Status
cancelled
Country / State / Closest City
πŸ‡ΊπŸ‡Έ usa / california /
Dates
First heard 2021-02
Construction start 2021-08
Operation start
Estimated start 2022-09
Month disappeared 2022-10
Construction time
Capacity in MWh
20
πŸ“ This is an estimate
Maximum Power in MW
10
Manufacturer
Type / Number of Packs / Cells
/ /
Customer / Owner / Developer
/ Broad Reach Power /
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:41.129475373876254+-121.2791257566415
Coordinates
41.129475373876254, -121.2791257566415
πŸ“ Coords are a guess. Only the state is known
Notes

Project website
Sources
Internal / External id
201 / 64320

U.S. EIA data

The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
Info from the 2022-09 report (Project first appeared in the 2021-02 report):

Plant Name / State
Sierra / CA
go live / power
2022-09 / 10MW
status / status verbose
construction / (V) Under construction, more than 50 percent complete
Plant id / generator id
64320 / SIER
Entity name / entity id
Broad Reach Power / 63883
Changes:
2022-08
date: 2022-08 -> 2022-09 delayed by 1 month
2022-06
date: 2022-05 -> 2022-08 delayed by 3 months
2022-05
status_verbose: (U) Under construction, less than or equal to 50 percent complete -> (V) Under construction, more than 50 percent complete
2022-04
date: 2022-03 -> 2022-05 delayed by 2 months
2021-12
date: 2021-12 -> 2022-03 delayed by 3 months
2021-11
date: 2021-10 -> 2021-12 delayed by 2 months
2021-08
status: planning -> construction πŸ—οΈ
status_verbose: (L) Regulatory approvals pending. Not under construction -> (U) Under construction, less than or equal to 50 percent complete



2022-10 This project disappeared in the 2022-10 report.
That's why the status was set to cancelled