CO Bar Solar and BESS πŸ“βš‘οΈπŸ“ŠπŸ“

Status
cancelled
Country / State / Closest City
πŸ‡ΊπŸ‡Έ usa / arizona /
Dates
First heard 2025-08
Construction start
Operation start
Estimated start 2027-12
Month disappeared 2025-09
Construction time
Capacity in MWh
1600
πŸ“ This is an estimate
Maximum Power in MW
800
Manufacturer
Type / Number of Packs / Cells
/ /
Customer / Owner / Developer
/ Clenera DevCo LLC /
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:36.188429+-109.885254
Coordinates
36.188429, -109.885254
πŸ“ Coords are a guess. Only the state is known
Notes

Project website
Sources
Internal / External id
1795 / 69056

U.S. EIA data

The government data source for this battery is the U.S. Energy Information Administration (EIA)
https://www.eia.gov/electricity/monthly/
This project has 2 generator ids under the same plant id
Info from the 2025-08 report (Project first appeared in the 2025-08 report):

Plant Name / State
CO Bar Solar and BESS / AZ
go live / power
2027-12 / 400MW
status / status verbose
planning / (P) Planned for installation, but regulatory approvals not initiated
Plant id / generator id
69056 / CBCBA
Entity name / entity id
Clenera DevCo LLC / 66571
Changes:


Info from the 2025-09 report (Project first appeared in the 2025-09 report):

Plant Name / State
CO Bar Solar and BESS / AZ
go live / power
2027-12 / 400MW
status / status verbose
planning / (P) Planned for installation, but regulatory approvals not initiated
Plant id / generator id
69056 / CBBA
Entity name / entity id
Clenera DevCo LLC / 66571
Changes:



2025-09 This project disappeared in the 2025-09 report.
That's why the status was set to cancelled