Scatter Wash 2 πŸ“πŸ“ŠπŸ‘€

Status
operation
Country / State / Closest City
πŸ‡ΊπŸ‡Έ usa / arizona /
Dates
First heard 2024-05
Construction start 2024-09
Operation start 2025-04
Estimated start 2025-05
Construction time 7 months -> 48 MWh/m
Capacity in MWh
340
Maximum Power in MW
85
Manufacturer
tesla
Type / Number of Packs / Cells
megapack 2XL / /
Customer / Owner / Developer
Arizona Public Service (APS) / Scatter Wash Energy Storage, LLC /
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:33.685402+-112.125062
Coordinates
33.685402, -112.125062
πŸ“ Coords are a guess. Only the city or county is known
Notes

Project website
Sources
https://twitter.com/SawyerMerritt/status/1748500029197726146
https://www.energy-storage.news/strata-breaks-ground-on-1gwh-arizona-bess/
Internal / External id
1331 / 67455

U.S. EIA data

The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
Info from the 2025-07 report (Project first appeared in the 2024-05 report):

Plant Name / State
Scatter Wash 2 / AZ
go live / power
2025-04 / 85MW
status / status verbose
operation / operation
Plant id / generator id
67455 / SW2
Entity name / entity id
Scatter Wash Energy Storage, LLC / 67092
Changes:
2025-06
status: construction -> operation 🍾 πŸŽ‰ 🍸
status_verbose: (U) Under construction, less than or equal to 50 percent complete -> operation
date: 2025-05 -> 2025-04 accelerated by 1 month
2025-05
entity id: 64778 -> 67092
entity name: Strata Manager, LLC -> Scatter Wash Energy Storage, LLC
2024-09
status: planning -> construction πŸ—οΈ
status_verbose: (P) Planned for installation, but regulatory approvals not initiated -> (U) Under construction, less than or equal to 50 percent complete