π¬π§ UK REPD data (>10MW)
    
        Latest UK REPD report from 
2024-04
        
            
                |  | operation | ποΈ | π» | 
            
            
                | Projects count | 62 | 56 | 590 | 
            
                | Total π battery power in GW | 2.2 | 3.4 | 53.5 | 
            
        
        ποΈ = construction; π» = planning
    
 
 Monthly big battery changes from UK REPD reports 
    - Comparing the reports to show the changes throughout the months.
- Projects are sorted by the max power output.
- All projects below are also listed on the All Big Batteries page
- Click on the reference number to get to the detail page of the project
2024-04
    New projects (79): 
    
        
        1000 MW - planning - wales - Rover Way, Splott - Energy Park & Data Centre - 
        
16190
        
            
    
        
        650 MW - planning - scotland - Braxbess Battery Storage - 
        
15169
        
            
    
        
        560 MW - planning - scotland - Whitehall Battery Storage - 
        
15797
        
            
    
        
        400 MW - planning - scotland - Glenside Farm - Battery Storage - 
        
14988
        
            
    
        
        400 MW - planning - north west - Low Harker Farm, Low Harker - Battery Storage Facility - 
        
15956
        
            
    
        
        400 MW - planning - west midlands - Cellarhead Substation, Rownall Road - Battery Storage Facility - 
        
16111
        
            
    
        
        400 MW - planning - wales - Bronwylfa Road, Rhostyllen - Energy Storage System - 
        
16114
        
            
    
        
        300 MW - planning - scotland - Kintore Energy Storage Project - 
        
10467
        
            
    
        
        290 MW - planning - south west - Saundercroft Farm - Battery Energy Storage System - 
        
13980
        
            
    
        
        250 MW - planning - eastern - Toddington Services, Hipsey Spinney - Battery Storage - 
        
15883
        
            
    
        
        249 MW - planning - south east - Ridham Avenue, Swale Way - Kemsley Battery Energy Storage - 
        
15779
        
            
    
        
        200 MW - planning - eastern - Walsoken, Burrettgate Road - Battery Storage Facility - 
        
15647
        
            
    
        
        200 MW - planning - south east - Sunbury Battery Energy Storage System - Battery Energy Storage System - 
        
15814
        
            
    
        
        150 MW - planning - scotland - Neilston - Battery Storage - 
        
14538
        
            
    
        
        120 MW - planning - scotland - Glen Ullinish II - Wind Farm - 
        
14534
        
            
    
        
        100 MW - planning - scotland - Flemyland Battery Storage - 
        
13770
        
            
    
        
        100 MW - planning - yorkshire and humber - Moat Lane, Wickersley - Battery Storage Facility - 
        
15746
        
            
    
        
        100 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage - 
        
16047
        
            
    
        
        100 MW - planning - yorkshire and humber - Moat Lane, Wickersley - Battery Storage Facility - 
        
16065
        
            
    
        
        99 MW - planning - west midlands - Newfields Farm - Battery Energy Storage - 
        
10233
        
            
    
        
        99 MW - planning - south west - Landulph Substation, Landulph - Battery Storage - 
        
13852
        
            
    
        
        99 MW - planning - west midlands - Newfields Farm, Rownall Road - Battery Energy Storage - 
        
14342
        
            
    
        
        90 MW - planning - south west - Summerway Drove, East Bower - Battery Storage - 
        
15716
        
            
    
        
        85 MW - planning - east midlands - Old Wood Energy Park - Battery Energy Storage - 
        
16013
        
            
    
        
        80 MW - planning - yorkshire and humber - Midland Road - Battery Energy Storage - 
        
15911
        
            
    
        
        70 MW - planning - west midlands - Oaklands Farm, New Road - Battery Energy Storage - 
        
15735
        
            
    
        
        70 MW - planning - north west - Sandyforth Farm, Ashton Road - Battery Energy Storage - 
        
15930
        
            
    
        
        57 MW - planning - south east - Kent Street, Cowfold - Battery Energy Storage System - 
        
14922
        
            
    
        
        50 MW - planning - eastern - Nutsgrove Farm, Thorney - Battery Energy Storage - 
        
9976
        
            
    
        
        50 MW - planning - south west - Pinkworthy Farm, Pyworthy - Battery Storage - 
        
13509
        
            
    
        
        50 MW - planning - scotland - Coylton Substation, Coylton - Battery Energy Storage - 
        
14170
        
            
    
        
        50 MW - planning - south west - Wareham Road, Scouse Farm - Battery Storage - 
        
15962
        
            
    
        
        50 MW - operation - eastern - Burwell - Battery Storage - 
        
15994
        
            
    
        
        50 MW - planning - scotland - Aultmore Forest - Buckie - Windfarm - 
        
15995
        
            
    
        
        49 MW - planning - scotland - Lochluichart - Energy Storage Facility - 
        
9220
        
            
    
        
        49 MW - planning - scotland - Cornhills Farm, Muttonhole Road - Battery Storage  - 
        
11647
        
            
    
        
        49 MW - planning - yorkshire and humber - Hewitts Avenue, New Waltham - Battery Storage - 
        
11832
        
            
    
        
        49 MW - planning - scotland - Balwyllo Farm, Dun - Energy Storage Facility - 
        
13058
        
            
    
        
        49 MW - planning - scotland - Templeton Farm, Templeton - Battery Storage - 
        
13605
        
            
    
        
        49 MW - planning - scotland - Existing Kaimes Substation, Old Burdiehouse Road - Battery Storage - 
        
13809
        
            
    
        
        49 MW - planning - scotland - Dunbar Grid Substation - Battery Storage - 
        
13864
        
            
    
        
        49 MW - planning - scotland - Ardencaple Farm - Battery Storage - 
        
14381
        
            
    
        
        49 MW - planning - scotland - Bankhead, Arbirlot - Battery Energy Storage - 
        
14985
        
            
    
        
        49 MW - planning - scotland - Glengolly Farmhouse- Battery Energy Storage - 
        
15088
        
            
    
        
        49 MW - planning - scotland - Dunmill, Substation Dun - 49.9MW Battery Energy Storage - 
        
15233
        
            
    
        
        49 MW - planning - scotland - Kintore Substation, Leylodge - Battery Energy Storage - 
        
15627
        
            
    
        
        49 MW - planning - west midlands - Hobble Lane, Great Wyrley -  Battery Energy Storage - 
        
15802
        
            
    
        
        49 MW - planning - wales - The Greenlink Converter Station - Lambeeth Battery Energy Storage - 
        
15803
        
            
    
        
        49 MW - planning - scotland - New Craigie Retail Park - Battery Energy Storage - 
        
16018
        
            
    
        
        49 MW - planning - eastern - Rush Green Motors - Battery storage - 
        
16045
        
            
    
        
        49 MW - operation - scotland - Camilla Battery Storage - 
        
16075
        
            
    
        
        49 MW - planning - west midlands - Hinksford Substation, Hinksford Lane - Battery Energy Storage - 
        
16101
        
            
    
        
        49 MW - planning - scotland - Barnwell, Wright Street - Battery Energy Storage - 
        
16107
        
            
    
        
        49 MW - planning - scotland - Coupar Angus, Pleasance Road - Battery Energy Facility - 
        
16137
        
            
    
        
        45 MW - planning - north west - Huncoat Power Station - Battery Storage Facility - 
        
13080
        
            
    
        
        45 MW - planning - scotland - The Smithy - Battery Storage - 
        
14676
        
            
    
        
        45 MW - planning - north west - Huncoat Power Station - Battery Storage Facility - 
        
15712
        
            
    
        
        41 MW - planning - scotland - Ladyfield Renewable Energy Park - 
        
15785
        
            
    
        
        40 MW - planning - east midlands - Heanor Road - Battery Energy Storage System - 
        
13472
        
            
    
        
        40 MW - planning - west midlands - Draycott Cross Road - Battery Storage System - 
        
14284
        
            
    
        
        39 MW - planning - scotland - Locarno Works, Brown Street - Battery Storage - 
        
14232
        
            
    
        
        37 MW - planning - east midlands - Oaklands Solar Farm Project - Solar Farm & Battery Storage - 
        
9547
        
            
    
        
        30 MW - planning - scotland - Burnbank Street, Greenhill - Battery Storage Facility - 
        
9368
        
            
    
        
        30 MW - planning - yorkshire and humber - Immingham Solar Farm - Battery Storage Facility - 
        
16092
        
            
    
        
        30 MW - planning - scotland - Kellas Wind Farm - 
        
16138
        
            
    
        
        25 MW - planning - scotland - Bankhead Farm - Energy Storage System - 
        
14450
        
            
    
        
        25 MW - planning - scotland - Fernishaw Solar Farm & Battery Energy Storage Facility - 
        
14541
        
            
    
        
        25 MW - planning - east midlands - West Thorpe Church Farm, Willoughby On The Wolds - Battery Energy Storage - 
        
15938
        
            
    
        
        25 MW - planning - south west - Pinkworthy Farm, Pyworthy - Battery Storage - 
        
16068
        
            
    
        
        24 MW - planning - scotland - Parkhouse Road - Battery Energy Storage - 
        
16086
        
            
    
        
        22 MW - planning - scotland - Crutherland Farm, Crutherland Highway - Battery Energy Storage - 
        
15523
        
            
    
        
        20 MW - planning - scotland - Duddingston Solar Farm and Battery Storage - 
        
11383
        
            
    
        
        20 MW - planning - scotland - Craigshaw Drive - Battery Storage Facility & Electric Vehicle Charging Hub - 
        
15435
        
            
    
        
        16 MW - planning - south east - Allington Lane - Solar & Battery Farm - 
        
14585
        
            
    
        
        15 MW - planning - west midlands - Flashbrook Road, Knighton - Solar Farm - 
        
16066
        
            
    
        
        14 MW - planning - scotland - Luggies Knowe, Hill Of Gremista - Wind Turbines & Battery Storage - 
        
15823
        
            
    
        
        10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 
        
13480
        
            
    
        
        10 MW - planning - south east - Wharf Road, Discovery Park - Battery Energy Storage - 
        
15093
        
            
    
        
        10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 
        
16074
        
            
    
    
    
    Disappeared projects (10): 
    
        
        600 MW - cancelled - east midlands - West Leake Lane, Ratcliffe - Battery Storage - 
        
12464    
    
        
        99 MW - cancelled - west midlands - Illeybrook Farm - Battery Energy Storage - 
        
14064    
    
        
        60 MW - cancelled - south west - Coldharbour, Chickerell - Battery Storage Facility - 
        
12967    
    
        
        50 MW - cancelled - scotland - Seath Road, Rutherglen - Battery Storage - 
        
14378    
    
        
        50 MW - cancelled - scotland - CoyltonοΏ½GreenerοΏ½GridοΏ½Park - 
        
15312    
    
        
        49 MW - cancelled - south west - Ravensroost Farm, Minety - Battery Energy Storage - 
        
7014    
    
        
        49 MW - cancelled - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility - 
        
15230    
    
        
        49 MW - cancelled - south east - Burcot Solar Farm - 
        
15444    
    
        
        30 MW - cancelled - west midlands - Tanners Lane - Battery Energy Storage System - 
        
15128    
    
        
        10 MW - cancelled - scotland - Lethen Wind Farm  Wind Turbines and Energy Storage - 
        
10237    
    
    
    
    Updated projects (246):
    
    
    
        
            
            
                
                    
                        
                        300 MW - construction - scotland - Kilmarnock South Substation - Battery storage - 
                        
9696
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/09/2021 
                            ->  
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 26/01/2024 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        230 MW - construction - wales - Uskmouth Power Station - Battery Storage - 
                        
10936
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/04/2022 
                            ->  
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Planning Permission Refused:  
                            -> 07/12/2022 
                        
                              Under Construction:  
                            -> 01/11/2023 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        150 MW - construction - north west - Fiddlers Ferry Power Station - Battery storage - 
                        
9404
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/08/2022 
                            -> 21/03/2024 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Planning Permission Expired: 20/06/2026 
                            -> 46193 
                        
                              Under Construction:  
                            -> 28/03/2024 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - construction - south west - Larks Green Solar Farm - 
                        
8052
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/09/2020 
                            -> 15/02/2024 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/01/2024 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - construction - scotland - Whitehills Energy Storage Facility - 
                        
8916
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/10/2022 
                            -> 08/03/2024 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/02/2024 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - operation - scotland - Pleasance Road - Battery Energy Facility - 
                        
9997
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/07/2022 
                            ->  
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              Planning Permission Refused:  
                            -> 01/06/2022 
                        
                              Operational:  
                            -> 01/01/2023 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        49 MW - operation - scotland - Jamesfield Organic Centre - Battery Storage - 
                        
10863
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/03/2022 
                            ->  
                        
                              Development Status: Under Construction 
                            -> Operational 
                        
                              Development Status (short): Under Construction 
                            -> Operational 
                        
                              Are they re-applying (Old REPD Ref) : 7315 & 10456 
                            ->  
                        
                              Planning Permission Refused:  
                            -> 28/09/2022 
                        
                              Operational:  
                            -> 01/02/2024 
                        
                              status: construction 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        40 MW - operation - south east - Newlands Farm Battery Storage Facility Phase 2 - 
                        
8264
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/03/2022 
                            -> 15/02/2024 
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              Planning Permission Expired: 26/01/2024 
                            -> 45317 
                        
                              Under Construction:  
                            -> 27/02/2022 
                        
                              Operational:  
                            -> 01/09/2022 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage - 
                        
9584
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/07/2023 
                            ->  
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 27/02/2024 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        40 MW - construction - south east - Derehams Farm, Derehams Lane - Battery Storage - 
                        
12803
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/07/2023 
                            -> 22/02/2024 
                        
                              Operator (or Applicant): Capbal Limited 
                            -> Eku Energy 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Planning Permission Refused:  
                            -> 29/06/2023 
                        
                              Under Construction:  
                            -> 19/02/2024 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        40 MW - construction - scotland - Cumberhead West Wind Farm - 
                        
15343
                            
                            
                        
                              Operator (or Applicant): Unknown 
                            -> 3R Energy Solutions Limited 
                        
                              Site Name: Midland Road - Battery Energy Storage 
                            -> Cumberhead West Wind Farm 
                        
                              Storage Type: Stand-alone Storage 
                            -> Co-located with RE 
                        
                              Storage Co-location REPD Ref ID:  
                            -> 3328 
                        
                              Installed Capacity (MWelec): 80 
                            -> 40 
                        
                              Development Status: Planning Application Submitted 
                            -> Under Construction 
                        
                              Development Status (short): Application Submitted 
                            -> Under Construction 
                        
                              Address: Midland Road, Bradford 
                            -> Cumberhead Forest 
                        
                              County: West Yorkshire 
                            -> Strathclyde 
                        
                              Region: Yorkshire and Humber 
                            -> Scotland 
                        
                              Country: England 
                            -> Scotland 
                        
                              Post Code: BD8 7DY 
                            -> ML11 9AX 
                        
                              X-coordinate: 416090 
                            -> 281169 
                        
                              Y-coordinate: 434143 
                            -> 635550 
                        
                              Planning Authority: Bradford Metropolitan District Council 
                            -> Scottish Government (S36) 
                        
                              Planning Application Submitted: 23/10/2023 
                            -> 02/12/2020 
                        
                              Planning Permission Expired:  
                            -> 18/11/2027 
                        
                              Under Construction:  
                            -> 01/10/2023 
                        
                              lat: 53.80334 
                            -> 55.599018 
                        
                              long: -1.757175 
                            -> -3.887474 
                        
                              status: planning 
                            -> construction ποΈ
                        
                              mw: 80 
                            -> 40 
                        
                        
                    
                        
                        28 MW - construction - eastern - Lower Dunton Road Battery Storage Facility - 
                        
8213
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/01/2022 
                            -> 22/02/2024 
                        
                              Operator (or Applicant): Cedar Tech Developments Limited 
                            -> Eku Energy 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 19/02/2024 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        20 MW - construction - north west - Welkin Road, Bredbury - Battery Storage System - 
                        
13740
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/04/2023 
                            -> 29/02/2024 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Are they re-applying (Old REPD Ref) : 8275 
                            ->  
                        
                              Under Construction:  
                            -> 27/02/2024 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        10 MW - planning - scotland - Binn Eco Park - Battery - 
                        
9098
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/10/2023 
                            -> 23/02/2024 
                        
                              Development Status: Under Construction 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Under Construction 
                            -> Awaiting Construction 
                        
                              Under Construction: 01/09/2023 
                            ->  
                        
                              status: construction 
                            -> planning 
                        
                        
                    
                
 
         
     
    
    
    
    
    
    
        
            
            
                
                    
                        
                        1450 MW - planning - yorkshire and humber - Thorpe Marsh Power Station - Battery Energy Storage - 
                        
12453
                            
                            
                        
                              Are they re-applying (Old REPD Ref) :  
                            -> 8470 
                        
                        
                    
                        
                        1040 MW - planning - north west - Carrington Power Station, Manchester Road - Battery Storage - 
                        
13362
                            
                            
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        1000 MW - planning - scotland - Coalburn II Energy Storage Facility - Battery Storage Facility - 
                        
12206
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/01/2023 
                            -> 08/02/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 24/01/2027 
                        
                        
                    
                        
                        550 MW - planning - east midlands - Spalding Energy Park - Battery Storage - 
                        
10173
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/12/2021 
                            ->  
                        
                        
                    
                        
                        500 MW - planning - scotland - Coalburn Energy -  Battery Storage - 
                        
11034
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/04/2022 
                            ->  
                        
                              Site Name: Coalburn II Energy -  Battery Storage 
                            -> Coalburn Energy -  Battery Storage 
                        
                        
                    
                        
                        500 MW - planning - east midlands - Normanton Energy Reserve - Battery Storage - 
                        
11988
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/01/2023 
                            -> 23/01/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 16/01/2027 
                        
                        
                    
                        
                        450 MW - planning - eastern - Gateway Energy Centre - Battery Energy Storage - 
                        
10309
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/12/2021 
                            ->  
                        
                        
                    
                        
                        400 MW - planning - scotland - Hunterston Grid Services Complex - Energy Storage Facility - 
                        
10535
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/02/2022 
                            ->  
                        
                        
                    
                        
                        400 MW - planning - scotland - Kincardine Grid Services Complex - Energy Storage Facility - 
                        
10536
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/06/2022 
                            ->  
                        
                        
                    
                        
                        350 MW - planning - scotland - Camsiscan Farm, Craigie - Battery Energy Storage System - 
                        
12820
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/02/2023 
                            -> 08/02/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Authority: North Ayrshire Council 
                            -> Scottish Government (S36) 
                        
                              Planning Permission Expired:  
                            -> 26/01/2027 
                        
                        
                    
                        
                        349 MW - planning - west midlands - Dunton Hall - Battery Energy Storage System - 
                        
9427
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/05/2022 
                            ->  
                        
                        
                    
                        
                        349 MW - planning - west midlands - Cellarhead - Battery Site - 
                        
10013
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/11/2021 
                            ->  
                        
                        
                    
                        
                        349 MW - planning - wales - Penrhos Works - Battery Energy Storage System - 
                        
15472
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/12/2023 
                            -> 27/02/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                        
                    
                        
                        320 MW - planning - yorkshire and humber - Monk Fryston Battery Storage - 
                        
15164
                            
                            
                        
                              Planning Permission Refused: 15/12/2021 
                            ->  
                        
                        
                    
                        
                        300 MW - construction - scotland - Blackhillock Electricity Substation - Battery Energy Storage System - 
                        
9723
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/09/2021 
                            ->  
                        
                        
                    
                        
                        264 MW - planning - south east - Bolney Substation - Battery Storage - 
                        
10843
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/03/2022 
                            ->  
                        
                              Are they re-applying (Old REPD Ref) :  
                            -> 8986 
                        
                        
                    
                        
                        250 MW - planning - eastern - Toddington Services, Hipsey Spinney - Battery Storage - 
                        
15573
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/01/2024 
                            -> 27/02/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Revised 
                        
                              Development Status (short): Application Submitted 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 15883 
                        
                              Planning Application Withdrawn:  
                            -> 13/02/2024 
                        
                        
                    
                        
                        249 MW - planning - south east - Richborough Energy Park - Phase 3 (Sheaf) - 
                        
11201
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/05/2022 
                            ->  
                        
                        
                    
                        
                        200 MW - planning - yorkshire and humber - Drax Re-Power - 
                        
7017
                            
                            
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        200 MW - planning - north west - Heysham Energy Storage Project - 
                        
9545
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/05/2022 
                            ->  
                        
                        
                    
                        
                        200 MW - planning - scotland - Carlisle Road - Battery Energy Storage System - 
                        
9684
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/09/2021 
                            ->  
                        
                        
                    
                        
                        200 MW - planning - eastern - Hornsea Project Three - Battery Storage - 
                        
9754
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/01/2023 
                            ->  
                        
                        
                    
                        
                        200 MW - planning - scotland - Whitehill Energy Storage - 
                        
10466
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/01/2022 
                            ->  
                        
                        
                    
                        
                        200 MW - planning - scotland - Windyhill Battery Storage Facility - 
                        
10596
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/02/2022 
                            ->  
                        
                        
                    
                        
                        200 MW - planning - north west - Todhills and Westlinton - Harker Battery Energy Storage Facility - 
                        
15599
                            
                            
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                        
                    
                        
                        150 MW - construction - south east - Cleve Hill Solar Project - 
                        
7856
                            
                            
                        
                              Planning Permission Refused:  
                            -> 28/05/2020 
                        
                              Under Construction:  
                            -> 01/04/2023 
                        
                        
                    
                        
                        150 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy - 
                        
10022
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/11/2021 
                            ->  
                        
                              Planning Permission Expired: PD 
                            ->  
                        
                        
                    
                        
                        150 MW - planning - north west - Printworks Road - Stalybridge Battery Storage - 
                        
10808
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/12/2023 
                            ->  
                        
                        
                    
                        
                        150 MW - planning - north east - Wilton International, Greystones Road - Phase 1 - 
                        
14729
                            
                            
                        
                              Planning Permission Expired: PD 
                            ->  
                        
                        
                    
                        
                        130 MW - planning - eastern - Stoke Lane - Battery Energy Storage - 
                        
10390
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/10/2022 
                            ->  
                        
                        
                    
                        
                        100 MW - planning - south east - Minchens Lane Battery Storage Facility - 
                        
8434
                            
                            
                        
                              Planning Authority: Basingstoke & Deane Borough Council 
                            -> Basingstoke and Deane Borough Council 
                        
                              Planning Permission Refused: 08/10/2021 
                            ->  
                        
                        
                    
                        
                        100 MW - planning - yorkshire and humber - Hales Lane - Battery Storage Facility - 
                        
9635
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/05/2022 
                            ->  
                        
                        
                    
                        
                        100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage - 
                        
9691
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/03/2023 
                            ->  
                        
                        
                    
                        
                        100 MW - planning - eastern - North Walpole, St Peter - Battery Energy Storage - 
                        
9762
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/10/2021 
                            ->  
                        
                        
                    
                        
                        100 MW - planning - north west - Cholmondeley Road - Battery Storage - 
                        
9763
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/08/2022 
                            ->  
                        
                        
                    
                        
                        100 MW - planning - south west - St Dennis - Battery Energy Storage - 
                        
10058
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/12/2021 
                            ->  
                        
                        
                    
                        
                        100 MW - planning - south east - Penn Croft Farm, Crondall - Battery Energy Storage Facility - 
                        
10163
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/12/2021 
                            ->  
                        
                        
                    
                        
                        100 MW - construction - eastern - Bullen Lane - Battery Storage - 
                        
10311
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/12/2023 
                            ->  
                        
                        
                    
                        
                        100 MW - planning - south west - Shaftesbury Energy Park - Battery Storage System - 
                        
10626
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 16/02/2022 
                            ->  
                        
                        
                    
                        
                        100 MW - planning - eastern - Walpole St Andrew - Battery storage  - 
                        
10876
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/03/2022 
                            ->  
                        
                        
                    
                        
                        100 MW - planning - north west - Hillside Farm, Lancaster Road - Battery Storage - 
                        
11948
                            
                            
                        
                              Are they re-applying (New REPD Ref): 12964 
                            ->  
                        
                        
                    
                        
                        100 MW - planning - scotland - Hill of Fare - Hill of Fare Wind Farm & Battery Storage - 
                        
12026
                            
                            
                        
                              Are they re-applying (Old REPD Ref) :  
                            -> 2975 
                        
                        
                    
                        
                        100 MW - operation - north west - National Grid Electricity Substation, Capenhurst Lane - Battery Storage - 
                        
12725
                            
                            
                        
                              Planning Authority: Cheshire West and Chester Council 
                            -> Cheshire West & Chester Council 
                        
                              Planning Permission Refused:  
                            -> 01/02/2021 
                        
                        
                    
                        
                        100 MW - planning - north west - Hillside Farm, Lancaster Road - Battery Storage - 
                        
12964
                            
                            
                        
                              Are they re-applying (Old REPD Ref) : 11948 
                            ->  
                        
                        
                    
                        
                        100 MW - planning - scotland - Learielaw Farm, Learielaw -  Battery Energy Storage - 
                        
13368
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/01/2024 
                            -> 19/02/2024 
                        
                              Are they re-applying (Old REPD Ref) : 7970 
                            ->  
                        
                        
                    
                        
                        99 MW - planning - yorkshire and humber - Scawby Brook, Brigg - Battery Storage - 
                        
9848
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 26/10/2021 
                            ->  
                        
                              Planning Permission Expired: PD 
                            ->  
                        
                        
                    
                        
                        99 MW - planning - north east - South Thinford Lane, Thinford - Energy Storage - 
                        
10489
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/01/2022 
                            ->  
                        
                        
                    
                        
                        99 MW - planning - south east - Butts Field, Mill Lane - Battery Storage - 
                        
13573
                            
                            
                        
                              Are they re-applying (Old REPD Ref) :  
                            -> 7399 
                        
                        
                    
                        
                        95 MW - planning - yorkshire and humber - Winterton Road - Battery Energy Storage - 
                        
9608
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/09/2021 
                            ->  
                        
                        
                    
                        
                        93 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage  - 
                        
15610
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/01/2024 
                            -> 12/04/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 08/04/2029 
                        
                        
                    
                        
                        90 MW - planning - east midlands - Caldwell Road - Battery Storage - 
                        
9507
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/11/2022 
                            ->  
                        
                        
                    
                        
                        80 MW - planning - yorkshire and humber - Netherlands Way - Battery Energy Facility - 
                        
10429
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/01/2022 
                            ->  
                        
                              Are they re-applying (Old REPD Ref) : 7090 
                            ->  
                        
                        
                    
                        
                        80 MW - planning - scotland - Tealing  Battery Energy Storage Farm - 
                        
11097
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/01/2024 
                            ->  
                        
                        
                    
                        
                        80 MW - planning - yorkshire and humber - Barlow Road, Barlow Road - Battery Storage - 
                        
12734
                            
                            
                        
                              Are they re-applying (New REPD Ref): 14715 
                            ->  
                        
                              Are they re-applying (Old REPD Ref) : 9970 
                            ->  
                        
                              Planning Permission Refused: 08/03/2023 
                            ->  
                        
                        
                    
                        
                        75 MW - planning - west midlands - Holly Lane Energy Park - Solar Farm & Battery Storage - 
                        
13695
                            
                            
                        
                              Are they re-applying (New REPD Ref):   
                            ->  
                        
                        
                    
                        
                        75 MW - planning - north east - Belasis Avenue - Battery Storage - 
                        
13850
                            
                            
                        
                              Are they re-applying (New REPD Ref):   
                            ->  
                        
                        
                    
                        
                        75 MW - planning - northern ireland - Quarterland Road, Islandmagee - Battery Storage - 
                        
14117
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/06/2023 
                            -> 23/01/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 19/01/2029 
                        
                        
                    
                        
                        70 MW - planning - north west - Tontine Road - Battery Energy Storage System - 
                        
9819
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/10/2021 
                            ->  
                        
                        
                    
                        
                        70 MW - planning - scotland - Shetland Battery Energy Storage System - 
                        
12856
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/09/2023 
                            -> 10/04/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 21/02/2027 
                        
                        
                    
                        
                        69 MW - planning - eastern - Thurleigh Road - Battery Energy Storage - 
                        
9651
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/09/2021 
                            ->  
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 30/01/2027 
                        
                        
                    
                        
                        60 MW - planning - north east - Greystones Road, Grangetown - Battery Energy Storage System - 
                        
10081
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/11/2021 
                            ->  
                        
                              Planning Permission Expired: PD 
                            ->  
                        
                        
                    
                        
                        60 MW - planning - yorkshire and humber - Redcote Lane, Armley - Battery Storage Facility - 
                        
12224
                            
                            
                        
                              Are they re-applying (Old REPD Ref) : 7111 
                            ->  
                        
                        
                    
                        
                        60 MW - planning - south east - Misslebrook Farm, Botley Road - Battery Storage - 
                        
12691
                            
                            
                        
                              Planning Authority: Test Valley Council 
                            -> Test Valley Borough Council 
                        
                        
                    
                        
                        57 MW - planning - north west - Capenhurst Lane - 
                        
8283
                            
                            
                        
                              Planning Authority: Cheshire West and Chester Council 
                            -> Cheshire West & Chester Council 
                        
                        
                    
                        
                        57 MW - construction - north west - Capenhurst Lane, Capenhurst - Battery storage - 
                        
9377
                            
                            
                        
                              Planning Authority: Cheshire West and Chester Council 
                            -> Cheshire West & Chester Council 
                        
                        
                    
                        
                        57 MW - planning - south east - Ash Lane, Little London - Battery Storage - 
                        
11090
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/04/2022 
                            ->  
                        
                              Planning Authority: Basingstoke & Deane Borough Council 
                            -> Basingstoke and Deane Borough Council 
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        57 MW - planning - north west - Penwortham - Battery storage - 
                        
11217
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/05/2022 
                            ->  
                        
                        
                    
                        
                        57 MW - planning - north west - Sutton Manor - Battery Storage Facility - 
                        
11559
                            
                            
                        
                              Are they re-applying (Old REPD Ref) : 8439 
                            ->  
                        
                        
                    
                        
                        57 MW - planning - eastern - Braintree Road, Cressing - Battery Storage - 
                        
11995
                            
                            
                        
                              Mounting Type for Solar: Ground 
                            ->  
                        
                              Are they re-applying (Old REPD Ref) : 7161 
                            ->  
                        
                        
                    
                        
                        57 MW - planning - north west - Waterloo Farm, Furbarn Road - Battery Storage - 
                        
12187
                            
                            
                        
                              Are they re-applying (New REPD Ref): 14597 
                            ->  
                        
                        
                    
                        
                        57 MW - planning - south east - Coxmoor Wood, Crondall Road - Battery Storage - 
                        
13728
                            
                            
                        
                              Are they re-applying (New REPD Ref):   
                            ->  
                        
                        
                    
                        
                        50 MW - operation - south east - Richborough Energy Park - Phase 2 - 
                        
9626
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/01/2024 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - south east - Upton Lane, Nursling - Battery Storage Facility - 
                        
9673
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/09/2021 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage  - 
                        
9910
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/01/2024 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - yorkshire and humber - Barlow Road, Barlow - Battery Storage - 
                        
9970
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/11/2021 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - eastern - Sundon Sub Station Battery Storage Facility - 
                        
9998
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/11/2023 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - scotland - Electricity Sub Station, Strichen - Battery Storage Facility - 
                        
10039
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/12/2021 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - eastern - Ardleigh Road, Little Bromley - Battery Energy Storage - 
                        
10302
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/11/2022 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - eastern - Newmarket Road, Bottisham -  Battery Energy Storage - 
                        
10486
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/01/2024 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - north west - Huncoat Power Station - Battery Storage - 
                        
10516
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/02/2022 
                            ->  
                        
                              Are they re-applying (New REPD Ref): 13080 
                            ->  
                        
                              Planning Permission Refused: 18/01/2022 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - west midlands - Penstone Lane, Penn 1 - Battery Storage Facility - 
                        
10705
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/03/2022 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - west midlands - Penstone Lane, Lower Penn 2 - Battery Storage - 
                        
10733
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/03/2022 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - scotland -  Frodo Solar and Battery Energy Development - 
                        
10994
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/04/2022 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - eastern - Stocking Pelham - Battery Storage System - 
                        
11212
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/05/2022 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - west midlands - Lowlands Farm - Battery Storage - 
                        
11399
                            
                            
                        
                              Are they re-applying (New REPD Ref): 12959 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - yorkshire and humber - Swangate Project - Energy Storage System - 
                        
11437
                            
                            
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                              Under Construction: Implemented 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - south west - Fairholme, Minety - Battery Storage - 
                        
11810
                            
                            
                        
                              Are they re-applying (Old REPD Ref) : 10488 
                            ->  
                        
                        
                    
                        
                        50 MW - construction - eastern - Norwich Road Industrial Estate - 
                        
12529
                            
                            
                        
                              Are they re-applying (Old REPD Ref) : 6958 
                            ->  
                        
                              Planning Permission Refused:  
                            -> 26/03/2021 
                        
                        
                    
                        
                        50 MW - planning - south east - Derehams Farm, Derehams Lane - Battery Storage - 
                        
12649
                            
                            
                        
                              Are they re-applying (New REPD Ref): 15544 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - scotland - Fairways Business Park - Battery Storage  - 
                        
13318
                            
                            
                        
                              Operator (or Applicant): Intelligent Land Investments Group Plc 
                            -> Inverness Caledonian Thistle Football Club 
                        
                        
                    
                        
                        50 MW - planning - scotland - East Rogerton Cottage, Markethill Road - Battery Storage Facility - 
                        
13449
                            
                            
                        
                              Operator (or Applicant): Private Developer 
                            -> Apatura οΏ½ GPC 612 Limited 
                        
                        
                    
                        
                        50 MW - planning - south west - Wareham Road, Scouse Farm - Battery Storage - 
                        
15165
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/11/2023 
                            -> 07/03/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Revised 
                        
                              Development Status (short): Application Submitted 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 15962 
                        
                              Planning Application Withdrawn:  
                            -> 26/01/2024 
                        
                        
                    
                        
                        49 MW - planning - north west - Middleton Clean Energy Plant - 
                        
7029
                            
                            
                        
                              Under Construction: Implemented 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - yorkshire and humber - Elland Storage Project - 
                        
7053
                            
                            
                        
                              Planning Permission Expired: PD 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - south east - Lovedean Energy Storage System - 
                        
7064
                            
                            
                        
                              Judicial Review: 43350 
                            -> 07/09/2018 
                        
                        
                    
                        
                        49 MW - planning - east midlands - Cottam Power Station - 
                        
7066
                            
                            
                        
                              Planning Permission Expired: PD 
                            ->  
                        
                        
                    
                        
                        49 MW - operation - north west - Lister Drive - 
                        
7740
                            
                            
                        
                              Under Construction: 01/05/2021 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - eastern - Reach Road - 
                        
7906
                            
                            
                        
                              Planning Permission Expired: PANR 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - london - Mill Hill National Grid Substation - 
                        
8009
                            
                            
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - scotland - Platchaig House, Kilmorack - Battery Storage Facility - 
                        
8248
                            
                            
                        
                              Planning Permission Refused: 30/08/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - scotland - Old Gallows Road - Battery storage - 
                        
8368
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/02/2021 
                            -> 07/02/2024 
                        
                              Operator (or Applicant): Whirlwind Renewables 
                            -> Foresight Group 
                        
                        
                    
                        
                        49 MW - planning - scotland - Shindour - Energy Storage Facility - 
                        
8464
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/05/2021 
                            -> 18/01/2024 
                        
                              Planning Authority: Tayside Council 
                            -> Perth & Kinross Council 
                        
                        
                    
                        
                        49 MW - planning - eastern - Rush Green Motors - Battery storage - 
                        
8987
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/10/2023 
                            -> 14/03/2024 
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 16045 
                        
                        
                    
                        
                        49 MW - planning - eastern - Greens Farm - Battery energy storage - 
                        
9012
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 13/05/2021 
                            -> 09/04/2024 
                        
                        
                    
                        
                        49 MW - planning - south east - Burcot Solar Farm - 
                        
9374
                            
                            
                        
                              Planning Permission Refused: 06/12/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - eastern - Admiralty Road - Battery Energy Storage Facility - 
                        
9470
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/08/2021 
                            ->  
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        49 MW - operation - scotland - Wishaw Battery Storage Facility - 
                        
9522
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/05/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - construction - north west - Bredbury Substation - Battery Storage Facility - 
                        
9653
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/09/2021 
                            ->  
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - west midlands - Chapel Lane - Battery Energy Storage System - 
                        
9721
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/11/2023 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - east midlands - Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage - 
                        
9796
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 13/10/2021 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - yorkshire and humber - Common Farm - Solar Farm & Battery Storage - 
                        
9877
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/11/2021 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - scotland - Drum Farm - Battery Energy Storage System - 
                        
9940
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/11/2021 
                            ->  
                        
                              Operator (or Applicant): Renewable Energy System Limited 
                            -> Field Energy 
                        
                        
                    
                        
                        49 MW - planning - scotland - Stainland Energy Storage Project - 
                        
10225
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/12/2021 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - yorkshire and humber - Elland Storage Project - 
                        
10236
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/02/2023 
                            ->  
                        
                              Are they re-applying (New REPD Ref): 15304 
                            ->  
                        
                              Are they re-applying (Old REPD Ref) : 7053 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - scotland - Fordtown Energy Storage - 
                        
10239
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/05/2022 
                            ->  
                        
                              Are they re-applying (Old REPD Ref) : 7764 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - west midlands - Doverdale - Solar Farm & Battery Storage - 
                        
10273
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/06/2021 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - scotland - Newburgh Road, Abernethy - Battery Storage  - 
                        
10607
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/02/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - scotland - Rothienorman - Battery Storage - 
                        
10638
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 16/02/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - eastern - Model Farm - 
                        
10687
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/02/2022 
                            ->  
                        
                              Are they re-applying (Old REPD Ref) : 7609 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - scotland - Midmill, Kintore - Battery Energy Storage - 
                        
10701
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/03/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - scotland - Broomloan Road -  Battery Energy Storage - 
                        
10886
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/03/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - scotland - Law Of Doune Road, Macduff - Battery Storage - 
                        
10894
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/12/2023 
                            ->  
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - north east - Hawthorn Grid Site - Battery Storage - 
                        
10896
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/03/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility - 
                        
10955
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/04/2022 
                            ->  
                        
                              Are they re-applying (New REPD Ref): 14321 
                            ->  
                        
                              Are they re-applying (Old REPD Ref) : 9341 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - scotland - South Leylodge Farmhouse, Kintore - Battery Energy Storage System - 
                        
11092
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/04/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - scotland - Holmston Road - Battery Storage Facility - 
                        
11679
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/07/2022 
                            -> 08/02/2024 
                        
                              Operator (or Applicant): Renewable Energy Systems Limited 
                            -> Field Energy 
                        
                        
                    
                        
                        49 MW - construction - london - Clay Tye Farm Phase 1 - Storage Facility - 
                        
11720
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/07/2022 
                            -> 27/03/2024 
                        
                              Planning Permission Refused:  
                            -> 18/07/2017 
                        
                              Operational:  
                            -> 22/03/2024 
                        
                        
                    
                        
                        49 MW - construction - london - Clay Tye Farm Phase 2 - Storage Facility - 
                        
11721
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/07/2022 
                            -> 27/03/2024 
                        
                              Planning Permission Refused:  
                            -> 10/09/2018 
                        
                              Operational:  
                            -> 22/03/2024 
                        
                        
                    
                        
                        49 MW - planning - scotland - Househill House, Househill -  Battery Storage - 
                        
12056
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/03/2023 
                            -> 30/01/2024 
                        
                        
                    
                        
                        49 MW - planning - scotland - Meetlaw Farm, Fordoun - Battery Energy Storage System - 
                        
12361
                            
                            
                        
                              Y-coordinate: 81886 
                            -> 781886 
                        
                              lat: 50.636363 
                            -> 56.92789 
                        
                              long: -2.265832 
                            -> -2.308901 
                        
                        
                    
                        
                        49 MW - planning - south west - Landulph, Ellbridge Lane - Battery Storage Facility - 
                        
12697
                            
                            
                        
                              Are they re-applying (Old REPD Ref) : 7051 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility - 
                        
12936
                            
                            
                        
                              Are they re-applying (New REPD Ref): 15230 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - north west - Welkin Mill, Welkin Road - Battery Storage - 
                        
12982
                            
                            
                        
                              Are they re-applying (Old REPD Ref) : 8055 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - west midlands - Lichfield Road, Watton Lane - Battery Storage - 
                        
13369
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/03/2023 
                            -> 02/04/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                        
                    
                        
                        49 MW - planning - scotland - Persley Croft - Battery Storage - 
                        
13684
                            
                            
                        
                              Are they re-applying (New REPD Ref):   
                            ->  
                        
                              Planning Authority: Aberdeen Council 
                            -> Aberdeen City Council 
                        
                        
                    
                        
                        49 MW - planning - south east - Weston Lane - Battery Storage Facility - 
                        
14005
                            
                            
                        
                              Are they re-applying (New REPD Ref):   
                            ->  
                        
                        
                    
                        
                        49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility - 
                        
14321
                            
                            
                        
                              Are they re-applying (Old REPD Ref) : 10955 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - scotland - Kintore Substation, Leylodge - Battery Energy Storage - 
                        
14374
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/07/2023 
                            -> 18/01/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Revised 
                        
                              Development Status (short): Application Submitted 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 15627 
                        
                              Planning Application Withdrawn:  
                            -> 18/12/2023 
                        
                        
                    
                        
                        49 MW - planning - south west - Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility - 
                        
14691
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/09/2023 
                            -> 01/02/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 04/01/2027 
                        
                        
                    
                        
                        47 MW - planning - south west - Dog Trap Lane, Minety - Battery Energy Storage Systems - 
                        
10488
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/01/2022 
                            ->  
                        
                              Are they re-applying (New REPD Ref): 11810 
                            ->  
                        
                        
                    
                        
                        45 MW - planning - north west - Cheshire Power Station - Battery Storage Facility - 
                        
10295
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/12/2021 
                            ->  
                        
                              Planning Authority: Cheshire West and Chester Council 
                            -> Cheshire West & Chester Council 
                        
                        
                    
                        
                        45 MW - planning - scotland - Sclenteuch Wind Farm  - 
                        
11987
                            
                            
                        
                              Are they re-applying (Old REPD Ref) : 4612 
                            ->  
                        
                        
                    
                        
                        43 MW - planning - scotland - Ballingall Farm, Leslie - Battery Energy Storage System - 
                        
10825
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/03/2022 
                            ->  
                        
                        
                    
                        
                        42 MW - planning - scotland - South Pargillis - Battery Storage - 
                        
9564
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/09/2021 
                            ->  
                        
                        
                    
                        
                        42 MW - planning - scotland - Armadale Wind Farm - 
                        
11219
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/05/2022 
                            ->  
                        
                        
                    
                        
                        42 MW - planning - scotland - Melvich Bay - Melvich Wind Energy Hub - 
                        
13826
                            
                            
                        
                              Are they re-applying (Old REPD Ref) :  
                            -> 3303 
                        
                        
                    
                        
                        40 MW - planning - east midlands - Breach Farm - Energy Barn - 
                        
6914
                            
                            
                        
                              Under Construction: Implemented 
                            ->  
                        
                        
                    
                        
                        40 MW - planning - eastern - Maldon Hall - 
                        
7095
                            
                            
                        
                              Under Construction: Implemented 
                            ->  
                        
                        
                    
                        
                        40 MW - planning - west midlands - Whitehouse Farm Energy Barn - 
                        
7987
                            
                            
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        40 MW - planning - south east - Loudwater Battery Storage Site - 
                        
8142
                            
                            
                        
                              Are they re-applying (New REPD Ref): 11993 
                            -> 12803 
                        
                        
                    
                        
                        40 MW - planning - south east - Tanners Lane -  Battery Energy Storage Facility (Phase One) - 
                        
9708
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/04/2022 
                            ->  
                        
                              Under Construction: Implemented 
                            ->  
                        
                        
                    
                        
                        40 MW - planning - yorkshire and humber - Field House Solar Farm - 
                        
10970
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/04/2022 
                            ->  
                        
                        
                    
                        
                        40 MW - planning - west midlands - Hollydale, Buildwas Road - Battery Storage - 
                        
13410
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 13/03/2023 
                            -> 13/02/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 12/01/2027 
                        
                        
                    
                        
                        40 MW - planning - scotland - Newton Farm, Westburn Road - Battery Storage Facility - 
                        
13450
                            
                            
                        
                              Operator (or Applicant): Bluefield Renewable Developments Limited 
                            -> Apatura οΏ½ GPC 676 Limited 
                        
                        
                    
                        
                        40 MW - planning - yorkshire and humber - Claire Court, Rawmarsh Road - Battery Energy Storage Facility - 
                        
13774
                            
                            
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        37 MW - planning - scotland - STOR Field 9 - 
                        
7018
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Planning Application Submitted 
                        
                              Development Status (short): Awaiting Construction 
                            -> Application Submitted 
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        36 MW - planning - south west - Kingston Road, Slimbridge - Battery Storage - 
                        
11516
                            
                            
                        
                              Are they re-applying (New REPD Ref): 14882 
                            ->  
                        
                        
                    
                        
                        35 MW - planning - south west - Northington Lane - Battery Storage Facility - 
                        
9992
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/11/2021 
                            ->  
                        
                        
                    
                        
                        35 MW - planning - south east - New Barn Road - Battery Energy Storage Facility - 
                        
14650
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/08/2023 
                            -> 19/02/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 15/02/2027 
                        
                        
                    
                        
                        33 MW - construction - yorkshire and humber - Wormald Green - Battery Energy Storage System - 
                        
10893
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 26/08/2023 
                            ->  
                        
                              Planning Permission Refused:  
                            -> 26/09/2022 
                        
                        
                    
                        
                        32 MW - planning - yorkshire and humber - Kirkhaw Lane Battery Storage - 
                        
8430
                            
                            
                        
                              Planning Authority: Wakefield Council 
                            -> Wakefield Metropolitan District Council 
                        
                        
                    
                        
                        32 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage - 
                        
10145
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/01/2022 
                            ->  
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 16047 
                        
                        
                    
                        
                        32 MW - planning - south west - Post Farm, Lytchett Minster - Battery Energy Storage - 
                        
10291
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/01/2022 
                            ->  
                        
                        
                    
                        
                        31 MW - planning - scotland - Benthead Farm - Solar Farm & Battery Storage - 
                        
10542
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/02/2022 
                            ->  
                        
                        
                    
                        
                        30 MW - planning - scotland - Blackpark Energy Storage - 
                        
8105
                            
                            
                        
                              Under Construction: Implemented 
                            ->  
                        
                        
                    
                        
                        30 MW - planning - scotland - Drumcross Battery Storage - 
                        
8155
                            
                            
                        
                              Under Construction: Implemented 
                            ->  
                        
                        
                    
                        
                        30 MW - planning - scotland - Jamesfield Organic Centre, Phase 1 - 
                        
10456
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 26/01/2022 
                            ->  
                        
                              Are they re-applying (New REPD Ref): 10863 
                            ->  
                        
                        
                    
                        
                        30 MW - planning - eastern - Colton - Solar photovoltaic farm, Battery storage - 
                        
10945
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/01/2024 
                            ->  
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        30 MW - planning - north east - West Sleekburn - Battery Storage Compound - 
                        
10957
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/04/2022 
                            ->  
                        
                        
                    
                        
                        30 MW - planning - west midlands - Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage - 
                        
10978
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/04/2022 
                            ->  
                        
                        
                    
                        
                        30 MW - planning - scotland - West Bendings - Battery Storage - 
                        
10985
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/04/2022 
                            ->  
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        30 MW - planning - scotland - Clachaig Glen - 
                        
10996
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/04/2022 
                            ->  
                        
                              Are they re-applying (Old REPD Ref) : 6119 
                            ->  
                        
                        
                    
                        
                        30 MW - planning - south west - Catsbrain Farm - Battery Storage  - 
                        
11787
                            
                            
                        
                              Are they re-applying (Old REPD Ref) : 7988 
                            ->  
                        
                        
                    
                        
                        30 MW - planning - yorkshire and humber - Back Lane, Skerne - Solar Farm & Battery Storage - 
                        
12297
                            
                            
                        
                              Under Construction: Implemented 
                            ->  
                        
                        
                    
                        
                        30 MW - planning - yorkshire and humber - North Lincolnshire Green Energy Park - 
                        
12706
                            
                            
                        
                              Are they re-applying (Old REPD Ref) : 7854 
                            ->  
                        
                        
                    
                        
                        30 MW - planning - scotland - Meiklelaught Farm - Battery Storage - 
                        
14525
                            
                            
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        30 MW - planning - north west - Wallerscote Limebeds - Battery Energy Storage - 
                        
14888
                            
                            
                        
                              Planning Authority: Cheshire West and Chester Council 
                            -> Cheshire West & Chester Council 
                        
                        
                    
                        
                        25 MW - planning - north west - Davies Road - Battery Storage - 
                        
9563
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/03/2022 
                            ->  
                        
                        
                    
                        
                        25 MW - planning - north west - Middlewich Road - Solar Photovoltaics & Battery Storage - 
                        
9565
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/03/2022 
                            ->  
                        
                        
                    
                        
                        25 MW - planning - north west - Caton Road, Lancaster -  Battery Storage Facility - 
                        
10047
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 13/12/2022 
                            ->  
                        
                        
                    
                        
                        25 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage - 
                        
10222
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/02/2022 
                            ->  
                        
                        
                    
                        
                        25 MW - planning - scotland - Earraghail Renewable Energy Development - 
                        
10712
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/03/2022 
                            ->  
                        
                        
                    
                        
                        22 MW - planning - eastern - Surmer Hall, Church Walk - Solar Farm & Battery Storage - 
                        
15401
                            
                            
                        
                              Planning Authority: Braintree Council 
                            -> Braintree District Council 
                        
                        
                    
                        
                        20 MW - operation - south west - Feeder Road - 
                        
7663
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/05/2023 
                            -> 22/01/2024 
                        
                              Development Status: Finished 
                            -> Operational 
                        
                              Development Status (short): Finished 
                            -> Operational 
                        
                              Operational:  
                            -> 09/01/2024 
                        
                        
                    
                        
                        20 MW - planning - south east - Basing Road - 
                        
7746
                            
                            
                        
                              Planning Authority: Basingstoke & Deane Borough Council 
                            -> Basingstoke and Deane Borough Council 
                        
                        
                    
                        
                        20 MW - planning - eastern - The Brickmakers Arms Battery - 
                        
9668
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/01/2022 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - scotland - Douglas West Wind Farm (extension) - 
                        
9957
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/11/2021 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - east midlands - Mount Road, Castle Gresley - Battery Storage Facility - 
                        
10012
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/11/2021 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - south west - Plymouth Stor Generation - Battery storage - 
                        
10432
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/01/2022 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - north west - Former EON Power Station, Booth Lane - Battery Energy Storage System - 
                        
10436
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/01/2022 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - scotland - Carrick Windfarm - 
                        
10540
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/02/2022 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - north west - Broadgate, Chadderton - Battery Storage Containers - 
                        
10690
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/03/2022 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - scotland - Strathruddie, Kinglassie - Solar farm - 
                        
10828
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/03/2022 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - east midlands - West Burton Solar Project - 
                        
10917
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/04/2022 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - eastern - Moggerhanger Road, Sandy - Solar Farm - 
                        
10981
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/04/2022 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - north west - Vause Farm - Battery Storage - 
                        
10989
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/04/2022 
                            ->  
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 09/02/2027 
                        
                        
                    
                        
                        20 MW - planning - scotland - Chleansaid Onshore Wind Farm - 
                        
10997
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/01/2024 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - scotland - Grayside Wind Farm - 
                        
11113
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/05/2022 
                            ->  
                        
                        
                    
                        
                        20 MW - construction - north west - Chadderton - Battery energy storage facility - 
                        
11160
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/05/2022 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - scotland - Ben Aketil Wind Farm - Repowered & Extended - 
                        
11876
                            
                            
                        
                              Are they re-applying (Old REPD Ref) :  
                            -> 8332 
                        
                        
                    
                        
                        20 MW - operation - south west - Hawkers Hill Energy Park - 
                        
12293
                            
                            
                        
                              Planning Permission Refused:  
                            -> 22/09/2017 
                        
                        
                    
                        
                        20 MW - planning - scotland - Chesters - Millmoor Rig Wind Farm & Battery Energy Storage - 
                        
12821
                            
                            
                        
                              Planning Authority: Scottish Borders Council 
                            -> Scottish Government (S36) 
                        
                        
                    
                        
                        20 MW - planning - south west - Fair Park Solar Farm - 
                        
13761
                            
                            
                        
                              Are they re-applying (New REPD Ref):   
                            ->  
                        
                        
                    
                        
                        20 MW - planning - scotland - Denfield Farm - 
                        
14341
                            
                            
                        
                              Are they re-applying (Old REPD Ref) : 7163 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - east midlands - Heron Solar Farm & Battery Storage - 
                        
15084
                            
                            
                        
                              Planning Authority: Rushcliffe Council 
                            -> Rushcliffe Borough Council 
                        
                        
                    
                        
                        19 MW - planning - scotland - Land North of Thornton Road - 
                        
7131
                            
                            
                        
                              Under Construction: Implemented 
                            ->  
                        
                        
                    
                        
                        19 MW - planning - scotland - North West Of Jameston Farm - 
                        
7133
                            
                            
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        19 MW - planning - scotland - Ochiltree - Battery Sorage - 
                        
10162
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/10/2022 
                            ->  
                        
                              Are they re-applying (New REPD Ref): 15312 
                            -> 14170 
                        
                        
                    
                        
                        19 MW - planning - scotland - Hillcrest Cottage, Shebster - Battery Energy Storage System - 
                        
10226
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/09/2022 
                            ->  
                        
                        
                    
                        
                        19 MW - planning - scotland - Speyslaw Farm - Battery Storage - 
                        
10394
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/03/2023 
                            ->  
                        
                        
                    
                        
                        19 MW - planning - scotland - Wardlaw Wood Windfarm - Battery Storage - 
                        
14231
                            
                            
                        
                              Are they re-applying (New REPD Ref):              
                            ->  
                        
                        
                    
                        
                        19 MW - planning - scotland - Tofts - Battery Storage - 
                        
14706
                            
                            
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        16 MW - planning - east midlands - Waterswallows Road, Green Fairfield - Battery Storage Equipment - 
                        
10716
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/03/2022 
                            ->  
                        
                        
                    
                        
                        16 MW - planning - scotland - Mains Of Keithick Farm, Keithick - Battery Storage &  Solar Farm - 
                        
11623
                            
                            
                        
                              Are they re-applying (Old REPD Ref) :  
                            -> 11439 
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        15 MW - planning - eastern - Three Bridges Solar Farm - 
                        
8220
                            
                            
                        
                              Planning Authority: Breckland Council 
                            -> Breckland District Council 
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        15 MW - planning - scotland - Hollandmey Renewable Energy Development - 
                        
10246
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/12/2021 
                            ->  
                        
                        
                    
                        
                        15 MW - planning - south west - Smithyard Lane - Battery Storage - 
                        
10766
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/03/2022 
                            ->  
                        
                        
                    
                        
                        15 MW - planning - north west - Grassing Rome Street - Battery Storage - 
                        
11611
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/07/2022 
                            -> 08/04/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 07/03/2027 
                        
                        
                    
                        
                        14 MW - planning - scotland - Hopsrig Wind Farm - 
                        
11066
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 26/04/2022 
                            ->  
                        
                              Are they re-applying (Old REPD Ref) : 6099 
                            ->  
                        
                        
                    
                        
                        13 MW - planning - west midlands - Maybrook Road - Battery facility - 
                        
11008
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/04/2022 
                            ->  
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        13 MW - planning - east midlands - Dolly Lane, Buxworth - Battery Storage Facility & Sub Station - 
                        
15127
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/10/2023 
                            -> 27/02/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 21/02/2027 
                        
                        
                    
                        
                        10 MW - planning - east midlands - Manor Farm Energy Storage - 
                        
6948
                            
                            
                        
                              Under Construction: Implemented 
                            ->  
                        
                        
                    
                        
                        10 MW - planning - south east - Stockbridge Road - 
                        
7097
                            
                            
                        
                              Under Construction: Implemented 
                            ->  
                        
                        
                    
                        
                        10 MW - construction - south east - Land Adj Harmer Warren Quarry - 
                        
7143
                            
                            
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                        
                        10 MW - planning - scotland - East Ballochy - 
                        
7675
                            
                            
                        
                              Under Construction: Implemented 
                            ->  
                        
                        
                    
                        
                        10 MW - planning - south west - Minety Substation - 
                        
7942
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/06/2020 
                            -> 12/07/2022 
                        
                        
                    
                        
                        10 MW - planning - eastern - Wissett Solar Farm, Wissett - Battery Storage - 
                        
9913
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/11/2021 
                            ->  
                        
                        
                    
                        
                        10 MW - planning - north west - Park Road Battery Storage - 
                        
10076
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 26/09/2022 
                            ->  
                        
                        
                    
                        
                        10 MW - planning - scotland - Glenniston Farm, Auchtertool - Solar Farm - 
                        
10434
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/01/2022 
                            ->  
                        
                        
                    
                        
                        10 MW - planning - scotland - Culachy Wind Farm - 
                        
10714
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/12/2023 
                            ->  
                        
                              Are they re-applying (Old REPD Ref) : 3926 
                            ->  
                        
                        
                    
                        
                        10 MW - operation - south west - Cirencester Solar Farm - 
                        
12791
                            
                            
                        
                              Planning Permission Refused:  
                            -> 17/09/2015 
                        
                        
                    
                        
                        10 MW - planning - yorkshire and humber - J3 Business Park - Battery Energy Storage Facility - 
                        
12920
                            
                            
                        
                              Are they re-applying (Old REPD Ref) : 6979 
                            ->  
                        
                              Planning Permission Expired: NA 
                            ->  
                        
                        
                    
                
 
         
     
     
    
    2024-01
    New projects (136): 
    
        
        1025 MW - planning - yorkshire and humber - The Balk, Almholme - Energy Storage System - 
        
14061
        
            
    
        
        940 MW - planning - north west - Fanny House Farm, Bay Gateway - Battery Storage - 
        
14386
        
            
    
        
        700 MW - planning - scotland - Auchentiber Road - Battery Energy Storage System - 
        
15425
        
            
    
        
        600 MW - cancelled - east midlands - West Leake Lane, Ratcliffe - Battery Storage - 
        
12464
        
            
    
        
        500 MW - planning - scotland - Kilmarnock Battery Energy Storage System - 
        
15176
        
            
    
        
        500 MW - planning - south east - East Claydon Battery Energy Storage - 
        
15501
        
            
    
        
        400 MW - planning - south west - East Chickerell Court Farm - Battery Energy Storage System - 
        
12651
        
            
    
        
        400 MW - planning - eastern - Elstree Substation, Hilfield Lane - Battery Energy Storage - 
        
14638
        
            
    
        
        400 MW - planning - south west - Junction 27, Westleigh - Battery Storage - 
        
14935
        
            
    
        
        400 MW - planning - north west - Blackdyke Farm, Blackford - Battery Storage - 
        
15005
        
            
    
        
        350 MW - planning - wales - Uskmouth Power Station, West Nash Road - Battery Storage Facility - 
        
15263
        
            
    
        
        349 MW - planning - wales - Penrhos Works - Battery Energy Storage System - 
        
15472
        
            
    
        
        320 MW - planning - yorkshire and humber - Monk Fryston Battery Storage - 
        
15164
        
            
    
        
        300 MW - planning - scotland - Newarthill Energy Park - 
        
14763
        
            
    
        
        250 MW - planning - eastern - Toddington Services, Hipsey Spinney - Battery Storage - 
        
15573
        
            
    
        
        200 MW - planning - scotland - Carlisle Road - Battery Energy Storage System - 
        
9684
        
            
    
        
        200 MW - planning - eastern - Hornsea Project Three - Battery Storage - 
        
9754
        
            Megapack
        
            
    
        
        200 MW - planning - north west - Cargo Road, Cargo -  Battery Storage - 
        
14939
        
            
    
        
        200 MW - planning - yorkshire and humber - Stocking Lane - Battery Energy Facility - 
        
15082
        
            
    
        
        200 MW - planning - yorkshire and humber - Corner Of Weeland Road, Lunn Lane - Battery Storage Facility - 
        
15375
        
            
    
        
        200 MW - planning - north west - Todhills and Westlinton - Harker Battery Energy Storage Facility - 
        
15599
        
            
    
        
        180 MW - planning - yorkshire and humber - Fordtead Lane, Thorpe Marsh - Battery Energy Facility - 
        
14932
        
            
    
        
        150 MW - planning - north west - Printworks Road - Stalybridge Battery Storage - 
        
10808
        
            
    
        
        150 MW - planning - north east - Wilton International, Greystones Road - Phase 1 - 
        
14729
        
            
    
        
        140 MW - planning - northern ireland - Coolkeeragh - Battery Storage - 
        
15151
        
            
    
        
        136 MW - planning - scotland - Newlands Hill Wind Energy Hub - 
        
15383
        
            
    
        
        126 MW - planning - south east - Derehams Farm, Derehams Lane - Battery Storage - 
        
15544
        
            
    
        
        106 MW - planning - scotland - Bodinglee Wind Farm - 
        
14532
        
            
    
        
        105 MW - planning - scotland - Kinmuck Battery Energy Storage - 
        
13001
        
            
    
        
        100 MW - planning - scotland - Hill of Fare - Hill of Fare Wind Farm & Battery Storage - 
        
12026
        
            
    
        
        100 MW - planning - north west - The Old Vicarage, Reedley - Battery Storage - 
        
12767
        
            
    
        
        100 MW - planning - scotland - Learielaw Farm, Learielaw -  Battery Energy Storage - 
        
13368
        
            
    
        
        100 MW - planning - north west - Walshaw House, Regent Street - Battery Energy Storage - 
        
14625
        
            
    
        
        100 MW - planning - yorkshire and humber - Murton Way - Battery Energy Storage - 
        
14759
        
            
    
        
        100 MW - planning - west midlands - New Road, Featherstone - Battery Storage - 
        
15297
        
            
    
        
        99 MW - planning - south east - Butts Field, Mill Lane - Battery Storage - 
        
13573
        
            
    
        
        99 MW - cancelled - west midlands - Illeybrook Farm - Battery Energy Storage - 
        
14064
        
            
    
        
        93 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage  - 
        
15610
        
            
    
        
        90 MW - planning - scotland - Rivox Wind Farm - Wind farm - 
        
14533
        
            
    
        
        80 MW - planning - yorkshire and humber - Barlow Road, Barlow Road - Battery Storage - 
        
12734
        
            
    
        
        80 MW - planning - yorkshire and humber - Barlow Road, Barlow Road - Battery Storage - 
        
14715
        
            
    
        
        80 MW - planning - east midlands - Old Trent Road, Beckingham - Battery Storage Facility  - 
        
14956
        
            
    
        
        40 MW - construction - scotland - Cumberhead West Wind Farm - 
        
15343
        
            
    
        
        75 MW - planning - west midlands - Holly Lane Energy Park - Solar Farm & Battery Storage - 
        
13695
        
            
    
        
        75 MW - planning - north east - Belasis Avenue - Battery Storage - 
        
13850
        
            
    
        
        70 MW - planning - scotland - Shetland Battery Energy Storage System - 
        
12856
        
            
    
        
        70 MW - planning - south west - Severn Road, Hallen - Battery Storage Facility - 
        
15027
        
            
    
        
        63 MW - planning - scotland - Dolphingstone Farm - Battery Energy Storage System - 
        
13618
        
            
    
        
        60 MW - planning - scotland - Saturland Farm, Salterland Road - Battery Energy Storage System - 
        
12024
        
            
    
        
        60 MW - planning - scotland - Inchbean Farm, Treeswoodhead Road - Battery Energy Storage System - 
        
13323
        
            
    
        
        60 MW - planning - north east - West Boldon Substation - Battery Energy Storage - 
        
14408
        
            
    
        
        57 MW - planning - north west - Waterloo Farm, Furbarn Road - Battery Storage - 
        
12187
        
            
    
        
        57 MW - planning - north west - The Rake, Lower Jowkin Lane - Battery Energy Storage - 
        
14597
        
            
    
        
        53 MW - planning - east midlands - Barfield Lane, Reepham - Battery Energy Storage System - 
        
12600
        
            
    
        
        50 MW - planning - wales - Pancross & Oaklands Solar Farm - 
        
7702
        
            
    
        
        50 MW - planning - east midlands - Main Street, Kelham - Solar Farm & Battery Energy Storage - 
        
11999
        
            
    
        
        50 MW - planning - south east - Derehams Farm, Derehams Lane - Battery Storage - 
        
12649
        
            
    
        
        50 MW - planning - scotland - Penicuik, Moorfoot Hills - Torfichen Wind Farm - 
        
13310
        
            
    
        
        50 MW - planning - scotland - East Rogerton Cottage, Markethill Road - Battery Storage Facility - 
        
13449
        
            
    
        
        50 MW - planning - scotland - Longcroft Wind Farm - 
        
13539
        
            
    
        
        50 MW - planning - south west - Bluebell Wood Solar Farm & Battery Storage - 
        
13989
        
            
    
        
        50 MW - cancelled - scotland - Seath Road, Rutherglen - Battery Storage - 
        
14378
        
            
    
        
        50 MW - planning - south west - Indian Queens Sub station, Carne Hill - Battery Energy Storage - 
        
14461
        
            
    
        
        50 MW - planning - south west - Indian Queens National Grid Substation, Domelick Hill - Battery Storage - 
        
14687
        
            
    
        
        50 MW - planning - north west - Orrell Street Battery Energy Storage Facility - 
        
14892
        
            
    
        
        50 MW - planning - south west - Wareham Road, Scouse Farm - Battery Storage - 
        
15165
        
            
    
        
        50 MW - cancelled - scotland - CoyltonοΏ½GreenerοΏ½GridοΏ½Park - 
        
15312
        
            
    
        
        50 MW - planning - yorkshire and humber - Westfield Road, Carlton - Battery Storage - 
        
15338
        
            
    
        
        50 MW - planning - west midlands - Upper Latherford Farm, Latherford Lane - Battery Energy Storage System - 
        
15446
        
            
    
        
        49 MW - planning - south east - Rye Common Lane - 
        
7028
        
            
    
        
        49 MW - planning - south east - Burcot Solar Farm - 
        
9374
        
            
    
        
        49 MW - planning - west midlands - Chapel Lane - Battery Energy Storage System - 
        
9721
        
            
    
        
        49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility - 
        
10955
        
            
    
        
        49 MW - planning - scotland - Wester Balbeggie Farm, Balbeggie Avenue - Battery Storage - 
        
12350
        
            
    
        
        49 MW - planning - south east - Blue Bell Lodge, Rye Common Lane - Battery Storage - 
        
12496
        
            
    
        
        49 MW - planning - scotland - Rigifa Cove Road - Battery Storage - 
        
12970
        
            
    
        
        49 MW - planning - wales - Carrog Ganol, Rhosgoch - Battery Energy Storage System - 
        
13217
        
            
    
        
        49 MW - planning - scotland - Dormitories Star Inn Farm, Mains Of Fowlis - Battery Energy Storage - 
        
13595
        
            
    
        
        49 MW - planning - scotland - Persley Croft - Battery Storage - 
        
13684
        
            
    
        
        49 MW - planning - scotland - Loch Toftingall, Halsary Wind Farm - Battery Energy Storage - 
        
13949
        
            
    
        
        49 MW - planning - south east - Weston Lane - Battery Storage Facility - 
        
14005
        
            
    
        
        49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility - 
        
14321
        
            
    
        
        49 MW - planning - scotland - Caulternich Croft Energy Storage Project - Battery Storage Facility - 
        
14373
        
            
    
        
        49 MW - planning - scotland - Kintore Substation, Leylodge - Battery Energy Storage - 
        
14374
        
            
    
        
        49 MW - planning - west midlands - Ebstree Road, Trysull - Battery Energy Storage - 
        
14497
        
            
    
        
        49 MW - planning - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility - 
        
14510
        
            
    
        
        49 MW - planning - north west - Coopers Lane, Kirkby - Battery Storage Facility - 
        
14670
        
            
    
        
        49 MW - planning - south west - Larks Lane & Latteridge Lane, Latteridge - Battery Storage Facility - 
        
14691
        
            
    
        
        49 MW - planning - east midlands - Little Hale Fen - Solar Farm - 
        
14955
        
            
    
        
        49 MW - planning - scotland - Flatterton Farm, Flatterton Road - Battery Storage - 
        
15154
        
            
    
        
        49 MW - cancelled - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility - 
        
15230
        
            
    
        
        49 MW - planning - yorkshire and humber - Lowfields Energy Storage Project - 
        
15304
        
            
    
        
        49 MW - planning - west midlands - Chapel Lane - Battery Energy Storage System - 
        
15308
        
            
    
        
        49 MW - cancelled - south east - Burcot Solar Farm - 
        
15444
        
            
    
        
        47 MW - planning - south west - Holt Road - Battery Energy Storage - 
        
15470
        
            
    
        
        45 MW - planning - scotland - Loch Fergus Farm - Energy Storage System - 
        
12274
        
            
    
        
        40 MW - planning - scotland - Newton Farm, Westburn Road - Battery Storage Facility - 
        
13450
        
            
    
        
        40 MW - planning - north west - Goyt Hall Farm, Goyt Valley Footpath - Battery Energy Storage - 
        
13985
        
            
    
        
        40 MW - planning - west midlands - Chillington Estate, Chillington Park - Battery Storage - 
        
14088
        
            
    
        
        40 MW - planning - yorkshire and humber - Bywater, Kippax - Battery Energy Storage - 
        
14362
        
            
    
        
        40 MW - planning - south west - Red Barn - Solar Farm & Battery Storage - 
        
15146
        
            
    
        
        40 MW - construction - scotland - Cumberhead West Wind Farm - 
        
15343
        
            
    
        
        36 MW - planning - south west - Kingston Road, Slimbridge - Battery Storage - 
        
14882
        
            
    
        
        35 MW - planning - south east - New Barn Road - Battery Energy Storage Facility - 
        
14650
        
            
    
        
        35 MW - planning - yorkshire and humber - Warren Lane, Bramham - Battery Energy Storage - 
        
14954
        
            
    
        
        34 MW - planning - scotland - Cloud Hill Wind Farm - 
        
15174
        
            
    
        
        34 MW - planning - northern ireland - Battery Energy Storage Facility in Londonderry - 
        
15303
        
            
    
        
        30 MW - planning - scotland - Meiklelaught Farm - Battery Storage - 
        
14525
        
            
    
        
        30 MW - planning - north west - Wallerscote Limebeds - Battery Energy Storage - 
        
14888
        
            
    
        
        30 MW - planning - north east - Fox Cover Road - Battery Energy Storage - 
        
14968
        
            
    
        
        30 MW - planning - scotland - Ditcher Law Wind Farm - 
        
14996
        
            
    
        
        30 MW - cancelled - west midlands - Tanners Lane - Battery Energy Storage System - 
        
15128
        
            
    
        
        29 MW - planning - scotland - Electricity Substation, Bardarroch - Battery Energy Storage - 
        
15569
        
            
    
        
        25 MW - planning - scotland - Houston Solar PV Farm & Energy Storage Facility - 
        
14294
        
            
    
        
        25 MW - planning - east midlands - Ash Tree Solar Farm & Battery Storage - 
        
15397
        
            
    
        
        22 MW - planning - eastern - Surmer Hall, Church Walk - Solar Farm & Battery Storage - 
        
15401
        
            
    
        
        22 MW - planning - eastern - Surmer Hall, Church Walk - Solar Farm & Battery Storage - 
        
15417
        
            
    
        
        20 MW - planning - scotland - Watten Wind Farm - 
        
11480
        
            
    
        
        20 MW - planning - scotland - Ben Aketil Wind Farm - Repowered & Extended - 
        
11876
        
            
    
        
        20 MW - planning - scotland - Knockodhar Wind Farm - 
        
14296
        
            
    
        
        20 MW - planning - scotland - Denfield Farm - 
        
14341
        
            
    
        
        20 MW - planning - scotland - Dunside Wind Farm - 
        
14531
        
            
    
        
        20 MW - planning - east midlands - Heron Solar Farm & Battery Storage - 
        
15084
        
            
    
        
        20 MW - planning - scotland - Vale of Leven Wind Farm - 
        
15175
        
            
    
        
        20 MW - planning - south west - Brockworth Road - Battery Storage System - 
        
15518
        
            
    
        
        19 MW - planning - scotland - Wardlaw Wood Windfarm - Battery Storage - 
        
14231
        
            
    
        
        19 MW - planning - scotland - Tofts - Battery Storage - 
        
14706
        
            
    
        
        19 MW - planning - scotland - Aikengall, Innerwick - Battery Energy Storage - 
        
15141
        
            
    
        
        13 MW - planning - scotland - Hare Craig Windfarm - 
        
15101
        
            
    
        
        13 MW - planning - east midlands - Dolly Lane, Buxworth - Battery Storage Facility & Sub Station - 
        
15127
        
            
    
        
        12 MW - planning - west midlands - Rock Farm - Solar Farm - 
        
15248
        
            
    
        
        12 MW - planning - south east - Caterham Bypass - Battery Energy Storage - 
        
15574
        
            
    
        
        11 MW - planning - scotland - Enoch Hill, Dalmellington - Battery Storage - 
        
14090
        
            
    
        
        10 MW - planning - scotland - Glenniston Farm, Auchtertool - Solar Farm - 
        
10434
        
            
    
        
        10 MW - planning - scotland - Culachy Wind Farm - 
        
10714
        
            
    
        
        10 MW - planning - yorkshire and humber - Bradley Road - Battery Energy Storage System - 
        
13863
        
            
    
    
    
    Disappeared projects (15): 
    
        
        120 MW - cancelled - south west - Pound Road, Hawkchurch - Battery Energy Storage System - 
        
14016    
    
        
        100 MW - cancelled - south west - Hook Street - Energy Storage Compound - 
        
10142    
    
        
        90 MW - cancelled - north west - Golf Road - Battery Energy Storage - 
        
13459    
    
        
        57 MW - cancelled - west midlands - Beechwood Farm, Hodgetts Lane - Battery Storage - 
        
13297    
    
        
        50 MW - cancelled - west midlands - Armshead Farm, Armshead Road - Battery Energy Storage Facility - 
        
12804    
    
        
        50 MW - cancelled - west midlands - Lowlands Farm - Battery Storage - 
        
12959    
    
        
        50 MW - cancelled - west midlands - Levedale Road, Levedale - Battery Energy Storage - 
        
13615    
    
        
        49 MW - cancelled - eastern - Whites Farm - Battery Storage - 
        
11880    
    
        
        45 MW - planning - north west - Huncoat Power Station - Battery Storage Facility - 
        
13080    
    
        
        25 MW - cancelled - scotland - Clauchrie Windfarm Battery - 
        
7804    
    
        
        24 MW - cancelled - yorkshire and humber - Mauxhall Farm - 
        
7827    
    
        
        20 MW - cancelled - south west - The Transmitting Station, Williton - Battery Storage - 
        
10186    
    
        
        12 MW - cancelled - yorkshire and humber - Windmill Farm Solar Farm  - 
        
8348    
    
        
        12 MW - cancelled - eastern - St Ippolyts - Solar Farm & Battery Storage - 
        
9695    
    
        
        10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 
        
13480    
    
    
    
    Updated projects (346):
    
    
    
        
            
            
                
                    
                        
                        100 MW - construction - eastern - Bullen Lane - Battery Storage - 
                        
10311
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/10/2022 
                            -> 05/12/2023 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/07/2023 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        99 MW - operation - eastern - Dollymans Storage - 
                        
7088
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 28/05/2021 
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              Operational:  
                            -> 01/07/2023 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        50 MW - operation - south east - Richborough Energy Park - Phase 2 - 
                        
9626
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/01/2023 
                            -> 11/01/2024 
                        
                              Installed Capacity (MWelec): 71.6 
                            -> 50.1 
                        
                              Development Status: Under Construction 
                            -> Operational 
                        
                              Development Status (short): Under Construction 
                            -> Operational 
                        
                              status: construction 
                            -> operation πΎ π πΈ
                        
                              mw: 71 
                            -> 50 
                        
                        
                    
                        
                        49 MW - operation - north west - West Didsbury Battery Storage - 
                        
7185
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 24/11/2023 
                        
                              Operator (or Applicant): Statera Energy 
                            -> Statera Energy / Gresham House 
                        
                              Development Status: Under Construction 
                            -> Operational 
                        
                              Development Status (short): Under Construction 
                            -> Operational 
                        
                              Operational:  
                            -> 21/11/2023 
                        
                              status: construction 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        49 MW - operation - north west - Lister Drive - 
                        
7740
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 04/01/2023 
                        
                              Operator (or Applicant): Arenko Cleantech 
                            -> Arenko Cleantech / Stratcraft 
                        
                              Development Status: Under Construction 
                            -> Operational 
                        
                              Development Status (short): Under Construction 
                            -> Operational 
                        
                              Operational:  
                            -> 01/08/2022 
                        
                              status: construction 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        49 MW - construction - south east - Titchfield Lane - 
                        
7828
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/09/2020 
                            -> 20/08/2023 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 20/08/2023 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - operation - west midlands - Bustleholme Substation - 
                        
7907
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/02/2021 
                            -> 20/10/2023 
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        49 MW - operation - south east - Richborough Energy Park - 
                        
8195
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/04/2023 
                            -> 11/01/2024 
                        
                              Development Status: Under Construction 
                            -> Operational 
                        
                              Development Status (short): Under Construction 
                            -> Operational 
                        
                              status: construction 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        49 MW - operation - scotland - Wishaw Battery Storage Facility - 
                        
9522
                            
                            
                        
                              Operator (or Applicant): Spectrum Reserve Limited 
                            -> Zenobe Energy 
                        
                              Site Name: Wishaw 49.9 Battery Storage Facility 
                            -> Wishaw Battery Storage Facility 
                        
                              Development Status: Under Construction 
                            -> Operational 
                        
                              Development Status (short): Under Construction 
                            -> Operational 
                        
                              status: construction 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        33 MW - construction - yorkshire and humber - Wormald Green - Battery Energy Storage System - 
                        
10893
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/09/2022 
                            -> 26/08/2023 
                        
                              Site Name: Station Lane, Burton Leonard - Battery Energy Storage System 
                            -> Wormald Green - Battery Energy Storage System 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 26/08/2023 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        20 MW - operation - wales - Energy Centre Royal Mint - 
                        
7684
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 16/02/2022 
                            -> 01/08/2023 
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              Under Construction:  
                            -> 01/05/2022 
                        
                              Operational:  
                            -> 01/08/2023 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        10 MW - planning - scotland - Binn Eco Park - Battery - 
                        
9098
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/03/2023 
                            -> 27/10/2023 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Planning Authority: Perth and Kinross Council 
                            -> Perth & Kinross Council 
                        
                              Under Construction:  
                            -> 01/09/2023 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                
 
         
     
    
    
    
    
    
    
        
            
            
                
                    
                        
                        1450 MW - planning - yorkshire and humber - Thorpe Marsh Power Station - Battery Energy Storage - 
                        
12453
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/02/2023 
                            -> 12/10/2023 
                        
                              Operator (or Applicant): Banks Renewables Limited 
                            -> West Burton Energy 
                        
                        
                    
                        
                        1400 MW - planning - yorkshire and humber - Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage - 
                        
13644
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 13/04/2023 
                            -> 12/10/2023 
                        
                              Operator (or Applicant): Banks Renewables Limited 
                            -> West Burton Energy / Banks Group 
                        
                        
                    
                        
                        1040 MW - planning - north west - Carrington Power Station, Manchester Road - Battery Storage - 
                        
13362
                            
                            
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> NA 
                        
                        
                    
                        
                        550 MW - planning - east midlands - Spalding Energy Park - Battery Storage - 
                        
10173
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/07/2023 
                            -> 28/12/2021 
                        
                        
                    
                        
                        500 MW - planning - scotland - Devilla Energy Storage Facility - 
                        
9248
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/05/2022 
                            -> 09/01/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 13/12/2028 
                        
                        
                    
                        
                        500 MW - planning - scotland - Coalburn Energy -  Battery Storage - 
                        
11034
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/07/2023 
                            -> 20/04/2022 
                        
                        
                    
                        
                        450 MW - planning - eastern - Gateway Energy Centre - Battery Energy Storage - 
                        
10309
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/01/2023 
                            -> 17/12/2021 
                        
                        
                    
                        
                        400 MW - planning - scotland - Kincardine Grid Services Complex - Energy Storage Facility - 
                        
10536
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/02/2022 
                            -> 08/06/2022 
                        
                        
                    
                        
                        400 MW - planning - scotland - Eccles Battery Energy Storage System - 
                        
11867
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/09/2022 
                            -> 12/09/2023 
                        
                              Operator (or Applicant): Weaver Power Limited 
                            ->  Zenobe Energy Limited 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 11/08/2028 
                        
                        
                    
                        
                        349 MW - planning - west midlands - Cellarhead - Battery Site - 
                        
10013
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/06/2022 
                            -> 29/11/2021 
                        
                        
                    
                        
                        340 MW - planning - north west - Blackdyke Farm, Blackford - Battery Storage - 
                        
12710
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/07/2023 
                            -> 10/10/2023 
                        
                              Operator (or Applicant): Novus Renewable Services Limited 
                            -> Novus Renewable Services Limited / Story Construction 
                        
                              Installed Capacity (MWelec): 400 
                            -> 340 
                        
                              Planning Authority: Carlisle Council 
                            -> Carlisle City Council 
                        
                              Planning Application Reference: 23/0444 
                            -> 23/0659 
                        
                              Planning Application Submitted: 21/06/2023 
                            -> 22/09/2023 
                        
                              mw: 400 
                            -> 340 
                        
                        
                    
                        
                        300 MW - construction - scotland - Kilmarnock South Substation - Battery storage - 
                        
9696
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 14/02/2022 
                            -> 27/09/2021 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Application Submitted: 01/04/2022 
                            -> 22/02/2022 
                        
                              Planning Permission Expired:  
                            -> 10/03/2028 
                        
                        
                    
                        
                        300 MW - construction - scotland - Blackhillock Electricity Substation - Battery Energy Storage System - 
                        
9723
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/02/2023 
                            -> 28/09/2021 
                        
                        
                    
                        
                        264 MW - planning - south east - Bolney Substation - Battery Storage - 
                        
10843
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/05/2023 
                            -> 22/03/2022 
                        
                        
                    
                        
                        249 MW - planning - south east - Richborough Energy Park - Phase 3 (Sheaf) - 
                        
11201
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/05/2023 
                            -> 10/05/2022 
                        
                              Site Name: Richborough Energy Park - Phase 3 
                            -> Richborough Energy Park - Phase 3 (Sheaf) 
                        
                        
                    
                        
                        240 MW - planning - yorkshire and humber - Springfield Farm, Hensall - Battery Energy Storage Facility - 
                        
11680
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/04/2023 
                            -> 18/07/2022 
                        
                              Planning Application Reference: 2023/0285/FULM 
                            -> 2022/0813/SCN 
                        
                        
                    
                        
                        230 MW - construction - wales - Uskmouth Power Station - Battery Storage - 
                        
10936
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/12/2022 
                            -> 06/04/2022 
                        
                        
                    
                        
                        200 MW - planning - yorkshire and humber - Drax Re-Power - 
                        
7017
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 02/01/2020 
                        
                        
                    
                        
                        200 MW - planning - scotland - Whitehill Energy Storage - 
                        
10466
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/11/2022 
                            -> 27/01/2022 
                        
                        
                    
                        
                        200 MW - planning - scotland - Windyhill Battery Storage Facility - 
                        
10596
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/07/2022 
                            -> 09/02/2022 
                        
                        
                    
                        
                        200 MW - planning - north east - Worset Lane - Battery Energy Storage System - 
                        
11406
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/02/2023 
                            -> 07/06/2022 
                        
                        
                    
                        
                        200 MW - planning - west midlands - Little Beanit Farm, Balsall Common - Battery Storage - 
                        
11656
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/11/2022 
                            -> 15/07/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 31/08/2026 
                        
                        
                    
                        
                        150 MW - planning - eastern - Thurrock Flexible Generation Plant - 
                        
7696
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 26/05/2022 
                            -> 04/10/2023 
                        
                        
                    
                        
                        150 MW - construction - south east - Cleve Hill Solar Project - 
                        
7856
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/05/2023 
                            -> 09/06/2022 
                        
                              Under Construction: 01/11/2022 
                            ->  
                        
                        
                    
                        
                        150 MW - construction - north west - Fiddlers Ferry Power Station - Battery storage - 
                        
9404
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/07/2023 
                            -> 08/08/2022 
                        
                        
                    
                        
                        150 MW - planning - south west - Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility - 
                        
11612
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/01/2023 
                            -> 08/07/2022 
                        
                        
                    
                        
                        130 MW - planning - yorkshire and humber - Clough Road - Battery Energy System - 
                        
14225
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/07/2023 
                            -> 20/09/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 12/09/2026 
                        
                        
                    
                        
                        114 MW - planning - eastern - Hickling Lane, Swainsthorpe -Battery Storage - 
                        
13560
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/04/2023 
                            -> 18/09/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 13/09/2026 
                        
                        
                    
                        
                        100 MW - planning - scotland - Harestanes Windfarm - 
                        
7395
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 25/06/2020 
                        
                        
                    
                        
                        100 MW - planning - south east - Minchens Lane Battery Storage Facility - 
                        
8434
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/02/2023 
                            -> 21/09/2023 
                        
                              Appeal Lodged:  
                            -> 22/12/2021 
                        
                        
                    
                        
                        100 MW - planning - scotland - Kilgallioch - Battery energy storage - 
                        
9007
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/05/2021 
                            -> 18/09/2023 
                        
                              Operator (or Applicant): Scottish Renewables Limited 
                            -> Scottish Power Renewables 
                        
                              Storage Type: Stand-alone Storage 
                            -> Co-located with RE 
                        
                              Storage Co-location REPD Ref ID:  
                            -> 4386 
                        
                              County: Strathclyde 
                            -> Dumfries and Galloway 
                        
                              Planning Authority: South Ayrshire Council 
                            -> Scottish Government (S36) 
                        
                              Planning Application Reference: 21/00387/DEEM 
                            -> ECU00002197 
                        
                              Planning Application Submitted: 29/03/2021 
                            -> 13/01/2021 
                        
                        
                    
                        
                        100 MW - planning - eastern - North Walpole, St Peter - Battery Energy Storage - 
                        
9762
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/08/2022 
                            -> 07/10/2021 
                        
                        
                    
                        
                        100 MW - planning - south west - St Dennis - Battery Energy Storage - 
                        
10058
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/02/2022 
                            -> 02/12/2021 
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 14461 & 14687 
                        
                        
                    
                        
                        100 MW - planning - south east - Penn Croft Farm, Crondall - Battery Energy Storage Facility - 
                        
10163
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/02/2023 
                            -> 24/12/2021 
                        
                        
                    
                        
                        100 MW - planning - south west - Shaftesbury Energy Park - Battery Storage System - 
                        
10626
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 31/03/2023 
                            -> 16/02/2022 
                        
                        
                    
                        
                        100 MW - planning - eastern - Walpole St Andrew - Battery storage  - 
                        
10876
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/10/2022 
                            -> 29/03/2022 
                        
                        
                    
                        
                        100 MW - planning - north west - Capenhurst Lane, Capenhurst - Battery Storage - 
                        
12503
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/11/2022 
                            -> 13/12/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 08/12/2026 
                        
                        
                    
                        
                        100 MW - operation - north west - National Grid Electricity Substation, Capenhurst Lane - Battery Storage - 
                        
12725
                            
                            
                        
                              Planning Authority: Cheshire West & Chester Council 
                            -> Cheshire West and Chester Council 
                        
                              Operational: 11/02/2023 
                            ->  
                        
                        
                    
                        
                        100 MW - planning - north west - Hillside Farm, Lancaster Road - Battery Storage - 
                        
12964
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/01/2023 
                            -> 28/09/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 19/09/2026 
                        
                        
                    
                        
                        99 MW - planning - yorkshire and humber - Lakeside Energy Storage Facility - 
                        
8268
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/06/2022 
                            -> 09/12/2021 
                        
                        
                    
                        
                        99 MW - planning - north east - South Thinford Lane, Thinford - Energy Storage - 
                        
10489
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/11/2022 
                            -> 28/01/2022 
                        
                        
                    
                        
                        99 MW - planning - yorkshire and humber - Neil Fox Way - Battery Storage - 
                        
11519
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 26/09/2022 
                            -> 22/09/2022 
                        
                        
                    
                        
                        99 MW - planning - south west - Linton Court Farm, Highnam - Battery storage - 
                        
13145
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/02/2023 
                            -> 08/09/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 21/08/2026 
                        
                        
                    
                        
                        95 MW - planning - yorkshire and humber - Winterton Road - Battery Energy Storage - 
                        
9608
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/01/2023 
                            -> 15/09/2021 
                        
                        
                    
                        
                        90 MW - planning - yorkshire and humber - Little Crow Solar Park - 
                        
7175
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 07/04/2022 
                        
                        
                    
                        
                        80 MW - operation - scotland - Aikengall II Community Wind Farm Battery - 
                        
7015
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 27/03/2023 
                        
                        
                    
                        
                        80 MW - construction - yorkshire and humber - Trondheim Way Battery energy storage - 
                        
8455
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/01/2022 
                            -> 13/05/2021 
                        
                        
                    
                        
                        80 MW - planning - scotland - Tealing  Battery Energy Storage Farm - 
                        
11097
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/11/2022 
                            -> 09/01/2024 
                        
                              Storage Type: Stand-alone Storage 
                            -> Co-located with RE 
                        
                              Storage Co-location REPD Ref ID:  
                            -> 14543 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 13/12/2028 
                        
                        
                    
                        
                        79 MW - construction - south east - Stony Energy Storage Facility - 
                        
7001
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 30/11/2022 
                        
                        
                    
                        
                        70 MW - planning - north west - Tontine Road - Battery Energy Storage System - 
                        
9819
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 31/01/2023 
                            -> 19/10/2021 
                        
                        
                    
                        
                        70 MW - planning - north west - Sale Golf Club, Golf Road - Battery Storage - 
                        
13731
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/04/2023 
                            -> 30/11/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 17/11/2026 
                        
                        
                    
                        
                        69 MW - planning - eastern - Thurleigh Road - Battery Energy Storage - 
                        
9651
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/06/2023 
                            -> 20/09/2021 
                        
                        
                    
                        
                        62 MW - planning - wales - Wentlooge Renewable Energy Hub - 
                        
7192
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 22/03/2019 
                        
                        
                    
                        
                        60 MW - planning - north east - Greystones Road, Grangetown - Battery Energy Storage System - 
                        
10081
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/02/2022 
                            -> 11/11/2021 
                        
                              Installed Capacity (MWelec): 360 
                            -> 60 
                        
                              Planning Authority: Redcar and Cleveland Borough Council 
                            -> Redcar & Cleveland Borough Council 
                        
                              mw: 360 
                            -> 60 
                        
                        
                    
                        
                        60 MW - planning - yorkshire and humber - Redcote Lane, Armley - Battery Storage Facility - 
                        
12224
                            
                            
                        
                              Operator (or Applicant): Leeds Power Limited 
                            -> Cambridge Power Limited 
                        
                        
                    
                        
                        60 MW - planning - south west - Blackhill Quarry, Woodbury - Battery Energy Storage Facility - 
                        
12815
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/12/2022 
                            -> 04/08/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 13/07/2026 
                        
                        
                    
                        
                        57 MW - planning - north west - Capenhurst Lane - 
                        
8283
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/07/2022 
                            -> 25/04/2023 
                        
                        
                    
                        
                        57 MW - planning - north west - National Grids Rainhill Substation Battery storage facility - 
                        
8439
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/10/2022 
                            -> 02/08/2021 
                        
                        
                    
                        
                        57 MW - planning - north east - The Carrs - Meadow Farm Energy storage facility - 
                        
9207
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/05/2023 
                            -> 26/09/2023 
                        
                              Operator (or Applicant): Meadow Farm Battery Limited 
                            -> BayWa r.e. 
                        
                              Site Name: The Carrs - Energy storage facility 
                            -> The Carrs - Meadow Farm Energy storage facility 
                        
                              Installed Capacity (MWelec): 60 
                            -> 57 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 21/09/2026 
                        
                              mw: 60 
                            -> 57 
                        
                        
                    
                        
                        57 MW - planning - south east - Ash Lane, Little London - Battery Storage - 
                        
11090
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 16/02/2023 
                            -> 27/04/2022 
                        
                        
                    
                        
                        57 MW - planning - north west - Penwortham - Battery storage - 
                        
11217
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/10/2022 
                            -> 10/05/2022 
                        
                        
                    
                        
                        57 MW - planning - north west - Sutton Manor - Battery Storage Facility - 
                        
11559
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/10/2022 
                            -> 28/06/2022 
                        
                        
                    
                        
                        57 MW - planning - eastern - Braintree Road, Cressing - Battery Storage - 
                        
11995
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/09/2022 
                            -> 11/09/2023 
                        
                              Operator (or Applicant): Pivot Power 
                            -> Pivot Power (EDF Renewables) 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 01/09/2026 
                        
                        
                    
                        
                        57 MW - planning - south east - Sellindge Substation, Church Lane - Battery Storage - 
                        
12351
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/10/2022 
                            -> 11/09/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 04/08/2026 
                        
                        
                    
                        
                        57 MW - planning - south east - Coxmoor Wood, Crondall Road - Battery Storage - 
                        
13728
                            
                            
                        
                              Planning Application Withdrawn:   
                            ->  
                        
                              Planning Permission Refused:   
                            ->  
                        
                              Appeal Lodged:   
                            ->  
                        
                              Appeal Withdrawn:   
                            ->  
                        
                              Appeal Refused:   
                            ->  
                        
                              Appeal Granted:   
                            ->  
                        
                              Secretary of State - Intervened:   
                            ->  
                        
                              Secretary of State - Refusal:   
                            ->  
                        
                              Secretary of State - Granted:   
                            ->  
                        
                              Planning Permission Expired:   
                            ->  
                        
                              Under Construction:   
                            ->  
                        
                              Operational:   
                            ->  
                        
                        
                    
                        
                        50 MW - operation - south west - Melksham Substation East Storage - 
                        
6953
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 22/11/2022 
                        
                        
                    
                        
                        50 MW - construction - northern ireland - Portadown Road - 
                        
7047
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 23/06/2020 
                        
                        
                    
                        
                        50 MW - construction - northern ireland - Dungannon Energy Storage System - 
                        
7050
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 03/03/2020 
                        
                        
                    
                        
                        50 MW - operation - scotland - Whitelee Wind Farm Battery Storage Extension - 
                        
7174
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 21/02/2022 
                        
                        
                    
                        
                        50 MW - planning - scotland - Clash Gour - 
                        
7178
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 27/10/2022 
                        
                        
                    
                        
                        50 MW - planning - wales - Garn Fach Wind Farm - 
                        
7705
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/05/2023 
                            -> 26/05/2022 
                        
                        
                    
                        
                        50 MW - operation - south west - Stonehill Energy Storage - 
                        
7773
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/11/2021 
                            -> 09/10/2021 
                        
                        
                    
                        
                        50 MW - planning - scotland - Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage - 
                        
8342
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/02/2022 
                            -> 05/02/2021 
                        
                        
                    
                        
                        50 MW - planning - south east - Upton Lane, Nursling - Battery Storage Facility - 
                        
9673
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/02/2022 
                            -> 22/09/2021 
                        
                              Operator (or Applicant): Balance Power Projects Limited 
                            -> Unknown 
                        
                        
                    
                        
                        50 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage  - 
                        
9910
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/11/2021 
                            -> 15/01/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Revised 
                        
                              Development Status (short): Application Submitted 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 15610 
                        
                        
                    
                        
                        50 MW - planning - yorkshire and humber - Barlow Road, Barlow - Battery Storage - 
                        
9970
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/11/2022 
                            -> 19/11/2021 
                        
                        
                    
                        
                        50 MW - planning - eastern - Sundon Sub Station Battery Storage Facility - 
                        
9998
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/11/2021 
                            -> 08/11/2023 
                        
                              Under Construction:  
                            -> 01/07/2023 
                        
                        
                    
                        
                        50 MW - planning - scotland - Electricity Sub Station, Strichen - Battery Storage Facility - 
                        
10039
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/03/2022 
                            -> 02/12/2021 
                        
                        
                    
                        
                        50 MW - planning - eastern - Ardleigh Road, Little Bromley - Battery Energy Storage - 
                        
10302
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 01/11/2022 
                        
                        
                    
                        
                        50 MW - planning - eastern - Newmarket Road, Bottisham -  Battery Energy Storage - 
                        
10486
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/12/2022 
                            -> 03/01/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 21/12/2026 
                        
                        
                    
                        
                        50 MW - planning - north west - Huncoat Power Station - Battery Storage - 
                        
10516
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/01/2023 
                            -> 01/02/2022 
                        
                        
                    
                        
                        50 MW - planning - west midlands - Penstone Lane, Penn 1 - Battery Storage Facility - 
                        
10705
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/10/2022 
                            -> 01/03/2022 
                        
                              County: West Midlands 
                            -> Staffordshire 
                        
                        
                    
                        
                        50 MW - planning - west midlands - Penstone Lane, Lower Penn 2 - Battery Storage - 
                        
10733
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/10/2022 
                            -> 04/03/2022 
                        
                        
                    
                        
                        50 MW - planning - scotland -  Frodo Solar and Battery Energy Development - 
                        
10994
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/06/2023 
                            -> 12/04/2022 
                        
                        
                    
                        
                        50 MW - planning - west midlands - Lowlands Farm - Battery Storage - 
                        
11399
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/01/2023 
                            -> 06/06/2022 
                        
                        
                    
                        
                        50 MW - planning - yorkshire and humber - Swangate Project - Energy Storage System - 
                        
11437
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/12/2022 
                            -> 09/06/2022 
                        
                        
                    
                        
                        50 MW - planning - eastern - Third Drove, Fengate - Battery Storage - 
                        
11558
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/06/2022 
                            -> 16/01/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 05/01/2026 
                        
                        
                    
                        
                        50 MW - planning - south west - Says Court Farm, Coalpit Heath - Battery Energy Storage - 
                        
11793
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 14/11/2022 
                            -> 04/08/2022 
                        
                        
                    
                        
                        50 MW - planning - scotland - Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility - 
                        
12780
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/12/2022 
                            -> 19/12/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 11/12/2026 
                        
                        
                    
                        
                        50 MW - planning - north east - Whelley Hill Farm, Worset Lane - Battery Energy Storage - 
                        
13246
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/02/2023 
                            -> 02/01/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Authority: Hartlepool Council 
                            -> Hartlepool Borough Council 
                        
                              Planning Permission Expired:  
                            -> 07/12/2026 
                        
                        
                    
                        
                        50 MW - planning - scotland - Fairways Business Park - Battery Storage  - 
                        
13318
                            
                            
                        
                              Planning Authority: Highlands Council 
                            -> Highland Council 
                        
                        
                    
                        
                        49 MW - operation - eastern - Pelham - 
                        
6898
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 03/01/2019 
                        
                        
                    
                        
                        49 MW - operation - north west - Roosecote - 
                        
6912
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 30/11/2018 
                        
                        
                    
                        
                        49 MW - operation - east midlands - West Burton - 
                        
6920
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 27/11/2018 
                        
                        
                    
                        
                        49 MW - planning - eastern - Tollgate Battery Storage Facility - 
                        
6949
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 23/11/2018 
                        
                        
                    
                        
                        49 MW - operation - yorkshire and humber - Pillswood Phase 1  - 
                        
7005
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 09/11/2022 
                        
                        
                    
                        
                        49 MW - cancelled - south west - Ravensroost Farm, Minety - Battery Energy Storage - 
                        
7014
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 29/06/2022 
                        
                        
                    
                        
                        49 MW - operation - yorkshire and humber - Nether Moor Field - 
                        
7019
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 27/05/2020 
                        
                        
                    
                        
                        49 MW - planning - eastern - Norwich Substation Storage Facility - 
                        
7021
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 17/09/2020 
                        
                        
                    
                        
                        49 MW - operation - south west - Mannington Battery Storage Plant - 
                        
7024
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 14/09/2022 
                        
                        
                    
                        
                        49 MW - planning - north west - Middleton Clean Energy Plant - 
                        
7029
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 26/09/2022 
                        
                              Operator (or Applicant): Lancaster Power 
                            -> Infra Balance New Energy 
                        
                        
                    
                        
                        49 MW - planning - eastern - Hilfield Farm Tech - 
                        
7030
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 26/03/2020 
                        
                        
                    
                        
                        49 MW - planning - north east - Lackenby - 
                        
7040
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 23/07/2019 
                        
                        
                    
                        
                        49 MW - construction - east midlands - Enderby Storage, Redcomb Farm - 
                        
7044
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 01/04/2021 
                        
                        
                    
                        
                        49 MW - planning - south west - Ellbridge Lane - 
                        
7051
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 23/11/2022 
                        
                        
                    
                        
                        49 MW - planning - yorkshire and humber - Elland Storage Project - 
                        
7053
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 14/11/2019 
                        
                        
                    
                        
                        49 MW - planning - eastern - Chapel Farm - 
                        
7058
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 13/06/2019 
                        
                        
                    
                        
                        49 MW - planning - south east - Lovedean Energy Storage System - 
                        
7064
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 16/05/2019 
                        
                              Judicial Review: 07/09/2018 
                            -> 43350 
                        
                        
                    
                        
                        49 MW - planning - east midlands - Cottam Power Station - 
                        
7066
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 12/08/2020 
                        
                        
                    
                        
                        49 MW - construction - south east - Sundridge Hill - 
                        
7081
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 17/03/2022 
                        
                        
                    
                        
                        49 MW - planning - yorkshire and humber - Land Adjacent to 4 Redcote Lane (Armley) - 
                        
7111
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 19/01/2022 
                        
                        
                    
                        
                        49 MW - operation - yorkshire and humber - Creyke Beck - 
                        
7122
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 28/01/2019 
                        
                        
                    
                        
                        49 MW - planning - eastern - Braintree Road Substation - 
                        
7161
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 06/09/2022 
                        
                        
                    
                        
                        49 MW - construction - south east - Halewick Lane, Sompting - Battery-based Energy Storage Facility - 
                        
7168
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 17/10/2022 
                        
                        
                    
                        
                        49 MW - construction - yorkshire and humber - Osbaldwick Substation - 
                        
7172
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 27/07/2022 
                        
                        
                    
                        
                        49 MW - operation - south west - Minety South - Battery Storage - 
                        
7184
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 21/08/2020 
                        
                        
                    
                        
                        49 MW - planning - eastern - Burwell Main Sub-Station - 
                        
7272
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 29/04/2019 
                        
                        
                    
                        
                        49 MW - planning - eastern - Sundon Substation - 
                        
7283
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 30/04/2019 
                        
                        
                    
                        
                        49 MW - construction - eastern - Tollgate Farm Battery Storage  - 
                        
7335
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 01/02/2022 
                        
                        
                    
                        
                        49 MW - operation - yorkshire and humber - Pillswood Phase 2 - 
                        
7360
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 01/11/2022 
                        
                        
                    
                        
                        49 MW - construction - south east - Kemsley Substation - 
                        
7368
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 15/11/2019 
                        
                        
                    
                        
                        49 MW - construction - scotland - Ferrymuir - 
                        
7371
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 29/07/2022 
                        
                        
                    
                        
                        49 MW - planning - north west - Harker Grid Sub Station - 
                        
7462
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 17/09/2020 
                        
                        
                    
                        
                        49 MW - construction - south west - Salisbury Substation - 
                        
7510
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 16/03/2023 
                        
                        
                    
                        
                        49 MW - construction - south east - Cowley electricity sub-station - 
                        
7571
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 17/09/2020 
                        
                        
                    
                        
                        49 MW - construction - yorkshire and humber - Bradford West Substation (Harrop Edge Farm) - 
                        
7577
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 08/07/2022 
                        
                        
                    
                        
                        49 MW - planning - south east - Rye Common - 
                        
7737
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 12/03/2020 
                        
                              Operator (or Applicant): Harmony Energy Storage 
                            -> Pulse Clean Energy 
                        
                              Are they re-applying (Old REPD Ref) :  
                            -> 7028 
                        
                        
                    
                        
                        49 MW - operation - north west - Liverpool Energy Management Facility - 
                        
7772
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/06/2023 
                            -> 01/03/2022 
                        
                        
                    
                        
                        49 MW - planning - east midlands - Newton Wood Farm - 
                        
7780
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/02/2021 
                            -> 22/03/2022 
                        
                        
                    
                        
                        49 MW - planning - north west - Welkin Mill - 
                        
7832
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/01/2023 
                            -> 12/08/2020 
                        
                        
                    
                        
                        49 MW - construction - west midlands - Coventry National Grid Substation - 
                        
7885
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/11/2022 
                            -> 25/06/2020 
                        
                        
                    
                        
                        49 MW - planning - eastern - Reach Road - 
                        
7906
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/09/2020 
                            -> 30/06/2020 
                        
                        
                    
                        
                        49 MW - operation - scotland - Dundee Technology Park - 
                        
7946
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/02/2021 
                            -> 30/09/2020 
                        
                              Operational: 21/06/2021 
                            ->  
                        
                        
                    
                        
                        49 MW - construction - north west - Unit 5 XL Business Park - 
                        
7985
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/07/2021 
                            -> 30/06/2020 
                        
                        
                    
                        
                        49 MW - planning - london - Mill Hill National Grid Substation - 
                        
8009
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/03/2023 
                            -> 27/03/2023 
                        
                        
                    
                        
                        49 MW - planning - south west - National Grid Minety Substation - 
                        
8021
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/02/2021 
                            -> 22/12/2022 
                        
                        
                    
                        
                        49 MW - planning - northern ireland - Colinglen Road Battery - 
                        
8033
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/09/2020 
                            -> 15/08/2022 
                        
                        
                    
                        
                        49 MW - construction - east midlands - National Grid Enderby Substation - 
                        
8037
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/01/2023 
                            -> 30/09/2020 
                        
                        
                    
                        
                        49 MW - planning - south west - Claydon Farm - Solar Farm & Battery Storage - 
                        
8039
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/05/2022 
                            -> 07/02/2021 
                        
                        
                    
                        
                        49 MW - construction - south west - Larks Green Solar Farm - 
                        
8052
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/06/2023 
                            -> 30/09/2020 
                        
                        
                    
                        
                        49 MW - planning - north west - Welkin Mill - 
                        
8055
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/01/2023 
                            -> 10/12/2021 
                        
                        
                    
                        
                        49 MW - planning - scotland - Torrdhuin, Auchteraw Battery Storage Facility - 
                        
8096
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/01/2021 
                            -> 04/08/2023 
                        
                        
                    
                        
                        49 MW - planning - scotland - Platchaig House, Kilmorack - Battery Storage Facility - 
                        
8248
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/08/2021 
                            -> 31/07/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Revised 
                        
                              Development Status (short): Application Submitted 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 14373 
                        
                              Planning Permission Refused:  
                            -> 30/08/2022 
                        
                        
                    
                        
                        49 MW - planning - eastern - Brentwood nergy Storage System - 
                        
8249
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/01/2021 
                            -> 08/07/2022 
                        
                        
                    
                        
                        49 MW - planning - eastern - Crouch Solar Farm - 
                        
8358
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 14/03/2022 
                            -> 11/07/2023 
                        
                              Site Name: Park Farm, Herongate Solar Photovoltaic PV Farm 
                            -> Crouch Solar Farm 
                        
                        
                    
                        
                        49 MW - planning - scotland - Old Gallows Road - Battery storage - 
                        
8368
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/04/2021 
                            -> 08/02/2021 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Authority: Perth and Kinross Council 
                            -> Perth & Kinross Council 
                        
                              Planning Permission Expired:  
                            -> 03/08/2024 
                        
                        
                    
                        
                        49 MW - planning - scotland - Shindour - Energy Storage Facility - 
                        
8464
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/11/2022 
                            -> 28/05/2021 
                        
                        
                    
                        
                        49 MW - construction - south west - Mannington Battery Energy Storage System - 
                        
8833
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/02/2023 
                            -> 26/03/2021 
                        
                        
                    
                        
                        49 MW - planning - south west - Moreton Lane - Solar Farm & Battery Storage - 
                        
8844
                            
                            
                        
                              Site Name: Whitminster - Solar Farm & Battery Storage 
                            -> Moreton Lane - Solar Farm & Battery Storage 
                        
                        
                    
                        
                        49 MW - planning - eastern - Rush Green Motors - Battery storage - 
                        
8987
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/09/2022 
                            -> 11/10/2023 
                        
                        
                    
                        
                        49 MW - planning - scotland - East Kilbride - Battery storage - 
                        
9013
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/11/2022 
                            -> 15/12/2023 
                        
                              Operator (or Applicant): Cathkin Energy Storage Limited 
                            -> Engie Regeneration Limited 
                        
                        
                    
                        
                        49 MW - planning - scotland - Newhouse Farm - Energy Storage Facility - 
                        
9047
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/02/2023 
                            -> 29/07/2022 
                        
                              Planning Authority: Perth and Kinross Council 
                            -> Perth & Kinross Council 
                        
                        
                    
                        
                        49 MW - construction - north west - Bredbury Substation - Battery Storage Facility - 
                        
9653
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/04/2023 
                            -> 20/09/2021 
                        
                        
                    
                        
                        49 MW - planning - east midlands - Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage - 
                        
9796
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/02/2023 
                            -> 13/10/2021 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 02/10/2026 
                        
                        
                    
                        
                        49 MW - planning - yorkshire and humber - Common Farm - Solar Farm & Battery Storage - 
                        
9877
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 13/07/2023 
                            -> 01/11/2021 
                        
                        
                    
                        
                        49 MW - planning - scotland - Drum Farm - Battery Energy Storage System - 
                        
9940
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/11/2022 
                            -> 17/11/2021 
                        
                        
                    
                        
                        49 MW - planning - scotland - Stainland Energy Storage Project - 
                        
10225
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 14/12/2022 
                            -> 29/12/2021 
                        
                              Planning Authority: Highlands Council 
                            -> Highland Council 
                        
                        
                    
                        
                        49 MW - planning - yorkshire and humber - Elland Storage Project - 
                        
10236
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 15304 
                        
                        
                    
                        
                        49 MW - planning - scotland - Newburgh Road, Abernethy - Battery Storage  - 
                        
10607
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/10/2022 
                            -> 11/02/2022 
                        
                              Planning Authority: Perth and Kinross Council 
                            -> Perth & Kinross Council 
                        
                        
                    
                        
                        49 MW - planning - scotland - Rothienorman - Battery Storage - 
                        
10638
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/11/2022 
                            -> 16/02/2022 
                        
                        
                    
                        
                        49 MW - planning - scotland - Midmill, Kintore - Battery Energy Storage - 
                        
10701
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/07/2022 
                            -> 01/03/2022 
                        
                        
                    
                        
                        49 MW - operation - scotland - Jamesfield Organic Centre - Battery Storage - 
                        
10863
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/01/2023 
                            -> 24/03/2022 
                        
                              Planning Authority: Perth and Kinross Council 
                            -> Perth & Kinross Council 
                        
                        
                    
                        
                        49 MW - planning - scotland - Broomloan Road -  Battery Energy Storage - 
                        
10886
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/07/2022 
                            -> 29/03/2022 
                        
                        
                    
                        
                        49 MW - planning - scotland - Law Of Doune Road, Macduff - Battery Storage - 
                        
10894
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 16/02/2023 
                            -> 07/12/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> NA 
                        
                        
                    
                        
                        49 MW - planning - north east - Hawthorn Grid Site - Battery Storage - 
                        
10896
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/12/2022 
                            -> 30/03/2022 
                        
                        
                    
                        
                        49 MW - planning - scotland - South Leylodge Farmhouse, Kintore - Battery Energy Storage System - 
                        
11092
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/05/2023 
                            -> 27/04/2022 
                        
                        
                    
                        
                        49 MW - planning - west midlands - Brown Edge - Battery Storage - 
                        
11418
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/03/2021 
                            -> 03/11/2021 
                        
                        
                    
                        
                        49 MW - planning - south east - Harrington Franklin, Richborough Energy Park - Battery Storage - 
                        
11449
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/12/2022 
                            -> 14/06/2022 
                        
                        
                    
                        
                        49 MW - planning - scotland - Well Street - Battery Storage - 
                        
11473
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/06/2023 
                            -> 31/03/2023 
                        
                        
                    
                        
                        49 MW - planning - scotland - Kellwood Road - Battery Storage - 
                        
11545
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/04/2023 
                            -> 24/06/2022 
                        
                        
                    
                        
                        49 MW - planning - scotland - Overhill Farm, Rothienorman  - Battery Energy Storage - 
                        
11590
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/03/2023 
                            -> 05/07/2022 
                        
                        
                    
                        
                        49 MW - planning - scotland - Holmston Road - Battery Storage Facility - 
                        
11679
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/07/2023 
                            -> 18/07/2022 
                        
                              Planning Application Reference: 23/00176/APPM 
                            -> 22/00505/PAN 
                        
                              Planning Permission Expired: 30/06/2023 
                            -> 30/06/2026 
                        
                        
                    
                        
                        49 MW - construction - london - Clay Tye Farm Phase 1 - Storage Facility - 
                        
11720
                            
                            
                        
                              Planning Authority: London Borough of Havering Council 
                            -> London Borough of Havering 
                        
                        
                    
                        
                        49 MW - construction - london - Clay Tye Farm Phase 2 - Storage Facility - 
                        
11721
                            
                            
                        
                              Planning Authority: London Borough of Havering Council 
                            -> London Borough of Havering 
                        
                        
                    
                        
                        49 MW - planning - scotland - Househill House, Househill -  Battery Storage - 
                        
12056
                            
                            
                        
                              Planning Authority: Highlands Council 
                            -> Highland Council 
                        
                        
                    
                        
                        49 MW - planning - scotland - Meetlaw Farm, Fordoun - Battery Energy Storage System - 
                        
12361
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/02/2023 
                            -> 04/10/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 19/09/2029 
                        
                        
                    
                        
                        49 MW - planning - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility - 
                        
12936
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/12/2022 
                            -> 13/11/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Revised 
                        
                              Development Status (short): Application Submitted 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 15230 
                        
                        
                    
                        
                        49 MW - planning - north west - Welkin Mill, Welkin Road - Battery Storage - 
                        
12982
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/01/2023 
                            -> 23/08/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 01/08/2026 
                        
                        
                    
                        
                        49 MW - planning - scotland - Drumore Cottage, Swordale - Battery Storage - 
                        
12983
                            
                            
                        
                              Planning Authority: Highlands Council 
                            -> Highland Council 
                        
                        
                    
                        
                        49 MW - planning - scotland - Middleton Of Blackhills, Rothienorman - Battery Energy Storage System - 
                        
13087
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/05/2023 
                            -> 18/09/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 07/09/2026 
                        
                        
                    
                        
                        49 MW - planning - south west - Landulph Substation, Ellbridge Lane - Battery Energy Storage - 
                        
13461
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/03/2023 
                            -> 11/09/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 05/09/2026 
                        
                        
                    
                        
                        49 MW - planning - scotland - Forest Avenue Cottage, Drumlithie - Battery Energy Storage - 
                        
13986
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 31/05/2023 
                            -> 30/11/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 14/11/2028 
                        
                        
                    
                        
                        48 MW - planning - northern ireland - Classic Marble Showers Site - 
                        
7208
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 16/04/2020 
                        
                        
                    
                        
                        47 MW - planning - south west - Indian Queens Sub-Station - Battery Storage - 
                        
11725
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/11/2022 
                            -> 25/07/2022 
                        
                        
                    
                        
                        45 MW - planning - scotland - Pleasance Road - 
                        
7217
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 08/03/2022 
                        
                              Planning Authority: Perth and Kinross Council 
                            -> Perth & Kinross Council 
                        
                        
                    
                        
                        45 MW - planning - north west - Cheshire Power Station - Battery Storage Facility - 
                        
10295
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/06/2023 
                            -> 22/12/2021 
                        
                        
                    
                        
                        45 MW - planning - north east - Edge Lane, Maiden Law - Solar Farm & Battery Storage - 
                        
11619
                            
                            
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 13/07/2026 
                        
                        
                    
                        
                        45 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage - 
                        
12711
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/04/2023 
                            -> 03/07/2023 
                        
                        
                    
                        
                        45 MW - planning - north west - Mount Pleasant Farm, Green Lane - Battery Storage - 
                        
13011
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/01/2023 
                            -> 30/10/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 03/10/2026 
                        
                        
                    
                        
                        43 MW - planning - scotland - Ballingall Farm, Leslie - Battery Energy Storage System - 
                        
10825
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/05/2023 
                            -> 18/03/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 14/09/2026 
                        
                        
                    
                        
                        43 MW - planning - scotland - Merchiston Industrial Estate, Smith Street - Battery Storage - 
                        
13225
                            
                            
                        
                              County: Central 
                            -> Falkirk 
                        
                        
                    
                        
                        42 MW - planning - scotland - South Pargillis - Battery Storage - 
                        
9564
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 14/06/2023 
                            -> 09/09/2021 
                        
                        
                    
                        
                        42 MW - planning - scotland - Armadale Wind Farm - 
                        
11219
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/05/2022 
                            -> 10/05/2022 
                        
                        
                    
                        
                        41 MW - operation - west midlands - Bloxwich Battery - 
                        
8160
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/10/2020 
                            -> 30/09/2020 
                        
                              Operational: 01/07/2019 
                            ->  
                        
                        
                    
                        
                        40 MW - planning - east midlands - Breach Farm - Energy Barn - 
                        
6914
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 27/05/2022 
                        
                        
                    
                        
                        40 MW - planning - eastern - Norwich Road Industrial Estate - 
                        
6958
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 04/11/2022 
                        
                        
                    
                        
                        40 MW - planning - east midlands - Breach Farm - 
                        
6962
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 27/05/2022 
                        
                        
                    
                        
                        40 MW - construction - south east - Land off Queenborough Road - 
                        
7003
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 12/01/2021 
                        
                        
                    
                        
                        40 MW - construction - scotland - Bilbo Solar Farm Energy Storage  - 
                        
7020
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 30/07/2020 
                        
                        
                    
                        
                        40 MW - planning - eastern - Maldon Hall - 
                        
7095
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 23/12/2021 
                        
                        
                    
                        
                        40 MW - planning - west midlands - Rubber and Allied Products - 
                        
7096
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 20/04/2020 
                        
                        
                    
                        
                        40 MW - operation - south east - Huggin's Hall - 
                        
7129
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 23/10/2018 
                        
                        
                    
                        
                        40 MW - planning - west midlands - Whitehouse Farm Energy Barn - 
                        
7987
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/05/2022 
                            -> 30/06/2020 
                        
                        
                    
                        
                        40 MW - planning - south east - Loudwater Battery Storage Site - 
                        
8142
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/12/2022 
                            -> 30/09/2020 
                        
                        
                    
                        
                        40 MW - operation - south east - Newlands Farm Battery Storage Facility Phase 2 - 
                        
8264
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/01/2021 
                            -> 18/03/2022 
                        
                        
                    
                        
                        40 MW - planning - scotland - Dalmarnock Road - Battery Storage - 
                        
8507
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/05/2022 
                            -> 09/03/2021 
                        
                        
                    
                        
                        40 MW - planning - south west - Forest Gate - Solar Farm & Battery Storage - 
                        
9230
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 14/03/2023 
                            -> 28/06/2021 
                        
                        
                    
                        
                        40 MW - planning - yorkshire and humber - Field House Solar Farm - 
                        
10970
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/07/2022 
                            -> 11/04/2022 
                        
                        
                    
                        
                        40 MW - planning - north east - Long Pasture Farm, Little Stainton - Solar Farm - 
                        
12952
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/12/2022 
                            -> 14/08/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 10/08/2030 
                        
                        
                    
                        
                        40 MW - planning - yorkshire and humber - Tofts Lane, Hunshelf - Battery Storage - 
                        
13733
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/04/2023 
                            -> 17/11/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 13/11/2028 
                        
                        
                    
                        
                        40 MW - planning - northern ireland - Doogary Road, Omagh - Battery Storage - 
                        
14125
                            
                            
                        
                              County: Fermanagh & Omagh 
                            -> Co. Fermanagh & Omagh 
                        
                        
                    
                        
                        37 MW - planning - scotland - STOR Field 9 - 
                        
7018
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 25/04/2023 
                        
                        
                    
                        
                        36 MW - planning - northern ireland - Lisnabreeny Road - 
                        
7556
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 25/06/2020 
                        
                        
                    
                        
                        36 MW - planning - south west - Kingston Road, Slimbridge - Battery Storage - 
                        
11516
                            
                            
                        
                              Development Status: Planning Application Submitted 
                            -> Revised 
                        
                              Development Status (short): Application Submitted 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 14882 
                        
                              Planning Permission Expired:  
                            -> 26/04/2026 
                        
                        
                    
                        
                        35 MW - operation - north east - Port of Tyne - 
                        
6976
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 09/05/2019 
                        
                        
                    
                        
                        35 MW - planning - yorkshire and humber - Rusholme Grange - 
                        
7093
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 16/09/2019 
                        
                        
                    
                        
                        35 MW - planning - south west - Northington Lane - Battery Storage Facility - 
                        
9992
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/05/2023 
                            -> 23/11/2021 
                        
                        
                    
                        
                        32 MW - operation - south west - Severn Road - 
                        
7085
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 13/10/2022 
                        
                        
                    
                        
                        32 MW - planning - south west - Gloucestershire Science and Technology Park (small) - 
                        
7181
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 14/03/2022 
                        
                        
                    
                        
                        32 MW - planning - yorkshire and humber - Kirkhaw Lane Battery Storage - 
                        
8430
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/02/2022 
                            -> 02/03/2021 
                        
                        
                    
                        
                        32 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage - 
                        
10145
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/03/2022 
                            -> 19/01/2022 
                        
                        
                    
                        
                        32 MW - planning - south west - Post Farm, Lytchett Minster - Battery Energy Storage - 
                        
10291
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 31/05/2023 
                            -> 24/01/2022 
                        
                        
                    
                        
                        31 MW - planning - scotland - Benthead Farm - Solar Farm & Battery Storage - 
                        
10542
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/02/2023 
                            -> 03/02/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 11/08/2028 
                        
                        
                    
                        
                        30 MW - planning - south west - Gloucestershire Science and Technology Park - 
                        
7067
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 14/03/2022 
                        
                        
                    
                        
                        30 MW - operation - south west - Fideoak Mills - 
                        
7152
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 21/09/2022 
                        
                        
                    
                        
                        30 MW - planning - south west - Catsbrain Farm - 
                        
7988
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/08/2022 
                            -> 30/06/2020 
                        
                        
                    
                        
                        30 MW - planning - scotland - Roaring Hill (Resubmission) - 
                        
7989
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/06/2020 
                            -> 24/01/2023 
                        
                              Post Code:  
                            -> KY6 3ET 
                        
                        
                    
                        
                        30 MW - planning - scotland - Blackpark Energy Storage - 
                        
8105
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/01/2021 
                            -> 12/01/2021 
                        
                              Under Construction:  
                            -> Implemented 
                        
                        
                    
                        
                        30 MW - planning - scotland - Drumcross Battery Storage - 
                        
8155
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/09/2022 
                            -> 06/12/2023 
                        
                              Post Code:  
                            -> EH54 6WF 
                        
                        
                    
                        
                        30 MW - planning - scotland - Farburn Place - Energy Storage Facility - 
                        
8385
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/12/2022 
                            -> 08/02/2021 
                        
                        
                    
                        
                        30 MW - planning - scotland - Jamesfield Organic Centre, Phase 1 - 
                        
10456
                            
                            
                        
                              Planning Authority: Perth and Kinross Council 
                            -> Perth & Kinross Council 
                        
                        
                    
                        
                        30 MW - planning - eastern - Colton - Solar photovoltaic farm, Battery storage - 
                        
10945
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/07/2022 
                            -> 05/01/2024 
                        
                        
                    
                        
                        30 MW - planning - north east - West Sleekburn - Battery Storage Compound - 
                        
10957
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/10/2022 
                            -> 06/04/2022 
                        
                        
                    
                        
                        30 MW - planning - west midlands - Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage - 
                        
10978
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/03/2023 
                            -> 11/04/2022 
                        
                        
                    
                        
                        30 MW - planning - scotland - West Bendings - Battery Storage - 
                        
10985
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/07/2023 
                            -> 11/04/2022 
                        
                        
                    
                        
                        30 MW - planning - south west - Catsbrain Farm - Battery Storage  - 
                        
11787
                            
                            
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 03/10/2026 
                        
                        
                    
                        
                        30 MW - planning - west midlands - Rectory Farm, Rectory Lane - Battery Storage - 
                        
11905
                            
                            
                        
                              Operator (or Applicant): Private Developer 
                            -> Balance Power Projects Limited 
                        
                              Installed Capacity (MWelec): 50 
                            -> 30 
                        
                              mw: 50 
                            -> 30 
                        
                        
                    
                        
                        30 MW - planning - yorkshire and humber - Back Lane, Skerne - Solar Farm & Battery Storage - 
                        
12297
                            
                            
                        
                              Under Construction:  
                            -> Implemented 
                        
                        
                    
                        
                        30 MW - planning - yorkshire and humber - North Lincolnshire Green Energy Park - 
                        
12706
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/11/2022 
                            -> 11/01/2024 
                        
                        
                    
                        
                        30 MW - planning - scotland - Bishopmill - Battery Energy Storage - 
                        
14191
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/07/2023 
                            -> 02/01/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 21/12/2026 
                        
                        
                    
                        
                        29 MW - planning - scotland - Fordtown Energy Storage  - 
                        
7764
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/06/2020 
                            -> 17/09/2020 
                        
                        
                    
                        
                        29 MW - planning - scotland - Learielaw Farm - 
                        
7970
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/03/2023 
                            -> 16/11/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 13368 
                        
                        
                    
                        
                        28 MW - construction - eastern - Lower Dunton Road Battery Storage Facility - 
                        
8213
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/02/2021 
                            -> 11/01/2022 
                        
                        
                    
                        
                        27 MW - operation - yorkshire and humber - Boscar Grange Farm - 
                        
7332
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 18/12/2019 
                        
                        
                    
                        
                        26 MW - planning - yorkshire and humber - West Melton Electricity Substation - Energy Storage System - 
                        
11436
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/09/2022 
                            -> 23/11/2023 
                        
                        
                    
                        
                        25 MW - operation - north east - Tynemouth Energy Storage System (TESS) - 
                        
6925
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 03/08/2018 
                        
                        
                    
                        
                        23 MW - operation - east midlands - Asfordby Business Park (1) - 
                        
6932
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 28/04/2020 
                        
                        
                    
                        
                        22 MW - operation - wales - Pen y Cymoedd Energy Storage - 
                        
6927
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 03/01/2019 
                        
                        
                    
                        
                        21 MW - operation - eastern - Clayhill Farm -  Battery Energy Storage - 
                        
7570
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 14/09/2022 
                        
                              Operational:  
                            -> 01/10/2019 
                        
                        
                    
                        
                        20 MW - operation - scotland - Broxburn  - 
                        
6910
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 18/04/2019 
                        
                        
                    
                        
                        20 MW - operation - west midlands - Land to the west of Clay Hill Pit / Larport Farm - 
                        
6911
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 20/01/2020 
                        
                        
                    
                        
                        20 MW - operation - west midlands - Noriker Power Staunch - 
                        
6918
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 09/05/2019 
                        
                        
                    
                        
                        20 MW - planning - wales - Traston Road - 
                        
6929
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 08/09/2023 
                        
                              Operator (or Applicant): UK Power Reserve 
                            -> Field Energy 
                        
                              Planning Permission Expired: 03/11/2021 
                            -> 27/07/2028 
                        
                        
                    
                        
                        20 MW - construction - east midlands - Chelveston Renewable Energy Park - 
                        
6941
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 27/05/2020 
                        
                        
                    
                        
                        20 MW - operation - north east - Ray Battery Storage Facility - 
                        
6943
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 27/03/2023 
                        
                        
                    
                        
                        20 MW - operation - eastern - Claredown Farm - 
                        
6945
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 26/11/2019 
                        
                        
                    
                        
                        20 MW - planning - london - Riverside Energy Park - 
                        
7036
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 06/04/2022 
                        
                        
                    
                        
                        20 MW - planning - west midlands - Perseverance Road - 
                        
7061
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 24/02/2022 
                        
                        
                    
                        
                        20 MW - operation - east midlands - Calow Green Farm - 
                        
7140
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 31/03/2023 
                        
                        
                    
                        
                        20 MW - operation - yorkshire and humber - Kirkhaw Lane - 
                        
7148
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 19/01/2022 
                        
                        
                    
                        
                        20 MW - planning - yorkshire and humber - Kirkhaw Lane - 
                        
7149
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 24/02/2022 
                        
                        
                    
                        
                        20 MW - operation - north west - Land at Carnegie Road - 
                        
7155
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 02/01/2019 
                        
                        
                    
                        
                        20 MW - planning - scotland - Blackpark Farm  - 
                        
7226
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 22/08/2019 
                        
                        
                    
                        
                        20 MW - planning - scotland - Fordtown Energy Storage - 
                        
7234
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 20/08/2019 
                        
                        
                    
                        
                        20 MW - planning - scotland - Stranoch 2 - 
                        
7306
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 24/11/2021 
                        
                        
                    
                        
                        20 MW - planning - scotland - Troston Loch Wind Farm - 
                        
7333
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 18/12/2020 
                        
                              Operator (or Applicant): EDF Renewables 
                            -> EDF Energy Renewables 
                        
                              Planning Permission Expired: 18/12/2023 
                            -> 18/12/2026 
                        
                        
                    
                        
                        20 MW - construction - south east - Plot 2B EurolinkV - 
                        
7383
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 13/12/2021 
                        
                        
                    
                        
                        20 MW - planning - scotland - Douglas West Wind Farm (extension) - 
                        
7460
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 02/07/2019 
                        
                        
                    
                        
                        20 MW - operation - north west - Lascar Works  - 
                        
7464
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 03/07/2019 
                        
                        
                    
                        
                        20 MW - planning - scotland - Hagshaw Hill - 
                        
7572
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 25/03/2020 
                        
                        
                    
                        
                        20 MW - construction - north west - Gipsy Lane - 
                        
7632
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/01/2022 
                            -> 01/07/2021 
                        
                        
                    
                        
                        20 MW - operation - south west - Feeder Road - 
                        
7663
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 13/06/2023 
                            -> 01/05/2023 
                        
                        
                    
                        
                        20 MW - planning - south east - Basing Road - 
                        
7746
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/09/2021 
                            -> 24/02/2023 
                        
                        
                    
                        
                        20 MW - construction - north west - Hawthorne Road - 
                        
7800
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/04/2023 
                            -> 30/09/2020 
                        
                        
                    
                        
                        20 MW - planning - scotland - Arecleoch Wind Farm (extension) - 
                        
7882
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/11/2021 
                            -> 20/02/2023 
                        
                        
                    
                        
                        20 MW - construction - south east - Mill Lane, Nursling - Battery Storage Facility - 
                        
8099
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/05/2023 
                            -> 02/03/2022 
                        
                        
                    
                        
                        20 MW - planning - east midlands - Vicarage Drove - Solar farm & Battery storage - 
                        
8518
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/11/2022 
                            -> 11/05/2022 
                        
                        
                    
                        
                        20 MW - planning - east midlands - Mount Road, Castle Gresley - Battery Storage Facility - 
                        
10012
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/08/2022 
                            -> 29/11/2021 
                        
                        
                    
                        
                        20 MW - planning - north west - Broadgate, Chadderton - Battery Storage Containers - 
                        
10690
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 14/06/2022 
                            -> 01/03/2022 
                        
                        
                    
                        
                        20 MW - planning - scotland - Strathruddie, Kinglassie - Solar farm - 
                        
10828
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/07/2022 
                            -> 21/03/2022 
                        
                        
                    
                        
                        20 MW - planning - east midlands - West Burton Solar Project - 
                        
10917
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/04/2023 
                            -> 01/04/2022 
                        
                        
                    
                        
                        20 MW - planning - scotland - Chleansaid Onshore Wind Farm - 
                        
10997
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/04/2022 
                            -> 09/01/2024 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 15/12/2026 
                        
                        
                    
                        
                        20 MW - planning - scotland - Grayside Wind Farm - 
                        
11113
                            
                            
                        
                              CfD Capacity (MW):  
                            -> 7 
                        
                              Turbine Capacity (MW): 7 
                            ->  
                        
                        
                    
                        
                        20 MW - construction - north west - Chadderton - Battery energy storage facility - 
                        
11160
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/06/2022 
                            -> 09/05/2022 
                        
                        
                    
                        
                        20 MW - operation - south west - Hawkers Hill Energy Park - 
                        
12293
                            
                            
                        
                              Operational: 03/10/2022 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - west midlands - Fordhouse Lane - Battery Energy Storage System - 
                        
13108
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 31/01/2023 
                            -> 11/09/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 18/08/2026 
                        
                        
                    
                        
                        20 MW - planning - north west - Peel Road, Westby With Plumptons - Battery Storage - 
                        
13300
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/02/2023 
                            -> 25/09/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 22/09/2026 
                        
                        
                    
                        
                        20 MW - planning - south west - Fair Park Solar Farm - 
                        
13761
                            
                            
                        
                              Planning Application Withdrawn:   
                            ->  
                        
                              Planning Permission Refused:   
                            ->  
                        
                              Appeal Lodged:   
                            ->  
                        
                              Appeal Withdrawn:   
                            ->  
                        
                              Appeal Refused:   
                            ->  
                        
                              Appeal Granted:   
                            ->  
                        
                              Secretary of State - Intervened:   
                            ->  
                        
                              Secretary of State - Refusal:   
                            ->  
                        
                              Secretary of State - Granted:   
                            ->  
                        
                              Planning Permission Expired:   
                            ->  
                        
                              Under Construction:   
                            ->  
                        
                              Operational:   
                            ->  
                        
                        
                    
                        
                        19 MW - planning - scotland - Land North of Thornton Road - 
                        
7131
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 29/04/2020 
                        
                        
                    
                        
                        19 MW - planning - scotland - North West Of Jameston Farm - 
                        
7133
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 27/09/2021 
                        
                        
                    
                        
                        19 MW - planning - scotland - Jamesfield Organic Centre, Phase 2 - 
                        
7315
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 07/03/2019 
                        
                              Planning Authority: Perth and Kinross Council 
                            -> Perth & Kinross Council 
                        
                        
                    
                        
                        19 MW - planning - scotland - Ochiltree - Battery Sorage - 
                        
10162
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 15312 
                        
                        
                    
                        
                        19 MW - planning - scotland - Hillcrest Cottage, Shebster - Battery Energy Storage System - 
                        
10226
                            
                            
                        
                              Planning Authority: Highlands Council 
                            -> Highland Council 
                        
                        
                    
                        
                        18 MW - construction - south east - Aurora Solar Farm - 
                        
7385
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 23/03/2023 
                        
                        
                    
                        
                        18 MW - planning - south west - Whaddon Lane, Hilperton - 
                        
9057
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/04/2022 
                            -> 29/09/2023 
                        
                              Operator (or Applicant): INRG 
                            -> British Solar Renewables 
                        
                        
                    
                        
                        16 MW - planning - east midlands - Waterswallows Road, Green Fairfield - Battery Storage Equipment - 
                        
10716
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/04/2022 
                            -> 04/03/2022 
                        
                        
                    
                        
                        16 MW - planning - wales - Little Llwyn Onn - Solar Farm & Battery Storage - 
                        
11544
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 14/03/2023 
                            -> 24/06/2022 
                        
                        
                    
                        
                        16 MW - planning - scotland - Mains Of Keithick Farm, Keithick - Battery Storage &  Solar Farm - 
                        
11623
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/04/2023 
                            -> 13/07/2022 
                        
                              Installed Capacity (MWelec): 66 
                            -> 16 
                        
                              mw: 66 
                            -> 16 
                        
                        
                    
                        
                        16 MW - planning - yorkshire and humber - J3 Business Park - Battery Storage Facility - 
                        
14054
                            
                            
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 11/07/2026 
                        
                        
                    
                        
                        15 MW - operation - south west - Lockleaze Energy Storage - 
                        
6961
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 31/01/2019 
                        
                        
                    
                        
                        15 MW - construction - south west - Holes Bay - 
                        
7688
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/04/2020 
                            -> 14/01/2020 
                        
                        
                    
                        
                        15 MW - planning - eastern - Three Bridges Solar Farm - 
                        
8220
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/04/2021 
                            -> 07/05/2021 
                        
                        
                    
                        
                        15 MW - planning - south west - Smithyard Lane - Battery Storage - 
                        
10766
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 16/02/2023 
                            -> 09/03/2022 
                        
                        
                    
                        
                        14 MW - planning - south east - Guildford Road Battery Storage Facility - 
                        
8269
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/01/2021 
                            -> 24/03/2023 
                        
                        
                    
                        
                        14 MW - planning - scotland - Hopsrig Wind Farm - 
                        
11066
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/10/2022 
                            -> 26/04/2022 
                        
                        
                    
                        
                        14 MW - planning - north west - St Michaels Road, Ditton Road - Battery Storage - 
                        
12904
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/12/2022 
                            -> 28/11/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 27/10/2026 
                        
                        
                    
                        
                        14 MW - planning - west midlands - Pershore Lane, Tibberton - Battery Energy Storage System - 
                        
13096
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/01/2023 
                            -> 31/10/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 27/10/2026 
                        
                        
                    
                        
                        13 MW - operation - south east - Bumpers Lane Solar Farm  - 
                        
6913
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 01/12/2021 
                        
                        
                    
                        
                        13 MW - planning - west midlands - Maybrook Road - Battery facility - 
                        
11008
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/08/2022 
                            -> 19/04/2022 
                        
                        
                    
                        
                        12 MW - planning - yorkshire and humber - Stor Generation Plant - Battery Storage - 
                        
8998
                            
                            
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 11/06/2024 
                        
                        
                    
                        
                        12 MW - planning - north west - Dragons Lane - Battery Storage Facility - 
                        
11701
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/12/2022 
                            -> 20/07/2022 
                        
                        
                    
                        
                        10 MW - operation - northern ireland - AES Kilroot Station Battery Storage Array - 
                        
6845
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 12/12/2018 
                        
                        
                    
                        
                        10 MW - operation - yorkshire and humber - Blackburn Meadows  - 
                        
6906
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 21/03/2019 
                        
                        
                    
                        
                        10 MW - operation - east midlands - Hill Farm - Energy Barn - 
                        
6915
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 15/03/2019 
                        
                        
                    
                        
                        10 MW - operation - south east - Kings Barn Farm - Energy Barn - 
                        
6916
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 15/03/2019 
                        
                        
                    
                        
                        10 MW - operation - east midlands - Leverton Farm - Energy Barn - 
                        
6917
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 11/12/2018 
                        
                        
                    
                        
                        10 MW - operation - eastern - Nevendon - 
                        
6926
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 28/03/2017 
                        
                        
                    
                        
                        10 MW - planning - east midlands - Manor Farm Energy Storage - 
                        
6948
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 15/12/2022 
                        
                        
                    
                        
                        10 MW - construction - eastern - Slamseys Energy Storage - 
                        
7000
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 20/01/2020 
                        
                        
                    
                        
                        10 MW - planning - south east - Stockbridge Road - 
                        
7097
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 25/02/2020 
                        
                        
                    
                        
                        10 MW - construction - south east - Land Adj Harmer Warren Quarry - 
                        
7143
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 09/12/2022 
                        
                        
                    
                        
                        10 MW - operation - north west - Cleator - 
                        
7177
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 03/01/2019 
                        
                        
                    
                        
                        10 MW - planning - south west - Old Green Farm, Alveston Battery Storage - 
                        
7182
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 03/08/2020 
                        
                        
                    
                        
                        10 MW - planning - south west - Trevol Business Park - 
                        
7404
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 23/01/2020 
                        
                        
                    
                        
                        10 MW - planning - south west - Tiddlywink Barn - 
                        
7527
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy):  
                            -> 20/12/2019 
                        
                        
                    
                        
                        10 MW - planning - scotland - East Ballochy - 
                        
7675
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/09/2020 
                            -> 15/09/2020 
                        
                              Under Construction:  
                            -> Implemented 
                        
                        
                    
                        
                        10 MW - planning - south west - Minety Substation - 
                        
7942
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/04/2022 
                            -> 30/06/2020 
                        
                        
                    
                        
                        10 MW - construction - north west - Moston Vale - 
                        
8085
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/09/2021 
                            -> 07/05/2021 
                        
                        
                    
                        
                        10 MW - construction - scotland - Dragonhall Farm, Padanaram - Battery Storage - 
                        
9066
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/03/2022 
                            -> 30/10/2023 
                        
                        
                    
                        
                        10 MW - operation - south west - South Farm Solar Park - 
                        
9361
                            
                            
                        
                              Operational: 16/12/2022 
                            ->  
                        
                        
                    
                        
                        10 MW - planning - eastern - Wissett Solar Farm, Wissett - Battery Storage - 
                        
9913
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/11/2022 
                            -> 11/11/2021 
                        
                        
                    
                        
                        10 MW - cancelled - scotland - Lethen Wind Farm  Wind Turbines and Energy Storage - 
                        
10237
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/01/2022 
                            -> 10/01/2022 
                        
                        
                    
                        
                        10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 
                        
11369
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/03/2023 
                            -> 27/05/2022 
                        
                        
                    
                        
                        10 MW - operation - south west - Cirencester Solar Farm - 
                        
12791
                            
                            
                        
                              Operational: 13/10/2022 
                            ->  
                        
                        
                    
                
 
         
     
     
    
    2023-07
    New projects (102): 
    
        
        1450 MW - planning - yorkshire and humber - Thorpe Marsh Power Station - Battery Energy Storage - 
        
12453
        
            
    
        
        1400 MW - planning - yorkshire and humber - Thorpe Marsh Power Station, Marsh Lane - Battery Energy Storage - 
        
13644
        
            
    
        
        1040 MW - planning - north west - Carrington Power Station, Manchester Road - Battery Storage - 
        
13362
        
            
    
        
        500 MW - planning - scotland - Coalburn Energy -  Battery Storage - 
        
11034
        
            
    
        
        500 MW - planning - east midlands - West Burton Power Station, North Road - Battery Storage - 
        
11928
        
            
    
        
        500 MW - planning - east midlands - Normanton Energy Reserve - Battery Storage - 
        
11988
        
            
    
        
        500 MW - planning - scotland - Eccles II Substation - Battery Energy Storage System - 
        
14058
        
            
    
        
        450 MW - planning - scotland - Haughend Farm - Alyth Battery Energy Storage System - 
        
11858
        
            
    
        
        400 MW - planning - scotland - Eccles Battery Energy Storage System - 
        
11867
        
            Megapack
        
            
    
        
        340 MW - planning - north west - Blackdyke Farm, Blackford - Battery Storage - 
        
12710
        
            
    
        
        350 MW - planning - scotland - Camsiscan Farm, Craigie - Battery Energy Storage System - 
        
12820
        
            
    
        
        300 MW - planning - east midlands - Staythorpe Road, Averham - Battery Storage - 
        
12893
        
            
    
        
        264 MW - planning - south east - Bolney Substation - Battery Storage - 
        
10843
        
            
    
        
        240 MW - planning - yorkshire and humber - Springfield Farm, Hensall - Battery Energy Storage Facility - 
        
11680
        
            
    
        
        200 MW - planning - scotland - Windyhill Battery Storage Facility - 
        
10596
        
            
    
        
        200 MW - planning - north east - Spennymoor Greener Grid Park - 
        
13576
        
            
    
        
        200 MW - planning - south west - Westerleigh Hill, Westerleigh - Battery Energy Storage Facility - 
        
13607
        
            
    
        
        200 MW - planning - south west - Earthcott Green Farm, Earthcott Green - Battery Energy Storage - 
        
13643
        
            
    
        
        200 MW - planning - west midlands - Astwood Lane, Feckenham - Battery Storage - 
        
13707
        
            
    
        
        200 MW - planning - south east - Bolney - Battery Storage - 
        
13880
        
            
    
        
        150 MW - construction - south east - Cleve Hill Solar Project - 
        
7856
        
            
    
        
        130 MW - planning - yorkshire and humber - Clough Road - Battery Energy System - 
        
14225
        
            
    
        
        120 MW - planning - south east - Kemsley Energy Park Battery Storage - 
        
13489
        
            
    
        
        120 MW - cancelled - south west - Pound Road, Hawkchurch - Battery Energy Storage System - 
        
14016
        
            
    
        
        114 MW - planning - eastern - Hickling Lane, Swainsthorpe -Battery Storage - 
        
13560
        
            
    
        
        100 MW - planning - south east - Libra Energy Stability Project  - Battery Energy Storage - 
        
12443
        
            
    
        
        100 MW - planning - eastern - Walpole Sub Station, Walpole Bank - Battery Storage - 
        
13045
        
            
    
        
        100 MW - planning - eastern - Walpole Bank - Battery Energy Storage Facility - 
        
13639
        
            
    
        
        99 MW - planning - south west - Linton Court Farm, Highnam - Battery storage - 
        
13145
        
            
    
        
        99 MW - planning - south west - Lower Larks Farm - Battery storage - 
        
14076
        
            
    
        
        90 MW - cancelled - north west - Golf Road - Battery Energy Storage - 
        
13459
        
            
    
        
        75 MW - planning - northern ireland - Quarterland Road, Islandmagee - Battery Storage - 
        
14117
        
            
    
        
        70 MW - planning - north west - Tontine Road - Battery Energy Storage System - 
        
9819
        
            
    
        
        70 MW - planning - north west - Sale Golf Club, Golf Road - Battery Storage - 
        
13731
        
            
    
        
        69 MW - planning - eastern - Thurleigh Road - Battery Energy Storage - 
        
9651
        
            
    
        
        69 MW - planning - scotland - Middleton Road - Linwood Battery Energy Storage System - 
        
11868
        
            
    
        
        57 MW - planning - north east - The Carrs - Meadow Farm Energy storage facility - 
        
9207
        
            
    
        
        60 MW - cancelled - south west - Coldharbour, Chickerell - Battery Storage Facility - 
        
12967
        
            
    
        
        57 MW - cancelled - west midlands - Beechwood Farm, Hodgetts Lane - Battery Storage - 
        
13297
        
            
    
        
        57 MW - planning - south east - Coxmoor Wood, Crondall Road - Battery Storage - 
        
13728
        
            
    
        
        50 MW - planning - wales - Garn Fach Wind Farm - 
        
7705
        
            
    
        
        50 MW - planning - north west - Huncoat Power Station - Battery Storage - 
        
10516
        
            
    
        
        50 MW - planning - scotland - Clashindarroch Wind Farm Extension - 
        
13117
        
            
    
        
        50 MW - planning - scotland - Quantans Hill Wind Farm - 
        
13238
        
            
    
        
        50 MW - planning - north east - Whelley Hill Farm, Worset Lane - Battery Energy Storage - 
        
13246
        
            
    
        
        50 MW - planning - scotland - Fairways Business Park - Battery Storage  - 
        
13318
        
            
    
        
        50 MW - cancelled - west midlands - Levedale Road, Levedale - Battery Energy Storage - 
        
13615
        
            
    
        
        49 MW - planning - london - Mill Hill National Grid Substation - 
        
8009
        
            
    
        
        49 MW - construction - south west - Larks Green Solar Farm - 
        
8052
        
            
    
        
        49 MW - planning - east midlands - Fair Oaks Renewable Energy Park - Solar farm & Battery energy storage - 
        
9796
        
            
    
        
        49 MW - planning - yorkshire and humber - Common Farm - Solar Farm & Battery Storage - 
        
9877
        
            
    
        
        49 MW - planning - scotland - Law Of Doune Road, Macduff - Battery Storage - 
        
10894
        
            
    
        
        49 MW - planning - north east - Hawthorn Grid Site - Battery Storage - 
        
10896
        
            
    
        
        49 MW - planning - scotland - Well Street - Battery Storage - 
        
11473
        
            
    
        
        49 MW - planning - scotland - Kellwood Road - Battery Storage - 
        
11545
        
            
    
        
        49 MW - planning - scotland - Holmston Road - Battery Storage Facility - 
        
11679
        
            
    
        
        49 MW - planning - scotland - Meetlaw Farm, Fordoun - Battery Energy Storage System - 
        
12361
        
            
    
        
        49 MW - planning - scotland - Drumore Cottage, Swordale - Battery Storage - 
        
12983
        
            
    
        
        49 MW - planning - scotland - Middleton Of Blackhills, Rothienorman - Battery Energy Storage System - 
        
13087
        
            
    
        
        49 MW - planning - scotland - Shindour, Feddal Hill Wood - Battery Energy Storage Facility - 
        
13236
        
            
    
        
        49 MW - planning - west midlands - Lichfield Road, Watton Lane - Battery Storage - 
        
13369
        
            
    
        
        49 MW - planning - south west - Landulph Substation, Ellbridge Lane - Battery Energy Storage - 
        
13461
        
            
    
        
        49 MW - planning - west midlands - Peterstow Gas Compressor Station, Hentland - Energy Storage System - 
        
13976
        
            
    
        
        49 MW - planning - scotland - Forest Avenue Cottage, Drumlithie - Battery Energy Storage - 
        
13986
        
            
    
        
        45 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage - 
        
12711
        
            
    
        
        45 MW - planning - scotland - Bloch Wind Farm & Battery Storage (Solway Bank Extension) - 
        
12760
        
            
    
        
        45 MW - planning - north west - Huncoat Power Station - Battery Storage Facility - 
        
13080
        
            
    
        
        43 MW - planning - scotland - Ballingall Farm, Leslie - Battery Energy Storage System - 
        
10825
        
            
    
        
        43 MW - planning - scotland - Merchiston Industrial Estate, Smith Street - Battery Storage - 
        
13225
        
            
    
        
        42 MW - planning - scotland - South Pargillis - Battery Storage - 
        
9564
        
            
    
        
        42 MW - planning - scotland - Melvich Bay - Melvich Wind Energy Hub - 
        
13826
        
            
    
        
        40 MW - planning - west midlands - Hollydale, Buildwas Road - Battery Storage - 
        
13410
        
            
    
        
        40 MW - planning - yorkshire and humber - Tofts Lane, Hunshelf - Battery Storage - 
        
13733
        
            
    
        
        40 MW - planning - yorkshire and humber - Claire Court, Rawmarsh Road - Battery Energy Storage Facility - 
        
13774
        
            
    
        
        40 MW - planning - northern ireland - Doogary Road, Omagh - Battery Storage - 
        
14125
        
            
    
        
        35 MW - planning - south west - Northington Lane - Battery Storage Facility - 
        
9992
        
            
    
        
        33 MW - construction - yorkshire and humber - Wormald Green - Battery Energy Storage System - 
        
10893
        
            
    
        
        32 MW - planning - south west - Post Farm, Lytchett Minster - Battery Energy Storage - 
        
10291
        
            
    
        
        31 MW - planning - scotland - Benthead Farm - Solar Farm & Battery Storage - 
        
10542
        
            
    
        
        30 MW - planning - west midlands - Lower Farm, Drointon Lane - Solar farm & Battery Energy Storage - 
        
13550
        
            
    
        
        30 MW - planning - east midlands - Marsh Lane, Gowhole - Energy Storage System - 
        
13982
        
            
    
        
        30 MW - planning - scotland - Abhainn Dubh Wind Farm - 
        
14039
        
            
    
        
        30 MW - planning - scotland - Bishopmill - Battery Energy Storage - 
        
14191
        
            
    
        
        30 MW - planning - south west - Frome Power, Styles Close - Energy Storage Facility - 
        
14227
        
            
    
        
        25 MW - planning - scotland - Earraghail Renewable Energy Development - 
        
10712
        
            
    
        
        20 MW - planning - east midlands - West Burton Solar Project - 
        
10917
        
            
    
        
        20 MW - planning - west midlands - Fordhouse Lane - Battery Energy Storage System - 
        
13108
        
            
    
        
        20 MW - planning - north west - Peel Road, Westby With Plumptons - Battery Storage - 
        
13300
        
            
    
        
        20 MW - planning - yorkshire and humber - Froghall Farm, Wyton Road - Solar Farm & Battery Energy Storage - 
        
13655
        
            
    
        
        20 MW - construction - north west - Welkin Road, Bredbury - Battery Storage System - 
        
13740
        
            
    
        
        20 MW - planning - south west - Fair Park Solar Farm - 
        
13761
        
            
    
        
        20 MW - planning - south west - Larks Lane, Iron Acton - Battery Storage Facility - 
        
14091
        
            
    
        
        16 MW - planning - yorkshire and humber - J3 Business Park - Battery Storage Facility - 
        
14054
        
            
    
        
        15 MW - planning - south west - Smithyard Lane - Battery Storage - 
        
10766
        
            
    
        
        15 MW - planning - scotland - Newburgh Road, Abernethy - Energy Storage - 
        
13111
        
            
    
        
        15 MW - planning - south east - Ash Farm, Titchfield Lane - Battery Storage - 
        
14145
        
            
    
        
        14 MW - planning - west midlands - Pershore Lane, Tibberton - Battery Energy Storage System - 
        
13096
        
            
    
        
        13 MW - planning - west midlands - Hollins Lane - Battery Energy Storage - 
        
13144
        
            
    
        
        12 MW - cancelled - yorkshire and humber - Windmill Farm Solar Farm  - 
        
8348
        
            
    
        
        12 MW - planning - north east - Highfield Energy Park - 
        
12312
        
            
    
        
        10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 
        
11369
        
            
    
        
        10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 
        
13480
        
            
    
    
    
    Disappeared projects (22): 
    
        
        200 MW - cancelled - south east - Bolney Substation - Battery Storage - 
        
8986    
    
        
        200 MW - cancelled - east midlands - Staythorpe Road - Battery energy storage - 
        
11321    
    
        
        130 MW - cancelled - east midlands - Southfields Farm, Common Lane - Battery Storage - 
        
12698    
    
        
        120 MW - cancelled - south west - Pound Road, Hawkchurch - Battery Energy Storage - 
        
12360    
    
        
        100 MW - cancelled - east midlands - Gotham - Battery Energy storage - 
        
10986    
    
        
        80 MW - planning - yorkshire and humber - Barlow Road, Barlow Road - Battery Storage - 
        
12734    
    
        
        57 MW - cancelled - south east - Slough Road - Battery Storage - 
        
9774    
    
        
        50 MW - cancelled - eastern - High Road, Saddlebow - Battery Storage - 
        
11648    
    
        
        50 MW - planning - south east - Derehams Farm, Derehams Lane - Battery Storage - 
        
12649    
    
        
        49 MW - cancelled - south west - Land North of Actrees Solar Farm - 
        
7230    
    
        
        49 MW - cancelled - south west - Snarlton Farm - 
        
7380    
    
        
        49 MW - cancelled - north east - Lackenby - 
        
7518    
    
        
        49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility - 
        
10955    
    
        
        40 MW - cancelled - north west - Carnegie Road (Phase 2) - 
        
7403    
    
        
        38 MW - cancelled - scotland - Sheirdrim Renewable Energy Development - Battery - 
        
7585    
    
        
        26 MW - cancelled - east midlands - Manor Farm - 
        
7820    
    
        
        20 MW - cancelled - south east - Brook Farm - 
        
7498    
    
        
        20 MW - cancelled - scotland - Ardoch Farm - 
        
7575    
    
        
        18 MW - cancelled - south west - Churchtown Solar Farm Battery Storage - 
        
7726    
    
        
        13 MW - cancelled - south west - Leechpool Farm, Norrington Battery Storage - 
        
7183    
    
        
        10 MW - cancelled - yorkshire and humber - South Kirkby Business Park - 
        
7109    
    
        
        10 MW - cancelled - south west - Park Farm - 
        
7983    
    
    
    
    Updated projects (209):
    
    
    
        
            
            
                
                    
                        
                        300 MW - construction - scotland - Blackhillock Electricity Substation - Battery Energy Storage System - 
                        
9723
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/11/2022 
                            -> 20/02/2023 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/02/2023 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        100 MW - operation - north west - National Grid Electricity Substation, Capenhurst Lane - Battery Storage - 
                        
12725
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/11/2022 
                            -> 14/02/2023 
                        
                              Development Status: Under Construction 
                            -> Operational 
                        
                              Development Status (short): Under Construction 
                            -> Operational 
                        
                              Planning Permission Expired: 01/02/2024 
                            -> 01/06/2021 
                        
                              Under Construction: 01/06/2021 
                            ->  
                        
                              Operational:  
                            -> 11/02/2023 
                        
                              status: construction 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        80 MW - operation - scotland - Aikengall II Community Wind Farm Battery - 
                        
7015
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/08/2020 
                            ->  
                        
                              Turbine Capacity (MW): 4.2 
                            ->  
                        
                              No. of Turbines: 19 
                            ->  
                        
                              Height of Turbines (m): 145 
                            ->  
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              Under Construction:  
                            -> 01/12/2020 
                        
                              Operational:  
                            -> 01/06/2021 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        57 MW - construction - eastern - Bramford Substation - 
                        
7479
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/09/2020 
                            -> 23/05/2023 
                        
                              Installed Capacity (MWelec): 49.9 
                            -> 57 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/06/2023 
                        
                              status: planning 
                            -> construction ποΈ
                        
                              mw: 49 
                            -> 57 
                        
                        
                    
                        
                        49 MW - construction - south east - Halewick Lane, Sompting - Battery-based Energy Storage Facility - 
                        
7168
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/10/2022 
                            ->  
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - construction - south west - Salisbury Substation - 
                        
7510
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/07/2022 
                            ->  
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/09/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - operation - scotland - Dunsinane Industrial Estate - 
                        
7591
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/06/2020 
                            -> 16/05/2023 
                        
                              Operator (or Applicant): Gigabox Developments 
                            -> JLEN Environmental Assets Group 
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              Planning Permission Expired: 27/03/2023 
                            -> 08/12/2023 
                        
                              Operational:  
                            -> 03/05/2023 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        49 MW - operation - north west - Liverpool Energy Management Facility - 
                        
7772
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/09/2020 
                            -> 22/06/2023 
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              Under Construction:  
                            -> 01/10/2021 
                        
                              Operational:  
                            -> 01/03/2022 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        49 MW - construction - east midlands - National Grid Enderby Substation - 
                        
8037
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 26/09/2022 
                            -> 25/01/2023 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/01/2023 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - operation - south east - Richborough Energy Park - 
                        
8195
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/12/2021 
                            -> 19/04/2023 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/03/2023 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - construction - south west - Mannington Battery Energy Storage System - 
                        
8833
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 26/03/2021 
                            -> 01/02/2023 
                        
                              Operator (or Applicant): Mannington Energy Centre Limited 
                            -> EDF Energy Renewables 
                        
                              Site Name: Holt Road - Battery Energy Storage System 
                            -> Mannington Battery Energy Storage System 
                        
                              Development Status: Planning Application Submitted 
                            -> Under Construction 
                        
                              Development Status (short): Application Submitted 
                            -> Under Construction 
                        
                              Planning Permission Granted:  
                            -> 18/06/2021 
                        
                              Planning Permission Expired:  
                            -> 18/06/2024 
                        
                              Under Construction:  
                            -> 01/10/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - construction - north west - Bredbury Substation - Battery Storage Facility - 
                        
9653
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/09/2021 
                            -> 11/04/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Under Construction 
                        
                              Development Status (short): Application Submitted 
                            -> Under Construction 
                        
                              Planning Permission Granted:  
                            -> 28/02/2023 
                        
                              Planning Permission Expired:  
                            -> NA 
                        
                              Under Construction:  
                            -> 01/03/2023 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - planning - yorkshire and humber - Elland Storage Project - 
                        
10236
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/08/2022 
                            -> 20/02/2023 
                        
                              Development Status: Under Construction 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Under Construction 
                            -> Awaiting Construction 
                        
                              Under Construction: 01/08/2022 
                            ->  
                        
                              status: construction 
                            -> planning 
                        
                        
                    
                        
                        20 MW - operation - north east - Ray Battery Storage Facility - 
                        
6943
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/09/2020 
                            ->  
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              Under Construction:  
                            -> 01/07/2022 
                        
                              Operational:  
                            -> 01/10/2022 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        20 MW - operation - east midlands - Calow Green Farm - 
                        
7140
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/02/2020 
                            ->  
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              Under Construction:  
                            -> 01/04/2019 
                        
                              Operational:  
                            -> 01/10/2019 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        20 MW - operation - south west - Feeder Road - 
                        
7663
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/05/2022 
                            -> 13/06/2023 
                        
                              Development Status: Planning Permission Granted 
                            -> Finished 
                        
                              Development Status (short): Awaiting Construction 
                            -> Finished 
                        
                              Under Construction:  
                            -> 01/01/2023 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        20 MW - construction - north west - Hawthorne Road - 
                        
7800
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/06/2020 
                            -> 19/04/2023 
                        
                              Operator (or Applicant): Shaw Energy 
                            -> Bluefield Renewable Developments 
                        
                              Installed Capacity (MWelec): 40 
                            -> 20 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 17/02/2023 
                        
                              status: planning 
                            -> construction ποΈ
                        
                              mw: 40 
                            -> 20 
                        
                        
                    
                        
                        20 MW - construction - south east - Mill Lane, Nursling - Battery Storage Facility - 
                        
8099
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/09/2020 
                            -> 22/05/2023 
                        
                              Site Name: SHB Hire Ltd 
                            -> Mill Lane, Nursling - Battery Storage Facility 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/01/2023 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        18 MW - construction - south east - Aurora Solar Farm - 
                        
7385
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/06/2020 
                            ->  
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 26/04/2021 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        10 MW - construction - scotland - Dragonhall Farm, Padanaram - Battery Storage - 
                        
9066
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/05/2021 
                            -> 02/03/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Under Construction 
                        
                              Development Status (short): Application Submitted 
                            -> Under Construction 
                        
                              Planning Permission Granted:  
                            -> 02/12/2021 
                        
                              Under Construction:  
                            -> 01/06/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                
 
         
     
    
    
    
    
    
    
        
            
            
                
                    
                        
                        550 MW - planning - east midlands - Spalding Energy Park - Battery Storage - 
                        
10173
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/12/2021 
                            -> 12/07/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 14/06/2023 
                        
                              Planning Permission Expired:  
                            -> 14/06/2028 
                        
                        
                    
                        
                        500 MW - planning - yorkshire and humber - Eggborough Power Station, Selby Road - Battery Storage - 
                        
12483
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 31/10/2022 
                            -> 24/01/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 17/01/2023 
                        
                              Planning Permission Expired:  
                            -> 17/01/2026 
                        
                        
                    
                        
                        450 MW - planning - eastern - Gateway Energy Centre - Battery Energy Storage - 
                        
10309
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/12/2021 
                            -> 30/01/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 13/01/2023 
                        
                              Planning Permission Expired:  
                            -> 13/01/2028 
                        
                        
                    
                        
                        60 MW - planning - north east - Greystones Road, Grangetown - Battery Energy Storage System - 
                        
10081
                            
                            
                        
                              Planning Permission Expired:  
                            -> PD 
                        
                        
                    
                        
                        249 MW - planning - south east - Richborough Energy Park - Phase 3 (Sheaf) - 
                        
11201
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/05/2022 
                            -> 22/05/2023 
                        
                              Operator (or Applicant): Sheaf Energy Limited 
                            -> Pacific Green 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 22/09/2022 
                        
                              Planning Permission Expired:  
                            -> 22/09/2025 
                        
                        
                    
                        
                        200 MW - planning - yorkshire and humber - Drax Re-Power - 
                        
7017
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/01/2020 
                            ->  
                        
                              Planning Permission Expired:  
                            -> NA 
                        
                        
                    
                        
                        200 MW - planning - north east - Worset Lane - Battery Energy Storage System - 
                        
11406
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/08/2022 
                            -> 01/02/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 18/01/2023 
                        
                              Planning Permission Expired:  
                            -> 18/01/2026 
                        
                        
                    
                        
                        150 MW - construction - north west - Fiddlers Ferry Power Station - Battery storage - 
                        
9404
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/08/2022 
                            -> 06/07/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 20/06/2023 
                        
                              Planning Permission Expired:  
                            -> 20/06/2026 
                        
                        
                    
                        
                        150 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy - 
                        
10022
                            
                            
                        
                              Planning Permission Expired:  
                            -> PD 
                        
                        
                    
                        
                        150 MW - planning - south west - Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility - 
                        
11612
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/10/2022 
                            -> 23/01/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 06/01/2023 
                        
                              Planning Permission Expired:  
                            -> 06/01/2026 
                        
                        
                    
                        
                        100 MW - planning - scotland - Harestanes Windfarm - 
                        
7395
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/06/2020 
                            ->  
                        
                        
                    
                        
                        100 MW - planning - south east - Minchens Lane Battery Storage Facility - 
                        
8434
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/03/2021 
                            -> 03/02/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Appeal Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Authority: Basingstoke and Deane Borough Council 
                            -> Basingstoke & Deane Borough Council 
                        
                              Planning Permission Refused:  
                            -> 08/10/2021 
                        
                              Appeal Granted:  
                            -> 26/01/2023 
                        
                              Planning Permission Granted:  
                            -> 26/01/2023 
                        
                              Planning Permission Expired:  
                            -> 26/01/2026 
                        
                        
                    
                        
                        100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage - 
                        
9691
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/10/2022 
                            -> 06/03/2023 
                        
                        
                    
                        
                        100 MW - planning - eastern - North Walpole, St Peter - Battery Energy Storage - 
                        
9762
                            
                            
                        
                              Planning Authority: King's Lynn and West Norfolk Borough Council 
                            -> Borough Council of King's Lynn & West Norfolk 
                        
                        
                    
                        
                        100 MW - planning - south east - Penn Croft Farm, Crondall - Battery Energy Storage Facility - 
                        
10163
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/12/2021 
                            -> 06/02/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 30/01/2023 
                        
                              Planning Permission Expired:  
                            -> 30/01/2026 
                        
                        
                    
                        
                        100 MW - construction - eastern - Bullen Lane - Battery Storage - 
                        
10311
                            
                            
                        
                              Planning Authority: Babergh and Mid Suffolk District Council 
                            -> Babergh & Mid Suffolk District Councils 
                        
                        
                    
                        
                        100 MW - planning - south west - Shaftesbury Energy Park - Battery Storage System - 
                        
10626
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/11/2022 
                            -> 31/03/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 29/03/2023 
                        
                              Planning Permission Expired:  
                            -> 29/03/2035 
                        
                        
                    
                        
                        100 MW - planning - eastern - Walpole St Andrew - Battery storage  - 
                        
10876
                            
                            
                        
                              Planning Authority: King's Lynn and West Norfolk Borough Council 
                            -> Borough Council of King's Lynn & West Norfolk 
                        
                        
                    
                        
                        100 MW - planning - eastern - Walpole Sub Station, Walpole Bank - Battery Storage - 
                        
12683
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/11/2022 
                            -> 12/07/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Authority: Kings Lynn and West Norfolk Council 
                            -> Borough Council of King's Lynn & West Norfolk 
                        
                              Planning Permission Granted:  
                            -> 04/07/2023 
                        
                              Planning Permission Expired:  
                            -> 04/07/2026 
                        
                        
                    
                        
                        100 MW - planning - north east - Newburn Bridge Road - Battery Storage Facility - 
                        
12729
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/11/2022 
                            -> 13/02/2023 
                        
                              Operator (or Applicant): Aura Power Storage Solutions 
                            -> The Renewables Infrastructure Group Limited 
                        
                        
                    
                        
                        100 MW - planning - yorkshire and humber - Bradford West, Harrop Lane, Wilsden - Battery Storage - 
                        
12909
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/12/2022 
                            -> 25/05/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Authority: Bradford City of 
                            -> Bradford Metropolitan District Council 
                        
                              Planning Permission Granted:  
                            -> 15/05/2023 
                        
                              Planning Permission Expired:  
                            -> 15/05/2026 
                        
                        
                    
                        
                        99 MW - operation - eastern - Dollymans Storage - 
                        
7088
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/05/2021 
                            ->  
                        
                        
                    
                        
                        99 MW - planning - yorkshire and humber - Scawby Brook, Brigg - Battery Storage - 
                        
9848
                            
                            
                        
                              Planning Permission Expired:  
                            -> PD 
                        
                        
                    
                        
                        99 MW - planning - north west - Freshfields, Fairy Lane - Battery Storage - 
                        
12694
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/11/2022 
                            -> 12/04/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 20/03/2023 
                        
                              Planning Permission Expired:  
                            -> 20/03/2026 
                        
                        
                    
                        
                        95 MW - planning - yorkshire and humber - Winterton Road - Battery Energy Storage - 
                        
9608
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/09/2021 
                            -> 25/01/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 16/12/2022 
                        
                              Planning Permission Expired:  
                            -> 16/12/2025 
                        
                        
                    
                        
                        90 MW - planning - yorkshire and humber - Little Crow Solar Park - 
                        
7175
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/04/2022 
                            ->  
                        
                        
                    
                        
                        85 MW - planning - yorkshire and humber - Green Lane, Thurcroft - Battery Energy Storage Facility - 
                        
12789
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/12/2022 
                            -> 30/05/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 12/05/2023 
                        
                              Planning Permission Expired:  
                            -> 12/05/2026 
                        
                        
                    
                        
                        79 MW - construction - south east - Stony Energy Storage Facility - 
                        
7001
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/11/2022 
                            ->  
                        
                        
                    
                        
                        16 MW - planning - scotland - Mains Of Keithick Farm, Keithick - Battery Storage &  Solar Farm - 
                        
11623
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/10/2022 
                            -> 06/04/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 21/03/2023 
                        
                              Planning Permission Expired:  
                            -> NA 
                        
                        
                    
                        
                        62 MW - planning - wales - Wentlooge Renewable Energy Hub - 
                        
7192
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/03/2019 
                            ->  
                        
                        
                    
                        
                        60 MW - planning - yorkshire and humber - Redcote Lane, Armley - Battery Storage Facility - 
                        
12224
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/10/2022 
                            -> 26/05/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 18/05/2023 
                        
                              Planning Permission Expired:  
                            -> 18/05/2026 
                        
                        
                    
                        
                        57 MW - planning - south east - Ash Lane, Little London - Battery Storage - 
                        
11090
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/07/2022 
                            -> 16/02/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Authority: Basingstoke and Deane Council 
                            -> Basingstoke & Deane Borough Council 
                        
                              Planning Permission Granted:  
                            -> 09/02/2023 
                        
                              Planning Permission Expired:  
                            -> NA 
                        
                        
                    
                        
                        57 MW - planning - south east - Sellindge Substation, Church Lane - Battery Storage - 
                        
12351
                            
                            
                        
                              Planning Authority: Ashford Council 
                            -> Ashford Borough Council 
                        
                        
                    
                        
                        50 MW - operation - south west - Melksham Substation East Storage - 
                        
6953
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/11/2022 
                            ->  
                        
                        
                    
                        
                        50 MW - construction - northern ireland - Portadown Road - 
                        
7047
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/06/2020 
                            ->  
                        
                        
                    
                        
                        50 MW - construction - northern ireland - Dungannon Energy Storage System - 
                        
7050
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/03/2020 
                            ->  
                        
                        
                    
                        
                        50 MW - operation - scotland - Whitelee Wind Farm Battery Storage Extension - 
                        
7174
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/02/2022 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - scotland - Clash Gour - 
                        
7178
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/10/2022 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage  - 
                        
9910
                            
                            
                        
                              Planning Authority: City of Cardiff Council 
                            -> Cardiff Council 
                        
                        
                    
                        
                        50 MW - planning - eastern - Ardleigh Road, Little Bromley - Battery Energy Storage - 
                        
10302
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/11/2022 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - scotland -  Frodo Solar and Battery Energy Development - 
                        
10994
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/04/2022 
                            -> 07/06/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 16/05/2023 
                        
                              Planning Permission Expired:  
                            -> 16/05/2028 
                        
                        
                    
                        
                        50 MW - planning - yorkshire and humber - Swangate Project - Energy Storage System - 
                        
11437
                            
                            
                        
                              Planning Permission Expired: 22/09/2020 
                            -> NA 
                        
                              Under Construction:  
                            -> Implemented 
                        
                        
                    
                        
                        30 MW - planning - west midlands - Rectory Farm, Rectory Lane - Battery Storage - 
                        
11905
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/11/2022 
                            -> 02/03/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 20/02/2023 
                        
                              Planning Permission Expired:  
                            -> 20/02/2026 
                        
                        
                    
                        
                        50 MW - planning - north west - Lancaster Power Extension, Middleton Road - Energy Storage Facility - 
                        
12125
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/09/2022 
                            -> 23/06/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 17/05/2023 
                        
                              Planning Permission Expired:  
                            -> 17/05/2026 
                        
                        
                    
                        
                        50 MW - planning - scotland - Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage - 
                        
12303
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/10/2022 
                            -> 09/02/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 30/01/2023 
                        
                              Planning Permission Expired:  
                            -> 30/01/2026 
                        
                        
                    
                        
                        50 MW - construction - eastern - Norwich Road Industrial Estate - 
                        
12529
                            
                            
                        
                              Planning Permission Expired: 26/03/2024 
                            -> 01/04/2022 
                        
                              Under Construction: 01/04/2022 
                            ->  
                        
                        
                    
                        
                        50 MW - planning - scotland - Eccles Substation, Eccles - Battery Energy Storage System - 
                        
13003
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/01/2023 
                            -> 30/06/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 15/06/2023 
                        
                              Planning Permission Expired:  
                            -> 15/06/2028 
                        
                        
                    
                        
                        49 MW - operation - eastern - Pelham - 
                        
6898
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/01/2019 
                            ->  
                        
                        
                    
                        
                        49 MW - operation - north west - Roosecote - 
                        
6912
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/11/2018 
                            ->  
                        
                        
                    
                        
                        49 MW - operation - east midlands - West Burton - 
                        
6920
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/11/2018 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - eastern - Tollgate Battery Storage Facility - 
                        
6949
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/11/2018 
                            ->  
                        
                        
                    
                        
                        49 MW - operation - yorkshire and humber - Pillswood Phase 1  - 
                        
7005
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/11/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - cancelled - south west - Ravensroost Farm, Minety - Battery Energy Storage - 
                        
7014
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/06/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - operation - yorkshire and humber - Nether Moor Field - 
                        
7019
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/05/2020 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - eastern - Norwich Substation Storage Facility - 
                        
7021
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/09/2020 
                            ->  
                        
                        
                    
                        
                        49 MW - operation - south west - Mannington Battery Storage Plant - 
                        
7024
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 14/09/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - north west - Middleton Clean Energy Plant - 
                        
7029
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 26/09/2022 
                            ->  
                        
                              Under Construction:  
                            -> Implemented 
                        
                        
                    
                        
                        49 MW - planning - eastern - Hilfield Farm Tech - 
                        
7030
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 26/03/2020 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - north east - Lackenby - 
                        
7040
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/07/2019 
                            ->  
                        
                        
                    
                        
                        49 MW - construction - east midlands - Enderby Storage, Redcomb Farm - 
                        
7044
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/08/2020 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - south west - Ellbridge Lane - 
                        
7051
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/11/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - yorkshire and humber - Elland Storage Project - 
                        
7053
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 14/11/2019 
                            ->  
                        
                              Planning Permission Expired:  
                            -> PD 
                        
                        
                    
                        
                        49 MW - planning - eastern - Chapel Farm - 
                        
7058
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 13/06/2019 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - south east - Lovedean Energy Storage System - 
                        
7064
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 16/05/2019 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - east midlands - Cottam Power Station - 
                        
7066
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/08/2020 
                            ->  
                        
                              Planning Permission Expired:  
                            -> PD 
                        
                        
                    
                        
                        49 MW - construction - south east - Sundridge Hill - 
                        
7081
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/03/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - yorkshire and humber - Land Adjacent to 4 Redcote Lane (Armley) - 
                        
7111
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/01/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - operation - yorkshire and humber - Creyke Beck - 
                        
7122
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/01/2019 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - eastern - Braintree Road Substation - 
                        
7161
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/09/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - construction - yorkshire and humber - Osbaldwick Substation - 
                        
7172
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/07/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - operation - south west - Minety South - Battery Storage - 
                        
7184
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/08/2020 
                            ->  
                        
                        
                    
                        
                        49 MW - operation - north west - West Didsbury Battery Storage - 
                        
7185
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/08/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - eastern - Burwell Main Sub-Station - 
                        
7272
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/09/2020 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - eastern - Sundon Substation - 
                        
7283
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/09/2020 
                            ->  
                        
                        
                    
                        
                        49 MW - construction - eastern - Tollgate Farm Battery Storage  - 
                        
7335
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/02/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - operation - yorkshire and humber - Pillswood Phase 2 - 
                        
7360
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/11/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - construction - south east - Kemsley Substation - 
                        
7368
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/09/2020 
                            ->  
                        
                        
                    
                        
                        49 MW - construction - scotland - Ferrymuir - 
                        
7371
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/09/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - north west - Harker Grid Sub Station - 
                        
7462
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/09/2020 
                            ->  
                        
                        
                    
                        
                        49 MW - construction - south east - Cowley electricity sub-station - 
                        
7571
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/09/2020 
                            ->  
                        
                        
                    
                        
                        49 MW - construction - yorkshire and humber - Bradford West Substation (Harrop Edge Farm) - 
                        
7577
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/07/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - eastern - Lapwing Fen II, Crown Farm - 
                        
7606
                            
                            
                        
                              Operator (or Applicant): Tribus Clean Energy 
                            -> Private Developer 
                        
                        
                    
                        
                        49 MW - planning - south east - Rye Common - 
                        
7737
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/10/2021 
                            ->  
                        
                        
                    
                        
                        49 MW - operation - north west - Lister Drive - 
                        
7740
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/05/2022 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - eastern - Reach Road - 
                        
7906
                            
                            
                        
                              Storage Co-location REPD Ref ID:  
                            -> NA 
                        
                              Planning Permission Expired:  
                            -> PANR 
                        
                        
                    
                        
                        49 MW - construction - scotland - Whitehills Energy Storage Facility - 
                        
8916
                            
                            
                        
                              Operator (or Applicant): Gigabox Developments Limited 
                            -> Gigabox Developments Limited / Whirlwind Renewables 
                        
                        
                    
                        
                        49 MW - planning - scotland - Newhouse Farm - Energy Storage Facility - 
                        
9047
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/07/2022 
                            -> 08/02/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 27/01/2023 
                        
                              Planning Permission Expired:  
                            -> 27/01/2026 
                        
                        
                    
                        
                        49 MW - planning - wales - Bronwylfa Road, Talwrn - Battery Storage Facility - 
                        
9052
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/07/2022 
                            -> 28/04/2023 
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 13768 
                        
                        
                    
                        
                        49 MW - planning - eastern - Admiralty Road - Battery Energy Storage Facility - 
                        
9470
                            
                            
                        
                              Planning Permission Expired:  
                            -> NA 
                        
                        
                    
                        
                        49 MW - planning - eastern - Model Farm - 
                        
10687
                            
                            
                        
                              Planning Authority: King's Lynn and West Norfolk Borough Council 
                            -> Borough Council of King's Lynn & West Norfolk 
                        
                        
                    
                        
                        49 MW - operation - scotland - Jamesfield Organic Centre - Battery Storage - 
                        
10863
                        
                            Megapack
                            
                            
                        
                              Planning Permission Expired: 28/09/2025 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - scotland - South Leylodge Farmhouse, Kintore - Battery Energy Storage System - 
                        
11092
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/10/2022 
                            -> 02/05/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 20/04/2023 
                        
                              Planning Permission Expired:  
                            -> 20/04/2028 
                        
                        
                    
                        
                        49 MW - planning - scotland - Overhill Farm, Rothienorman  - Battery Energy Storage - 
                        
11590
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/11/2022 
                            -> 02/03/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 01/03/2023 
                        
                              Planning Permission Expired:  
                            -> 01/03/2026 
                        
                        
                    
                        
                        49 MW - cancelled - eastern - Whites Farm - Battery Storage - 
                        
11880
                            
                            
                        
                              Planning Authority: Basildon Council 
                            -> Basildon Borough Council 
                        
                        
                    
                        
                        49 MW - planning - scotland - Househill House, Househill -  Battery Storage - 
                        
12056
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/09/2022 
                            -> 10/03/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 15/02/2023 
                        
                              Planning Permission Expired:  
                            -> 15/02/2026 
                        
                        
                    
                        
                        49 MW - planning - scotland - Killoch Depot, Killoch Colliery - Battery Storage - 
                        
12349
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/10/2022 
                            -> 17/04/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 30/03/2023 
                        
                              Planning Permission Expired:  
                            -> 30/03/2026 
                        
                        
                    
                        
                        49 MW - planning - scotland - Electricity Substation, Westerton Road - Battery Storage - 
                        
12467
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/10/2022 
                            -> 20/03/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 15/03/2023 
                        
                              Planning Permission Expired:  
                            -> 15/03/2028 
                        
                        
                    
                        
                        49 MW - planning - south west - Landulph, Ellbridge Lane - Battery Storage Facility - 
                        
12697
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/11/2022 
                            -> 22/02/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 06/02/2023 
                        
                              Planning Permission Expired:  
                            -> 06/02/2026 
                        
                        
                    
                        
                        48 MW - planning - northern ireland - Classic Marble Showers Site - 
                        
7208
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 16/04/2020 
                            ->  
                        
                        
                    
                        
                        45 MW - planning - scotland - Pleasance Road - 
                        
7217
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/03/2022 
                            ->  
                        
                        
                    
                        
                        45 MW - planning - north west - Cheshire Power Station - Battery Storage Facility - 
                        
10295
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/12/2021 
                            -> 06/06/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 24/05/2023 
                        
                              Planning Permission Expired:  
                            -> 24/05/2026 
                        
                        
                    
                        
                        40 MW - planning - east midlands - Breach Farm - Energy Barn - 
                        
6914
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/05/2022 
                            ->  
                        
                              Under Construction:  
                            -> Implemented 
                        
                        
                    
                        
                        40 MW - planning - eastern - Norwich Road Industrial Estate - 
                        
6958
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/11/2022 
                            ->  
                        
                        
                    
                        
                        40 MW - planning - east midlands - Breach Farm - 
                        
6962
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/05/2022 
                            ->  
                        
                        
                    
                        
                        40 MW - construction - south east - Land off Queenborough Road - 
                        
7003
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/01/2021 
                            ->  
                        
                        
                    
                        
                        40 MW - construction - scotland - Bilbo Solar Farm Energy Storage  - 
                        
7020
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/07/2020 
                            ->  
                        
                              County: Aberdeen 
                            -> Aberdeenshire 
                        
                        
                    
                        
                        40 MW - planning - eastern - Maldon Hall - 
                        
7095
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/12/2021 
                            ->  
                        
                              Under Construction:  
                            -> Implemented 
                        
                        
                    
                        
                        40 MW - planning - west midlands - Rubber and Allied Products - 
                        
7096
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/04/2020 
                            ->  
                        
                              Planning Permission Expired:  
                            -> 15/12/2020 
                        
                        
                    
                        
                        40 MW - operation - south east - Huggin's Hall - 
                        
7129
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/10/2018 
                            ->  
                        
                        
                    
                        
                        40 MW - planning - west midlands - Whitehouse Farm Energy Barn - 
                        
7987
                            
                            
                        
                              Planning Permission Expired:  
                            -> NA 
                        
                        
                    
                        
                        40 MW - planning - south west - Forest Gate - Solar Farm & Battery Storage - 
                        
9230
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/06/2021 
                            -> 14/03/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 10/03/2023 
                        
                              Planning Permission Expired:  
                            -> 10/03/2026 
                        
                        
                    
                        
                        40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage - 
                        
9584
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/02/2022 
                            -> 05/07/2023 
                        
                        
                    
                        
                        40 MW - planning - south east - Tanners Lane -  Battery Energy Storage Facility (Phase One) - 
                        
9708
                            
                            
                        
                              Under Construction:  
                            -> Implemented 
                        
                        
                    
                        
                        40 MW - construction - south east - Derehams Farm, Derehams Lane - Battery Storage - 
                        
12803
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/12/2022 
                            -> 12/07/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Authority: Buckinghamshire Council  
                            -> Buckinghamshire Council - Wycombe Area 
                        
                              Planning Permission Granted:  
                            -> 29/06/2023 
                        
                              Planning Permission Expired:  
                            -> 29/06/2026 
                        
                        
                    
                        
                        37 MW - planning - scotland - STOR Field 9 - 
                        
7018
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/07/2020 
                            ->  
                        
                              Planning Permission Expired: 06/12/2021 
                            -> NA 
                        
                        
                    
                        
                        36 MW - planning - northern ireland - Lisnabreeny Road - 
                        
7556
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/06/2020 
                            ->  
                        
                        
                    
                        
                        35 MW - operation - north east - Port of Tyne - 
                        
6976
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/05/2019 
                            ->  
                        
                        
                    
                        
                        35 MW - planning - yorkshire and humber - Rusholme Grange - 
                        
7093
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 16/09/2019 
                            ->  
                        
                        
                    
                        
                        32 MW - operation - south west - Severn Road - 
                        
7085
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 13/10/2022 
                            ->  
                        
                        
                    
                        
                        32 MW - planning - south west - Gloucestershire Science and Technology Park (small) - 
                        
7181
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 14/03/2022 
                            ->  
                        
                        
                    
                        
                        30 MW - planning - south west - Gloucestershire Science and Technology Park - 
                        
7067
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 14/03/2022 
                            ->  
                        
                        
                    
                        
                        30 MW - operation - south west - Fideoak Mills - 
                        
7152
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/09/2022 
                            ->  
                        
                        
                    
                        
                        30 MW - planning - scotland - Drumcross Battery Storage - 
                        
8155
                            
                            
                        
                              Installed Capacity (MWelec): 49.9 
                            -> 30 
                        
                              Under Construction:  
                            -> Implemented 
                        
                              mw: 49 
                            -> 30 
                        
                        
                    
                        
                        30 MW - planning - eastern - Colton - Solar photovoltaic farm, Battery storage - 
                        
10945
                            
                            
                        
                              Planning Permission Expired:  
                            -> NA 
                        
                        
                    
                        
                        30 MW - planning - west midlands - Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage - 
                        
10978
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/04/2022 
                            -> 02/03/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 28/02/2023 
                        
                              Planning Permission Expired:  
                            -> 28/02/2028 
                        
                        
                    
                        
                        30 MW - planning - scotland - West Bendings - Battery Storage - 
                        
10985
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/09/2022 
                            -> 04/07/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 29/06/2023 
                        
                              Planning Permission Expired:  
                            -> NA 
                        
                        
                    
                        
                        29 MW - planning - scotland - Learielaw Farm - 
                        
7970
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/06/2022 
                            -> 06/03/2023 
                        
                        
                    
                        
                        27 MW - operation - yorkshire and humber - Boscar Grange Farm - 
                        
7332
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/01/2020 
                            ->  
                        
                        
                    
                        
                        25 MW - operation - north east - Tynemouth Energy Storage System (TESS) - 
                        
6925
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/08/2018 
                            ->  
                        
                        
                    
                        
                        25 MW - cancelled - scotland - Clauchrie Windfarm Battery - 
                        
7804
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 31/03/2020 
                            ->  
                        
                        
                    
                        
                        25 MW - planning - north west - Bristol Avenue - Battery Energy Storage Facility - 
                        
8809
                            
                            
                        
                              Planning Authority: Blackpool City Council 
                            -> Blackpool Council 
                        
                        
                    
                        
                        23 MW - operation - east midlands - Asfordby Business Park (1) - 
                        
6932
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/04/2020 
                            ->  
                        
                        
                    
                        
                        22 MW - operation - wales - Pen y Cymoedd Energy Storage - 
                        
6927
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/01/2019 
                            ->  
                        
                        
                    
                        
                        21 MW - operation - eastern - Clayhill Farm -  Battery Energy Storage - 
                        
7570
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 14/09/2022 
                            ->  
                        
                        
                    
                        
                        20 MW - operation - scotland - Broxburn  - 
                        
6910
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/04/2019 
                            ->  
                        
                        
                    
                        
                        20 MW - operation - west midlands - Land to the west of Clay Hill Pit / Larport Farm - 
                        
6911
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/01/2020 
                            ->  
                        
                        
                    
                        
                        20 MW - operation - west midlands - Noriker Power Staunch - 
                        
6918
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/05/2019 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - wales - Traston Road - 
                        
6929
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/04/2020 
                            ->  
                        
                        
                    
                        
                        20 MW - construction - east midlands - Chelveston Renewable Energy Park - 
                        
6941
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/05/2020 
                            ->  
                        
                        
                    
                        
                        20 MW - operation - eastern - Claredown Farm - 
                        
6945
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 26/11/2019 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - london - Riverside Energy Park - 
                        
7036
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/04/2022 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - west midlands - Perseverance Road - 
                        
7061
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/02/2022 
                            ->  
                        
                        
                    
                        
                        20 MW - operation - yorkshire and humber - Kirkhaw Lane - 
                        
7148
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/01/2022 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - yorkshire and humber - Kirkhaw Lane - 
                        
7149
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/02/2022 
                            ->  
                        
                        
                    
                        
                        20 MW - operation - north west - Land at Carnegie Road - 
                        
7155
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/01/2019 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - scotland - Blackpark Farm  - 
                        
7226
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/08/2019 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - scotland - Fordtown Energy Storage - 
                        
7234
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/06/2020 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - scotland - Stranoch 2 - 
                        
7306
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/12/2021 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - scotland - Troston Loch Wind Farm - 
                        
7333
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 16/01/2021 
                            ->  
                        
                        
                    
                        
                        20 MW - construction - south east - Plot 2B EurolinkV - 
                        
7383
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 13/12/2021 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - scotland - Douglas West Wind Farm (extension) - 
                        
7460
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/07/2019 
                            ->  
                        
                        
                    
                        
                        20 MW - operation - north west - Lascar Works  - 
                        
7464
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/07/2019 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - scotland - Hagshaw Hill - 
                        
7572
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/03/2020 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - south east - Basing Road - 
                        
7746
                            
                            
                        
                              Planning Authority: Basingstoke and Deane Borough Council 
                            -> Basingstoke & Deane Borough Council 
                        
                        
                    
                        
                        20 MW - planning - west midlands - Perserverance Road  - 
                        
7966
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/10/2022 
                            -> 22/03/2023 
                        
                        
                    
                        
                        20 MW - planning - south west - Hele Manor Farm, Bradford On Tone - Battery Storage System - 
                        
12174
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/09/2022 
                            -> 19/06/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 13/04/2023 
                        
                              Planning Permission Expired:  
                            -> 13/04/2026 
                        
                        
                    
                        
                        20 MW - operation - south west - Hawkers Hill Energy Park - 
                        
12293
                            
                            
                        
                              Planning Permission Expired: 22/09/2020 
                            ->  
                        
                        
                    
                        
                        20 MW - planning - wales - John Green Frog Power Compound, John North Road - Battery System - 
                        
12455
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/10/2022 
                            -> 24/01/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 20/01/2023 
                        
                              Planning Permission Expired:  
                            -> 20/01/2028 
                        
                        
                    
                        
                        20 MW - planning - scotland - Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility - 
                        
12823
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/12/2022 
                            -> 08/03/2023 
                        
                        
                    
                        
                        19 MW - planning - scotland - Land North of Thornton Road - 
                        
7131
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/04/2020 
                            ->  
                        
                              Under Construction:  
                            -> Implemented 
                        
                        
                    
                        
                        19 MW - planning - scotland - North West Of Jameston Farm - 
                        
7133
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/09/2021 
                            ->  
                        
                              Planning Permission Expired:  
                            -> NA 
                        
                        
                    
                        
                        19 MW - planning - scotland - Jamesfield Organic Centre, Phase 2 - 
                        
7315
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 26/01/2022 
                            ->  
                        
                        
                    
                        
                        19 MW - planning - scotland - Ochiltree - Battery Sorage - 
                        
10162
                            
                            
                        
                              Planning Permission Expired: 05/10/2022 
                            -> 05/10/2025 
                        
                        
                    
                        
                        19 MW - planning - scotland - Speyslaw Farm - Battery Storage - 
                        
10394
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 16/12/2021 
                            -> 02/03/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 09/02/2023 
                        
                              Planning Permission Expired:  
                            -> 09/02/2026 
                        
                        
                    
                        
                        16 MW - planning - wales - Little Llwyn Onn - Solar Farm & Battery Storage - 
                        
11544
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/06/2022 
                            -> 14/03/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 08/03/2023 
                        
                              Planning Permission Expired:  
                            -> 08/03/2028 
                        
                        
                    
                        
                        15 MW - operation - south west - Lockleaze Energy Storage - 
                        
6961
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 31/01/2019 
                            ->  
                        
                        
                    
                        
                        15 MW - planning - eastern - Three Bridges Solar Farm - 
                        
8220
                            
                            
                        
                              Planning Permission Expired:  
                            -> NA 
                        
                        
                    
                        
                        15 MW - planning - eastern - Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage - 
                        
9346
                            
                            
                        
                              Planning Authority: Borough Council of KingοΏ½s Lynn & West Norfolk 
                            -> Borough Council of King's Lynn & West Norfolk 
                        
                        
                    
                        
                        13 MW - operation - south east - Bumpers Lane Solar Farm  - 
                        
6913
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/12/2021 
                            ->  
                        
                        
                    
                        
                        13 MW - planning - west midlands - Maybrook Road - Battery facility - 
                        
11008
                            
                            
                        
                              Planning Permission Expired:  
                            -> NA 
                        
                        
                    
                        
                        10 MW - operation - northern ireland - AES Kilroot Station Battery Storage Array - 
                        
6845
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/12/2018 
                            ->  
                        
                        
                    
                        
                        10 MW - operation - yorkshire and humber - Blackburn Meadows  - 
                        
6906
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/03/2019 
                            ->  
                        
                        
                    
                        
                        10 MW - operation - east midlands - Hill Farm - Energy Barn - 
                        
6915
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/03/2019 
                            ->  
                        
                        
                    
                        
                        10 MW - operation - south east - Kings Barn Farm - Energy Barn - 
                        
6916
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/03/2019 
                            ->  
                        
                        
                    
                        
                        10 MW - operation - east midlands - Leverton Farm - Energy Barn - 
                        
6917
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/12/2018 
                            ->  
                        
                        
                    
                        
                        10 MW - operation - eastern - Nevendon - 
                        
6926
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/03/2017 
                            ->  
                        
                        
                    
                        
                        10 MW - planning - east midlands - Manor Farm Energy Storage - 
                        
6948
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/12/2022 
                            ->  
                        
                              Planning Permission Expired:  
                            -> 30/11/2020 
                        
                              Under Construction:  
                            -> Implemented 
                        
                        
                    
                        
                        10 MW - construction - eastern - Slamseys Energy Storage - 
                        
7000
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/01/2020 
                            ->  
                        
                        
                    
                        
                        10 MW - planning - south east - Stockbridge Road - 
                        
7097
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/02/2020 
                            ->  
                        
                              Under Construction:  
                            -> Implemented 
                        
                        
                    
                        
                        10 MW - construction - south east - Land Adj Harmer Warren Quarry - 
                        
7143
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/12/2022 
                            ->  
                        
                              Planning Permission Expired:  
                            -> NA 
                        
                        
                    
                        
                        10 MW - planning - scotland - Greenburn Wind Park - 
                        
7159
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/06/2020 
                            -> 10/05/2023 
                        
                              Operator (or Applicant): Energy Consents And Deployment Unit 
                            -> REG Windpower Limited 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 21/04/2023 
                        
                              Planning Permission Expired:  
                            -> 21/04/2029 
                        
                        
                    
                        
                        10 MW - operation - north west - Cleator - 
                        
7177
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/01/2019 
                            ->  
                        
                        
                    
                        
                        10 MW - planning - south west - Old Green Farm, Alveston Battery Storage - 
                        
7182
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/08/2020 
                            ->  
                        
                        
                    
                        
                        10 MW - planning - south west - Trevol Business Park - 
                        
7404
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/01/2020 
                            ->  
                        
                        
                    
                        
                        10 MW - planning - south west - Tiddlywink Barn - 
                        
7527
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/12/2019 
                            ->  
                        
                        
                    
                        
                        10 MW - planning - scotland - Binn Eco Park - Battery - 
                        
9098
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/10/2022 
                            -> 02/03/2023 
                        
                              Site Name: Binn Eco Park Wind Farm Energy Storage Facility 
                            -> Binn Eco Park - Battery 
                        
                              Storage Type: Stand-alone Storage 
                            -> Co-located with RE 
                        
                              Storage Co-location REPD Ref ID:  
                            -> 4817, 7807, 9071 & 13672 
                        
                        
                    
                        
                        10 MW - planning - west midlands - Aspley House Farm, Aspley Lane -  Battery Storage Facility - 
                        
12571
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/11/2022 
                            -> 08/02/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 27/01/2023 
                        
                              Planning Permission Expired:  
                            -> 27/01/2026 
                        
                        
                    
                        
                        10 MW - operation - south west - Cirencester Solar Farm - 
                        
12791
                            
                            
                        
                              Planning Permission Expired: 17/09/2018 
                            -> 06/09/2018 
                        
                              Under Construction: 06/09/2018 
                            ->  
                        
                        
                    
                        
                        10 MW - planning - yorkshire and humber - J3 Business Park - Battery Energy Storage Facility - 
                        
12920
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/12/2022 
                            -> 27/01/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 24/01/2023 
                        
                              Planning Permission Expired:  
                            -> NA 
                        
                        
                    
                
 
         
     
     
    
    2023-01
    New projects (66): 
    
        
        1000 MW - planning - scotland - Coalburn II Energy Storage Facility - Battery Storage Facility - 
        
12206
        
            
    
        
        500 MW - planning - yorkshire and humber - Eggborough Power Station, Selby Road - Battery Storage - 
        
12483
        
            
    
        
        200 MW - planning - scotland - Whitehill Energy Storage - 
        
10466
        
            
    
        
        200 MW - cancelled - east midlands - Staythorpe Road - Battery energy storage - 
        
11321
        
            
    
        
        200 MW - planning - west midlands - Little Beanit Farm, Balsall Common - Battery Storage - 
        
11656
        
            
    
        
        130 MW - cancelled - east midlands - Southfields Farm, Common Lane - Battery Storage - 
        
12698
        
            
    
        
        120 MW - cancelled - south west - Pound Road, Hawkchurch - Battery Energy Storage - 
        
12360
        
            
    
        
        100 MW - planning - south west - Shaftesbury Energy Park - Battery Storage System - 
        
10626
        
            
    
        
        100 MW - planning - north west - Hillside Farm, Lancaster Road - Battery Storage - 
        
11948
        
            
    
        
        100 MW - planning - north west - Capenhurst Lane, Capenhurst - Battery Storage - 
        
12503
        
            
    
        
        100 MW - planning - eastern - Walpole Sub Station, Walpole Bank - Battery Storage - 
        
12683
        
            
    
        
        100 MW - operation - north west - National Grid Electricity Substation, Capenhurst Lane - Battery Storage - 
        
12725
        
            
    
        
        100 MW - planning - north east - Newburn Bridge Road - Battery Storage Facility - 
        
12729
        
            
    
        
        100 MW - planning - yorkshire and humber - Bradford West, Harrop Lane, Wilsden - Battery Storage - 
        
12909
        
            
    
        
        100 MW - planning - north west - Hillside Farm, Lancaster Road - Battery Storage - 
        
12964
        
            
    
        
        99 MW - planning - north west - Freshfields, Fairy Lane - Battery Storage - 
        
12694
        
            
    
        
        85 MW - planning - yorkshire and humber - Green Lane, Thurcroft - Battery Energy Storage Facility - 
        
12789
        
            
    
        
        80 MW - planning - yorkshire and humber - Barlow Road, Barlow Road - Battery Storage - 
        
12734
        
            
    
        
        60 MW - planning - south east - Misslebrook Farm, Botley Road - Battery Storage - 
        
12691
        
            
    
        
        60 MW - planning - south west - Blackhill Quarry, Woodbury - Battery Energy Storage Facility - 
        
12815
        
            
    
        
        57 MW - planning - south east - Sellindge Substation, Church Lane - Battery Storage - 
        
12351
        
            
    
        
        50 MW - planning - scotland - Clash Gour - 
        
7178
        
            
    
        
        50 MW - planning - eastern - Newmarket Road, Bottisham -  Battery Energy Storage - 
        
10486
        
            
    
        
        50 MW - planning - west midlands - Lowlands Farm - Battery Storage - 
        
11399
        
            
    
        
        50 MW - planning - yorkshire and humber - Swangate Project - Energy Storage System - 
        
11437
        
            
    
        
        30 MW - planning - west midlands - Rectory Farm, Rectory Lane - Battery Storage - 
        
11905
        
            
    
        
        50 MW - planning - scotland - Greenbank Caravan & Trailers, Hillhead Of Phingask - Battery Storage - 
        
12303
        
            
    
        
        50 MW - planning - west midlands - Ryton End, Barston - Battery Storage - 
        
12348
        
            
    
        
        50 MW - construction - eastern - Norwich Road Industrial Estate - 
        
12529
        
            
    
        
        50 MW - planning - south east - Derehams Farm, Derehams Lane - Battery Storage - 
        
12649
        
            
    
        
        50 MW - planning - scotland - Ourack - 
        
12727
        
            
    
        
        50 MW - planning - scotland - Alness Grid Sub Station, Mid Balnacraig - Battery Storage Facility - 
        
12780
        
            
    
        
        50 MW - cancelled - west midlands - Armshead Farm, Armshead Road - Battery Energy Storage Facility - 
        
12804
        
            
    
        
        50 MW - planning - scotland - Tomchrasky Estate Wind farm - 
        
12877
        
            
    
        
        50 MW - cancelled - west midlands - Lowlands Farm - Battery Storage - 
        
12959
        
            
    
        
        50 MW - planning - scotland - Eccles Substation, Eccles - Battery Energy Storage System - 
        
13003
        
            
    
        
        49 MW - planning - north west - Welkin Mill - 
        
7832
        
            
    
        
        49 MW - planning - scotland - Rothienorman - Battery Storage - 
        
10638
        
            
    
        
        49 MW - planning - scotland - Overhill Farm, Rothienorman  - Battery Energy Storage - 
        
11590
        
            
    
        
        49 MW - planning - scotland - Killoch Depot, Killoch Colliery - Battery Storage - 
        
12349
        
            
    
        
        49 MW - planning - scotland - Electricity Substation, Westerton Road - Battery Storage - 
        
12467
        
            
    
        
        49 MW - planning - south west - Landulph, Ellbridge Lane - Battery Storage Facility - 
        
12697
        
            
    
        
        49 MW - planning - south west - Bengrove Farm, Base Lane - Battery Storage - 
        
12830
        
            
    
        
        49 MW - planning - west midlands - Hodgetts Lane, Berkswell - Electricity Storage Facility - 
        
12936
        
            
    
        
        49 MW - planning - north west - Welkin Mill, Welkin Road - Battery Storage - 
        
12982
        
            
    
        
        45 MW - planning - north west - Mount Pleasant Farm, Green Lane - Battery Storage - 
        
13011
        
            
    
        
        40 MW - construction - south east - Derehams Farm, Derehams Lane - Battery Storage - 
        
12803
        
            
    
        
        40 MW - planning - north east - Long Pasture Farm, Little Stainton - Solar Farm - 
        
12952
        
            
    
        
        38 MW - cancelled - scotland - Sheirdrim Renewable Energy Development - Battery - 
        
7585
        
            
    
        
        30 MW - planning - yorkshire and humber - North Lincolnshire Green Energy Park - 
        
12706
        
            
    
        
        28 MW - planning - south east - Sunny Oaks Renewable Energy Park - 
        
12415
        
            
    
        
        20 MW - planning - wales - John Green Frog Power Compound, John North Road - Battery System - 
        
12455
        
            
    
        
        20 MW - planning - yorkshire and humber - Yarra Industrial Estate, Loicher Lane - Battery Storage - 
        
12524
        
            
    
        
        20 MW - planning - scotland - Chesters - Millmoor Rig Wind Farm & Battery Energy Storage - 
        
12821
        
            
    
        
        20 MW - planning - scotland - Fraserburgh Road - Kirkton Solar PV Farm & Energy Storage Facility - 
        
12823
        
            
    
        
        20 MW - planning - scotland - Kirkton Energy Farm - 
        
12876
        
            
    
        
        20 MW - planning - south east - Reeds Solar Farm, Alders Road - Solar Farm & Battery Storage - 
        
12941
        
            
    
        
        14 MW - planning - scotland - Hopsrig Wind Farm - 
        
11066
        
            
    
        
        14 MW - planning - north west - St Michaels Road, Ditton Road - Battery Storage - 
        
12904
        
            
    
        
        12 MW - planning - scotland - Scawd Law Wind Farm - 
        
13000
        
            
    
        
        10 MW - planning - east midlands - Manor Farm Energy Storage - 
        
6948
        
            
    
        
        10 MW - construction - south east - Land Adj Harmer Warren Quarry - 
        
7143
        
            
    
        
        10 MW - planning - eastern - Wissett Solar Farm, Wissett - Battery Storage - 
        
9913
        
            
    
        
        10 MW - planning - west midlands - Aspley House Farm, Aspley Lane -  Battery Storage Facility - 
        
12571
        
            
    
        
        10 MW - operation - south west - Cirencester Solar Farm - 
        
12791
        
            
    
        
        10 MW - planning - yorkshire and humber - J3 Business Park - Battery Energy Storage Facility - 
        
12920
        
            
    
    
    
    Disappeared projects (14): 
    
        
        99 MW - planning - west midlands - Newfields Farm - Battery Energy Storage - 
        
10233    
    
        
        57 MW - planning - north west - Waterloo Farm, Furbarn Road - Battery Storage - 
        
12187    
    
        
        50 MW - cancelled - north west - Penwortham Sub Station - 
        
7119    
    
        
        49 MW - planning - south east - Burcot Solar Farm - 
        
9374    
    
        
        49 MW - cancelled - west midlands - Lanegreat Barr, Great Barr - Battery Storage Facility - 
        
10438    
    
        
        49 MW - cancelled - scotland - Rothienorman - Battery Energy Storage Facility - 
        
11497    
    
        
        49 MW - cancelled - south west - Arlingham Solar Farm - Solar PV Panels & Battery Storage Facility - 
        
11636    
    
        
        16 MW - cancelled - wales - Maelor Gasworks - Solar Farm & Battery Storage - 
        
9343    
    
        
        12 MW - cancelled - west midlands - Mucklow Hill - 
        
7984    
    
        
        10 MW - cancelled - eastern - Rayleigh Transforming Station - 
        
6984    
    
        
        10 MW - cancelled - scotland - Shindour Feddal Hill Wood Braco - 
        
7573    
    
        
        10 MW - cancelled - scotland - Orchardbank Industrial Estate - 
        
7574    
    
        
        10 MW - cancelled - north west - Britannia House - 
        
7986    
    
        
        10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 
        
11369    
    
    
    
    Updated projects (59):
    
    
    
        
            
            
                
                    
                        
                        79 MW - construction - south east - Stony Energy Storage Facility - 
                        
7001
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/03/2022 
                            -> 30/11/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/07/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        50 MW - operation - south east - Richborough Energy Park - Phase 2 - 
                        
9626
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 16/09/2021 
                            -> 10/01/2023 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/01/2023 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        50 MW - operation - south west - Melksham Substation East Storage - 
                        
6953
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/08/2020 
                            -> 22/11/2022 
                        
                              Development Status: Under Construction 
                            -> Operational 
                        
                              Development Status (short): Under Construction 
                            -> Operational 
                        
                              Operational:  
                            -> 07/11/2022 
                        
                              status: construction 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        49 MW - operation - yorkshire and humber - Pillswood Phase 1  - 
                        
7005
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 13/06/2019 
                            -> 09/11/2022 
                        
                              Site Name: Creyke Substation 
                            -> Pillswood Phase 1  
                        
                              Development Status: Revised 
                            -> Operational 
                        
                              Development Status (short): Revised 
                            -> Operational 
                        
                              Are they re-applying (New REPD Ref): 7360 
                            ->  
                        
                              Under Construction:  
                            -> 01/04/2022 
                        
                              Operational:  
                            -> 01/11/2022 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        49 MW - construction - south east - Halewick Lane, Sompting - Battery-based Energy Storage Facility - 
                        
7168
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/08/2022 
                            -> 17/10/2022 
                        
                              Development Status: Under Construction 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Under Construction 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired: 03/04/2022 
                            ->  
                        
                              Under Construction: 01/07/2022 
                            -> 01/02/2023 
                        
                              status: construction 
                            -> planning 
                        
                        
                    
                        
                        49 MW - operation - south west - Minety South - Battery Storage - 
                        
7184
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              Operational:  
                            -> 01/10/2022 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        49 MW - operation - yorkshire and humber - Pillswood Phase 2 - 
                        
7360
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 31/01/2020 
                            -> 09/11/2022 
                        
                              Operator (or Applicant): Northern Powergrid 
                            -> Harmony Energy Storage 
                        
                              Site Name: Creyke Beck Substation 
                            -> Pillswood Phase 2 
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              Are they re-applying (Old REPD Ref) : 7005 
                            ->  
                        
                              Under Construction:  
                            -> 01/04/2022 
                        
                              Operational:  
                            -> 01/11/2022 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        49 MW - construction - west midlands - Coventry National Grid Substation - 
                        
7885
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/02/2021 
                            -> 11/11/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/07/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - operation - scotland - Jamesfield Organic Centre - Battery Storage - 
                        
10863
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/06/2022 
                            -> 12/01/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Under Construction 
                        
                              Development Status (short): Application Submitted 
                            -> Under Construction 
                        
                              Planning Permission Granted:  
                            -> 28/09/2022 
                        
                              Planning Permission Expired:  
                            -> 28/09/2025 
                        
                              Under Construction:  
                            -> 01/01/2023 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        23 MW - operation - east midlands - Asfordby Business Park (1) - 
                        
6932
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              Under Construction:  
                            -> 08/06/2018 
                        
                              Operational:  
                            -> 01/04/2019 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        20 MW - construction - north east - Standby Embedded Stor Power Plant - Battery storage - 
                        
9010
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/06/2021 
                            -> 16/01/2023 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/10/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        10 MW - operation - south west - South Farm Solar Park - 
                        
9361
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/07/2021 
                            -> 21/12/2022 
                        
                              Development Status: Under Construction 
                            -> Operational 
                        
                              Development Status (short): Under Construction 
                            -> Operational 
                        
                              Operational:  
                            -> 16/12/2022 
                        
                              status: construction 
                            -> operation πΎ π πΈ
                        
                        
                    
                
 
         
     
    
    
    
    
    
    
        
            
            
                
                    
                        
                        300 MW - construction - scotland - Blackhillock Electricity Substation - Battery Energy Storage System - 
                        
9723
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/01/2022 
                            -> 07/11/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 30/09/2022 
                        
                              Planning Permission Expired:  
                            -> 30/09/2027 
                        
                        
                    
                        
                        230 MW - construction - wales - Uskmouth Power Station - Battery Storage - 
                        
10936
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/09/2022 
                            -> 20/12/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 07/12/2022 
                        
                              Planning Permission Expired:  
                            -> 07/12/2027 
                        
                        
                    
                        
                        150 MW - planning - south west - Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility - 
                        
11612
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/07/2022 
                            -> 17/10/2022 
                        
                        
                    
                        
                        130 MW - planning - eastern - Stoke Lane - Battery Energy Storage - 
                        
10390
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 16/12/2021 
                            -> 17/10/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 09/09/2022 
                        
                              Planning Permission Expired:  
                            -> 09/09/2025 
                        
                        
                    
                        
                        100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage - 
                        
9691
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/05/2022 
                            -> 27/10/2022 
                        
                        
                    
                        
                        100 MW - construction - eastern - Bullen Lane - Battery Storage - 
                        
10311
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/07/2022 
                            -> 17/10/2022 
                        
                        
                    
                        
                        99 MW - planning - north east - South Thinford Lane, Thinford - Energy Storage - 
                        
10489
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/01/2022 
                            -> 01/11/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 21/10/2022 
                        
                              Planning Permission Expired:  
                            -> 21/10/2025 
                        
                        
                    
                        
                        90 MW - planning - east midlands - Caldwell Road - Battery Storage - 
                        
9507
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/04/2022 
                            -> 04/11/2022 
                        
                              Operator (or Applicant): Aura Power BESS Ltd 
                            -> Infrared Capital Partners Limited 
                        
                        
                    
                        
                        80 MW - planning - scotland - Tealing  Battery Energy Storage Farm - 
                        
11097
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/04/2022 
                            -> 29/11/2022 
                        
                        
                    
                        
                        57 MW - planning - north west - National Grids Rainhill Substation Battery storage facility - 
                        
8439
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/03/2021 
                            -> 21/10/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 11559 
                        
                        
                    
                        
                        57 MW - planning - north west - Penwortham - Battery storage - 
                        
11217
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/05/2022 
                            -> 17/10/2022 
                        
                        
                    
                        
                        57 MW - planning - north west - Sutton Manor - Battery Storage Facility - 
                        
11559
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/06/2022 
                            -> 21/10/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Are they re-applying (Old REPD Ref) :  
                            -> 8439 
                        
                              Planning Permission Granted:  
                            -> 16/09/2022 
                        
                              Planning Permission Expired:  
                            -> 16/09/2025 
                        
                        
                    
                        
                        50 MW - planning - scotland - Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage - 
                        
8342
                            
                            
                        
                              Storage Co-location REPD Ref ID: 8341 
                            -> 8341 & 9076 
                        
                        
                    
                        
                        50 MW - planning - yorkshire and humber - Barlow Road, Barlow - Battery Storage - 
                        
9970
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/11/2021 
                            -> 28/11/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Revised 
                        
                              Development Status (short): Application Submitted 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 12734 
                        
                              Planning Application Withdrawn:  
                            -> 18/10/2022 
                        
                        
                    
                        
                        50 MW - planning - eastern - Ardleigh Road, Little Bromley - Battery Energy Storage - 
                        
10302
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/12/2021 
                            -> 01/11/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 28/09/2022 
                        
                              Planning Permission Expired:  
                            -> 28/09/2025 
                        
                        
                    
                        
                        50 MW - planning - west midlands - Penstone Lane, Penn 1 - Battery Storage Facility - 
                        
10705
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/03/2022 
                            -> 17/10/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 11/10/2022 
                        
                              Planning Permission Expired:  
                            -> 11/10/2025 
                        
                        
                    
                        
                        50 MW - planning - west midlands - Penstone Lane, Lower Penn 2 - Battery Storage - 
                        
10733
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/03/2022 
                            -> 17/10/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 29/09/2022 
                        
                              Planning Permission Expired:  
                            -> 29/09/2025 
                        
                        
                    
                        
                        50 MW - cancelled - eastern - High Road, Saddlebow - Battery Storage - 
                        
11648
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/07/2022 
                            -> 04/11/2022 
                        
                        
                    
                        
                        50 MW - planning - south west - Says Court Farm, Coalpit Heath - Battery Energy Storage - 
                        
11793
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/08/2022 
                            -> 14/11/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 02/11/2022 
                        
                              Planning Permission Expired:  
                            -> 02/11/2025 
                        
                        
                    
                        
                        49 MW - planning - south west - Ellbridge Lane - 
                        
7051
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/09/2020 
                            -> 23/11/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 12697 
                        
                        
                    
                        
                        49 MW - planning - eastern - Lapwing Fen II, Crown Farm - 
                        
7606
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/09/2022 
                            -> 22/11/2022 
                        
                        
                    
                        
                        49 MW - planning - north west - Welkin Mill - 
                        
8055
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/09/2020 
                            -> 05/01/2023 
                        
                              Development Status: Planning Application Submitted 
                            -> Revised 
                        
                              Development Status (short): Application Submitted 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 12982 
                        
                              Are they re-applying (Old REPD Ref) :  
                            -> 7832 
                        
                        
                    
                        
                        49 MW - planning - scotland - Shindour - Energy Storage Facility - 
                        
8464
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/07/2022 
                            -> 11/11/2022 
                        
                        
                    
                        
                        49 MW - construction - scotland - Whitehills Energy Storage Facility - 
                        
8916
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/03/2022 
                            -> 17/10/2022 
                        
                        
                    
                        
                        49 MW - planning - scotland - East Kilbride - Battery storage - 
                        
9013
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/04/2022 
                            -> 04/11/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 22/08/2022 
                        
                              Planning Permission Expired:  
                            -> 22/08/2025 
                        
                        
                    
                        
                        49 MW - planning - south west - Minety South 2 - Battery Storage Facility - 
                        
9063
                            
                            
                        
                              Operator (or Applicant): Minety South 2 
                            -> Statera Energy 
                        
                        
                    
                        
                        49 MW - planning - scotland - Drum Farm - Battery Energy Storage System - 
                        
9940
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/05/2022 
                            -> 22/11/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 27/10/2022 
                        
                              Planning Permission Expired:  
                            -> 27/10/2027 
                        
                        
                    
                        
                        49 MW - planning - scotland - Stainland Energy Storage Project - 
                        
10225
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/06/2022 
                            -> 14/12/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 04/11/2022 
                        
                              Planning Permission Expired:  
                            -> 04/11/2027 
                        
                        
                    
                        
                        49 MW - planning - scotland - Newburgh Road, Abernethy - Battery Storage  - 
                        
10607
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/06/2022 
                            -> 25/10/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 26/09/2022 
                        
                              Planning Permission Expired:  
                            -> 26/09/2025 
                        
                        
                    
                        
                        49 MW - planning - south east - Harrington Franklin, Richborough Energy Park - Battery Storage - 
                        
11449
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 14/06/2022 
                            -> 12/12/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 06/12/2022 
                        
                              Planning Permission Expired:  
                            -> 06/12/2025 
                        
                        
                    
                        
                        49 MW - planning - scotland - Gleniston, Auchtertool - Battery Storage Facility - 
                        
11808
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/08/2022 
                            -> 11/11/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 09/11/2022 
                        
                              Planning Permission Expired:  
                            -> 09/11/2025 
                        
                        
                    
                        
                        49 MW - planning - scotland - Househill House, Househill -  Battery Storage - 
                        
12056
                            
                            
                        
                              County: Highlands 
                            -> Highland 
                        
                        
                    
                        
                        47 MW - planning - south west - Indian Queens Sub-Station - Battery Storage - 
                        
11725
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/07/2022 
                            -> 01/11/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 17/10/2022 
                        
                              Planning Permission Expired:  
                            -> 17/10/2025 
                        
                        
                    
                        
                        40 MW - planning - east midlands - Breach Farm - Energy Barn - 
                        
6914
                            
                            
                        
                              Planning Permission Expired: 15/08/2020 
                            -> 01/05/2021 
                        
                        
                    
                        
                        40 MW - planning - eastern - Norwich Road Industrial Estate - 
                        
6958
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/04/2021 
                            -> 04/11/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 12529 
                        
                        
                    
                        
                        40 MW - planning - south east - Loudwater Battery Storage Site - 
                        
8142
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/06/2021 
                            -> 12/12/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 11993 
                        
                        
                    
                        
                        30 MW - planning - scotland - Farburn Place - Energy Storage Facility - 
                        
8385
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/10/2021 
                            -> 21/12/2022 
                        
                              Operator (or Applicant): Peak Reserve Power Limited 
                            -> Peak Reserve Power Limited / Centrica / Cragside 
                        
                        
                    
                        
                        30 MW - planning - north east - West Sleekburn - Battery Storage Compound - 
                        
10957
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/06/2022 
                            -> 21/10/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 19/10/2022 
                        
                              Planning Permission Expired:  
                            -> 19/10/2025 
                        
                        
                    
                        
                        30 MW - planning - yorkshire and humber - Back Lane, Skerne - Solar Farm & Battery Storage - 
                        
12297
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 13/10/2022 
                            -> 18/11/2022 
                        
                        
                    
                        
                        25 MW - planning - north west - Caton Road, Lancaster -  Battery Storage Facility - 
                        
10047
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/12/2021 
                            -> 13/12/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 07/12/2022 
                        
                              Planning Permission Expired:  
                            -> 07/12/2027 
                        
                        
                    
                        
                        22 MW - operation - wales - Pen y Cymoedd Energy Storage - 
                        
6927
                            
                            
                        
                              Planning Authority: Neath Port Talbot County Borough Council 
                            -> Neath Port Talbot Council 
                        
                              Planning Application Reference:  
                            -> P2009/1053 
                        
                              Planning Application Submitted:  
                            -> 19/11/2009 
                        
                              Planning Permission Granted:  
                            -> 18/11/2011 
                        
                        
                    
                        
                        20 MW - planning - east midlands - Vicarage Drove - Solar farm & Battery storage - 
                        
8518
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/02/2022 
                            -> 04/11/2022 
                        
                        
                    
                        
                        20 MW - planning - eastern - South Fambridge Hall - Solar farm & Battery storage - 
                        
9274
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/08/2022 
                            -> 17/11/2022 
                        
                        
                    
                        
                        19 MW - planning - scotland - Ochiltree - Battery Sorage - 
                        
10162
                            
                            
                        
                              Y-coordinate: 62020 
                            -> 620201 
                        
                              lat: 50.440496 
                            -> 55.454634 
                        
                              long: -4.018763 
                            -> -4.266842 
                        
                        
                    
                        
                        18 MW - cancelled - south west - Churchtown Solar Farm Battery Storage - 
                        
7726
                            
                            
                        
                              Storage Type: Co-located with RE 
                            -> Stand-alone Storage 
                        
                        
                    
                        
                        12 MW - planning - north west - Dragons Lane - Battery Storage Facility - 
                        
11701
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/07/2022 
                            -> 12/12/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 01/12/2022 
                        
                              Planning Permission Expired:  
                            -> 01/12/2025 
                        
                        
                    
                        
                        10 MW - planning - scotland - Binn Eco Park - Battery - 
                        
9098
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/02/2022 
                            -> 17/10/2022 
                        
                        
                    
                
 
         
     
     
    
    2022-10
    New projects (40): 
    
        
        349 MW - planning - west midlands - Cellarhead - Battery Site - 
        
10013
        
            
    
        
        300 MW - construction - scotland - Kilmarnock South Substation - Battery storage - 
        
9696
        
            
    
        
        230 MW - construction - wales - Uskmouth Power Station - Battery Storage - 
        
10936
        
            
    
        
        200 MW - planning - north east - Worset Lane - Battery Energy Storage System - 
        
11406
        
            
    
        
        150 MW - construction - north west - Fiddlers Ferry Power Station - Battery storage - 
        
9404
        
            
    
        
        100 MW - planning - eastern - North Walpole, St Peter - Battery Energy Storage - 
        
9762
        
            
    
        
        100 MW - construction - eastern - Bullen Lane - Battery Storage - 
        
10311
        
            
    
        
        100 MW - cancelled - east midlands - Gotham - Battery Energy storage - 
        
10986
        
            
    
        
        99 MW - planning - yorkshire and humber - Neil Fox Way - Battery Storage - 
        
11519
        
            
    
        
        16 MW - planning - scotland - Mains Of Keithick Farm, Keithick - Battery Storage &  Solar Farm - 
        
11623
        
            
    
        
        62 MW - planning - wales - Wentlooge Renewable Energy Hub - 
        
7192
        
            
    
        
        60 MW - planning - yorkshire and humber - Redcote Lane, Armley - Battery Storage Facility - 
        
12224
        
            
    
        
        57 MW - planning - south east - Ash Lane, Little London - Battery Storage - 
        
11090
        
            
    
        
        57 MW - planning - eastern - Braintree Road, Cressing - Battery Storage - 
        
11995
        
            
    
        
        57 MW - planning - north west - Waterloo Farm, Furbarn Road - Battery Storage - 
        
12187
        
            
    
        
        50 MW - planning - west midlands - South Staffordshire Railway Walk, Castlecroft  - Battery Storage - 
        
11414
        
            
    
        
        50 MW - cancelled - eastern - High Road, Saddlebow - Battery Storage - 
        
11648
        
            
    
        
        50 MW - planning - south west - Says Court Farm, Coalpit Heath - Battery Energy Storage - 
        
11793
        
            
    
        
        50 MW - planning - south west - Fairholme, Minety - Battery Storage - 
        
11810
        
            
    
        
        50 MW - planning - south west - Stonehill, Minety - 
        
11812
        
            
    
        
        50 MW - planning - north west - Lancaster Power Extension, Middleton Road - Energy Storage Facility - 
        
12125
        
            
    
        
        49 MW - planning - scotland - Newhouse Farm - Energy Storage Facility - 
        
9047
        
            
    
        
        49 MW - cancelled - south west - Arlingham Solar Farm - Solar PV Panels & Battery Storage Facility - 
        
11636
        
            
    
        
        49 MW - construction - london - Clay Tye Farm Phase 1 - Storage Facility - 
        
11720
        
            
    
        
        49 MW - construction - london - Clay Tye Farm Phase 2 - Storage Facility - 
        
11721
        
            
    
        
        49 MW - planning - scotland - Gleniston, Auchtertool - Battery Storage Facility - 
        
11808
        
            Megapack
        
            
    
        
        49 MW - cancelled - eastern - Whites Farm - Battery Storage - 
        
11880
        
            
    
        
        49 MW - planning - scotland - Househill House, Househill -  Battery Storage - 
        
12056
        
            
    
        
        47 MW - planning - south west - Dog Trap Lane, Minety - Battery Energy Storage Systems - 
        
10488
        
            
    
        
        47 MW - planning - south west - Indian Queens Sub-Station - Battery Storage - 
        
11725
        
            
    
        
        45 MW - planning - scotland - Sclenteuch Wind Farm  - 
        
11987
        
            
    
        
        30 MW - planning - scotland - West Bendings - Battery Storage - 
        
10985
        
            
    
        
        30 MW - planning - south west - Catsbrain Farm - Battery Storage  - 
        
11787
        
            
    
        
        30 MW - planning - yorkshire and humber - Back Lane, Skerne - Solar Farm & Battery Storage - 
        
12297
        
            
    
        
        28 MW - planning - scotland - Sandy Knowe Wind Farm Extension - 
        
12080
        
            
    
        
        20 MW - planning - south west - Hele Manor Farm, Bradford On Tone - Battery Storage System - 
        
12174
        
            
    
        
        20 MW - operation - south west - Hawkers Hill Energy Park - 
        
12293
        
            
    
        
        19 MW - planning - scotland - Ochiltree - Battery Sorage - 
        
10162
        
            
    
        
        16 MW - planning - scotland - Knockkippen Wind, Solar & Battery Farm - 
        
11676
        
            
    
        
        12 MW - planning - north west - Dragons Lane - Battery Storage Facility - 
        
11701
        
            
    
    
    
    Disappeared projects (33): 
    
        
        240 MW - cancelled - east midlands - Temple Oaks Renewable Energy Park - 
        
11562    
    
        
        100 MW - cancelled - eastern - Tilbury Energy Centre - 
        
7048    
    
        
        50 MW - cancelled - south west - Minety North - 
        
6952    
    
        
        50 MW - cancelled - west midlands - Wolverhampton West Sub Station - 
        
6977    
    
        
        50 MW - cancelled - scotland - Braidfield Road, Hardgate - Battery Storage Facility - 
        
9869    
    
        
        50 MW - planning - west midlands - Lowlands Farm - Battery Storage - 
        
11399    
    
        
        49 MW - cancelled - north east - Norton - 
        
6923    
    
        
        49 MW - cancelled - west midlands - Former Rugeley Power Station - 
        
6981    
    
        
        49 MW - cancelled - north west - Charleywood Road, Knowsley Industrial Park - 
        
7026    
    
        
        49 MW - cancelled - yorkshire and humber - Salt End Lane - 
        
7039    
    
        
        49 MW - cancelled - south west - Riverford Farm - 
        
7078    
    
        
        49 MW - cancelled - east midlands - Grendon Storage - 
        
7089    
    
        
        49 MW - cancelled - south west - Taunton Substation  - 
        
7153    
    
        
        40 MW - cancelled - yorkshire and humber - Tofts Lane - 
        
6942    
    
        
        29 MW - cancelled - north east - Land at Derwenthaugh Eco Park - 
        
7054    
    
        
        29 MW - cancelled - scotland - Land SW of Shilton Cottage - 
        
7134    
    
        
        29 MW - cancelled - scotland - Drumfad Wood - 
        
7165    
    
        
        25 MW - cancelled - scotland - Fraserburgh Development - 
        
7041    
    
        
        24 MW - cancelled - east midlands - The Hollies - 
        
6946    
    
        
        20 MW - cancelled - south west - Bristol Road - 
        
6930    
    
        
        20 MW - cancelled - yorkshire and humber - Aven Industrial Estate - 
        
7007    
    
        
        20 MW - cancelled - north west - Leighton Hall Farm - 
        
7032    
    
        
        20 MW - cancelled - scotland - Land To The East Of Wholeflats Road (Grangemouth) - 
        
7043    
    
        
        20 MW - cancelled - north west - Kilshaw Street - 
        
7072    
    
        
        20 MW - cancelled - north west - Beaufort Road - 
        
7128    
    
        
        18 MW - cancelled - east midlands - Callywhite Lane Commercial Estate - 
        
7087    
    
        
        10 MW - cancelled - north west - Pikelaw Place - 
        
6944    
    
        
        10 MW - cancelled - south east - Litchlake Farm - 
        
7011    
    
        
        10 MW - cancelled - east midlands - Manton Wood - 
        
7035    
    
        
        10 MW - cancelled - scotland - Strichen South - 
        
7056    
    
        
        10 MW - cancelled - eastern - Hadham Road - 
        
7068    
    
        
        10 MW - construction - south east - Land Adj Harmer Warren Quarry - 
        
7143    
    
        
        10 MW - cancelled - south west - Earthcott Green - Battery Storage - 
        
11510    
    
    
    
    Updated projects (119):
    
    
    
        
            
            
                
                    
                        
                        57 MW - planning - north west - Capenhurst Lane - 
                        
8283
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/01/2022 
                            -> 15/07/2022 
                        
                              Development Status: Under Construction 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Under Construction 
                            -> Awaiting Construction 
                        
                              Planning Permission Expired:  
                            -> 16/04/2024 
                        
                              Under Construction: 01/02/2022 
                            ->  
                        
                              status: construction 
                            -> planning 
                        
                        
                    
                        
                        57 MW - construction - north west - Capenhurst Lane, Capenhurst - Battery storage - 
                        
9377
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 03/08/2021 
                            -> 15/09/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Under Construction 
                        
                              Development Status (short): Application Submitted 
                            -> Under Construction 
                        
                              Planning Permission Granted:  
                            -> 21/10/2021 
                        
                              Planning Permission Expired:  
                            -> 21/10/2024 
                        
                              Under Construction:  
                            -> 01/09/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        50 MW - operation - south west - Melksham Substation East Storage - 
                        
6953
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Planning Permission Expired:  
                            -> 28/09/2020 
                        
                              Under Construction:  
                            -> 01/01/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - operation - yorkshire and humber - Nether Moor Field - 
                        
7019
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              Planning Permission Expired:  
                            -> 22/11/2022 
                        
                              Operational:  
                            -> 01/09/2020 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        49 MW - operation - south west - Mannington Battery Storage Plant - 
                        
7024
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/05/2020 
                            -> 14/09/2022 
                        
                              Operator (or Applicant): Public Power Solutions 
                            -> Still Waters Green Technology 
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              Planning Permission Expired:  
                            -> 28/02/2021 
                        
                              Under Construction:  
                            -> 01/11/2020 
                        
                              Operational:  
                            -> 01/10/2021 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        49 MW - planning - yorkshire and humber - Land Adjacent to 4 Redcote Lane (Armley) - 
                        
7111
                            
                            
                        
                              Development Status: Under Construction 
                            -> Revised 
                        
                              Development Status (short): Under Construction 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 12224 
                        
                              Under Construction: 01/02/2022 
                            ->  
                        
                              status: construction 
                            -> planning 
                        
                        
                    
                        
                        49 MW - construction - south east - Halewick Lane, Sompting - Battery-based Energy Storage Facility - 
                        
7168
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/03/2022 
                            -> 04/08/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Planning Permission Expired:  
                            -> 03/04/2022 
                        
                              Under Construction:  
                            -> 01/07/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - construction - yorkshire and humber - Osbaldwick Substation - 
                        
7172
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 14/11/2019 
                            -> 27/07/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Address: Os Field 5070, Hull Road, Dunnington, York, North Yorkshire 
                            -> Os Field 5070, Hull Road, Dunnington, York,  
                        
                              Planning Application Reference: 18/02659/OUT 
                            -> 20/01515/REM 
                        
                              Planning Application Submitted: 21/11/2018 
                            -> 21/08/2020 
                        
                              Planning Permission Granted: 22/02/2019 
                            -> 08/10/2020 
                        
                              Planning Permission Expired: 22/02/2022 
                            ->  
                        
                              Under Construction:  
                            -> 01/05/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - operation - north west - West Didsbury Battery Storage - 
                        
7185
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/08/2020 
                            -> 23/08/2022 
                        
                              Installed Capacity (MWelec): 50 
                            -> 49.99 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/06/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                              mw: 50 
                            -> 49 
                        
                        
                    
                        
                        49 MW - construction - scotland - Ferrymuir - 
                        
7371
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/03/2022 
                            -> 21/09/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Planning Permission Expired:  
                            -> 21/11/2022 
                        
                              Under Construction: 14/07/1905 
                            -> 29/07/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - planning - yorkshire and humber - Elland Storage Project - 
                        
10236
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/01/2022 
                            -> 15/08/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Planning Permission Expired:  
                            -> 23/12/2023 
                        
                              Under Construction:  
                            -> 01/08/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        32 MW - operation - south west - Severn Road - 
                        
7085
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/01/2022 
                            -> 13/10/2022 
                        
                              Development Status: Under Construction 
                            -> Operational 
                        
                              Development Status (short): Under Construction 
                            -> Operational 
                        
                              Operational:  
                            -> 23/12/2021 
                        
                              status: construction 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        30 MW - operation - south west - Fideoak Mills - 
                        
7152
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/02/2020 
                            -> 21/09/2022 
                        
                              Development Status: Under Construction 
                            -> Operational 
                        
                              Development Status (short): Under Construction 
                            -> Operational 
                        
                              Operational:  
                            -> 01/08/2020 
                        
                              status: construction 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        21 MW - operation - eastern - Clayhill Farm -  Battery Energy Storage - 
                        
7570
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 26/01/2022 
                            -> 14/09/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              Planning Permission Expired:  
                            -> 23/03/2021 
                        
                              Under Construction:  
                            -> 01/05/2019 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        20 MW - planning - west midlands - Perserverance Road  - 
                        
7966
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 16/06/2022 
                            -> 12/10/2022 
                        
                              Development Status: Under Construction 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Under Construction 
                            -> Awaiting Construction 
                        
                              Under Construction: 01/06/2022 
                            ->  
                        
                              status: construction 
                            -> planning 
                        
                        
                    
                        
                        19 MW - construction - scotland - Balsillie Avenue - Roaring Hill Energy Storage Facility - 
                        
9224
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/11/2021 
                            -> 15/09/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Planning Permission Expired:  
                            -> 03/09/2024 
                        
                              Under Construction:  
                            -> 12/09/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                
 
         
     
    
    
    
    
    
    
        
            
            
                
                    
                        
                        400 MW - planning - scotland - Hunterston Grid Services Complex - Energy Storage Facility - 
                        
10535
                            
                            
                        
                              Planning Permission Expired:  
                            -> 05/01/2027 
                        
                        
                    
                        
                        400 MW - planning - scotland - Kincardine Grid Services Complex - Energy Storage Facility - 
                        
10536
                            
                            
                        
                              Planning Permission Expired:  
                            -> 05/01/2023 
                        
                        
                    
                        
                        349 MW - planning - west midlands - Dunton Hall - Battery Energy Storage System - 
                        
9427
                            
                            
                        
                              Planning Permission Expired:  
                            -> 04/03/2025 
                        
                        
                    
                        
                        200 MW - planning - north west - Heysham Energy Storage Project - 
                        
9545
                            
                            
                        
                              Planning Permission Expired:  
                            -> 26/05/2025 
                        
                        
                    
                        
                        150 MW - planning - eastern - Thurrock Flexible Generation Plant - 
                        
7696
                            
                            
                        
                              Planning Permission Expired:  
                            -> 16/02/2027 
                        
                        
                    
                        
                        100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage - 
                        
9691
                            
                            
                        
                              Planning Permission Expired:  
                            -> 14/10/2024 
                        
                        
                    
                        
                        100 MW - planning - north west - Cholmondeley Road - Battery Storage - 
                        
9763
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/10/2021 
                            -> 15/08/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 10/08/2022 
                        
                              Planning Permission Expired:  
                            -> 10/08/2025 
                        
                        
                    
                        
                        100 MW - planning - south west - St Dennis - Battery Energy Storage - 
                        
10058
                            
                            
                        
                              Planning Permission Expired:  
                            -> 02/02/2025 
                        
                        
                    
                        
                        100 MW - planning - eastern - Walpole St Andrew - Battery storage  - 
                        
10876
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/03/2022 
                            -> 11/10/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 20/09/2022 
                        
                              Planning Permission Expired:  
                            -> 20/09/2025 
                        
                        
                    
                        
                        100 MW - planning - scotland - Teviot Wind Farm - 
                        
11442
                            
                            
                        
                              Storage Co-location REPD Ref ID: 8921, 11441 
                            -> 8921 & 11441 
                        
                        
                    
                        
                        99 MW - planning - yorkshire and humber - Lakeside Energy Storage Facility - 
                        
8268
                        
                            Megapack
                            
                            
                        
                              Planning Permission Expired:  
                            -> 06/05/2024 
                        
                        
                    
                        
                        99 MW - planning - yorkshire and humber - Skelton Grange Battery Storage Facility - 
                        
8914
                            
                            
                        
                              Planning Permission Expired:  
                            -> 04/08/2024 
                        
                        
                    
                        
                        99 MW - planning - north west - Bay Gateway - Battery Storage Facility - 
                        
9199
                            
                            
                        
                              Planning Permission Expired:  
                            -> 26/04/2025 
                        
                        
                    
                        
                        90 MW - planning - yorkshire and humber - Little Crow Solar Park - 
                        
7175
                            
                            
                        
                              Planning Permission Expired:  
                            -> 05/04/2027 
                        
                        
                    
                        
                        90 MW - planning - east midlands - Caldwell Road - Battery Storage - 
                        
9507
                            
                            
                        
                              Planning Permission Expired:  
                            -> 03/03/2025 
                        
                        
                    
                        
                        80 MW - planning - yorkshire and humber - Netherlands Way - Battery Energy Facility - 
                        
10429
                            
                            
                        
                              Are they re-applying (Old REPD Ref) :  
                            -> 7090 
                        
                              Planning Permission Expired:  
                            -> 06/01/2025 
                        
                        
                    
                        
                        80 MW - planning - scotland - Tealing  Battery Energy Storage Farm - 
                        
11097
                            
                            
                        
                              Storage Type:  
                            -> Stand-alone Storage 
                        
                        
                    
                        
                        79 MW - construction - south east - Stony Energy Storage Facility - 
                        
7001
                            
                            
                        
                              Planning Permission Expired:  
                            -> 12/10/2020 
                        
                        
                    
                        
                        50 MW - operation - south east - Richborough Energy Park - Phase 2 - 
                        
9626
                            
                            
                        
                              Planning Permission Expired:  
                            -> 30/04/2024 
                        
                        
                    
                        
                        57 MW - planning - north west - National Grids Rainhill Substation Battery storage facility - 
                        
8439
                            
                            
                        
                              Planning Permission Expired:  
                            -> 07/06/2024 
                        
                        
                    
                        
                        57 MW - planning - north west - Penwortham - Battery storage - 
                        
11217
                            
                            
                        
                              Planning Permission Expired:  
                            -> 03/05/2025 
                        
                        
                    
                        
                        50 MW - planning - scotland - Dersalloch Battery Storage Facility - 
                        
8927
                            
                            
                        
                              Planning Permission Expired:  
                            -> 29/11/2026 
                        
                        
                    
                        
                        50 MW - planning - south east - Upton Lane, Nursling - Battery Storage Facility - 
                        
9673
                            
                            
                        
                              Planning Permission Expired:  
                            -> 28/01/2025 
                        
                        
                    
                        
                        50 MW - planning - eastern - Sundon Sub Station Battery Storage Facility - 
                        
9998
                            
                            
                        
                              Planning Permission Expired:  
                            -> 10/11/2024 
                        
                        
                    
                        
                        50 MW - planning - scotland - Electricity Sub Station, Strichen - Battery Storage Facility - 
                        
10039
                            
                            
                        
                              Planning Permission Expired:  
                            -> 01/03/2025 
                        
                        
                    
                        
                        49 MW - operation - yorkshire and humber - Pillswood Phase 1  - 
                        
7005
                        
                            Megapack
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 7360 
                        
                              Planning Permission Expired:  
                            -> 17/11/2020 
                        
                        
                    
                        
                        49 MW - planning - north west - Middleton Clean Energy Plant - 
                        
7029
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/02/2022 
                            -> 26/09/2022 
                        
                        
                    
                        
                        49 MW - planning - yorkshire and humber - Elland Storage Project - 
                        
7053
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 10236 
                        
                        
                    
                        
                        49 MW - planning - eastern - Braintree Road Substation - 
                        
7161
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/09/2020 
                            -> 06/09/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 11995 
                        
                        
                    
                        
                        49 MW - operation - south west - Minety South - Battery Storage - 
                        
7184
                            
                            
                        
                              Site Name: Minety South Battery Storage 
                            -> Minety South - Battery Storage 
                        
                              Installed Capacity (MWelec): 50 
                            -> 49.99 
                        
                              mw: 50 
                            -> 49 
                        
                        
                    
                        
                        49 MW - operation - yorkshire and humber - Pillswood Phase 2 - 
                        
7360
                        
                            Megapack
                            
                            
                        
                              Are they re-applying (Old REPD Ref) :  
                            -> 7005 
                        
                        
                    
                        
                        49 MW - planning - eastern - Lapwing Fen II, Crown Farm - 
                        
7606
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/09/2020 
                            -> 15/09/2022 
                        
                              Site Name: Crown Farm 
                            -> Lapwing Fen II, Crown Farm 
                        
                        
                    
                        
                        49 MW - planning - south east - Rye Common - 
                        
7737
                        
                            Megapack
                            
                            
                        
                              Planning Permission Granted:  
                            -> 28/09/2021 
                        
                              Planning Permission Expired:  
                            -> 28/09/2024 
                        
                        
                    
                        
                        49 MW - planning - east midlands - Newton Wood Farm - 
                        
7780
                            
                            
                        
                              Planning Permission Expired:  
                            -> 28/10/2023 
                        
                        
                    
                        
                        49 MW - construction - east midlands - National Grid Enderby Substation - 
                        
8037
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/02/2021 
                            -> 26/09/2022 
                        
                        
                    
                        
                        49 MW - planning - south west - Claydon Farm - Solar Farm & Battery Storage - 
                        
8039
                            
                            
                        
                              Planning Permission Expired:  
                            -> 17/12/2026 
                        
                        
                    
                        
                        30 MW - planning - scotland - Drumcross Battery Storage - 
                        
8155
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/09/2020 
                            -> 15/09/2022 
                        
                        
                    
                        
                        49 MW - operation - south east - Richborough Energy Park - 
                        
8195
                            
                            
                        
                              Planning Permission Expired:  
                            -> 09/02/2024 
                        
                        
                    
                        
                        49 MW - planning - eastern - Brentwood nergy Storage System - 
                        
8249
                            
                            
                        
                              Planning Permission Expired:  
                            -> 21/05/2024 
                        
                        
                    
                        
                        49 MW - planning - eastern - Crouch Solar Farm - 
                        
8358
                            
                            
                        
                              Planning Permission Expired:  
                            -> 23/12/2024 
                        
                        
                    
                        
                        49 MW - planning - scotland - Shindour - Energy Storage Facility - 
                        
8464
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/01/2022 
                            -> 28/07/2022 
                        
                              Planning Permission Expired:  
                            -> 16/12/2025 
                        
                        
                    
                        
                        49 MW - planning - south west - Moreton Lane - Solar Farm & Battery Storage - 
                        
8844
                            
                            
                        
                              Planning Permission Expired:  
                            -> 05/04/2025 
                        
                        
                    
                        
                        49 MW - construction - scotland - Whitehills Energy Storage Facility - 
                        
8916
                            
                            
                        
                              Planning Permission Expired:  
                            -> 15/12/2024 
                        
                        
                    
                        
                        49 MW - planning - scotland - Drumshoreland Road Battery Storage Facility - 
                        
8920
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/04/2022 
                            -> 15/08/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 07/07/2022 
                        
                              Planning Permission Expired:  
                            -> 07/07/2025 
                        
                        
                    
                        
                        49 MW - planning - eastern - Rush Green Motors - Battery storage - 
                        
8987
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/01/2022 
                            -> 15/09/2022 
                        
                              Planning Permission Expired:  
                            -> 06/10/2024 
                        
                        
                    
                        
                        49 MW - planning - wales - Bronwylfa Road, Talwrn - Battery Storage Facility - 
                        
9052
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/05/2021 
                            -> 27/07/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 05/07/2022 
                        
                              Planning Permission Expired:  
                            -> 05/07/2027 
                        
                        
                    
                        
                        49 MW - planning - south west - Minety South 2 - Battery Storage Facility - 
                        
9063
                            
                            
                        
                              Site Name: Purlieus Farm, Minety - Battery Storage Facility 
                            -> Minety South 2 - Battery Storage Facility 
                        
                              Planning Permission Expired:  
                            -> 08/11/2024 
                        
                        
                    
                        
                        49 MW - planning - eastern - Sundon Substation  - 
                        
9315
                            
                            
                        
                              Planning Permission Expired:  
                            -> 26/01/2025 
                        
                        
                    
                        
                        49 MW - operation - scotland - Pleasance Road - Battery Energy Facility - 
                        
9997
                            
                            
                        
                              Planning Permission Expired:  
                            -> 01/06/2025 
                        
                        
                    
                        
                        49 MW - planning - scotland - Fordtown Energy Storage - 
                        
10239
                            
                            
                        
                              Planning Permission Expired:  
                            -> 24/02/2024 
                        
                        
                    
                        
                        49 MW - planning - eastern - Model Farm - 
                        
10687
                            
                            
                        
                              Planning Permission Expired:  
                            -> 27/01/2025 
                        
                        
                    
                        
                        49 MW - planning - scotland - Midmill, Kintore - Battery Energy Storage - 
                        
10701
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/03/2022 
                            -> 20/07/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 01/07/2022 
                        
                              Planning Permission Expired:  
                            -> 01/07/2025 
                        
                        
                    
                        
                        49 MW - planning - scotland - Broomloan Road -  Battery Energy Storage - 
                        
10886
                            
                            
                        
                              Planning Permission Expired:  
                            -> 28/06/2025 
                        
                        
                    
                        
                        49 MW - planning - scotland - South Leylodge Farmhouse, Kintore - Battery Energy Storage System - 
                        
11092
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/04/2022 
                            -> 11/10/2022 
                        
                              Planning Application Reference: ENQ/2022/0562  
                            -> APP/2022/2022 
                        
                              Planning Application Submitted: 14/04/2022 
                            -> 30/09/2022 
                        
                        
                    
                        
                        49 MW - planning - west midlands - Brown Edge - Battery Storage - 
                        
11418
                            
                            
                        
                              Storage Type:  
                            -> Stand-alone Storage 
                        
                        
                    
                        
                        40 MW - planning - eastern - Maldon Hall - 
                        
7095
                            
                            
                        
                              Planning Permission Expired:  
                            -> 13/05/2022 
                        
                        
                    
                        
                        40 MW - operation - south east - Newlands Farm Battery Storage Facility Phase 2 - 
                        
8264
                            
                            
                        
                              Planning Permission Expired:  
                            -> 26/01/2024 
                        
                        
                    
                        
                        40 MW - planning - scotland - Dalmarnock Road - Battery Storage - 
                        
8507
                            
                            
                        
                              Planning Permission Expired:  
                            -> 16/02/2025 
                        
                        
                    
                        
                        40 MW - planning - yorkshire and humber - Rusholme Grange  - 
                        
9121
                        
                            Megapack
                            
                            
                        
                              Planning Permission Expired:  
                            -> 03/09/2024 
                        
                        
                    
                        
                        40 MW - planning - south west - Leigh Delamere - Solar farm & Battery storage - 
                        
9238
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/06/2021 
                            -> 01/09/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 11/08/2022 
                        
                              Planning Permission Expired:  
                            -> 11/08/2025 
                        
                        
                    
                        
                        40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage - 
                        
9584
                            
                            
                        
                              Planning Permission Expired:  
                            -> 10/02/2025 
                        
                        
                    
                        
                        40 MW - planning - south east - Tanners Lane -  Battery Energy Storage Facility (Phase One) - 
                        
9708
                            
                            
                        
                              Site Name: Tanners Lane - 40 MW Battery Energy Storage Facility (Phase One) 
                            -> Tanners Lane -  Battery Energy Storage Facility (Phase One) 
                        
                              Planning Permission Expired:  
                            -> 26/11/2022 
                        
                        
                    
                        
                        40 MW - planning - yorkshire and humber - Field House Solar Farm - 
                        
10970
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/04/2022 
                            -> 28/07/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 08/07/2022 
                        
                              Planning Permission Expired:  
                            -> 08/07/2025 
                        
                        
                    
                        
                        38 MW - planning - north east - Maiden, Annfield Plain - Energy Storage - 
                        
9036
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 13/12/2021 
                            -> 28/07/2022 
                        
                              Planning Permission Expired:  
                            -> 18/08/2026 
                        
                        
                    
                        
                        35 MW - planning - south west - Patch Elm Lane - Battery Storage  - 
                        
11415
                            
                            
                        
                              Planning Permission Expired:  
                            -> 18/03/2025 
                        
                        
                    
                        
                        32 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage - 
                        
10145
                            
                            
                        
                              Planning Permission Expired:  
                            -> 28/02/2025 
                        
                        
                    
                        
                        30 MW - planning - south west - Catsbrain Farm - 
                        
7988
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/08/2020 
                            -> 04/08/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Are they re-applying (New REPD Ref):  
                            -> 11787 
                        
                              Address: N/o Kingsdown Road and W/o, Catsbrain Farm, Swindon, Wiltshire 
                            -> N/o Kingsdown Road and W/o, Catsbrain Farm, Swindon,  
                        
                        
                    
                        
                        30 MW - planning - scotland - Farburn Place - Energy Storage Facility - 
                        
8385
                            
                            
                        
                              Planning Permission Expired:  
                            -> 30/09/2024 
                        
                        
                    
                        
                        30 MW - planning - south west - North Tawton Primary Substation - Battery Storage - 
                        
9275
                            
                            
                        
                              Planning Permission Expired:  
                            -> 03/11/2024 
                        
                        
                    
                        
                        28 MW - construction - eastern - Lower Dunton Road Battery Storage Facility - 
                        
8213
                            
                            
                        
                              Planning Permission Expired:  
                            -> 05/02/2024 
                        
                        
                    
                        
                        26 MW - planning - yorkshire and humber - West Melton Electricity Substation - Energy Storage System - 
                        
11436
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/06/2022 
                            -> 23/09/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 13/09/2022 
                        
                              Planning Permission Expired:  
                            -> 13/09/2025 
                        
                        
                    
                        
                        25 MW - planning - north west - Bristol Avenue - Battery Energy Storage Facility - 
                        
8809
                            
                            
                        
                              Planning Permission Expired:  
                            -> 11/05/2024 
                        
                        
                    
                        
                        25 MW - planning - yorkshire and humber - Stainland Road, Salterhebble - Battery Storage Facility - 
                        
9397
                            
                            
                        
                              Planning Permission Expired:  
                            -> 28/09/2024 
                        
                        
                    
                        
                        25 MW - planning - north west - Davies Road - Battery Storage - 
                        
9563
                            
                            
                        
                              Planning Permission Expired:  
                            -> 17/03/2025 
                        
                        
                    
                        
                        25 MW - planning - north west - Middlewich Road - Solar Photovoltaics & Battery Storage - 
                        
9565
                            
                            
                        
                              Planning Permission Expired:  
                            -> 11/03/2025 
                        
                        
                    
                        
                        25 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage - 
                        
10222
                            
                            
                        
                              Planning Permission Expired:  
                            -> 21/02/2025 
                        
                        
                    
                        
                        25 MW - planning - scotland - Wemyss Estate - Randolph Solar Farm & Battery Energy Storage - 
                        
11482
                            
                            
                        
                              Storage Type:  
                            -> Co-located with RE 
                        
                              Planning Permission Granted:  
                            -> 24/05/2022 
                        
                              Secretary of State - Intervened: 24/05/2022 
                            ->  
                        
                              Planning Permission Expired:  
                            -> 24/05/2027 
                        
                        
                    
                        
                        20 MW - planning - london - Riverside Energy Park - 
                        
7036
                            
                            
                        
                              Planning Permission Expired:  
                            -> 09/04/2025 
                        
                        
                    
                        
                        20 MW - planning - scotland - Stranoch 2 - 
                        
7306
                            
                            
                        
                              Planning Permission Expired:  
                            -> 24/11/2027 
                        
                        
                    
                        
                        20 MW - planning - scotland - Hagshaw Hill - 
                        
7572
                            
                            
                        
                              Planning Permission Expired: 26/02/2023 
                            -> 26/02/2025 
                        
                        
                    
                        
                        20 MW - planning - scotland - Arecleoch Wind Farm (extension) - 
                        
7882
                            
                            
                        
                              Planning Permission Expired:  
                            -> 16/11/2027 
                        
                        
                    
                        
                        20 MW - planning - east midlands - Vicarage Drove - Solar farm & Battery storage - 
                        
8518
                            
                            
                        
                              Planning Permission Expired:  
                            -> 17/02/2026 
                        
                        
                    
                        
                        20 MW - planning - yorkshire and humber - Hull East Stor Generation Compound - Battery energy storage - 
                        
9006
                            
                            
                        
                              Planning Permission Expired:  
                            -> 29/07/2024 
                        
                        
                    
                        
                        20 MW - construction - north east - Standby Embedded Stor Power Plant - Battery storage - 
                        
9010
                            
                            
                        
                              Planning Permission Expired:  
                            -> 16/06/2024 
                        
                        
                    
                        
                        20 MW - planning - eastern - South Fambridge Hall - Solar farm & Battery storage - 
                        
9274
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/12/2021 
                            -> 05/08/2022 
                        
                              Operator (or Applicant): British Solar Renewables 
                            -> British Solar Renewables / BayWa r.e. UK Limited 
                        
                              Planning Permission Expired:  
                            -> 15/12/2024 
                        
                        
                    
                        
                        20 MW - planning - eastern - The Brickmakers Arms Battery - 
                        
9668
                            
                            
                        
                              Planning Permission Expired:  
                            -> 22/12/2024 
                        
                        
                    
                        
                        20 MW - planning - scotland - Douglas West Wind Farm (extension) - 
                        
9957
                            
                            
                        
                              Planning Permission Expired:  
                            -> 18/11/2024 
                        
                        
                    
                        
                        20 MW - planning - east midlands - Mount Road, Castle Gresley - Battery Storage Facility - 
                        
10012
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/11/2021 
                            -> 18/08/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 17/07/2022 
                        
                              Planning Permission Expired:  
                            -> 17/07/2025 
                        
                        
                    
                        
                        20 MW - planning - north west - Broadgate, Chadderton - Battery Storage Containers - 
                        
10690
                            
                            
                        
                              Planning Permission Expired:  
                            -> 19/05/2025 
                        
                        
                    
                        
                        20 MW - planning - scotland - Strathruddie, Kinglassie - Solar farm - 
                        
10828
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/03/2022 
                            -> 18/07/2022 
                        
                              Planning Permission Expired:  
                            -> 16/03/2025 
                        
                        
                    
                        
                        20 MW - construction - north west - Chadderton - Battery energy storage facility - 
                        
11160
                            
                            
                        
                              Storage Type:  
                            -> Stand-alone Storage 
                        
                        
                    
                        
                        19 MW - planning - scotland - Land North of Thornton Road - 
                        
7131
                            
                            
                        
                              Planning Permission Expired:  
                            -> 10/02/2019 
                        
                        
                    
                        
                        19 MW - planning - scotland - Hillcrest Cottage, Shebster - Battery Energy Storage System - 
                        
10226
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/12/2021 
                            -> 29/09/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 22/08/2022 
                        
                              Planning Permission Expired:  
                            -> 22/08/2025 
                        
                        
                    
                        
                        18 MW - cancelled - south west - Churchtown Solar Farm Battery Storage - 
                        
7726
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/06/2020 
                            -> 15/09/2022 
                        
                        
                    
                        
                        18 MW - planning - south west - Whaddon Lane, Hilperton - 
                        
9057
                            
                            
                        
                              Planning Permission Expired:  
                            -> 06/04/2025 
                        
                        
                    
                        
                        16 MW - planning - east midlands - Waterswallows Road, Green Fairfield - Battery Storage Equipment - 
                        
10716
                            
                            
                        
                              Planning Permission Expired:  
                            -> 08/04/2025 
                        
                        
                    
                        
                        15 MW - planning - eastern - Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage - 
                        
9346
                            
                            
                        
                              Planning Permission Expired:  
                            -> 08/12/2024 
                        
                        
                    
                        
                        13 MW - planning - west midlands - Maybrook Road - Battery facility - 
                        
11008
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 19/04/2022 
                            -> 18/08/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 08/08/2022 
                        
                        
                    
                        
                        10 MW - planning - south east - Stockbridge Road - 
                        
7097
                            
                            
                        
                              Planning Permission Expired:  
                            -> 14/12/2020 
                        
                        
                    
                        
                        10 MW - planning - south west - Minety Substation - 
                        
7942
                            
                            
                        
                              Planning Permission Expired:  
                            -> 07/04/2025 
                        
                        
                    
                        
                        10 MW - planning - scotland - Binn Eco Park - Battery - 
                        
9098
                            
                            
                        
                              Planning Permission Expired:  
                            -> 12/07/2024 
                        
                        
                    
                        
                        10 MW - planning - north west - Park Road Battery Storage - 
                        
10076
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/12/2021 
                            -> 26/09/2022 
                        
                              Planning Permission Expired:  
                            -> 19/11/2024 
                        
                        
                    
                        
                        10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 
                        
11369
                            
                            
                        
                              Site Name: Bath Mews, Minsterley - 10MW Battery Storage Facility 
                            -> Bath Mews, Minsterley - Battery Storage Facility 
                        
                        
                    
                
 
         
     
     
    
    2022-07
    New projects (49): 
    
        
        500 MW - planning - scotland - Devilla Energy Storage Facility - 
        
9248
        
            
    
        
        249 MW - planning - south east - Richborough Energy Park - Phase 3 (Sheaf) - 
        
11201
        
            
    
        
        240 MW - cancelled - east midlands - Temple Oaks Renewable Energy Park - 
        
11562
        
            
    
        
        150 MW - planning - south west - Norrington Gate Farm, Broughton Gifford - Battery Energy Storage Facility - 
        
11612
        
            
    
        
        100 MW - planning - yorkshire and humber - Hales Lane - Battery Storage Facility - 
        
9635
        
            
    
        
        100 MW - planning - scotland - Teviot Wind Farm - 
        
11442
        
            
    
        
        99 MW - planning - west midlands - Newfields Farm - Battery Energy Storage - 
        
10233
        
            
    
        
        80 MW - planning - scotland - Tealing  Battery Energy Storage Farm - 
        
11097
        
            
    
        
        57 MW - planning - north west - Penwortham - Battery storage - 
        
11217
        
            
    
        
        57 MW - planning - north west - Sutton Manor - Battery Storage Facility - 
        
11559
        
            
    
        
        50 MW - planning - eastern - Stocking Pelham - Battery Storage System - 
        
11212
        
            
    
        
        50 MW - planning - west midlands - Lowlands Farm - Battery Storage - 
        
11399
        
            
    
        
        50 MW - planning - eastern - Third Drove, Fengate - Battery Storage - 
        
11558
        
            
    
        
        49 MW - planning - eastern - Tollgate Battery Storage Facility - 
        
6949
        
            
    
        
        49 MW - planning - eastern - Hilfield Farm Tech - 
        
7030
        
            
    
        
        49 MW - planning - north east - Lackenby - 
        
7040
        
            
    
        
        49 MW - planning - south east - Lovedean Energy Storage System - 
        
7064
        
            
    
        
        49 MW - planning - south west - Moreton Lane - Solar Farm & Battery Storage - 
        
8844
        
            
    
        
        49 MW - planning - scotland - East Kilbride - Battery storage - 
        
9013
        
            
    
        
        49 MW - planning - east midlands - Grendon Lakes - Battery Storage - 
        
9341
        
            
    
        
        49 MW - planning - scotland - Drum Farm - Battery Energy Storage System - 
        
9940
        
            
    
        
        49 MW - planning - scotland - Newburgh Road, Abernethy - Battery Storage  - 
        
10607
        
            
    
        
        49 MW - operation - scotland - Jamesfield Organic Centre - Battery Storage - 
        
10863
        
            Megapack
        
            
    
        
        49 MW - planning - scotland - South Leylodge Farmhouse, Kintore - Battery Energy Storage System - 
        
11092
        
            
    
        
        49 MW - planning - west midlands - Brown Edge - Battery Storage - 
        
11418
        
            
    
        
        49 MW - planning - south east - Harrington Franklin, Richborough Energy Park - Battery Storage - 
        
11449
        
            
    
        
        49 MW - cancelled - scotland - Rothienorman - Battery Energy Storage Facility - 
        
11497
        
            
    
        
        45 MW - planning - north east - Edge Lane, Maiden Law - Solar Farm & Battery Storage - 
        
11619
        
            
    
        
        42 MW - planning - scotland - Armadale Wind Farm - 
        
11219
        
            
    
        
        40 MW - planning - east midlands - Breach Farm - 
        
6962
        
            
    
        
        36 MW - planning - south west - Kingston Road, Slimbridge - Battery Storage - 
        
11516
        
            
    
        
        35 MW - planning - south west - Patch Elm Lane - Battery Storage  - 
        
11415
        
            
    
        
        32 MW - planning - south west - Gloucestershire Science and Technology Park (small) - 
        
7181
        
            
    
        
        32 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage - 
        
10145
        
            
    
        
        30 MW - planning - south west - Gloucestershire Science and Technology Park - 
        
7067
        
            
    
        
        30 MW - planning - scotland - Roaring Hill (Resubmission) - 
        
7989
        
            
    
        
        30 MW - planning - north east - West Sleekburn - Battery Storage Compound - 
        
10957
        
            
    
        
        27 MW - planning - scotland - Craig Watch - Wind Farm & Battery Storage - 
        
11609
        
            
    
        
        26 MW - planning - yorkshire and humber - West Melton Electricity Substation - Energy Storage System - 
        
11436
        
            
    
        
        25 MW - planning - scotland - Wemyss Estate - Randolph Solar Farm & Battery Energy Storage - 
        
11482
        
            
    
        
        20 MW - planning - scotland - Fordtown Energy Storage - 
        
7234
        
            
    
        
        20 MW - planning - scotland - Grayside Wind Farm - 
        
11113
        
            
    
        
        20 MW - construction - north west - Chadderton - Battery energy storage facility - 
        
11160
        
            
    
        
        16 MW - planning - wales - Little Llwyn Onn - Solar Farm & Battery Storage - 
        
11544
        
            
    
        
        15 MW - planning - north west - Grassing Rome Street - Battery Storage - 
        
11611
        
            
    
        
        13 MW - planning - west midlands - Maybrook Road - Battery facility - 
        
11008
        
            
    
        
        10 MW - planning - south west - Tiddlywink Barn - 
        
7527
        
            
    
        
        10 MW - planning - west midlands - Bath Mews, Minsterley - Battery Storage Facility - 
        
11369
        
            
    
        
        10 MW - cancelled - south west - Earthcott Green - Battery Storage - 
        
11510
        
            
    
    
    
    Disappeared projects (11): 
    
        
        349 MW - planning - west midlands - Cellarhead - Battery Site - 
        
10013    
    
        
        100 MW - cancelled - eastern - Battlesbridge Bypass, Rettendon - Battery Storage - 
        
9801    
    
        
        49 MW - planning - london - Mill Hill National Grid Substation - 
        
8009    
    
        
        49 MW - cancelled - west midlands - Brown Edge - Battery Storage - 
        
10431    
    
        
        49 MW - cancelled - scotland - East Croftmore - Battery Energy Storage  - 
        
10700    
    
        
        47 MW - planning - south west - Dog Trap Lane, Minety - Battery Energy Storage Systems - 
        
10488    
    
        
        35 MW - planning - south west - Northington Lane - Battery Storage Facility - 
        
9992    
    
        
        35 MW - cancelled - south west - Patch Elm Lane - Battery Storage  - 
        
10282    
    
        
        30 MW - cancelled - wales - Pound Farm Lane - Battery Storage - 
        
9969    
    
        
        20 MW - cancelled - south west - Tiddlywink Barn Battery Storage Power Plant - 
        
9552    
    
        
        13 MW - cancelled - north east - Newcastle International Airport Phase 2 - Battery Storage - 
        
9756    
    
    
    
    Updated projects (55):
    
    
    
        
            
            
                
                    
                        
                        250 MW - construction - eastern - Lapwing Fen 2 - Battery Storage Plant - 
                        
7614
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/02/2022 
                            -> 08/06/2022 
                        
                              Site Name: Flower Farm 
                            -> Lapwing Fen 2 - Battery Storage Plant 
                        
                              Installed Capacity (MWelec): 49.90 
                            -> 250 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/06/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                              mw: 49 
                            -> 250 
                        
                        
                    
                        
                        49 MW - construction - yorkshire and humber - Bradford West Substation (Harrop Edge Farm) - 
                        
7577
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/03/2022 
                            -> 08/07/2022 
                        
                              Site Name: Bradford West Substation (Harrop Edge Farm Resubmission) 
                            -> Bradford West Substation (Harrop Edge Farm) 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction: 01/03/2022 
                            -> 07/07/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - operation - scotland - Wishaw Battery Storage Facility - 
                        
9522
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/09/2021 
                            -> 10/05/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/04/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        20 MW - planning - west midlands - Perserverance Road  - 
                        
7966
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/02/2021 
                            -> 16/06/2022 
                        
                              Site Name: Perserverance Road (Resubmission) 
                            -> Perserverance Road  
                        
                              Storage Type: Co-located with fossil fuel plant 
                            -> Stand-alone Storage 
                        
                              CHP Enabled: Yes 
                            -> No 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Address: Old School Lane, Hereford, Hereford and Worcester 
                            -> Old School Lane, Hereford,  
                        
                              Under Construction:  
                            -> 01/06/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                
 
         
     
    
    
    
    
    
    
        
            
            
                
                    
                        
                        349 MW - planning - west midlands - Dunton Hall - Battery Energy Storage System - 
                        
9427
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/03/2022 
                            -> 17/05/2022 
                        
                        
                    
                        
                        200 MW - planning - north west - Heysham Energy Storage Project - 
                        
9545
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/09/2021 
                            -> 30/05/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 27/05/2022 
                        
                        
                    
                        
                        150 MW - planning - eastern - Thurrock Flexible Generation Plant - 
                        
7696
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/07/2020 
                            -> 26/05/2022 
                        
                              Operator (or Applicant): RPS Group / Thurrock Power 
                            -> Thurrock Power 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Address: Thurrock Flexible Generation Plant Fort Road Tilbury Essex 
                            -> Thurrock Flexible Generation Plant Fort Road Tilbury 
                        
                              Planning Permission Granted:  
                            -> 16/02/2022 
                        
                        
                    
                        
                        100 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy - 
                        
9115
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                        
                    
                        
                        100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage - 
                        
9691
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/10/2021 
                            -> 10/05/2022 
                        
                        
                    
                        
                        99 MW - operation - eastern - Dollymans Storage - 
                        
7088
                            
                            
                        
                              Address: Land North Of National Grid, Doublegate Lane, Rawreth, Wickford, Essex 
                            -> Land North Of National Grid, Doublegate Lane, Rawreth, Wickford,  
                        
                              Planning Permission Expired:  
                            -> 05/11/2023 
                        
                        
                    
                        
                        99 MW - planning - yorkshire and humber - Lakeside Energy Storage Facility - 
                        
8268
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/05/2021 
                            -> 21/06/2022 
                        
                              Operator (or Applicant): Renewable Energy System Limited 
                            -> Tag Energy UK 
                        
                              Installed Capacity (MWelec): 100.00 
                            -> 99.9 
                        
                              mw: 100 
                            -> 99 
                        
                        
                    
                        
                        99 MW - planning - north west - Bay Gateway - Battery Storage Facility - 
                        
9199
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 16/07/2021 
                            -> 27/06/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 26/04/2022 
                        
                        
                    
                        
                        90 MW - planning - east midlands - Caldwell Road - Battery Storage - 
                        
9507
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 31/08/2021 
                            -> 19/04/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 03/03/2022 
                        
                        
                    
                        
                        49 MW - cancelled - south west - Ravensroost Farm, Minety - Battery Energy Storage - 
                        
7014
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/02/2020 
                            -> 29/06/2022 
                        
                              Operator (or Applicant): Arlington Energy (formerly Enso Energy) 
                            -> Conrad Energy Developments II Limited 
                        
                              Site Name: Ravensroost Farm 
                            -> Ravensroost Farm, Minety - Battery Energy Storage 
                        
                              CHP Enabled:  
                            -> No 
                        
                              Development Status: Planning Permission Granted 
                            -> Planning Application Submitted 
                        
                              Development Status (short): Awaiting Construction 
                            -> Application Submitted 
                        
                              Address: Land Adjacent Ravensroost Farm, Minety, Malmesbury, Wiltshire 
                            -> Ravensroost Farm, Minety, Malmesbury,  
                        
                              Planning Application Reference: 18/04914/FUL 
                            -> PL/2022/04524 
                        
                              Planning Application Submitted: 15/06/2018 
                            -> 13/06/2022 
                        
                              Planning Permission Granted: 10/10/2018 
                            ->  
                        
                        
                    
                        
                        49 MW - planning - eastern - Burwell Main Sub-Station - 
                        
7272
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                        
                    
                        
                        49 MW - planning - eastern - Sundon Substation - 
                        
7283
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                        
                    
                        
                        49 MW - construction - south west - Salisbury Substation - 
                        
7510
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/04/2020 
                            -> 04/07/2022 
                        
                              Operator (or Applicant): Harmony Energy Storage 
                            -> SSE Renewables 
                        
                              Address: Land Adjacent To, Salisbury Substation, Wilton, Salisbury, Wiltshire 
                            -> Land Adjacent To, Salisbury Substation, Wilton, Salisbury,  
                        
                        
                    
                        
                        49 MW - cancelled - north east - Lackenby - 
                        
7518
                            
                            
                        
                              Site Name: Lackenby (Resubmission) 
                            -> Lackenby 
                        
                              Address: Land at, Crow Lane, Old Lackenby, Middlesbrough, Cleveland 
                            -> Land at, Crow Lane, Old Lackenby, Middlesbrough 
                        
                        
                    
                        
                        49 MW - planning - eastern - Lapwing Fen II, Crown Farm - 
                        
7606
                            
                            
                        
                              Address: Crown Farm, Mill Road, West Walton, Wisbech, Cambridgeshire 
                            -> Crown Farm, Mill Road, West Walton, Wisbech,  
                        
                              County: Norfolk 
                            -> Cambridgeshire 
                        
                        
                    
                        
                        49 MW - planning - eastern - Model Farm - 
                        
7609
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                        
                    
                        
                        49 MW - operation - north west - Lister Drive - 
                        
7740
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/05/2021 
                            -> 17/05/2022 
                        
                        
                    
                        
                        49 MW - planning - south west - Claydon Farm - Solar Farm & Battery Storage - 
                        
8039
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/01/2022 
                            -> 10/05/2022 
                        
                        
                    
                        
                        49 MW - operation - scotland - Pleasance Road - Battery Energy Facility - 
                        
9997
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/03/2022 
                            -> 12/07/2022 
                        
                              Operator (or Applicant): Coronation Power Limited 
                            -> Gresham House 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Authority: Perth and Kinross Council 
                            -> Perth & Kinross Council 
                        
                              Planning Permission Granted:  
                            -> 01/06/2022 
                        
                        
                    
                        
                        49 MW - planning - scotland - Stainland Energy Storage Project - 
                        
10225
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/12/2021 
                            -> 21/06/2022 
                        
                              Site Name: Upper Geiselittle -  Energy Storage Facility 
                            -> Stainland Energy Storage Project 
                        
                              Planning Application Reference: 21/05957/PAN 
                            -> 22/02054/FUL 
                        
                              Planning Application Submitted: 21/12/2021 
                            -> 23/05/2022 
                        
                        
                    
                        
                        49 MW - planning - scotland - Fordtown Energy Storage - 
                        
10239
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/12/2021 
                            -> 19/05/2022 
                        
                              Operator (or Applicant): Intelligent Land Investments (ILI) 
                            -> Private Developer 
                        
                              Site Name: Fordtown Energy Storage (Resubmission) 
                            -> Fordtown Energy Storage 
                        
                              Installed Capacity (MWelec): 19.90 
                            -> 49.9 
                        
                              mw: 19 
                            -> 49 
                        
                        
                    
                        
                        49 MW - cancelled - west midlands - Lanegreat Barr, Great Barr - Battery Storage Facility - 
                        
10438
                            
                            
                        
                              Address: Adj The Duckery, Chapel Lane, Great Barr 
                            -> Adj The Duckery, Chapel Lane, Great Barr, Walsall 
                        
                              County: Walsall 
                            -> West Midlands 
                        
                        
                    
                        
                        49 MW - planning - scotland - Broomloan Road -  Battery Energy Storage - 
                        
10886
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/03/2022 
                            -> 08/07/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 28/06/2022 
                        
                        
                    
                        
                        48 MW - planning - northern ireland - Classic Marble Showers Site - 
                        
7208
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Address: South of Classic Marble (Showe, 31 Garvaghy Bridge Road, Garvaghy, Dungannon, Co Tyrone 
                            -> South of Classic Marble (Showe, 31 Garvaghy Bridge Road, Garvaghy, Dungannon,  
                        
                        
                    
                        
                        45 MW - planning - scotland - Pleasance Road - 
                        
7217
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                        
                    
                        
                        40 MW - planning - east midlands - Breach Farm - Energy Barn - 
                        
6914
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/08/2020 
                            -> 27/05/2022 
                        
                              Operator (or Applicant): Anesco/ Green Hedge Energy UK 
                            -> Bluefield Solar Income Fund 
                        
                              Address: Breach Farm, Caldwell, Swadlincote, Derbyshire 
                            -> Breach Farm, Caldwell, Swadlincote,  
                        
                              Planning Permission Expired:  
                            -> 15/08/2020 
                        
                        
                    
                        
                        40 MW - planning - eastern - Norwich Road Industrial Estate - 
                        
6958
                            
                            
                        
                              Address: Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth Suffolk 
                            -> Land Within Norwich Road Industrial Estate West Of Sub Station And North Of Halesworth Business Park Norwich Road Halesworth  
                        
                        
                    
                        
                        40 MW - planning - west midlands - Whitehouse Farm Energy Barn - 
                        
7987
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/08/2020 
                            -> 27/05/2022 
                        
                              Operator (or Applicant): Green Hedge 
                            -> Bluefield Solar Income Fund 
                        
                              Address: Whitehouse Farm, Blakes Lane, Guarlford, Malvern, Hereford and Worcester 
                            -> Whitehouse Farm, Blakes Lane, Guarlford, Malvern, 
                        
                              Planning Permission Expired: 29/11/2020 
                            ->  
                        
                        
                    
                        
                        40 MW - planning - scotland - Dalmarnock Road - Battery Storage - 
                        
8507
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/03/2022 
                            -> 11/05/2022 
                        
                        
                    
                        
                        35 MW - planning - yorkshire and humber - Rusholme Grange - 
                        
7093
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                        
                    
                        
                        32 MW - planning - yorkshire and humber - Kirkhaw Lane Battery Storage - 
                        
8430
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                        
                    
                        
                        30 MW - planning - scotland - Blackpark Energy Storage - 
                        
8105
                            
                            
                        
                              Site Name: Blackpark Energy Storage (Resubmission) 
                            -> Blackpark Energy Storage 
                        
                              Address: Black Park Farm, Nairn, Highlands 
                            -> Black Park Farm, Nairn, 
                        
                        
                    
                        
                        30 MW - planning - scotland - Jamesfield Organic Centre, Phase 1 - 
                        
10456
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                        
                    
                        
                        30 MW - planning - eastern - Colton - Solar photovoltaic farm, Battery storage - 
                        
10945
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/04/2022 
                            -> 08/07/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 30/06/2022 
                        
                        
                    
                        
                        29 MW - planning - scotland - Fordtown Energy Storage  - 
                        
7764
                            
                            
                        
                              Site Name: Fordtown Energy Storage (Resubmission) 
                            -> Fordtown Energy Storage  
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                        
                    
                        
                        29 MW - planning - scotland - Learielaw Farm - 
                        
7970
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/02/2021 
                            -> 21/06/2022 
                        
                        
                    
                        
                        23 MW - operation - east midlands - Asfordby Business Park (1) - 
                        
6932
                            
                            
                        
                              Address: Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire,  
                            -> Zone P, Asfordby Business Park, Welby Road, Melton Mowbray,  
                        
                        
                    
                        
                        20 MW - operation - west midlands - Land to the west of Clay Hill Pit / Larport Farm - 
                        
6911
                            
                            
                        
                              Address: Land West of Clay Hill Pit Larport Farm Larport Lane Dormington Herefordshire  
                            -> Land West of Clay Hill Pit Larport Farm Larport Lane Dormington  
                        
                        
                    
                        
                        20 MW - construction - east midlands - Chelveston Renewable Energy Park - 
                        
6941
                            
                            
                        
                              Address: Chelveston Renewable Energy Pa, The Airfield, Chelveston, Wellingborough,οΏ½Northamptonshire 
                            -> Chelveston Renewable Energy Pa, The Airfield, Chelveston, Wellingborough,οΏ½ 
                        
                        
                    
                        
                        20 MW - operation - north east - Ray Battery Storage Facility - 
                        
6943
                            
                            
                        
                              Address: Ray Wind Farm, Kirkwhelpington, Newcastle Upon Tyne, Northumberland 
                            -> Ray Wind Farm, Kirkwhelpington, Newcastle Upon Tyne, 
                        
                        
                    
                        
                        20 MW - planning - west midlands - Perseverance Road - 
                        
7061
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Address: Land At Perseverance Road, Perseverance Road, Hereford, Hereford & Worcester 
                            -> Land At Perseverance Road, Perseverance Road, Hereford,  
                        
                        
                    
                        
                        20 MW - planning - yorkshire and humber - Kirkhaw Lane - 
                        
7149
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                        
                    
                        
                        20 MW - planning - scotland - Blackpark Farm  - 
                        
7226
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                              Address: Black Park Farm, Nairn, Highlands 
                            -> Black Park Farm, Nairn,  
                        
                        
                    
                        
                        20 MW - operation - south west - Feeder Road - 
                        
7663
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/05/2021 
                            -> 20/05/2022 
                        
                        
                    
                        
                        20 MW - planning - north west - Broadgate, Chadderton - Battery Storage Containers - 
                        
10690
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 01/03/2022 
                            -> 14/06/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 19/05/2022 
                        
                        
                    
                        
                        19 MW - planning - scotland - Jamesfield Organic Centre, Phase 2 - 
                        
7315
                            
                            
                        
                              Development Status: Planning Permission Granted 
                            -> Revised 
                        
                              Development Status (short): Awaiting Construction 
                            -> Revised 
                        
                        
                    
                        
                        18 MW - construction - south east - Aurora Solar Farm - 
                        
7385
                            
                            
                        
                              Address: Twelve Acre Farm, Chilbridge Road, Eynsham, Witney, Oxfordshire 
                            -> Twelve Acre Farm, Chilbridge Road, Eynsham, Witney,  
                        
                        
                    
                        
                        18 MW - planning - south west - Whaddon Lane, Hilperton - 
                        
9057
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/05/2021 
                            -> 27/04/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 06/04/2022 
                        
                        
                    
                        
                        16 MW - planning - east midlands - Waterswallows Road, Green Fairfield - Battery Storage Equipment - 
                        
10716
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/03/2022 
                            -> 19/04/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 08/04/2022 
                        
                        
                    
                        
                        10 MW - operation - eastern - Nevendon - 
                        
6926
                            
                            
                        
                              Address: Nevendon, Essex 
                            -> Nevendon, 
                        
                        
                    
                        
                        10 MW - planning - south west - Minety Substation - 
                        
7942
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/06/2020 
                            -> 27/04/2022 
                        
                              Installed Capacity (MWelec): 49.90 
                            -> 10 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Address: Land Near Minety Substation, Stonehill, Charlton, Malmesbury, Wiltshire 
                            -> Land Near Minety Substation, Stonehill, Charlton, Malmesbury,  
                        
                              Planning Permission Granted:  
                            -> 07/04/2022 
                        
                              mw: 49 
                            -> 10 
                        
                        
                    
                
 
         
     
     
    
    2022-04
    New projects (48): 
    
        
        400 MW - planning - scotland - Hunterston Grid Services Complex - Energy Storage Facility - 
        
10535
        
            
    
        
        400 MW - planning - scotland - Kincardine Grid Services Complex - Energy Storage Facility - 
        
10536
        
            
    
        
        300 MW - construction - scotland - Blackhillock Electricity Substation - Battery Energy Storage System - 
        
9723
        
            
    
        
        100 MW - cancelled - eastern - Battlesbridge Bypass, Rettendon - Battery Storage - 
        
9801
        
            
    
        
        100 MW - planning - eastern - Walpole St Andrew - Battery storage  - 
        
10876
        
            
    
        
        100 MW - cancelled - south west - Hook Street - Energy Storage Compound - 
        
10142
        
            
    
        
        99 MW - planning - north east - South Thinford Lane, Thinford - Energy Storage - 
        
10489
        
            
    
        
        90 MW - planning - yorkshire and humber - Little Crow Solar Park - 
        
7175
        
            
    
        
        80 MW - planning - yorkshire and humber - Netherlands Way - Battery Energy Facility - 
        
10429
        
            
    
        
        50 MW - planning - scotland -  Frodo Solar and Battery Energy Development - 
        
10994
        
            
    
        
        50 MW - planning - west midlands - Penstone Lane, Penn 1 - Battery Storage Facility - 
        
10705
        
            
    
        
        50 MW - planning - west midlands - Penstone Lane, Lower Penn 2 - Battery Storage - 
        
10733
        
            
    
        
        50 MW - planning - south east - Upton Lane, Nursling - Battery Storage Facility - 
        
9673
        
            
    
        
        49 MW - planning - scotland - Midmill, Kintore - Battery Energy Storage - 
        
10701
        
            
    
        
        49 MW - construction - scotland - Ferrymuir - 
        
7371
        
            
    
        
        49 MW - planning - scotland - Broomloan Road -  Battery Energy Storage - 
        
10886
        
            
    
        
        49 MW - planning - eastern - Model Farm - 
        
10687
        
            
    
        
        49 MW - cancelled - west midlands - Brown Edge - Battery Storage - 
        
10431
        
            
    
        
        49 MW - operation - scotland - Pleasance Road - Battery Energy Facility - 
        
9997
        
            
    
        
        49 MW - construction - south east - Halewick Lane, Sompting - Battery-based Energy Storage Facility - 
        
7168
        
            
    
        
        49 MW - planning - south east - Burcot Solar Farm - 
        
9374
        
            
    
        
        49 MW - planning - scotland - Shindour - Energy Storage Facility - 
        
8464
        
            
    
        
        49 MW - planning - south west - Claydon Farm - Solar Farm & Battery Storage - 
        
8039
        
            
    
        
        49 MW - cancelled - scotland - East Croftmore - Battery Energy Storage  - 
        
10700
        
            
    
        
        49 MW - cancelled - west midlands - Lanegreat Barr, Great Barr - Battery Storage Facility - 
        
10438
        
            
    
        
        49 MW - planning - east midlands - Grendon Lakes, Grendon - Battery Storage Facility - 
        
10955
        
            
    
        
        49 MW - planning - scotland - Drumshoreland Road Battery Storage Facility - 
        
8920
        
            
    
        
        47 MW - planning - south west - Dog Trap Lane, Minety - Battery Energy Storage Systems - 
        
10488
        
            
    
        
        40 MW - planning - yorkshire and humber - Field House Solar Farm - 
        
10970
        
            
    
        
        40 MW - planning - scotland - Dalmarnock Road - Battery Storage - 
        
8507
        
            
    
        
        35 MW - planning - yorkshire and humber - Rusholme Grange - 
        
7093
        
            
    
        
        30 MW - planning - scotland - Jamesfield Organic Centre, Phase 1 - 
        
10456
        
            
    
        
        30 MW - planning - scotland - Clachaig Glen - 
        
10996
        
            
    
        
        30 MW - planning - eastern - Colton - Solar photovoltaic farm, Battery storage - 
        
10945
        
            
    
        
        30 MW - planning - west midlands - Upper Newton Farm, Upper Tean - Solar Farm & Battery Storage - 
        
10978
        
            
    
        
        20 MW - planning - east midlands - Vicarage Drove - Solar farm & Battery storage - 
        
8518
        
            
    
        
        20 MW - planning - eastern - Moggerhanger Road, Sandy - Solar Farm - 
        
10981
        
            
    
        
        20 MW - planning - north west - Former EON Power Station, Booth Lane - Battery Energy Storage System - 
        
10436
        
            
    
        
        20 MW - planning - north west - Vause Farm - Battery Storage - 
        
10989
        
            
    
        
        20 MW - planning - scotland - Strathruddie, Kinglassie - Solar farm - 
        
10828
        
            
    
        
        20 MW - planning - north west - Broadgate, Chadderton - Battery Storage Containers - 
        
10690
        
            
    
        
        20 MW - planning - south west - Plymouth Stor Generation - Battery storage - 
        
10432
        
            
    
        
        20 MW - planning - scotland - Carrick Windfarm - 
        
10540
        
            
    
        
        20 MW - planning - scotland - Chleansaid Onshore Wind Farm - 
        
10997
        
            
    
        
        20 MW - operation - yorkshire and humber - Kirkhaw Lane - 
        
7148
        
            
    
        
        16 MW - planning - east midlands - Waterswallows Road, Green Fairfield - Battery Storage Equipment - 
        
10716
        
            
    
        
        12 MW - cancelled - eastern - St Ippolyts - Solar Farm & Battery Storage - 
        
9695
        
            
    
        
        10 MW - planning - scotland - Binn Eco Park - Battery - 
        
9098
        
            
    
    
    
    Disappeared projects (3): 
    
        
        150 MW - construction - south east - Cleve Hill Solar Project - 
        
7856    
    
        
        30 MW - planning - south west - Gloucestershire Science and Technology Park - 
        
7067    
    
        
        30 MW - planning - scotland - Roaring Hill (Resubmission) - 
        
7989    
    
    
    
    Updated projects (56):
    
    
    
        
            
            
                
                    
                        
                        57 MW - planning - north west - Capenhurst Lane - 
                        
8283
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/01/2021 
                            -> 24/01/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Under Construction 
                        
                              Development Status (short): Application Submitted 
                            -> Under Construction 
                        
                              Planning Authority:  
                            -> Cheshire West and Chester Council 
                        
                              Planning Permission Granted:  
                            -> 16/04/2021 
                        
                              Under Construction:  
                            -> 01/02/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        50 MW - operation - scotland - Whitelee Wind Farm Battery Storage Extension - 
                        
7174
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/04/2020 
                            -> 21/02/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Operational 
                        
                              Development Status (short): Awaiting Construction 
                            -> Operational 
                        
                              Under Construction:  
                            -> 01/10/2020 
                        
                              Operational:  
                            -> 01/10/2021 
                        
                              status: planning 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        49 MW - construction - south east - Sundridge Hill - 
                        
7081
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/01/2020 
                            -> 17/03/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Address: Land To South Of A228, Sundridge Hill, Cuxton, Rochester, Kent 
                            -> Land To South Of A228, Sundridge Hill, Cuxton, Rochester, 
                        
                              Under Construction:  
                            -> 01/02/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        49 MW - construction - eastern - Tollgate Farm Battery Storage  - 
                        
7335
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/12/2021 
                            -> 01/02/2022 
                        
                              Site Name: Tollgate Farm Battery Storage (Resubmission) 
                            -> Tollgate Farm Battery Storage  
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Under Construction:  
                            -> 01/02/2022 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        21 MW - operation - eastern - Clayhill Farm -  Battery Energy Storage - 
                        
7570
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/01/2020 
                            -> 26/01/2022 
                        
                              Operator (or Applicant): Arlington Energy 
                            -> Enso Energy Limited 
                        
                              Site Name: Greenfield Road 
                            -> Clayhill Farm -  Battery Energy Storage 
                        
                              Storage Type: Co-located with RE 
                            -> Stand-alone Storage 
                        
                              Storage Co-location REPD Ref ID: 2265 
                            ->  
                        
                              Installed Capacity (MWelec): 40.00 
                            -> 21.00 
                        
                              CHP Enabled:  
                            -> No 
                        
                              Development Status: Under Construction 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Under Construction 
                            -> Awaiting Construction 
                        
                              Under Construction: 19/06/2019 
                            ->  
                        
                              status: construction 
                            -> planning 
                        
                              mw: 40 
                            -> 21 
                        
                        
                    
                        
                        20 MW - operation - wales - Energy Centre Royal Mint - 
                        
7684
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 17/08/2020 
                            -> 16/02/2022 
                        
                              Development Status: Under Construction 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Under Construction 
                            -> Awaiting Construction 
                        
                              Under Construction: 01/04/2021 
                            ->  
                        
                              status: construction 
                            -> planning 
                        
                        
                    
                
 
         
     
    
    
    
    
    
    
        
            
            
                
                    
                        
                        550 MW - planning - east midlands - Spalding Energy Park - Battery Storage - 
                        
10173
                            
                            
                        
                              Operator (or Applicant): Spalding Energy Park Limited 
                            -> Intergen Limited 
                        
                              Site Name: West Marsh Road - Battery Energy Storage System 
                            -> Spalding Energy Park - Battery Storage 
                        
                        
                    
                        
                        450 MW - planning - eastern - Gateway Energy Centre - Battery Energy Storage - 
                        
10309
                            
                            
                        
                              Operator (or Applicant): Gateway Energy Centre Limited 
                            -> Intergen Limited 
                        
                              Site Name: Baltic Avenue - Battery Energy Storage 
                            -> Gateway Energy Centre - Battery Energy Storage 
                        
                        
                    
                        
                        60 MW - planning - north east - Greystones Road, Grangetown - Battery Energy Storage System - 
                        
10081
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/11/2021 
                            -> 11/02/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Authority: Redcar and Cleveland Council 
                            -> Redcar and Cleveland Borough Council 
                        
                              Planning Permission Granted:  
                            -> 17/12/2021 
                        
                        
                    
                        
                        349 MW - planning - west midlands - Dunton Hall - Battery Energy Storage System - 
                        
9427
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 13/08/2021 
                            -> 08/03/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 04/03/2022 
                        
                        
                    
                        
                        100 MW - planning - south west - St Dennis - Battery Energy Storage - 
                        
10058
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/12/2021 
                            -> 08/02/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 02/02/2022 
                        
                        
                    
                        
                        99 MW - planning - yorkshire and humber - Skelton Grange Battery Storage Facility - 
                        
8914
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/04/2021 
                            -> 24/01/2022 
                        
                              Operator (or Applicant): Skelton Peak Power Limited 
                            -> Catalyst Capital LLP 
                        
                              Site Name: Skelton Battery Storage Facility 
                            -> Skelton Grange Battery Storage Facility 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 04/08/2021 
                        
                        
                    
                        
                        80 MW - operation - scotland - Aikengall II Community Wind Farm Battery - 
                        
7015
                            
                            
                        
                              Turbine Capacity (MW): 4.20 
                            -> 4.2 
                        
                              Height of Turbines (m): 145.00 
                            -> 145 
                        
                        
                    
                        
                        79 MW - construction - south east - Stony Energy Storage Facility - 
                        
7001
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/06/2020 
                            -> 18/03/2022 
                        
                              Operator (or Applicant): Renewable Energy Systems (RES) 
                            -> Gore Street Energy Storage Fund 
                        
                              Installed Capacity (MWelec): 49.90 
                            -> 79.90 
                        
                              mw: 49 
                            -> 79 
                        
                        
                    
                        
                        57 MW - planning - north west - National Grids Rainhill Substation Battery storage facility - 
                        
8439
                            
                            
                        
                              Address: οΏ½Land To The South Of National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens WA9 4QH 
                            -> οΏ½Land To The South Of National Grid's Rainhill Substation Lea Green Road Sutton Manor St Helens  
                        
                        
                    
                        
                        50 MW - planning - scotland - Electricity Sub Station, Strichen - Battery Storage Facility - 
                        
10039
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 02/12/2021 
                            -> 04/03/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 01/03/2022 
                        
                        
                    
                        
                        50 MW - operation - south west - Stonehill Energy Storage - 
                        
7773
                            
                            
                        
                              Address: Land Adjacent To Electricity S, Stonehill, Charlton, Malmesbury, Wiltshire 
                            -> Land Adjacent To Electricity S, Stonehill, Charlton, Malmesbury, 
                        
                        
                    
                        
                        50 MW - planning - scotland - Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage - 
                        
8342
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/11/2021 
                            -> 21/02/2022 
                        
                              Post Code: G76 
                            -> G76 0QQ 
                        
                              Planning Authority: East Ayrshire Council 
                            -> Scottish Government (S36) 
                        
                              Planning Application Reference: 21/0261/PP  
                            -> ECU00002198 
                        
                              Planning Application Submitted: 13/05/2021 
                            -> 17/04/2021 
                        
                        
                    
                        
                        49 MW - construction - scotland - Whitehills Energy Storage Facility - 
                        
8916
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/09/2021 
                            -> 11/03/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 15/12/2021 
                        
                        
                    
                        
                        49 MW - construction - yorkshire and humber - Bradford West Substation (Harrop Edge Farm) - 
                        
7577
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 15/11/2019 
                            -> 08/03/2022 
                        
                              Address: Land At Grid Ref 409233 434810 Old Allen Road Wilsden Bradford West Yorkshire 
                            -> Land At Grid Ref 409233 434810 Old Allen Road Wilsden Bradford  
                        
                              Post Code:  
                            -> BD15 9AG 
                        
                              Under Construction:  
                            -> 01/03/2022 
                        
                        
                    
                        
                        49 MW - planning - eastern - Burwell Main Sub-Station - 
                        
7272
                            
                            
                        
                              Address: Land adj to Burwell 400kV Subs, Weirs Drove, Burwell, Cambridge, Cambridgeshire 
                            -> Land adj to Burwell 400kV Subs, Weirs Drove, Burwell, Cambridge,  
                        
                        
                    
                        
                        49 MW - planning - eastern - Sundon Substation - 
                        
7283
                            
                            
                        
                              Address: Sundon 400KV Substation, Waterend Lane, Chalton, Luton, Bedfordshire 
                            -> Sundon 400KV Substation, Waterend Lane, Chalton, 
                        
                        
                    
                        
                        49 MW - planning - eastern - Crouch Solar Farm - 
                        
8358
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/05/2021 
                            -> 14/03/2022 
                        
                              Operator (or Applicant): Private Developer 
                            -> Low Carbon Storage 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Address: Dunton Road 
                            -> Park Farm, Dunton Road, Brentwood 
                        
                              Planning Permission Granted:  
                            -> 23/12/2021 
                        
                        
                    
                        
                        49 MW - planning - south east - Rye Common - 
                        
7737
                        
                            Megapack
                            
                            
                        
                              Address: Street Record, Rye Common Lane, Crondall, Farnham, Surrey 
                            -> Street Record, Rye Common Lane, Crondall, Farnham,  
                        
                        
                    
                        
                        49 MW - operation - north west - Lister Drive - 
                        
7740
                            
                            
                        
                              Address: Land Adjacent to Lister Drive, Carnegie Road, Liverpool, Merseyside 
                            -> Land Adjacent to Lister Drive, Carnegie Road, Liverpool,  
                        
                        
                    
                        
                        49 MW - operation - north west - Liverpool Energy Management Facility - 
                        
7772
                            
                            
                        
                              Address: Land To The South Of, Carnegie Road, Liverpool, Merseyside 
                            -> Land To The South Of, Carnegie Road, Liverpool, 
                        
                        
                    
                        
                        49 MW - planning - eastern - Sundon Substation  - 
                        
9315
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 16/07/2021 
                            -> 30/03/2022 
                        
                              Site Name: Sundon Substation - 49.9MW Battery Storage 
                            -> Sundon Substation  
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 26/01/2022 
                        
                        
                    
                        
                        49 MW - planning - eastern - Admiralty Road - Battery Energy Storage Facility - 
                        
9470
                            
                            
                        
                              County: Norfolk  
                            -> Norfolk 
                        
                        
                    
                        
                        49 MW - planning - eastern - Model Farm - 
                        
7609
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 13/09/2021 
                            -> 24/02/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Address: Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech, Cambridgeshire 
                            -> Model Farm, Frenchs Road, Walpole St. Andrew, Wisbech,  
                        
                              County: Norfolk 
                            -> Cambridgeshire 
                        
                              Planning Application Reference: 21/01715/FM 
                            -> 19/02003/F 
                        
                              Planning Application Submitted: 31/08/2021 
                            -> 20/11/2019 
                        
                              Planning Permission Granted:  
                            -> 06/03/2020 
                        
                        
                    
                        
                        250 MW - construction - eastern - Lapwing Fen 2 - Battery Storage Plant - 
                        
7614
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/09/2020 
                            -> 21/02/2022 
                        
                              Address: Flower Farm, The Marsh, Walpole St. Andrew, Wisbech, Cambridgeshire 
                            -> Flower Farm, The Marsh, Walpole St. Andrew, Wisbech,  
                        
                              County: Norfolk 
                            -> Cambridgeshire 
                        
                        
                    
                        
                        49 MW - planning - north west - Middleton Clean Energy Plant - 
                        
7029
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 04/06/2020 
                            -> 01/02/2022 
                        
                              CHP Enabled:  
                            -> No 
                        
                              Address: Middleton Clean Energy Plant, Middleton Road, Heysham, Morecambe, Lancashire, LA3 2 
                            -> Middleton Clean Energy Plant, Middleton Road, Heysham, Morecambe 
                        
                        
                    
                        
                        49 MW - planning - yorkshire and humber - Land Adjacent to 4 Redcote Lane (Armley) - 
                        
7111
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 12/08/2020 
                            -> 19/01/2022 
                        
                              CHP Enabled:  
                            -> No 
                        
                              Address: Land Adjacent, 4 Redcote Lane, Armley, Leeds, West Yorkshire 
                            -> Land Adjacent, 4 Redcote Lane, Armley, Leeds,  
                        
                              Under Construction: 01/06/2021 
                            -> 01/02/2022 
                        
                        
                    
                        
                        49 MW - planning - eastern - Rush Green Motors - Battery storage - 
                        
8987
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/10/2021 
                            -> 24/01/2022 
                        
                        
                    
                        
                        45 MW - planning - scotland - Pleasance Road - 
                        
7217
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/01/2020 
                            -> 08/03/2022 
                        
                        
                    
                        
                        40 MW - planning - south east - Tanners Lane -  Battery Energy Storage Facility (Phase One) - 
                        
9708
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/09/2021 
                            -> 07/04/2022 
                        
                        
                    
                        
                        40 MW - planning - yorkshire and humber - Rusholme Grange  - 
                        
9121
                        
                            Megapack
                            
                            
                        
                              Site Name: Rusholme Grange Resubmission 
                            -> Rusholme Grange  
                        
                        
                    
                        
                        40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage - 
                        
9584
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 13/09/2021 
                            -> 24/02/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 10/02/2022 
                        
                        
                    
                        
                        35 MW - cancelled - south west - Patch Elm Lane - Battery Storage  - 
                        
10282
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/12/2021 
                            -> 30/03/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 18/03/2022 
                        
                        
                    
                        
                        32 MW - planning - yorkshire and humber - Kirkhaw Lane Battery Storage - 
                        
8430
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 11/05/2021 
                            -> 24/02/2022 
                        
                              Address: Kirkhaw Lane Knottingley West Yorkshire 
                            -> Kirkhaw Lane Knottingley  
                        
                        
                    
                        
                        29 MW - planning - scotland - Fordtown Energy Storage  - 
                        
7764
                            
                            
                        
                              Address: Fordtown, Kintore, Inverurie, Grampian 
                            -> Fordtown, Kintore, Inverurie 
                        
                        
                    
                        
                        25 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage - 
                        
10222
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/12/2021 
                            -> 28/02/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 21/02/2022 
                        
                        
                    
                        
                        25 MW - planning - north west - Middlewich Road - Solar Photovoltaics & Battery Storage - 
                        
9565
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/09/2021 
                            -> 17/03/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 11/03/2022 
                        
                        
                    
                        
                        25 MW - planning - north west - Davies Road - Battery Storage - 
                        
9563
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 09/09/2021 
                            -> 18/03/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 17/03/2022 
                        
                        
                    
                        
                        20 MW - operation - north west - Lascar Works  - 
                        
7464
                            
                            
                        
                              Planning Application Reference: 62,215 
                            -> 62215 
                        
                        
                    
                        
                        20 MW - planning - south east - Basing Road - 
                        
7746
                            
                            
                        
                              Address: Land At, Basing Road, Old Basing, Basingstoke, Hampshire 
                            -> Land At, Basing Road, Old Basing, Basingstoke,  
                        
                        
                    
                        
                        20 MW - planning - west midlands - Perseverance Road - 
                        
7061
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/11/2021 
                            -> 24/02/2022 
                        
                        
                    
                        
                        20 MW - planning - scotland - Douglas West Wind Farm (extension) - 
                        
9957
                            
                            
                        
                              Operator (or Applicant): Greencoat UK Wind PLC 
                            -> ScottishPower Renewables (UK) Limited 
                        
                              Address: Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark, Strathclyde 
                            -> Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark, 
                        
                        
                    
                        
                        20 MW - construction - north west - Gipsy Lane - 
                        
7632
                            
                            
                        
                              Planning Authority: Rochdale Borough Council 
                            -> Rochdale Metropolitan Borough Council 
                        
                        
                    
                        
                        20 MW - planning - london - Riverside Energy Park - 
                        
7036
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/06/2020 
                            -> 06/04/2022 
                        
                        
                    
                        
                        20 MW - planning - yorkshire and humber - Kirkhaw Lane - 
                        
7149
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/01/2022 
                            -> 24/02/2022 
                        
                              Operator (or Applicant): Volta Energy Storage 
                            -> Walker & Son (Hauliers) Limited 
                        
                              Site Name: Kirkhaw Lane - Resubmission 
                            -> Kirkhaw Lane 
                        
                              Storage Type: Co-located with fossil fuel plant 
                            -> Stand-alone Storage 
                        
                              Planning Authority: Wakefield Council 
                            -> Wakefield Metropolitan District Council 
                        
                        
                    
                        
                        20 MW - cancelled - south west - Tiddlywink Barn Battery Storage Power Plant - 
                        
9552
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 08/09/2021 
                            -> 21/02/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 14/01/2022 
                        
                        
                    
                        
                        49 MW - planning - scotland - Fordtown Energy Storage - 
                        
10239
                            
                            
                        
                              Installed Capacity (MWelec): 49.90 
                            -> 19.90 
                        
                              mw: 49 
                            -> 19 
                        
                        
                    
                        
                        19 MW - planning - scotland - Jamesfield Organic Centre, Phase 2 - 
                        
7315
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/04/2020 
                            -> 26/01/2022 
                        
                              Site Name: Jamesfield Organic Centre 
                            -> Jamesfield Organic Centre, Phase 2 
                        
                              CHP Enabled:  
                            -> No 
                        
                              Address: Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar, Fife 
                            -> Land 140 Metres North East Of, Jamesfield Organic Centre, Newburgh, Cupar,  
                        
                              Planning Permission Expired: 06/03/2022 
                            -> 30/09/2022 
                        
                        
                    
                        
                        18 MW - cancelled - south west - Churchtown Solar Farm Battery Storage - 
                        
7726
                            
                            
                        
                              Address: Churchtown Solar Farm, Nanterrow Lane, Connor Downs, Hayle, Cornwall 
                            -> Churchtown Solar Farm, Nanterrow Lane, Connor Downs, Hayle,  
                        
                        
                    
                        
                        10 MW - construction - south east - Land Adj Harmer Warren Quarry - 
                        
7143
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/04/2020 
                            -> 21/02/2022 
                        
                              Address: Land Adj Harmer Warren Quarry, Plumley, Harbridge Drove, Ellingham, Ringwood, Hampshire 
                            -> Land Adj Harmer Warren Quarry, Plumley, Harbridge Drove, Ellingham, Ringwood 
                        
                        
                    
                        
                        10 MW - cancelled - scotland - Lethen Wind Farm  Wind Turbines and Energy Storage - 
                        
10237
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 10/01/2022 
                            -> 24/01/2022 
                        
                              Planning Authority: Highland Council 
                            -> Scottish Government (S36) 
                        
                              Planning Application Reference: 21/05946/S36 
                            -> ECU00002216 
                        
                              Planning Application Submitted: 20/12/2021 
                            -> 21/01/2022 
                        
                        
                    
                
 
         
     
     
    
    2021-12
    New projects (39): 
    
        
        550 MW - planning - east midlands - Spalding Energy Park - Battery Storage - 
        
10173
        
            
    
        
        450 MW - planning - eastern - Gateway Energy Centre - Battery Energy Storage - 
        
10309
        
            
    
        
        60 MW - planning - north east - Greystones Road, Grangetown - Battery Energy Storage System - 
        
10081
        
            
    
        
        349 MW - planning - west midlands - Cellarhead - Battery Site - 
        
10013
        
            
    
        
        150 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy - 
        
10022
        
            
    
        
        130 MW - planning - eastern - Stoke Lane - Battery Energy Storage - 
        
10390
        
            
    
        
        100 MW - planning - south west - St Dennis - Battery Energy Storage - 
        
10058
        
            
    
        
        100 MW - planning - south east - Penn Croft Farm, Crondall - Battery Energy Storage Facility - 
        
10163
        
            
    
        
        99 MW - planning - yorkshire and humber - Scawby Brook, Brigg - Battery Storage - 
        
9848
        
            
    
        
        50 MW - planning - scotland - Whitelees Hydrogen Production Facility, Solar Farm & Battery Storage - 
        
8342
        
            
    
        
        50 MW - cancelled - scotland - Braidfield Road, Hardgate - Battery Storage Facility - 
        
9869
        
            
    
        
        50 MW - planning - wales - Ipswich Road, Cardiff - Battery Storage  - 
        
9910
        
            
    
        
        50 MW - planning - yorkshire and humber - Barlow Road, Barlow - Battery Storage - 
        
9970
        
            
    
        
        50 MW - planning - eastern - Sundon Sub Station Battery Storage Facility - 
        
9998
        
            
    
        
        50 MW - planning - scotland - Electricity Sub Station, Strichen - Battery Storage Facility - 
        
10039
        
            
    
        
        50 MW - planning - eastern - Ardleigh Road, Little Bromley - Battery Energy Storage - 
        
10302
        
            
    
        
        49 MW - planning - eastern - Rush Green Motors - Battery storage - 
        
8987
        
            
    
        
        49 MW - planning - scotland - Stainland Energy Storage Project - 
        
10225
        
            
    
        
        49 MW - planning - yorkshire and humber - Elland Storage Project - 
        
10236
        
            
    
        
        49 MW - planning - scotland - Fordtown Energy Storage - 
        
10239
        
            
    
        
        49 MW - planning - west midlands - Doverdale - Solar Farm & Battery Storage - 
        
10273
        
            
    
        
        45 MW - planning - north west - Cheshire Power Station - Battery Storage Facility - 
        
10295
        
            
    
        
        35 MW - planning - south west - Northington Lane - Battery Storage Facility - 
        
9992
        
            
    
        
        35 MW - cancelled - south west - Patch Elm Lane - Battery Storage  - 
        
10282
        
            
    
        
        30 MW - planning - south west - North Tawton Primary Substation - Battery Storage - 
        
9275
        
            
    
        
        30 MW - cancelled - wales - Pound Farm Lane - Battery Storage - 
        
9969
        
            
    
        
        25 MW - planning - north west - Caton Road, Lancaster -  Battery Storage Facility - 
        
10047
        
            
    
        
        25 MW - planning - scotland - A981 Fraserburgh - Battery Energy Storage - 
        
10222
        
            
    
        
        20 MW - planning - scotland - Stranoch 2 - 
        
7306
        
            
    
        
        20 MW - planning - scotland - Douglas West Wind Farm (extension) - 
        
9957
        
            
    
        
        20 MW - planning - east midlands - Mount Road, Castle Gresley - Battery Storage Facility - 
        
10012
        
            
    
        
        20 MW - cancelled - south west - The Transmitting Station, Williton - Battery Storage - 
        
10186
        
            
    
        
        19 MW - planning - scotland - Hillcrest Cottage, Shebster - Battery Energy Storage System - 
        
10226
        
            
    
        
        19 MW - planning - scotland - Speyslaw Farm - Battery Storage - 
        
10394
        
            
    
        
        15 MW - planning - scotland - Hollandmey Renewable Energy Development - 
        
10246
        
            
    
        
        13 MW - operation - south east - Bumpers Lane Solar Farm  - 
        
6913
        
            
    
        
        13 MW - cancelled - north east - Newcastle International Airport Phase 2 - Battery Storage - 
        
9756
        
            
    
        
        10 MW - planning - north west - Park Road Battery Storage - 
        
10076
        
            
    
        
        10 MW - cancelled - scotland - Lethen Wind Farm  Wind Turbines and Energy Storage - 
        
10237
        
            
    
    
    
    Disappeared projects (7): 
    
        
        100 MW - cancelled - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy - 
        
9475    
    
        
        62 MW - planning - wales - Wentlooge Renewable Energy Hub - 
        
7192    
    
        
        50 MW - cancelled - south west - Melksham Substation West Storage - 
        
6955    
    
        
        50 MW - cancelled - south east - Upton Lane, Nursling - Battery Storage Facility - 
        
9760    
    
        
        49 MW - cancelled - west midlands - Doverdale - Solar Farm & Battery Storage - 
        
8529    
    
        
        49 MW - planning - east midlands - Grendon Lakes - Battery Storage - 
        
9341    
    
        
        19 MW - cancelled - scotland - Roaring Hill Energy Storage Facility - 
        
7002    
    
    
    
    Updated projects (29):
    
    
    
        
            
            
                
                    
                        
                        80 MW - construction - yorkshire and humber - Trondheim Way Battery energy storage - 
                        
8455
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/05/2021 
                            -> 12/01/2022 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Address: Land At Trondheim Way Stallingborough North East Lincolnshire 
                            -> Land At Trondheim Way Stallingborough 
                        
                              Under Construction:  
                            -> 01/09/2021 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                        
                        50 MW - operation - south west - Stonehill Energy Storage - 
                        
7773
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 29/06/2020 
                            -> 01/11/2021 
                        
                              CHP Enabled:  
                            -> No 
                        
                              Development Status: Under Construction 
                            -> Operational 
                        
                              Development Status (short): Under Construction 
                            -> Operational 
                        
                              Operational:  
                            -> 09/10/2021 
                        
                              status: construction 
                            -> operation πΎ π πΈ
                        
                        
                    
                        
                        40 MW - planning - south east - Loudwater Battery Storage Site - 
                        
8142
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/09/2020 
                            -> 30/06/2021 
                        
                              CHP Enabled:  
                            -> No 
                        
                              Development Status: Under Construction 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Under Construction 
                            -> Awaiting Construction 
                        
                              Under Construction: 10/06/2021 
                            ->  
                        
                              status: construction 
                            -> planning 
                        
                        
                    
                        
                        32 MW - operation - south west - Severn Road - 
                        
7085
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/07/2020 
                            -> 10/01/2022 
                        
                              Installed Capacity (MWelec): 18.00 
                            -> 32.00 
                        
                              CHP Enabled:  
                            -> No 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Address: Land At, Severn Road, Hallen, Bristol, Avon 
                            -> Land At, Severn Road, Hallen, Bristol 
                        
                              Under Construction:  
                            -> 01/08/2021 
                        
                              status: planning 
                            -> construction ποΈ
                        
                              mw: 18 
                            -> 32 
                        
                        
                    
                        
                        20 MW - construction - south east - Plot 2B EurolinkV - 
                        
7383
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 31/01/2020 
                            -> 13/12/2021 
                        
                              CHP Enabled:  
                            -> No 
                        
                              Development Status: Planning Permission Granted 
                            -> Under Construction 
                        
                              Development Status (short): Awaiting Construction 
                            -> Under Construction 
                        
                              Address: Plot 2B Eurolink V, Sittingbourne, Land orth of Swale Way, Sittingbourne, Kent 
                            -> Plot 2B Eurolink V, Sittingbourne, Land orth of Swale Way, Sittingbourne 
                        
                              Under Construction:  
                            -> 01/10/2021 
                        
                              status: planning 
                            -> construction ποΈ
                        
                        
                    
                
 
         
     
    
    
    
    
    
    
        
            
            
                
                    
                        
                        100 MW - planning - scotland - Daer Wind Farm - 
                        
9127
                            
                            
                        
                              Planning Application Reference: P/21/1014  
                            ->  ECU00000740 
                        
                        
                    
                        
                        100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage - 
                        
9691
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 23/09/2021 
                            -> 25/10/2021 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 14/10/2021 
                        
                        
                    
                        
                        99 MW - operation - eastern - Dollymans Storage - 
                        
7088
                            
                            
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 05/11/2021 
                        
                        
                    
                        
                        50 MW - planning - scotland - Dersalloch Battery Storage Facility - 
                        
8927
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 28/04/2021 
                            -> 22/12/2021 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 29/11/2021 
                        
                        
                    
                        
                        49 MW - construction - eastern - Tollgate Farm Battery Storage  - 
                        
7335
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 27/01/2020 
                            -> 23/12/2021 
                        
                              Operator (or Applicant): RNA Energy 
                            -> RNA Energy / Harmony Energy Storage/ Tag Energy UK 
                        
                              CHP Enabled:  
                            -> No 
                        
                        
                    
                        
                        49 MW - operation - south east - Richborough Energy Park - 
                        
8195
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/02/2021 
                            -> 07/12/2021 
                        
                        
                    
                        
                        49 MW - planning - south west - Minety South 2 - Battery Storage Facility - 
                        
9063
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/05/2021 
                            -> 08/12/2021 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 08/11/2021 
                        
                        
                    
                        
                        40 MW - planning - eastern - Maldon Hall - 
                        
7095
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 24/07/2020 
                            -> 23/12/2021 
                        
                              Operator (or Applicant): Capbal 
                            -> Green Investment Group 
                        
                              CHP Enabled:  
                            -> No 
                        
                              Address: Land North West Of Maldon Hall, Spital Road, Maldon, Essex 
                            -> Land North West Of Maldon Hall, Spital Road, Maldon 
                        
                        
                    
                        
                        40 MW - operation - south east - Newlands Farm Battery Storage Facility Phase 2 - 
                        
8264
                            
                            
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 26/01/2021 
                        
                        
                    
                        
                        40 MW - planning - yorkshire and humber - Rusholme Grange  - 
                        
9121
                        
                            Megapack
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 07/06/2021 
                            -> 13/12/2021 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Address: Rusholme Grange, Rusholme Lane, Drax, Selby, North Yorkshire 
                            -> Rusholme Grange, Rusholme Lane, Drax, Selby 
                        
                              Planning Permission Granted: 19/12/2017 
                            -> 03/09/2021 
                        
                        
                    
                        
                        40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage - 
                        
9584
                            
                            
                        
                              Planning Authority: Rochdale borough Council 
                            -> Rochdale Borough Council 
                        
                        
                    
                        
                        38 MW - planning - north east - Maiden, Annfield Plain - Energy Storage - 
                        
9036
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 18/05/2021 
                            -> 13/12/2021 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 18/08/2021 
                        
                        
                    
                        
                        25 MW - planning - north west - Bristol Avenue - Battery Energy Storage Facility - 
                        
8809
                            
                            
                        
                              Address: 281 BRISTOL AVENUE, BLACKPOOL, FY2 0JF 
                            -> 281 BRISTOL AVENUE, BLACKPOOL,  
                        
                        
                    
                        
                        25 MW - planning - yorkshire and humber - Stainland Road, Salterhebble - Battery Storage Facility - 
                        
9397
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 06/08/2021 
                            -> 13/12/2021 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 28/09/2021 
                        
                        
                    
                        
                        20 MW - planning - west midlands - Perseverance Road - 
                        
7061
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 31/01/2020 
                            -> 29/11/2021 
                        
                              CHP Enabled:  
                            -> No 
                        
                        
                    
                        
                        20 MW - planning - yorkshire and humber - Kirkhaw Lane - 
                        
7149
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 20/04/2020 
                            -> 10/01/2022 
                        
                              CHP Enabled:  
                            -> No 
                        
                              Address: Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley, West Yorkshire 
                            -> Industrial Pallet And Transpor, Kirkhaw Lane, Knottingley 
                        
                        
                    
                        
                        20 MW - operation - north west - Lascar Works  - 
                        
7464
                            
                            
                        
                              Planning Application Reference: 62215 
                            -> 62,215 
                        
                        
                    
                        
                        20 MW - cancelled - south east - Brook Farm - 
                        
7498
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 30/06/2020 
                            -> 05/01/2022 
                        
                              CHP Enabled:  
                            -> No 
                        
                              Address: Os Parcel 6086 Adjacent, Ploughley Road, Railway Line, Arncott, Bicester, Oxfordshire 
                            -> Os Parcel 6086 Adjacent, Ploughley Road, Railway Line, Arncott, Bicester 
                        
                        
                    
                        
                        20 MW - construction - north west - Gipsy Lane - 
                        
7632
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/08/2021 
                            -> 12/01/2022 
                        
                              Address: Land Rear Of The Royal Toby Ho, Manchester Road, Rochdale, 
                            -> Land Rear Of The Royal Toby Ho, Manchester Road, Rochdale 
                        
                        
                    
                        
                        20 MW - planning - scotland - Arecleoch Wind Farm (extension) - 
                        
7882
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/06/2020 
                            -> 18/11/2021 
                        
                              CHP Enabled:  
                            -> No 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 16/11/2021 
                        
                        
                    
                        
                        20 MW - planning - eastern - South Fambridge Hall - Solar farm & Battery storage - 
                        
9274
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 05/07/2021 
                            -> 22/12/2021 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 15/12/2021 
                        
                        
                    
                        
                        20 MW - planning - eastern - The Brickmakers Arms Battery - 
                        
9668
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 21/09/2021 
                            -> 05/01/2022 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 22/12/2021 
                        
                        
                    
                        
                        19 MW - construction - scotland - Balsillie Avenue - Roaring Hill Energy Storage Facility - 
                        
9224
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 25/06/2021 
                            -> 18/11/2021 
                        
                              Operator (or Applicant): RES Limited 
                            -> Tag Energy UK 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 03/09/2021 
                        
                        
                    
                        
                        15 MW - planning - eastern - Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage - 
                        
9346
                            
                            
                        
                              Record Last Updated (dd/mm/yyyy): 22/07/2021 
                            -> 15/12/2021 
                        
                              Development Status: Planning Application Submitted 
                            -> Planning Permission Granted 
                        
                              Development Status (short): Application Submitted 
                            -> Awaiting Construction 
                        
                              Planning Permission Granted:  
                            -> 08/12/2021 
                        
                        
                    
                
 
         
     
     
    
    2021-09
    New projects (265): 
    
        
        150 MW - construction - south east - Cleve Hill Solar Project - 
        
7856
        
            
    
        
        349 MW - planning - west midlands - Dunton Hall - Battery Energy Storage System - 
        
9427
        
            
    
        
        200 MW - planning - yorkshire and humber - Drax Re-Power - 
        
7017
        
            
    
        
        200 MW - cancelled - south east - Bolney Substation - Battery Storage - 
        
8986
        
            
    
        
        200 MW - planning - north west - Heysham Energy Storage Project - 
        
9545
        
            
    
        
        150 MW - planning - eastern - Thurrock Flexible Generation Plant - 
        
7696
        
            
    
        
        100 MW - cancelled - eastern - Tilbury Energy Centre - 
        
7048
        
            
    
        
        100 MW - planning - scotland - Harestanes Windfarm - 
        
7395
        
            
    
        
        99 MW - planning - yorkshire and humber - Lakeside Energy Storage Facility - 
        
8268
        
            Megapack
        
            
    
        
        100 MW - planning - south east - Minchens Lane Battery Storage Facility - 
        
8434
        
            
    
        
        100 MW - planning - scotland - Kilgallioch - Battery energy storage - 
        
9007
        
            
    
        
        100 MW - planning - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy - 
        
9115
        
            
    
        
        100 MW - planning - scotland - Daer Wind Farm - 
        
9127
        
            
    
        
        100 MW - cancelled - yorkshire and humber - Kirkhaw Lane - Battery Storage Energy - 
        
9475
        
            
    
        
        100 MW - planning - yorkshire and humber - Third Energy UK Gas Limited - Battery Energy Storage - 
        
9691
        
            
    
        
        100 MW - planning - north west - Cholmondeley Road - Battery Storage - 
        
9763
        
            
    
        
        99 MW - operation - eastern - Dollymans Storage - 
        
7088
        
            
    
        
        99 MW - planning - yorkshire and humber - Skelton Grange Battery Storage Facility - 
        
8914
        
            
    
        
        99 MW - planning - north west - Bay Gateway - Battery Storage Facility - 
        
9199
        
            
    
        
        95 MW - planning - yorkshire and humber - Winterton Road - Battery Energy Storage - 
        
9608
        
            
    
        
        90 MW - planning - east midlands - Caldwell Road - Battery Storage - 
        
9507
        
            
    
        
        80 MW - operation - scotland - Aikengall II Community Wind Farm Battery - 
        
7015
        
            
    
        
        80 MW - construction - yorkshire and humber - Trondheim Way Battery energy storage - 
        
8455
        
            
    
        
        50 MW - operation - south east - Richborough Energy Park - Phase 2 - 
        
9626
        
            
    
        
        70 MW - planning - north west - Widow Hill, Balderstone Lane - Battery Energy Storage System - 
        
9340
        
            
    
        
        62 MW - planning - wales - Wentlooge Renewable Energy Hub - 
        
7192
        
            
    
        
        57 MW - planning - north west - Capenhurst Lane - 
        
8283
        
            
    
        
        57 MW - planning - north west - National Grids Rainhill Substation Battery storage facility - 
        
8439
        
            
    
        
        57 MW - construction - north west - Capenhurst Lane, Capenhurst - Battery storage - 
        
9377
        
            
    
        
        57 MW - cancelled - south east - Slough Road - Battery Storage - 
        
9774
        
            
    
        
        50 MW - cancelled - south west - Minety North - 
        
6952
        
            
    
        
        50 MW - operation - south west - Melksham Substation East Storage - 
        
6953
        
            
    
        
        50 MW - cancelled - south west - Melksham Substation West Storage - 
        
6955
        
            
    
        
        50 MW - cancelled - west midlands - Wolverhampton West Sub Station - 
        
6977
        
            
    
        
        50 MW - construction - northern ireland - Portadown Road - 
        
7047
        
            
    
        
        50 MW - construction - northern ireland - Dungannon Energy Storage System - 
        
7050
        
            
    
        
        50 MW - cancelled - north west - Penwortham Sub Station - 
        
7119
        
            
    
        
        50 MW - operation - scotland - Whitelee Wind Farm Battery Storage Extension - 
        
7174
        
            
    
        
        49 MW - operation - south west - Minety South - Battery Storage - 
        
7184
        
            
    
        
        49 MW - operation - north west - West Didsbury Battery Storage - 
        
7185
        
            
    
        
        50 MW - operation - south west - Stonehill Energy Storage - 
        
7773
        
            
    
        
        50 MW - planning - east midlands - Cottom Power Station - 
        
8278
        
            
    
        
        50 MW - planning - scotland - Dersalloch Battery Storage Facility - 
        
8927
        
            
    
        
        50 MW - cancelled - south east - Upton Lane, Nursling - Battery Storage Facility - 
        
9760
        
            
    
        
        49 MW - operation - eastern - Pelham - 
        
6898
        
            
    
        
        49 MW - operation - north west - Roosecote - 
        
6912
        
            
    
        
        49 MW - operation - east midlands - West Burton - 
        
6920
        
            
    
        
        49 MW - cancelled - north east - Norton - 
        
6923
        
            
    
        
        49 MW - cancelled - west midlands - Former Rugeley Power Station - 
        
6981
        
            
    
        
        79 MW - construction - south east - Stony Energy Storage Facility - 
        
7001
        
            
    
        
        49 MW - operation - yorkshire and humber - Pillswood Phase 1  - 
        
7005
        
            Megapack
        
            
    
        
        49 MW - cancelled - south west - Ravensroost Farm, Minety - Battery Energy Storage - 
        
7014
        
            
    
        
        49 MW - operation - yorkshire and humber - Nether Moor Field - 
        
7019
        
            
    
        
        49 MW - planning - eastern - Norwich Substation Storage Facility - 
        
7021
        
            
    
        
        49 MW - operation - south west - Mannington Battery Storage Plant - 
        
7024
        
            
    
        
        49 MW - cancelled - north west - Charleywood Road, Knowsley Industrial Park - 
        
7026
        
            
    
        
        49 MW - construction - east midlands - Enderby Storage, Redcomb Farm - 
        
7044
        
            
    
        
        49 MW - planning - north west - Middleton Clean Energy Plant - 
        
7029
        
            
    
        
        49 MW - cancelled - yorkshire and humber - Salt End Lane - 
        
7039
        
            
    
        
        49 MW - planning - south west - Ellbridge Lane - 
        
7051
        
            
    
        
        49 MW - planning - yorkshire and humber - Elland Storage Project - 
        
7053
        
            
    
        
        49 MW - planning - eastern - Chapel Farm - 
        
7058
        
            Megapack
        
            
    
        
        49 MW - planning - east midlands - Cottam Power Station - 
        
7066
        
            
    
        
        49 MW - cancelled - south west - Riverford Farm - 
        
7078
        
            
    
        
        49 MW - construction - south east - Sundridge Hill - 
        
7081
        
            
    
        
        49 MW - planning - yorkshire and humber - Land Adjacent to 4 Redcote Lane (Armley) - 
        
7111
        
            
    
        
        49 MW - cancelled - east midlands - Grendon Storage - 
        
7089
        
            
    
        
        49 MW - operation - yorkshire and humber - Creyke Beck - 
        
7122
        
            
    
        
        49 MW - cancelled - south west - Taunton Substation  - 
        
7153
        
            
    
        
        49 MW - planning - eastern - Braintree Road Substation - 
        
7161
        
            
    
        
        49 MW - construction - yorkshire and humber - Osbaldwick Substation - 
        
7172
        
            
    
        
        49 MW - cancelled - south west - Land North of Actrees Solar Farm - 
        
7230
        
            
    
        
        49 MW - planning - eastern - Burwell Main Sub-Station - 
        
7272
        
            
    
        
        49 MW - planning - eastern - Sundon Substation - 
        
7283
        
            
    
        
        49 MW - construction - south east - Kemsley Substation - 
        
7368
        
            
    
        
        49 MW - construction - eastern - Tollgate Farm Battery Storage  - 
        
7335
        
            
    
        
        49 MW - operation - yorkshire and humber - Pillswood Phase 2 - 
        
7360
        
            Megapack
        
            
    
        
        49 MW - cancelled - south west - Snarlton Farm - 
        
7380
        
            
    
        
        49 MW - planning - north west - Harker Grid Sub Station - 
        
7462
        
            
    
        
        57 MW - construction - eastern - Bramford Substation - 
        
7479
        
            
    
        
        49 MW - construction - south west - Salisbury Substation - 
        
7510
        
            
    
        
        49 MW - cancelled - north east - Lackenby - 
        
7518
        
            
    
        
        49 MW - construction - south east - Cowley electricity sub-station - 
        
7571
        
            
    
        
        49 MW - construction - yorkshire and humber - Bradford West Substation (Harrop Edge Farm) - 
        
7577
        
            
    
        
        49 MW - operation - scotland - Dunsinane Industrial Estate - 
        
7591
        
            
    
        
        49 MW - planning - eastern - Lapwing Fen II, Crown Farm - 
        
7606
        
            
    
        
        49 MW - planning - eastern - Model Farm - 
        
7609
        
            
    
        
        250 MW - construction - eastern - Lapwing Fen 2 - Battery Storage Plant - 
        
7614
        
            
    
        
        49 MW - operation - north west - Lister Drive - 
        
7740
        
            
    
        
        49 MW - planning - south east - Rye Common - 
        
7737
        
            Megapack
        
            
    
        
        49 MW - operation - north west - Liverpool Energy Management Facility - 
        
7772
        
            
    
        
        49 MW - planning - east midlands - Newton Wood Farm - 
        
7780
        
            
    
        
        49 MW - construction - south east - Titchfield Lane - 
        
7828
        
            
    
        
        49 MW - construction - west midlands - Coventry National Grid Substation - 
        
7885
        
            
    
        
        49 MW - operation - scotland - Dundee Technology Park - 
        
7946
        
            
    
        
        49 MW - planning - eastern - Reach Road - 
        
7906
        
            
    
        
        49 MW - operation - west midlands - Bustleholme Substation - 
        
7907
        
            
    
        
        10 MW - planning - south west - Minety Substation - 
        
7942
        
            
    
        
        49 MW - construction - north west - Unit 5 XL Business Park - 
        
7985
        
            
    
        
        49 MW - planning - london - Mill Hill National Grid Substation - 
        
8009
        
            
    
        
        49 MW - planning - south west - National Grid Minety Substation - 
        
8021
        
            
    
        
        49 MW - planning - northern ireland - Colinglen Road Battery - 
        
8033
        
            
    
        
        49 MW - planning - south west - National Grid Axminster Substation - 
        
8036
        
            
    
        
        49 MW - construction - east midlands - National Grid Enderby Substation - 
        
8037
        
            
    
        
        49 MW - planning - north west - Welkin Mill - 
        
8055
        
            
    
        
        49 MW - planning - scotland - Torrdhuin, Auchteraw Battery Storage Facility - 
        
8096
        
            
    
        
        30 MW - planning - scotland - Drumcross Battery Storage - 
        
8155
        
            
    
        
        49 MW - operation - south east - Richborough Energy Park - 
        
8195
        
            
    
        
        49 MW - planning - scotland - Platchaig House, Kilmorack - Battery Storage Facility - 
        
8248
        
            
    
        
        49 MW - planning - eastern - Brentwood nergy Storage System - 
        
8249
        
            
    
        
        49 MW - planning - eastern - Crouch Solar Farm - 
        
8358
        
            
    
        
        49 MW - planning - scotland - Old Gallows Road - Battery storage - 
        
8368
        
            
    
        
        49 MW - cancelled - west midlands - Doverdale - Solar Farm & Battery Storage - 
        
8529
        
            
    
        
        49 MW - planning - north west - Howick Hall Farm - Battery Storage Facility - 
        
8829
        
            
    
        
        49 MW - construction - south west - Mannington Battery Energy Storage System - 
        
8833
        
            
    
        
        49 MW - planning - scotland - Bolfornought Farm Battery Storage Facility - 
        
8912
        
            
    
        
        49 MW - construction - scotland - Whitehills Energy Storage Facility - 
        
8916
        
            
    
        
        49 MW - planning - eastern - Greens Farm - Battery energy storage - 
        
9012
        
            
    
        
        49 MW - planning - wales - Bronwylfa Road, Talwrn - Battery Storage Facility - 
        
9052
        
            
    
        
        49 MW - planning - south west - Minety South 2 - Battery Storage Facility - 
        
9063
        
            
    
        
        49 MW - planning - eastern - Sundon Substation  - 
        
9315
        
            
    
        
        49 MW - planning - east midlands - Grendon Lakes - Battery Storage - 
        
9341
        
            
    
        
        49 MW - planning - eastern - Admiralty Road - Battery Energy Storage Facility - 
        
9470
        
            
    
        
        49 MW - operation - scotland - Wishaw Battery Storage Facility - 
        
9522
        
            
    
        
        49 MW - construction - north west - Bredbury Substation - Battery Storage Facility - 
        
9653
        
            
    
        
        48 MW - planning - northern ireland - Classic Marble Showers Site - 
        
7208
        
            
    
        
        45 MW - planning - scotland - Pleasance Road - 
        
7217
        
            
    
        
        41 MW - operation - west midlands - Bloxwich Battery - 
        
8160
        
            
    
        
        40 MW - planning - east midlands - Breach Farm - Energy Barn - 
        
6914
        
            
    
        
        40 MW - cancelled - yorkshire and humber - Tofts Lane - 
        
6942
        
            
    
        
        40 MW - planning - eastern - Norwich Road Industrial Estate - 
        
6958
        
            
    
        
        40 MW - construction - south east - Land off Queenborough Road - 
        
7003
        
            
    
        
        40 MW - construction - scotland - Bilbo Solar Farm Energy Storage  - 
        
7020
        
            
    
        
        40 MW - planning - eastern - Maldon Hall - 
        
7095
        
            
    
        
        40 MW - planning - west midlands - Rubber and Allied Products - 
        
7096
        
            
    
        
        40 MW - operation - south east - Huggin's Hall - 
        
7129
        
            
    
        
        40 MW - cancelled - north west - Carnegie Road (Phase 2) - 
        
7403
        
            
    
        
        21 MW - operation - eastern - Clayhill Farm -  Battery Energy Storage - 
        
7570
        
            
    
        
        20 MW - construction - north west - Hawthorne Road - 
        
7800
        
            
    
        
        40 MW - planning - west midlands - Whitehouse Farm Energy Barn - 
        
7987
        
            
    
        
        40 MW - planning - south east - Loudwater Battery Storage Site - 
        
8142
        
            
    
        
        40 MW - operation - south east - Newlands Farm Battery Storage Facility Phase 2 - 
        
8264
        
            
    
        
        40 MW - planning - yorkshire and humber - Rusholme Grange  - 
        
9121
        
            Megapack
        
            
    
        
        40 MW - planning - south west - Forest Gate - Solar Farm & Battery Storage - 
        
9230
        
            
    
        
        40 MW - planning - south west - Leigh Delamere - Solar farm & Battery storage - 
        
9238
        
            
    
        
        40 MW - construction - north west - Astra Centre, Royal Barn Road - Energy Storage - 
        
9584
        
            
    
        
        40 MW - planning - south east - Tanners Lane -  Battery Energy Storage Facility (Phase One) - 
        
9708
        
            
    
        
        38 MW - planning - north east - Maiden, Annfield Plain - Energy Storage - 
        
9036
        
            
    
        
        37 MW - planning - scotland - STOR Field 9 - 
        
7018
        
            
    
        
        36 MW - planning - northern ireland - Lisnabreeny Road - 
        
7556
        
            
    
        
        35 MW - operation - north east - Port of Tyne - 
        
6976
        
            
    
        
        32 MW - planning - yorkshire and humber - Kirkhaw Lane Battery Storage - 
        
8430
        
            
    
        
        30 MW - planning - south west - Gloucestershire Science and Technology Park - 
        
7067
        
            
    
        
        30 MW - operation - south west - Fideoak Mills - 
        
7152
        
            
    
        
        30 MW - planning - south west - Catsbrain Farm - 
        
7988
        
            
    
        
        30 MW - planning - scotland - Roaring Hill (Resubmission) - 
        
7989
        
            
    
        
        30 MW - planning - scotland - Blackpark Energy Storage - 
        
8105
        
            
    
        
        30 MW - planning - scotland - Farburn Place - Energy Storage Facility - 
        
8385
        
            
    
        
        30 MW - planning - eastern - Weirs Drove, Burwell - Battery Storage Facility - 
        
9292
        
            
    
        
        29 MW - cancelled - north east - Land at Derwenthaugh Eco Park - 
        
7054
        
            
    
        
        29 MW - cancelled - scotland - Land SW of Shilton Cottage - 
        
7134
        
            
    
        
        29 MW - cancelled - scotland - Drumfad Wood - 
        
7165
        
            
    
        
        29 MW - planning - scotland - Fordtown Energy Storage  - 
        
7764
        
            
    
        
        29 MW - planning - scotland - Learielaw Farm - 
        
7970
        
            
    
        
        28 MW - construction - eastern - Lower Dunton Road Battery Storage Facility - 
        
8213
        
            
    
        
        27 MW - operation - yorkshire and humber - Boscar Grange Farm - 
        
7332
        
            
    
        
        26 MW - cancelled - east midlands - Manor Farm - 
        
7820
        
            
    
        
        25 MW - operation - north east - Tynemouth Energy Storage System (TESS) - 
        
6925
        
            
    
        
        25 MW - cancelled - scotland - Fraserburgh Development - 
        
7041
        
            
    
        
        25 MW - cancelled - scotland - Clauchrie Windfarm Battery - 
        
7804
        
            
    
        
        25 MW - planning - north west - Bristol Avenue - Battery Energy Storage Facility - 
        
8809
        
            
    
        
        25 MW - planning - yorkshire and humber - Stainland Road, Salterhebble - Battery Storage Facility - 
        
9397
        
            
    
        
        25 MW - planning - north west - Davies Road - Battery Storage - 
        
9563
        
            
    
        
        25 MW - planning - north west - Middlewich Road - Solar Photovoltaics & Battery Storage - 
        
9565
        
            
    
        
        24 MW - cancelled - east midlands - The Hollies - 
        
6946
        
            
    
        
        24 MW - cancelled - yorkshire and humber - Mauxhall Farm - 
        
7827
        
            
    
        
        23 MW - operation - east midlands - Asfordby Business Park (1) - 
        
6932
        
            
    
        
        22 MW - operation - wales - Pen y Cymoedd Energy Storage - 
        
6927
        
            
    
        
        22 MW - planning - south west - Barton Hill Industrial Park - Battery Energy Storage Facility - 
        
9046
        
            
    
        
        20 MW - operation - scotland - Broxburn  - 
        
6910
        
            
    
        
        20 MW - operation - west midlands - Land to the west of Clay Hill Pit / Larport Farm - 
        
6911
        
            
    
        
        20 MW - operation - west midlands - Noriker Power Staunch - 
        
6918
        
            
    
        
        20 MW - construction - east midlands - Chelveston Renewable Energy Park - 
        
6941
        
            
    
        
        20 MW - operation - eastern - Claredown Farm - 
        
6945
        
            
    
        
        20 MW - planning - wales - Traston Road - 
        
6929
        
            
    
        
        20 MW - cancelled - south west - Bristol Road - 
        
6930
        
            
    
        
        20 MW - operation - north east - Ray Battery Storage Facility - 
        
6943
        
            
    
        
        20 MW - cancelled - yorkshire and humber - Aven Industrial Estate - 
        
7007
        
            
    
        
        20 MW - cancelled - north west - Leighton Hall Farm - 
        
7032
        
            
    
        
        20 MW - planning - london - Riverside Energy Park - 
        
7036
        
            
    
        
        20 MW - cancelled - scotland - Land To The East Of Wholeflats Road (Grangemouth) - 
        
7043
        
            
    
        
        20 MW - planning - west midlands - Perseverance Road - 
        
7061
        
            
    
        
        20 MW - cancelled - north west - Kilshaw Street - 
        
7072
        
            
    
        
        20 MW - operation - north west - Land at Carnegie Road - 
        
7155
        
            
    
        
        20 MW - cancelled - north west - Beaufort Road - 
        
7128
        
            
    
        
        20 MW - operation - east midlands - Calow Green Farm - 
        
7140
        
            
    
        
        20 MW - planning - yorkshire and humber - Kirkhaw Lane - 
        
7149
        
            
    
        
        20 MW - planning - scotland - Blackpark Farm  - 
        
7226
        
            
    
        
        20 MW - planning - scotland - Troston Loch Wind Farm - 
        
7333
        
            
    
        
        20 MW - construction - south east - Plot 2B EurolinkV - 
        
7383
        
            
    
        
        20 MW - operation - north west - Lascar Works  - 
        
7464
        
            
    
        
        20 MW - planning - scotland - Douglas West Wind Farm (extension) - 
        
7460
        
            
    
        
        20 MW - cancelled - south east - Brook Farm - 
        
7498
        
            
    
        
        20 MW - planning - scotland - Hagshaw Hill - 
        
7572
        
            
    
        
        20 MW - cancelled - scotland - Ardoch Farm - 
        
7575
        
            
    
        
        20 MW - construction - north west - Gipsy Lane - 
        
7632
        
            
    
        
        20 MW - operation - wales - Energy Centre Royal Mint - 
        
7684
        
            
    
        
        20 MW - operation - south west - Feeder Road - 
        
7663
        
            
    
        
        20 MW - planning - south east - Basing Road - 
        
7746
        
            
    
        
        20 MW - planning - scotland - Arecleoch Wind Farm (extension) - 
        
7882
        
            
    
        
        20 MW - planning - west midlands - Perserverance Road  - 
        
7966
        
            
    
        
        20 MW - construction - south east - Mill Lane, Nursling - Battery Storage Facility - 
        
8099
        
            
    
        
        20 MW - planning - south east - Gerrards Cross Sewage Treatment Works - 
        
8271
        
            
    
        
        20 MW - planning - yorkshire and humber - Hull East Stor Generation Compound - Battery energy storage - 
        
9006
        
            
    
        
        20 MW - construction - north east - Standby Embedded Stor Power Plant - Battery storage - 
        
9010
        
            
    
        
        20 MW - planning - eastern - South Fambridge Hall - Solar farm & Battery storage - 
        
9274
        
            
    
        
        20 MW - cancelled - south west - Tiddlywink Barn Battery Storage Power Plant - 
        
9552
        
            
    
        
        20 MW - planning - eastern - The Brickmakers Arms Battery - 
        
9668
        
            
    
        
        19 MW - cancelled - scotland - Roaring Hill Energy Storage Facility - 
        
7002
        
            
    
        
        19 MW - planning - scotland - Land North of Thornton Road - 
        
7131
        
            
    
        
        19 MW - planning - scotland - North West Of Jameston Farm - 
        
7133
        
            
    
        
        19 MW - planning - scotland - Jamesfield Organic Centre, Phase 2 - 
        
7315
        
            
    
        
        19 MW - construction - scotland - Balsillie Avenue - Roaring Hill Energy Storage Facility - 
        
9224
        
            
    
        
        32 MW - operation - south west - Severn Road - 
        
7085
        
            
    
        
        18 MW - cancelled - east midlands - Callywhite Lane Commercial Estate - 
        
7087
        
            
    
        
        18 MW - construction - south east - Aurora Solar Farm - 
        
7385
        
            
    
        
        18 MW - cancelled - south west - Churchtown Solar Farm Battery Storage - 
        
7726
        
            
    
        
        18 MW - planning - south west - Whaddon Lane, Hilperton - 
        
9057
        
            
    
        
        16 MW - cancelled - wales - Maelor Gasworks - Solar Farm & Battery Storage - 
        
9343
        
            
    
        
        15 MW - operation - south west - Lockleaze Energy Storage - 
        
6961
        
            
    
        
        15 MW - construction - south west - Holes Bay - 
        
7688
        
            Megapack
        
            
    
        
        15 MW - planning - eastern - Three Bridges Solar Farm - 
        
8220
        
            
    
        
        15 MW - planning - eastern - Estuary Farm, Edward Benefer Way - Solar Farm & Battery Storage - 
        
9346
        
            
    
        
        14 MW - planning - south east - Guildford Road Battery Storage Facility - 
        
8269
        
            
    
        
        13 MW - cancelled - south west - Leechpool Farm, Norrington Battery Storage - 
        
7183
        
            
    
        
        12 MW - cancelled - west midlands - Mucklow Hill - 
        
7984
        
            
    
        
        12 MW - planning - yorkshire and humber - Stor Generation Plant - Battery Storage - 
        
8998
        
            
    
        
        10 MW - operation - northern ireland - AES Kilroot Station Battery Storage Array - 
        
6845
        
            
    
        
        10 MW - operation - yorkshire and humber - Blackburn Meadows  - 
        
6906
        
            
    
        
        10 MW - operation - east midlands - Hill Farm - Energy Barn - 
        
6915
        
            
    
        
        10 MW - operation - south east - Kings Barn Farm - Energy Barn - 
        
6916
        
            
    
        
        10 MW - operation - east midlands - Leverton Farm - Energy Barn - 
        
6917
        
            
    
        
        10 MW - operation - eastern - Nevendon - 
        
6926
        
            
    
        
        10 MW - cancelled - north west - Pikelaw Place - 
        
6944
        
            
    
        
        10 MW - construction - eastern - Slamseys Energy Storage - 
        
7000
        
            
    
        
        10 MW - cancelled - eastern - Rayleigh Transforming Station - 
        
6984
        
            
    
        
        10 MW - cancelled - south east - Litchlake Farm - 
        
7011
        
            
    
        
        10 MW - cancelled - east midlands - Manton Wood - 
        
7035
        
            
    
        
        10 MW - cancelled - scotland - Strichen South - 
        
7056
        
            
    
        
        10 MW - cancelled - eastern - Hadham Road - 
        
7068
        
            
    
        
        10 MW - planning - south east - Stockbridge Road - 
        
7097
        
            
    
        
        10 MW - cancelled - yorkshire and humber - South Kirkby Business Park - 
        
7109
        
            
    
        
        10 MW - construction - south east - Land Adj Harmer Warren Quarry - 
        
7143
        
            
    
        
        10 MW - operation - north west - Cleator - 
        
7177
        
            
    
        
        10 MW - planning - scotland - Greenburn Wind Park - 
        
7159
        
            
    
        
        10 MW - planning - south west - Old Green Farm, Alveston Battery Storage - 
        
7182
        
            
    
        
        10 MW - planning - south west - Trevol Business Park - 
        
7404
        
            
    
        
        10 MW - cancelled - scotland - Shindour Feddal Hill Wood Braco - 
        
7573
        
            
    
        
        10 MW - cancelled - scotland - Orchardbank Industrial Estate - 
        
7574
        
            
    
        
        10 MW - planning - scotland - East Ballochy - 
        
7675
        
            
    
        
        10 MW - cancelled - south west - Park Farm - 
        
7983
        
            
    
        
        10 MW - cancelled - north west - Britannia House - 
        
7986
        
            
    
        
        10 MW - construction - north west - Moston Vale - 
        
8085
        
            
    
        
        10 MW - construction - scotland - Dragonhall Farm, Padanaram - Battery Storage - 
        
9066
        
            
    
        
        10 MW - operation - south west - South Farm Solar Park - 
        
9361
        
            
    
    
    
    Updated projects (0):