Tesla Megapack Tracker
Megapack tracker
Cars vs Stationary
Big battery tracker
Government data
πΊπΈ US EIA data (>10MW)
π¬π§ UK REPD data (>10MW)
π©πͺ DE MaStR data (>10MW)
π©πͺ DE MaStR data (< 30kWh small batteries)
New
Blog
Contact
Supernode Stage 1
π€
Status
construction
Country / State / Closest City
π¦πΊ australia / queensland / brisbane
Dates
First heard
Construction start
2024-04-11
Operation start
Estimated start
2025Q4
Construction time
Capacity in MWh
520
Maximum Power in MW
250
Manufacturer
tesla
Type / Number of Packs / Cells
megapack / /
Customer / Owner / Developer
Origin Energy / Quinbrook /
Use case
Link to google maps satellite view
http://maps.google.com/maps?z=19&t=k&q=loc:-27.318405+152.969631
Coordinates
-27.318405, 152.969631
β The site is known, coords are +/- 1 kilometer
Notes
todo: need to verify on quinbrook website or some official press release that tesla is really the manufacturer
Project website
https://supernode.com.au/project/metro-dc/
Sources
https://reneweconomy.com.au/construction-starts-on-sunshine-states-biggest-battery-after-landing-oftake-deal-with-origin-energy/
https://driveteslacanada.ca/news/tesla-megapack-set-to-triple-brisbane-based-supernode-battery-storage-project/
https://x.com/FredericLambert/status/1811399467070894094
https://www.pv-magazine-australia.com/2024/04/12/quinbrook-closes-first-stage-of-2-gwh-supernode-battery-project/
Internal / External id
1390 /