Stanton Energy Reliability Center Hybrid πππ
Status
operation
Country / State / Closest City
πΊπΈ usa / california /
Dates
First heard |
2020-09 |
Construction start |
|
Operation start |
2020-08 |
Estimated start |
|
Construction time |
|
Capacity in MWh
40
π This is an estimate
Maximum Power in MW
20
Manufacturer
Type / Number of Packs / Cells
/ /
Customer / Owner / Developer
/ Wellhead Energy, LLC /
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:40.832677000000004+-121.300049
Coordinates
40.832677000000004, -121.300049
π Coords are a guess. Only the state is known
Notes
Project website
Sources
Internal / External id
195 / 60698
U.S. EIA data
The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
This project has 2
generator ids under the same plant id
Info from the
2021-02
report (Project first appeared in the
2020-09
report):
Plant Name / State
Stanton Energy Reliability Center Hybrid / CA
go live / power
2020-08 / 10MW
status / status verbose
operation / operation
Plant id / generator id
60698 / BESS1
Entity name / entity id
Wellhead Energy, LLC / 20323
Changes:
2020-10
status: planning -> operation πΎ π πΈ
status_verbose: (OT) Other -> operation
date: 2020-09 -> 2020-08 accelerated by
1 month
Info from the
2021-02
report (Project first appeared in the
2020-09
report):
Plant Name / State
Stanton Energy Reliability Center Hybrid / CA
go live / power
2020-08 / 10MW
status / status verbose
operation / operation
Plant id / generator id
60698 / BESS2
Entity name / entity id
Wellhead Energy, LLC / 20323
Changes:
2020-10
status: planning -> operation πΎ π πΈ
status_verbose: (OT) Other -> operation
date: 2020-09 -> 2020-08 accelerated by
1 month