/mm/yyyy): 23/01/2023
->
200 MW - planning - scotland - Whitehill Energy Storage -
10466
Record Last Updated (dd/mm/yyyy): 27/01/2022
->
200 MW - planning - scotland - Windyhill Battery Storage Facility -
10596
Record Last Updated (dd/mm/yyyy): 09/02/2022
->
200 MW - planning - north west - Todhills and Westlinton - Harker Battery Energy Storage Facility -
15599
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
150 MW - construction - south east - Cleve Hill Solar Project -
7856
Planning Permission Refused:
-> 28/05/2020
Under Construction:
-> 01/04/2023
150 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy -
10022
Record Last Updated (dd/mm/yyyy): 29/11/2021
->
Planning Permission Expired: PD
->
150 MW - planning - north west - Printworks Road - Stalybridge Battery Storage -
10808
Record Last Updated (dd/mm/yyyy): 19/12/2023
->
150 MW - planning - north east - Wilton International, Greystones Road - Phase 1 -
14729
Planning Permission Expired: PD
->
130 MW - planning - eastern - Stoke Lane - Battery Energy Storage -
10390
Record Last Updated (dd/mm/yyyy): 17/10/2022
->
100 MW - planning - south east - Minchens Lane Battery Storage Facility -
8434
Planning Authority: Basingstoke & Deane Borough Council
-> Basingstoke and Deane Borough Council
Planning Permission Refused: 08/10/2021
->
100 MW - planning - yorkshire and humber - Hales Lane - Battery Storage Facility -
9635
Record Last Updated (dd/mm/yyyy): 19/05/2022
->
100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage -
9691
Record Last Updated (dd/mm/yyyy): 06/03/2023
->
100 MW - planning - eastern - North Walpole, St Peter - Battery Energy Storage -
9762
Record Last Updated (dd/mm/yyyy): 07/10/2021
->
100 MW - planning - north west - Cholmondeley Road - Battery Storage -
9763
Record Last Updated (dd/mm/yyyy): 15/08/2022
->
100 MW - planning - south west - St Dennis - Battery Energy Storage -
10058
Record Last Updated (dd/mm/yyyy): 02/12/2021
->
100 MW - planning - south east - Penn Croft Farm, Crondall - Battery Energy Storage Facility -
10163
Record Last Updated (dd/mm/yyyy): 24/12/2021
->
100 MW - construction - eastern - Bullen Lane - Battery Storage -
10311
Record Last Updated (dd/mm/yyyy): 05/12/2023
->
100 MW - planning - south west - Shaftesbury Energy Park - Battery Storage System -
10626
Record Last Updated (dd/mm/yyyy): 16/02/2022
->
100 MW - planning - eastern - Walpole St Andrew - Battery storage -
10876
Record Last Updated (dd/mm/yyyy): 29/03/2022
->
100 MW - planning - north west - Hillside Farm, Lancaster Road - Battery Storage -
11948
Are they re-applying (New REPD Ref): 12964
->
100 MW - planning - scotland - Hill of Fare - Hill of Fare Wind Farm & Battery Storage -
12026
Are they re-applying (Old REPD Ref) :
-> 2975
100 MW - operation - north west - National Grid Electricity Substation, Capenhurst Lane - Battery Storage -
12725
Planning Authority: Cheshire West and Chester Council
-> Cheshire West & Chester Council
Planning Permission Refused:
-> 01/02/2021
100 MW - planning - north west - Hillside Farm, Lancaster Road - Battery Storage -
12964
Are they re-applying (Old REPD Ref) : 11948
->
100 MW - planning - scotland - Learielaw Farm, Learielaw - Battery Energy Storage -
13368
Record Last Updated (dd/mm/yyyy): 08/01/2024
-> 19/02/2024
Are they re-applying (Old REPD Ref) : 7970
->
99 MW - planning - yorkshire and humber - Scawby Brook, Brigg - Battery Storage -
9848
Record Last Updated (dd/mm/yyyy): 26/10/2021
->
Planning Permission Expired: PD
->
99 MW - planning - north east - South Thinford Lane, Thinford - Energy Storage -
10489
Record Last Updated (dd/mm/yyyy): 28/01/2022
->
99 MW - planning - south east - Butts Field, Mill Lane - Battery Storage -
13573
Are they re-applying (Old REPD Ref) :
-> 7399
95 MW - planning - yorkshire and humber - Winterton Road - Battery Energy Storage -
9608
Record Last Updated (dd/mm/yyyy): 15/09/2021
->
93 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage -
15610
Record Last Updated (dd/mm/yyyy): 15/01/2024
-> 12/04/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 08/04/2029
90 MW - planning - east midlands - Caldwell Road - Battery Storage -
9507
Record Last Updated (dd/mm/yyyy): 04/11/2022
->
80 MW - planning - yorkshire and humber - Netherlands Way - Battery Energy Facility -
10429
Record Last Updated (dd/mm/yyyy): 19/01/2022
->
Are they re-applying (Old REPD Ref) : 7090
->
80 MW - planning - scotland - Tealing Battery Energy Storage Farm -
11097
Record Last Updated (dd/mm/yyyy): 09/01/2024
->
80 MW - planning - yorkshire and humber - Barlow Road, Barlow Road - Battery Storage -
12734
Are they re-applying (New REPD Ref): 14715
->
Are they re-applying (Old REPD Ref) : 9970
->
Planning Permission Refused: 08/03/2023
->
75 MW - planning - west midlands - Holly Lane Energy Park - Solar Farm & Battery Storage -
13695
Are they re-applying (New REPD Ref):
->
75 MW - planning - north east - Belasis Avenue - Battery Storage -
13850
Are they re-applying (New REPD Ref):
->
75 MW - planning - northern ireland - Quarterland Road, Islandmagee - Battery Storage -
14117
Record Last Updated (dd/mm/yyyy): 20/06/2023
-> 23/01/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 19/01/2029
70 MW - planning - north west - Tontine Road - Battery Energy Storage System -
9819
Record Last Updated (dd/mm/yyyy): 19/10/2021
->
70 MW - planning - scotland - Shetland Battery Energy Storage System -
12856
Record Last Updated (dd/mm/yyyy): 12/09/2023
-> 10/04/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 21/02/2027
69 MW - planning - eastern - Thurleigh Road - Battery Energy Storage -
9651
Record Last Updated (dd/mm/yyyy): 20/09/2021
->
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 30/01/2027
60 MW - planning - north east - Greystones Road, Grangetown - Battery Energy Storage System -
10081
Record Last Updated (dd/mm/yyyy): 11/11/2021
->
Planning Permission Expired: PD
->
60 MW - planning - yorkshire and humber - Redcote Lane, Armley - Battery Storage Facility -
12224
Are they re-applying (Old REPD Ref) : 7111
->
60 MW - planning - south east - Misslebrook Farm, Botley Road - Battery Storage -
12691
Planning Authority: Test Valley Council
-> Test Valley Borough Council
57 MW - planning - north west - Capenhurst Lane -
8283
Planning Authority: Cheshire West and Chester Council
-> Cheshire West & Chester Council
57 MW - construction - north west - Capenhurst Lane, Capenhurst - Battery storage -
9377
Planning Authority: Cheshire West and Chester Council
-> Cheshire West & Chester Council
57 MW - planning - south east - Ash Lane, Little London - Battery Storage -
11090
Record Last Updated (dd/mm/yyyy): 27/04/2022
->
Planning Authority: Basingstoke & Deane Borough Council
-> Basingstoke and Deane Borough Council
Planning Permission Expired: NA
->
57 MW - planning - north west - Penwortham - Battery storage -
11217
Record Last Updated (dd/mm/yyyy): 10/05/2022
->
57 MW - planning - north west - Sutton Manor - Battery Storage Facility -
11559
Are they re-applying (Old REPD Ref) : 8439
->
57 MW - planning - eastern - Braintree Road, Cressing - Battery Storage -
11995
Mounting Type for Solar: Ground
->
Are they re-applying (Old REPD Ref) : 7161
->
57 MW - planning - north west - Waterloo Farm, Furbarn Road - Battery Storage -
12187
Are they re-applying (New REPD Ref): 14597
->
57 MW - planning - south east - Coxmoor Wood, Crondall Road - Battery Storage -
13728
Are they re-applying (New REPD Ref):
->
50 MW - operation - south east - Richborough Energy Park - Phase 2 -
9626
Record Last Updated (dd/mm/yyyy): 11/01/2024
->
50 MW - planning - south east - Upton Lane, Nursling - Battery Storage Facility -
9673
Record Last Updated (dd/mm/yyyy): 22/09/2021
->
50 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage -
9910
Record Last Updated (dd/mm/yyyy): 15/01/2024
->
50 MW - planning - yorkshire and humber - Barlow Road, Barlow - Battery Storage -
9970
Record Last Updated (dd/mm/yyyy): 19/11/2021
->
50 MW - planning - eastern - Sundon Sub Station Battery Storage Facility -
9998
Record Last Updated (dd/mm/yyyy): 08/11/2023
->
50 MW - planning - scotland - Electricity Sub Station, Strichen - Battery Storage Facility -
10039
Record Last Updated (dd/mm/yyyy): 02/12/2021
->
50 MW - planning - eastern - Ardleigh Road, Little Bromley - Battery Energy Storage -
10302
Record Last Updated (dd/mm/yyyy): 01/11/2022
->
50 MW - planning - eastern - Newmarket Road, Bottisham - Battery Energy Storage -
10486
Record Last Updated (dd/mm/yyyy): 03/01/2024
->
50 MW - planning - north west - Huncoat Power Station - Battery Storage -
10516
Record Last Updated (dd/mm/yyyy): 01/02/2022
->
Are they re-applying (New REPD Ref): 13080
->
Planning Permission Refused: 18/01/2022
->
50 MW - planning - west midlands - Penstone Lane, Penn 1 - Battery Storage Facility -
10705
Record Last Updated (dd/mm/yyyy): 01/03/2022
->
50 MW - planning - west midlands - Penstone Lane, Lower Penn 2 - Battery Storage -
10733
Record Last Updated (dd/mm/yyyy): 04/03/2022
->
50 MW - planning - scotland - Frodo Solar and Battery Energy Development -
10994
Record Last Updated (dd/mm/yyyy): 12/04/2022
->
50 MW - planning - eastern - Stocking Pelham - Battery Storage System -
11212
Record Last Updated (dd/mm/yyyy): 10/05/2022
->
50 MW - planning - west midlands - Lowlands Farm - Battery Storage -
11399
Are they re-applying (New REPD Ref): 12959
->
50 MW - planning - yorkshire and humber - Swangate Project - Energy Storage System -
11437
Planning Permission Expired: NA
->
Under Construction: Implemented
->
50 MW - planning - south west - Fairholme, Minety - Battery Storage -
11810
Are they re-applying (Old REPD Ref) : 10488
->
50 MW - construction - eastern - Norwich Road Industrial Estate -
12529
Are they re-applying (Old REPD Ref) : 6958
->
Planning Permission Refused:
-> 26/03/2021
50 MW - planning - south east - Derehams Farm, Derehams Lane - Battery Storage -
12649
Are they re-applying (New REPD Ref): 15544
->
50 MW - planning - scotland - Fairways Business Park - Battery Storage -
13318
Operator (or Applicant): Intelligent Land Investments Group Plc
-> Inverness Caledonian Thistle Football Club
50 MW - planning - scotland - East Rogerton Cottage, Markethill Road - Battery Storage Facility -
13449
Operator (or Applicant): Private Developer
-> Apatura ๏ฟฝ GPC 612 Limited
50 MW - planning - south west - Wareham Road, Scouse Farm - Battery Storage -
15165
Record Last Updated (dd/mm/yyyy): 03/11/2023
-> 07/03/2024
Development Status: Planning Application Submitted
-> Revised
Development Status (short): Application Submitted
-> Revised
Are they re-applying (New REPD Ref):
-> 15962
Planning Application Withdrawn:
-> 26/01/2024
49 MW - planning - north west - Middleton Clean Energy Plant -
7029
Under Construction: Implemented
->
49 MW - planning - yorkshire and humber - Elland Storage Project -
7053
Planning Permission Expired: PD
->
49 MW - planning - south east - Lovedean Energy Storage System -
7064
Judicial Review: 43350
-> 07/09/2018
49 MW - planning - east midlands - Cottam Power Station -
7066
Planning Permission Expired: PD
->
49 MW - operation - north west - Lister Drive -
7740
Under Construction: 01/05/2021
->
49 MW - planning - eastern - Reach Road -
7906
Planning Permission Expired: PANR
->
49 MW - planning - london - Mill Hill National Grid Substation -
8009
Planning Permission Expired: NA
->
49 MW - planning - scotland - Platchaig House, Kilmorack - Battery Storage Facility -
8248
Planning Permission Refused: 30/08/2022
->
49 MW - planning - scotland - Old Gallows Road - Battery storage -
8368
Record Last Updated (dd/mm/yyyy): 08/02/2021
-> 07/02/2024
Operator (or Applicant): Whirlwind Renewables
-> Foresight Group
49 MW - planning - scotland - Shindour - Energy Storage Facility -
8464
Record Last Updated (dd/mm/yyyy): 28/05/2021
-> 18/01/2024
Planning Authority: Tayside Council
-> Perth & Kinross Council
49 MW - planning - eastern - Rush Green Motors - Battery storage -
8987
Record Last Updated (dd/mm/yyyy): 11/10/2023
-> 14/03/2024
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Are they re-applying (New REPD Ref):
-> 16045
49 MW - planning - eastern - Greens Farm - Battery energy storage -
9012
Record Last Updated (dd/mm/yyyy): 13/05/2021
-> 09/04/2024
49 MW - planning - south east - Burcot Solar Farm -
9374
Planning Permission Refused: 06/12/2022
->
49 MW - planning - eastern - Admiralty Road - Battery Energy Storage Facility -
9470
Record Last Updated (dd/mm/yyyy): 23/08/2021
->
Planning Permission Expired: NA
->
49 MW - operation - scotland - Wishaw Battery Storage Facility -
9522
Record Last Updated (dd/mm/yyyy): 10/05/2022
->
49 MW - construction - north west - Bredbury Substation - Battery Storage Facility -
9653
Record Last Updated (dd/mm/yyyy): 20/09/2021
->
Planning Permission Expired: NA
->
49 MW - planning - west midlands - Chapel Lane - Battery Energy Storage System -
9721
Record Last Updated (dd/mm/yyyy): 24/11/2023
->
49 MW - planning - east midlands - Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage -
9796
Record Last Updated (dd/mm/yyyy): 13/10/2021
->
49 MW - planning - yorkshire and humber - Common Farm - Solar Farm & Battery Storage -
9877
Record Last Updated (dd/mm/yyyy): 01/11/2021
->
49 MW - planning - scotland - Drum Farm - Battery Energy Storage System -
9940
Record Last Updated (dd/mm/yyyy): 17/11/2021
->
Operator (or Applicant): Renewable Energy System Limited
-> Field Energy
49 MW - planning - scotland - Stainland Energy Storage Project -
10225
Record Last Updated (dd/mm/yyyy): 29/12/2021
->
49 MW - planning - yorkshire and humber - Elland Storage Project -
10236
Record Last Updated (dd/mm/yyyy): 20/02/2023
->
Are they re-applying (New REPD Ref): 15304
->
Are they re-applying (Old REPD Ref) : 7053
->
49 MW - planning - scotland - Fordtown Energy Storage -
10239
Record Last Updated (dd/mm/yyyy): 19/05/2022
->
Are they re-applying (Old REPD Ref) : 7764
->
49 MW - planning - west midlands - Doverdale - Solar Farm & Battery Storage -
10273
Record Last Updated (dd/mm/yyyy): 28/06/2021
->
49 MW - planning - scotland - Newburgh Road, Abernethy - Battery Storage -
10607
Record Last Updated (dd/mm/yyyy): 11/02/2022
->
49 MW - planning - scotland - Rothienorman - Battery Storage -
10638
Record Last Updated (dd/mm/yyyy): 16/02/2022
->
49 MW - planning - eastern - Model Farm -
10687
Record Last Updated (dd/mm/yyyy): 24/02/2022
->
Are they re-applying (Old REPD Ref) : 7609
->
49 MW - planning - scotland - Midmill, Kintore - Battery Energy Storage -
10701
Record Last Updated (dd/mm/yyyy): 01/03/2022
->
49 MW - planning - scotland - Broomloan Road - Battery Energy Storage -
10886
Record Last Updated (dd/mm/yyyy): 29/03/2022
->
49 MW - planning - scotland - Law Of Doune Road, Macduff - Battery Storage -
10894
Record Last Updated (dd/mm/yyyy): 07/12/2023
->
Planning Permission Expired: NA
->
49 MW - planning - north east - Hawthorn Grid Site - Battery Storage -
10896
Record Last Updated (dd/mm/yyyy): 30/03/2022
->
49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility -
10955
Record Last Updated (dd/mm/yyyy): 06/04/2022
->
Are they re-applying (New REPD Ref): 14321
->
Are they re-applying (Old REPD Ref) : 9341
->
49 MW - planning - scotland - South Leylodge Farmhouse, Kintore - Battery Energy Storage System -
11092
Record Last Updated (dd/mm/yyyy): 27/04/2022
->
49 MW - planning - scotland - Holmston Road - Battery Storage Facility -
11679
Record Last Updated (dd/mm/yyyy): 18/07/2022
-> 08/02/2024
Operator (or Applicant): Renewable Energy Systems Limited
-> Field Energy
49 MW - construction - london - Clay Tye Farm Phase 1 - Storage Facility -
11720
Record Last Updated (dd/mm/yyyy): 25/07/2022
-> 27/03/2024
Planning Permission Refused:
-> 18/07/2017
Operational:
-> 22/03/2024
49 MW - construction - london - Clay Tye Farm Phase 2 - Storage Facility -
11721
Record Last Updated (dd/mm/yyyy): 25/07/2022
-> 27/03/2024
Planning Permission Refused:
-> 10/09/2018
Operational:
-> 22/03/2024
49 MW - planning - scotland - Househill House, Househill - Battery Storage -
12056
Record Last Updated (dd/mm/yyyy): 10/03/2023
-> 30/01/2024
49 MW - planning - scotland - Meetlaw Farm, Fordoun - Battery Energy Storage System -
12361
Y-coordinate: 81886
-> 781886
lat: 50.636363
-> 56.92789
long: -2.265832
-> -2.308901
49 MW - planning - south west - Landulph, Ellbridge Lane - Battery Storage Facility -
12697
Are they re-applying (Old REPD Ref) : 7051
->
49 MW - planning - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility -
12936
Are they re-applying (New REPD Ref): 15230
->
49 MW - planning - north west - Welkin Mill, Welkin Road - Battery Storage -
12982
Are they re-applying (Old REPD Ref) : 8055
->
49 MW - planning - west midlands - Lichfield Road, Watton Lane - Battery Storage -
13369
Record Last Updated (dd/mm/yyyy): 09/03/2023
-> 02/04/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
49 MW - planning - scotland - Persley Croft - Battery Storage -
13684
Are they re-applying (New REPD Ref):
->
Planning Authority: Aberdeen Council
-> Aberdeen City Council
49 MW - planning - south east - Weston Lane - Battery Storage Facility -
14005
Are they re-applying (New REPD Ref):
->
49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility -
14321
Are they re-applying (Old REPD Ref) : 10955
->
49 MW - planning - scotland - Kintore Substation, Leylodge - Battery Energy Storage -
14374
Record Last Updated (dd/mm/yyyy): 24/07/2023
-> 18/01/2024
Development Status: Planning Application Submitted
-> Revised
Development Status (short): Application Submitted
-> Revised
Are they re-applying (New REPD Ref):
-> 15627
Planning Application Withdrawn:
-> 18/12/2023
49 MW - planning - south west - Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility -
14691
Record Last Updated (dd/mm/yyyy): 01/09/2023
-> 01/02/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 04/01/2027
47 MW - planning - south west - Dog Trap Lane, Minety - Battery Energy Storage Systems -
10488
Record Last Updated (dd/mm/yyyy): 28/01/2022
->
Are they re-applying (New REPD Ref): 11810
->
45 MW - planning - north west - Cheshire Power Station - Battery Storage Facility -
10295
Record Last Updated (dd/mm/yyyy): 22/12/2021
->
Planning Authority: Cheshire West and Chester Council
-> Cheshire West & Chester Council
45 MW - planning - scotland - Sclenteuch Wind Farm -
11987
Are they re-applying (Old REPD Ref) : 4612
->
43 MW - planning - scotland - Ballingall Farm, Leslie - Battery Energy Storage System -
10825
Record Last Updated (dd/mm/yyyy): 18/03/2022
->
42 MW - planning - scotland - South Pargillis - Battery Storage -
9564
Record Last Updated (dd/mm/yyyy): 09/09/2021
->
42 MW - planning - scotland - Armadale Wind Farm -
11219
Record Last Updated (dd/mm/yyyy): 10/05/2022
->
42 MW - planning - scotland - Melvich Bay - Melvich Wind Energy Hub -
13826
Are they re-applying (Old REPD Ref) :
-> 3303
40 MW - planning - east midlands - Breach Farm - Energy Barn -
6914
Under Construction: Implemented
->
40 MW - planning - eastern - Maldon Hall -
7095
Under Construction: Implemented
->
40 MW - planning - west midlands - Whitehouse Farm Energy Barn -
7987
Planning Permission Expired: NA
->
40 MW - planning - south east - Loudwater Battery Storage Site -
8142
Are they re-applying (New REPD Ref): 11993
-> 12803
40 MW - planning - south east - Tanners Lane - Battery Energy Storage Facility (Phase One) -
9708
Record Last Updated (dd/mm/yyyy): 07/04/2022
->
Under Construction: Implemented
->
40 MW - planning - yorkshire and humber - Field House Solar Farm -
10970
Record Last Updated (dd/mm/yyyy): 11/04/2022
->
40 MW - planning - west midlands - Hollydale, Buildwas Road - Battery Storage -
13410
Record Last Updated (dd/mm/yyyy): 13/03/2023
-> 13/02/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 12/01/2027
40 MW - planning - scotland - Newton Farm, Westburn Road - Battery Storage Facility -
13450
Operator (or Applicant): Bluefield Renewable Developments Limited
-> Apatura ๏ฟฝ GPC 676 Limited
40 MW - planning - yorkshire and humber - Claire Court, Rawmarsh Road - Battery Energy Storage Facility -
13774
Planning Permission Expired: NA
->
37 MW - planning - scotland - STOR Field 9 -
7018
Development Status: Planning Permission Granted
-> Planning Application Submitted
Development Status (short): Awaiting Construction
-> Application Submitted
Planning Permission Expired: NA
->
36 MW - planning - south west - Kingston Road, Slimbridge - Battery Storage -
11516
Are they re-applying (New REPD Ref): 14882
->
35 MW - planning - south west - Northington Lane - Battery Storage Facility -
9992
Record Last Updated (dd/mm/yyyy): 23/11/2021
->
35 MW - planning - south east - New Barn Road - Battery Energy Storage Facility -
14650
Record Last Updated (dd/mm/yyyy): 29/08/2023
-> 19/02/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 15/02/2027
33 MW - construction - yorkshire and humber - Wormald Green - Battery Energy Storage System -
10893
Record Last Updated (dd/mm/yyyy): 26/08/2023
->
Planning Permission Refused:
-> 26/09/2022
32 MW - planning - yorkshire and humber - Kirkhaw Lane Battery Storage -
8430
Planning Authority: Wakefield Council
-> Wakefield Metropolitan District Council
32 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage -
10145
Record Last Updated (dd/mm/yyyy): 19/01/2022
->
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Are they re-applying (New REPD Ref):
-> 16047
32 MW - planning - south west - Post Farm, Lytchett Minster - Battery Energy Storage -
10291
Record Last Updated (dd/mm/yyyy): 24/01/2022
->
31 MW - planning - scotland - Benthead Farm - Solar Farm & Battery Storage -
10542
Record Last Updated (dd/mm/yyyy): 03/02/2022
->
30 MW - planning - scotland - Blackpark Energy Storage -
8105
Under Construction: Implemented
->
30 MW - planning - scotland - Drumcross Battery Storage -
8155
Under Construction: Implemented
->
30 MW - planning - scotland - Jamesfield Organic Centre, Phase 1 -
10456
Record Last Updated (dd/mm/yyyy): 26/01/2022
->
Are they re-applying (New REPD Ref): 10863
->
30 MW - planning - eastern - Colton - Solar photovoltaic farm, Battery storage -
10945
Record Last Updated (dd/mm/yyyy): 05/01/2024
->
Planning Permission Expired: NA
->
30 MW - planning - north east - West Sleekburn - Battery Storage Compound -
10957
Record Last Updated (dd/mm/yyyy): 06/04/2022
->
30 MW - planning - west midlands - Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage -
10978
Record Last Updated (dd/mm/yyyy): 11/04/2022
->
30 MW - planning - scotland - West Bendings - Battery Storage -
10985
Record Last Updated (dd/mm/yyyy): 11/04/2022
->
Planning Permission Expired: NA
->
30 MW - planning - scotland - Clachaig Glen -
10996
Record Last Updated (dd/mm/yyyy): 12/04/2022
->
Are they re-applying (Old REPD Ref) : 6119
->
30 MW - planning - south west - Catsbrain Farm - Battery Storage -
11787
Are they re-applying (Old REPD Ref) : 7988
->
30 MW - planning - yorkshire and humber - Back Lane, Skerne - Solar Farm & Battery Storage -
12297
Under Construction: Implemented
->
30 MW - planning - yorkshire and humber - North Lincolnshire Green Energy Park -
12706
Are they re-applying (Old REPD Ref) : 7854
->
30 MW - planning - scotland - Meiklelaught Farm - Battery Storage -
14525
Planning Permission Expired: NA
->
30 MW - planning - north west - Wallerscote Limebeds - Battery Energy Storage -
14888
Planning Authority: Cheshire West and Chester Council
-> Cheshire West & Chester Council
25 MW - planning - north west - Davies Road - Battery Storage -
9563
Record Last Updated (dd/mm/yyyy): 18/03/2022
->
25 MW - planning - north west - Middlewich Road - Solar Photovoltaics & Battery Storage -
9565
Record Last Updated (dd/mm/yyyy): 17/03/2022
->
25 MW - planning - north west - Caton Road, Lancaster - Battery Storage Facility -
10047
Record Last Updated (dd/mm/yyyy): 13/12/2022
->
25 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage -
10222
Record Last Updated (dd/mm/yyyy): 28/02/2022
->
25 MW - planning - scotland - Earraghail Renewable Energy Development -
10712
Record Last Updated (dd/mm/yyyy): 02/03/2022
->
22 MW - planning - eastern - Surmer Hall, Church Walk - Solar Farm & Battery Storage -
15401
Planning Authority: Braintree Council
-> Braintree District Council
20 MW - operation - south west - Feeder Road -
7663
Record Last Updated (dd/mm/yyyy): 01/05/2023
-> 22/01/2024
Development Status: Finished
-> Operational
Development Status (short): Finished
-> Operational
Operational:
-> 09/01/2024
20 MW - planning - south east - Basing Road -
7746
Planning Authority: Basingstoke & Deane Borough Council
-> Basingstoke and Deane Borough Council
20 MW - planning - eastern - The Brickmakers Arms Battery -
9668
Record Last Updated (dd/mm/yyyy): 05/01/2022
->
20 MW - planning - scotland - Douglas West Wind Farm (extension) -
9957
Record Last Updated (dd/mm/yyyy): 18/11/2021
->
20 MW - planning - east midlands - Mount Road, Castle Gresley - Battery Storage Facility -
10012
Record Last Updated (dd/mm/yyyy): 29/11/2021
->
20 MW - planning - south west - Plymouth Stor Generation - Battery storage -
10432
Record Last Updated (dd/mm/yyyy): 21/01/2022
->
20 MW - planning - north west - Former EON Power Station, Booth Lane - Battery Energy Storage System -
10436
Record Last Updated (dd/mm/yyyy): 24/01/2022
->
20 MW - planning - scotland - Carrick Windfarm -
10540
Record Last Updated (dd/mm/yyyy): 03/02/2022
->
20 MW - planning - north west - Broadgate, Chadderton - Battery Storage Containers -
10690
Record Last Updated (dd/mm/yyyy): 01/03/2022
->
20 MW - planning - scotland - Strathruddie, Kinglassie - Solar farm -
10828
Record Last Updated (dd/mm/yyyy): 21/03/2022
->
20 MW - planning - east midlands - West Burton Solar Project -
10917
Record Last Updated (dd/mm/yyyy): 01/04/2022
->
20 MW - planning - eastern - Moggerhanger Road, Sandy - Solar Farm -
10981
Record Last Updated (dd/mm/yyyy): 11/04/2022
->
20 MW - planning - north west - Vause Farm - Battery Storage -
10989
Record Last Updated (dd/mm/yyyy): 11/04/2022
->
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 09/02/2027
20 MW - planning - scotland - Chleansaid Onshore Wind Farm -
10997
Record Last Updated (dd/mm/yyyy): 09/01/2024
->
20 MW - planning - scotland - Grayside Wind Farm -
11113
Record Last Updated (dd/mm/yyyy): 04/05/2022
->
20 MW - construction - north west - Chadderton - Battery energy storage facility -
11160
Record Last Updated (dd/mm/yyyy): 09/05/2022
->
20 MW - planning - scotland - Ben Aketil Wind Farm - Repowered & Extended -
11876
Are they re-applying (Old REPD Ref) :
-> 8332
20 MW - operation - south west - Hawkers Hill Energy Park -
12293
Planning Permission Refused:
-> 22/09/2017
20 MW - planning - scotland - Chesters - Millmoor Rig Wind Farm & Battery Energy Storage -
12821
Planning Authority: Scottish Borders Council
-> Scottish Government (S36)
20 MW - planning - south west - Fair Park Solar Farm -
13761
Are they re-applying (New REPD Ref):
->
20 MW - planning - scotland - Denfield Farm -
14341
Are they re-applying (Old REPD Ref) : 7163
->
20 MW - planning - east midlands - Heron Solar Farm & Battery Storage -
15084
Planning Authority: Rushcliffe Council
-> Rushcliffe Borough Council
19 MW - planning - scotland - Land North of Thornton Road -
7131
Under Construction: Implemented
->
19 MW - planning - scotland - North West Of Jameston Farm -
7133
Planning Permission Expired: NA
->
19 MW - planning - scotland - Ochiltree - Battery Sorage -
10162
Record Last Updated (dd/mm/yyyy): 06/10/2022
->
Are they re-applying (New REPD Ref): 15312
-> 14170
19 MW - planning - scotland - Hillcrest Cottage, Shebster - Battery Energy Storage System -
10226
Record Last Updated (dd/mm/yyyy): 29/09/2022
->
19 MW - planning - scotland - Speyslaw Farm - Battery Storage -
10394
Record Last Updated (dd/mm/yyyy): 02/03/2023
->
19 MW - planning - scotland - Wardlaw Wood Windfarm - Battery Storage -
14231
Are they re-applying (New REPD Ref):
->
19 MW - planning - scotland - Tofts - Battery Storage -
14706
Planning Permission Expired: NA
->
16 MW - planning - east midlands - Waterswallows Road, Green Fairfield - Battery Storage Equipment -
10716
Record Last Updated (dd/mm/yyyy): 04/03/2022
->
16 MW - planning - scotland - Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm -
11623
Are they re-applying (Old REPD Ref) :
-> 11439
Planning Permission Expired: NA
->
15 MW - planning - eastern - Three Bridges Solar Farm -
8220
Planning Authority: Breckland Council
-> Breckland District Council
Planning Permission Expired: NA
->
15 MW - planning - scotland - Hollandmey Renewable Energy Development -
10246
Record Last Updated (dd/mm/yyyy): 22/12/2021
->
15 MW - planning - south west - Smithyard Lane - Battery Storage -
10766
Record Last Updated (dd/mm/yyyy): 09/03/2022
->
15 MW - planning - north west - Grassing Rome Street - Battery Storage -
11611
Record Last Updated (dd/mm/yyyy): 08/07/2022
-> 08/04/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 07/03/2027
14 MW - planning - scotland - Hopsrig Wind Farm -
11066
Record Last Updated (dd/mm/yyyy): 26/04/2022
->
Are they re-applying (Old REPD Ref) : 6099
->
13 MW - planning - west midlands - Maybrook Road - Battery facility -
11008
Record Last Updated (dd/mm/yyyy): 19/04/2022
->
Planning Permission Expired: NA
->
13 MW - planning - east midlands - Dolly Lane, Buxworth - Battery Storage Facility & Sub Station -
15127
Record Last Updated (dd/mm/yyyy): 30/10/2023
-> 27/02/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 21/02/2027
10 MW - planning - east midlands - Manor Farm Energy Storage -
6948
Under Construction: Implemented
->
10 MW - planning - south east - Stockbridge Road -
7097
Under Construction: Implemented
->
10 MW - construction - south east - Land Adj Harmer Warren Quarry -
7143
Planning Permission Expired: NA
->
10 MW - planning - scotland - East Ballochy -
7675
Under Construction: Implemented
->
10 MW - planning - south west - Minety Substation -
7942
Record Last Updated (dd/mm/yyyy): 30/06/2020
-> 12/07/2022
10 MW - planning - eastern - Wissett Solar Farm, Wissett - Battery Storage -
9913
Record Last Updated (dd/mm/yyyy): 11/11/2021
->
10 MW - planning - north west - Park Road Battery Storage -
10076
Record Last Updated (dd/mm/yyyy): 26/09/2022
->
10 MW - planning - scotland - Glenniston Farm, Auchtertool - Solar Farm -
10434
Record Last Updated (dd/mm/yyyy): 24/01/2022
->
10 MW - planning - scotland - Culachy Wind Farm -
10714
Record Last Updated (dd/mm/yyyy): 06/12/2023
->
Are they re-applying (Old REPD Ref) : 3926
->
10 MW - operation - south west - Cirencester Solar Farm -
12791
Planning Permission Refused:
-> 17/09/2015
10 MW - planning - yorkshire and humber - J3 Business Park - Battery Energy Storage Facility -
12920
Are they re-applying (Old REPD Ref) : 6979
->
Planning Permission Expired: NA
->
2024-01
New projects (136):
1025 MW - planning - yorkshire and humber - The Balk, Almholme - Energy Storage System -
14061
940 MW - planning - north west - Fanny House Farm, Bay Gateway - Battery Storage -
14386
700 MW - planning - scotland - Auchentiber Road - Battery Energy Storage System -
15425
600 MW - cancelled - east midlands - West Leake Lane, Ratcliffe - Battery Storage -
12464
500 MW - planning - scotland - Kilmarnock Battery Energy Storage System -
15176
500 MW - planning - south east - East Claydon Battery Energy Storage -
15501
400 MW - planning - south west - East Chickerell Court Farm - Battery Energy Storage System -
12651
400 MW - planning - eastern - Elstree Substation, Hilfield Lane - Battery Energy Storage -
14638
400 MW - planning - south west - Junction 27, Westleigh - Battery Storage -
14935
400 MW - planning - north west - Blackdyke Farm, Blackford - Battery Storage -
15005
350 MW - planning - wales - Uskmouth Power Station, West Nash Road - Battery Storage Facility -
15263
349 MW - planning - wales - Penrhos Works - Battery Energy Storage System -
15472
320 MW - planning - yorkshire and humber - Monk Fryston Battery Storage -
15164
300 MW - planning - scotland - Newarthill Energy Park -
14763
250 MW - planning - eastern - Toddington Services, Hipsey Spinney - Battery Storage -
15573
200 MW - planning - scotland - Carlisle Road - Battery Energy Storage System -
9684
200 MW - planning - eastern - Hornsea Project Three - Battery Storage -
9754
Megapack
200 MW - planning - north west - Cargo Road, Cargo - Battery Storage -
14939
200 MW - planning - yorkshire and humber - Stocking Lane - Battery Energy Facility -
15082
200 MW - planning - yorkshire and humber - Corner Of Weeland Road, Lunn Lane - Battery Storage Facility -
15375
200 MW - planning - north west - Todhills and Westlinton - Harker Battery Energy Storage Facility -
15599
180 MW - planning - yorkshire and humber - Fordtead Lane, Thorpe Marsh - Battery Energy Facility -
14932
150 MW - planning - north west - Printworks Road - Stalybridge Battery Storage -
10808
150 MW - planning - north east - Wilton International, Greystones Road - Phase 1 -
14729
140 MW - planning - northern ireland - Coolkeeragh - Battery Storage -
15151
136 MW - planning - scotland - Newlands Hill Wind Energy Hub -
15383
126 MW - planning - south east - Derehams Farm, Derehams Lane - Battery Storage -
15544
106 MW - planning - scotland - Bodinglee Wind Farm -
14532
105 MW - planning - scotland - Kinmuck Battery Energy Storage -
13001
100 MW - planning - scotland - Hill of Fare - Hill of Fare Wind Farm & Battery Storage -
12026
100 MW - planning - north west - The Old Vicarage, Reedley - Battery Storage -
12767
100 MW - planning - scotland - Learielaw Farm, Learielaw - Battery Energy Storage -
13368
100 MW - planning - north west - Walshaw House, Regent Street - Battery Energy Storage -
14625
100 MW - planning - yorkshire and humber - Murton Way - Battery Energy Storage -
14759
100 MW - planning - west midlands - New Road, Featherstone - Battery Storage -
15297
99 MW - planning - south east - Butts Field, Mill Lane - Battery Storage -
13573
99 MW - cancelled - west midlands - Illeybrook Farm - Battery Energy Storage -
14064
93 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage -
15610
90 MW - planning - scotland - Rivox Wind Farm - Wind farm -
14533
80 MW - planning - yorkshire and humber - Barlow Road, Barlow Road - Battery Storage -
12734
80 MW - planning - yorkshire and humber - Barlow Road, Barlow Road - Battery Storage -
14715
80 MW - planning - east midlands - Old Trent Road, Beckingham - Battery Storage Facility -
14956
40 MW - construction - scotland - Cumberhead West Wind Farm -
15343
75 MW - planning - west midlands - Holly Lane Energy Park - Solar Farm & Battery Storage -
13695
75 MW - planning - north east - Belasis Avenue - Battery Storage -
13850
70 MW - planning - scotland - Shetland Battery Energy Storage System -
12856
70 MW - planning - south west - Severn Road, Hallen - Battery Storage Facility -
15027
63 MW - planning - scotland - Dolphingstone Farm - Battery Energy Storage System -
13618
60 MW - planning - scotland - Saturland Farm, Salterland Road - Battery Energy Storage System -
12024
60 MW - planning - scotland - Inchbean Farm, Treeswoodhead Road - Battery Energy Storage System -
13323
60 MW - planning - north east - West Boldon Substation - Battery Energy Storage -
14408
57 MW - planning - north west - Waterloo Farm, Furbarn Road - Battery Storage -
12187
57 MW - planning - north west - The Rake, Lower Jowkin Lane - Battery Energy Storage -
14597
53 MW - planning - east midlands - Barfield Lane, Reepham - Battery Energy Storage System -
12600
50 MW - planning - wales - Pancross & Oaklands Solar Farm -
7702
50 MW - planning - east midlands - Main Street, Kelham - Solar Farm & Battery Energy Storage -
11999
50 MW - planning - south east - Derehams Farm, Derehams Lane - Battery Storage -
12649
50 MW - planning - scotland - Penicuik, Moorfoot Hills - Torfichen Wind Farm -
13310
50 MW - planning - scotland - East Rogerton Cottage, Markethill Road - Battery Storage Facility -
13449
50 MW - planning - scotland - Longcroft Wind Farm -
13539
50 MW - planning - south west - Bluebell Wood Solar Farm & Battery Storage -
13989
50 MW - cancelled - scotland - Seath Road, Rutherglen - Battery Storage -
14378
50 MW - planning - south west - Indian Queens Sub station, Carne Hill - Battery Energy Storage -
14461
50 MW - planning - south west - Indian Queens National Grid Substation, Domelick Hill - Battery Storage -
14687
50 MW - planning - north west - Orrell Street Battery Energy Storage Facility -
14892
50 MW - planning - south west - Wareham Road, Scouse Farm - Battery Storage -
15165
50 MW - cancelled - scotland - Coylton๏ฟฝGreener๏ฟฝGrid๏ฟฝPark -
15312
50 MW - planning - yorkshire and humber - Westfield Road, Carlton - Battery Storage -
15338
50 MW - planning - west midlands - Upper Latherford Farm, Latherford Lane - Battery Energy Storage System -
15446
49 MW - planning - south east - Rye Common Lane -
7028
49 MW - planning - south east - Burcot Solar Farm -
9374
49 MW - planning - west midlands - Chapel Lane - Battery Energy Storage System -
9721
49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility -
10955
49 MW - planning - scotland - Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage -
12350
49 MW - planning - south east - Blue Bell Lodge, Rye Common Lane - Battery Storage -
12496
49 MW - planning - scotland - Rigifa Cove Road - Battery Storage -
12970
49 MW - planning - wales - Carrog Ganol, Rhosgoch - Battery Energy Storage System -
13217
49 MW - planning - scotland - Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage -
13595
49 MW - planning - scotland - Persley Croft - Battery Storage -
13684
49 MW - planning - scotland - Loch Toftingall, Halsary Wind Farm - Battery Energy Storage -
13949
49 MW - planning - south east - Weston Lane - Battery Storage Facility -
14005
49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility -
14321
49 MW - planning - scotland - Caulternich Croft Energy Storage Project - Battery Storage Facility -
14373
49 MW - planning - scotland - Kintore Substation, Leylodge - Battery Energy Storage -
14374
49 MW - planning - west midlands - Ebstree Road, Trysull - Battery Energy Storage -
14497
49 MW - planning - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility -
14510
49 MW - planning - north west - Coopers Lane, Kirkby - Battery Storage Facility -
14670
49 MW - planning - south west - Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility -
14691
49 MW - planning - east midlands - Little Hale Fen - Solar Farm -
14955
49 MW - planning - scotland - Flatterton Farm, Flatterton Road - Battery Storage -
15154
49 MW - cancelled - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility -
15230
49 MW - planning - yorkshire and humber - Lowfields Energy Storage Project -
15304
49 MW - planning - west midlands - Chapel Lane - Battery Energy Storage System -
15308
49 MW - cancelled - south east - Burcot Solar Farm -
15444
47 MW - planning - south west - Holt Road - Battery Energy Storage -
15470
45 MW - planning - scotland - Loch Fergus Farm - Energy Storage System -
12274
40 MW - planning - scotland - Newton Farm, Westburn Road - Battery Storage Facility -
13450
40 MW - planning - north west - Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage -
13985
40 MW - planning - west midlands - Chillington Estate, Chillington Park - Battery Storage -
14088
40 MW - planning - yorkshire and humber - Bywater, Kippax - Battery Energy Storage -
14362
40 MW - planning - south west - Red Barn - Solar Farm & Battery Storage -
15146
40 MW - construction - scotland - Cumberhead West Wind Farm -
15343
36 MW - planning - south west - Kingston Road, Slimbridge - Battery Storage -
14882
35 MW - planning - south east - New Barn Road - Battery Energy Storage Facility -
14650
35 MW - planning - yorkshire and humber - Warren Lane, Bramham - Battery Energy Storage -
14954
34 MW - planning - scotland - Cloud Hill Wind Farm -
15174
34 MW - planning - northern ireland - Battery Energy Storage Facility in Londonderry -
15303
30 MW - planning - scotland - Meiklelaught Farm - Battery Storage -
14525
30 MW - planning - north west - Wallerscote Limebeds - Battery Energy Storage -
14888
30 MW - planning - north east - Fox Cover Road - Battery Energy Storage -
14968
30 MW - planning - scotland - Ditcher Law Wind Farm -
14996
30 MW - cancelled - west midlands - Tanners Lane - Battery Energy Storage System -
15128
29 MW - planning - scotland - Electricity Substation, Bardarroch - Battery Energy Storage -
15569
25 MW - planning - scotland - Houston Solar PV Farm & Energy Storage Facility -
14294
25 MW - planning - east midlands - Ash Tree Solar Farm & Battery Storage -
15397
22 MW - planning - eastern - Surmer Hall, Church Walk - Solar Farm & Battery Storage -
15401
22 MW - planning - eastern - Surmer Hall, Church Walk - Solar Farm & Battery Storage -
15417
20 MW - planning - scotland - Watten Wind Farm -
11480
20 MW - planning - scotland - Ben Aketil Wind Farm - Repowered & Extended -
11876
20 MW - planning - scotland - Knockodhar Wind Farm -
14296
20 MW - planning - scotland - Denfield Farm -
14341
20 MW - planning - scotland - Dunside Wind Farm -
14531
20 MW - planning - east midlands - Heron Solar Farm & Battery Storage -
15084
20 MW - planning - scotland - Vale of Leven Wind Farm -
15175
20 MW - planning - south west - Brockworth Road - Battery Storage System -
15518
19 MW - planning - scotland - Wardlaw Wood Windfarm - Battery Storage -
14231
19 MW - planning - scotland - Tofts - Battery Storage -
14706
19 MW - planning - scotland - Aikengall, Innerwick - Battery Energy Storage -
15141
13 MW - planning - scotland - Hare Craig Windfarm -
15101
13 MW - planning - east midlands - Dolly Lane, Buxworth - Battery Storage Facility & Sub Station -
15127
12 MW - planning - west midlands - Rock Farm - Solar Farm -
15248
12 MW - planning - south east - Caterham Bypass - Battery Energy Storage -
15574
11 MW - planning - scotland - Enoch Hill, Dalmellington - Battery Storage -
14090
10 MW - planning - scotland - Glenniston Farm, Auchtertool - Solar Farm -
10434
10 MW - planning - scotland - Culachy Wind Farm -
10714
10 MW - planning - yorkshire and humber - Bradley Road - Battery Energy Storage System -
13863
Disappeared projects (15):
120 MW - cancelled - south west - Pound Road, Hawkchurch - Battery Energy Storage System -
14016
100 MW - cancelled - south west - Hook Street - Energy Storage Compound -
10142
90 MW - cancelled - north west - Golf Road - Battery Energy Storage -
13459
57 MW - cancelled - west midlands - Beechwood Farm, Hodgetts Lane - Battery Storage -
13297
50 MW - cancelled - west midlands - Armshead Farm, Armshead Road - Battery Energy Storage Facility -
12804
50 MW - cancelled - west midlands - Lowlands Farm - Battery Storage -
12959
50 MW - cancelled - west midlands - Levedale Road, Levedale - Battery Energy Storage -
13615
49 MW - cancelled - eastern - Whites Farm - Battery Storage -
11880
45 MW - planning - north west - Huncoat Power Station - Battery Storage Facility -
13080
25 MW - cancelled - scotland - Clauchrie Windfarm Battery -
7804
24 MW - cancelled - yorkshire and humber - Mauxhall Farm -
7827
20 MW - cancelled - south west - The Transmitting Station, Williton - Battery Storage -
10186
12 MW - cancelled - yorkshire and humber - Windmill Farm Solar Farm -
8348
12 MW - cancelled - eastern - St Ippolyts - Solar Farm & Battery Storage -
9695
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility -
13480
Updated projects (346):
100 MW - construction - eastern - Bullen Lane - Battery Storage -
10311
Record Last Updated (dd/mm/yyyy): 17/10/2022
-> 05/12/2023
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/07/2023
status: planning
-> construction ๐๏ธ
99 MW - operation - eastern - Dollymans Storage -
7088
Record Last Updated (dd/mm/yyyy):
-> 28/05/2021
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
Operational:
-> 01/07/2023
status: planning
-> operation ๐พ ๐ ๐ธ
50 MW - operation - south east - Richborough Energy Park - Phase 2 -
9626
Record Last Updated (dd/mm/yyyy): 10/01/2023
-> 11/01/2024
Installed Capacity (MWelec): 71.6
-> 50.1
Development Status: Under Construction
-> Operational
Development Status (short): Under Construction
-> Operational
status: construction
-> operation ๐พ ๐ ๐ธ
mw: 71
-> 50
49 MW - operation - north west - West Didsbury Battery Storage -
7185
Record Last Updated (dd/mm/yyyy):
-> 24/11/2023
Operator (or Applicant): Statera Energy
-> Statera Energy / Gresham House
Development Status: Under Construction
-> Operational
Development Status (short): Under Construction
-> Operational
Operational:
-> 21/11/2023
status: construction
-> operation ๐พ ๐ ๐ธ
49 MW - operation - north west - Lister Drive -
7740
Record Last Updated (dd/mm/yyyy):
-> 04/01/2023
Operator (or Applicant): Arenko Cleantech
-> Arenko Cleantech / Stratcraft
Development Status: Under Construction
-> Operational
Development Status (short): Under Construction
-> Operational
Operational:
-> 01/08/2022
status: construction
-> operation ๐พ ๐ ๐ธ
49 MW - construction - south east - Titchfield Lane -
7828
Record Last Updated (dd/mm/yyyy): 30/09/2020
-> 20/08/2023
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 20/08/2023
status: planning
-> construction ๐๏ธ
49 MW - operation - west midlands - Bustleholme Substation -
7907
Record Last Updated (dd/mm/yyyy): 07/02/2021
-> 20/10/2023
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
status: planning
-> operation ๐พ ๐ ๐ธ
49 MW - operation - south east - Richborough Energy Park -
8195
Record Last Updated (dd/mm/yyyy): 19/04/2023
-> 11/01/2024
Development Status: Under Construction
-> Operational
Development Status (short): Under Construction
-> Operational
status: construction
-> operation ๐พ ๐ ๐ธ
49 MW - operation - scotland - Wishaw Battery Storage Facility -
9522
Operator (or Applicant): Spectrum Reserve Limited
-> Zenobe Energy
Site Name: Wishaw 49.9 Battery Storage Facility
-> Wishaw Battery Storage Facility
Development Status: Under Construction
-> Operational
Development Status (short): Under Construction
-> Operational
status: construction
-> operation ๐พ ๐ ๐ธ
33 MW - construction - yorkshire and humber - Wormald Green - Battery Energy Storage System -
10893
Record Last Updated (dd/mm/yyyy): 27/09/2022
-> 26/08/2023
Site Name: Station Lane, Burton Leonard - Battery Energy Storage System
-> Wormald Green - Battery Energy Storage System
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 26/08/2023
status: planning
-> construction ๐๏ธ
20 MW - operation - wales - Energy Centre Royal Mint -
7684
Record Last Updated (dd/mm/yyyy): 16/02/2022
-> 01/08/2023
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
Under Construction:
-> 01/05/2022
Operational:
-> 01/08/2023
status: planning
-> operation ๐พ ๐ ๐ธ
10 MW - planning - scotland - Binn Eco Park - Battery -
9098
Record Last Updated (dd/mm/yyyy): 02/03/2023
-> 27/10/2023
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Planning Authority: Perth and Kinross Council
-> Perth & Kinross Council
Under Construction:
-> 01/09/2023
status: planning
-> construction ๐๏ธ
1450 MW - planning - yorkshire and humber - Thorpe Marsh Power Station - Battery Energy Storage -
12453
Record Last Updated (dd/mm/yyyy): 06/02/2023
-> 12/10/2023
Operator (or Applicant): Banks Renewables Limited
-> West Burton Energy
1400 MW - planning - yorkshire and humber - Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage -
13644
Record Last Updated (dd/mm/yyyy): 13/04/2023
-> 12/10/2023
Operator (or Applicant): Banks Renewables Limited
-> West Burton Energy / Banks Group
1040 MW - planning - north west - Carrington Power Station, Manchester Road - Battery Storage -
13362
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> NA
550 MW - planning - east midlands - Spalding Energy Park - Battery Storage -
10173
Record Last Updated (dd/mm/yyyy): 12/07/2023
-> 28/12/2021
500 MW - planning - scotland - Devilla Energy Storage Facility -
9248
Record Last Updated (dd/mm/yyyy): 24/05/2022
-> 09/01/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 13/12/2028
500 MW - planning - scotland - Coalburn Energy - Battery Storage -
11034
Record Last Updated (dd/mm/yyyy): 10/07/2023
-> 20/04/2022
450 MW - planning - eastern - Gateway Energy Centre - Battery Energy Storage -
10309
Record Last Updated (dd/mm/yyyy): 30/01/2023
-> 17/12/2021
400 MW - planning - scotland - Kincardine Grid Services Complex - Energy Storage Facility -
10536
Record Last Updated (dd/mm/yyyy): 03/02/2022
-> 08/06/2022
400 MW - planning - scotland - Eccles Battery Energy Storage System -
11867
Megapack
Record Last Updated (dd/mm/yyyy): 29/09/2022
-> 12/09/2023
Operator (or Applicant): Weaver Power Limited
-> Zenobe Energy Limited
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 11/08/2028
349 MW - planning - west midlands - Cellarhead - Battery Site -
10013
Record Last Updated (dd/mm/yyyy): 24/06/2022
-> 29/11/2021
340 MW - planning - north west - Blackdyke Farm, Blackford - Battery Storage -
12710
Record Last Updated (dd/mm/yyyy): 12/07/2023
-> 10/10/2023
Operator (or Applicant): Novus Renewable Services Limited
-> Novus Renewable Services Limited / Story Construction
Installed Capacity (MWelec): 400
-> 340
Planning Authority: Carlisle Council
-> Carlisle City Council
Planning Application Reference: 23/0444
-> 23/0659
Planning Application Submitted: 21/06/2023
-> 22/09/2023
mw: 400
-> 340
300 MW - construction - scotland - Kilmarnock South Substation - Battery storage -
9696
Record Last Updated (dd/mm/yyyy): 14/02/2022
-> 27/09/2021
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Application Submitted: 01/04/2022
-> 22/02/2022
Planning Permission Expired:
-> 10/03/2028
300 MW - construction - scotland - Blackhillock Electricity Substation - Battery Energy Storage System -
9723
Record Last Updated (dd/mm/yyyy): 20/02/2023
-> 28/09/2021
264 MW - planning - south east - Bolney Substation - Battery Storage -
10843
Record Last Updated (dd/mm/yyyy): 18/05/2023
-> 22/03/2022
249 MW - planning - south east - Richborough Energy Park - Phase 3 (Sheaf) -
11201
Record Last Updated (dd/mm/yyyy): 22/05/2023
-> 10/05/2022
Site Name: Richborough Energy Park - Phase 3
-> Richborough Energy Park - Phase 3 (Sheaf)
240 MW - planning - yorkshire and humber - Springfield Farm, Hensall - Battery Energy Storage Facility -
11680
Record Last Updated (dd/mm/yyyy): 05/04/2023
-> 18/07/2022
Planning Application Reference: 2023/0285/FULM
-> 2022/0813/SCN
230 MW - construction - wales - Uskmouth Power Station - Battery Storage -
10936
Record Last Updated (dd/mm/yyyy): 20/12/2022
-> 06/04/2022
200 MW - planning - yorkshire and humber - Drax Re-Power -
7017
Record Last Updated (dd/mm/yyyy):
-> 02/01/2020
200 MW - planning - scotland - Whitehill Energy Storage -
10466
Record Last Updated (dd/mm/yyyy): 11/11/2022
-> 27/01/2022
200 MW - planning - scotland - Windyhill Battery Storage Facility -
10596
Record Last Updated (dd/mm/yyyy): 15/07/2022
-> 09/02/2022
200 MW - planning - north east - Worset Lane - Battery Energy Storage System -
11406
Record Last Updated (dd/mm/yyyy): 01/02/2023
-> 07/06/2022
200 MW - planning - west midlands - Little Beanit Farm, Balsall Common - Battery Storage -
11656
Record Last Updated (dd/mm/yyyy): 10/11/2022
-> 15/07/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 31/08/2026
150 MW - planning - eastern - Thurrock Flexible Generation Plant -
7696
Record Last Updated (dd/mm/yyyy): 26/05/2022
-> 04/10/2023
150 MW - construction - south east - Cleve Hill Solar Project -
7856
Record Last Updated (dd/mm/yyyy): 02/05/2023
-> 09/06/2022
Under Construction: 01/11/2022
->
150 MW - construction - north west - Fiddlers Ferry Power Station - Battery storage -
9404
Record Last Updated (dd/mm/yyyy): 06/07/2023
-> 08/08/2022
150 MW - planning - south west - Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility -
11612
Record Last Updated (dd/mm/yyyy): 23/01/2023
-> 08/07/2022
130 MW - planning - yorkshire and humber - Clough Road - Battery Energy System -
14225
Record Last Updated (dd/mm/yyyy): 06/07/2023
-> 20/09/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 12/09/2026
114 MW - planning - eastern - Hickling Lane, Swainsthorpe -Battery Storage -
13560
Record Last Updated (dd/mm/yyyy): 03/04/2023
-> 18/09/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 13/09/2026
100 MW - planning - scotland - Harestanes Windfarm -
7395
Record Last Updated (dd/mm/yyyy):
-> 25/06/2020
100 MW - planning - south east - Minchens Lane Battery Storage Facility -
8434
Record Last Updated (dd/mm/yyyy): 03/02/2023
-> 21/09/2023
Appeal Lodged:
-> 22/12/2021
100 MW - planning - scotland - Kilgallioch - Battery energy storage -
9007
Record Last Updated (dd/mm/yyyy): 12/05/2021
-> 18/09/2023
Operator (or Applicant): Scottish Renewables Limited
-> Scottish Power Renewables
Storage Type: Stand-alone Storage
-> Co-located with RE
Storage Co-location REPD Ref ID:
-> 4386
County: Strathclyde
-> Dumfries and Galloway
Planning Authority: South Ayrshire Council
-> Scottish Government (S36)
Planning Application Reference: 21/00387/DEEM
-> ECU00002197
Planning Application Submitted: 29/03/2021
-> 13/01/2021
100 MW - planning - eastern - North Walpole, St Peter - Battery Energy Storage -
9762
Record Last Updated (dd/mm/yyyy): 18/08/2022
-> 07/10/2021
100 MW - planning - south west - St Dennis - Battery Energy Storage -
10058
Record Last Updated (dd/mm/yyyy): 08/02/2022
-> 02/12/2021
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Are they re-applying (New REPD Ref):
-> 14461 & 14687
100 MW - planning - south east - Penn Croft Farm, Crondall - Battery Energy Storage Facility -
10163
Record Last Updated (dd/mm/yyyy): 06/02/2023
-> 24/12/2021
100 MW - planning - south west - Shaftesbury Energy Park - Battery Storage System -
10626
Record Last Updated (dd/mm/yyyy): 31/03/2023
-> 16/02/2022
100 MW - planning - eastern - Walpole St Andrew - Battery storage -
10876
Record Last Updated (dd/mm/yyyy): 11/10/2022
-> 29/03/2022
100 MW - planning - north west - Capenhurst Lane, Capenhurst - Battery Storage -
12503
Record Last Updated (dd/mm/yyyy): 03/11/2022
-> 13/12/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 08/12/2026
100 MW - operation - north west - National Grid Electricity Substation, Capenhurst Lane - Battery Storage -
12725
Planning Authority: Cheshire West & Chester Council
-> Cheshire West and Chester Council
Operational: 11/02/2023
->
100 MW - planning - north west - Hillside Farm, Lancaster Road - Battery Storage -
12964
Record Last Updated (dd/mm/yyyy): 05/01/2023
-> 28/09/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 19/09/2026
99 MW - planning - yorkshire and humber - Lakeside Energy Storage Facility -
8268
Megapack
Record Last Updated (dd/mm/yyyy): 21/06/2022
-> 09/12/2021
99 MW - planning - north east - South Thinford Lane, Thinford - Energy Storage -
10489
Record Last Updated (dd/mm/yyyy): 01/11/2022
-> 28/01/2022
99 MW - planning - yorkshire and humber - Neil Fox Way - Battery Storage -
11519
Record Last Updated (dd/mm/yyyy): 26/09/2022
-> 22/09/2022
99 MW - planning - south west - Linton Court Farm, Highnam - Battery storage -
13145
Record Last Updated (dd/mm/yyyy): 02/02/2023
-> 08/09/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 21/08/2026
95 MW - planning - yorkshire and humber - Winterton Road - Battery Energy Storage -
9608
Record Last Updated (dd/mm/yyyy): 25/01/2023
-> 15/09/2021
90 MW - planning - yorkshire and humber - Little Crow Solar Park -
7175
Record Last Updated (dd/mm/yyyy):
-> 07/04/2022
80 MW - operation - scotland - Aikengall II Community Wind Farm Battery -
7015
Record Last Updated (dd/mm/yyyy):
-> 27/03/2023
80 MW - construction - yorkshire and humber - Trondheim Way Battery energy storage -
8455
Record Last Updated (dd/mm/yyyy): 12/01/2022
-> 13/05/2021
80 MW - planning - scotland - Tealing Battery Energy Storage Farm -
11097
Record Last Updated (dd/mm/yyyy): 29/11/2022
-> 09/01/2024
Storage Type: Stand-alone Storage
-> Co-located with RE
Storage Co-location REPD Ref ID:
-> 14543
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 13/12/2028
79 MW - construction - south east - Stony Energy Storage Facility -
7001
Record Last Updated (dd/mm/yyyy):
-> 30/11/2022
70 MW - planning - north west - Tontine Road - Battery Energy Storage System -
9819
Record Last Updated (dd/mm/yyyy): 31/01/2023
-> 19/10/2021
70 MW - planning - north west - Sale Golf Club, Golf Road - Battery Storage -
13731
Record Last Updated (dd/mm/yyyy): 25/04/2023
-> 30/11/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 17/11/2026
69 MW - planning - eastern - Thurleigh Road - Battery Energy Storage -
9651
Record Last Updated (dd/mm/yyyy): 30/06/2023
-> 20/09/2021
62 MW - planning - wales - Wentlooge Renewable Energy Hub -
7192
Record Last Updated (dd/mm/yyyy):
-> 22/03/2019
60 MW - planning - north east - Greystones Road, Grangetown - Battery Energy Storage System -
10081
Record Last Updated (dd/mm/yyyy): 11/02/2022
-> 11/11/2021
Installed Capacity (MWelec): 360
-> 60
Planning Authority: Redcar and Cleveland Borough Council
-> Redcar & Cleveland Borough Council
mw: 360
-> 60
60 MW - planning - yorkshire and humber - Redcote Lane, Armley - Battery Storage Facility -
12224
Operator (or Applicant): Leeds Power Limited
-> Cambridge Power Limited
60 MW - planning - south west - Blackhill Quarry, Woodbury - Battery Energy Storage Facility -
12815
Record Last Updated (dd/mm/yyyy): 12/12/2022
-> 04/08/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 13/07/2026
57 MW - planning - north west - Capenhurst Lane -
8283
Record Last Updated (dd/mm/yyyy): 15/07/2022
-> 25/04/2023
57 MW - planning - north west - National Grids Rainhill Substation Battery storage facility -
8439
Record Last Updated (dd/mm/yyyy): 21/10/2022
-> 02/08/2021
57 MW - planning - north east - The Carrs - Meadow Farm Energy storage facility -
9207
Record Last Updated (dd/mm/yyyy): 05/05/2023
-> 26/09/2023
Operator (or Applicant): Meadow Farm Battery Limited
-> BayWa r.e.
Site Name: The Carrs - Energy storage facility
-> The Carrs - Meadow Farm Energy storage facility
Installed Capacity (MWelec): 60
-> 57
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 21/09/2026
mw: 60
-> 57
57 MW - planning - south east - Ash Lane, Little London - Battery Storage -
11090
Record Last Updated (dd/mm/yyyy): 16/02/2023
-> 27/04/2022
57 MW - planning - north west - Penwortham - Battery storage -
11217
Record Last Updated (dd/mm/yyyy): 17/10/2022
-> 10/05/2022
57 MW - planning - north west - Sutton Manor - Battery Storage Facility -
11559
Record Last Updated (dd/mm/yyyy): 21/10/2022
-> 28/06/2022
57 MW - planning - eastern - Braintree Road, Cressing - Battery Storage -
11995
Record Last Updated (dd/mm/yyyy): 06/09/2022
-> 11/09/2023
Operator (or Applicant): Pivot Power
-> Pivot Power (EDF Renewables)
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 01/09/2026
57 MW - planning - south east - Sellindge Substation, Church Lane - Battery Storage -
12351
Record Last Updated (dd/mm/yyyy): 19/10/2022
-> 11/09/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 04/08/2026
57 MW - planning - south east - Coxmoor Wood, Crondall Road - Battery Storage -
13728
Planning Application Withdrawn:
->
Planning Permission Refused:
->
Appeal Lodged:
->
Appeal Withdrawn:
->
Appeal Refused:
->
Appeal Granted:
->
Secretary of State - Intervened:
->
Secretary of State - Refusal:
->
Secretary of State - Granted:
->
Planning Permission Expired:
->
Under Construction:
->
Operational:
->
50 MW - operation - south west - Melksham Substation East Storage -
6953
Record Last Updated (dd/mm/yyyy):
-> 22/11/2022
50 MW - construction - northern ireland - Portadown Road -
7047
Record Last Updated (dd/mm/yyyy):
-> 23/06/2020
50 MW - construction - northern ireland - Dungannon Energy Storage System -
7050
Record Last Updated (dd/mm/yyyy):
-> 03/03/2020
50 MW - operation - scotland - Whitelee Wind Farm Battery Storage Extension -
7174
Record Last Updated (dd/mm/yyyy):
-> 21/02/2022
50 MW - planning - scotland - Clash Gour -
7178
Record Last Updated (dd/mm/yyyy):
-> 27/10/2022
50 MW - planning - wales - Garn Fach Wind Farm -
7705
Record Last Updated (dd/mm/yyyy): 11/05/2023
-> 26/05/2022
50 MW - operation - south west - Stonehill Energy Storage -
7773
Record Last Updated (dd/mm/yyyy): 01/11/2021
-> 09/10/2021
50 MW - planning - scotland - Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage -
8342
Record Last Updated (dd/mm/yyyy): 21/02/2022
-> 05/02/2021
50 MW - planning - south east - Upton Lane, Nursling - Battery Storage Facility -
9673
Record Last Updated (dd/mm/yyyy): 10/02/2022
-> 22/09/2021
Operator (or Applicant): Balance Power Projects Limited
-> Unknown
50 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage -
9910
Record Last Updated (dd/mm/yyyy): 11/11/2021
-> 15/01/2024
Development Status: Planning Application Submitted
-> Revised
Development Status (short): Application Submitted
-> Revised
Are they re-applying (New REPD Ref):
-> 15610
50 MW - planning - yorkshire and humber - Barlow Road, Barlow - Battery Storage -
9970
Record Last Updated (dd/mm/yyyy): 28/11/2022
-> 19/11/2021
50 MW - planning - eastern - Sundon Sub Station Battery Storage Facility -
9998
Record Last Updated (dd/mm/yyyy): 24/11/2021
-> 08/11/2023
Under Construction:
-> 01/07/2023
50 MW - planning - scotland - Electricity Sub Station, Strichen - Battery Storage Facility -
10039
Record Last Updated (dd/mm/yyyy): 04/03/2022
-> 02/12/2021
50 MW - planning - eastern - Ardleigh Road, Little Bromley - Battery Energy Storage -
10302
Record Last Updated (dd/mm/yyyy):
-> 01/11/2022
50 MW - planning - eastern - Newmarket Road, Bottisham - Battery Energy Storage -
10486
Record Last Updated (dd/mm/yyyy): 01/12/2022
-> 03/01/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 21/12/2026
50 MW - planning - north west - Huncoat Power Station - Battery Storage -
10516
Record Last Updated (dd/mm/yyyy): 23/01/2023
-> 01/02/2022
50 MW - planning - west midlands - Penstone Lane, Penn 1 - Battery Storage Facility -
10705
Record Last Updated (dd/mm/yyyy): 17/10/2022
-> 01/03/2022
County: West Midlands
-> Staffordshire
50 MW - planning - west midlands - Penstone Lane, Lower Penn 2 - Battery Storage -
10733
Record Last Updated (dd/mm/yyyy): 17/10/2022
-> 04/03/2022
50 MW - planning - scotland - Frodo Solar and Battery Energy Development -
10994
Record Last Updated (dd/mm/yyyy): 07/06/2023
-> 12/04/2022
50 MW - planning - west midlands - Lowlands Farm - Battery Storage -
11399
Record Last Updated (dd/mm/yyyy): 04/01/2023
-> 06/06/2022
50 MW - planning - yorkshire and humber - Swangate Project - Energy Storage System -
11437
Record Last Updated (dd/mm/yyyy): 22/12/2022
-> 09/06/2022
50 MW - planning - eastern - Third Drove, Fengate - Battery Storage -
11558
Record Last Updated (dd/mm/yyyy): 28/06/2022
-> 16/01/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 05/01/2026
50 MW - planning - south west - Says Court Farm, Coalpit Heath - Battery Energy Storage -
11793
Record Last Updated (dd/mm/yyyy): 14/11/2022
-> 04/08/2022
50 MW - planning - scotland - Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility -
12780
Record Last Updated (dd/mm/yyyy): 05/12/2022
-> 19/12/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 11/12/2026
50 MW - planning - north east - Whelley Hill Farm, Worset Lane - Battery Energy Storage -
13246
Record Last Updated (dd/mm/yyyy): 20/02/2023
-> 02/01/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Authority: Hartlepool Council
-> Hartlepool Borough Council
Planning Permission Expired:
-> 07/12/2026
50 MW - planning - scotland - Fairways Business Park - Battery Storage -
13318
Planning Authority: Highlands Council
-> Highland Council
49 MW - operation - eastern - Pelham -
6898
Record Last Updated (dd/mm/yyyy):
-> 03/01/2019
49 MW - operation - north west - Roosecote -
6912
Record Last Updated (dd/mm/yyyy):
-> 30/11/2018
49 MW - operation - east midlands - West Burton -
6920
Record Last Updated (dd/mm/yyyy):
-> 27/11/2018
49 MW - planning - eastern - Tollgate Battery Storage Facility -
6949
Record Last Updated (dd/mm/yyyy):
-> 23/11/2018
49 MW - operation - yorkshire and humber - Pillswood Phase 1 -
7005
Megapack
Record Last Updated (dd/mm/yyyy):
-> 09/11/2022
49 MW - cancelled - south west - Ravensroost Farm, Minety - Battery Energy Storage -
7014
Record Last Updated (dd/mm/yyyy):
-> 29/06/2022
49 MW - operation - yorkshire and humber - Nether Moor Field -
7019
Record Last Updated (dd/mm/yyyy):
-> 27/05/2020
49 MW - planning - eastern - Norwich Substation Storage Facility -
7021
Record Last Updated (dd/mm/yyyy):
-> 17/09/2020
49 MW - operation - south west - Mannington Battery Storage Plant -
7024
Record Last Updated (dd/mm/yyyy):
-> 14/09/2022
49 MW - planning - north west - Middleton Clean Energy Plant -
7029
Record Last Updated (dd/mm/yyyy):
-> 26/09/2022
Operator (or Applicant): Lancaster Power
-> Infra Balance New Energy
49 MW - planning - eastern - Hilfield Farm Tech -
7030
Record Last Updated (dd/mm/yyyy):
-> 26/03/2020
49 MW - planning - north east - Lackenby -
7040
Record Last Updated (dd/mm/yyyy):
-> 23/07/2019
49 MW - construction - east midlands - Enderby Storage, Redcomb Farm -
7044
Record Last Updated (dd/mm/yyyy):
-> 01/04/2021
49 MW - planning - south west - Ellbridge Lane -
7051
Record Last Updated (dd/mm/yyyy):
-> 23/11/2022
49 MW - planning - yorkshire and humber - Elland Storage Project -
7053
Record Last Updated (dd/mm/yyyy):
-> 14/11/2019
49 MW - planning - eastern - Chapel Farm -
7058
Megapack
Record Last Updated (dd/mm/yyyy):
-> 13/06/2019
49 MW - planning - south east - Lovedean Energy Storage System -
7064
Record Last Updated (dd/mm/yyyy):
-> 16/05/2019
Judicial Review: 07/09/2018
-> 43350
49 MW - planning - east midlands - Cottam Power Station -
7066
Record Last Updated (dd/mm/yyyy):
-> 12/08/2020
49 MW - construction - south east - Sundridge Hill -
7081
Record Last Updated (dd/mm/yyyy):
-> 17/03/2022
49 MW - planning - yorkshire and humber - Land Adjacent to 4 Redcote Lane (Armley) -
7111
Record Last Updated (dd/mm/yyyy):
-> 19/01/2022
49 MW - operation - yorkshire and humber - Creyke Beck -
7122
Record Last Updated (dd/mm/yyyy):
-> 28/01/2019
49 MW - planning - eastern - Braintree Road Substation -
7161
Record Last Updated (dd/mm/yyyy):
-> 06/09/2022
49 MW - construction - south east - Halewick Lane, Sompting - Battery-based Energy Storage Facility -
7168
Record Last Updated (dd/mm/yyyy):
-> 17/10/2022
49 MW - construction - yorkshire and humber - Osbaldwick Substation -
7172
Record Last Updated (dd/mm/yyyy):
-> 27/07/2022
49 MW - operation - south west - Minety South - Battery Storage -
7184
Record Last Updated (dd/mm/yyyy):
-> 21/08/2020
49 MW - planning - eastern - Burwell Main Sub-Station -
7272
Record Last Updated (dd/mm/yyyy):
-> 29/04/2019
49 MW - planning - eastern - Sundon Substation -
7283
Record Last Updated (dd/mm/yyyy):
-> 30/04/2019
49 MW - construction - eastern - Tollgate Farm Battery Storage -
7335
Record Last Updated (dd/mm/yyyy):
-> 01/02/2022
49 MW - operation - yorkshire and humber - Pillswood Phase 2 -
7360
Megapack
Record Last Updated (dd/mm/yyyy):
-> 01/11/2022
49 MW - construction - south east - Kemsley Substation -
7368
Record Last Updated (dd/mm/yyyy):
-> 15/11/2019
49 MW - construction - scotland - Ferrymuir -
7371
Record Last Updated (dd/mm/yyyy):
-> 29/07/2022
49 MW - planning - north west - Harker Grid Sub Station -
7462
Record Last Updated (dd/mm/yyyy):
-> 17/09/2020
49 MW - construction - south west - Salisbury Substation -
7510
Record Last Updated (dd/mm/yyyy):
-> 16/03/2023
49 MW - construction - south east - Cowley electricity sub-station -
7571
Record Last Updated (dd/mm/yyyy):
-> 17/09/2020
49 MW - construction - yorkshire and humber - Bradford West Substation (Harrop Edge Farm) -
7577
Record Last Updated (dd/mm/yyyy):
-> 08/07/2022
49 MW - planning - south east - Rye Common -
7737
Megapack
Record Last Updated (dd/mm/yyyy):
-> 12/03/2020
Operator (or Applicant): Harmony Energy Storage
-> Pulse Clean Energy
Are they re-applying (Old REPD Ref) :
-> 7028
49 MW - operation - north west - Liverpool Energy Management Facility -
7772
Record Last Updated (dd/mm/yyyy): 22/06/2023
-> 01/03/2022
49 MW - planning - east midlands - Newton Wood Farm -
7780
Record Last Updated (dd/mm/yyyy): 07/02/2021
-> 22/03/2022
49 MW - planning - north west - Welkin Mill -
7832
Record Last Updated (dd/mm/yyyy): 05/01/2023
-> 12/08/2020
49 MW - construction - west midlands - Coventry National Grid Substation -
7885
Record Last Updated (dd/mm/yyyy): 11/11/2022
-> 25/06/2020
49 MW - planning - eastern - Reach Road -
7906
Record Last Updated (dd/mm/yyyy): 30/09/2020
-> 30/06/2020
49 MW - operation - scotland - Dundee Technology Park -
7946
Record Last Updated (dd/mm/yyyy): 07/02/2021
-> 30/09/2020
Operational: 21/06/2021
->
49 MW - construction - north west - Unit 5 XL Business Park -
7985
Record Last Updated (dd/mm/yyyy): 30/07/2021
-> 30/06/2020
49 MW - planning - london - Mill Hill National Grid Substation -
8009
Record Last Updated (dd/mm/yyyy): 21/03/2023
-> 27/03/2023
49 MW - planning - south west - National Grid Minety Substation -
8021
Record Last Updated (dd/mm/yyyy): 07/02/2021
-> 22/12/2022
49 MW - planning - northern ireland - Colinglen Road Battery -
8033
Record Last Updated (dd/mm/yyyy): 30/09/2020
-> 15/08/2022
49 MW - construction - east midlands - National Grid Enderby Substation -
8037
Record Last Updated (dd/mm/yyyy): 25/01/2023
-> 30/09/2020
49 MW - planning - south west - Claydon Farm - Solar Farm & Battery Storage -
8039
Record Last Updated (dd/mm/yyyy): 10/05/2022
-> 07/02/2021
49 MW - construction - south west - Larks Green Solar Farm -
8052
Record Last Updated (dd/mm/yyyy): 06/06/2023
-> 30/09/2020
49 MW - planning - north west - Welkin Mill -
8055
Record Last Updated (dd/mm/yyyy): 05/01/2023
-> 10/12/2021
49 MW - planning - scotland - Torrdhuin, Auchteraw Battery Storage Facility -
8096
Record Last Updated (dd/mm/yyyy): 12/01/2021
-> 04/08/2023
49 MW - planning - scotland - Platchaig House, Kilmorack - Battery Storage Facility -
8248
Record Last Updated (dd/mm/yyyy): 02/08/2021
-> 31/07/2023
Development Status: Planning Application Submitted
-> Revised
Development Status (short): Application Submitted
-> Revised
Are they re-applying (New REPD Ref):
-> 14373
Planning Permission Refused:
-> 30/08/2022
49 MW - planning - eastern - Brentwood nergy Storage System -
8249
Record Last Updated (dd/mm/yyyy): 12/01/2021
-> 08/07/2022
49 MW - planning - eastern - Crouch Solar Farm -
8358
Record Last Updated (dd/mm/yyyy): 14/03/2022
-> 11/07/2023
Site Name: Park Farm, Herongate Solar Photovoltaic PV Farm
-> Crouch Solar Farm
49 MW - planning - scotland - Old Gallows Road - Battery storage -
8368
Record Last Updated (dd/mm/yyyy): 28/04/2021
-> 08/02/2021
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Authority: Perth and Kinross Council
-> Perth & Kinross Council
Planning Permission Expired:
-> 03/08/2024
49 MW - planning - scotland - Shindour - Energy Storage Facility -
8464
Record Last Updated (dd/mm/yyyy): 11/11/2022
-> 28/05/2021
49 MW - construction - south west - Mannington Battery Energy Storage System -
8833
Record Last Updated (dd/mm/yyyy): 01/02/2023
-> 26/03/2021
49 MW - planning - south west - Moreton Lane - Solar Farm & Battery Storage -
8844
Site Name: Whitminster - Solar Farm & Battery Storage
-> Moreton Lane - Solar Farm & Battery Storage
49 MW - planning - eastern - Rush Green Motors - Battery storage -
8987
Record Last Updated (dd/mm/yyyy): 15/09/2022
-> 11/10/2023
49 MW - planning - scotland - East Kilbride - Battery storage -
9013
Record Last Updated (dd/mm/yyyy): 04/11/2022
-> 15/12/2023
Operator (or Applicant): Cathkin Energy Storage Limited
-> Engie Regeneration Limited
49 MW - planning - scotland - Newhouse Farm - Energy Storage Facility -
9047
Record Last Updated (dd/mm/yyyy): 08/02/2023
-> 29/07/2022
Planning Authority: Perth and Kinross Council
-> Perth & Kinross Council
49 MW - construction - north west - Bredbury Substation - Battery Storage Facility -
9653
Record Last Updated (dd/mm/yyyy): 11/04/2023
-> 20/09/2021
49 MW - planning - east midlands - Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage -
9796
Record Last Updated (dd/mm/yyyy): 24/02/2023
-> 13/10/2021
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 02/10/2026
49 MW - planning - yorkshire and humber - Common Farm - Solar Farm & Battery Storage -
9877
Record Last Updated (dd/mm/yyyy): 13/07/2023
-> 01/11/2021
49 MW - planning - scotland - Drum Farm - Battery Energy Storage System -
9940
Record Last Updated (dd/mm/yyyy): 22/11/2022
-> 17/11/2021
49 MW - planning - scotland - Stainland Energy Storage Project -
10225
Record Last Updated (dd/mm/yyyy): 14/12/2022
-> 29/12/2021
Planning Authority: Highlands Council
-> Highland Council
49 MW - planning - yorkshire and humber - Elland Storage Project -
10236
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Are they re-applying (New REPD Ref):
-> 15304
49 MW - planning - scotland - Newburgh Road, Abernethy - Battery Storage -
10607
Record Last Updated (dd/mm/yyyy): 25/10/2022
-> 11/02/2022
Planning Authority: Perth and Kinross Council
-> Perth & Kinross Council
49 MW - planning - scotland - Rothienorman - Battery Storage -
10638
Record Last Updated (dd/mm/yyyy): 22/11/2022
-> 16/02/2022
49 MW - planning - scotland - Midmill, Kintore - Battery Energy Storage -
10701
Record Last Updated (dd/mm/yyyy): 20/07/2022
-> 01/03/2022
49 MW - operation - scotland - Jamesfield Organic Centre - Battery Storage -
10863
Megapack
Record Last Updated (dd/mm/yyyy): 12/01/2023
-> 24/03/2022
Planning Authority: Perth and Kinross Council
-> Perth & Kinross Council
49 MW - planning - scotland - Broomloan Road - Battery Energy Storage -
10886
Record Last Updated (dd/mm/yyyy): 08/07/2022
-> 29/03/2022
49 MW - planning - scotland - Law Of Doune Road, Macduff - Battery Storage -
10894
Record Last Updated (dd/mm/yyyy): 16/02/2023
-> 07/12/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> NA
49 MW - planning - north east - Hawthorn Grid Site - Battery Storage -
10896
Record Last Updated (dd/mm/yyyy): 05/12/2022
-> 30/03/2022
49 MW - planning - scotland - South Leylodge Farmhouse, Kintore - Battery Energy Storage System -
11092
Record Last Updated (dd/mm/yyyy): 02/05/2023
-> 27/04/2022
49 MW - planning - west midlands - Brown Edge - Battery Storage -
11418
Record Last Updated (dd/mm/yyyy): 18/03/2021
-> 03/11/2021
49 MW - planning - south east - Harrington Franklin, Richborough Energy Park - Battery Storage -
11449
Record Last Updated (dd/mm/yyyy): 12/12/2022
-> 14/06/2022
49 MW - planning - scotland - Well Street - Battery Storage -
11473
Record Last Updated (dd/mm/yyyy): 22/06/2023
-> 31/03/2023
49 MW - planning - scotland - Kellwood Road - Battery Storage -
11545
Record Last Updated (dd/mm/yyyy): 17/04/2023
-> 24/06/2022
49 MW - planning - scotland - Overhill Farm, Rothienorman - Battery Energy Storage -
11590
Record Last Updated (dd/mm/yyyy): 02/03/2023
-> 05/07/2022
49 MW - planning - scotland - Holmston Road - Battery Storage Facility -
11679
Record Last Updated (dd/mm/yyyy): 06/07/2023
-> 18/07/2022
Planning Application Reference: 23/00176/APPM
-> 22/00505/PAN
Planning Permission Expired: 30/06/2023
-> 30/06/2026
49 MW - construction - london - Clay Tye Farm Phase 1 - Storage Facility -
11720
Planning Authority: London Borough of Havering Council
-> London Borough of Havering
49 MW - construction - london - Clay Tye Farm Phase 2 - Storage Facility -
11721
Planning Authority: London Borough of Havering Council
-> London Borough of Havering
49 MW - planning - scotland - Househill House, Househill - Battery Storage -
12056
Planning Authority: Highlands Council
-> Highland Council
49 MW - planning - scotland - Meetlaw Farm, Fordoun - Battery Energy Storage System -
12361
Record Last Updated (dd/mm/yyyy): 01/02/2023
-> 04/10/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 19/09/2029
49 MW - planning - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility -
12936
Record Last Updated (dd/mm/yyyy): 22/12/2022
-> 13/11/2023
Development Status: Planning Application Submitted
-> Revised
Development Status (short): Application Submitted
-> Revised
Are they re-applying (New REPD Ref):
-> 15230
49 MW - planning - north west - Welkin Mill, Welkin Road - Battery Storage -
12982
Record Last Updated (dd/mm/yyyy): 05/01/2023
-> 23/08/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 01/08/2026
49 MW - planning - scotland - Drumore Cottage, Swordale - Battery Storage -
12983
Planning Authority: Highlands Council
-> Highland Council
49 MW - planning - scotland - Middleton Of Blackhills, Rothienorman - Battery Energy Storage System -
13087
Record Last Updated (dd/mm/yyyy): 25/05/2023
-> 18/09/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 07/09/2026
49 MW - planning - south west - Landulph Substation, Ellbridge Lane - Battery Energy Storage -
13461
Record Last Updated (dd/mm/yyyy): 20/03/2023
-> 11/09/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 05/09/2026
49 MW - planning - scotland - Forest Avenue Cottage, Drumlithie - Battery Energy Storage -
13986
Record Last Updated (dd/mm/yyyy): 31/05/2023
-> 30/11/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 14/11/2028
48 MW - planning - northern ireland - Classic Marble Showers Site -
7208
Record Last Updated (dd/mm/yyyy):
-> 16/04/2020
47 MW - planning - south west - Indian Queens Sub-Station - Battery Storage -
11725
Record Last Updated (dd/mm/yyyy): 01/11/2022
-> 25/07/2022
45 MW - planning - scotland - Pleasance Road -
7217
Record Last Updated (dd/mm/yyyy):
-> 08/03/2022
Planning Authority: Perth and Kinross Council
-> Perth & Kinross Council
45 MW - planning - north west - Cheshire Power Station - Battery Storage Facility -
10295
Record Last Updated (dd/mm/yyyy): 06/06/2023
-> 22/12/2021
45 MW - planning - north east - Edge Lane, Maiden Law - Solar Farm & Battery Storage -
11619
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 13/07/2026
45 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage -
12711
Record Last Updated (dd/mm/yyyy): 18/04/2023
-> 03/07/2023
45 MW - planning - north west - Mount Pleasant Farm, Green Lane - Battery Storage -
13011
Record Last Updated (dd/mm/yyyy): 12/01/2023
-> 30/10/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 03/10/2026
43 MW - planning - scotland - Ballingall Farm, Leslie - Battery Energy Storage System -
10825
Record Last Updated (dd/mm/yyyy): 25/05/2023
-> 18/03/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 14/09/2026
43 MW - planning - scotland - Merchiston Industrial Estate, Smith Street - Battery Storage -
13225
County: Central
-> Falkirk
42 MW - planning - scotland - South Pargillis - Battery Storage -
9564
Record Last Updated (dd/mm/yyyy): 14/06/2023
-> 09/09/2021
42 MW - planning - scotland - Armadale Wind Farm -
11219
Record Last Updated (dd/mm/yyyy): 18/05/2022
-> 10/05/2022
41 MW - operation - west midlands - Bloxwich Battery -
8160
Record Last Updated (dd/mm/yyyy): 02/10/2020
-> 30/09/2020
Operational: 01/07/2019
->
40 MW - planning - east midlands - Breach Farm - Energy Barn -
6914
Record Last Updated (dd/mm/yyyy):
-> 27/05/2022
40 MW - planning - eastern - Norwich Road Industrial Estate -
6958
Record Last Updated (dd/mm/yyyy):
-> 04/11/2022
40 MW - planning - east midlands - Breach Farm -
6962
Record Last Updated (dd/mm/yyyy):
-> 27/05/2022
40 MW - construction - south east - Land off Queenborough Road -
7003
Record Last Updated (dd/mm/yyyy):
-> 12/01/2021
40 MW - construction - scotland - Bilbo Solar Farm Energy Storage -
7020
Record Last Updated (dd/mm/yyyy):
-> 30/07/2020
40 MW - planning - eastern - Maldon Hall -
7095
Record Last Updated (dd/mm/yyyy):
-> 23/12/2021
40 MW - planning - west midlands - Rubber and Allied Products -
7096
Record Last Updated (dd/mm/yyyy):
-> 20/04/2020
40 MW - operation - south east - Huggin's Hall -
7129
Record Last Updated (dd/mm/yyyy):
-> 23/10/2018
40 MW - planning - west midlands - Whitehouse Farm Energy Barn -
7987
Record Last Updated (dd/mm/yyyy): 27/05/2022
-> 30/06/2020
40 MW - planning - south east - Loudwater Battery Storage Site -
8142
Record Last Updated (dd/mm/yyyy): 12/12/2022
-> 30/09/2020
40 MW - operation - south east - Newlands Farm Battery Storage Facility Phase 2 -
8264
Record Last Updated (dd/mm/yyyy): 12/01/2021
-> 18/03/2022
40 MW - planning - scotland - Dalmarnock Road - Battery Storage -
8507
Record Last Updated (dd/mm/yyyy): 11/05/2022
-> 09/03/2021
40 MW - planning - south west - Forest Gate - Solar Farm & Battery Storage -
9230
Record Last Updated (dd/mm/yyyy): 14/03/2023
-> 28/06/2021
40 MW - planning - yorkshire and humber - Field House Solar Farm -
10970
Record Last Updated (dd/mm/yyyy): 28/07/2022
-> 11/04/2022
40 MW - planning - north east - Long Pasture Farm, Little Stainton - Solar Farm -
12952
Record Last Updated (dd/mm/yyyy): 23/12/2022
-> 14/08/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 10/08/2030
40 MW - planning - yorkshire and humber - Tofts Lane, Hunshelf - Battery Storage -
13733
Record Last Updated (dd/mm/yyyy): 25/04/2023
-> 17/11/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 13/11/2028
40 MW - planning - northern ireland - Doogary Road, Omagh - Battery Storage -
14125
County: Fermanagh & Omagh
-> Co. Fermanagh & Omagh
37 MW - planning - scotland - STOR Field 9 -
7018
Record Last Updated (dd/mm/yyyy):
-> 25/04/2023
36 MW - planning - northern ireland - Lisnabreeny Road -
7556
Record Last Updated (dd/mm/yyyy):
-> 25/06/2020
36 MW - planning - south west - Kingston Road, Slimbridge - Battery Storage -
11516
Development Status: Planning Application Submitted
-> Revised
Development Status (short): Application Submitted
-> Revised
Are they re-applying (New REPD Ref):
-> 14882
Planning Permission Expired:
-> 26/04/2026
35 MW - operation - north east - Port of Tyne -
6976
Record Last Updated (dd/mm/yyyy):
-> 09/05/2019
35 MW - planning - yorkshire and humber - Rusholme Grange -
7093
Record Last Updated (dd/mm/yyyy):
-> 16/09/2019
35 MW - planning - south west - Northington Lane - Battery Storage Facility -
9992
Record Last Updated (dd/mm/yyyy): 18/05/2023
-> 23/11/2021
32 MW - operation - south west - Severn Road -
7085
Record Last Updated (dd/mm/yyyy):
-> 13/10/2022
32 MW - planning - south west - Gloucestershire Science and Technology Park (small) -
7181
Record Last Updated (dd/mm/yyyy):
-> 14/03/2022
32 MW - planning - yorkshire and humber - Kirkhaw Lane Battery Storage -
8430
Record Last Updated (dd/mm/yyyy): 24/02/2022
-> 02/03/2021
32 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage -
10145
Record Last Updated (dd/mm/yyyy): 04/03/2022
-> 19/01/2022
32 MW - planning - south west - Post Farm, Lytchett Minster - Battery Energy Storage -
10291
Record Last Updated (dd/mm/yyyy): 31/05/2023
-> 24/01/2022
31 MW - planning - scotland - Benthead Farm - Solar Farm & Battery Storage -
10542
Record Last Updated (dd/mm/yyyy): 09/02/2023
-> 03/02/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 11/08/2028
30 MW - planning - south west - Gloucestershire Science and Technology Park -
7067
Record Last Updated (dd/mm/yyyy):
-> 14/03/2022
30 MW - operation - south west - Fideoak Mills -
7152
Record Last Updated (dd/mm/yyyy):
-> 21/09/2022
30 MW - planning - south west - Catsbrain Farm -
7988
Record Last Updated (dd/mm/yyyy): 04/08/2022
-> 30/06/2020
30 MW - planning - scotland - Roaring Hill (Resubmission) -
7989
Record Last Updated (dd/mm/yyyy): 30/06/2020
-> 24/01/2023
Post Code:
-> KY6 3ET
30 MW - planning - scotland - Blackpark Energy Storage -
8105
Record Last Updated (dd/mm/yyyy): 22/01/2021
-> 12/01/2021
Under Construction:
-> Implemented
30 MW - planning - scotland - Drumcross Battery Storage -
8155
Record Last Updated (dd/mm/yyyy): 15/09/2022
-> 06/12/2023
Post Code:
-> EH54 6WF
30 MW - planning - scotland - Farburn Place - Energy Storage Facility -
8385
Record Last Updated (dd/mm/yyyy): 21/12/2022
-> 08/02/2021
30 MW - planning - scotland - Jamesfield Organic Centre, Phase 1 -
10456
Planning Authority: Perth and Kinross Council
-> Perth & Kinross Council
30 MW - planning - eastern - Colton - Solar photovoltaic farm, Battery storage -
10945
Record Last Updated (dd/mm/yyyy): 08/07/2022
-> 05/01/2024
30 MW - planning - north east - West Sleekburn - Battery Storage Compound -
10957
Record Last Updated (dd/mm/yyyy): 21/10/2022
-> 06/04/2022
30 MW - planning - west midlands - Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage -
10978
Record Last Updated (dd/mm/yyyy): 02/03/2023
-> 11/04/2022
30 MW - planning - scotland - West Bendings - Battery Storage -
10985
Record Last Updated (dd/mm/yyyy): 04/07/2023
-> 11/04/2022
30 MW - planning - south west - Catsbrain Farm - Battery Storage -
11787
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 03/10/2026
30 MW - planning - west midlands - Rectory Farm, Rectory Lane - Battery Storage -
11905
Operator (or Applicant): Private Developer
-> Balance Power Projects Limited
Installed Capacity (MWelec): 50
-> 30
mw: 50
-> 30
30 MW - planning - yorkshire and humber - Back Lane, Skerne - Solar Farm & Battery Storage -
12297
Under Construction:
-> Implemented
30 MW - planning - yorkshire and humber - North Lincolnshire Green Energy Park -
12706
Record Last Updated (dd/mm/yyyy): 24/11/2022
-> 11/01/2024
30 MW - planning - scotland - Bishopmill - Battery Energy Storage -
14191
Record Last Updated (dd/mm/yyyy): 03/07/2023
-> 02/01/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 21/12/2026
29 MW - planning - scotland - Fordtown Energy Storage -
7764
Record Last Updated (dd/mm/yyyy): 30/06/2020
-> 17/09/2020
29 MW - planning - scotland - Learielaw Farm -
7970
Record Last Updated (dd/mm/yyyy): 06/03/2023
-> 16/11/2022
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Are they re-applying (New REPD Ref):
-> 13368
28 MW - construction - eastern - Lower Dunton Road Battery Storage Facility -
8213
Record Last Updated (dd/mm/yyyy): 24/02/2021
-> 11/01/2022
27 MW - operation - yorkshire and humber - Boscar Grange Farm -
7332
Record Last Updated (dd/mm/yyyy):
-> 18/12/2019
26 MW - planning - yorkshire and humber - West Melton Electricity Substation - Energy Storage System -
11436
Record Last Updated (dd/mm/yyyy): 23/09/2022
-> 23/11/2023
25 MW - operation - north east - Tynemouth Energy Storage System (TESS) -
6925
Record Last Updated (dd/mm/yyyy):
-> 03/08/2018
23 MW - operation - east midlands - Asfordby Business Park (1) -
6932
Record Last Updated (dd/mm/yyyy):
-> 28/04/2020
22 MW - operation - wales - Pen y Cymoedd Energy Storage -
6927
Record Last Updated (dd/mm/yyyy):
-> 03/01/2019
21 MW - operation - eastern - Clayhill Farm - Battery Energy Storage -
7570
Record Last Updated (dd/mm/yyyy):
-> 14/09/2022
Operational:
-> 01/10/2019
20 MW - operation - scotland - Broxburn -
6910
Record Last Updated (dd/mm/yyyy):
-> 18/04/2019
20 MW - operation - west midlands - Land to the west of Clay Hill Pit / Larport Farm -
6911
Record Last Updated (dd/mm/yyyy):
-> 20/01/2020
20 MW - operation - west midlands - Noriker Power Staunch -
6918
Record Last Updated (dd/mm/yyyy):
-> 09/05/2019
20 MW - planning - wales - Traston Road -
6929
Record Last Updated (dd/mm/yyyy):
-> 08/09/2023
Operator (or Applicant): UK Power Reserve
-> Field Energy
Planning Permission Expired: 03/11/2021
-> 27/07/2028
20 MW - construction - east midlands - Chelveston Renewable Energy Park -
6941
Record Last Updated (dd/mm/yyyy):
-> 27/05/2020
20 MW - operation - north east - Ray Battery Storage Facility -
6943
Record Last Updated (dd/mm/yyyy):
-> 27/03/2023
20 MW - operation - eastern - Claredown Farm -
6945
Record Last Updated (dd/mm/yyyy):
-> 26/11/2019
20 MW - planning - london - Riverside Energy Park -
7036
Record Last Updated (dd/mm/yyyy):
-> 06/04/2022
20 MW - planning - west midlands - Perseverance Road -
7061
Record Last Updated (dd/mm/yyyy):
-> 24/02/2022
20 MW - operation - east midlands - Calow Green Farm -
7140
Record Last Updated (dd/mm/yyyy):
-> 31/03/2023
20 MW - operation - yorkshire and humber - Kirkhaw Lane -
7148
Record Last Updated (dd/mm/yyyy):
-> 19/01/2022
20 MW - planning - yorkshire and humber - Kirkhaw Lane -
7149
Record Last Updated (dd/mm/yyyy):
-> 24/02/2022
20 MW - operation - north west - Land at Carnegie Road -
7155
Record Last Updated (dd/mm/yyyy):
-> 02/01/2019
20 MW - planning - scotland - Blackpark Farm -
7226
Record Last Updated (dd/mm/yyyy):
-> 22/08/2019
20 MW - planning - scotland - Fordtown Energy Storage -
7234
Record Last Updated (dd/mm/yyyy):
-> 20/08/2019
20 MW - planning - scotland - Stranoch 2 -
7306
Record Last Updated (dd/mm/yyyy):
-> 24/11/2021
20 MW - planning - scotland - Troston Loch Wind Farm -
7333
Record Last Updated (dd/mm/yyyy):
-> 18/12/2020
Operator (or Applicant): EDF Renewables
-> EDF Energy Renewables
Planning Permission Expired: 18/12/2023
-> 18/12/2026
20 MW - construction - south east - Plot 2B EurolinkV -
7383
Record Last Updated (dd/mm/yyyy):
-> 13/12/2021
20 MW - planning - scotland - Douglas West Wind Farm (extension) -
7460
Record Last Updated (dd/mm/yyyy):
-> 02/07/2019
20 MW - operation - north west - Lascar Works -
7464
Record Last Updated (dd/mm/yyyy):
-> 03/07/2019
20 MW - planning - scotland - Hagshaw Hill -
7572
Record Last Updated (dd/mm/yyyy):
-> 25/03/2020
20 MW - construction - north west - Gipsy Lane -
7632
Record Last Updated (dd/mm/yyyy): 12/01/2022
-> 01/07/2021
20 MW - operation - south west - Feeder Road -
7663
Record Last Updated (dd/mm/yyyy): 13/06/2023
-> 01/05/2023
20 MW - planning - south east - Basing Road -
7746
Record Last Updated (dd/mm/yyyy): 15/09/2021
-> 24/02/2023
20 MW - construction - north west - Hawthorne Road -
7800
Record Last Updated (dd/mm/yyyy): 19/04/2023
-> 30/09/2020
20 MW - planning - scotland - Arecleoch Wind Farm (extension) -
7882
Record Last Updated (dd/mm/yyyy): 18/11/2021
-> 20/02/2023
20 MW - construction - south east - Mill Lane, Nursling - Battery Storage Facility -
8099
Record Last Updated (dd/mm/yyyy): 22/05/2023
-> 02/03/2022
20 MW - planning - east midlands - Vicarage Drove - Solar farm & Battery storage -
8518
Record Last Updated (dd/mm/yyyy): 04/11/2022
-> 11/05/2022
20 MW - planning - east midlands - Mount Road, Castle Gresley - Battery Storage Facility -
10012
Record Last Updated (dd/mm/yyyy): 18/08/2022
-> 29/11/2021
20 MW - planning - north west - Broadgate, Chadderton - Battery Storage Containers -
10690
Record Last Updated (dd/mm/yyyy): 14/06/2022
-> 01/03/2022
20 MW - planning - scotland - Strathruddie, Kinglassie - Solar farm -
10828
Record Last Updated (dd/mm/yyyy): 18/07/2022
-> 21/03/2022
20 MW - planning - east midlands - West Burton Solar Project -
10917
Record Last Updated (dd/mm/yyyy): 11/04/2023
-> 01/04/2022
20 MW - planning - scotland - Chleansaid Onshore Wind Farm -
10997
Record Last Updated (dd/mm/yyyy): 12/04/2022
-> 09/01/2024
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 15/12/2026
20 MW - planning - scotland - Grayside Wind Farm -
11113
CfD Capacity (MW):
-> 7
Turbine Capacity (MW): 7
->
20 MW - construction - north west - Chadderton - Battery energy storage facility -
11160
Record Last Updated (dd/mm/yyyy): 07/06/2022
-> 09/05/2022
20 MW - operation - south west - Hawkers Hill Energy Park -
12293
Operational: 03/10/2022
->
20 MW - planning - west midlands - Fordhouse Lane - Battery Energy Storage System -
13108
Record Last Updated (dd/mm/yyyy): 31/01/2023
-> 11/09/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 18/08/2026
20 MW - planning - north west - Peel Road, Westby With Plumptons - Battery Storage -
13300
Record Last Updated (dd/mm/yyyy): 24/02/2023
-> 25/09/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 22/09/2026
20 MW - planning - south west - Fair Park Solar Farm -
13761
Planning Application Withdrawn:
->
Planning Permission Refused:
->
Appeal Lodged:
->
Appeal Withdrawn:
->
Appeal Refused:
->
Appeal Granted:
->
Secretary of State - Intervened:
->
Secretary of State - Refusal:
->
Secretary of State - Granted:
->
Planning Permission Expired:
->
Under Construction:
->
Operational:
->
19 MW - planning - scotland - Land North of Thornton Road -
7131
Record Last Updated (dd/mm/yyyy):
-> 29/04/2020
19 MW - planning - scotland - North West Of Jameston Farm -
7133
Record Last Updated (dd/mm/yyyy):
-> 27/09/2021
19 MW - planning - scotland - Jamesfield Organic Centre, Phase 2 -
7315
Record Last Updated (dd/mm/yyyy):
-> 07/03/2019
Planning Authority: Perth and Kinross Council
-> Perth & Kinross Council
19 MW - planning - scotland - Ochiltree - Battery Sorage -
10162
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Are they re-applying (New REPD Ref):
-> 15312
19 MW - planning - scotland - Hillcrest Cottage, Shebster - Battery Energy Storage System -
10226
Planning Authority: Highlands Council
-> Highland Council
18 MW - construction - south east - Aurora Solar Farm -
7385
Record Last Updated (dd/mm/yyyy):
-> 23/03/2023
18 MW - planning - south west - Whaddon Lane, Hilperton -
9057
Record Last Updated (dd/mm/yyyy): 27/04/2022
-> 29/09/2023
Operator (or Applicant): INRG
-> British Solar Renewables
16 MW - planning - east midlands - Waterswallows Road, Green Fairfield - Battery Storage Equipment -
10716
Record Last Updated (dd/mm/yyyy): 19/04/2022
-> 04/03/2022
16 MW - planning - wales - Little Llwyn Onn - Solar Farm & Battery Storage -
11544
Record Last Updated (dd/mm/yyyy): 14/03/2023
-> 24/06/2022
16 MW - planning - scotland - Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm -
11623
Record Last Updated (dd/mm/yyyy): 06/04/2023
-> 13/07/2022
Installed Capacity (MWelec): 66
-> 16
mw: 66
-> 16
16 MW - planning - yorkshire and humber - J3 Business Park - Battery Storage Facility -
14054
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 11/07/2026
15 MW - operation - south west - Lockleaze Energy Storage -
6961
Record Last Updated (dd/mm/yyyy):
-> 31/01/2019
15 MW - construction - south west - Holes Bay -
7688
Megapack
Record Last Updated (dd/mm/yyyy): 29/04/2020
-> 14/01/2020
15 MW - planning - eastern - Three Bridges Solar Farm -
8220
Record Last Updated (dd/mm/yyyy): 07/04/2021
-> 07/05/2021
15 MW - planning - south west - Smithyard Lane - Battery Storage -
10766
Record Last Updated (dd/mm/yyyy): 16/02/2023
-> 09/03/2022
14 MW - planning - south east - Guildford Road Battery Storage Facility -
8269
Record Last Updated (dd/mm/yyyy): 12/01/2021
-> 24/03/2023
14 MW - planning - scotland - Hopsrig Wind Farm -
11066
Record Last Updated (dd/mm/yyyy): 27/10/2022
-> 26/04/2022
14 MW - planning - north west - St Michaels Road, Ditton Road - Battery Storage -
12904
Record Last Updated (dd/mm/yyyy): 19/12/2022
-> 28/11/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 27/10/2026
14 MW - planning - west midlands - Pershore Lane, Tibberton - Battery Energy Storage System -
13096
Record Last Updated (dd/mm/yyyy): 25/01/2023
-> 31/10/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 27/10/2026
13 MW - operation - south east - Bumpers Lane Solar Farm -
6913
Record Last Updated (dd/mm/yyyy):
-> 01/12/2021
13 MW - planning - west midlands - Maybrook Road - Battery facility -
11008
Record Last Updated (dd/mm/yyyy): 18/08/2022
-> 19/04/2022
12 MW - planning - yorkshire and humber - Stor Generation Plant - Battery Storage -
8998
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Expired:
-> 11/06/2024
12 MW - planning - north west - Dragons Lane - Battery Storage Facility -
11701
Record Last Updated (dd/mm/yyyy): 12/12/2022
-> 20/07/2022
10 MW - operation - northern ireland - AES Kilroot Station Battery Storage Array -
6845
Record Last Updated (dd/mm/yyyy):
-> 12/12/2018
10 MW - operation - yorkshire and humber - Blackburn Meadows -
6906
Record Last Updated (dd/mm/yyyy):
-> 21/03/2019
10 MW - operation - east midlands - Hill Farm - Energy Barn -
6915
Record Last Updated (dd/mm/yyyy):
-> 15/03/2019
10 MW - operation - south east - Kings Barn Farm - Energy Barn -
6916
Record Last Updated (dd/mm/yyyy):
-> 15/03/2019
10 MW - operation - east midlands - Leverton Farm - Energy Barn -
6917
Record Last Updated (dd/mm/yyyy):
-> 11/12/2018
10 MW - operation - eastern - Nevendon -
6926
Record Last Updated (dd/mm/yyyy):
-> 28/03/2017
10 MW - planning - east midlands - Manor Farm Energy Storage -
6948
Record Last Updated (dd/mm/yyyy):
-> 15/12/2022
10 MW - construction - eastern - Slamseys Energy Storage -
7000
Record Last Updated (dd/mm/yyyy):
-> 20/01/2020
10 MW - planning - south east - Stockbridge Road -
7097
Record Last Updated (dd/mm/yyyy):
-> 25/02/2020
10 MW - construction - south east - Land Adj Harmer Warren Quarry -
7143
Record Last Updated (dd/mm/yyyy):
-> 09/12/2022
10 MW - operation - north west - Cleator -
7177
Record Last Updated (dd/mm/yyyy):
-> 03/01/2019
10 MW - planning - south west - Old Green Farm, Alveston Battery Storage -
7182
Record Last Updated (dd/mm/yyyy):
-> 03/08/2020
10 MW - planning - south west - Trevol Business Park -
7404
Record Last Updated (dd/mm/yyyy):
-> 23/01/2020
10 MW - planning - south west - Tiddlywink Barn -
7527
Record Last Updated (dd/mm/yyyy):
-> 20/12/2019
10 MW - planning - scotland - East Ballochy -
7675
Record Last Updated (dd/mm/yyyy): 30/09/2020
-> 15/09/2020
Under Construction:
-> Implemented
10 MW - planning - south west - Minety Substation -
7942
Record Last Updated (dd/mm/yyyy): 27/04/2022
-> 30/06/2020
10 MW - construction - north west - Moston Vale -
8085
Record Last Updated (dd/mm/yyyy): 27/09/2021
-> 07/05/2021
10 MW - construction - scotland - Dragonhall Farm, Padanaram - Battery Storage -
9066
Record Last Updated (dd/mm/yyyy): 02/03/2022
-> 30/10/2023
10 MW - operation - south west - South Farm Solar Park -
9361
Operational: 16/12/2022
->
10 MW - planning - eastern - Wissett Solar Farm, Wissett - Battery Storage -
9913
Record Last Updated (dd/mm/yyyy): 01/11/2022
-> 11/11/2021
10 MW - cancelled - scotland - Lethen Wind Farm Wind Turbines and Energy Storage -
10237
Record Last Updated (dd/mm/yyyy): 24/01/2022
-> 10/01/2022
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility -
11369
Record Last Updated (dd/mm/yyyy): 21/03/2023
-> 27/05/2022
10 MW - operation - south west - Cirencester Solar Farm -
12791
Operational: 13/10/2022
->
2023-07
New projects (102):
1450 MW - planning - yorkshire and humber - Thorpe Marsh Power Station - Battery Energy Storage -
12453
1400 MW - planning - yorkshire and humber - Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage -
13644
1040 MW - planning - north west - Carrington Power Station, Manchester Road - Battery Storage -
13362
500 MW - planning - scotland - Coalburn Energy - Battery Storage -
11034
500 MW - planning - east midlands - West Burton Power Station, North Road - Battery Storage -
11928
500 MW - planning - east midlands - Normanton Energy Reserve - Battery Storage -
11988
500 MW - planning - scotland - Eccles II Substation - Battery Energy Storage System -
14058
450 MW - planning - scotland - Haughend Farm - Alyth Battery Energy Storage System -
11858
400 MW - planning - scotland - Eccles Battery Energy Storage System -
11867
Megapack
340 MW - planning - north west - Blackdyke Farm, Blackford - Battery Storage -
12710
350 MW - planning - scotland - Camsiscan Farm, Craigie - Battery Energy Storage System -
12820
300 MW - planning - east midlands - Staythorpe Road, Averham - Battery Storage -
12893
264 MW - planning - south east - Bolney Substation - Battery Storage -
10843
240 MW - planning - yorkshire and humber - Springfield Farm, Hensall - Battery Energy Storage Facility -
11680
200 MW - planning - scotland - Windyhill Battery Storage Facility -
10596
200 MW - planning - north east - Spennymoor Greener Grid Park -
13576
200 MW - planning - south west - Westerleigh Hill, Westerleigh - Battery Energy Storage Facility -
13607
200 MW - planning - south west - Earthcott Green Farm, Earthcott Green - Battery Energy Storage -
13643
200 MW - planning - west midlands - Astwood Lane, Feckenham - Battery Storage -
13707
200 MW - planning - south east - Bolney - Battery Storage -
13880
150 MW - construction - south east - Cleve Hill Solar Project -
7856
130 MW - planning - yorkshire and humber - Clough Road - Battery Energy System -
14225
120 MW - planning - south east - Kemsley Energy Park Battery Storage -
13489
120 MW - cancelled - south west - Pound Road, Hawkchurch - Battery Energy Storage System -
14016
114 MW - planning - eastern - Hickling Lane, Swainsthorpe -Battery Storage -
13560
100 MW - planning - south east - Libra Energy Stability Project - Battery Energy Storage -
12443
100 MW - planning - eastern - Walpole Sub Station, Walpole Bank - Battery Storage -
13045
100 MW - planning - eastern - Walpole Bank - Battery Energy Storage Facility -
13639
99 MW - planning - south west - Linton Court Farm, Highnam - Battery storage -
13145
99 MW - planning - south west - Lower Larks Farm - Battery storage -
14076
90 MW - cancelled - north west - Golf Road - Battery Energy Storage -
13459
75 MW - planning - northern ireland - Quarterland Road, Islandmagee - Battery Storage -
14117
70 MW - planning - north west - Tontine Road - Battery Energy Storage System -
9819
70 MW - planning - north west - Sale Golf Club, Golf Road - Battery Storage -
13731
69 MW - planning - eastern - Thurleigh Road - Battery Energy Storage -
9651
69 MW - planning - scotland - Middleton Road - Linwood Battery Energy Storage System -
11868
57 MW - planning - north east - The Carrs - Meadow Farm Energy storage facility -
9207
60 MW - cancelled - south west - Coldharbour, Chickerell - Battery Storage Facility -
12967
57 MW - cancelled - west midlands - Beechwood Farm, Hodgetts Lane - Battery Storage -
13297
57 MW - planning - south east - Coxmoor Wood, Crondall Road - Battery Storage -
13728
50 MW - planning - wales - Garn Fach Wind Farm -
7705
50 MW - planning - north west - Huncoat Power Station - Battery Storage -
10516
50 MW - planning - scotland - Clashindarroch Wind Farm Extension -
13117
50 MW - planning - scotland - Quantans Hill Wind Farm -
13238
50 MW - planning - north east - Whelley Hill Farm, Worset Lane - Battery Energy Storage -
13246
50 MW - planning - scotland - Fairways Business Park - Battery Storage -
13318
50 MW - cancelled - west midlands - Levedale Road, Levedale - Battery Energy Storage -
13615
49 MW - planning - london - Mill Hill National Grid Substation -
8009
49 MW - construction - south west - Larks Green Solar Farm -
8052
49 MW - planning - east midlands - Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage -
9796
49 MW - planning - yorkshire and humber - Common Farm - Solar Farm & Battery Storage -
9877
49 MW - planning - scotland - Law Of Doune Road, Macduff - Battery Storage -
10894
49 MW - planning - north east - Hawthorn Grid Site - Battery Storage -
10896
49 MW - planning - scotland - Well Street - Battery Storage -
11473
49 MW - planning - scotland - Kellwood Road - Battery Storage -
11545
49 MW - planning - scotland - Holmston Road - Battery Storage Facility -
11679
49 MW - planning - scotland - Meetlaw Farm, Fordoun - Battery Energy Storage System -
12361
49 MW - planning - scotland - Drumore Cottage, Swordale - Battery Storage -
12983
49 MW - planning - scotland - Middleton Of Blackhills, Rothienorman - Battery Energy Storage System -
13087
49 MW - planning - scotland - Shindour, Feddal Hill Wood - Battery Energy Storage Facility -
13236
49 MW - planning - west midlands - Lichfield Road, Watton Lane - Battery Storage -
13369
49 MW - planning - south west - Landulph Substation, Ellbridge Lane - Battery Energy Storage -
13461
49 MW - planning - west midlands - Peterstow Gas Compressor Station, Hentland - Energy Storage System -
13976
49 MW - planning - scotland - Forest Avenue Cottage, Drumlithie - Battery Energy Storage -
13986
45 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage -
12711
45 MW - planning - scotland - Bloch Wind Farm & Battery Storage (Solway Bank Extension) -
12760
45 MW - planning - north west - Huncoat Power Station - Battery Storage Facility -
13080
43 MW - planning - scotland - Ballingall Farm, Leslie - Battery Energy Storage System -
10825
43 MW - planning - scotland - Merchiston Industrial Estate, Smith Street - Battery Storage -
13225
42 MW - planning - scotland - South Pargillis - Battery Storage -
9564
42 MW - planning - scotland - Melvich Bay - Melvich Wind Energy Hub -
13826
40 MW - planning - west midlands - Hollydale, Buildwas Road - Battery Storage -
13410
40 MW - planning - yorkshire and humber - Tofts Lane, Hunshelf - Battery Storage -
13733
40 MW - planning - yorkshire and humber - Claire Court, Rawmarsh Road - Battery Energy Storage Facility -
13774
40 MW - planning - northern ireland - Doogary Road, Omagh - Battery Storage -
14125
35 MW - planning - south west - Northington Lane - Battery Storage Facility -
9992
33 MW - construction - yorkshire and humber - Wormald Green - Battery Energy Storage System -
10893
32 MW - planning - south west - Post Farm, Lytchett Minster - Battery Energy Storage -
10291
31 MW - planning - scotland - Benthead Farm - Solar Farm & Battery Storage -
10542
30 MW - planning - west midlands - Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage -
13550
30 MW - planning - east midlands - Marsh Lane, Gowhole - Energy Storage System -
13982
30 MW - planning - scotland - Abhainn Dubh Wind Farm -
14039
30 MW - planning - scotland - Bishopmill - Battery Energy Storage -
14191
30 MW - planning - south west - Frome Power, Styles Close - Energy Storage Facility -
14227
25 MW - planning - scotland - Earraghail Renewable Energy Development -
10712
20 MW - planning - east midlands - West Burton Solar Project -
10917
20 MW - planning - west midlands - Fordhouse Lane - Battery Energy Storage System -
13108
20 MW - planning - north west - Peel Road, Westby With Plumptons - Battery Storage -
13300
20 MW - planning - yorkshire and humber - Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage -
13655
20 MW - construction - north west - Welkin Road, Bredbury - Battery Storage System -
13740
20 MW - planning - south west - Fair Park Solar Farm -
13761
20 MW - planning - south west - Larks Lane, Iron Acton - Battery Storage Facility -
14091
16 MW - planning - yorkshire and humber - J3 Business Park - Battery Storage Facility -
14054
15 MW - planning - south west - Smithyard Lane - Battery Storage -
10766
15 MW - planning - scotland - Newburgh Road, Abernethy - Energy Storage -
13111
15 MW - planning - south east - Ash Farm, Titchfield Lane - Battery Storage -
14145
14 MW - planning - west midlands - Pershore Lane, Tibberton - Battery Energy Storage System -
13096
13 MW - planning - west midlands - Hollins Lane - Battery Energy Storage -
13144
12 MW - cancelled - yorkshire and humber - Windmill Farm Solar Farm -
8348
12 MW - planning - north east - Highfield Energy Park -
12312
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility -
11369
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility -
13480
Disappeared projects (22):
200 MW - cancelled - south east - Bolney Substation - Battery Storage -
8986
200 MW - cancelled - east midlands - Staythorpe Road - Battery energy storage -
11321
130 MW - cancelled - east midlands - Southfields Farm, Common Lane - Battery Storage -
12698
120 MW - cancelled - south west - Pound Road, Hawkchurch - Battery Energy Storage -
12360
100 MW - cancelled - east midlands - Gotham - Battery Energy storage -
10986
80 MW - planning - yorkshire and humber - Barlow Road, Barlow Road - Battery Storage -
12734
57 MW - cancelled - south east - Slough Road - Battery Storage -
9774
50 MW - cancelled - eastern - High Road, Saddlebow - Battery Storage -
11648
50 MW - planning - south east - Derehams Farm, Derehams Lane - Battery Storage -
12649
49 MW - cancelled - south west - Land North of Actrees Solar Farm -
7230
49 MW - cancelled - south west - Snarlton Farm -
7380
49 MW - cancelled - north east - Lackenby -
7518
49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility -
10955
40 MW - cancelled - north west - Carnegie Road (Phase 2) -
7403
38 MW - cancelled - scotland - Sheirdrim Renewable Energy Development - Battery -
7585
26 MW - cancelled - east midlands - Manor Farm -
7820
20 MW - cancelled - south east - Brook Farm -
7498
20 MW - cancelled - scotland - Ardoch Farm -
7575
18 MW - cancelled - south west - Churchtown Solar Farm Battery Storage -
7726
13 MW - cancelled - south west - Leechpool Farm, Norrington Battery Storage -
7183
10 MW - cancelled - yorkshire and humber - South Kirkby Business Park -
7109
10 MW - cancelled - south west - Park Farm -
7983
Updated projects (209):
300 MW - construction - scotland - Blackhillock Electricity Substation - Battery Energy Storage System -
9723
Record Last Updated (dd/mm/yyyy): 07/11/2022
-> 20/02/2023
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/02/2023
status: planning
-> construction ๐๏ธ
100 MW - operation - north west - National Grid Electricity Substation, Capenhurst Lane - Battery Storage -
12725
Record Last Updated (dd/mm/yyyy): 28/11/2022
-> 14/02/2023
Development Status: Under Construction
-> Operational
Development Status (short): Under Construction
-> Operational
Planning Permission Expired: 01/02/2024
-> 01/06/2021
Under Construction: 01/06/2021
->
Operational:
-> 11/02/2023
status: construction
-> operation ๐พ ๐ ๐ธ
80 MW - operation - scotland - Aikengall II Community Wind Farm Battery -
7015
Record Last Updated (dd/mm/yyyy): 21/08/2020
->
Turbine Capacity (MW): 4.2
->
No. of Turbines: 19
->
Height of Turbines (m): 145
->
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
Under Construction:
-> 01/12/2020
Operational:
-> 01/06/2021
status: planning
-> operation ๐พ ๐ ๐ธ
57 MW - construction - eastern - Bramford Substation -
7479
Record Last Updated (dd/mm/yyyy): 17/09/2020
-> 23/05/2023
Installed Capacity (MWelec): 49.9
-> 57
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/06/2023
status: planning
-> construction ๐๏ธ
mw: 49
-> 57
49 MW - construction - south east - Halewick Lane, Sompting - Battery-based Energy Storage Facility -
7168
Record Last Updated (dd/mm/yyyy): 17/10/2022
->
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
status: planning
-> construction ๐๏ธ
49 MW - construction - south west - Salisbury Substation -
7510
Record Last Updated (dd/mm/yyyy): 04/07/2022
->
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/09/2022
status: planning
-> construction ๐๏ธ
49 MW - operation - scotland - Dunsinane Industrial Estate -
7591
Record Last Updated (dd/mm/yyyy): 30/06/2020
-> 16/05/2023
Operator (or Applicant): Gigabox Developments
-> JLEN Environmental Assets Group
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
Planning Permission Expired: 27/03/2023
-> 08/12/2023
Operational:
-> 03/05/2023
status: planning
-> operation ๐พ ๐ ๐ธ
49 MW - operation - north west - Liverpool Energy Management Facility -
7772
Record Last Updated (dd/mm/yyyy): 23/09/2020
-> 22/06/2023
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
Under Construction:
-> 01/10/2021
Operational:
-> 01/03/2022
status: planning
-> operation ๐พ ๐ ๐ธ
49 MW - construction - east midlands - National Grid Enderby Substation -
8037
Record Last Updated (dd/mm/yyyy): 26/09/2022
-> 25/01/2023
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/01/2023
status: planning
-> construction ๐๏ธ
49 MW - operation - south east - Richborough Energy Park -
8195
Record Last Updated (dd/mm/yyyy): 07/12/2021
-> 19/04/2023
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/03/2023
status: planning
-> construction ๐๏ธ
49 MW - construction - south west - Mannington Battery Energy Storage System -
8833
Record Last Updated (dd/mm/yyyy): 26/03/2021
-> 01/02/2023
Operator (or Applicant): Mannington Energy Centre Limited
-> EDF Energy Renewables
Site Name: Holt Road - Battery Energy Storage System
-> Mannington Battery Energy Storage System
Development Status: Planning Application Submitted
-> Under Construction
Development Status (short): Application Submitted
-> Under Construction
Planning Permission Granted:
-> 18/06/2021
Planning Permission Expired:
-> 18/06/2024
Under Construction:
-> 01/10/2022
status: planning
-> construction ๐๏ธ
49 MW - construction - north west - Bredbury Substation - Battery Storage Facility -
9653
Record Last Updated (dd/mm/yyyy): 20/09/2021
-> 11/04/2023
Development Status: Planning Application Submitted
-> Under Construction
Development Status (short): Application Submitted
-> Under Construction
Planning Permission Granted:
-> 28/02/2023
Planning Permission Expired:
-> NA
Under Construction:
-> 01/03/2023
status: planning
-> construction ๐๏ธ
49 MW - planning - yorkshire and humber - Elland Storage Project -
10236
Record Last Updated (dd/mm/yyyy): 15/08/2022
-> 20/02/2023
Development Status: Under Construction
-> Planning Permission Granted
Development Status (short): Under Construction
-> Awaiting Construction
Under Construction: 01/08/2022
->
status: construction
-> planning
20 MW - operation - north east - Ray Battery Storage Facility -
6943
Record Last Updated (dd/mm/yyyy): 21/09/2020
->
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
Under Construction:
-> 01/07/2022
Operational:
-> 01/10/2022
status: planning
-> operation ๐พ ๐ ๐ธ
20 MW - operation - east midlands - Calow Green Farm -
7140
Record Last Updated (dd/mm/yyyy): 12/02/2020
->
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
Under Construction:
-> 01/04/2019
Operational:
-> 01/10/2019
status: planning
-> operation ๐พ ๐ ๐ธ
20 MW - operation - south west - Feeder Road -
7663
Record Last Updated (dd/mm/yyyy): 20/05/2022
-> 13/06/2023
Development Status: Planning Permission Granted
-> Finished
Development Status (short): Awaiting Construction
-> Finished
Under Construction:
-> 01/01/2023
status: planning
-> operation ๐พ ๐ ๐ธ
20 MW - construction - north west - Hawthorne Road -
7800
Record Last Updated (dd/mm/yyyy): 30/06/2020
-> 19/04/2023
Operator (or Applicant): Shaw Energy
-> Bluefield Renewable Developments
Installed Capacity (MWelec): 40
-> 20
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 17/02/2023
status: planning
-> construction ๐๏ธ
mw: 40
-> 20
20 MW - construction - south east - Mill Lane, Nursling - Battery Storage Facility -
8099
Record Last Updated (dd/mm/yyyy): 30/09/2020
-> 22/05/2023
Site Name: SHB Hire Ltd
-> Mill Lane, Nursling - Battery Storage Facility
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/01/2023
status: planning
-> construction ๐๏ธ
18 MW - construction - south east - Aurora Solar Farm -
7385
Record Last Updated (dd/mm/yyyy): 04/06/2020
->
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 26/04/2021
status: planning
-> construction ๐๏ธ
10 MW - construction - scotland - Dragonhall Farm, Padanaram - Battery Storage -
9066
Record Last Updated (dd/mm/yyyy): 25/05/2021
-> 02/03/2022
Development Status: Planning Application Submitted
-> Under Construction
Development Status (short): Application Submitted
-> Under Construction
Planning Permission Granted:
-> 02/12/2021
Under Construction:
-> 01/06/2022
status: planning
-> construction ๐๏ธ
550 MW - planning - east midlands - Spalding Energy Park - Battery Storage -
10173
Record Last Updated (dd/mm/yyyy): 28/12/2021
-> 12/07/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 14/06/2023
Planning Permission Expired:
-> 14/06/2028
500 MW - planning - yorkshire and humber - Eggborough Power Station, Selby Road - Battery Storage -
12483
Record Last Updated (dd/mm/yyyy): 31/10/2022
-> 24/01/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 17/01/2023
Planning Permission Expired:
-> 17/01/2026
450 MW - planning - eastern - Gateway Energy Centre - Battery Energy Storage -
10309
Record Last Updated (dd/mm/yyyy): 17/12/2021
-> 30/01/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 13/01/2023
Planning Permission Expired:
-> 13/01/2028
60 MW - planning - north east - Greystones Road, Grangetown - Battery Energy Storage System -
10081
Planning Permission Expired:
-> PD
249 MW - planning - south east - Richborough Energy Park - Phase 3 (Sheaf) -
11201
Record Last Updated (dd/mm/yyyy): 10/05/2022
-> 22/05/2023
Operator (or Applicant): Sheaf Energy Limited
-> Pacific Green
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 22/09/2022
Planning Permission Expired:
-> 22/09/2025
200 MW - planning - yorkshire and humber - Drax Re-Power -
7017
Record Last Updated (dd/mm/yyyy): 02/01/2020
->
Planning Permission Expired:
-> NA
200 MW - planning - north east - Worset Lane - Battery Energy Storage System -
11406
Record Last Updated (dd/mm/yyyy): 05/08/2022
-> 01/02/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 18/01/2023
Planning Permission Expired:
-> 18/01/2026
150 MW - construction - north west - Fiddlers Ferry Power Station - Battery storage -
9404
Record Last Updated (dd/mm/yyyy): 08/08/2022
-> 06/07/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 20/06/2023
Planning Permission Expired:
-> 20/06/2026
150 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy -
10022
Planning Permission Expired:
-> PD
150 MW - planning - south west - Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility -
11612
Record Last Updated (dd/mm/yyyy): 17/10/2022
-> 23/01/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 06/01/2023
Planning Permission Expired:
-> 06/01/2026
100 MW - planning - scotland - Harestanes Windfarm -
7395
Record Last Updated (dd/mm/yyyy): 25/06/2020
->
100 MW - planning - south east - Minchens Lane Battery Storage Facility -
8434
Record Last Updated (dd/mm/yyyy): 02/03/2021
-> 03/02/2023
Development Status: Planning Application Submitted
-> Appeal Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Authority: Basingstoke and Deane Borough Council
-> Basingstoke & Deane Borough Council
Planning Permission Refused:
-> 08/10/2021
Appeal Granted:
-> 26/01/2023
Planning Permission Granted:
-> 26/01/2023
Planning Permission Expired:
-> 26/01/2026
100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage -
9691
Record Last Updated (dd/mm/yyyy): 27/10/2022
-> 06/03/2023
100 MW - planning - eastern - North Walpole, St Peter - Battery Energy Storage -
9762
Planning Authority: King's Lynn and West Norfolk Borough Council
-> Borough Council of King's Lynn & West Norfolk
100 MW - planning - south east - Penn Croft Farm, Crondall - Battery Energy Storage Facility -
10163
Record Last Updated (dd/mm/yyyy): 24/12/2021
-> 06/02/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 30/01/2023
Planning Permission Expired:
-> 30/01/2026
100 MW - construction - eastern - Bullen Lane - Battery Storage -
10311
Planning Authority: Babergh and Mid Suffolk District Council
-> Babergh & Mid Suffolk District Councils
100 MW - planning - south west - Shaftesbury Energy Park - Battery Storage System -
10626
Record Last Updated (dd/mm/yyyy): 01/11/2022
-> 31/03/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 29/03/2023
Planning Permission Expired:
-> 29/03/2035
100 MW - planning - eastern - Walpole St Andrew - Battery storage -
10876
Planning Authority: King's Lynn and West Norfolk Borough Council
-> Borough Council of King's Lynn & West Norfolk
100 MW - planning - eastern - Walpole Sub Station, Walpole Bank - Battery Storage -
12683
Record Last Updated (dd/mm/yyyy): 23/11/2022
-> 12/07/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Authority: Kings Lynn and West Norfolk Council
-> Borough Council of King's Lynn & West Norfolk
Planning Permission Granted:
-> 04/07/2023
Planning Permission Expired:
-> 04/07/2026
100 MW - planning - north east - Newburn Bridge Road - Battery Storage Facility -
12729
Record Last Updated (dd/mm/yyyy): 28/11/2022
-> 13/02/2023
Operator (or Applicant): Aura Power Storage Solutions
-> The Renewables Infrastructure Group Limited
100 MW - planning - yorkshire and humber - Bradford West, Harrop Lane, Wilsden - Battery Storage -
12909
Record Last Updated (dd/mm/yyyy): 20/12/2022
-> 25/05/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Authority: Bradford City of
-> Bradford Metropolitan District Council
Planning Permission Granted:
-> 15/05/2023
Planning Permission Expired:
-> 15/05/2026
99 MW - operation - eastern - Dollymans Storage -
7088
Record Last Updated (dd/mm/yyyy): 28/05/2021
->
99 MW - planning - yorkshire and humber - Scawby Brook, Brigg - Battery Storage -
9848
Planning Permission Expired:
-> PD
99 MW - planning - north west - Freshfields, Fairy Lane - Battery Storage -
12694
Record Last Updated (dd/mm/yyyy): 23/11/2022
-> 12/04/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 20/03/2023
Planning Permission Expired:
-> 20/03/2026
95 MW - planning - yorkshire and humber - Winterton Road - Battery Energy Storage -
9608
Record Last Updated (dd/mm/yyyy): 15/09/2021
-> 25/01/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 16/12/2022
Planning Permission Expired:
-> 16/12/2025
90 MW - planning - yorkshire and humber - Little Crow Solar Park -
7175
Record Last Updated (dd/mm/yyyy): 07/04/2022
->
85 MW - planning - yorkshire and humber - Green Lane, Thurcroft - Battery Energy Storage Facility -
12789
Record Last Updated (dd/mm/yyyy): 05/12/2022
-> 30/05/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 12/05/2023
Planning Permission Expired:
-> 12/05/2026
79 MW - construction - south east - Stony Energy Storage Facility -
7001
Record Last Updated (dd/mm/yyyy): 30/11/2022
->
16 MW - planning - scotland - Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm -
11623
Record Last Updated (dd/mm/yyyy): 12/10/2022
-> 06/04/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 21/03/2023
Planning Permission Expired:
-> NA
62 MW - planning - wales - Wentlooge Renewable Energy Hub -
7192
Record Last Updated (dd/mm/yyyy): 22/03/2019
->
60 MW - planning - yorkshire and humber - Redcote Lane, Armley - Battery Storage Facility -
12224
Record Last Updated (dd/mm/yyyy): 05/10/2022
-> 26/05/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 18/05/2023
Planning Permission Expired:
-> 18/05/2026
57 MW - planning - south east - Ash Lane, Little London - Battery Storage -
11090
Record Last Updated (dd/mm/yyyy): 15/07/2022
-> 16/02/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Authority: Basingstoke and Deane Council
-> Basingstoke & Deane Borough Council
Planning Permission Granted:
-> 09/02/2023
Planning Permission Expired:
-> NA
57 MW - planning - south east - Sellindge Substation, Church Lane - Battery Storage -
12351
Planning Authority: Ashford Council
-> Ashford Borough Council
50 MW - operation - south west - Melksham Substation East Storage -
6953
Record Last Updated (dd/mm/yyyy): 22/11/2022
->
50 MW - construction - northern ireland - Portadown Road -
7047
Record Last Updated (dd/mm/yyyy): 23/06/2020
->
50 MW - construction - northern ireland - Dungannon Energy Storage System -
7050
Record Last Updated (dd/mm/yyyy): 03/03/2020
->
50 MW - operation - scotland - Whitelee Wind Farm Battery Storage Extension -
7174
Record Last Updated (dd/mm/yyyy): 21/02/2022
->
50 MW - planning - scotland - Clash Gour -
7178
Record Last Updated (dd/mm/yyyy): 27/10/2022
->
50 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage -
9910
Planning Authority: City of Cardiff Council
-> Cardiff Council
50 MW - planning - eastern - Ardleigh Road, Little Bromley - Battery Energy Storage -
10302
Record Last Updated (dd/mm/yyyy): 01/11/2022
->
50 MW - planning - scotland - Frodo Solar and Battery Energy Development -
10994
Record Last Updated (dd/mm/yyyy): 12/04/2022
-> 07/06/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 16/05/2023
Planning Permission Expired:
-> 16/05/2028
50 MW - planning - yorkshire and humber - Swangate Project - Energy Storage System -
11437
Planning Permission Expired: 22/09/2020
-> NA
Under Construction:
-> Implemented
30 MW - planning - west midlands - Rectory Farm, Rectory Lane - Battery Storage -
11905
Record Last Updated (dd/mm/yyyy): 28/11/2022
-> 02/03/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 20/02/2023
Planning Permission Expired:
-> 20/02/2026
50 MW - planning - north west - Lancaster Power Extension, Middleton Road - Energy Storage Facility -
12125
Record Last Updated (dd/mm/yyyy): 20/09/2022
-> 23/06/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 17/05/2023
Planning Permission Expired:
-> 17/05/2026
50 MW - planning - scotland - Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage -
12303
Record Last Updated (dd/mm/yyyy): 17/10/2022
-> 09/02/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 30/01/2023
Planning Permission Expired:
-> 30/01/2026
50 MW - construction - eastern - Norwich Road Industrial Estate -
12529
Planning Permission Expired: 26/03/2024
-> 01/04/2022
Under Construction: 01/04/2022
->
50 MW - planning - scotland - Eccles Substation, Eccles - Battery Energy Storage System -
13003
Record Last Updated (dd/mm/yyyy): 12/01/2023
-> 30/06/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 15/06/2023
Planning Permission Expired:
-> 15/06/2028
49 MW - operation - eastern - Pelham -
6898
Record Last Updated (dd/mm/yyyy): 03/01/2019
->
49 MW - operation - north west - Roosecote -
6912
Record Last Updated (dd/mm/yyyy): 30/11/2018
->
49 MW - operation - east midlands - West Burton -
6920
Record Last Updated (dd/mm/yyyy): 27/11/2018
->
49 MW - planning - eastern - Tollgate Battery Storage Facility -
6949
Record Last Updated (dd/mm/yyyy): 23/11/2018
->
49 MW - operation - yorkshire and humber - Pillswood Phase 1 -
7005
Megapack
Record Last Updated (dd/mm/yyyy): 09/11/2022
->
49 MW - cancelled - south west - Ravensroost Farm, Minety - Battery Energy Storage -
7014
Record Last Updated (dd/mm/yyyy): 29/06/2022
->
49 MW - operation - yorkshire and humber - Nether Moor Field -
7019
Record Last Updated (dd/mm/yyyy): 27/05/2020
->
49 MW - planning - eastern - Norwich Substation Storage Facility -
7021
Record Last Updated (dd/mm/yyyy): 17/09/2020
->
49 MW - operation - south west - Mannington Battery Storage Plant -
7024
Record Last Updated (dd/mm/yyyy): 14/09/2022
->
49 MW - planning - north west - Middleton Clean Energy Plant -
7029
Record Last Updated (dd/mm/yyyy): 26/09/2022
->
Under Construction:
-> Implemented
49 MW - planning - eastern - Hilfield Farm Tech -
7030
Record Last Updated (dd/mm/yyyy): 26/03/2020
->
49 MW - planning - north east - Lackenby -
7040
Record Last Updated (dd/mm/yyyy): 23/07/2019
->
49 MW - construction - east midlands - Enderby Storage, Redcomb Farm -
7044
Record Last Updated (dd/mm/yyyy): 21/08/2020
->
49 MW - planning - south west - Ellbridge Lane -
7051
Record Last Updated (dd/mm/yyyy): 23/11/2022
->
49 MW - planning - yorkshire and humber - Elland Storage Project -
7053
Record Last Updated (dd/mm/yyyy): 14/11/2019
->
Planning Permission Expired:
-> PD
49 MW - planning - eastern - Chapel Farm -
7058
Megapack
Record Last Updated (dd/mm/yyyy): 13/06/2019
->
49 MW - planning - south east - Lovedean Energy Storage System -
7064
Record Last Updated (dd/mm/yyyy): 16/05/2019
->
49 MW - planning - east midlands - Cottam Power Station -
7066
Record Last Updated (dd/mm/yyyy): 12/08/2020
->
Planning Permission Expired:
-> PD
49 MW - construction - south east - Sundridge Hill -
7081
Record Last Updated (dd/mm/yyyy): 17/03/2022
->
49 MW - planning - yorkshire and humber - Land Adjacent to 4 Redcote Lane (Armley) -
7111
Record Last Updated (dd/mm/yyyy): 19/01/2022
->
49 MW - operation - yorkshire and humber - Creyke Beck -
7122
Record Last Updated (dd/mm/yyyy): 28/01/2019
->
49 MW - planning - eastern - Braintree Road Substation -
7161
Record Last Updated (dd/mm/yyyy): 06/09/2022
->
49 MW - construction - yorkshire and humber - Osbaldwick Substation -
7172
Record Last Updated (dd/mm/yyyy): 27/07/2022
->
49 MW - operation - south west - Minety South - Battery Storage -
7184
Record Last Updated (dd/mm/yyyy): 21/08/2020
->
49 MW - operation - north west - West Didsbury Battery Storage -
7185
Record Last Updated (dd/mm/yyyy): 23/08/2022
->
49 MW - planning - eastern - Burwell Main Sub-Station -
7272
Record Last Updated (dd/mm/yyyy): 17/09/2020
->
49 MW - planning - eastern - Sundon Substation -
7283
Record Last Updated (dd/mm/yyyy): 17/09/2020
->
49 MW - construction - eastern - Tollgate Farm Battery Storage -
7335
Record Last Updated (dd/mm/yyyy): 01/02/2022
->
49 MW - operation - yorkshire and humber - Pillswood Phase 2 -
7360
Megapack
Record Last Updated (dd/mm/yyyy): 09/11/2022
->
49 MW - construction - south east - Kemsley Substation -
7368
Record Last Updated (dd/mm/yyyy): 17/09/2020
->
49 MW - construction - scotland - Ferrymuir -
7371
Record Last Updated (dd/mm/yyyy): 21/09/2022
->
49 MW - planning - north west - Harker Grid Sub Station -
7462
Record Last Updated (dd/mm/yyyy): 17/09/2020
->
49 MW - construction - south east - Cowley electricity sub-station -
7571
Record Last Updated (dd/mm/yyyy): 17/09/2020
->
49 MW - construction - yorkshire and humber - Bradford West Substation (Harrop Edge Farm) -
7577
Record Last Updated (dd/mm/yyyy): 08/07/2022
->
49 MW - planning - eastern - Lapwing Fen II, Crown Farm -
7606
Operator (or Applicant): Tribus Clean Energy
-> Private Developer
49 MW - planning - south east - Rye Common -
7737
Megapack
Record Last Updated (dd/mm/yyyy): 06/10/2021
->
49 MW - operation - north west - Lister Drive -
7740
Record Last Updated (dd/mm/yyyy): 17/05/2022
->
49 MW - planning - eastern - Reach Road -
7906
Storage Co-location REPD Ref ID:
-> NA
Planning Permission Expired:
-> PANR
49 MW - construction - scotland - Whitehills Energy Storage Facility -
8916
Operator (or Applicant): Gigabox Developments Limited
-> Gigabox Developments Limited / Whirlwind Renewables
49 MW - planning - scotland - Newhouse Farm - Energy Storage Facility -
9047
Record Last Updated (dd/mm/yyyy): 29/07/2022
-> 08/02/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 27/01/2023
Planning Permission Expired:
-> 27/01/2026
49 MW - planning - wales - Bronwylfa Road, Talwrn - Battery Storage Facility -
9052
Record Last Updated (dd/mm/yyyy): 27/07/2022
-> 28/04/2023
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Are they re-applying (New REPD Ref):
-> 13768
49 MW - planning - eastern - Admiralty Road - Battery Energy Storage Facility -
9470
Planning Permission Expired:
-> NA
49 MW - planning - eastern - Model Farm -
10687
Planning Authority: King's Lynn and West Norfolk Borough Council
-> Borough Council of King's Lynn & West Norfolk
49 MW - operation - scotland - Jamesfield Organic Centre - Battery Storage -
10863
Megapack
Planning Permission Expired: 28/09/2025
->
49 MW - planning - scotland - South Leylodge Farmhouse, Kintore - Battery Energy Storage System -
11092
Record Last Updated (dd/mm/yyyy): 11/10/2022
-> 02/05/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 20/04/2023
Planning Permission Expired:
-> 20/04/2028
49 MW - planning - scotland - Overhill Farm, Rothienorman - Battery Energy Storage -
11590
Record Last Updated (dd/mm/yyyy): 10/11/2022
-> 02/03/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 01/03/2023
Planning Permission Expired:
-> 01/03/2026
49 MW - cancelled - eastern - Whites Farm - Battery Storage -
11880
Planning Authority: Basildon Council
-> Basildon Borough Council
49 MW - planning - scotland - Househill House, Househill - Battery Storage -
12056
Record Last Updated (dd/mm/yyyy): 09/09/2022
-> 10/03/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 15/02/2023
Planning Permission Expired:
-> 15/02/2026
49 MW - planning - scotland - Killoch Depot, Killoch Colliery - Battery Storage -
12349
Record Last Updated (dd/mm/yyyy): 19/10/2022
-> 17/04/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 30/03/2023
Planning Permission Expired:
-> 30/03/2026
49 MW - planning - scotland - Electricity Substation, Westerton Road - Battery Storage -
12467
Record Last Updated (dd/mm/yyyy): 28/10/2022
-> 20/03/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 15/03/2023
Planning Permission Expired:
-> 15/03/2028
49 MW - planning - south west - Landulph, Ellbridge Lane - Battery Storage Facility -
12697
Record Last Updated (dd/mm/yyyy): 23/11/2022
-> 22/02/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 06/02/2023
Planning Permission Expired:
-> 06/02/2026
48 MW - planning - northern ireland - Classic Marble Showers Site -
7208
Record Last Updated (dd/mm/yyyy): 16/04/2020
->
45 MW - planning - scotland - Pleasance Road -
7217
Record Last Updated (dd/mm/yyyy): 08/03/2022
->
45 MW - planning - north west - Cheshire Power Station - Battery Storage Facility -
10295
Record Last Updated (dd/mm/yyyy): 22/12/2021
-> 06/06/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 24/05/2023
Planning Permission Expired:
-> 24/05/2026
40 MW - planning - east midlands - Breach Farm - Energy Barn -
6914
Record Last Updated (dd/mm/yyyy): 27/05/2022
->
Under Construction:
-> Implemented
40 MW - planning - eastern - Norwich Road Industrial Estate -
6958
Record Last Updated (dd/mm/yyyy): 04/11/2022
->
40 MW - planning - east midlands - Breach Farm -
6962
Record Last Updated (dd/mm/yyyy): 27/05/2022
->
40 MW - construction - south east - Land off Queenborough Road -
7003
Record Last Updated (dd/mm/yyyy): 12/01/2021
->
40 MW - construction - scotland - Bilbo Solar Farm Energy Storage -
7020
Record Last Updated (dd/mm/yyyy): 30/07/2020
->
County: Aberdeen
-> Aberdeenshire
40 MW - planning - eastern - Maldon Hall -
7095
Record Last Updated (dd/mm/yyyy): 23/12/2021
->
Under Construction:
-> Implemented
40 MW - planning - west midlands - Rubber and Allied Products -
7096
Record Last Updated (dd/mm/yyyy): 20/04/2020
->
Planning Permission Expired:
-> 15/12/2020
40 MW - operation - south east - Huggin's Hall -
7129
Record Last Updated (dd/mm/yyyy): 23/10/2018
->
40 MW - planning - west midlands - Whitehouse Farm Energy Barn -
7987
Planning Permission Expired:
-> NA
40 MW - planning - south west - Forest Gate - Solar Farm & Battery Storage -
9230
Record Last Updated (dd/mm/yyyy): 28/06/2021
-> 14/03/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 10/03/2023
Planning Permission Expired:
-> 10/03/2026
40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage -
9584
Record Last Updated (dd/mm/yyyy): 24/02/2022
-> 05/07/2023
40 MW - planning - south east - Tanners Lane - Battery Energy Storage Facility (Phase One) -
9708
Under Construction:
-> Implemented
40 MW - construction - south east - Derehams Farm, Derehams Lane - Battery Storage -
12803
Record Last Updated (dd/mm/yyyy): 12/12/2022
-> 12/07/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Authority: Buckinghamshire Council
-> Buckinghamshire Council - Wycombe Area
Planning Permission Granted:
-> 29/06/2023
Planning Permission Expired:
-> 29/06/2026
37 MW - planning - scotland - STOR Field 9 -
7018
Record Last Updated (dd/mm/yyyy): 24/07/2020
->
Planning Permission Expired: 06/12/2021
-> NA
36 MW - planning - northern ireland - Lisnabreeny Road -
7556
Record Last Updated (dd/mm/yyyy): 25/06/2020
->
35 MW - operation - north east - Port of Tyne -
6976
Record Last Updated (dd/mm/yyyy): 09/05/2019
->
35 MW - planning - yorkshire and humber - Rusholme Grange -
7093
Record Last Updated (dd/mm/yyyy): 16/09/2019
->
32 MW - operation - south west - Severn Road -
7085
Record Last Updated (dd/mm/yyyy): 13/10/2022
->
32 MW - planning - south west - Gloucestershire Science and Technology Park (small) -
7181
Record Last Updated (dd/mm/yyyy): 14/03/2022
->
30 MW - planning - south west - Gloucestershire Science and Technology Park -
7067
Record Last Updated (dd/mm/yyyy): 14/03/2022
->
30 MW - operation - south west - Fideoak Mills -
7152
Record Last Updated (dd/mm/yyyy): 21/09/2022
->
30 MW - planning - scotland - Drumcross Battery Storage -
8155
Installed Capacity (MWelec): 49.9
-> 30
Under Construction:
-> Implemented
mw: 49
-> 30
30 MW - planning - eastern - Colton - Solar photovoltaic farm, Battery storage -
10945
Planning Permission Expired:
-> NA
30 MW - planning - west midlands - Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage -
10978
Record Last Updated (dd/mm/yyyy): 11/04/2022
-> 02/03/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 28/02/2023
Planning Permission Expired:
-> 28/02/2028
30 MW - planning - scotland - West Bendings - Battery Storage -
10985
Record Last Updated (dd/mm/yyyy): 29/09/2022
-> 04/07/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 29/06/2023
Planning Permission Expired:
-> NA
29 MW - planning - scotland - Learielaw Farm -
7970
Record Last Updated (dd/mm/yyyy): 21/06/2022
-> 06/03/2023
27 MW - operation - yorkshire and humber - Boscar Grange Farm -
7332
Record Last Updated (dd/mm/yyyy): 02/01/2020
->
25 MW - operation - north east - Tynemouth Energy Storage System (TESS) -
6925
Record Last Updated (dd/mm/yyyy): 03/08/2018
->
25 MW - cancelled - scotland - Clauchrie Windfarm Battery -
7804
Record Last Updated (dd/mm/yyyy): 31/03/2020
->
25 MW - planning - north west - Bristol Avenue - Battery Energy Storage Facility -
8809
Planning Authority: Blackpool City Council
-> Blackpool Council
23 MW - operation - east midlands - Asfordby Business Park (1) -
6932
Record Last Updated (dd/mm/yyyy): 28/04/2020
->
22 MW - operation - wales - Pen y Cymoedd Energy Storage -
6927
Record Last Updated (dd/mm/yyyy): 03/01/2019
->
21 MW - operation - eastern - Clayhill Farm - Battery Energy Storage -
7570
Record Last Updated (dd/mm/yyyy): 14/09/2022
->
20 MW - operation - scotland - Broxburn -
6910
Record Last Updated (dd/mm/yyyy): 18/04/2019
->
20 MW - operation - west midlands - Land to the west of Clay Hill Pit / Larport Farm -
6911
Record Last Updated (dd/mm/yyyy): 20/01/2020
->
20 MW - operation - west midlands - Noriker Power Staunch -
6918
Record Last Updated (dd/mm/yyyy): 09/05/2019
->
20 MW - planning - wales - Traston Road -
6929
Record Last Updated (dd/mm/yyyy): 28/04/2020
->
20 MW - construction - east midlands - Chelveston Renewable Energy Park -
6941
Record Last Updated (dd/mm/yyyy): 27/05/2020
->
20 MW - operation - eastern - Claredown Farm -
6945
Record Last Updated (dd/mm/yyyy): 26/11/2019
->
20 MW - planning - london - Riverside Energy Park -
7036
Record Last Updated (dd/mm/yyyy): 06/04/2022
->
20 MW - planning - west midlands - Perseverance Road -
7061
Record Last Updated (dd/mm/yyyy): 24/02/2022
->
20 MW - operation - yorkshire and humber - Kirkhaw Lane -
7148
Record Last Updated (dd/mm/yyyy): 19/01/2022
->
20 MW - planning - yorkshire and humber - Kirkhaw Lane -
7149
Record Last Updated (dd/mm/yyyy): 24/02/2022
->
20 MW - operation - north west - Land at Carnegie Road -
7155
Record Last Updated (dd/mm/yyyy): 02/01/2019
->
20 MW - planning - scotland - Blackpark Farm -
7226
Record Last Updated (dd/mm/yyyy): 22/08/2019
->
20 MW - planning - scotland - Fordtown Energy Storage -
7234
Record Last Updated (dd/mm/yyyy): 30/06/2020
->
20 MW - planning - scotland - Stranoch 2 -
7306
Record Last Updated (dd/mm/yyyy): 22/12/2021
->
20 MW - planning - scotland - Troston Loch Wind Farm -
7333
Record Last Updated (dd/mm/yyyy): 16/01/2021
->
20 MW - construction - south east - Plot 2B EurolinkV -
7383
Record Last Updated (dd/mm/yyyy): 13/12/2021
->
20 MW - planning - scotland - Douglas West Wind Farm (extension) -
7460
Record Last Updated (dd/mm/yyyy): 02/07/2019
->
20 MW - operation - north west - Lascar Works -
7464
Record Last Updated (dd/mm/yyyy): 03/07/2019
->
20 MW - planning - scotland - Hagshaw Hill -
7572
Record Last Updated (dd/mm/yyyy): 25/03/2020
->
20 MW - planning - south east - Basing Road -
7746
Planning Authority: Basingstoke and Deane Borough Council
-> Basingstoke & Deane Borough Council
20 MW - planning - west midlands - Perserverance Road -
7966
Record Last Updated (dd/mm/yyyy): 12/10/2022
-> 22/03/2023
20 MW - planning - south west - Hele Manor Farm, Bradford On Tone - Battery Storage System -
12174
Record Last Updated (dd/mm/yyyy): 27/09/2022
-> 19/06/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 13/04/2023
Planning Permission Expired:
-> 13/04/2026
20 MW - operation - south west - Hawkers Hill Energy Park -
12293
Planning Permission Expired: 22/09/2020
->
20 MW - planning - wales - John Green Frog Power Compound, John North Road - Battery System -
12455
Record Last Updated (dd/mm/yyyy): 28/10/2022
-> 24/01/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 20/01/2023
Planning Permission Expired:
-> 20/01/2028
20 MW - planning - scotland - Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility -
12823
Record Last Updated (dd/mm/yyyy): 12/12/2022
-> 08/03/2023
19 MW - planning - scotland - Land North of Thornton Road -
7131
Record Last Updated (dd/mm/yyyy): 29/04/2020
->
Under Construction:
-> Implemented
19 MW - planning - scotland - North West Of Jameston Farm -
7133
Record Last Updated (dd/mm/yyyy): 27/09/2021
->
Planning Permission Expired:
-> NA
19 MW - planning - scotland - Jamesfield Organic Centre, Phase 2 -
7315
Record Last Updated (dd/mm/yyyy): 26/01/2022
->
19 MW - planning - scotland - Ochiltree - Battery Sorage -
10162
Planning Permission Expired: 05/10/2022
-> 05/10/2025
19 MW - planning - scotland - Speyslaw Farm - Battery Storage -
10394
Record Last Updated (dd/mm/yyyy): 16/12/2021
-> 02/03/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 09/02/2023
Planning Permission Expired:
-> 09/02/2026
16 MW - planning - wales - Little Llwyn Onn - Solar Farm & Battery Storage -
11544
Record Last Updated (dd/mm/yyyy): 24/06/2022
-> 14/03/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 08/03/2023
Planning Permission Expired:
-> 08/03/2028
15 MW - operation - south west - Lockleaze Energy Storage -
6961
Record Last Updated (dd/mm/yyyy): 31/01/2019
->
15 MW - planning - eastern - Three Bridges Solar Farm -
8220
Planning Permission Expired:
-> NA
15 MW - planning - eastern - Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage -
9346
Planning Authority: Borough Council of King๏ฟฝs Lynn & West Norfolk
-> Borough Council of King's Lynn & West Norfolk
13 MW - operation - south east - Bumpers Lane Solar Farm -
6913
Record Last Updated (dd/mm/yyyy): 01/12/2021
->
13 MW - planning - west midlands - Maybrook Road - Battery facility -
11008
Planning Permission Expired:
-> NA
10 MW - operation - northern ireland - AES Kilroot Station Battery Storage Array -
6845
Record Last Updated (dd/mm/yyyy): 12/12/2018
->
10 MW - operation - yorkshire and humber - Blackburn Meadows -
6906
Record Last Updated (dd/mm/yyyy): 21/03/2019
->
10 MW - operation - east midlands - Hill Farm - Energy Barn -
6915
Record Last Updated (dd/mm/yyyy): 15/03/2019
->
10 MW - operation - south east - Kings Barn Farm - Energy Barn -
6916
Record Last Updated (dd/mm/yyyy): 15/03/2019
->
10 MW - operation - east midlands - Leverton Farm - Energy Barn -
6917
Record Last Updated (dd/mm/yyyy): 11/12/2018
->
10 MW - operation - eastern - Nevendon -
6926
Record Last Updated (dd/mm/yyyy): 28/03/2017
->
10 MW - planning - east midlands - Manor Farm Energy Storage -
6948
Record Last Updated (dd/mm/yyyy): 15/12/2022
->
Planning Permission Expired:
-> 30/11/2020
Under Construction:
-> Implemented
10 MW - construction - eastern - Slamseys Energy Storage -
7000
Record Last Updated (dd/mm/yyyy): 20/01/2020
->
10 MW - planning - south east - Stockbridge Road -
7097
Record Last Updated (dd/mm/yyyy): 25/02/2020
->
Under Construction:
-> Implemented
10 MW - construction - south east - Land Adj Harmer Warren Quarry -
7143
Record Last Updated (dd/mm/yyyy): 09/12/2022
->
Planning Permission Expired:
-> NA
10 MW - planning - scotland - Greenburn Wind Park -
7159
Record Last Updated (dd/mm/yyyy): 24/06/2020
-> 10/05/2023
Operator (or Applicant): Energy Consents And Deployment Unit
-> REG Windpower Limited
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 21/04/2023
Planning Permission Expired:
-> 21/04/2029
10 MW - operation - north west - Cleator -
7177
Record Last Updated (dd/mm/yyyy): 03/01/2019
->
10 MW - planning - south west - Old Green Farm, Alveston Battery Storage -
7182
Record Last Updated (dd/mm/yyyy): 03/08/2020
->
10 MW - planning - south west - Trevol Business Park -
7404
Record Last Updated (dd/mm/yyyy): 23/01/2020
->
10 MW - planning - south west - Tiddlywink Barn -
7527
Record Last Updated (dd/mm/yyyy): 20/12/2019
->
10 MW - planning - scotland - Binn Eco Park - Battery -
9098
Record Last Updated (dd/mm/yyyy): 17/10/2022
-> 02/03/2023
Site Name: Binn Eco Park Wind Farm Energy Storage Facility
-> Binn Eco Park - Battery
Storage Type: Stand-alone Storage
-> Co-located with RE
Storage Co-location REPD Ref ID:
-> 4817, 7807, 9071 & 13672
10 MW - planning - west midlands - Aspley House Farm, Aspley Lane - Battery Storage Facility -
12571
Record Last Updated (dd/mm/yyyy): 07/11/2022
-> 08/02/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 27/01/2023
Planning Permission Expired:
-> 27/01/2026
10 MW - operation - south west - Cirencester Solar Farm -
12791
Planning Permission Expired: 17/09/2018
-> 06/09/2018
Under Construction: 06/09/2018
->
10 MW - planning - yorkshire and humber - J3 Business Park - Battery Energy Storage Facility -
12920
Record Last Updated (dd/mm/yyyy): 22/12/2022
-> 27/01/2023
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 24/01/2023
Planning Permission Expired:
-> NA
2023-01
New projects (66):
1000 MW - planning - scotland - Coalburn II Energy Storage Facility - Battery Storage Facility -
12206
500 MW - planning - yorkshire and humber - Eggborough Power Station, Selby Road - Battery Storage -
12483
200 MW - planning - scotland - Whitehill Energy Storage -
10466
200 MW - cancelled - east midlands - Staythorpe Road - Battery energy storage -
11321
200 MW - planning - west midlands - Little Beanit Farm, Balsall Common - Battery Storage -
11656
130 MW - cancelled - east midlands - Southfields Farm, Common Lane - Battery Storage -
12698
120 MW - cancelled - south west - Pound Road, Hawkchurch - Battery Energy Storage -
12360
100 MW - planning - south west - Shaftesbury Energy Park - Battery Storage System -
10626
100 MW - planning - north west - Hillside Farm, Lancaster Road - Battery Storage -
11948
100 MW - planning - north west - Capenhurst Lane, Capenhurst - Battery Storage -
12503
100 MW - planning - eastern - Walpole Sub Station, Walpole Bank - Battery Storage -
12683
100 MW - operation - north west - National Grid Electricity Substation, Capenhurst Lane - Battery Storage -
12725
100 MW - planning - north east - Newburn Bridge Road - Battery Storage Facility -
12729
100 MW - planning - yorkshire and humber - Bradford West, Harrop Lane, Wilsden - Battery Storage -
12909
100 MW - planning - north west - Hillside Farm, Lancaster Road - Battery Storage -
12964
99 MW - planning - north west - Freshfields, Fairy Lane - Battery Storage -
12694
85 MW - planning - yorkshire and humber - Green Lane, Thurcroft - Battery Energy Storage Facility -
12789
80 MW - planning - yorkshire and humber - Barlow Road, Barlow Road - Battery Storage -
12734
60 MW - planning - south east - Misslebrook Farm, Botley Road - Battery Storage -
12691
60 MW - planning - south west - Blackhill Quarry, Woodbury - Battery Energy Storage Facility -
12815
57 MW - planning - south east - Sellindge Substation, Church Lane - Battery Storage -
12351
50 MW - planning - scotland - Clash Gour -
7178
50 MW - planning - eastern - Newmarket Road, Bottisham - Battery Energy Storage -
10486
50 MW - planning - west midlands - Lowlands Farm - Battery Storage -
11399
50 MW - planning - yorkshire and humber - Swangate Project - Energy Storage System -
11437
30 MW - planning - west midlands - Rectory Farm, Rectory Lane - Battery Storage -
11905
50 MW - planning - scotland - Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage -
12303
50 MW - planning - west midlands - Ryton End, Barston - Battery Storage -
12348
50 MW - construction - eastern - Norwich Road Industrial Estate -
12529
50 MW - planning - south east - Derehams Farm, Derehams Lane - Battery Storage -
12649
50 MW - planning - scotland - Ourack -
12727
50 MW - planning - scotland - Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility -
12780
50 MW - cancelled - west midlands - Armshead Farm, Armshead Road - Battery Energy Storage Facility -
12804
50 MW - planning - scotland - Tomchrasky Estate Wind farm -
12877
50 MW - cancelled - west midlands - Lowlands Farm - Battery Storage -
12959
50 MW - planning - scotland - Eccles Substation, Eccles - Battery Energy Storage System -
13003
49 MW - planning - north west - Welkin Mill -
7832
49 MW - planning - scotland - Rothienorman - Battery Storage -
10638
49 MW - planning - scotland - Overhill Farm, Rothienorman - Battery Energy Storage -
11590
49 MW - planning - scotland - Killoch Depot, Killoch Colliery - Battery Storage -
12349
49 MW - planning - scotland - Electricity Substation, Westerton Road - Battery Storage -
12467
49 MW - planning - south west - Landulph, Ellbridge Lane - Battery Storage Facility -
12697
49 MW - planning - south west - Bengrove Farm, Base Lane - Battery Storage -
12830
49 MW - planning - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility -
12936
49 MW - planning - north west - Welkin Mill, Welkin Road - Battery Storage -
12982
45 MW - planning - north west - Mount Pleasant Farm, Green Lane - Battery Storage -
13011
40 MW - construction - south east - Derehams Farm, Derehams Lane - Battery Storage -
12803
40 MW - planning - north east - Long Pasture Farm, Little Stainton - Solar Farm -
12952
38 MW - cancelled - scotland - Sheirdrim Renewable Energy Development - Battery -
7585
30 MW - planning - yorkshire and humber - North Lincolnshire Green Energy Park -
12706
28 MW - planning - south east - Sunny Oaks Renewable Energy Park -
12415
20 MW - planning - wales - John Green Frog Power Compound, John North Road - Battery System -
12455
20 MW - planning - yorkshire and humber - Yarra Industrial Estate, Loicher Lane - Battery Storage -
12524
20 MW - planning - scotland - Chesters - Millmoor Rig Wind Farm & Battery Energy Storage -
12821
20 MW - planning - scotland - Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility -
12823
20 MW - planning - scotland - Kirkton Energy Farm -
12876
20 MW - planning - south east - Reeds Solar Farm, Alders Road - Solar Farm & Battery Storage -
12941
14 MW - planning - scotland - Hopsrig Wind Farm -
11066
14 MW - planning - north west - St Michaels Road, Ditton Road - Battery Storage -
12904
12 MW - planning - scotland - Scawd Law Wind Farm -
13000
10 MW - planning - east midlands - Manor Farm Energy Storage -
6948
10 MW - construction - south east - Land Adj Harmer Warren Quarry -
7143
10 MW - planning - eastern - Wissett Solar Farm, Wissett - Battery Storage -
9913
10 MW - planning - west midlands - Aspley House Farm, Aspley Lane - Battery Storage Facility -
12571
10 MW - operation - south west - Cirencester Solar Farm -
12791
10 MW - planning - yorkshire and humber - J3 Business Park - Battery Energy Storage Facility -
12920
Disappeared projects (14):
99 MW - planning - west midlands - Newfields Farm - Battery Energy Storage -
10233
57 MW - planning - north west - Waterloo Farm, Furbarn Road - Battery Storage -
12187
50 MW - cancelled - north west - Penwortham Sub Station -
7119
49 MW - planning - south east - Burcot Solar Farm -
9374
49 MW - cancelled - west midlands - Lanegreat Barr, Great Barr - Battery Storage Facility -
10438
49 MW - cancelled - scotland - Rothienorman - Battery Energy Storage Facility -
11497
49 MW - cancelled - south west - Arlingham Solar Farm - Solar PV Panels & Battery Storage Facility -
11636
16 MW - cancelled - wales - Maelor Gasworks - Solar Farm & Battery Storage -
9343
12 MW - cancelled - west midlands - Mucklow Hill -
7984
10 MW - cancelled - eastern - Rayleigh Transforming Station -
6984
10 MW - cancelled - scotland - Shindour Feddal Hill Wood Braco -
7573
10 MW - cancelled - scotland - Orchardbank Industrial Estate -
7574
10 MW - cancelled - north west - Britannia House -
7986
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility -
11369
Updated projects (59):
79 MW - construction - south east - Stony Energy Storage Facility -
7001
Record Last Updated (dd/mm/yyyy): 18/03/2022
-> 30/11/2022
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/07/2022
status: planning
-> construction ๐๏ธ
50 MW - operation - south east - Richborough Energy Park - Phase 2 -
9626
Record Last Updated (dd/mm/yyyy): 16/09/2021
-> 10/01/2023
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/01/2023
status: planning
-> construction ๐๏ธ
50 MW - operation - south west - Melksham Substation East Storage -
6953
Record Last Updated (dd/mm/yyyy): 21/08/2020
-> 22/11/2022
Development Status: Under Construction
-> Operational
Development Status (short): Under Construction
-> Operational
Operational:
-> 07/11/2022
status: construction
-> operation ๐พ ๐ ๐ธ
49 MW - operation - yorkshire and humber - Pillswood Phase 1 -
7005
Megapack
Record Last Updated (dd/mm/yyyy): 13/06/2019
-> 09/11/2022
Site Name: Creyke Substation
-> Pillswood Phase 1
Development Status: Revised
-> Operational
Development Status (short): Revised
-> Operational
Are they re-applying (New REPD Ref): 7360
->
Under Construction:
-> 01/04/2022
Operational:
-> 01/11/2022
status: planning
-> operation ๐พ ๐ ๐ธ
49 MW - construction - south east - Halewick Lane, Sompting - Battery-based Energy Storage Facility -
7168
Record Last Updated (dd/mm/yyyy): 04/08/2022
-> 17/10/2022
Development Status: Under Construction
-> Planning Permission Granted
Development Status (short): Under Construction
-> Awaiting Construction
Planning Permission Expired: 03/04/2022
->
Under Construction: 01/07/2022
-> 01/02/2023
status: construction
-> planning
49 MW - operation - south west - Minety South - Battery Storage -
7184
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
Operational:
-> 01/10/2022
status: planning
-> operation ๐พ ๐ ๐ธ
49 MW - operation - yorkshire and humber - Pillswood Phase 2 -
7360
Megapack
Record Last Updated (dd/mm/yyyy): 31/01/2020
-> 09/11/2022
Operator (or Applicant): Northern Powergrid
-> Harmony Energy Storage
Site Name: Creyke Beck Substation
-> Pillswood Phase 2
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
Are they re-applying (Old REPD Ref) : 7005
->
Under Construction:
-> 01/04/2022
Operational:
-> 01/11/2022
status: planning
-> operation ๐พ ๐ ๐ธ
49 MW - construction - west midlands - Coventry National Grid Substation -
7885
Record Last Updated (dd/mm/yyyy): 07/02/2021
-> 11/11/2022
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/07/2022
status: planning
-> construction ๐๏ธ
49 MW - operation - scotland - Jamesfield Organic Centre - Battery Storage -
10863
Megapack
Record Last Updated (dd/mm/yyyy): 07/06/2022
-> 12/01/2023
Development Status: Planning Application Submitted
-> Under Construction
Development Status (short): Application Submitted
-> Under Construction
Planning Permission Granted:
-> 28/09/2022
Planning Permission Expired:
-> 28/09/2025
Under Construction:
-> 01/01/2023
status: planning
-> construction ๐๏ธ
23 MW - operation - east midlands - Asfordby Business Park (1) -
6932
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
Under Construction:
-> 08/06/2018
Operational:
-> 01/04/2019
status: planning
-> operation ๐พ ๐ ๐ธ
20 MW - construction - north east - Standby Embedded Stor Power Plant - Battery storage -
9010
Record Last Updated (dd/mm/yyyy): 21/06/2021
-> 16/01/2023
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/10/2022
status: planning
-> construction ๐๏ธ
10 MW - operation - south west - South Farm Solar Park -
9361
Record Last Updated (dd/mm/yyyy): 28/07/2021
-> 21/12/2022
Development Status: Under Construction
-> Operational
Development Status (short): Under Construction
-> Operational
Operational:
-> 16/12/2022
status: construction
-> operation ๐พ ๐ ๐ธ
300 MW - construction - scotland - Blackhillock Electricity Substation - Battery Energy Storage System -
9723
Record Last Updated (dd/mm/yyyy): 27/01/2022
-> 07/11/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 30/09/2022
Planning Permission Expired:
-> 30/09/2027
230 MW - construction - wales - Uskmouth Power Station - Battery Storage -
10936
Record Last Updated (dd/mm/yyyy): 09/09/2022
-> 20/12/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 07/12/2022
Planning Permission Expired:
-> 07/12/2027
150 MW - planning - south west - Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility -
11612
Record Last Updated (dd/mm/yyyy): 08/07/2022
-> 17/10/2022
130 MW - planning - eastern - Stoke Lane - Battery Energy Storage -
10390
Record Last Updated (dd/mm/yyyy): 16/12/2021
-> 17/10/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 09/09/2022
Planning Permission Expired:
-> 09/09/2025
100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage -
9691
Record Last Updated (dd/mm/yyyy): 10/05/2022
-> 27/10/2022
100 MW - construction - eastern - Bullen Lane - Battery Storage -
10311
Record Last Updated (dd/mm/yyyy): 18/07/2022
-> 17/10/2022
99 MW - planning - north east - South Thinford Lane, Thinford - Energy Storage -
10489
Record Last Updated (dd/mm/yyyy): 28/01/2022
-> 01/11/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 21/10/2022
Planning Permission Expired:
-> 21/10/2025
90 MW - planning - east midlands - Caldwell Road - Battery Storage -
9507
Record Last Updated (dd/mm/yyyy): 19/04/2022
-> 04/11/2022
Operator (or Applicant): Aura Power BESS Ltd
-> Infrared Capital Partners Limited
80 MW - planning - scotland - Tealing Battery Energy Storage Farm -
11097
Record Last Updated (dd/mm/yyyy): 27/04/2022
-> 29/11/2022
57 MW - planning - north west - National Grids Rainhill Substation Battery storage facility -
8439
Record Last Updated (dd/mm/yyyy): 02/03/2021
-> 21/10/2022
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Are they re-applying (New REPD Ref):
-> 11559
57 MW - planning - north west - Penwortham - Battery storage -
11217
Record Last Updated (dd/mm/yyyy): 24/05/2022
-> 17/10/2022
57 MW - planning - north west - Sutton Manor - Battery Storage Facility -
11559
Record Last Updated (dd/mm/yyyy): 28/06/2022
-> 21/10/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Are they re-applying (Old REPD Ref) :
-> 8439
Planning Permission Granted:
-> 16/09/2022
Planning Permission Expired:
-> 16/09/2025
50 MW - planning - scotland - Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage -
8342
Storage Co-location REPD Ref ID: 8341
-> 8341 & 9076
50 MW - planning - yorkshire and humber - Barlow Road, Barlow - Battery Storage -
9970
Record Last Updated (dd/mm/yyyy): 19/11/2021
-> 28/11/2022
Development Status: Planning Application Submitted
-> Revised
Development Status (short): Application Submitted
-> Revised
Are they re-applying (New REPD Ref):
-> 12734
Planning Application Withdrawn:
-> 18/10/2022
50 MW - planning - eastern - Ardleigh Road, Little Bromley - Battery Energy Storage -
10302
Record Last Updated (dd/mm/yyyy): 23/12/2021
-> 01/11/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 28/09/2022
Planning Permission Expired:
-> 28/09/2025
50 MW - planning - west midlands - Penstone Lane, Penn 1 - Battery Storage Facility -
10705
Record Last Updated (dd/mm/yyyy): 01/03/2022
-> 17/10/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 11/10/2022
Planning Permission Expired:
-> 11/10/2025
50 MW - planning - west midlands - Penstone Lane, Lower Penn 2 - Battery Storage -
10733
Record Last Updated (dd/mm/yyyy): 04/03/2022
-> 17/10/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 29/09/2022
Planning Permission Expired:
-> 29/09/2025
50 MW - cancelled - eastern - High Road, Saddlebow - Battery Storage -
11648
Record Last Updated (dd/mm/yyyy): 15/07/2022
-> 04/11/2022
50 MW - planning - south west - Says Court Farm, Coalpit Heath - Battery Energy Storage -
11793
Record Last Updated (dd/mm/yyyy): 04/08/2022
-> 14/11/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 02/11/2022
Planning Permission Expired:
-> 02/11/2025
49 MW - planning - south west - Ellbridge Lane -
7051
Record Last Updated (dd/mm/yyyy): 17/09/2020
-> 23/11/2022
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Are they re-applying (New REPD Ref):
-> 12697
49 MW - planning - eastern - Lapwing Fen II, Crown Farm -
7606
Record Last Updated (dd/mm/yyyy): 15/09/2022
-> 22/11/2022
49 MW - planning - north west - Welkin Mill -
8055
Record Last Updated (dd/mm/yyyy): 30/09/2020
-> 05/01/2023
Development Status: Planning Application Submitted
-> Revised
Development Status (short): Application Submitted
-> Revised
Are they re-applying (New REPD Ref):
-> 12982
Are they re-applying (Old REPD Ref) :
-> 7832
49 MW - planning - scotland - Shindour - Energy Storage Facility -
8464
Record Last Updated (dd/mm/yyyy): 28/07/2022
-> 11/11/2022
49 MW - construction - scotland - Whitehills Energy Storage Facility -
8916
Record Last Updated (dd/mm/yyyy): 11/03/2022
-> 17/10/2022
49 MW - planning - scotland - East Kilbride - Battery storage -
9013
Record Last Updated (dd/mm/yyyy): 27/04/2022
-> 04/11/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 22/08/2022
Planning Permission Expired:
-> 22/08/2025
49 MW - planning - south west - Minety South 2 - Battery Storage Facility -
9063
Operator (or Applicant): Minety South 2
-> Statera Energy
49 MW - planning - scotland - Drum Farm - Battery Energy Storage System -
9940
Record Last Updated (dd/mm/yyyy): 18/05/2022
-> 22/11/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 27/10/2022
Planning Permission Expired:
-> 27/10/2027
49 MW - planning - scotland - Stainland Energy Storage Project -
10225
Record Last Updated (dd/mm/yyyy): 21/06/2022
-> 14/12/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 04/11/2022
Planning Permission Expired:
-> 04/11/2027
49 MW - planning - scotland - Newburgh Road, Abernethy - Battery Storage -
10607
Record Last Updated (dd/mm/yyyy): 07/06/2022
-> 25/10/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 26/09/2022
Planning Permission Expired:
-> 26/09/2025
49 MW - planning - south east - Harrington Franklin, Richborough Energy Park - Battery Storage -
11449
Record Last Updated (dd/mm/yyyy): 14/06/2022
-> 12/12/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 06/12/2022
Planning Permission Expired:
-> 06/12/2025
49 MW - planning - scotland - Gleniston, Auchtertool - Battery Storage Facility -
11808
Megapack
Record Last Updated (dd/mm/yyyy): 08/08/2022
-> 11/11/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 09/11/2022
Planning Permission Expired:
-> 09/11/2025
49 MW - planning - scotland - Househill House, Househill - Battery Storage -
12056
County: Highlands
-> Highland
47 MW - planning - south west - Indian Queens Sub-Station - Battery Storage -
11725
Record Last Updated (dd/mm/yyyy): 25/07/2022
-> 01/11/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 17/10/2022
Planning Permission Expired:
-> 17/10/2025
40 MW - planning - east midlands - Breach Farm - Energy Barn -
6914
Planning Permission Expired: 15/08/2020
-> 01/05/2021
40 MW - planning - eastern - Norwich Road Industrial Estate -
6958
Record Last Updated (dd/mm/yyyy): 07/04/2021
-> 04/11/2022
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Are they re-applying (New REPD Ref):
-> 12529
40 MW - planning - south east - Loudwater Battery Storage Site -
8142
Record Last Updated (dd/mm/yyyy): 30/06/2021
-> 12/12/2022
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Are they re-applying (New REPD Ref):
-> 11993
30 MW - planning - scotland - Farburn Place - Energy Storage Facility -
8385
Record Last Updated (dd/mm/yyyy): 11/10/2021
-> 21/12/2022
Operator (or Applicant): Peak Reserve Power Limited
-> Peak Reserve Power Limited / Centrica / Cragside
30 MW - planning - north east - West Sleekburn - Battery Storage Compound -
10957
Record Last Updated (dd/mm/yyyy): 29/06/2022
-> 21/10/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 19/10/2022
Planning Permission Expired:
-> 19/10/2025
30 MW - planning - yorkshire and humber - Back Lane, Skerne - Solar Farm & Battery Storage -
12297
Record Last Updated (dd/mm/yyyy): 13/10/2022
-> 18/11/2022
25 MW - planning - north west - Caton Road, Lancaster - Battery Storage Facility -
10047
Record Last Updated (dd/mm/yyyy): 02/12/2021
-> 13/12/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 07/12/2022
Planning Permission Expired:
-> 07/12/2027
22 MW - operation - wales - Pen y Cymoedd Energy Storage -
6927
Planning Authority: Neath Port Talbot County Borough Council
-> Neath Port Talbot Council
Planning Application Reference:
-> P2009/1053
Planning Application Submitted:
-> 19/11/2009
Planning Permission Granted:
-> 18/11/2011
20 MW - planning - east midlands - Vicarage Drove - Solar farm & Battery storage -
8518
Record Last Updated (dd/mm/yyyy): 28/02/2022
-> 04/11/2022
20 MW - planning - eastern - South Fambridge Hall - Solar farm & Battery storage -
9274
Record Last Updated (dd/mm/yyyy): 05/08/2022
-> 17/11/2022
19 MW - planning - scotland - Ochiltree - Battery Sorage -
10162
Y-coordinate: 62020
-> 620201
lat: 50.440496
-> 55.454634
long: -4.018763
-> -4.266842
18 MW - cancelled - south west - Churchtown Solar Farm Battery Storage -
7726
Storage Type: Co-located with RE
-> Stand-alone Storage
12 MW - planning - north west - Dragons Lane - Battery Storage Facility -
11701
Record Last Updated (dd/mm/yyyy): 20/07/2022
-> 12/12/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 01/12/2022
Planning Permission Expired:
-> 01/12/2025
10 MW - planning - scotland - Binn Eco Park - Battery -
9098
Record Last Updated (dd/mm/yyyy): 11/02/2022
-> 17/10/2022
2022-10
New projects (40):
349 MW - planning - west midlands - Cellarhead - Battery Site -
10013
300 MW - construction - scotland - Kilmarnock South Substation - Battery storage -
9696
230 MW - construction - wales - Uskmouth Power Station - Battery Storage -
10936
200 MW - planning - north east - Worset Lane - Battery Energy Storage System -
11406
150 MW - construction - north west - Fiddlers Ferry Power Station - Battery storage -
9404
100 MW - planning - eastern - North Walpole, St Peter - Battery Energy Storage -
9762
100 MW - construction - eastern - Bullen Lane - Battery Storage -
10311
100 MW - cancelled - east midlands - Gotham - Battery Energy storage -
10986
99 MW - planning - yorkshire and humber - Neil Fox Way - Battery Storage -
11519
16 MW - planning - scotland - Mains Of Keithick Farm, Keithick - Battery Storage & Solar Farm -
11623
62 MW - planning - wales - Wentlooge Renewable Energy Hub -
7192
60 MW - planning - yorkshire and humber - Redcote Lane, Armley - Battery Storage Facility -
12224
57 MW - planning - south east - Ash Lane, Little London - Battery Storage -
11090
57 MW - planning - eastern - Braintree Road, Cressing - Battery Storage -
11995
57 MW - planning - north west - Waterloo Farm, Furbarn Road - Battery Storage -
12187
50 MW - planning - west midlands - South Staffordshire Railway Walk, Castlecroft - Battery Storage -
11414
50 MW - cancelled - eastern - High Road, Saddlebow - Battery Storage -
11648
50 MW - planning - south west - Says Court Farm, Coalpit Heath - Battery Energy Storage -
11793
50 MW - planning - south west - Fairholme, Minety - Battery Storage -
11810
50 MW - planning - south west - Stonehill, Minety -
11812
50 MW - planning - north west - Lancaster Power Extension, Middleton Road - Energy Storage Facility -
12125
49 MW - planning - scotland - Newhouse Farm - Energy Storage Facility -
9047
49 MW - cancelled - south west - Arlingham Solar Farm - Solar PV Panels & Battery Storage Facility -
11636
49 MW - construction - london - Clay Tye Farm Phase 1 - Storage Facility -
11720
49 MW - construction - london - Clay Tye Farm Phase 2 - Storage Facility -
11721
49 MW - planning - scotland - Gleniston, Auchtertool - Battery Storage Facility -
11808
Megapack
49 MW - cancelled - eastern - Whites Farm - Battery Storage -
11880
49 MW - planning - scotland - Househill House, Househill - Battery Storage -
12056
47 MW - planning - south west - Dog Trap Lane, Minety - Battery Energy Storage Systems -
10488
47 MW - planning - south west - Indian Queens Sub-Station - Battery Storage -
11725
45 MW - planning - scotland - Sclenteuch Wind Farm -
11987
30 MW - planning - scotland - West Bendings - Battery Storage -
10985
30 MW - planning - south west - Catsbrain Farm - Battery Storage -
11787
30 MW - planning - yorkshire and humber - Back Lane, Skerne - Solar Farm & Battery Storage -
12297
28 MW - planning - scotland - Sandy Knowe Wind Farm Extension -
12080
20 MW - planning - south west - Hele Manor Farm, Bradford On Tone - Battery Storage System -
12174
20 MW - operation - south west - Hawkers Hill Energy Park -
12293
19 MW - planning - scotland - Ochiltree - Battery Sorage -
10162
16 MW - planning - scotland - Knockkippen Wind, Solar & Battery Farm -
11676
12 MW - planning - north west - Dragons Lane - Battery Storage Facility -
11701
Disappeared projects (33):
240 MW - cancelled - east midlands - Temple Oaks Renewable Energy Park -
11562
100 MW - cancelled - eastern - Tilbury Energy Centre -
7048
50 MW - cancelled - south west - Minety North -
6952
50 MW - cancelled - west midlands - Wolverhampton West Sub Station -
6977
50 MW - cancelled - scotland - Braidfield Road, Hardgate - Battery Storage Facility -
9869
50 MW - planning - west midlands - Lowlands Farm - Battery Storage -
11399
49 MW - cancelled - north east - Norton -
6923
49 MW - cancelled - west midlands - Former Rugeley Power Station -
6981
49 MW - cancelled - north west - Charleywood Road, Knowsley Industrial Park -
7026
49 MW - cancelled - yorkshire and humber - Salt End Lane -
7039
49 MW - cancelled - south west - Riverford Farm -
7078
49 MW - cancelled - east midlands - Grendon Storage -
7089
49 MW - cancelled - south west - Taunton Substation -
7153
40 MW - cancelled - yorkshire and humber - Tofts Lane -
6942
29 MW - cancelled - north east - Land at Derwenthaugh Eco Park -
7054
29 MW - cancelled - scotland - Land SW of Shilton Cottage -
7134
29 MW - cancelled - scotland - Drumfad Wood -
7165
25 MW - cancelled - scotland - Fraserburgh Development -
7041
24 MW - cancelled - east midlands - The Hollies -
6946
20 MW - cancelled - south west - Bristol Road -
6930
20 MW - cancelled - yorkshire and humber - Aven Industrial Estate -
7007
20 MW - cancelled - north west - Leighton Hall Farm -
7032
20 MW - cancelled - scotland - Land To The East Of Wholeflats Road (Grangemouth) -
7043
20 MW - cancelled - north west - Kilshaw Street -
7072
20 MW - cancelled - north west - Beaufort Road -
7128
18 MW - cancelled - east midlands - Callywhite Lane Commercial Estate -
7087
10 MW - cancelled - north west - Pikelaw Place -
6944
10 MW - cancelled - south east - Litchlake Farm -
7011
10 MW - cancelled - east midlands - Manton Wood -
7035
10 MW - cancelled - scotland - Strichen South -
7056
10 MW - cancelled - eastern - Hadham Road -
7068
10 MW - construction - south east - Land Adj Harmer Warren Quarry -
7143
10 MW - cancelled - south west - Earthcott Green - Battery Storage -
11510
Updated projects (119):
57 MW - planning - north west - Capenhurst Lane -
8283
Record Last Updated (dd/mm/yyyy): 24/01/2022
-> 15/07/2022
Development Status: Under Construction
-> Planning Permission Granted
Development Status (short): Under Construction
-> Awaiting Construction
Planning Permission Expired:
-> 16/04/2024
Under Construction: 01/02/2022
->
status: construction
-> planning
57 MW - construction - north west - Capenhurst Lane, Capenhurst - Battery storage -
9377
Record Last Updated (dd/mm/yyyy): 03/08/2021
-> 15/09/2022
Development Status: Planning Application Submitted
-> Under Construction
Development Status (short): Application Submitted
-> Under Construction
Planning Permission Granted:
-> 21/10/2021
Planning Permission Expired:
-> 21/10/2024
Under Construction:
-> 01/09/2022
status: planning
-> construction ๐๏ธ
50 MW - operation - south west - Melksham Substation East Storage -
6953
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Planning Permission Expired:
-> 28/09/2020
Under Construction:
-> 01/01/2022
status: planning
-> construction ๐๏ธ
49 MW - operation - yorkshire and humber - Nether Moor Field -
7019
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
Planning Permission Expired:
-> 22/11/2022
Operational:
-> 01/09/2020
status: planning
-> operation ๐พ ๐ ๐ธ
49 MW - operation - south west - Mannington Battery Storage Plant -
7024
Record Last Updated (dd/mm/yyyy): 27/05/2020
-> 14/09/2022
Operator (or Applicant): Public Power Solutions
-> Still Waters Green Technology
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
Planning Permission Expired:
-> 28/02/2021
Under Construction:
-> 01/11/2020
Operational:
-> 01/10/2021
status: planning
-> operation ๐พ ๐ ๐ธ
49 MW - planning - yorkshire and humber - Land Adjacent to 4 Redcote Lane (Armley) -
7111
Development Status: Under Construction
-> Revised
Development Status (short): Under Construction
-> Revised
Are they re-applying (New REPD Ref):
-> 12224
Under Construction: 01/02/2022
->
status: construction
-> planning
49 MW - construction - south east - Halewick Lane, Sompting - Battery-based Energy Storage Facility -
7168
Record Last Updated (dd/mm/yyyy): 11/03/2022
-> 04/08/2022
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Planning Permission Expired:
-> 03/04/2022
Under Construction:
-> 01/07/2022
status: planning
-> construction ๐๏ธ
49 MW - construction - yorkshire and humber - Osbaldwick Substation -
7172
Record Last Updated (dd/mm/yyyy): 14/11/2019
-> 27/07/2022
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Address: Os Field 5070, Hull Road, Dunnington, York, North Yorkshire
-> Os Field 5070, Hull Road, Dunnington, York,
Planning Application Reference: 18/02659/OUT
-> 20/01515/REM
Planning Application Submitted: 21/11/2018
-> 21/08/2020
Planning Permission Granted: 22/02/2019
-> 08/10/2020
Planning Permission Expired: 22/02/2022
->
Under Construction:
-> 01/05/2022
status: planning
-> construction ๐๏ธ
49 MW - operation - north west - West Didsbury Battery Storage -
7185
Record Last Updated (dd/mm/yyyy): 21/08/2020
-> 23/08/2022
Installed Capacity (MWelec): 50
-> 49.99
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/06/2022
status: planning
-> construction ๐๏ธ
mw: 50
-> 49
49 MW - construction - scotland - Ferrymuir -
7371
Record Last Updated (dd/mm/yyyy): 17/03/2022
-> 21/09/2022
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Planning Permission Expired:
-> 21/11/2022
Under Construction: 14/07/1905
-> 29/07/2022
status: planning
-> construction ๐๏ธ
49 MW - planning - yorkshire and humber - Elland Storage Project -
10236
Record Last Updated (dd/mm/yyyy): 10/01/2022
-> 15/08/2022
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Planning Permission Expired:
-> 23/12/2023
Under Construction:
-> 01/08/2022
status: planning
-> construction ๐๏ธ
32 MW - operation - south west - Severn Road -
7085
Record Last Updated (dd/mm/yyyy): 10/01/2022
-> 13/10/2022
Development Status: Under Construction
-> Operational
Development Status (short): Under Construction
-> Operational
Operational:
-> 23/12/2021
status: construction
-> operation ๐พ ๐ ๐ธ
30 MW - operation - south west - Fideoak Mills -
7152
Record Last Updated (dd/mm/yyyy): 21/02/2020
-> 21/09/2022
Development Status: Under Construction
-> Operational
Development Status (short): Under Construction
-> Operational
Operational:
-> 01/08/2020
status: construction
-> operation ๐พ ๐ ๐ธ
21 MW - operation - eastern - Clayhill Farm - Battery Energy Storage -
7570
Record Last Updated (dd/mm/yyyy): 26/01/2022
-> 14/09/2022
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
Planning Permission Expired:
-> 23/03/2021
Under Construction:
-> 01/05/2019
status: planning
-> operation ๐พ ๐ ๐ธ
20 MW - planning - west midlands - Perserverance Road -
7966
Record Last Updated (dd/mm/yyyy): 16/06/2022
-> 12/10/2022
Development Status: Under Construction
-> Planning Permission Granted
Development Status (short): Under Construction
-> Awaiting Construction
Under Construction: 01/06/2022
->
status: construction
-> planning
19 MW - construction - scotland - Balsillie Avenue - Roaring Hill Energy Storage Facility -
9224
Record Last Updated (dd/mm/yyyy): 18/11/2021
-> 15/09/2022
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Planning Permission Expired:
-> 03/09/2024
Under Construction:
-> 12/09/2022
status: planning
-> construction ๐๏ธ
400 MW - planning - scotland - Hunterston Grid Services Complex - Energy Storage Facility -
10535
Planning Permission Expired:
-> 05/01/2027
400 MW - planning - scotland - Kincardine Grid Services Complex - Energy Storage Facility -
10536
Planning Permission Expired:
-> 05/01/2023
349 MW - planning - west midlands - Dunton Hall - Battery Energy Storage System -
9427
Planning Permission Expired:
-> 04/03/2025
200 MW - planning - north west - Heysham Energy Storage Project -
9545
Planning Permission Expired:
-> 26/05/2025
150 MW - planning - eastern - Thurrock Flexible Generation Plant -
7696
Planning Permission Expired:
-> 16/02/2027
100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage -
9691
Planning Permission Expired:
-> 14/10/2024
100 MW - planning - north west - Cholmondeley Road - Battery Storage -
9763
Record Last Updated (dd/mm/yyyy): 07/10/2021
-> 15/08/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 10/08/2022
Planning Permission Expired:
-> 10/08/2025
100 MW - planning - south west - St Dennis - Battery Energy Storage -
10058
Planning Permission Expired:
-> 02/02/2025
100 MW - planning - eastern - Walpole St Andrew - Battery storage -
10876
Record Last Updated (dd/mm/yyyy): 29/03/2022
-> 11/10/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 20/09/2022
Planning Permission Expired:
-> 20/09/2025
100 MW - planning - scotland - Teviot Wind Farm -
11442
Storage Co-location REPD Ref ID: 8921, 11441
-> 8921 & 11441
99 MW - planning - yorkshire and humber - Lakeside Energy Storage Facility -
8268
Megapack
Planning Permission Expired:
-> 06/05/2024
99 MW - planning - yorkshire and humber - Skelton Grange Battery Storage Facility -
8914
Planning Permission Expired:
-> 04/08/2024
99 MW - planning - north west - Bay Gateway - Battery Storage Facility -
9199
Planning Permission Expired:
-> 26/04/2025
90 MW - planning - yorkshire and humber - Little Crow Solar Park -
7175
Planning Permission Expired:
-> 05/04/2027
90 MW - planning - east midlands - Caldwell Road - Battery Storage -
9507
Planning Permission Expired:
-> 03/03/2025
80 MW - planning - yorkshire and humber - Netherlands Way - Battery Energy Facility -
10429
Are they re-applying (Old REPD Ref) :
-> 7090
Planning Permission Expired:
-> 06/01/2025
80 MW - planning - scotland - Tealing Battery Energy Storage Farm -
11097
Storage Type:
-> Stand-alone Storage
79 MW - construction - south east - Stony Energy Storage Facility -
7001
Planning Permission Expired:
-> 12/10/2020
50 MW - operation - south east - Richborough Energy Park - Phase 2 -
9626
Planning Permission Expired:
-> 30/04/2024
57 MW - planning - north west - National Grids Rainhill Substation Battery storage facility -
8439
Planning Permission Expired:
-> 07/06/2024
57 MW - planning - north west - Penwortham - Battery storage -
11217
Planning Permission Expired:
-> 03/05/2025
50 MW - planning - scotland - Dersalloch Battery Storage Facility -
8927
Planning Permission Expired:
-> 29/11/2026
50 MW - planning - south east - Upton Lane, Nursling - Battery Storage Facility -
9673
Planning Permission Expired:
-> 28/01/2025
50 MW - planning - eastern - Sundon Sub Station Battery Storage Facility -
9998
Planning Permission Expired:
-> 10/11/2024
50 MW - planning - scotland - Electricity Sub Station, Strichen - Battery Storage Facility -
10039
Planning Permission Expired:
-> 01/03/2025
49 MW - operation - yorkshire and humber - Pillswood Phase 1 -
7005
Megapack
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Are they re-applying (New REPD Ref):
-> 7360
Planning Permission Expired:
-> 17/11/2020
49 MW - planning - north west - Middleton Clean Energy Plant -
7029
Record Last Updated (dd/mm/yyyy): 01/02/2022
-> 26/09/2022
49 MW - planning - yorkshire and humber - Elland Storage Project -
7053
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Are they re-applying (New REPD Ref):
-> 10236
49 MW - planning - eastern - Braintree Road Substation -
7161
Record Last Updated (dd/mm/yyyy): 17/09/2020
-> 06/09/2022
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Are they re-applying (New REPD Ref):
-> 11995
49 MW - operation - south west - Minety South - Battery Storage -
7184
Site Name: Minety South Battery Storage
-> Minety South - Battery Storage
Installed Capacity (MWelec): 50
-> 49.99
mw: 50
-> 49
49 MW - operation - yorkshire and humber - Pillswood Phase 2 -
7360
Megapack
Are they re-applying (Old REPD Ref) :
-> 7005
49 MW - planning - eastern - Lapwing Fen II, Crown Farm -
7606
Record Last Updated (dd/mm/yyyy): 07/09/2020
-> 15/09/2022
Site Name: Crown Farm
-> Lapwing Fen II, Crown Farm
49 MW - planning - south east - Rye Common -
7737
Megapack
Planning Permission Granted:
-> 28/09/2021
Planning Permission Expired:
-> 28/09/2024
49 MW - planning - east midlands - Newton Wood Farm -
7780
Planning Permission Expired:
-> 28/10/2023
49 MW - construction - east midlands - National Grid Enderby Substation -
8037
Record Last Updated (dd/mm/yyyy): 07/02/2021
-> 26/09/2022
49 MW - planning - south west - Claydon Farm - Solar Farm & Battery Storage -
8039
Planning Permission Expired:
-> 17/12/2026
30 MW - planning - scotland - Drumcross Battery Storage -
8155
Record Last Updated (dd/mm/yyyy): 30/09/2020
-> 15/09/2022
49 MW - operation - south east - Richborough Energy Park -
8195
Planning Permission Expired:
-> 09/02/2024
49 MW - planning - eastern - Brentwood nergy Storage System -
8249
Planning Permission Expired:
-> 21/05/2024
49 MW - planning - eastern - Crouch Solar Farm -
8358
Planning Permission Expired:
-> 23/12/2024
49 MW - planning - scotland - Shindour - Energy Storage Facility -
8464
Record Last Updated (dd/mm/yyyy): 18/01/2022
-> 28/07/2022
Planning Permission Expired:
-> 16/12/2025
49 MW - planning - south west - Moreton Lane - Solar Farm & Battery Storage -
8844
Planning Permission Expired:
-> 05/04/2025
49 MW - construction - scotland - Whitehills Energy Storage Facility -
8916
Planning Permission Expired:
-> 15/12/2024
49 MW - planning - scotland - Drumshoreland Road Battery Storage Facility -
8920
Record Last Updated (dd/mm/yyyy): 11/04/2022
-> 15/08/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 07/07/2022
Planning Permission Expired:
-> 07/07/2025
49 MW - planning - eastern - Rush Green Motors - Battery storage -
8987
Record Last Updated (dd/mm/yyyy): 24/01/2022
-> 15/09/2022
Planning Permission Expired:
-> 06/10/2024
49 MW - planning - wales - Bronwylfa Road, Talwrn - Battery Storage Facility -
9052
Record Last Updated (dd/mm/yyyy): 24/05/2021
-> 27/07/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 05/07/2022
Planning Permission Expired:
-> 05/07/2027
49 MW - planning - south west - Minety South 2 - Battery Storage Facility -
9063
Site Name: Purlieus Farm, Minety - Battery Storage Facility
-> Minety South 2 - Battery Storage Facility
Planning Permission Expired:
-> 08/11/2024
49 MW - planning - eastern - Sundon Substation -
9315
Planning Permission Expired:
-> 26/01/2025
49 MW - operation - scotland - Pleasance Road - Battery Energy Facility -
9997
Planning Permission Expired:
-> 01/06/2025
49 MW - planning - scotland - Fordtown Energy Storage -
10239
Planning Permission Expired:
-> 24/02/2024
49 MW - planning - eastern - Model Farm -
10687
Planning Permission Expired:
-> 27/01/2025
49 MW - planning - scotland - Midmill, Kintore - Battery Energy Storage -
10701
Record Last Updated (dd/mm/yyyy): 01/03/2022
-> 20/07/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 01/07/2022
Planning Permission Expired:
-> 01/07/2025
49 MW - planning - scotland - Broomloan Road - Battery Energy Storage -
10886
Planning Permission Expired:
-> 28/06/2025
49 MW - planning - scotland - South Leylodge Farmhouse, Kintore - Battery Energy Storage System -
11092
Record Last Updated (dd/mm/yyyy): 27/04/2022
-> 11/10/2022
Planning Application Reference: ENQ/2022/0562
-> APP/2022/2022
Planning Application Submitted: 14/04/2022
-> 30/09/2022
49 MW - planning - west midlands - Brown Edge - Battery Storage -
11418
Storage Type:
-> Stand-alone Storage
40 MW - planning - eastern - Maldon Hall -
7095
Planning Permission Expired:
-> 13/05/2022
40 MW - operation - south east - Newlands Farm Battery Storage Facility Phase 2 -
8264
Planning Permission Expired:
-> 26/01/2024
40 MW - planning - scotland - Dalmarnock Road - Battery Storage -
8507
Planning Permission Expired:
-> 16/02/2025
40 MW - planning - yorkshire and humber - Rusholme Grange -
9121
Megapack
Planning Permission Expired:
-> 03/09/2024
40 MW - planning - south west - Leigh Delamere - Solar farm & Battery storage -
9238
Record Last Updated (dd/mm/yyyy): 29/06/2021
-> 01/09/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 11/08/2022
Planning Permission Expired:
-> 11/08/2025
40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage -
9584
Planning Permission Expired:
-> 10/02/2025
40 MW - planning - south east - Tanners Lane - Battery Energy Storage Facility (Phase One) -
9708
Site Name: Tanners Lane - 40 MW Battery Energy Storage Facility (Phase One)
-> Tanners Lane - Battery Energy Storage Facility (Phase One)
Planning Permission Expired:
-> 26/11/2022
40 MW - planning - yorkshire and humber - Field House Solar Farm -
10970
Record Last Updated (dd/mm/yyyy): 11/04/2022
-> 28/07/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 08/07/2022
Planning Permission Expired:
-> 08/07/2025
38 MW - planning - north east - Maiden, Annfield Plain - Energy Storage -
9036
Record Last Updated (dd/mm/yyyy): 13/12/2021
-> 28/07/2022
Planning Permission Expired:
-> 18/08/2026
35 MW - planning - south west - Patch Elm Lane - Battery Storage -
11415
Planning Permission Expired:
-> 18/03/2025
32 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage -
10145
Planning Permission Expired:
-> 28/02/2025
30 MW - planning - south west - Catsbrain Farm -
7988
Record Last Updated (dd/mm/yyyy): 25/08/2020
-> 04/08/2022
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Are they re-applying (New REPD Ref):
-> 11787
Address: N/o Kingsdown Road and W/o, Catsbrain Farm, Swindon, Wiltshire
-> N/o Kingsdown Road and W/o, Catsbrain Farm, Swindon,
30 MW - planning - scotland - Farburn Place - Energy Storage Facility -
8385
Planning Permission Expired:
-> 30/09/2024
30 MW - planning - south west - North Tawton Primary Substation - Battery Storage -
9275
Planning Permission Expired:
-> 03/11/2024
28 MW - construction - eastern - Lower Dunton Road Battery Storage Facility -
8213
Planning Permission Expired:
-> 05/02/2024
26 MW - planning - yorkshire and humber - West Melton Electricity Substation - Energy Storage System -
11436
Record Last Updated (dd/mm/yyyy): 09/06/2022
-> 23/09/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 13/09/2022
Planning Permission Expired:
-> 13/09/2025
25 MW - planning - north west - Bristol Avenue - Battery Energy Storage Facility -
8809
Planning Permission Expired:
-> 11/05/2024
25 MW - planning - yorkshire and humber - Stainland Road, Salterhebble - Battery Storage Facility -
9397
Planning Permission Expired:
-> 28/09/2024
25 MW - planning - north west - Davies Road - Battery Storage -
9563
Planning Permission Expired:
-> 17/03/2025
25 MW - planning - north west - Middlewich Road - Solar Photovoltaics & Battery Storage -
9565
Planning Permission Expired:
-> 11/03/2025
25 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage -
10222
Planning Permission Expired:
-> 21/02/2025
25 MW - planning - scotland - Wemyss Estate - Randolph Solar Farm & Battery Energy Storage -
11482
Storage Type:
-> Co-located with RE
Planning Permission Granted:
-> 24/05/2022
Secretary of State - Intervened: 24/05/2022
->
Planning Permission Expired:
-> 24/05/2027
20 MW - planning - london - Riverside Energy Park -
7036
Planning Permission Expired:
-> 09/04/2025
20 MW - planning - scotland - Stranoch 2 -
7306
Planning Permission Expired:
-> 24/11/2027
20 MW - planning - scotland - Hagshaw Hill -
7572
Planning Permission Expired: 26/02/2023
-> 26/02/2025
20 MW - planning - scotland - Arecleoch Wind Farm (extension) -
7882
Planning Permission Expired:
-> 16/11/2027
20 MW - planning - east midlands - Vicarage Drove - Solar farm & Battery storage -
8518
Planning Permission Expired:
-> 17/02/2026
20 MW - planning - yorkshire and humber - Hull East Stor Generation Compound - Battery energy storage -
9006
Planning Permission Expired:
-> 29/07/2024
20 MW - construction - north east - Standby Embedded Stor Power Plant - Battery storage -
9010
Planning Permission Expired:
-> 16/06/2024
20 MW - planning - eastern - South Fambridge Hall - Solar farm & Battery storage -
9274
Record Last Updated (dd/mm/yyyy): 22/12/2021
-> 05/08/2022
Operator (or Applicant): British Solar Renewables
-> British Solar Renewables / BayWa r.e. UK Limited
Planning Permission Expired:
-> 15/12/2024
20 MW - planning - eastern - The Brickmakers Arms Battery -
9668
Planning Permission Expired:
-> 22/12/2024
20 MW - planning - scotland - Douglas West Wind Farm (extension) -
9957
Planning Permission Expired:
-> 18/11/2024
20 MW - planning - east midlands - Mount Road, Castle Gresley - Battery Storage Facility -
10012
Record Last Updated (dd/mm/yyyy): 29/11/2021
-> 18/08/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 17/07/2022
Planning Permission Expired:
-> 17/07/2025
20 MW - planning - north west - Broadgate, Chadderton - Battery Storage Containers -
10690
Planning Permission Expired:
-> 19/05/2025
20 MW - planning - scotland - Strathruddie, Kinglassie - Solar farm -
10828
Record Last Updated (dd/mm/yyyy): 21/03/2022
-> 18/07/2022
Planning Permission Expired:
-> 16/03/2025
20 MW - construction - north west - Chadderton - Battery energy storage facility -
11160
Storage Type:
-> Stand-alone Storage
19 MW - planning - scotland - Land North of Thornton Road -
7131
Planning Permission Expired:
-> 10/02/2019
19 MW - planning - scotland - Hillcrest Cottage, Shebster - Battery Energy Storage System -
10226
Record Last Updated (dd/mm/yyyy): 24/12/2021
-> 29/09/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 22/08/2022
Planning Permission Expired:
-> 22/08/2025
18 MW - cancelled - south west - Churchtown Solar Farm Battery Storage -
7726
Record Last Updated (dd/mm/yyyy): 25/06/2020
-> 15/09/2022
18 MW - planning - south west - Whaddon Lane, Hilperton -
9057
Planning Permission Expired:
-> 06/04/2025
16 MW - planning - east midlands - Waterswallows Road, Green Fairfield - Battery Storage Equipment -
10716
Planning Permission Expired:
-> 08/04/2025
15 MW - planning - eastern - Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage -
9346
Planning Permission Expired:
-> 08/12/2024
13 MW - planning - west midlands - Maybrook Road - Battery facility -
11008
Record Last Updated (dd/mm/yyyy): 19/04/2022
-> 18/08/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 08/08/2022
10 MW - planning - south east - Stockbridge Road -
7097
Planning Permission Expired:
-> 14/12/2020
10 MW - planning - south west - Minety Substation -
7942
Planning Permission Expired:
-> 07/04/2025
10 MW - planning - scotland - Binn Eco Park - Battery -
9098
Planning Permission Expired:
-> 12/07/2024
10 MW - planning - north west - Park Road Battery Storage -
10076
Record Last Updated (dd/mm/yyyy): 07/12/2021
-> 26/09/2022
Planning Permission Expired:
-> 19/11/2024
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility -
11369
Site Name: Bath Mews, Minsterley - 10MW Battery Storage Facility
-> Bath Mews, Minsterley - Battery Storage Facility
2022-07
New projects (49):
500 MW - planning - scotland - Devilla Energy Storage Facility -
9248
249 MW - planning - south east - Richborough Energy Park - Phase 3 (Sheaf) -
11201
240 MW - cancelled - east midlands - Temple Oaks Renewable Energy Park -
11562
150 MW - planning - south west - Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility -
11612
100 MW - planning - yorkshire and humber - Hales Lane - Battery Storage Facility -
9635
100 MW - planning - scotland - Teviot Wind Farm -
11442
99 MW - planning - west midlands - Newfields Farm - Battery Energy Storage -
10233
80 MW - planning - scotland - Tealing Battery Energy Storage Farm -
11097
57 MW - planning - north west - Penwortham - Battery storage -
11217
57 MW - planning - north west - Sutton Manor - Battery Storage Facility -
11559
50 MW - planning - eastern - Stocking Pelham - Battery Storage System -
11212
50 MW - planning - west midlands - Lowlands Farm - Battery Storage -
11399
50 MW - planning - eastern - Third Drove, Fengate - Battery Storage -
11558
49 MW - planning - eastern - Tollgate Battery Storage Facility -
6949
49 MW - planning - eastern - Hilfield Farm Tech -
7030
49 MW - planning - north east - Lackenby -
7040
49 MW - planning - south east - Lovedean Energy Storage System -
7064
49 MW - planning - south west - Moreton Lane - Solar Farm & Battery Storage -
8844
49 MW - planning - scotland - East Kilbride - Battery storage -
9013
49 MW - planning - east midlands - Grendon Lakes - Battery Storage -
9341
49 MW - planning - scotland - Drum Farm - Battery Energy Storage System -
9940
49 MW - planning - scotland - Newburgh Road, Abernethy - Battery Storage -
10607
49 MW - operation - scotland - Jamesfield Organic Centre - Battery Storage -
10863
Megapack
49 MW - planning - scotland - South Leylodge Farmhouse, Kintore - Battery Energy Storage System -
11092
49 MW - planning - west midlands - Brown Edge - Battery Storage -
11418
49 MW - planning - south east - Harrington Franklin, Richborough Energy Park - Battery Storage -
11449
49 MW - cancelled - scotland - Rothienorman - Battery Energy Storage Facility -
11497
45 MW - planning - north east - Edge Lane, Maiden Law - Solar Farm & Battery Storage -
11619
42 MW - planning - scotland - Armadale Wind Farm -
11219
40 MW - planning - east midlands - Breach Farm -
6962
36 MW - planning - south west - Kingston Road, Slimbridge - Battery Storage -
11516
35 MW - planning - south west - Patch Elm Lane - Battery Storage -
11415
32 MW - planning - south west - Gloucestershire Science and Technology Park (small) -
7181
32 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage -
10145
30 MW - planning - south west - Gloucestershire Science and Technology Park -
7067
30 MW - planning - scotland - Roaring Hill (Resubmission) -
7989
30 MW - planning - north east - West Sleekburn - Battery Storage Compound -
10957
27 MW - planning - scotland - Craig Watch - Wind Farm & Battery Storage -
11609
26 MW - planning - yorkshire and humber - West Melton Electricity Substation - Energy Storage System -
11436
25 MW - planning - scotland - Wemyss Estate - Randolph Solar Farm & Battery Energy Storage -
11482
20 MW - planning - scotland - Fordtown Energy Storage -
7234
20 MW - planning - scotland - Grayside Wind Farm -
11113
20 MW - construction - north west - Chadderton - Battery energy storage facility -
11160
16 MW - planning - wales - Little Llwyn Onn - Solar Farm & Battery Storage -
11544
15 MW - planning - north west - Grassing Rome Street - Battery Storage -
11611
13 MW - planning - west midlands - Maybrook Road - Battery facility -
11008
10 MW - planning - south west - Tiddlywink Barn -
7527
10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility -
11369
10 MW - cancelled - south west - Earthcott Green - Battery Storage -
11510
Disappeared projects (11):
349 MW - planning - west midlands - Cellarhead - Battery Site -
10013
100 MW - cancelled - eastern - Battlesbridge Bypass, Rettendon - Battery Storage -
9801
49 MW - planning - london - Mill Hill National Grid Substation -
8009
49 MW - cancelled - west midlands - Brown Edge - Battery Storage -
10431
49 MW - cancelled - scotland - East Croftmore - Battery Energy Storage -
10700
47 MW - planning - south west - Dog Trap Lane, Minety - Battery Energy Storage Systems -
10488
35 MW - planning - south west - Northington Lane - Battery Storage Facility -
9992
35 MW - cancelled - south west - Patch Elm Lane - Battery Storage -
10282
30 MW - cancelled - wales - Pound Farm Lane - Battery Storage -
9969
20 MW - cancelled - south west - Tiddlywink Barn Battery Storage Power Plant -
9552
13 MW - cancelled - north east - Newcastle International Airport Phase 2 - Battery Storage -
9756
Updated projects (55):
250 MW - construction - eastern - Lapwing Fen 2 - Battery Storage Plant -
7614
Record Last Updated (dd/mm/yyyy): 21/02/2022
-> 08/06/2022
Site Name: Flower Farm
-> Lapwing Fen 2 - Battery Storage Plant
Installed Capacity (MWelec): 49.90
-> 250
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/06/2022
status: planning
-> construction ๐๏ธ
mw: 49
-> 250
49 MW - construction - yorkshire and humber - Bradford West Substation (Harrop Edge Farm) -
7577
Record Last Updated (dd/mm/yyyy): 08/03/2022
-> 08/07/2022
Site Name: Bradford West Substation (Harrop Edge Farm Resubmission)
-> Bradford West Substation (Harrop Edge Farm)
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction: 01/03/2022
-> 07/07/2022
status: planning
-> construction ๐๏ธ
49 MW - operation - scotland - Wishaw Battery Storage Facility -
9522
Record Last Updated (dd/mm/yyyy): 01/09/2021
-> 10/05/2022
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/04/2022
status: planning
-> construction ๐๏ธ
20 MW - planning - west midlands - Perserverance Road -
7966
Record Last Updated (dd/mm/yyyy): 07/02/2021
-> 16/06/2022
Site Name: Perserverance Road (Resubmission)
-> Perserverance Road
Storage Type: Co-located with fossil fuel plant
-> Stand-alone Storage
CHP Enabled: Yes
-> No
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Address: Old School Lane, Hereford, Hereford and Worcester
-> Old School Lane, Hereford,
Under Construction:
-> 01/06/2022
status: planning
-> construction ๐๏ธ
349 MW - planning - west midlands - Dunton Hall - Battery Energy Storage System -
9427
Record Last Updated (dd/mm/yyyy): 08/03/2022
-> 17/05/2022
200 MW - planning - north west - Heysham Energy Storage Project -
9545
Record Last Updated (dd/mm/yyyy): 07/09/2021
-> 30/05/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 27/05/2022
150 MW - planning - eastern - Thurrock Flexible Generation Plant -
7696
Record Last Updated (dd/mm/yyyy): 06/07/2020
-> 26/05/2022
Operator (or Applicant): RPS Group / Thurrock Power
-> Thurrock Power
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Address: Thurrock Flexible Generation Plant Fort Road Tilbury Essex
-> Thurrock Flexible Generation Plant Fort Road Tilbury
Planning Permission Granted:
-> 16/02/2022
100 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy -
9115
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage -
9691
Record Last Updated (dd/mm/yyyy): 25/10/2021
-> 10/05/2022
99 MW - operation - eastern - Dollymans Storage -
7088
Address: Land North Of National Grid, Doublegate Lane, Rawreth, Wickford, Essex
-> Land North Of National Grid, Doublegate Lane, Rawreth, Wickford,
Planning Permission Expired:
-> 05/11/2023
99 MW - planning - yorkshire and humber - Lakeside Energy Storage Facility -
8268
Megapack
Record Last Updated (dd/mm/yyyy): 21/05/2021
-> 21/06/2022
Operator (or Applicant): Renewable Energy System Limited
-> Tag Energy UK
Installed Capacity (MWelec): 100.00
-> 99.9
mw: 100
-> 99
99 MW - planning - north west - Bay Gateway - Battery Storage Facility -
9199
Record Last Updated (dd/mm/yyyy): 16/07/2021
-> 27/06/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 26/04/2022
90 MW - planning - east midlands - Caldwell Road - Battery Storage -
9507
Record Last Updated (dd/mm/yyyy): 31/08/2021
-> 19/04/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 03/03/2022
49 MW - cancelled - south west - Ravensroost Farm, Minety - Battery Energy Storage -
7014
Record Last Updated (dd/mm/yyyy): 12/02/2020
-> 29/06/2022
Operator (or Applicant): Arlington Energy (formerly Enso Energy)
-> Conrad Energy Developments II Limited
Site Name: Ravensroost Farm
-> Ravensroost Farm, Minety - Battery Energy Storage
CHP Enabled:
-> No
Development Status: Planning Permission Granted
-> Planning Application Submitted
Development Status (short): Awaiting Construction
-> Application Submitted
Address: Land Adjacent Ravensroost Farm, Minety, Malmesbury, Wiltshire
-> Ravensroost Farm, Minety, Malmesbury,
Planning Application Reference: 18/04914/FUL
-> PL/2022/04524
Planning Application Submitted: 15/06/2018
-> 13/06/2022
Planning Permission Granted: 10/10/2018
->
49 MW - planning - eastern - Burwell Main Sub-Station -
7272
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
49 MW - planning - eastern - Sundon Substation -
7283
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
49 MW - construction - south west - Salisbury Substation -
7510
Record Last Updated (dd/mm/yyyy): 29/04/2020
-> 04/07/2022
Operator (or Applicant): Harmony Energy Storage
-> SSE Renewables
Address: Land Adjacent To, Salisbury Substation, Wilton, Salisbury, Wiltshire
-> Land Adjacent To, Salisbury Substation, Wilton, Salisbury,
49 MW - cancelled - north east - Lackenby -
7518
Site Name: Lackenby (Resubmission)
-> Lackenby
Address: Land at, Crow Lane, Old Lackenby, Middlesbrough, Cleveland
-> Land at, Crow Lane, Old Lackenby, Middlesbrough
49 MW - planning - eastern - Lapwing Fen II, Crown Farm -
7606
Address: Crown Farm, Mill Road, West Walton, Wisbech, Cambridgeshire
-> Crown Farm, Mill Road, West Walton, Wisbech,
County: Norfolk
-> Cambridgeshire
49 MW - planning - eastern - Model Farm -
7609
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
49 MW - operation - north west - Lister Drive -
7740
Record Last Updated (dd/mm/yyyy): 07/05/2021
-> 17/05/2022
49 MW - planning - south west - Claydon Farm - Solar Farm & Battery Storage -
8039
Record Last Updated (dd/mm/yyyy): 18/01/2022
-> 10/05/2022
49 MW - operation - scotland - Pleasance Road - Battery Energy Facility -
9997
Record Last Updated (dd/mm/yyyy): 08/03/2022
-> 12/07/2022
Operator (or Applicant): Coronation Power Limited
-> Gresham House
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Authority: Perth and Kinross Council
-> Perth & Kinross Council
Planning Permission Granted:
-> 01/06/2022
49 MW - planning - scotland - Stainland Energy Storage Project -
10225
Record Last Updated (dd/mm/yyyy): 29/12/2021
-> 21/06/2022
Site Name: Upper Geiselittle - Energy Storage Facility
-> Stainland Energy Storage Project
Planning Application Reference: 21/05957/PAN
-> 22/02054/FUL
Planning Application Submitted: 21/12/2021
-> 23/05/2022
49 MW - planning - scotland - Fordtown Energy Storage -
10239
Record Last Updated (dd/mm/yyyy): 10/12/2021
-> 19/05/2022
Operator (or Applicant): Intelligent Land Investments (ILI)
-> Private Developer
Site Name: Fordtown Energy Storage (Resubmission)
-> Fordtown Energy Storage
Installed Capacity (MWelec): 19.90
-> 49.9
mw: 19
-> 49
49 MW - cancelled - west midlands - Lanegreat Barr, Great Barr - Battery Storage Facility -
10438
Address: Adj The Duckery, Chapel Lane, Great Barr
-> Adj The Duckery, Chapel Lane, Great Barr, Walsall
County: Walsall
-> West Midlands
49 MW - planning - scotland - Broomloan Road - Battery Energy Storage -
10886
Record Last Updated (dd/mm/yyyy): 29/03/2022
-> 08/07/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 28/06/2022
48 MW - planning - northern ireland - Classic Marble Showers Site -
7208
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Address: South of Classic Marble (Showe, 31 Garvaghy Bridge Road, Garvaghy, Dungannon, Co Tyrone
-> South of Classic Marble (Showe, 31 Garvaghy Bridge Road, Garvaghy, Dungannon,
45 MW - planning - scotland - Pleasance Road -
7217
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
40 MW - planning - east midlands - Breach Farm - Energy Barn -
6914
Record Last Updated (dd/mm/yyyy): 25/08/2020
-> 27/05/2022
Operator (or Applicant): Anesco/ Green Hedge Energy UK
-> Bluefield Solar Income Fund
Address: Breach Farm, Caldwell, Swadlincote, Derbyshire
-> Breach Farm, Caldwell, Swadlincote,
Planning Permission Expired:
-> 15/08/2020
40 MW - planning - eastern - Norwich Road Industrial Estate -
6958
Address: Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth Suffolk
-> Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth
40 MW - planning - west midlands - Whitehouse Farm Energy Barn -
7987
Record Last Updated (dd/mm/yyyy): 25/08/2020
-> 27/05/2022
Operator (or Applicant): Green Hedge
-> Bluefield Solar Income Fund
Address: Whitehouse Farm, Blakes Lane, Guarlford, Malvern, Hereford and Worcester
-> Whitehouse Farm, Blakes Lane, Guarlford, Malvern,
Planning Permission Expired: 29/11/2020
->
40 MW - planning - scotland - Dalmarnock Road - Battery Storage -
8507
Record Last Updated (dd/mm/yyyy): 25/03/2022
-> 11/05/2022
35 MW - planning - yorkshire and humber - Rusholme Grange -
7093
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
32 MW - planning - yorkshire and humber - Kirkhaw Lane Battery Storage -
8430
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
30 MW - planning - scotland - Blackpark Energy Storage -
8105
Site Name: Blackpark Energy Storage (Resubmission)
-> Blackpark Energy Storage
Address: Black Park Farm, Nairn, Highlands
-> Black Park Farm, Nairn,
30 MW - planning - scotland - Jamesfield Organic Centre, Phase 1 -
10456
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
30 MW - planning - eastern - Colton - Solar photovoltaic farm, Battery storage -
10945
Record Last Updated (dd/mm/yyyy): 06/04/2022
-> 08/07/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 30/06/2022
29 MW - planning - scotland - Fordtown Energy Storage -
7764
Site Name: Fordtown Energy Storage (Resubmission)
-> Fordtown Energy Storage
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
29 MW - planning - scotland - Learielaw Farm -
7970
Record Last Updated (dd/mm/yyyy): 07/02/2021
-> 21/06/2022
23 MW - operation - east midlands - Asfordby Business Park (1) -
6932
Address: Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire,
-> Zone P, Asfordby Business Park, Welby Road, Melton Mowbray,
20 MW - operation - west midlands - Land to the west of Clay Hill Pit / Larport Farm -
6911
Address: Land West of Clay Hill Pit Larport Farm Larport Lane Dormington Herefordshire
-> Land West of Clay Hill Pit Larport Farm Larport Lane Dormington
20 MW - construction - east midlands - Chelveston Renewable Energy Park -
6941
Address: Chelveston Renewable Energy Pa, The Airfield, Chelveston, Wellingborough,๏ฟฝNorthamptonshire
-> Chelveston Renewable Energy Pa, The Airfield, Chelveston, Wellingborough,๏ฟฝ
20 MW - operation - north east - Ray Battery Storage Facility -
6943
Address: Ray Wind Farm, Kirkwhelpington, Newcastle Upon Tyne, Northumberland
-> Ray Wind Farm, Kirkwhelpington, Newcastle Upon Tyne,
20 MW - planning - west midlands - Perseverance Road -
7061
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Address: Land At Perseverance Road, Perseverance Road, Hereford, Hereford & Worcester
-> Land At Perseverance Road, Perseverance Road, Hereford,
20 MW - planning - yorkshire and humber - Kirkhaw Lane -
7149
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
20 MW - planning - scotland - Blackpark Farm -
7226
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
Address: Black Park Farm, Nairn, Highlands
-> Black Park Farm, Nairn,
20 MW - operation - south west - Feeder Road -
7663
Record Last Updated (dd/mm/yyyy): 21/05/2021
-> 20/05/2022
20 MW - planning - north west - Broadgate, Chadderton - Battery Storage Containers -
10690
Record Last Updated (dd/mm/yyyy): 01/03/2022
-> 14/06/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 19/05/2022
19 MW - planning - scotland - Jamesfield Organic Centre, Phase 2 -
7315
Development Status: Planning Permission Granted
-> Revised
Development Status (short): Awaiting Construction
-> Revised
18 MW - construction - south east - Aurora Solar Farm -
7385
Address: Twelve Acre Farm, Chilbridge Road, Eynsham, Witney, Oxfordshire
-> Twelve Acre Farm, Chilbridge Road, Eynsham, Witney,
18 MW - planning - south west - Whaddon Lane, Hilperton -
9057
Record Last Updated (dd/mm/yyyy): 24/05/2021
-> 27/04/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 06/04/2022
16 MW - planning - east midlands - Waterswallows Road, Green Fairfield - Battery Storage Equipment -
10716
Record Last Updated (dd/mm/yyyy): 04/03/2022
-> 19/04/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 08/04/2022
10 MW - operation - eastern - Nevendon -
6926
Address: Nevendon, Essex
-> Nevendon,
10 MW - planning - south west - Minety Substation -
7942
Record Last Updated (dd/mm/yyyy): 30/06/2020
-> 27/04/2022
Installed Capacity (MWelec): 49.90
-> 10
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Address: Land Near Minety Substation, Stonehill, Charlton, Malmesbury, Wiltshire
-> Land Near Minety Substation, Stonehill, Charlton, Malmesbury,
Planning Permission Granted:
-> 07/04/2022
mw: 49
-> 10
2022-04
New projects (48):
400 MW - planning - scotland - Hunterston Grid Services Complex - Energy Storage Facility -
10535
400 MW - planning - scotland - Kincardine Grid Services Complex - Energy Storage Facility -
10536
300 MW - construction - scotland - Blackhillock Electricity Substation - Battery Energy Storage System -
9723
100 MW - cancelled - eastern - Battlesbridge Bypass, Rettendon - Battery Storage -
9801
100 MW - planning - eastern - Walpole St Andrew - Battery storage -
10876
100 MW - cancelled - south west - Hook Street - Energy Storage Compound -
10142
99 MW - planning - north east - South Thinford Lane, Thinford - Energy Storage -
10489
90 MW - planning - yorkshire and humber - Little Crow Solar Park -
7175
80 MW - planning - yorkshire and humber - Netherlands Way - Battery Energy Facility -
10429
50 MW - planning - scotland - Frodo Solar and Battery Energy Development -
10994
50 MW - planning - west midlands - Penstone Lane, Penn 1 - Battery Storage Facility -
10705
50 MW - planning - west midlands - Penstone Lane, Lower Penn 2 - Battery Storage -
10733
50 MW - planning - south east - Upton Lane, Nursling - Battery Storage Facility -
9673
49 MW - planning - scotland - Midmill, Kintore - Battery Energy Storage -
10701
49 MW - construction - scotland - Ferrymuir -
7371
49 MW - planning - scotland - Broomloan Road - Battery Energy Storage -
10886
49 MW - planning - eastern - Model Farm -
10687
49 MW - cancelled - west midlands - Brown Edge - Battery Storage -
10431
49 MW - operation - scotland - Pleasance Road - Battery Energy Facility -
9997
49 MW - construction - south east - Halewick Lane, Sompting - Battery-based Energy Storage Facility -
7168
49 MW - planning - south east - Burcot Solar Farm -
9374
49 MW - planning - scotland - Shindour - Energy Storage Facility -
8464
49 MW - planning - south west - Claydon Farm - Solar Farm & Battery Storage -
8039
49 MW - cancelled - scotland - East Croftmore - Battery Energy Storage -
10700
49 MW - cancelled - west midlands - Lanegreat Barr, Great Barr - Battery Storage Facility -
10438
49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility -
10955
49 MW - planning - scotland - Drumshoreland Road Battery Storage Facility -
8920
47 MW - planning - south west - Dog Trap Lane, Minety - Battery Energy Storage Systems -
10488
40 MW - planning - yorkshire and humber - Field House Solar Farm -
10970
40 MW - planning - scotland - Dalmarnock Road - Battery Storage -
8507
35 MW - planning - yorkshire and humber - Rusholme Grange -
7093
30 MW - planning - scotland - Jamesfield Organic Centre, Phase 1 -
10456
30 MW - planning - scotland - Clachaig Glen -
10996
30 MW - planning - eastern - Colton - Solar photovoltaic farm, Battery storage -
10945
30 MW - planning - west midlands - Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage -
10978
20 MW - planning - east midlands - Vicarage Drove - Solar farm & Battery storage -
8518
20 MW - planning - eastern - Moggerhanger Road, Sandy - Solar Farm -
10981
20 MW - planning - north west - Former EON Power Station, Booth Lane - Battery Energy Storage System -
10436
20 MW - planning - north west - Vause Farm - Battery Storage -
10989
20 MW - planning - scotland - Strathruddie, Kinglassie - Solar farm -
10828
20 MW - planning - north west - Broadgate, Chadderton - Battery Storage Containers -
10690
20 MW - planning - south west - Plymouth Stor Generation - Battery storage -
10432
20 MW - planning - scotland - Carrick Windfarm -
10540
20 MW - planning - scotland - Chleansaid Onshore Wind Farm -
10997
20 MW - operation - yorkshire and humber - Kirkhaw Lane -
7148
16 MW - planning - east midlands - Waterswallows Road, Green Fairfield - Battery Storage Equipment -
10716
12 MW - cancelled - eastern - St Ippolyts - Solar Farm & Battery Storage -
9695
10 MW - planning - scotland - Binn Eco Park - Battery -
9098
Disappeared projects (3):
150 MW - construction - south east - Cleve Hill Solar Project -
7856
30 MW - planning - south west - Gloucestershire Science and Technology Park -
7067
30 MW - planning - scotland - Roaring Hill (Resubmission) -
7989
Updated projects (56):
57 MW - planning - north west - Capenhurst Lane -
8283
Record Last Updated (dd/mm/yyyy): 12/01/2021
-> 24/01/2022
Development Status: Planning Application Submitted
-> Under Construction
Development Status (short): Application Submitted
-> Under Construction
Planning Authority:
-> Cheshire West and Chester Council
Planning Permission Granted:
-> 16/04/2021
Under Construction:
-> 01/02/2022
status: planning
-> construction ๐๏ธ
50 MW - operation - scotland - Whitelee Wind Farm Battery Storage Extension -
7174
Record Last Updated (dd/mm/yyyy): 29/04/2020
-> 21/02/2022
Development Status: Planning Permission Granted
-> Operational
Development Status (short): Awaiting Construction
-> Operational
Under Construction:
-> 01/10/2020
Operational:
-> 01/10/2021
status: planning
-> operation ๐พ ๐ ๐ธ
49 MW - construction - south east - Sundridge Hill -
7081
Record Last Updated (dd/mm/yyyy): 27/01/2020
-> 17/03/2022
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Address: Land To South Of A228, Sundridge Hill, Cuxton, Rochester, Kent
-> Land To South Of A228, Sundridge Hill, Cuxton, Rochester,
Under Construction:
-> 01/02/2022
status: planning
-> construction ๐๏ธ
49 MW - construction - eastern - Tollgate Farm Battery Storage -
7335
Record Last Updated (dd/mm/yyyy): 23/12/2021
-> 01/02/2022
Site Name: Tollgate Farm Battery Storage (Resubmission)
-> Tollgate Farm Battery Storage
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Under Construction:
-> 01/02/2022
status: planning
-> construction ๐๏ธ
21 MW - operation - eastern - Clayhill Farm - Battery Energy Storage -
7570
Record Last Updated (dd/mm/yyyy): 20/01/2020
-> 26/01/2022
Operator (or Applicant): Arlington Energy
-> Enso Energy Limited
Site Name: Greenfield Road
-> Clayhill Farm - Battery Energy Storage
Storage Type: Co-located with RE
-> Stand-alone Storage
Storage Co-location REPD Ref ID: 2265
->
Installed Capacity (MWelec): 40.00
-> 21.00
CHP Enabled:
-> No
Development Status: Under Construction
-> Planning Permission Granted
Development Status (short): Under Construction
-> Awaiting Construction
Under Construction: 19/06/2019
->
status: construction
-> planning
mw: 40
-> 21
20 MW - operation - wales - Energy Centre Royal Mint -
7684
Record Last Updated (dd/mm/yyyy): 17/08/2020
-> 16/02/2022
Development Status: Under Construction
-> Planning Permission Granted
Development Status (short): Under Construction
-> Awaiting Construction
Under Construction: 01/04/2021
->
status: construction
-> planning
550 MW - planning - east midlands - Spalding Energy Park - Battery Storage -
10173
Operator (or Applicant): Spalding Energy Park Limited
-> Intergen Limited
Site Name: West Marsh Road - Battery Energy Storage System
-> Spalding Energy Park - Battery Storage
450 MW - planning - eastern - Gateway Energy Centre - Battery Energy Storage -
10309
Operator (or Applicant): Gateway Energy Centre Limited
-> Intergen Limited
Site Name: Baltic Avenue - Battery Energy Storage
-> Gateway Energy Centre - Battery Energy Storage
60 MW - planning - north east - Greystones Road, Grangetown - Battery Energy Storage System -
10081
Record Last Updated (dd/mm/yyyy): 11/11/2021
-> 11/02/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Authority: Redcar and Cleveland Council
-> Redcar and Cleveland Borough Council
Planning Permission Granted:
-> 17/12/2021
349 MW - planning - west midlands - Dunton Hall - Battery Energy Storage System -
9427
Record Last Updated (dd/mm/yyyy): 13/08/2021
-> 08/03/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 04/03/2022
100 MW - planning - south west - St Dennis - Battery Energy Storage -
10058
Record Last Updated (dd/mm/yyyy): 02/12/2021
-> 08/02/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 02/02/2022
99 MW - planning - yorkshire and humber - Skelton Grange Battery Storage Facility -
8914
Record Last Updated (dd/mm/yyyy): 27/04/2021
-> 24/01/2022
Operator (or Applicant): Skelton Peak Power Limited
-> Catalyst Capital LLP
Site Name: Skelton Battery Storage Facility
-> Skelton Grange Battery Storage Facility
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 04/08/2021
80 MW - operation - scotland - Aikengall II Community Wind Farm Battery -
7015
Turbine Capacity (MW): 4.20
-> 4.2
Height of Turbines (m): 145.00
-> 145
79 MW - construction - south east - Stony Energy Storage Facility -
7001
Record Last Updated (dd/mm/yyyy): 25/06/2020
-> 18/03/2022
Operator (or Applicant): Renewable Energy Systems (RES)
-> Gore Street Energy Storage Fund
Installed Capacity (MWelec): 49.90
-> 79.90
mw: 49
-> 79
57 MW - planning - north west - National Grids Rainhill Substation Battery storage facility -
8439
Address: ๏ฟฝLand To The South Of National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens WA9 4QH
-> ๏ฟฝLand To The South Of National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens
50 MW - planning - scotland - Electricity Sub Station, Strichen - Battery Storage Facility -
10039
Record Last Updated (dd/mm/yyyy): 02/12/2021
-> 04/03/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 01/03/2022
50 MW - operation - south west - Stonehill Energy Storage -
7773
Address: Land Adjacent To Electricity S, Stonehill, Charlton, Malmesbury, Wiltshire
-> Land Adjacent To Electricity S, Stonehill, Charlton, Malmesbury,
50 MW - planning - scotland - Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage -
8342
Record Last Updated (dd/mm/yyyy): 23/11/2021
-> 21/02/2022
Post Code: G76
-> G76 0QQ
Planning Authority: East Ayrshire Council
-> Scottish Government (S36)
Planning Application Reference: 21/0261/PP
-> ECU00002198
Planning Application Submitted: 13/05/2021
-> 17/04/2021
49 MW - construction - scotland - Whitehills Energy Storage Facility -
8916
Record Last Updated (dd/mm/yyyy): 20/09/2021
-> 11/03/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 15/12/2021
49 MW - construction - yorkshire and humber - Bradford West Substation (Harrop Edge Farm) -
7577
Record Last Updated (dd/mm/yyyy): 15/11/2019
-> 08/03/2022
Address: Land At Grid Ref 409233 434810 Old Allen Road Wilsden Bradford West Yorkshire
-> Land At Grid Ref 409233 434810 Old Allen Road Wilsden Bradford
Post Code:
-> BD15 9AG
Under Construction:
-> 01/03/2022
49 MW - planning - eastern - Burwell Main Sub-Station -
7272
Address: Land adj to Burwell 400kV Subs, Weirs Drove, Burwell, Cambridge, Cambridgeshire
-> Land adj to Burwell 400kV Subs, Weirs Drove, Burwell, Cambridge,
49 MW - planning - eastern - Sundon Substation -
7283
Address: Sundon 400KV Substation, Waterend Lane, Chalton, Luton, Bedfordshire
-> Sundon 400KV Substation, Waterend Lane, Chalton,
49 MW - planning - eastern - Crouch Solar Farm -
8358
Record Last Updated (dd/mm/yyyy): 20/05/2021
-> 14/03/2022
Operator (or Applicant): Private Developer
-> Low Carbon Storage
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Address: Dunton Road
-> Park Farm, Dunton Road, Brentwood
Planning Permission Granted:
-> 23/12/2021
49 MW - planning - south east - Rye Common -
7737
Megapack
Address: Street Record, Rye Common Lane, Crondall, Farnham, Surrey
-> Street Record, Rye Common Lane, Crondall, Farnham,
49 MW - operation - north west - Lister Drive -
7740
Address: Land Adjacent to Lister Drive, Carnegie Road, Liverpool, Merseyside
-> Land Adjacent to Lister Drive, Carnegie Road, Liverpool,
49 MW - operation - north west - Liverpool Energy Management Facility -
7772
Address: Land To The South Of, Carnegie Road, Liverpool, Merseyside
-> Land To The South Of, Carnegie Road, Liverpool,
49 MW - planning - eastern - Sundon Substation -
9315
Record Last Updated (dd/mm/yyyy): 16/07/2021
-> 30/03/2022
Site Name: Sundon Substation - 49.9MW Battery Storage
-> Sundon Substation
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 26/01/2022
49 MW - planning - eastern - Admiralty Road - Battery Energy Storage Facility -
9470
County: Norfolk
-> Norfolk
49 MW - planning - eastern - Model Farm -
7609
Record Last Updated (dd/mm/yyyy): 13/09/2021
-> 24/02/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Address: Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech, Cambridgeshire
-> Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech,
County: Norfolk
-> Cambridgeshire
Planning Application Reference: 21/01715/FM
-> 19/02003/F
Planning Application Submitted: 31/08/2021
-> 20/11/2019
Planning Permission Granted:
-> 06/03/2020
250 MW - construction - eastern - Lapwing Fen 2 - Battery Storage Plant -
7614
Record Last Updated (dd/mm/yyyy): 07/09/2020
-> 21/02/2022
Address: Flower Farm, The Marsh, Walpole St. Andrew, Wisbech, Cambridgeshire
-> Flower Farm, The Marsh, Walpole St. Andrew, Wisbech,
County: Norfolk
-> Cambridgeshire
49 MW - planning - north west - Middleton Clean Energy Plant -
7029
Record Last Updated (dd/mm/yyyy): 04/06/2020
-> 01/02/2022
CHP Enabled:
-> No
Address: Middleton Clean Energy Plant, Middleton Road, Heysham, Morecambe, Lancashire, LA3 2
-> Middleton Clean Energy Plant, Middleton Road, Heysham, Morecambe
49 MW - planning - yorkshire and humber - Land Adjacent to 4 Redcote Lane (Armley) -
7111
Record Last Updated (dd/mm/yyyy): 12/08/2020
-> 19/01/2022
CHP Enabled:
-> No
Address: Land Adjacent, 4 Redcote Lane, Armley, Leeds, West Yorkshire
-> Land Adjacent, 4 Redcote Lane, Armley, Leeds,
Under Construction: 01/06/2021
-> 01/02/2022
49 MW - planning - eastern - Rush Green Motors - Battery storage -
8987
Record Last Updated (dd/mm/yyyy): 25/10/2021
-> 24/01/2022
45 MW - planning - scotland - Pleasance Road -
7217
Record Last Updated (dd/mm/yyyy): 23/01/2020
-> 08/03/2022
40 MW - planning - south east - Tanners Lane - Battery Energy Storage Facility (Phase One) -
9708
Record Last Updated (dd/mm/yyyy): 27/09/2021
-> 07/04/2022
40 MW - planning - yorkshire and humber - Rusholme Grange -
9121
Megapack
Site Name: Rusholme Grange Resubmission
-> Rusholme Grange
40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage -
9584
Record Last Updated (dd/mm/yyyy): 13/09/2021
-> 24/02/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 10/02/2022
35 MW - cancelled - south west - Patch Elm Lane - Battery Storage -
10282
Record Last Updated (dd/mm/yyyy): 20/12/2021
-> 30/03/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 18/03/2022
32 MW - planning - yorkshire and humber - Kirkhaw Lane Battery Storage -
8430
Record Last Updated (dd/mm/yyyy): 11/05/2021
-> 24/02/2022
Address: Kirkhaw Lane Knottingley West Yorkshire
-> Kirkhaw Lane Knottingley
29 MW - planning - scotland - Fordtown Energy Storage -
7764
Address: Fordtown, Kintore, Inverurie, Grampian
-> Fordtown, Kintore, Inverurie
25 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage -
10222
Record Last Updated (dd/mm/yyyy): 29/12/2021
-> 28/02/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 21/02/2022
25 MW - planning - north west - Middlewich Road - Solar Photovoltaics & Battery Storage -
9565
Record Last Updated (dd/mm/yyyy): 09/09/2021
-> 17/03/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 11/03/2022
25 MW - planning - north west - Davies Road - Battery Storage -
9563
Record Last Updated (dd/mm/yyyy): 09/09/2021
-> 18/03/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 17/03/2022
20 MW - operation - north west - Lascar Works -
7464
Planning Application Reference: 62,215
-> 62215
20 MW - planning - south east - Basing Road -
7746
Address: Land At, Basing Road, Old Basing, Basingstoke, Hampshire
-> Land At, Basing Road, Old Basing, Basingstoke,
20 MW - planning - west midlands - Perseverance Road -
7061
Record Last Updated (dd/mm/yyyy): 29/11/2021
-> 24/02/2022
20 MW - planning - scotland - Douglas West Wind Farm (extension) -
9957
Operator (or Applicant): Greencoat UK Wind PLC
-> ScottishPower Renewables (UK) Limited
Address: Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark, Strathclyde
-> Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark,
20 MW - construction - north west - Gipsy Lane -
7632
Planning Authority: Rochdale Borough Council
-> Rochdale Metropolitan Borough Council
20 MW - planning - london - Riverside Energy Park -
7036
Record Last Updated (dd/mm/yyyy): 24/06/2020
-> 06/04/2022
20 MW - planning - yorkshire and humber - Kirkhaw Lane -
7149
Record Last Updated (dd/mm/yyyy): 10/01/2022
-> 24/02/2022
Operator (or Applicant): Volta Energy Storage
-> Walker & Son (Hauliers) Limited
Site Name: Kirkhaw Lane - Resubmission
-> Kirkhaw Lane
Storage Type: Co-located with fossil fuel plant
-> Stand-alone Storage
Planning Authority: Wakefield Council
-> Wakefield Metropolitan District Council
20 MW - cancelled - south west - Tiddlywink Barn Battery Storage Power Plant -
9552
Record Last Updated (dd/mm/yyyy): 08/09/2021
-> 21/02/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 14/01/2022
49 MW - planning - scotland - Fordtown Energy Storage -
10239
Installed Capacity (MWelec): 49.90
-> 19.90
mw: 49
-> 19
19 MW - planning - scotland - Jamesfield Organic Centre, Phase 2 -
7315
Record Last Updated (dd/mm/yyyy): 29/04/2020
-> 26/01/2022
Site Name: Jamesfield Organic Centre
-> Jamesfield Organic Centre, Phase 2
CHP Enabled:
-> No
Address: Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar, Fife
-> Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar,
Planning Permission Expired: 06/03/2022
-> 30/09/2022
18 MW - cancelled - south west - Churchtown Solar Farm Battery Storage -
7726
Address: Churchtown Solar Farm, Nanterrow Lane, Connor Downs, Hayle, Cornwall
-> Churchtown Solar Farm, Nanterrow Lane, Connor Downs, Hayle,
10 MW - construction - south east - Land Adj Harmer Warren Quarry -
7143
Record Last Updated (dd/mm/yyyy): 29/04/2020
-> 21/02/2022
Address: Land Adj Harmer Warren Quarry, Plumley, Harbridge Drove, Ellingham, Ringwood, Hampshire
-> Land Adj Harmer Warren Quarry, Plumley, Harbridge Drove, Ellingham, Ringwood
10 MW - cancelled - scotland - Lethen Wind Farm Wind Turbines and Energy Storage -
10237
Record Last Updated (dd/mm/yyyy): 10/01/2022
-> 24/01/2022
Planning Authority: Highland Council
-> Scottish Government (S36)
Planning Application Reference: 21/05946/S36
-> ECU00002216
Planning Application Submitted: 20/12/2021
-> 21/01/2022
2021-12
New projects (39):
550 MW - planning - east midlands - Spalding Energy Park - Battery Storage -
10173
450 MW - planning - eastern - Gateway Energy Centre - Battery Energy Storage -
10309
60 MW - planning - north east - Greystones Road, Grangetown - Battery Energy Storage System -
10081
349 MW - planning - west midlands - Cellarhead - Battery Site -
10013
150 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy -
10022
130 MW - planning - eastern - Stoke Lane - Battery Energy Storage -
10390
100 MW - planning - south west - St Dennis - Battery Energy Storage -
10058
100 MW - planning - south east - Penn Croft Farm, Crondall - Battery Energy Storage Facility -
10163
99 MW - planning - yorkshire and humber - Scawby Brook, Brigg - Battery Storage -
9848
50 MW - planning - scotland - Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage -
8342
50 MW - cancelled - scotland - Braidfield Road, Hardgate - Battery Storage Facility -
9869
50 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage -
9910
50 MW - planning - yorkshire and humber - Barlow Road, Barlow - Battery Storage -
9970
50 MW - planning - eastern - Sundon Sub Station Battery Storage Facility -
9998
50 MW - planning - scotland - Electricity Sub Station, Strichen - Battery Storage Facility -
10039
50 MW - planning - eastern - Ardleigh Road, Little Bromley - Battery Energy Storage -
10302
49 MW - planning - eastern - Rush Green Motors - Battery storage -
8987
49 MW - planning - scotland - Stainland Energy Storage Project -
10225
49 MW - planning - yorkshire and humber - Elland Storage Project -
10236
49 MW - planning - scotland - Fordtown Energy Storage -
10239
49 MW - planning - west midlands - Doverdale - Solar Farm & Battery Storage -
10273
45 MW - planning - north west - Cheshire Power Station - Battery Storage Facility -
10295
35 MW - planning - south west - Northington Lane - Battery Storage Facility -
9992
35 MW - cancelled - south west - Patch Elm Lane - Battery Storage -
10282
30 MW - planning - south west - North Tawton Primary Substation - Battery Storage -
9275
30 MW - cancelled - wales - Pound Farm Lane - Battery Storage -
9969
25 MW - planning - north west - Caton Road, Lancaster - Battery Storage Facility -
10047
25 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage -
10222
20 MW - planning - scotland - Stranoch 2 -
7306
20 MW - planning - scotland - Douglas West Wind Farm (extension) -
9957
20 MW - planning - east midlands - Mount Road, Castle Gresley - Battery Storage Facility -
10012
20 MW - cancelled - south west - The Transmitting Station, Williton - Battery Storage -
10186
19 MW - planning - scotland - Hillcrest Cottage, Shebster - Battery Energy Storage System -
10226
19 MW - planning - scotland - Speyslaw Farm - Battery Storage -
10394
15 MW - planning - scotland - Hollandmey Renewable Energy Development -
10246
13 MW - operation - south east - Bumpers Lane Solar Farm -
6913
13 MW - cancelled - north east - Newcastle International Airport Phase 2 - Battery Storage -
9756
10 MW - planning - north west - Park Road Battery Storage -
10076
10 MW - cancelled - scotland - Lethen Wind Farm Wind Turbines and Energy Storage -
10237
Disappeared projects (7):
100 MW - cancelled - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy -
9475
62 MW - planning - wales - Wentlooge Renewable Energy Hub -
7192
50 MW - cancelled - south west - Melksham Substation West Storage -
6955
50 MW - cancelled - south east - Upton Lane, Nursling - Battery Storage Facility -
9760
49 MW - cancelled - west midlands - Doverdale - Solar Farm & Battery Storage -
8529
49 MW - planning - east midlands - Grendon Lakes - Battery Storage -
9341
19 MW - cancelled - scotland - Roaring Hill Energy Storage Facility -
7002
Updated projects (29):
80 MW - construction - yorkshire and humber - Trondheim Way Battery energy storage -
8455
Record Last Updated (dd/mm/yyyy): 24/05/2021
-> 12/01/2022
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Address: Land At Trondheim Way Stallingborough North East Lincolnshire
-> Land At Trondheim Way Stallingborough
Under Construction:
-> 01/09/2021
status: planning
-> construction ๐๏ธ
50 MW - operation - south west - Stonehill Energy Storage -
7773
Record Last Updated (dd/mm/yyyy): 29/06/2020
-> 01/11/2021
CHP Enabled:
-> No
Development Status: Under Construction
-> Operational
Development Status (short): Under Construction
-> Operational
Operational:
-> 09/10/2021
status: construction
-> operation ๐พ ๐ ๐ธ
40 MW - planning - south east - Loudwater Battery Storage Site -
8142
Record Last Updated (dd/mm/yyyy): 30/09/2020
-> 30/06/2021
CHP Enabled:
-> No
Development Status: Under Construction
-> Planning Permission Granted
Development Status (short): Under Construction
-> Awaiting Construction
Under Construction: 10/06/2021
->
status: construction
-> planning
32 MW - operation - south west - Severn Road -
7085
Record Last Updated (dd/mm/yyyy): 30/07/2020
-> 10/01/2022
Installed Capacity (MWelec): 18.00
-> 32.00
CHP Enabled:
-> No
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Address: Land At, Severn Road, Hallen, Bristol, Avon
-> Land At, Severn Road, Hallen, Bristol
Under Construction:
-> 01/08/2021
status: planning
-> construction ๐๏ธ
mw: 18
-> 32
20 MW - construction - south east - Plot 2B EurolinkV -
7383
Record Last Updated (dd/mm/yyyy): 31/01/2020
-> 13/12/2021
CHP Enabled:
-> No
Development Status: Planning Permission Granted
-> Under Construction
Development Status (short): Awaiting Construction
-> Under Construction
Address: Plot 2B Eurolink V, Sittingbourne, Land orth of Swale Way, Sittingbourne, Kent
-> Plot 2B Eurolink V, Sittingbourne, Land orth of Swale Way, Sittingbourne
Under Construction:
-> 01/10/2021
status: planning
-> construction ๐๏ธ
100 MW - planning - scotland - Daer Wind Farm -
9127
Planning Application Reference: P/21/1014
-> ECU00000740
100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage -
9691
Record Last Updated (dd/mm/yyyy): 23/09/2021
-> 25/10/2021
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 14/10/2021
99 MW - operation - eastern - Dollymans Storage -
7088
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 05/11/2021
50 MW - planning - scotland - Dersalloch Battery Storage Facility -
8927
Record Last Updated (dd/mm/yyyy): 28/04/2021
-> 22/12/2021
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 29/11/2021
49 MW - construction - eastern - Tollgate Farm Battery Storage -
7335
Record Last Updated (dd/mm/yyyy): 27/01/2020
-> 23/12/2021
Operator (or Applicant): RNA Energy
-> RNA Energy / Harmony Energy Storage/ Tag Energy UK
CHP Enabled:
-> No
49 MW - operation - south east - Richborough Energy Park -
8195
Record Last Updated (dd/mm/yyyy): 24/02/2021
-> 07/12/2021
49 MW - planning - south west - Minety South 2 - Battery Storage Facility -
9063
Record Last Updated (dd/mm/yyyy): 25/05/2021
-> 08/12/2021
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 08/11/2021
40 MW - planning - eastern - Maldon Hall -
7095
Record Last Updated (dd/mm/yyyy): 24/07/2020
-> 23/12/2021
Operator (or Applicant): Capbal
-> Green Investment Group
CHP Enabled:
-> No
Address: Land North West Of Maldon Hall, Spital Road, Maldon, Essex
-> Land North West Of Maldon Hall, Spital Road, Maldon
40 MW - operation - south east - Newlands Farm Battery Storage Facility Phase 2 -
8264
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 26/01/2021
40 MW - planning - yorkshire and humber - Rusholme Grange -
9121
Megapack
Record Last Updated (dd/mm/yyyy): 07/06/2021
-> 13/12/2021
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Address: Rusholme Grange, Rusholme Lane, Drax, Selby, North Yorkshire
-> Rusholme Grange, Rusholme Lane, Drax, Selby
Planning Permission Granted: 19/12/2017
-> 03/09/2021
40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage -
9584
Planning Authority: Rochdale borough Council
-> Rochdale Borough Council
38 MW - planning - north east - Maiden, Annfield Plain - Energy Storage -
9036
Record Last Updated (dd/mm/yyyy): 18/05/2021
-> 13/12/2021
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 18/08/2021
25 MW - planning - north west - Bristol Avenue - Battery Energy Storage Facility -
8809
Address: 281 BRISTOL AVENUE, BLACKPOOL, FY2 0JF
-> 281 BRISTOL AVENUE, BLACKPOOL,
25 MW - planning - yorkshire and humber - Stainland Road, Salterhebble - Battery Storage Facility -
9397
Record Last Updated (dd/mm/yyyy): 06/08/2021
-> 13/12/2021
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 28/09/2021
20 MW - planning - west midlands - Perseverance Road -
7061
Record Last Updated (dd/mm/yyyy): 31/01/2020
-> 29/11/2021
CHP Enabled:
-> No
20 MW - planning - yorkshire and humber - Kirkhaw Lane -
7149
Record Last Updated (dd/mm/yyyy): 20/04/2020
-> 10/01/2022
CHP Enabled:
-> No
Address: Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley, West Yorkshire
-> Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley
20 MW - operation - north west - Lascar Works -
7464
Planning Application Reference: 62215
-> 62,215
20 MW - cancelled - south east - Brook Farm -
7498
Record Last Updated (dd/mm/yyyy): 30/06/2020
-> 05/01/2022
CHP Enabled:
-> No
Address: Os Parcel 6086 Adjacent, Ploughley Road, Railway Line, Arncott, Bicester, Oxfordshire
-> Os Parcel 6086 Adjacent, Ploughley Road, Railway Line, Arncott, Bicester
20 MW - construction - north west - Gipsy Lane -
7632
Record Last Updated (dd/mm/yyyy): 05/08/2021
-> 12/01/2022
Address: Land Rear Of The Royal Toby Ho, Manchester Road, Rochdale,
-> Land Rear Of The Royal Toby Ho, Manchester Road, Rochdale
20 MW - planning - scotland - Arecleoch Wind Farm (extension) -
7882
Record Last Updated (dd/mm/yyyy): 25/06/2020
-> 18/11/2021
CHP Enabled:
-> No
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 16/11/2021
20 MW - planning - eastern - South Fambridge Hall - Solar farm & Battery storage -
9274
Record Last Updated (dd/mm/yyyy): 05/07/2021
-> 22/12/2021
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 15/12/2021
20 MW - planning - eastern - The Brickmakers Arms Battery -
9668
Record Last Updated (dd/mm/yyyy): 21/09/2021
-> 05/01/2022
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 22/12/2021
19 MW - construction - scotland - Balsillie Avenue - Roaring Hill Energy Storage Facility -
9224
Record Last Updated (dd/mm/yyyy): 25/06/2021
-> 18/11/2021
Operator (or Applicant): RES Limited
-> Tag Energy UK
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 03/09/2021
15 MW - planning - eastern - Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage -
9346
Record Last Updated (dd/mm/yyyy): 22/07/2021
-> 15/12/2021
Development Status: Planning Application Submitted
-> Planning Permission Granted
Development Status (short): Application Submitted
-> Awaiting Construction
Planning Permission Granted:
-> 08/12/2021
2021-09
New projects (265):
150 MW - construction - south east - Cleve Hill Solar Project -
7856
349 MW - planning - west midlands - Dunton Hall - Battery Energy Storage System -
9427
200 MW - planning - yorkshire and humber - Drax Re-Power -
7017
200 MW - cancelled - south east - Bolney Substation - Battery Storage -
8986
200 MW - planning - north west - Heysham Energy Storage Project -
9545
150 MW - planning - eastern - Thurrock Flexible Generation Plant -
7696
100 MW - cancelled - eastern - Tilbury Energy Centre -
7048
100 MW - planning - scotland - Harestanes Windfarm -
7395
99 MW - planning - yorkshire and humber - Lakeside Energy Storage Facility -
8268
Megapack
100 MW - planning - south east - Minchens Lane Battery Storage Facility -
8434
100 MW - planning - scotland - Kilgallioch - Battery energy storage -
9007
100 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy -
9115
100 MW - planning - scotland - Daer Wind Farm -
9127
100 MW - cancelled - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy -
9475
100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage -
9691
100 MW - planning - north west - Cholmondeley Road - Battery Storage -
9763
99 MW - operation - eastern - Dollymans Storage -
7088
99 MW - planning - yorkshire and humber - Skelton Grange Battery Storage Facility -
8914
99 MW - planning - north west - Bay Gateway - Battery Storage Facility -
9199
95 MW - planning - yorkshire and humber - Winterton Road - Battery Energy Storage -
9608
90 MW - planning - east midlands - Caldwell Road - Battery Storage -
9507
80 MW - operation - scotland - Aikengall II Community Wind Farm Battery -
7015
80 MW - construction - yorkshire and humber - Trondheim Way Battery energy storage -
8455
50 MW - operation - south east - Richborough Energy Park - Phase 2 -
9626
70 MW - planning - north west - Widow Hill, Balderstone Lane - Battery Energy Storage System -
9340
62 MW - planning - wales - Wentlooge Renewable Energy Hub -
7192
57 MW - planning - north west - Capenhurst Lane -
8283
57 MW - planning - north west - National Grids Rainhill Substation Battery storage facility -
8439
57 MW - construction - north west - Capenhurst Lane, Capenhurst - Battery storage -
9377
57 MW - cancelled - south east - Slough Road - Battery Storage -
9774
50 MW - cancelled - south west - Minety North -
6952
50 MW - operation - south west - Melksham Substation East Storage -
6953
50 MW - cancelled - south west - Melksham Substation West Storage -
6955
50 MW - cancelled - west midlands - Wolverhampton West Sub Station -
6977
50 MW - construction - northern ireland - Portadown Road -
7047
50 MW - construction - northern ireland - Dungannon Energy Storage System -
7050
50 MW - cancelled - north west - Penwortham Sub Station -
7119
50 MW - operation - scotland - Whitelee Wind Farm Battery Storage Extension -
7174
49 MW - operation - south west - Minety South - Battery Storage -
7184
49 MW - operation - north west - West Didsbury Battery Storage -
7185
50 MW - operation - south west - Stonehill Energy Storage -
7773
50 MW - planning - east midlands - Cottom Power Station -
8278
50 MW - planning - scotland - Dersalloch Battery Storage Facility -
8927
50 MW - cancelled - south east - Upton Lane, Nursling - Battery Storage Facility -
9760
49 MW - operation - eastern - Pelham -
6898
49 MW - operation - north west - Roosecote -
6912
49 MW - operation - east midlands - West Burton -
6920
49 MW - cancelled - north east - Norton -
6923
49 MW - cancelled - west midlands - Former Rugeley Power Station -
6981
79 MW - construction - south east - Stony Energy Storage Facility -
7001
49 MW - operation - yorkshire and humber - Pillswood Phase 1 -
7005
Megapack
49 MW - cancelled - south west - Ravensroost Farm, Minety - Battery Energy Storage -
7014
49 MW - operation - yorkshire and humber - Nether Moor Field -
7019
49 MW - planning - eastern - Norwich Substation Storage Facility -
7021
49 MW - operation - south west - Mannington Battery Storage Plant -
7024
49 MW - cancelled - north west - Charleywood Road, Knowsley Industrial Park -
7026
49 MW - construction - east midlands - Enderby Storage, Redcomb Farm -
7044
49 MW - planning - north west - Middleton Clean Energy Plant -
7029
49 MW - cancelled - yorkshire and humber - Salt End Lane -
7039
49 MW - planning - south west - Ellbridge Lane -
7051
49 MW - planning - yorkshire and humber - Elland Storage Project -
7053
49 MW - planning - eastern - Chapel Farm -
7058
Megapack
49 MW - planning - east midlands - Cottam Power Station -
7066
49 MW - cancelled - south west - Riverford Farm -
7078
49 MW - construction - south east - Sundridge Hill -
7081
49 MW - planning - yorkshire and humber - Land Adjacent to 4 Redcote Lane (Armley) -
7111
49 MW - cancelled - east midlands - Grendon Storage -
7089
49 MW - operation - yorkshire and humber - Creyke Beck -
7122
49 MW - cancelled - south west - Taunton Substation -
7153
49 MW - planning - eastern - Braintree Road Substation -
7161
49 MW - construction - yorkshire and humber - Osbaldwick Substation -
7172
49 MW - cancelled - south west - Land North of Actrees Solar Farm -
7230
49 MW - planning - eastern - Burwell Main Sub-Station -
7272
49 MW - planning - eastern - Sundon Substation -
7283
49 MW - construction - south east - Kemsley Substation -
7368
49 MW - construction - eastern - Tollgate Farm Battery Storage -
7335
49 MW - operation - yorkshire and humber - Pillswood Phase 2 -
7360
Megapack
49 MW - cancelled - south west - Snarlton Farm -
7380
49 MW - planning - north west - Harker Grid Sub Station -
7462
57 MW - construction - eastern - Bramford Substation -
7479
49 MW - construction - south west - Salisbury Substation -
7510
49 MW - cancelled - north east - Lackenby -
7518
49 MW - construction - south east - Cowley electricity sub-station -
7571
49 MW - construction - yorkshire and humber - Bradford West Substation (Harrop Edge Farm) -
7577
49 MW - operation - scotland - Dunsinane Industrial Estate -
7591
49 MW - planning - eastern - Lapwing Fen II, Crown Farm -
7606
49 MW - planning - eastern - Model Farm -
7609
250 MW - construction - eastern - Lapwing Fen 2 - Battery Storage Plant -
7614
49 MW - operation - north west - Lister Drive -
7740
49 MW - planning - south east - Rye Common -
7737
Megapack
49 MW - operation - north west - Liverpool Energy Management Facility -
7772
49 MW - planning - east midlands - Newton Wood Farm -
7780
49 MW - construction - south east - Titchfield Lane -
7828
49 MW - construction - west midlands - Coventry National Grid Substation -
7885
49 MW - operation - scotland - Dundee Technology Park -
7946
49 MW - planning - eastern - Reach Road -
7906
49 MW - operation - west midlands - Bustleholme Substation -
7907
10 MW - planning - south west - Minety Substation -
7942
49 MW - construction - north west - Unit 5 XL Business Park -
7985
49 MW - planning - london - Mill Hill National Grid Substation -
8009
49 MW - planning - south west - National Grid Minety Substation -
8021
49 MW - planning - northern ireland - Colinglen Road Battery -
8033
49 MW - planning - south west - National Grid Axminster Substation -
8036
49 MW - construction - east midlands - National Grid Enderby Substation -
8037
49 MW - planning - north west - Welkin Mill -
8055
49 MW - planning - scotland - Torrdhuin, Auchteraw Battery Storage Facility -
8096
30 MW - planning - scotland - Drumcross Battery Storage -
8155
49 MW - operation - south east - Richborough Energy Park -
8195
49 MW - planning - scotland - Platchaig House, Kilmorack - Battery Storage Facility -
8248
49 MW - planning - eastern - Brentwood nergy Storage System -
8249
49 MW - planning - eastern - Crouch Solar Farm -
8358
49 MW - planning - scotland - Old Gallows Road - Battery storage -
8368
49 MW - cancelled - west midlands - Doverdale - Solar Farm & Battery Storage -
8529
49 MW - planning - north west - Howick Hall Farm - Battery Storage Facility -
8829
49 MW - construction - south west - Mannington Battery Energy Storage System -
8833
49 MW - planning - scotland - Bolfornought Farm Battery Storage Facility -
8912
49 MW - construction - scotland - Whitehills Energy Storage Facility -
8916
49 MW - planning - eastern - Greens Farm - Battery energy storage -
9012
49 MW - planning - wales - Bronwylfa Road, Talwrn - Battery Storage Facility -
9052
49 MW - planning - south west - Minety South 2 - Battery Storage Facility -
9063
49 MW - planning - eastern - Sundon Substation -
9315
49 MW - planning - east midlands - Grendon Lakes - Battery Storage -
9341
49 MW - planning - eastern - Admiralty Road - Battery Energy Storage Facility -
9470
49 MW - operation - scotland - Wishaw Battery Storage Facility -
9522
49 MW - construction - north west - Bredbury Substation - Battery Storage Facility -
9653
48 MW - planning - northern ireland - Classic Marble Showers Site -
7208
45 MW - planning - scotland - Pleasance Road -
7217
41 MW - operation - west midlands - Bloxwich Battery -
8160
40 MW - planning - east midlands - Breach Farm - Energy Barn -
6914
40 MW - cancelled - yorkshire and humber - Tofts Lane -
6942
40 MW - planning - eastern - Norwich Road Industrial Estate -
6958
40 MW - construction - south east - Land off Queenborough Road -
7003
40 MW - construction - scotland - Bilbo Solar Farm Energy Storage -
7020
40 MW - planning - eastern - Maldon Hall -
7095
40 MW - planning - west midlands - Rubber and Allied Products -
7096
40 MW - operation - south east - Huggin's Hall -
7129
40 MW - cancelled - north west - Carnegie Road (Phase 2) -
7403
21 MW - operation - eastern - Clayhill Farm - Battery Energy Storage -
7570
20 MW - construction - north west - Hawthorne Road -
7800
40 MW - planning - west midlands - Whitehouse Farm Energy Barn -
7987
40 MW - planning - south east - Loudwater Battery Storage Site -
8142
40 MW - operation - south east - Newlands Farm Battery Storage Facility Phase 2 -
8264
40 MW - planning - yorkshire and humber - Rusholme Grange -
9121
Megapack
40 MW - planning - south west - Forest Gate - Solar Farm & Battery Storage -
9230
40 MW - planning - south west - Leigh Delamere - Solar farm & Battery storage -
9238
40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage -
9584
40 MW - planning - south east - Tanners Lane - Battery Energy Storage Facility (Phase One) -
9708
38 MW - planning - north east - Maiden, Annfield Plain - Energy Storage -
9036
37 MW - planning - scotland - STOR Field 9 -
7018
36 MW - planning - northern ireland - Lisnabreeny Road -
7556
35 MW - operation - north east - Port of Tyne -
6976
32 MW - planning - yorkshire and humber - Kirkhaw Lane Battery Storage -
8430
30 MW - planning - south west - Gloucestershire Science and Technology Park -
7067
30 MW - operation - south west - Fideoak Mills -
7152
30 MW - planning - south west - Catsbrain Farm -
7988
30 MW - planning - scotland - Roaring Hill (Resubmission) -
7989
30 MW - planning - scotland - Blackpark Energy Storage -
8105
30 MW - planning - scotland - Farburn Place - Energy Storage Facility -
8385
30 MW - planning - eastern - Weirs Drove, Burwell - Battery Storage Facility -
9292
29 MW - cancelled - north east - Land at Derwenthaugh Eco Park -
7054
29 MW - cancelled - scotland - Land SW of Shilton Cottage -
7134
29 MW - cancelled - scotland - Drumfad Wood -
7165
29 MW - planning - scotland - Fordtown Energy Storage -
7764
29 MW - planning - scotland - Learielaw Farm -
7970
28 MW - construction - eastern - Lower Dunton Road Battery Storage Facility -
8213
27 MW - operation - yorkshire and humber - Boscar Grange Farm -
7332
26 MW - cancelled - east midlands - Manor Farm -
7820
25 MW - operation - north east - Tynemouth Energy Storage System (TESS) -
6925
25 MW - cancelled - scotland - Fraserburgh Development -
7041
25 MW - cancelled - scotland - Clauchrie Windfarm Battery -
7804
25 MW - planning - north west - Bristol Avenue - Battery Energy Storage Facility -
8809
25 MW - planning - yorkshire and humber - Stainland Road, Salterhebble - Battery Storage Facility -
9397
25 MW - planning - north west - Davies Road - Battery Storage -
9563
25 MW - planning - north west - Middlewich Road - Solar Photovoltaics & Battery Storage -
9565
24 MW - cancelled - east midlands - The Hollies -
6946
24 MW - cancelled - yorkshire and humber - Mauxhall Farm -
7827
23 MW - operation - east midlands - Asfordby Business Park (1) -
6932
22 MW - operation - wales - Pen y Cymoedd Energy Storage -
6927
22 MW - planning - south west - Barton Hill Industrial Park - Battery Energy Storage Facility -
9046
20 MW - operation - scotland - Broxburn -
6910
20 MW - operation - west midlands - Land to the west of Clay Hill Pit / Larport Farm -
6911
20 MW - operation - west midlands - Noriker Power Staunch -
6918
20 MW - construction - east midlands - Chelveston Renewable Energy Park -
6941
20 MW - operation - eastern - Claredown Farm -
6945
20 MW - planning - wales - Traston Road -
6929
20 MW - cancelled - south west - Bristol Road -
6930
20 MW - operation - north east - Ray Battery Storage Facility -
6943
20 MW - cancelled - yorkshire and humber - Aven Industrial Estate -
7007
20 MW - cancelled - north west - Leighton Hall Farm -
7032
20 MW - planning - london - Riverside Energy Park -
7036
20 MW - cancelled - scotland - Land To The East Of Wholeflats Road (Grangemouth) -
7043
20 MW - planning - west midlands - Perseverance Road -
7061
20 MW - cancelled - north west - Kilshaw Street -
7072
20 MW - operation - north west - Land at Carnegie Road -
7155
20 MW - cancelled - north west - Beaufort Road -
7128
20 MW - operation - east midlands - Calow Green Farm -
7140
20 MW - planning - yorkshire and humber - Kirkhaw Lane -
7149
20 MW - planning - scotland - Blackpark Farm -
7226
20 MW - planning - scotland - Troston Loch Wind Farm -
7333
20 MW - construction - south east - Plot 2B EurolinkV -
7383
20 MW - operation - north west - Lascar Works -
7464
20 MW - planning - scotland - Douglas West Wind Farm (extension) -
7460
20 MW - cancelled - south east - Brook Farm -
7498
20 MW - planning - scotland - Hagshaw Hill -
7572
20 MW - cancelled - scotland - Ardoch Farm -
7575
20 MW - construction - north west - Gipsy Lane -
7632
20 MW - operation - wales - Energy Centre Royal Mint -
7684
20 MW - operation - south west - Feeder Road -
7663
20 MW - planning - south east - Basing Road -
7746
20 MW - planning - scotland - Arecleoch Wind Farm (extension) -
7882
20 MW - planning - west midlands - Perserverance Road -
7966
20 MW - construction - south east - Mill Lane, Nursling - Battery Storage Facility -
8099
20 MW - planning - south east - Gerrards Cross Sewage Treatment Works -
8271
20 MW - planning - yorkshire and humber - Hull East Stor Generation Compound - Battery energy storage -
9006
20 MW - construction - north east - Standby Embedded Stor Power Plant - Battery storage -
9010
20 MW - planning - eastern - South Fambridge Hall - Solar farm & Battery storage -
9274
20 MW - cancelled - south west - Tiddlywink Barn Battery Storage Power Plant -
9552
20 MW - planning - eastern - The Brickmakers Arms Battery -
9668
19 MW - cancelled - scotland - Roaring Hill Energy Storage Facility -
7002
19 MW - planning - scotland - Land North of Thornton Road -
7131
19 MW - planning - scotland - North West Of Jameston Farm -
7133
19 MW - planning - scotland - Jamesfield Organic Centre, Phase 2 -
7315
19 MW - construction - scotland - Balsillie Avenue - Roaring Hill Energy Storage Facility -
9224
32 MW - operation - south west - Severn Road -
7085
18 MW - cancelled - east midlands - Callywhite Lane Commercial Estate -
7087
18 MW - construction - south east - Aurora Solar Farm -
7385
18 MW - cancelled - south west - Churchtown Solar Farm Battery Storage -
7726
18 MW - planning - south west - Whaddon Lane, Hilperton -
9057
16 MW - cancelled - wales - Maelor Gasworks - Solar Farm & Battery Storage -
9343
15 MW - operation - south west - Lockleaze Energy Storage -
6961
15 MW - construction - south west - Holes Bay -
7688
Megapack
15 MW - planning - eastern - Three Bridges Solar Farm -
8220
15 MW - planning - eastern - Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage -
9346
14 MW - planning - south east - Guildford Road Battery Storage Facility -
8269
13 MW - cancelled - south west - Leechpool Farm, Norrington Battery Storage -
7183
12 MW - cancelled - west midlands - Mucklow Hill -
7984
12 MW - planning - yorkshire and humber - Stor Generation Plant - Battery Storage -
8998
10 MW - operation - northern ireland - AES Kilroot Station Battery Storage Array -
6845
10 MW - operation - yorkshire and humber - Blackburn Meadows -
6906
10 MW - operation - east midlands - Hill Farm - Energy Barn -
6915
10 MW - operation - south east - Kings Barn Farm - Energy Barn -
6916
10 MW - operation - east midlands - Leverton Farm - Energy Barn -
6917
10 MW - operation - eastern - Nevendon -
6926
10 MW - cancelled - north west - Pikelaw Place -
6944
10 MW - construction - eastern - Slamseys Energy Storage -
7000
10 MW - cancelled - eastern - Rayleigh Transforming Station -
6984
10 MW - cancelled - south east - Litchlake Farm -
7011
10 MW - cancelled - east midlands - Manton Wood -
7035
10 MW - cancelled - scotland - Strichen South -
7056
10 MW - cancelled - eastern - Hadham Road -
7068
10 MW - planning - south east - Stockbridge Road -
7097
10 MW - cancelled - yorkshire and humber - South Kirkby Business Park -
7109
10 MW - construction - south east - Land Adj Harmer Warren Quarry -
7143
10 MW - operation - north west - Cleator -
7177
10 MW - planning - scotland - Greenburn Wind Park -
7159
10 MW - planning - south west - Old Green Farm, Alveston Battery Storage -
7182
10 MW - planning - south west - Trevol Business Park -
7404
10 MW - cancelled - scotland - Shindour Feddal Hill Wood Braco -
7573
10 MW - cancelled - scotland - Orchardbank Industrial Estate -
7574
10 MW - planning - scotland - East Ballochy -
7675
10 MW - cancelled - south west - Park Farm -
7983
10 MW - cancelled - north west - Britannia House -
7986
10 MW - construction - north west - Moston Vale -
8085
10 MW - construction - scotland - Dragonhall Farm, Padanaram - Battery Storage -
9066
10 MW - operation - south west - South Farm Solar Park -
9361
Updated projects (0):